Double-layer fixture and palletizer

By designing a double-layer fixture, the function of clamping two-layer brick rows is achieved at one time using two clamping modules and driving mechanisms, the problem of low efficiency of existing palletizing fixtures is solved, the palletizing efficiency is improved and the requirements of forklift holes is met. .

CN115417169BActive Publication Date: 2024-11-01QINGDAO SACPACK INTELLIGENT EQUIP CO LTD
View PDF 16 Cites 0 Cited by

Patent Information

Application Number
CN202211007426.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2021-08-24
Filing Date
2022-08-22
Publication Date
2024-11-01
Estimated Expiration
2042-08-22

AI Technical Summary

Technical Problem

The existing palletizing fixtures are inefficient when handling bricks, and require single-layer handling and reciprocating movement, resulting in low palletizing efficiency.

Method used

Design a double-layer fixture, including two clamping modules and a drive mechanism, to achieve relative activity of clamping components by mounting a hanger and a sliding mounting frame, to clamp two layers of brick rows at a time, and adjust clamping when needed components to form a forklift hole.

Benefits of technology

The double-layer cargo is transported at one time through double-layer fixtures, which significantly saves brick trash handling time, improves the palletization efficiency, meets the reserve requirements of forklift holes, and improves the overall efficiency of the palletization system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115417169B_ABST
    Figure CN115417169B_ABST
Patent Text Reader

Abstract

The present invention provides a double-layer clamp and a palletizer. The double-layer clamp includes: a mounting hanger; a first clamping module includes a first driving component and a plurality of first clamping components, the first clamping component includes a first mounting frame and two first clamping components, the first clamping component is arranged on the first mounting frame, and the first driving component is used to drive the two first clamping components arranged relatively to move relative to each other; the second clamping module includes a second driving component and a second clamping component, the second clamping component includes a second mounting frame and two second clamping components, the second clamping component is arranged on the second mounting frame, and the second driving component is used to drive the two second clamping components arranged relatively to move relative to each other; wherein, the second mounting frame is arranged on the mounting hanger, a plurality of first mounting frames are arranged side by side, and at least one first mounting frame can slide relative to the mounting hanger along a first direction. The double-layer clamp is used to carry double-layer goods at a time to improve the carrying efficiency and thus improve the palletizing efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of mechanical technology, and in particular to a double-layer clamp and a palletizer. Background Art

[0002] At present, with the continuous development of the logistics industry, goods usually need to be packaged with strapping tape before transportation. Bulk goods (such as bricks) need to be stacked before packaging. In order to achieve automatic stacking, a stacking clamp is generally used to clamp the object layer for stacking. For example, China Announcement No. CN 210943935 U discloses a brick stacking clamp, which is used to clamp objects for stacking. However, in actual use, in order to meet the requirements of forklift operation, it is necessary to leave a forklift hole in the process of stacking bricks. For this purpose, an additional splitting mechanism is added. When it is necessary to reserve a hole position, the splitting mechanism is lowered to separate the brick rows through the splitting mechanism to form a forklift hole. However, since it is necessary to carry and stack bricks in a single layer, the clamp needs to move back and forth in the process of carrying the brick rows, which consumes a lot of time and leads to low stacking efficiency. How to design a technology to improve stacking efficiency is the technical problem to be solved by the present invention. Summary of the invention

[0003] The present invention provides a double-layer clamp and a palletizer, which can improve the carrying efficiency and thus improve the palletizing efficiency by transporting double-layer goods at a time through the double-layer clamp.

[0004] The present invention provides a double-layer clamp, comprising:

[0005] Install the hanger;

[0006] A first clamping module, the first clamping module comprises a first driving component and a plurality of first clamping components, the first clamping component comprises a first mounting frame and two first clamping components, the two first clamping components are arranged opposite to each other and form a first clamping area, the first clamping component is arranged on the first mounting frame, and the first driving component is used to drive the two first clamping components arranged opposite to each other to move relative to each other;

[0007] A second clamping module, the second clamping module comprises a second driving component and a second clamping assembly, the second clamping assembly comprises a second mounting frame and two second clamping components, the two second clamping components are arranged opposite to each other and form a second clamping area, the second clamping component is arranged on the second mounting frame, and the second driving component is used to drive the two second clamping components arranged opposite to each other to move relative to each other;

[0008] Wherein, the second mounting frame is arranged on the mounting hanger, a plurality of the first mounting frames are arranged side by side, at least one of the first mounting frames can slide along a first direction relative to the mounting hanger, and the first clamping assembly is located between two of the second clamping components.

[0009] Furthermore, the slidable first mounting frame is configured to slide relative to the mounting hanger when the distance between two adjacent first clamping assemblies needs to be adjusted.

[0010] Furthermore, the first clamping module also includes a first driving mechanism; the first driving mechanism includes a first frame and a first driving component, a plurality of the first mounting frames are arranged on the first frame, the first driving component is configured to drive at least two of the first mounting frames to slide, and the first frame is arranged on the mounting bracket.

[0011] Furthermore, the first driving component includes a hole pulling cylinder, which spans across the plurality of first mounting frames and is configured to drive the plurality of first mounting frames to slide on the first frame.

[0012] Furthermore, the hole pulling cylinder is connected between two first mounting frames arranged at intervals; for the plurality of first mounting frames spanned and covered by the hole pulling cylinder, a flexible connecting member is further provided between two adjacent first mounting frames.

