CFG pile construction monitoring system
Through the CFG pile construction monitoring system, the construction parameters are collected and displayed in real time, and the problem of low operating efficiency of long auger drilling rigs and concrete pump trucks is solved, and the drilling and infusion are completed independently is achieved, which improves construction efficiency and management capabilities.
Patent Information
- Application Number
- CN202211232683.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-10
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-10-10
AI Technical Summary
During the CFG pile construction process, the operating efficiency of the long auger and the concrete pump truck is low, and the recorder and the operator need to cooperate with each other, resulting in a decrease in work efficiency.
A CFG pile construction monitoring system was designed, including vehicle terminals, wireless communication modules and remote monitoring platform, which was used to collect and display construction parameters in real time, such as pile formation position, depth, pipe extraction rate, force-holding layer current and concrete pouring paradigm The operator can independently complete drilling and infusion, reducing the need for manual cooperation.
The work efficiency of CFG pile construction has been improved, and through real-time monitoring and data processing, operation errors have been reduced, and the management and coordination capabilities of the construction site have been improved.
Smart Images

Figure CN115426549B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of CFG pile construction, and in particular to a CFG pile construction monitoring system. Background Art
[0002] Since long spiral machine drilling and pouring has the advantages of high pile efficiency, good pile quality, wide application range and no pollution, CFG piles are generally poured into piles using the process of long spiral machine drilling core tube pump mixed material during construction.
[0003] During the piling process using a long spiral drill and the pouring process using a pump truck, a recorder is required to record various parameters during the construction process, including pile position, pile length, bearing layer current, verticality, pipe pulling rate, pile body mixture filling, etc. The recorder cooperates with the operator of the long spiral drill through the recorded parameters to complete the drilling, which greatly improves work efficiency. Summary of the invention
[0004] In order to improve the work efficiency during CFG pile construction, the present application provides a CFG pile construction monitoring system.
[0005] The present application provides a CFG pile construction monitoring system, which adopts the following technical solutions:
[0006] A CFG pile construction monitoring system, comprising: a vehicle-mounted terminal, a first wireless communication module, a second wireless communication module and a remote monitoring platform, wherein the vehicle-mounted terminal comprises a long spiral drilling machine vehicle-mounted terminal and a concrete pump truck vehicle-mounted terminal;
[0007] The long spiral drilling rig vehicle-mounted terminal is used to collect the first construction parameters during the long spiral drilling rig drilling process, wherein the first construction parameters include the pile position, pile depth, pipe pulling rate, bearing layer current, mast verticality and construction site wind speed;
[0008] The on-board terminal of the concrete pump truck is used to collect the second construction parameter during the construction process of the concrete pump truck, wherein the second construction parameter includes the concrete pouring volume and filling coefficient of a single CFG pile;
[0009] The remote monitoring platform is used to obtain the first construction parameter and the second construction parameter, and store and process the first construction parameter and the second construction parameter;
[0010] The first wireless communication module is used to realize the communication between the vehicle-mounted terminal of the long spiral drilling machine and the vehicle-mounted terminal of the concrete pump truck;
[0011] The second wireless communication module is used to realize the communication between the long spiral drilling rig vehicle terminal and the remote monitoring platform;
[0012] The drilling rig vehicle terminal is also used to display the first construction parameter and the second construction parameter in real time, so that the operator of the long spiral drilling rig can view the first construction parameter and the second construction parameter in real time.
[0013] By adopting the above technical solution, through the vehicle-mounted terminal, the first wireless communication module, the second wireless communication module and the remote monitoring platform, it is convenient for the operator of the long spiral drill to view the first construction parameter and the second construction parameter in real time, and independently complete the drilling by the first construction parameter and the second construction parameter. Compared with the drilling method in which the recorder cooperates with the operator of the long spiral drill through the recorded parameters, it is more convenient and quicker.
