A method for reconstructing an orchard using raw soil and using the soil to increase the waterlogging resistance of the orchard

By laying and deeply plowing the foundation soil of construction land in the orchard, combined with grass growth and fertilization, the problem of the foundation soil being unfavorable to the growth of fruit trees has been solved, the orchard's waterlogging resistance and fruit tree production level have been improved, and the orchard's rapid maturation has been achieved and flood defense.

CN115443848BActive Publication Date: 2024-10-01SHANGHAI ELITE AGRI SCI TECH GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211322378.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-27
Publication Date
2024-10-01
Estimated Expiration
2042-10-27

AI Technical Summary

Technical Problem

After typhoons, orchards in low-lying areas are prone to waterlogging. Although using the foundation soil of construction land to pile up orchards can prevent and control waterlogging, because the foundation soil has not been reclaimed, the soil is compacted, has low microbial content, and has few nutrients, which has adverse effects on the growth of fruit trees. Disadvantageous, rapid maturation is required to mitigate adverse effects.

Method used

By laying foundation soil for construction land in the orchard, fertilizing and deep plowing, combining artificial or natural grass growth, spreading organic fertilizer and microbial fertilizer, deep plowing the soil, increasing the amount of irrigation, setting up drainage ditches and protective forests, and adjusting the terrain slope to improve drainage. ability.

Benefits of technology

It effectively accelerates the maturation of raw soil, reduces the adverse effects of foundation soil on fruit trees, improves the waterlogging resistance of orchards and the growth and fruiting of fruit trees, and solves the problem of foundation soil stacking on construction land.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115443848B_ABST
    Figure CN115443848B_ABST
Patent Text Reader

Abstract

The present invention provides a method for reconstructing an orchard using raw soil and for increasing the waterlogging resistance of the orchard, and belongs to the technical field of horticulture. The method for reconstructing an orchard using raw soil provided by the present invention comprises: laying raw soil in the orchard, applying fertilizer, and leveling the land; weeding the orchard after the saplings are planted, and deep plowing is performed when organic fertilizer is applied in autumn, and the grass is turned to less than 20 to 30 cm. The present invention uses raw soil to pile up the orchard, and adopts the orchard reconstruction method. On the basis of using raw soil to pile up the orchard to prevent waterlogging, the raw soil maturation is accelerated, and the adverse effects of the raw soil on the fruit trees are reduced, which can effectively resist the harm of floods, ensure the normal growth and fruiting of the fruit trees, and improve the production level of the fruit trees.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of horticulture, and in particular relates to a method for reconstructing an orchard using raw soil and using the method for increasing the waterlogging resistance of the orchard. Background Art

[0002] Before and after a typhoon, the amount of rain is large, which often causes short-term waterlogging damage, which can damage trees or even kill them. Common methods to reduce waterlogging damage include three-ditch matching, forced drainage, small enclosure, and soil piling. However, for counties with low terrain, rivers often flood after a typhoon, and there is nowhere to drain water, which poses a huge challenge to agricultural development.

[0003] The problem of piling up foundation soil on construction land is a difficult problem in the construction industry. Due to the large amount of foundation soil piled up on construction land, construction sites often need to pay for the location of the pile. Using the foundation soil of construction land to pile up the orchard can make full use of construction waste and improve the orchard's waterlogging resistance. However, since the foundation soil of construction land has generally not been reclaimed and planted, the soil is raw soil, the soil is compacted, the structure is tight, the microbial content is low, the nutrients are few, and the water retention capacity is poor. Therefore, although piling up the orchard with the foundation soil of construction land can prevent and control waterlogging, it will also have an adverse effect on the normal growth of fruit trees. If the foundation soil is used to pile up the orchard to prevent and control waterlogging, a series of improvement measures are needed to promote the rapid maturation of the foundation soil in the orchard. Therefore, how to promote the rapid maturation of raw soil in the orchard and reduce the adverse effects of the foundation soil pile on the normal growth of fruit trees has become the key to preventing and controlling waterlogging in orchards piled up with raw soil. Summary of the invention

[0004] In view of this, the object of the present invention is to provide a method for reconstructing an orchard using raw soil, which can accelerate the maturation of the raw soil and avoid the adverse effects of the raw soil on the normal growth of fruit trees.