[0013] Furthermore, a plurality of the first mounting frames are arranged within the span of the hole pulling cylinder, and for two adjacent first mounting frames, the cylinder body of the first spacing cylinder is set on one of the first mounting frames, and the piston rod of the first spacing cylinder extends toward the direction of the other mounting frame and is configured to abut against the other mounting frame after extending.

[0014] Furthermore, the first spacing cylinder installed on the first mounting frame outside the spanning range of the hole pulling cylinder is configured to drive two adjacent first mounting frames to move relatively closer to and farther away from each other.

[0015] Furthermore, the first driving mechanism also includes a reset cylinder, a cylinder body of the reset cylinder is arranged on the first frame, and a piston rod of the reset cylinder is arranged on one of the first mounting frames.

[0016] Furthermore, the second clamping module includes a second driving mechanism and a plurality of second clamping components, and the plurality of second clamping components are arranged side by side; the second driving mechanism is configured to drive at least one second mounting frame to slide relative to the mounting hanger along a second direction, and the second direction and the first direction are arranged alternately.

[0017] Furthermore, one of the second mounting frames is fixedly disposed on the second frame, and the remaining second mounting frames are slidably disposed on the second frame and are provided with the second spacing cylinder, which is connected between two of the second mounting frames and is configured to drive two adjacent second mounting frames to move relatively closer and farther away.

[0018] The present invention also provides a palletizing system, comprising a palletizing robot and the above-mentioned double-layer clamp, wherein the double-layer clamp is arranged on the palletizing robot.

[0019] The present invention also provides a palletizing method, which adopts the above-mentioned palletizing system for palletizing; the method comprises: a palletizing robot drives a double-layer clamp to move to a clamping station, first clamps an upper layer of bricks by a first clamping module and then clamps a lower layer of bricks by a second clamping module, then, the palletizing robot drives the double-layer clamp to move to the palletizing station, and finally, the double-layer clamp palletizes two layers of bricks.

[0020] Furthermore, the upper brick row is first clamped by the first clamping module and then the lower brick row is clamped by the second clamping module. Specifically, after the upper brick row is clamped by the first clamping module, the second clamping module and the first clamping module are rotated 90 degrees, and then the lower brick row is clamped by the second clamping module.

[0021] The present invention provides a double-layer clamp, which is installed on a hanger and has two clamping modules, each of which is equipped with a corresponding clamping component. In actual use, the two clamping modules can be distributed to clamp rows of bricks through their respective clamping components, so that the double-layer clamp can transport two layers of rows of bricks at a time, thereby effectively saving the time required for transporting the rows of bricks; at the same time, the first clamping module is equipped with a plurality of first clamping components arranged side by side, and the first clamping components can slide relatively, so that when it is necessary to clamp the brick layer with reserved forklift holes, the first clamping components are moved to form forklift holes between the rows of bricks to meet the requirements of the reserved forklift holes, and the double-layer clamp can transport double layers of goods at a time to improve the transportation efficiency and thus the stacking efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of a double-layer clamp embodiment 1 of the present invention;

[0023] Figure 2 for Figure 1 Exploded view of the double-layer fixture;

[0024] Figure 3 for Figure 1 Schematic diagram of the structure of the installation hanger;

[0025] Figure 4 for Figure 1 A schematic structural diagram of the second clamping module;

[0026] Figure 5 for Figure 1 A schematic structural diagram of the first clamping module;

[0027] Figure 6 This is one of the structural schematic diagrams of the second embodiment of the double-layer clamp of the present invention;

[0028] Figure 7 This is the second structural schematic diagram of the second embodiment of the double-layer clamp of the present invention;

[0029] Figure 8 for Figure 6 A schematic structural diagram of the first clamping module;

[0030] Fig. 9 for Figure 8 A schematic structural diagram of the first clamping assembly;

[0031] Fig.10 for Figure 6 A schematic structural diagram of the second clamping module;

[0032] Fig.11 for Fig.10 Schematic diagram of the structure of the second clamping component.

[0033] Reference numerals:

[0034] Install the hanger 1;

[0035] Connecting component 11, main gear 12, ring gear 13, motor 14;

[0036] The second clamping module 2;

[0037] A second mounting frame 21, a second driving component 22, a lifting component 23, a second clamping component 24, and a second driving mechanism 25;

[0038] The second slide rail 211, the guide sleeve 212, the second transmission plate 221, the second cylinder 222, the second connecting rod 223, the second sliding frame 224, the lifting cylinder 231, the second frame 251, and the second spacing cylinder 252;

[0039] The first clamping module 3;

[0040] A first mounting frame 31, a first driving component 32, a first clamping component 33, and a first driving mechanism 34;

[0041] The first slide rail 311, the guide rod 312, the auxiliary slide 313, the auxiliary mounting frame 314, the first transmission plate 321, the first cylinder 322, the first connecting rod 323, the first slide frame 324, the first frame 341, the first spacing cylinder 342, the hole pulling cylinder 343, the push-pull cylinder 344, the flexible connector 345, and the reset cylinder 346;

[0042] The upper brick row is 100 and the lower brick row is 200. DETAILED DESCRIPTION

[0043] The present invention is described in detail below with reference to the accompanying drawings.