[0014] Optionally, the long spiral drilling rig vehicle terminal includes a wind speed detection module, a positioning module, an inclination detection module, a power module, a current detection module, a CFG pile information collection module, a display module, a first control module and an alarm module;
[0015] The wind speed detection module is used to collect wind speed information at the CFG pile construction site;
[0016] The positioning module is used to collect the position information of the CFG pile;
[0017] The inclination detection module is used to collect verticality information of the drill rod of the long spiral drilling rig;
[0018] The power module is used to provide power to the motor of the drill rod of the long spiral drilling machine;
[0019] The current detection module is used to collect the current information of the drill rod during the drilling process of the long spiral drill;
[0020] The CFG pile information collection module is used to collect the depth information, pipe sinking speed information and pipe pulling speed information of the CFG pile;
[0021] The display module is used to display the first construction parameter and the second construction parameter in real time;
[0022] The first control module is used to obtain the first construction parameter and the second construction parameter, and control the display module to display the first construction parameter and the second construction parameter;
[0023] The alarm module is used to issue an alarm message when the first construction parameter exceeds a threshold.
[0024] Optionally, the concrete pump truck onboard terminal includes a pressure detection module, a displacement detection module and a second control module;
[0025] The pressure detection module is used to collect pressure information on the oil circuit of the concrete pump truck;
[0026] The displacement detection module is used to collect the displacement of the concrete cylinder piston on the pump truck;
[0027] The second control module is used to obtain and send the pressure information and the displacement of the concrete cylinder piston.
[0028] Optionally, the remote monitoring platform includes a first module, and the first module includes:
[0029] An acquisition division submodule is used to acquire a construction area and divide the construction area into a plurality of areas to be constructed;
[0030] A construction submodule, used to construct a scene graph of each area to be constructed;
[0031] The marking acquisition submodule is used to acquire the coordinates of a plurality of CFG piles in each of the areas to be constructed, and mark the position of each CFG pile on each of the scene graphs based on the coordinates.
[0032] By adopting the above technical solution, by constructing submodules and obtaining marking submodules, the staff of the remote monitoring platform can intuitively understand the distribution of CFG piles on site in the construction area.
[0033] Optionally, the remote monitoring platform further includes a second module, and the second module includes:
[0034] A first judgment submodule is used to judge whether the CFG pile is poured based on the first construction parameter and the second construction parameter; if so, obtain the positioning information of the CFG pile based on the first construction parameter, and determine the scene graph based on the positioning information;
[0035] The marking submodule is used to mark the CFG pile corresponding to the positioning information on the scene graph to feedback to the user that the construction of the CFG pile has been completed.
[0036] By adopting the above technical solution, it is easy to intuitively understand the completion status of the CFG piles at the CFG pile construction site through the marks on the scene graph.
[0037] Optionally, the remote monitoring platform further includes a third module, and the third module includes:
[0038] an acquisition submodule, configured to acquire a construction image of the CFG pile after acquiring the positioning information of the CFG pile based on the first construction parameter;
[0039] An input recognition submodule is used to input the construction image into the image model for recognition to obtain a recognition result;
[0040] The second judgment submodule is used to judge whether marking is required based on the recognition result, and if so, transfer to the marking submodule.
[0041] By adopting the above technical solution, the completed CFG piles are proofread through the construction images, thereby reducing the occurrence of marking errors.
[0042] Optionally, the remote monitoring platform includes a fourth module, and the fourth module includes:
[0043] A statistical submodule, used for counting a first total amount of CFG piles that have been constructed in each of the to-be-constructed areas within a preset time;
[0044] A total amount acquisition submodule, used for acquiring a second total amount of CGF piles expected to be completed in each of the to-be-constructed areas within the preset time;
[0045] The comparison and judgment submodule is used to compare the first total number and the second total number of each area to be constructed to determine whether the first total number is less than the second total number; if so, adjust the construction strategy of the area to be constructed where the first total number is less than the second total number.
[0046] By adopting the above technical solution, the areas to be constructed whose construction progress is less than expected and the areas to be constructed whose construction progress exceeds expectations are obtained through the first total amount and the second total amount, so as to adjust the construction strategy for the areas to be constructed whose construction progress is less than expected based on the areas to be constructed that exceed expectations, thereby reducing the possibility of construction delays.