[0005] The present invention also aims to provide a method for improving the waterlogging resistance of an orchard, which can effectively resist the harm of floods, reduce the adverse effects of raw soil piles on fruit trees, ensure the normal growth and fruiting of fruit trees, and improve the production level of fruit trees.

[0006] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:

[0007] The present invention provides a method for reconstructing an orchard using raw soil, comprising the following steps:

[0008] Lay raw soil in the orchard, apply fertilizer, and level the land; after the young trees are planted, grass is grown in the orchard. When applying organic fertilizer in autumn, deep plowing is carried out to turn the grass to less than 20 to 30 cm.

[0009] Preferably, the raw soil is foundation soil of a construction site, and the soil of 0 to 50 cm above the surface of the foundation soil is laid on the upper part of the orchard.

[0010] Preferably, the orchard grass includes artificial grass and natural grass.

[0011] Preferably, after laying the raw soil, 5 to 10 tons of organic fertilizer and 1 to 5 tons of high-fiber agricultural waste are spread per mu, and the land is deep-turned and rotary-tilled to level it.

[0012] Preferably, the orchard is leveled before winter and the orchard is watered thoroughly before frost.

[0013] Preferably, the young trees are watered once every half a month; topdressed once every half a month, with 50-150g of nitrogen fertilizer applied to each tree; and as base fertilizer in autumn, 1-2 tons of organic fertilizer + 3-6kg of microbial fertilizer + 200-300kg of fermented soybean fertilizer are applied per mu.

[0014] The present invention also provides a method for improving the waterlogging resistance of an orchard, comprising the following steps:

[0015] The orchard is elevated by piling up raw soil, and the orchard is rebuilt using the method of rebuilding the orchard with the raw soil mentioned above.

[0016] Preferably, the height of the soil pile is 20 to 30 cm higher than the flooded location in previous years, and the ground slope is set to 3 to 6‰.

[0017] Preferably, the orchard grass is mowed in time when it is higher than 50 cm, leaving a stubble height of 15 to 20 cm.

[0018] Preferably, drainage ditches, small enclosure facilities and / or protective forests are constructed around the orchard.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] The method for reconstructing an orchard using raw soil described in the present invention matures the raw soil by reapplying organic fertilizers, artificial grass or natural grass fertilization, and accelerates the maturation of the raw soil by a series of operations such as spreading chemical fertilizers and microbial fertilizers, increasing the amount of irrigation, etc., which can effectively avoid the adverse effects of the raw soil on fruit trees.

[0021] The present invention uses raw soil to pile up the orchard, and adopts the method of using raw soil to rebuild the orchard. On the basis of using raw soil to pile up the orchard to prevent waterlogging, the raw soil maturation is accelerated, and the adverse effects of the piled soil on the fruit trees are reduced. It can not only effectively resist the harm of floods and waterlogging, but also ensure the normal growth and fruiting of fruit trees, and improve the production level of fruit trees. At the same time, it effectively solves the problem of piling foundation soil on construction land. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 The process of building a garden with foundation soil for construction;

[0023] Figure 2 Rebuild orchards for small enclosure facilities with high waterlogging resistance;

[0024] Figure 3 To rebuild the orchard for the already established high flood resistance. DETAILED DESCRIPTION

[0025] The present invention provides a method for reconstructing an orchard using raw soil, comprising the following steps:

[0026] Lay raw soil in the orchard, apply fertilizer, and level the land; after the young trees are planted, grass is grown in the orchard. When applying organic fertilizer in autumn, deep plowing is carried out to turn the grass to less than 20 to 30 cm.