[0044] Embodiment 1, as Figure 1-Figure 5 As shown, the present invention provides a double-layer fixture, comprising:

[0045] A first clamping module 3, the first clamping module 3 includes a first driving component 32 and a plurality of first clamping components, the first clamping component includes a first mounting frame 31 and two first clamping components 33, the two first clamping components 33 are arranged opposite to each other and form a first clamping area, the first clamping components 33 are arranged on the first mounting frame 31, and the first driving component 32 is used to drive the two first clamping components 33 arranged opposite to each other to move relative to each other;

[0046] A second clamping module 2, the second clamping module 2 comprises a second driving component 22 and a second clamping assembly, the second clamping assembly comprises a second mounting frame 21 and two second clamping components 24, the two second clamping components 24 are arranged opposite to each other and form a second clamping area, the second clamping components 24 are arranged on the second mounting frame 21, and the second driving component 22 is used to drive the two second clamping components 24 arranged opposite to each other to move relative to each other;

[0047] The second mounting frame 21 is disposed on the mounting hanger, a plurality of the first mounting frames are arranged side by side, at least one of the first mounting frames can slide relative to the mounting hanger, and the first clamping assembly is located between two of the second clamping components.

[0048] Specifically, the second clamping module 2 clamps the goods through the two second clamping parts 24, and the goods will be located in the second clamping area. Similarly, the first clamping module 3 clamps the goods through the two first clamping parts 33, and the goods will be located in the first clamping area. In actual use, the double-layer clamp will be set on a palletizing robot (such as a mechanical arm, a three-dimensional mobile platform) to achieve movement, and the palletizing of bricks is used as an example for explanation.

[0049] Taking brick stacking as an example, in the process of stacking bricks, the stacking robot drives the double-layer clamp to clamp the upper brick row 100 and the lower brick row 200 in turn through the first clamping module 3 and the second clamping module 2 at the clamping station, and then transports the two layers of bricks to the stacking station at one time, and then releases the bricks on the second clamping module 2 and the first clamping module 3 in turn to complete the stacking operation of two layers of bricks at one time, effectively saving the time required for the stacking robot to drive the double-layer clamp to move back and forth.

[0050] During the stacking process, when forklift holes need to be reserved, forklift holes can be formed at the positions of the non-top and non-bottom brick rows. To this end, the first clamping module uses some of the first clamping components to clamp the brick rows, while the remaining first clamping components are in an idle state. In this way, the multiple first clamping components for clamping the brick rows can be separated from each other, thereby separating the two adjacent brick rows at the corresponding positions to form a forklift hole between the two brick rows.

[0051] In order to facilitate the installation of the double-layer fixture, the double-layer fixture also includes a mounting hanger 1, and the mounting hanger 1 is provided with a connecting component 11 at the bottom; the second mounting frame 21 is provided on the connecting component 11, and the mounting hanger 1 is fixed on the palletizing robot. Since two clamping modules are configured on the mounting hanger 1 at the same time, the second clamping module 2 cooperates with the first clamping module 3 to achieve clamping of two layers of brick rows at one time at the clamping station. At the same time, when clamping the row of bricks at the clamping station, the pre-stacking operation of the two layers of brick rows can also be achieved, which is more conducive to improving the palletizing efficiency.

[0052] In addition, the specific entities of the second clamping member 24 and the first clamping member 33 can adopt a variety of structural forms, for example: the second clamping member 24 and the first clamping member 33 can adopt the structural form of a clamping plate, that is, the two second clamping members 24 are slidably arranged on the second mounting frame 21, and similarly, the two first clamping members 33 are slidably arranged on the first mounting frame 31. Alternatively, the second clamping member 24 and the first clamping member 33 can adopt the structural form of a clamping claw, that is, the two second clamping members 24 are rotatably arranged on the second mounting frame 21, and similarly, the two first clamping members 33 are rotatably arranged on the first mounting frame 31. Here, the specific entities of the second clamping member 24 and the first clamping member 33 are not limited or repeated.

[0053] The following description will be made by taking the example that the second clamping member 24 and the first clamping member 33 can adopt the structure of a clamping plate.

[0054] Furthermore, in order to ensure that the second clamping member 24 and the first clamping member 33 can slide relatively smoothly, there are multiple ways for the driving member to drive the clamping members to move relative to each other.

[0055] Method 1: Figure 4 and Figure 5 As shown, the relative movement of two relatively arranged clamping parts is achieved by a single driving part to synchronously drive the movement of each clamping part. According to design requirements, a single clamping part can be used to move, or two relatively clamping parts can be used to synchronously slide in different directions.

[0056] Specifically, the second mounting frame 21 is provided with a second slide rail 211, and the second clamping member 24 is slidably arranged on the second slide rail 211. Specifically, for the two second clamping members 24, they only need to be relatively close or far away to meet the requirement of clamping bricks. By configuring the second slide rail 211 on the second mounting frame 21, the second clamping member 24 can slide along the guide of the second slide rail 211 to ensure its smooth reciprocating movement. Among them, the second slide rail 211 and the first slide rail 311 can be arranged in an alternating manner up and down, or can be arranged side by side up and down.