[0047] Optional, comparison and judgment submodule, including:
[0048] An extraction unit, used to extract a first total amount of a to-be-constructed area that does not require adjustment of a construction strategy, a construction time, and a third total amount of CFG piles to be constructed;
[0049] A first determining unit, configured to determine a completion time of a to-be-constructed area for which a construction strategy does not need to be adjusted based on the first total amount, the construction time, and the third total amount;
[0050] A position acquisition unit, used for acquiring the end point position of each construction area to be constructed that does not need to adjust the construction strategy based on the scene graph;
[0051] A calculation unit, used to calculate the distance information between the end point position and the area to be constructed where the construction strategy needs to be adjusted;
[0052] The second determining unit is used to determine the long spiral drilling machine to be deployed based on the completion time and the distance information.
[0053] By adopting the above technical solution, a long spiral drill with a faster construction completion speed is used by allocating time and distance information, and the long spiral drill with a faster construction completion speed is used to assist the construction area with a slower construction speed, thereby improving the overall construction efficiency of CFG piles.
[0054] Optionally, the remote monitoring platform includes a fifth module, and the fifth module includes:
[0055] Weather acquisition submodule, used to obtain weather information;
[0056] The feedback submodule feeds back warning information to the user when the weather information does not meet the first construction parameter, wherein the first construction parameter includes wind speed information.
[0057] By adopting the above technical solution, the weather at the construction site can be predicted in advance through weather information, thereby reducing the threat to the life safety of workers when construction is carried out in severe weather conditions.
[0058] Optionally, the remote monitoring platform includes a sixth module, and the sixth module includes:
[0059] The third judgment submodule is used to judge whether the CFG pile is qualified based on the first construction parameter and the second construction parameter; if not, feedback the unqualified information of the CFG pile to the user and mark it on the scene graph corresponding to the CFG pile.
[0060] By adopting the above technical solution, the staff can quickly understand the distribution of unqualified CFG piles through the scene graph, so as to facilitate the repair of the unqualified CFG piles.
[0061] In summary, the present application includes at least one of the following beneficial technical effects:
[0062] 1. Through the vehicle terminal, the first wireless communication module, the second wireless communication module and the remote monitoring platform, the operator of the long spiral drill can view the first construction parameter and the second construction parameter in real time, and complete the drilling independently according to the first construction parameter and the second construction parameter. Compared with the drilling method in which the recorder cooperates with the operator of the long spiral drill according to the recorded parameters, it is more convenient and quicker;
[0063] 2. By building submodules and obtaining marking submodules, the staff of the remote monitoring platform can intuitively understand the distribution of CFG piles at the construction site;
[0064] 3. Proofread the completed CFG piles through construction images to reduce the occurrence of marking errors. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] Figure 1It is a structural block diagram of a CFG pile construction monitoring system in an embodiment of the present application.
[0066] Figure 2 It is a structural block diagram of a long spiral drilling rig vehicle terminal 100 in an embodiment of the present application.
[0067] Figure 3 It is a structural block diagram of a concrete pump truck vehicle-mounted terminal 200 in an embodiment of the present application.
[0068] Figure 4 It is a structural block diagram of a remote monitoring platform 300 in an embodiment of the present application.
[0069] Figure 5 It is a structural block diagram of the first module in the embodiment of the present application.
[0070] Figure 6 It is a structural block diagram of the third module in the embodiment of the present application.
[0071] Figure 7 It is a structural block diagram of the fourth module in the embodiment of the present application.
[0072] Description of the accompanying drawings: 100, long spiral drilling machine vehicle terminal; 101, wind speed detection module; 102, positioning module; 103, inclination detection module; 104, power module; 105, current detection module; 106, CFG pile information acquisition module; 107, display module; 108, first control module; 109, alarm module; 200, concrete pump truck vehicle terminal; 201, pressure detection module; 202, displacement detection module; 203, second control module; 300, first wireless communication module; 301, second Wireless communication module; 400, remote monitoring platform; 401, first module; 4011, acquisition division submodule; 4012, construction submodule; 4013, acquisition mark submodule; 402, second module; 403, third module; 4031, acquisition submodule; 4032, input recognition submodule; 4033, second judgment submodule; 404, fourth module; 4041, statistics submodule; 4042, total amount acquisition submodule; 4043, comparison and judgment submodule; 405, fifth module; 406, sixth module. DETAILED DESCRIPTION
[0073] The present application is further described in detail below in conjunction with the accompanying drawings.