[0027] The raw soil described in the present invention is soil that has not been cultivated and planted. The soil source of the present invention is preferably foundation soil of construction land, and the foundation soil is divided into upper soil (0-50 cm) and undisturbed original soil in the middle and lower parts. When laying the raw soil, the original soil in the middle and lower parts of the foundation soil is laid first, and then the soil in the upper part of the foundation soil is laid. As an optional embodiment, the present invention unloads the middle and lower parts of the foundation soil from the transport vehicle and inverts them on the plot in a uniform dotted shape. After all the foundation soil is unloaded, a bulldozer is used to level it, and the upper layer of foundation soil is laid on the upper part. The thickness of the upper layer of foundation soil is 10-30 cm, preferably 15-25 cm, and more preferably 20 cm. See Figure 1 .

[0028] The present invention applies fertilizers after laying raw soil. The present invention spreads 5 to 10 tons of organic fertilizer and 1 to 5 tons of high-fiber agricultural waste per mu. After spreading on the plot, a machine is used for deep plowing and rotary tillage for 3 to 5 times, with a plowing depth of 50 to 60 cm, and then the land is leveled. The organic fertilizer described in the present invention can be selected from one or more commonly used organic fertilizers such as fermented sheep manure, cow manure, pig manure, chicken manure or commercial organic fertilizer; the high-fiber agricultural waste described in the present invention can be selected from one or more agricultural wastes rich in high fiber such as rice husks, crushed plant straw or mushroom residues. The present invention does not limit the sources of the organic fertilizer and high-fiber agricultural waste. The present invention promotes the maturation of raw soil by heavily applying fertilizers to nourish the soil with fertilizers, and increases the air permeability of the soil by applying high-fiber agricultural wastes, reduces compaction, and promotes the maturation of raw soil.

[0029] The orchard leveling work of the present invention is completed as far as possible before winter, and the orchard is irrigated before frost comes. Solid soil blocks are differentiated by freezing and drying, which can effectively promote the maturation of raw soil.

[0030] The present invention adopts ridging machinery to ridge the field for planting saplings. As an optional embodiment, the present invention carries out ridging according to a row spacing of 5 to 6 m, a ridge width of 1 to 1.5 m, and a ridge height of 30 to 50 cm; and leaves a space of 2 to 3 m at the end of the field for the orchard machinery to turn around.

[0031] The present invention performs planting of young trees in an orchard. As an optional implementation, the present invention draws lines on the planting rows according to the planting plan, inserts branches or spreads lime on the planting points to make marks, then digs small holes at the planting points, plants the seedlings in the center, stretches the root system, straightens them, plants them in rows horizontally and vertically, then fills in the topsoil, gently lifts the seedlings to ensure that the root system stretches, then tamps them down, exposes the grafting points to the soil surface, waters them thoroughly, and then covers them with soil to conserve moisture.

[0032] In order to meet the needs of orchard modernization and mechanization, a wide row and dense planting mode is adopted, that is, the row spacing is 4-6m, the plant spacing is 2-3m, and the planting density is 44-66 plants / 667m 2 For small-scale planting within 3 mu, the traditional method of planting 33 trees per mu (row spacing 4m×5m) can still be used, but attention should be paid to appropriately raising the angle of the main branches during shaping.

[0033] The quality requirements for seedlings are: purity of species and rootstock ≥ 95%, seedling height ≥ 80cm, good healing of grafting site, ≥ 6 full buds in shaping zone, no shrinkage, wrinkles or new damage on root bark and stem bark, no scale insects and gummosis; ≥ 4 lateral roots, evenly distributed, stretched without curling, no root cancer and root-knot nematodes. When purchasing seedlings, buy 5% more reserve seedlings for later seedling supplementation.

[0034] The present invention grows grass in the orchard after the young trees are planted, and the orchard grass includes artificial grass and natural grass. The artificial grass is preferably edamame, soybean, rapeseed, alfalfa, clover, etc. During the growth of the grass, the malignant weeds should be removed in time (continuous manual uprooting). When applying organic fertilizer in autumn from September to November, the grass is turned to less than 20 to 30 cm by deep plowing to increase soil organic matter, and the depth is preferably less than 24 to 26 cm. The present invention can effectively increase soil organic matter and accelerate soil maturation by growing grass and deep plowing in the orchard with grass as green manure.