[0057] As for the first clamping member 33, since the multiple first clamping components need to be able to slide relative to each other to meet the requirement of forming a forklift hole, in order to meet the requirement that the multiple first clamping members 33 share a first driving member 32 to drive simultaneously, and in order to facilitate the installation of the first mounting frame 31, an auxiliary mounting frame 314 is additionally configured, and a first slide rail 311 is provided on the auxiliary mounting frame 314, and two auxiliary slides 313 that are slidably arranged opposite to each other are provided on the first slide rail 311, and the multiple first clamping members 33 located on the same auxiliary slide 313 can slide relative to each other laterally to meet the requirement of forming a forklift hole. When the brick row is clamped by multiple first clamping components, the two first clamping members 33 that are arranged opposite to each other are located at the two ends of the corresponding brick row, and then the first driving member 32 drives the two auxiliary slides 313 to approach each other, so that the two first clamping members 33 that are arranged opposite to each other clamp the corresponding brick row. At the same time, an auxiliary slide rail (not marked) perpendicular to the first slide rail 311 is provided on the auxiliary slide frame 313. When it is necessary to separate the brick rows to form a forklift hole, the two first clamping parts 33 arranged opposite to each other slide along the auxiliary slide rail to separate the two adjacent brick rows to form a forklift hole.

[0058] Furthermore, in the case where two relatively arranged clamping parts slide synchronously in opposite directions, it is convenient to drive the clamping parts to slide.

[0059] For the second driving component 22, the second driving component 22 includes a second transmission plate 221, a second cylinder 222 and a second connecting rod 223. The middle part of the second transmission plate 221 is rotatably arranged on the second mounting frame 21. The second cylinder 222 is hinged between the end of the second transmission plate 221 and the corresponding end of the second mounting frame 21. The second connecting rod 223 is hinged between the end of the second transmission plate 221 and the corresponding second clamping component 24.

[0060] Specifically, for the second driving component 22, a second cylinder 222 is used as a power source. The second cylinder 222 is connected between the second mounting frame 21 and the second transmission plate 221. The second transmission plate 221 is driven to rotate by the extension and retraction of the second cylinder 222. The second transmission plate 221 will push and pull the second clamping component 24 to slide through the second connecting rod 223.

[0061] By disposing the second cylinders 222 on both sides of the second transmission plate 221 respectively, the two second cylinders 222 synchronously and cooperatively drive the second transmission plate 221 to rotate, so as to ensure that the second clamping members 24 at the two ends slide synchronously in opposite directions.

[0062] Preferably, the second cylinder 222 and the second connecting rod 223 on the same side of the second transmission plate 221 are arranged crosswise. Specifically, for the second cylinder 222, the second connecting rod 223 and the second clamping member 24 on the same side of the second transmission plate 221, in the process of pushing and pulling the second transmission plate 221 by the second cylinder 222, the force on the second transmission plate 221 is more balanced due to the crosswise arrangement of the second cylinder 222 and the second connecting rod 223, so as to ensure that the second transmission plate 221 can smoothly drive the second clamping member 24 to slide through the second connecting rod 223.

[0063] Similarly, for the first driving component 32, the first driving component 32 includes a first transmission plate 321, a first cylinder 322 and a first connecting rod 323. The middle part of the first transmission plate 321 is rotatably arranged on the auxiliary mounting frame 314. The first cylinder 322 is hinged between the end of the first transmission plate 321 and the corresponding end of the auxiliary mounting frame 314, and the first connecting rod 323 is hinged between the end of the first transmission plate 321 and the corresponding auxiliary slide 313. Preferably, the first cylinder 322 and the first connecting rod 323 located on the same side of the first transmission plate 321 are arranged crosswise. The manner in which the first driving component 32 drives the auxiliary slide 313 to slide back and forth can refer to the driving manner of the second driving component 22, which will not be described in detail here.

[0064] In the second method, each first clamping assembly is provided with an independent first driving component 32; similarly, the second clamping module 2 can also be provided with a plurality of second clamping assemblies, and each second clamping assembly is provided with an independent second driving component 22, and specific reference is made to the following second embodiment.

[0065] Furthermore, the first clamping module 3 can move up and down relative to the second clamping module 2 . The second clamping module 2 further includes a lifting component 23 . The lifting component 23 is vertically arranged on the second mounting frame 21 .

[0066] Specifically, when performing the clamping operation of the upper and lower layers of brick rows, in order to ensure that the second clamping module 2 and the first clamping module 3 do not interfere with each other and facilitate clamping, the lifting component 23 can be used to drive the first mounting frame 31 to rise and fall, so as to complete the clamping operation of the first clamping module 3. That is, when the first clamping module 3 clamps the row of objects, the lifting component 23 drives the first mounting frame 31 to descend, and after the first clamping module 3 clamps the row of objects, the lifting component 23 drives the first mounting frame 31 to rise, so that there is enough space at the bottom of the second clamping module 2 to clamp the row of objects.

[0067] In order to enable the first mounting frame 31 to smoothly drive the brick row to rise and fall, the lifting component 23 includes two second lifting cylinders 231. Lifting cylinders 231 are respectively arranged on both sides of the second mounting frame 21, and the piston rods of the second lifting cylinders are connected to the first mounting frame 31; guide rods 312 are also arranged at the four corners of the auxiliary mounting frame 314, and guide sleeves 212 cooperating with the guide rods 312 are arranged on the second mounting frame 21, and the guide rods 312 are inserted into the corresponding guide sleeves 212.

[0068] Specifically, the second lifting cylinders are respectively arranged on both sides of the second mounting frame 21, and the two second lifting cylinders are controlled to move synchronously to drive the first mounting frame 31 at the bottom to move up and down. During the up and down movement of the auxiliary mounting frame 314, the four corners of the auxiliary mounting frame 314 are respectively guided by the guide rod 312 and the guide sleeve 212, thereby ensuring that the first mounting frame 31 can be lifted and lowered smoothly after the first clamping component 33 clamps the brick row.