[0074] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. After reading this specification, those skilled in the art may make modifications to the present embodiment without any creative contribution as needed, but such modifications are protected by the patent law as long as they are within the scope of the claims of the present application.
[0075] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0076] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0077] The present application embodiment provides a CFG pile construction monitoring system, such as Figure 1 As shown, the CFG pile construction monitoring system includes multiple vehicle-mounted terminals, a first wireless communication module 300, a second wireless communication module 301 and a remote monitoring platform 400, and each vehicle-mounted terminal includes a long spiral drilling machine vehicle-mounted terminal 100 and a concrete pump truck vehicle-mounted terminal 200.
[0078] The first wireless communication module 300 and the second wireless communication module 301 can both use GPRS modules or 4G and / 5G communication modules, wherein the first wireless communication module 300 is used to realize the communication between the long auger drilling machine vehicle terminal 100 and the concrete pump truck vehicle terminal 200, and the second wireless communication module 301 is used for the long auger drilling machine vehicle terminal 100 and the remote monitoring platform 400 to communicate;
[0079] The remote monitoring platform 400 may include multiple terminal devices, which may be computers or mobile phones, for obtaining first construction parameters and second construction parameters, and storing and processing the first construction parameters and the second construction parameters; the long spiral drill vehicle-mounted terminal 100 is used to collect the first construction parameters during the drilling process of the long spiral drill, wherein the first construction parameters include the pile position, pile depth, pipe pulling rate, bearing layer current, mast verticality and construction site wind speed; the concrete pump truck vehicle-mounted terminal 200 is used to collect the second construction parameters during the construction process of the concrete pump truck, wherein the second construction parameters include the concrete pouring volume and filling coefficient of a single CFG pile.
[0080] The following describes the long auger drilling machine vehicle-mounted terminal 100 and the concrete pump truck vehicle-mounted terminal 200 respectively:
[0081] (I) Long auger drilling machine vehicle terminal 100
[0082] like Figure 2 As shown, the long spiral drilling rig vehicle terminal 100 includes a wind speed detection module 101, a positioning module 102, an inclination detection module 103, a power module 104, a current detection module 105, a CFG pile information collection module 106, a display module 107, a first control module 108, and an alarm module 109.
[0083] Among them, the wind speed detection module 101 is installed at the top of the fuselage of the long spiral drilling machine to collect wind speed information at the CFG pile construction site. In this embodiment, the wind speed detection module 101 can be installed at the top of the mast of the long spiral drilling machine, and the wind speed collection module can use an anemometer;
[0084] The positioning module 102 is installed at the top of the drill rod of the long spiral drill to collect the position information of the CFG pile currently under construction. In this embodiment, the positioning module 102 can use a BT-F9PK4 RTK GNSS positioning antenna with a PTK differential function. In order to enhance the accuracy of the CFG pile positioning at the construction site, a reference station is installed at the CFG construction site. The reference station is used in conjunction with the positioning module 102, wherein the reference station includes a fixed base station and a CORS system, and the fixed base station includes a GPS receiver and a GNSS positioning antenna.