[0035] The present invention manages the fertilizer and water of young trees in the orchard rebuilt by filling soil, and timely irrigates and fertilizes the young trees, preferably once every half a month, and the amount of water each time is preferably 30 to 50 cm in soil moisture depth; the present invention applies topdressing once every half a month, and starts to apply topdressing after the new shoots of the young trees grow to 30 cm, and continues to apply topdressing until August, and then applies autumn basal fertilizer. The present invention preferably applies 50 to 150 g of nitrogen fertilizer per tree, and the nitrogen fertilizer can be selected from high-nitrogen compound fertilizer, water-soluble fertilizer, urea, etc., and is preferably applied with water; the present invention can promote the rapid growth of seedlings and reduce the influence of raw soil on the normal growth of young trees by applying high-nitrogen fertilizer.

[0036] The autumn basal fertilizer of the present invention comprises 1-2 tons of organic fertilizer + 3-6 kg of microbial fertilizer + 200-300 kg of fermented soybean fertilizer per mu. The present invention does not limit the source of the organic fertilizer. In addition to providing multiple element nutrients and organic matter, the autumn basal fertilizer of the present invention can also improve the physical structure of the soil and promote the formation of soil aggregate structure. The formation of the aggregate structure is conducive to storing nutrients and air, has a promoting effect on the root system, and can promote the growth of fruit trees.

[0037] The main component of the microbial fertilizer of the present invention is Bacillus subtilis, with a content of ≥ 1 billion / g. The preferred dosage for each tree is 50-100g. After Bacillus subtilis enters the soil, it can decompose some relatively difficult-to-decompose substances in the soil with its activity, accelerate the decomposition of organic matter in the soil, improve the soil aggregate structure, alleviate the problem of saline-alkali land, make the soil more suitable for the survival of beneficial bacteria, and promote soil maturation.

[0038] The present invention can accelerate soil maturation through fertilizer and water management, significantly improve soil physical and chemical properties, and promote the growth of young trees. The fertilization method of the present invention can be selected from broadcasting or furrowing.

[0039] The orchard described in the present invention can be a stone fruit orchard such as a peach orchard, an apricot orchard, a plum orchard, a cherry orchard, etc., preferably an orchard with a shallow root system, and most preferably a peach orchard.

[0040] The present invention also provides a method for improving the waterlogging resistance of an orchard, comprising the following steps:

[0041] Use raw soil to raise the orchard and use the above method to rebuild the orchard.

[0042] The present invention uses foundation soil of construction land to pile up the land. The height of the soil pile is determined according to the height of the river water during the rainstorm and waterlogging periods in previous years. The height of the soil pile after settlement is 20 to 30 cm higher than the flooded position of previous years, and preferably 25 to 28 cm higher. After leveling the land, the slope of the terrain in the row direction is set to 3 to 6‰, preferably 5‰, to facilitate drainage. As an optional embodiment, the present invention roughly calculates the volume of soil and the number of transportation trucks based on the area of ​​the plot and the target height of the soil pile to achieve the filling and reconstruction of the orchard; the present invention uses a large-scale Chinese plow for deep turning and rotary tillage to level the land.

[0043] The present invention timely mows the orchard grass when it is higher than 50 cm, and the stubble height is 15 to 20 cm. The present invention does not weed in the rainy season and the dry season to reduce drought and waterlogging. In the rainy season, weeds can increase the water storage capacity and air permeability of the soil and avoid excessive changes in the amount of water in the soil. In the dry season, the soil evaporates a lot, and most irrigation equipment is relatively small, or there is little manpower and it is impossible to irrigate in real time. Weeds cover the soil, firstly, to reduce the soil temperature and prevent the roots from being harmed by high temperature, and secondly, to reduce the evaporation of water in the soil; and the weed root system is generally shallower than the root system of fruit trees, so the competition with the tree for water is also limited and has little impact.