[0069] Furthermore, in order to realize the pre-stacking operation of two layers of brick rows in advance during the process of clamping the row of objects, the connecting component 11 is rotatably arranged at the bottom of the mounting hanger 1 through a slewing bearing, and the outer circumference of the connecting component 11 is provided with a ring gear 13, and the bottom of the mounting hanger is also provided with a rotatable main gear 12, and the mounting hanger is also provided with a motor 14 for driving the main gear to rotate, and the main gear is meshed with the ring gear.

[0070] Specifically, the motor 14 is connected to the main gear 12, and the motor 14 drives the main gear 12 to rotate, so as to drive the ring gear 13 to rotate through the main gear 12, and finally drive the second mounting frame 21 to rotate. During use, after the first clamping module 3 completes the clamping operation of the upper brick row, the second mounting frame 21 is driven by the motor 14 to rotate 90 degrees, and then the lower brick row is clamped by the second clamping module 2. In this way, in the process of clamping and carrying two layers of brick rows, the stacking operation of the upper and lower brick rows can be completed, which is more conducive to improving the stacking efficiency.

[0071] Embodiment 2: Figure 6-Figure 8 As shown, in order to meet the requirements of directly grabbing and merging the brick rows on the conveyor line, the first clamping module is equipped with a plurality of first clamping components that can slide against each other, so that when the first clamping module grabs the brick rows, it can merge them according to the distance between adjacent brick rows.

[0072] As for the second clamping module, it is also configured with a plurality of second clamping components, and a plurality of second mounting frames 21 can slide relative to the mounting hanger 1 .

[0073] Specifically, for the first clamping module, in order to facilitate the control of the independent driving of each first clamping assembly to grab the brick row, an independent first driving component 32 is configured on the first mounting frame 31, and the first driving component 32 drives the two first clamping components 33 on the corresponding first mounting frame 31 to move relatively. In order to meet the requirement that the first mounting frame can slide relative to the mounting hanger 1, the first clamping module 3 is also provided with a first frame 341 to install multiple first mounting frames, and the first frame 341 is arranged below the mounting hanger 1. Multiple first mounting frames are arranged side by side and at least one first mounting frame can slide on the first frame 341.

[0074] Similarly, the second clamping module 2 is also provided with a second frame 251 to install multiple second mounting frames 21. The second frame 251 is arranged below the mounting hanger 1. The multiple second mounting frames 21 are arranged side by side and at least one second mounting frame 21 can slide on the second frame 251.

[0075] In actual use, when the first clamping module grabs multiple rows of bricks, two oppositely arranged first clamping components 33 are arranged at the two ends of the brick rows at corresponding positions. After the multiple first clamping components grab the multiple rows of bricks, the slidable first mounting frame 31 slides to bring the brick rows together. The process of grabbing multiple rows of bricks by the second clamping module is similar to that of the first clamping module, and no limitation is made here.

[0076] In actual use, the number of the first slidable mounting brackets is set according to the number of rows of bricks and the forklift holes, and is not limited here. Similarly, the number of the second slidable mounting brackets 21 is also based on the requirement that the brick rows can be accurately grasped and reliably closed, and is not limited here either.

[0077] Furthermore, the slidable first mounting frame is configured to slide relative to the mounting hanger when the distance between two adjacent first clamping assemblies needs to be adjusted. The first mounting frame is configured to be movable to a hole pulling position and an object picking position. Specifically, during use of the first mounting frame, when it is necessary to pick up bricks, the first mounting frame slides on the first frame 341 so that the distance between two adjacent first clamping assemblies meets the requirement of grabbing multiple rows of bricks. When it is necessary to pull a hole, the two first clamping assemblies corresponding to the rows of bricks forming both sides of the forklift hole are further moved away from each other so that the distance between the two first clamping assemblies meets the requirement of pulling a hole.

[0078] In some embodiments, the first mounting bracket is further configured to be movable to a merged position.

[0079] Specifically, when the first mounting frame is in use and the grabbed rows of bricks need to be merged, the first mounting frame slides on the first frame 341 to bring two adjacent first clamping assemblies closer to each other, thereby finally merging and bringing multiple rows of bricks closer together.

[0080] As for the second clamping module 2, when grabbing the brick row, the slidable second mounting frame 21 can also be configured to move to the merging position or to the picking position. The specific operation can refer to the description of the brick row grabbing and merging in the first clamping module 3, which will not be repeated here.

[0081] In certain embodiments, in order to drive multiple first clamping assemblies to slide relative to each other, the first clamping module also includes a first driving mechanism 34; the first driving mechanism 34 includes a first frame 341 and a first driving module; multiple first mounting frames are arranged on the first frame, and the first driving module is configured to drive at least two of the first mounting frames to slide, and the first frame is arranged on the mounting bracket.

[0082] Specifically, in the process of grabbing the brick row and pulling holes in the brick row as needed, the first driving module drives the first slidable mounting frame to make the multiple first clamping components slide relative to each other.

[0083] The first driving module includes a hole pulling cylinder 343 spanning across the first mounting frames and configured to drive the first mounting frames to slide on the first frame 341;

[0084] In addition, the first driving module also includes a first spacing cylinder 342, which is arranged between two adjacent first mounting frames. The first spacing cylinder 342 is configured to drive the two adjacent first mounting frames to move relatively away from each other and slide to a picking position, and the first frame 341 is arranged on the mounting bracket.