[0085] The inclination detection module 103 is installed on the lower side of the mast of the long spiral drilling rig to collect verticality information of the long spiral drill rod. In this embodiment, the inclination detection module 103 can use a dual-axis inclination sensor;
[0086] The power module 104 is used to provide power to the motor of the long auger drill. In this embodiment, the power module 104 can adopt a power distribution cabinet;
[0087] The current detection module 105 is installed inside the power module 104. In this embodiment, the power module 104 is installed on the power line inside the power distribution cabinet to collect the current information of the drill rod during the drilling process of the long spiral drill. The current detection module 105 can use an open-type current transformer;
[0088] The CFG pile information collection module 106 is installed inside the winch of the long spiral drilling machine body to collect the depth information, pipe sinking speed information and pipe pulling speed information of the CFG pile. In this embodiment, the CFG pile information collection module 106 can use a Hall speed sensor;
[0089] The display module 107 is installed inside the cab of the long auger drill to enable the operator of the long auger drill to view the first construction parameter and the second construction parameter in real time. In this embodiment, the display module 107 can be an industrial tablet;
[0090] The alarm module 109 is installed in the cab of the long spiral drilling machine. When the first construction parameter and the second construction parameter exceed the threshold value, an alarm message is issued. In this embodiment, the alarm module 109 can be an audible and visual alarm;
[0091] The first control module 108 is installed in the cab of the long spiral drilling machine. In this embodiment, the first control module 108 can be a plc controller;
[0092] The second wireless communication module 301 is installed inside the cab of the long auger drill and is used for the long auger drill vehicle-mounted terminal 100 to communicate with the remote monitoring platform 400.
[0093] (II) Concrete pump truck onboard terminal 200
[0094] like Figure 3 As shown, the on-board terminal 200 of the concrete pump truck includes a pressure detection module 201 , a displacement detection module 202 and a second control module 203 .
[0095] Among them, the pressure detection module 201 is installed on the oil inlet of the concrete pump truck pumping system, that is, the pressure input end of the voltmeter of the oil inlet of the pumping system, to collect pressure information on the oil inlet of the concrete pump truck. In this embodiment, the pressure detection module 201 can be a pressure sensor; the displacement detection module 202 is installed inside the water tank of the concrete pump truck, and is used to collect the displacement of the concrete cylinder piston on the concrete pump truck. In this embodiment, the displacement detection module 202 can use a displacement sensor; the second control module 203 is installed at a position close to the power supply of the concrete pump truck; the first wireless communication module 300 is installed on the top of the concrete pump truck, and is used to communicate with the vehicle-mounted terminal of the long spiral drill. In this embodiment, the first wireless communication module 300 can use a communication antenna.
[0096] like Figure 4 As shown, the remote monitoring platform 400 includes a first module 401 , a second module 402 , a third module 403 , a fourth module 404 , a fifth module 405 and a sixth module 406 .
[0097] like Figure 5 As shown, the first module 401 includes an acquisition division submodule 4011, a construction submodule 4012 and an acquisition mark submodule 4013, which are as follows:
[0098] The acquisition division submodule 4011 is used to acquire the construction area and divide the construction area into multiple areas to be constructed;
[0099] Construction submodule 4012, used to construct a scene graph of each area to be constructed;
[0100] The obtaining mark submodule 4013 is used to obtain the coordinates of multiple CFG piles in each area to be constructed, and mark the position of each CFG pile on each scene graph based on the coordinates.
[0101] In this embodiment, when the division submodule 4011 obtains the construction area, the construction area is divided into multiple areas to be constructed according to the area, shape and construction period of the construction area, and each area to be constructed is equipped with at least one vehicle-mounted terminal. The construction submodule 4012 generates a scene graph for each area to be constructed, and the scene graph can be a map or a scene graph generated by a three-dimensional scene production software, such as solidwork. Before construction, the staff is required to input the coordinates of each CFG pile to be constructed into the remote monitoring platform 400. When the marking submodule 4013 obtains the coordinates of the CFG pile, the corresponding coordinates are marked to the corresponding scene graph, where the coordinates are composed of longitude and latitude.
[0102] During the construction of CFG piles, the completed CFG needs to be marked to facilitate the staff to understand the progress of the construction.
[0103] Specifically, the second module 402 includes a first judgment submodule and a marking submodule, which are as follows:
[0104] A first judgment submodule is used to judge whether the CFG pile is poured based on the first construction parameter and the second construction parameter; if so, obtain the positioning information of the CFG pile based on the first construction parameter, and determine the scene graph based on the positioning information;
[0105] In this embodiment, when the remote monitoring platform 400 receives the first construction parameter and the second construction parameter of the same CFG pile, the first judgment submodule judges whether the first construction parameter and the second construction parameter are complete. When the first construction parameter and the second construction parameter are complete, it is determined that the construction of the CFG pile is completed.