[0085] Specifically, during use, the first driving mechanism 34 can drive the first slidable mounting frame to slide on the first frame 341. The first spacing cylinder 342 and the hole pulling cylinder 343 perform corresponding actions according to the requirements of grabbing the brick row and pulling the hole to form a forklift hole.

[0086] In the process of grabbing the rows of bricks, the first spacing cylinders 342 are all in an extended state, so that the two adjacent first mounting frames are relatively far away and moved to the picking position. In this way, the rows of bricks at the corresponding positions can be clamped by the two first clamping components 33 on the multiple first mounting frames. For example: when the rows of bricks are transported through the conveyor line, the adjacent rows of bricks are arranged and transported at intervals. When the first clamping module 3 takes bricks, since the first mounting frame moves to the picking position, the two first clamping components 33 on the multiple first mounting frames can grab multiple rows of bricks at the same time to improve the grabbing efficiency. In the process of picking, the hole pulling cylinder 343 is in a free state without ventilation, and the piston rod of the hole pulling cylinder 343 can be stretched and retracted under force.

[0087] When holes need to be pulled between two adjacent rows of bricks to form forklift holes, the hole pulling cylinder 343 is ventilated and retracted to drive the corresponding sliding of the first mounting frame spanned by the hole pulling cylinder 343, and finally the first mounting frame is moved to the hole pulling position.

[0088] In addition, the hole-pulling cylinder 343 is also configured to drive the plurality of first mounting frames to slide to a merged position on the first frame 341. Specifically, when it is not necessary to pull holes, after each first clamping member 33 clamps the brick row, the hole-pulling cylinder 343 retracts to make each first mounting frame approach each other, and finally merge and bring adjacent brick rows together.

[0089] by Figure 6 and Figure 7 The four pairs of first clamping components 33 shown in the figure clamping the brick row are taken as an example.

[0090] When clamping the brick row normally, Figure 6 As shown, the first distance cylinder 342 is in an extended state when ventilated, and the hole-pulling cylinder 343 is in a free state without ventilating. Under the driving action of the first distance cylinder 342, the first mounting frame slides on the first frame 341 to the object-taking position, and the four pairs of first clamping components 33 clamp four rows of bricks respectively. Then, the first distance cylinder 342 is in a free state when the air is cut off, and the hole-pulling cylinder 343 is ventilated and retracted, so that the four rows of bricks are combined and brought together to complete the brick-closing operation.

[0091] When forklift holes need to be reserved for clamping brick rows, Figure 7 As shown, the first distance cylinders 342 are in an extended state when ventilated, the hole-pulling cylinders 343 are in a free state without ventilating, and only three pairs of first clamping components 33 are used to clamp the brick rows, while the remaining pair of first clamping components 33 is not operated. In this way, three rows of bricks can be clamped by the first clamping module. Then, the first distance cylinders 342 are in a free state when the air is cut off, and the hole-pulling cylinders 343 are in an extended state when the air is ventilated, so that two forklift holes are formed between the three rows of bricks.

[0092] There is no restriction on the number of brick rows that can be clamped by the clamping module.

[0093] Furthermore, a plurality of the first mounting frames are arranged within the span of the hole pulling cylinder 343, and for two adjacent first mounting frames, the cylinder body of the first spacing cylinder 342 is set on one of the first mounting frames, and the piston rod of the first spacing cylinder 342 extends toward the direction of the other mounting frame and is configured to abut against the other mounting frame after extending.

[0094] Specifically, the first spacing cylinder 342 disposed between the plurality of first mounting frames spanned by the hole-pulling cylinder 343 is only used to drive two adjacent first mounting frames away from each other so that the corresponding first mounting frames move to the object-taking position. When the brick rows need to be merged, the hole-pulling cylinder 343 is retracted to drive the plurality of first mounting frames spanned by the hole-pulling cylinder 343 to move closer to each other.

[0095] Furthermore, the hole pulling cylinder 343 is connected between two first mounting frames arranged at intervals; for the multiple first mounting frames spanned and covered by the hole pulling cylinder 343, a flexible connecting member 345 is further provided between two adjacent first mounting frames.

[0096] Specifically, when the hole pulling process is to be performed on the multiple first mounting frames spanned and covered by the hole pulling cylinder 343, the hole pulling cylinder 343 is stretched to drive each of the first mounting frames to move away from each other. After the hole pulling cylinder 343 is stretched, the distance between the two first mounting frames directly connected to the hole pulling cylinder 343 can be determined, and the first mounting frame in the middle is pulled and moved by the flexible connector 345. Finally, after the hole pulling cylinder 343 is fully stretched, the multiple first mounting frames spanned and covered by the hole pulling cylinder 343 are all moved to the hole pulling position. The flexible connector 345 can be a flexible belt, a chain, a connecting rope, etc., which will not be limited or elaborated here.

[0097] By configuring the flexible connector 345 as a traction component between the first mounting frames during the hole pulling process, relying on its deformable characteristics, when the brick rows are retracted and merged through the hole pulling cylinder 343, the flexible connector 345 will not prevent the two adjacent first mounting frames from approaching each other.

[0098] Furthermore, for the first mounting frame that does not participate in the hole pulling process, in order to ensure that the first mounting frame arranged outside the span range of the hole pulling cylinder 343 can slide as needed during the normal brick taking process and the process of merging brick rows, the first spacing cylinder 342 installed on the first mounting frame arranged outside the span range of the hole pulling cylinder 343 is configured to drive two adjacent first mounting frames to move relatively closer and farther away.

[0099] Specifically, in the normal process of clamping the brick row, the distance between the multiple first mounting racks spanned by the hole pulling cylinder 343 is stretched after the first spacing cylinder 342 is ventilated so that the first mounting rack moves to the corresponding picking position.

[0100] The first spacing cylinder 342 between the multiple first mounting frames spanned and covered by the hole-pulling cylinder 343 is only used to drive the two first mounting frames to move relatively away from each other to reach the picking position, while the hole-pulling cylinder 343 is used to retract when merging brick rows.

[0101] The first spacing cylinder arranged on the first mounting frame outside the spanning range of the hole pulling cylinder 343 is designed as a push-pull cylinder 344, which can drive two adjacent first mounting frames to move relatively away from each other to the picking position, and can also drive two adjacent first mounting frames to move relatively close to each other to the merging position.

[0102] In a preferred embodiment, the first driving mechanism 34 further includes a reset cylinder 346 , a cylinder body of the reset cylinder 346 is disposed on the first frame 341 , and a piston rod of the reset cylinder 346 is disposed on one of the first mounting frames.

[0103] Specifically, during use, the multiple first clamping components in the first clamping module need to be switched between the normal brick picking and hole picking positions according to the use requirements. When picking bricks normally, the reset cylinder 346 extends and moves the outermost first clamping components to ensure that all the first clamping components participate in the grabbing work and accurately place the brick row. When it is necessary to grab the brick row that forms the forklift hole, one of the first clamping components does not participate in the grabbing operation. At this time, the reset cylinder 346 retracts so that the multiple first clamping components involved in the work can be placed in the center of the brick row that forms the forklift hole, thereby improving the quality of brick stacking.

[0104] In another embodiment, for the second clamping module, in order to meet the requirements of taking bricks and merging brick rows, the second clamping module includes a second driving mechanism 25 and a plurality of second clamping components, and the plurality of second clamping components are arranged side by side; the second driving mechanism 25 is configured to drive at least one second mounting frame 21 to slide relative to the mounting hanger along a second direction, and the first driving mechanism 34 is configured to drive at least one first mounting frame to slide relative to the mounting hanger along a first direction, and the second direction and the first direction are arranged alternately.

[0105] Specifically, the second clamping module is equipped with a plurality of the second clamping components. In the process of picking up the brick rows, in order to meet the requirement of simultaneously clamping multiple rows of brick rows on the conveyor line at one time, the second driving mechanism 25 can be used to drive the plurality of the second clamping components to separate from each other, so as to meet the requirement of clamping the brick rows arranged at intervals on the conveyor line. After simultaneously grabbing multiple rows of brick rows, the second driving mechanism 25 can be used to drive the plurality of the second clamping components to approach each other, so as to meet the requirement of multiple rows of brick rows to approach each other.

[0106] The second driving mechanism 25 includes a second frame 251 and a second driving module, a plurality of second mounting frames 21 are arranged on the second frame, the second driving module is configured to drive the second mounting frames 21 to slide relatively, and the second frame is arranged on the mounting bracket.

[0107] Specifically, the second driving module is used to drive the slidable second mounting frame 21 to slide on the second frame 251. The second driving module may include at least one second spacing cylinder 252, wherein one second mounting frame 21 is fixedly arranged on the second frame 251, and the remaining second mounting frames 21 are slidably arranged on the second frame 251 and are provided with a second spacing cylinder 252, and the second spacing cylinder 252 is connected between the two second mounting frames 21 and is configured to drive the two second mounting frames 21 to move relatively close to and away from each other.

[0108] During the brick picking process, the second spacing cylinder 252 extends to drive the corresponding second clamping assembly to slide on the second frame 251, thereby realizing the separation of the two second clamping assemblies from each other to meet the needs of grabbing the brick rows on the conveyor line. After grabbing the brick rows, the second spacing cylinder 252 retracts to make the adjacent brick rows close together, and then the whole layer of bricks is laid down to complete the stacking. The specific control method for the second clamping assemblies to move closer or further away from each other can refer to the cylinder action method of the first clamping assembly when switching between the picking position and the merging position, which will not be limited or elaborated here.

[0109] The present invention also provides a palletizing system, comprising a palletizing robot and the above-mentioned double-layer clamp, wherein the double-layer clamp is arranged on the palletizing robot.

[0110] Specifically, for the palletizing robot, any palletizing mobile device with any structure in conventional technology can be used, which is not limited or elaborated herein.

[0111] The present invention also provides a palletizing method, which adopts the above-mentioned palletizing system for palletizing; the method comprises: a palletizing robot drives a double-layer clamp to move to a clamping station, first clamps an upper layer of bricks by a first clamping module and then clamps a lower layer of bricks by a second clamping module, then, the palletizing robot drives the double-layer clamp to move to the palletizing station, and finally, the double-layer clamp palletizes two layers of bricks.