[0106] A camera device is also installed on the long spiral drilling rig. In the present embodiment, the camera device can be a camera. When the display module 107 receives the first construction parameter and the second construction parameter, the first control module 108 controls the camera to take a picture of the current CFG pile to obtain a construction picture, and sends the taken construction picture to the remote monitoring platform 400 through the second wireless communication module 301. The third module 403 checks whether the construction of the CFG pile is completed.
[0107] like Figure 6 As shown, the third module 403 includes an acquisition submodule 4031 , an input recognition submodule 4032 and a second judgment submodule 4033 .
[0108] An acquisition submodule 4031 is used to acquire a construction image of the CFG pile after acquiring the positioning information of the CFG pile based on the first construction parameter;
[0109] An input recognition submodule 4032 is used to input the construction image into the image model for recognition to obtain a recognition result;
[0110] The second judgment submodule 4033 is used to judge whether marking is required based on the recognition result, and if so, transfer to the marking module.
[0111] In this embodiment, the acquisition submodule 4031 receives the construction image sent by the long spiral drilling rig vehicle terminal 100, and inputs the construction image into the image recognition model, wherein the image recognition model is a deep neural network for image recognition, and the deep neural network can be a convolutional neural network, but is not limited to this. When the recognition result is that the construction is completed, it enters the marking module; when the recognition result is that the construction is not completed, the information that the CFG pile construction is not completed is fed back to the user.
[0112] The marking submodule is used to mark the CFG pile corresponding to the positioning information on the scene graph to feedback to the user that the CFG pile has been completed.
[0113] In this embodiment, when it is determined that the construction of the CFG pile is completed, the positioning information in the first construction parameter is extracted. The positioning information is composed of longitude and latitude. The corresponding scene graph is determined based on the positioning information. The CFG shape corresponding to the positioning information is marked as completed in the scene graph. The mark can be a text mark or a color mark, which is not specifically limited in this embodiment.
[0114] Unqualified CFG piles are marked accordingly on the scene graph. Specifically, the sixth module 406 of the remote monitoring platform includes a third judgment submodule.
[0115] The third judgment submodule is used to judge whether the CFG pile is qualified based on the first construction parameter and the second construction parameter; if not, feedback the unqualified CFG pile information to the user and mark it on the scene graph corresponding to the CFG pile.
[0116] In this embodiment, each construction parameter corresponds to a threshold information. For example, when the wind speed of a long spiral drill is 10.8m / s (level 6) or above, construction is not allowed. At this time, it will be marked on the scene map. The marking method can be text or color, which is not specifically limited in this embodiment.
[0117] The fourth module 404 in the remote monitoring platform 400 also monitors the construction progress in real time and generates corresponding adjustment strategies, such as Figure 6As shown, the fourth module 404 includes a statistical submodule 4041 , a total amount acquisition submodule 4042 , and a comparison and judgment submodule 4043 .
[0118] A statistics submodule 4041 is used to count a first total amount of CFG piles that have been constructed in each area to be constructed within a preset time;
[0119] Among them, the preset time can be one hour, two hours, or four hours, which is not specifically limited in the present embodiment. Since the CFG piles that have been completed are marked in each scene graph, the first total amount of the CFG piles that have been completed in each area to be constructed is counted through the scene graph.
[0120] A total amount acquisition submodule 4042 is used to acquire a second total amount of CGF piles that are expected to be completed in each area to be constructed within a preset time;
[0121] Among them, the second total amount is set according to the construction period.
[0122] The comparison and judgment submodule 4043 is used to compare the first total number and the second total number of each area to be constructed to determine whether the first total number is less than the second total number; if so, adjust the construction strategy of the area to be constructed where the first total number is less than the second total number.
[0123] When the first total amount of one of the areas to be constructed is less than the second total amount, it proves that the construction progress of the area to be constructed is slightly slow, and then the construction strategy of the area to be constructed needs to be adjusted.
[0124] The comparison and judgment submodule 4043 specifically includes an extraction unit, a first determination unit, a position acquisition unit, a calculation unit and a second determination unit.