[0112] Specifically, in order to improve the efficiency of palletizing, improve work efficiency, and save palletizing time, replacing the conventional single-layer clamp of the original palletizer with a double-layer clamp can improve the efficiency of palletizing (estimated to increase by 30%-35%) and save time. When the conveying device under the palletizing system sends the single-layer brick row to the clamping station, the double-layer clamp is lowered into place, and the first clamping module in the clamp clamps the single-layer brick and then retracts and the entire clamp is slightly lifted. After the conveying device sends the single-layer brick to the clamping station again, the entire clamp is slightly lowered into place, and the second clamping module clamps the first layer of single-layer bricks. The double-layer clamp is lifted and moved horizontally to the palletizing station with two layers of bricks. When it is lowered into place, the lower brick row is put down first, and then the upper brick row is put down, thereby realizing two layers of horizontal movement and lifting at one time, saving the time of horizontal movement and lifting.

[0113] Furthermore, the upper brick row is first clamped by the first clamping module and then the lower brick row is clamped by the second clamping module. Specifically, after the upper brick row is clamped by the first clamping module, the second clamping module and the first clamping module are rotated 90 degrees, and then the lower brick row is clamped by the second clamping module.

[0114] Specifically, during the clamping operation, after the upper brick row is clamped by the first clamping module, the second clamping module rotates 90 degrees and then clamps the lower brick row, thereby completing the pre-stacking operation.

[0115] A double-layer clamp and palletizer provided by the present invention are configured with two clamping components on an installation hanger, wherein a first clamping module can move up and down relative to a second clamping module. In actual use, the clamping operation of the upper row of bricks can be completed by lifting the first clamping module, and then the clamping operation of the lower row of bricks is performed by the second clamping module. In this way, during the transportation process, two rows of bricks can be transported at a time, thereby effectively saving the time required for transporting the rows of bricks. The double-layer clamp can be used to transport double layers of goods at a time to improve the transportation efficiency and thus the palletizing efficiency.

Claims

1. A double-layer fixture, characterized in that: include: Install the hanger; A first clamping module, the first clamping module comprises a first driving component, a first driving mechanism and a plurality of first clamping components, the first clamping component comprises a first mounting frame and two first clamping components, the first clamping component is arranged on the first mounting frame, and the first driving component is used to drive the two first clamping components arranged relatively to move relative to each other; A second clamping module, the second clamping module comprises a second driving component, a second driving mechanism and a second clamping assembly, the second clamping assembly comprises a second mounting frame and two second clamping components, the second clamping component is arranged on the second mounting frame, and the second driving component is used to drive the two second clamping components arranged relatively to move relative to each other; Wherein, the second mounting frame is arranged on the mounting hanger, a plurality of the first mounting frames are arranged side by side, the first driving mechanism is configured to drive at least one of the first mounting frames to slide relative to the mounting hanger along a first direction, the second driving mechanism is configured to drive at least one of the second mounting frames to slide relative to the mounting hanger along a second direction, the second direction and the first direction are arranged alternately, and the first clamping assembly is located between two of the second clamping components; In addition, the second clamping module is configured to rotate 90 degrees with the first clamping module after the first clamping module clamps the upper row of bricks to complete the pre-stacking operation.

2. The double-layer clamp according to claim 1, characterized in that: The slidable first mounting bracket is configured to slide relative to the mounting bracket when the distance between two adjacent first clamping assemblies needs to be adjusted.

3. The double-layer clamp according to claim 2, characterized in that: The first driving mechanism includes a first frame and a first driving module. A plurality of the first mounting frames are arranged on the first frame. The first driving module is configured to drive at least two of the first mounting frames to slide. The first frame is arranged on the mounting hanger.

4. The double-layer clamp according to claim 3, characterized in that: The first driving module includes a hole pulling cylinder, which spans across the first mounting frames and is configured to drive the first mounting frames to slide on the first frame.

5. The double-layer clamp according to claim 4, characterized in that: The hole pulling cylinder is connected between two first mounting frames arranged at intervals; for the plurality of first mounting frames spanned and covered by the hole pulling cylinder, a flexible connecting member is further provided between two adjacent first mounting frames.

6. The double-layer clamp according to claim 3, characterized in that: The first driving module further includes a first distance cylinder, which is disposed between two adjacent first mounting frames, and the first distance cylinder is configured to drive the two adjacent first mounting frames to slide relative to each other.

7. The double-layer clamp according to claim 3, characterized in that: The first driving mechanism further comprises a reset cylinder, a cylinder body of the reset cylinder is arranged on the first frame, and a piston rod of the reset cylinder is arranged on one of the first mounting frames.

8. The double-layer clamp according to any one of claims 1 to 7, characterized in that: The second clamping module includes a plurality of the second clamping components, and the plurality of the second clamping components are arranged side by side.

9. The double-layer clamp according to claim 8, characterized in that: The second driving mechanism includes a second frame and a second driving module. A plurality of second mounting frames are arranged on the second frame. The second driving module is configured to drive the second mounting frames to slide relatively. The second frame is arranged on the mounting hanger.

10. A palletizer, comprising a palletizing robot, characterized in that: It also includes a double-layer clamp as described in any one of claims 1 to 9, and the double-layer clamp is arranged on the palletizing robot.

Citation Information

Patent Citations

  • Green brick stacking clamp

    CN210943935U

  • Sintered brick layered composite brick unloading method and device thereof

    CN103434851A

  • Stacker crane clamp reserved with forklift hole

    CN108687787A

  • Stacking device for bricks

    CN111217156A

  • Calculon anchor clamps dolly and use brick hacking machine of this calculon anchor clamps dolly

    CN205526594U