[0125] An extraction unit, used to extract a first total amount of a to-be-constructed area that does not require adjustment of a construction strategy, a construction time, and a third total amount of CFG piles to be constructed;
[0126] A first determining unit is used to determine the completion time of the area to be constructed that does not need to adjust the construction strategy based on the first total amount, the construction time, and the third total amount;
[0127] For example, the first total amount is 10, the construction time is 10 hours, and the third total amount is 5. Based on the first total amount and the construction time, it can be known that the third total amount takes 5 hours.
[0128] A position acquisition unit, used to acquire the end point position of each construction area to be constructed that does not need to adjust the construction strategy based on the scene graph;
[0129] In this embodiment, the completed end point position in each area to be constructed can be determined through the scene graph.
[0130] A calculation unit, used to calculate the distance information between the end point position and the area to be constructed where the construction strategy needs to be adjusted;
[0131] The second determining unit is used to determine the long spiral drilling machine to be deployed based on the completion time and distance information.
[0132] In this embodiment, by determining the distance between the end point position and the position of the construction area that needs to be adjusted, the time for the long spiral drilling rig in the construction area that does not need to be adjusted to reach the construction area that needs to be adjusted can be calculated, thereby selecting the long spiral drilling rig to be deployed. When the selected long spiral drilling rig completes the construction, it goes to the construction area that needs to be adjusted to carry out construction.
[0133] The fifth module 405 includes an information weather acquisition submodule and a feedback submodule.
[0134] Weather acquisition submodule, used to obtain weather information;
[0135] The feedback submodule feeds back warning information to the user when the weather information does not meet the first construction parameter, wherein the first construction parameter includes wind speed information.
[0136] In this embodiment, the acquisition module obtains weather information of the construction site in real time. In this embodiment, wind speed information is taken as an example. It is 1 o'clock in the afternoon. At 2 o'clock in the afternoon, the wind speed information exceeds the threshold. Then the feedback module feeds back warning information to the user, prompting to stop construction at 2 o'clock in the afternoon.
[0137] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.
[0138] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned application concept. For example, the above features are replaced with (but not limited to) technical features with similar functions applied in the present application.
Claims
1. A CFG pile construction monitoring system, characterized in that: include: A vehicle-mounted terminal, a first wireless communication module, a second wireless communication module and a remote monitoring platform, wherein the vehicle-mounted terminal includes a long auger drilling machine vehicle-mounted terminal and a concrete pump truck vehicle-mounted terminal; The long spiral drilling rig vehicle-mounted terminal is used to collect the first construction parameters during the long spiral drilling rig drilling process, wherein the first construction parameters include the pile position, pile depth, pipe pulling rate, bearing layer current, mast verticality and construction site wind speed; The on-board terminal of the concrete pump truck is used to collect the second construction parameter during the construction process of the concrete pump truck, wherein the second construction parameter includes the concrete pouring volume and filling coefficient of a single CFG pile; The remote monitoring platform is used to obtain the first construction parameter and the second construction parameter, and store and process the first construction parameter and the second construction parameter; The first wireless communication module is used to realize the communication between the long auger drilling machine vehicle terminal and the concrete pump truck vehicle terminal; The second wireless communication module is used to realize the communication between the long spiral drilling rig vehicle terminal and the remote monitoring platform; The drilling rig vehicle terminal is also used to display the first construction parameter and the second construction parameter in real time, so that the operator of the long spiral drilling rig can view the first construction parameter and the second construction parameter in real time; The remote monitoring platform includes a first module, which includes: An acquisition division submodule is used to acquire a construction area and divide the construction area into a plurality of areas to be constructed; A construction submodule, used to construct a scene graph of each of the areas to be constructed; An acquisition marking submodule is used to acquire the coordinates of a plurality of CFG piles in each of the areas to be constructed, and mark the position of each CFG pile on each of the scene graphs based on the coordinates; The remote monitoring platform includes a fourth module, and the fourth module includes: A statistical submodule, used for counting a first total amount of CFG piles that have been constructed in each of the to-be-constructed areas within a preset time; A total amount acquisition submodule, used for acquiring a second total amount of CGF piles expected to be completed in each of the to-be-constructed areas within the preset time; A comparison and judgment submodule is used to compare the first total number and the second total number of each of the to-be-constructed areas to determine whether the first total number is less than the second total number; if so, adjust the construction strategy of the to-be-constructed area whose first total number is less than the second total number; The comparison and judgment submodule includes: An extraction unit, used to extract a first total amount of a to-be-constructed area that does not require adjustment of a construction strategy, a construction time, and a third total amount of CFG piles to be constructed; A first determining unit is used to determine the completion time of the area to be constructed that does not need to adjust the construction strategy based on the first total amount, the construction time and the third total amount; A position acquisition unit, used for acquiring the end point position of each construction area to be constructed that does not need to adjust the construction strategy based on the scene graph; A calculation unit, used to calculate the distance information between the end point position and the area to be constructed where the construction strategy needs to be adjusted; The second determining unit is used to determine the long spiral drilling machine to be deployed based on the completion time and the distance information.
2. A CFG pile construction monitoring system according to claim 1, characterized in that: The long spiral drilling rig vehicle terminal includes a wind speed detection module, a positioning module, an inclination detection module, a power module, a current detection module, a CFG pile information collection module, a display module, a first control module and an alarm module; The wind speed detection module is used to collect wind speed information at the CFG pile construction site; The positioning module is used to collect the position information of the CFG pile; The inclination detection module is used to collect verticality information of the drill rod of the long spiral drilling rig; The power module is used to provide power to the motor of the drill rod of the long spiral drilling machine; The current detection module is used to collect the current information of the drill rod during the drilling process of the long spiral drill; The CFG pile information collection module is used to collect the depth information, pipe sinking speed information and pipe pulling speed information of the CFG pile; The display module is used to display the first construction parameter and the second construction parameter in real time; The first control module is used to obtain the first construction parameter and the second construction parameter, and control the display module to display the first construction parameter and the second construction parameter; The alarm module is used to issue an alarm message when the first construction parameter exceeds a threshold.
3. A CFG pile construction monitoring system according to claim 1, characterized in that: The concrete pump truck onboard terminal includes a pressure detection module, a displacement detection module and a second control module; The pressure detection module is used to collect pressure information on the oil circuit of the concrete pump truck; The displacement detection module is used to collect the displacement of the concrete cylinder piston on the pump truck; The second control module is used to obtain and send the pressure information and the displacement of the concrete cylinder piston.
4. A CFG pile construction monitoring system according to claim 1, characterized in that: The remote monitoring platform also includes a second module, which includes: A first judgment submodule is used to judge whether the CFG pile is poured based on the first construction parameter and the second construction parameter; if so, obtain the positioning information of the CFG pile based on the first construction parameter, and determine the scene graph based on the positioning information; The marking submodule is used to mark the CFG pile corresponding to the positioning information on the scene graph to feedback to the user that the construction of the CFG pile has been completed.
5. A CFG pile construction monitoring system according to claim 1, characterized in that: The remote monitoring platform further includes a third module, which includes: an acquisition submodule, configured to acquire a construction image of the CFG pile after acquiring the positioning information of the CFG pile based on the first construction parameter; An input recognition submodule is used to input the construction image into the image model for recognition to obtain a recognition result; The second judgment submodule is used to judge whether marking is required based on the recognition result, and if so, transfer to the marking submodule.
6. A CFG pile construction monitoring system according to claim 1, characterized in that: The remote monitoring platform includes a fifth module, and the fifth module includes: Weather acquisition submodule, used to obtain weather information; The feedback submodule feeds back warning information to the user when the weather information does not meet the first construction parameter, wherein the first construction parameter includes wind speed information.
7. A CFG pile construction monitoring system according to claim 1, characterized in that: The remote monitoring platform includes a sixth module, and the sixth module includes: The third judgment submodule is used to judge whether the CFG pile is qualified based on the first construction parameter and the second construction parameter; if not, feedback the unqualified information of the CFG pile to the user and mark it on the scene graph corresponding to the CFG pile.