[0044] The present invention constructs drainage ditches, small surrounding facilities and / or protective forests on the periphery of the orchard to further prevent waterlogging. The size of the drainage ditch, the height of the small surrounding facilities and the width of the protective forest are all determined according to the local rain and waterlogging conditions in the orchard. As an optional implementation mode, the present invention connects the enclosure ditch of the orchard drainage ditch to the external river channel, generally with a depth of 0.8 to 1.2m and a width of 1.0 to 1.5m, to drain the accumulated water in the orchard and lower the groundwater level in the orchard; the present invention constructs small enclosure facilities around the orchard to prevent river water from backflowing. The small enclosure facilities can be built with bricks and cement, generally with a thickness of 30cm and a height of 50 to 60cm. The height of the small enclosure is determined according to the height of the backflow of river water, and gates and water pumps are constructed at the intersection of the small enclosure, enclosure ditch and river channel to facilitate the drainage of more accumulated water in the orchard; the present invention sets up windbreaks on the periphery of the planned orchards, and the trees are mainly local original fast-growing species with a width of 10m. There are main forest belts on the windward side of the orchard periphery, with 4 to 8 rows, and the forest belts are a combination of trees and shrubs. Trees that are hosts to fruit tree diseases and insect pests cannot be planted. Figure 2 .

[0045] As an optional embodiment, the present invention digs a waist ditch and / or a hair ditch in an orchard rebuilt by filling soil. The waist ditch is connected to the surrounding ditch, perpendicular to the planting row, 1m to 2m wide, 0.3 to 0.4cm deep, or 0.6 to 0.8m wide, 0.5 to 0.8m deep. The waist ditch can be buried in the culvert and covered with soil to facilitate the movement of machinery. The hair ditch is in the same direction as the planting row, in the middle of the row, with a depth of 0.2m and a width of 0.3 to 0.5m. The position of the ditch can also be appropriately biased to one side to facilitate the movement of machinery. If the flatness between the rows is good, the hair ditch can be omitted.

[0046] As an optional embodiment, the present invention can dig a water storage tank and establish a forced drainage system in areas prone to flooding or low-lying areas.

[0047] The technical solutions provided by the present invention are described in detail below in conjunction with the embodiments, but they should not be construed as limiting the protection scope of the present invention.

[0048] The implementation site of the specific embodiment of the present invention is located in Shanghai Jinshan Peach Research Institute (the variety is 'Yu Lu' peach), which is located in Jinshan Luxiang District. Due to the low terrain, the proportion of dead peach trees during typhoon and rainstorm seasons exceeds 60%.

[0049] In the following embodiments, unless otherwise specified, all of them are conventional methods.

[0050] Unless otherwise specified, the materials and reagents used in the following examples can be obtained from commercial sources.

[0051] Example 1

[0052] This embodiment provides a method for reconstructing a peach orchard to increase waterlogging resistance:

[0053] (1) Filling up the land with soil: Use the foundation soil of the construction land to pile up the land. The height of the soil pile is determined according to the height of the river water during the heavy rain and waterlogging periods in the past years. The height of the soil pile after settlement is 20 to 30 cm higher than the flooded position. According to the area of ​​the land and the target height of the soil pile, roughly calculate the volume of soil and the number of trucks used for transportation. Pile the upper part of the foundation soil (0 to 50 cm) in a space for later use. Unload the middle and lower part of the foundation soil from the transport vehicle and invert it on the land in a uniform dot shape. After unloading, use a bulldozer to level it, and then lay the upper layer of foundation soil on the top, with a thickness of about 20 cm.

[0054] (2) Fertilization: Spread 5-10 tons of organic fertilizer (fermented chicken manure) and 1-5 tons of rice husk per mu on the land. Use a large plow to deep plow and rotary till the land 3-5 times. Then level the land and set a slope of 5‰ in the direction of the row to facilitate drainage.

[0055] (3) Dig a trench in the middle of the row: perpendicular to the row, 1m to 2m wide and 0.3 to 0.4cm deep. Place a culvert in the trench and cover it with soil to facilitate the movement of machinery.

[0056] (4) Ridge formation: Use ridging machinery to form ridges with a row spacing of 5 to 6 m, a ridge width of 1 to 1.5 m, and a ridge height of 30 to 50 cm, leaving a 2 to 3 m space at the end of the field for the orchard machinery to turn around. Complete orchard leveling and other work before winter, irrigate the orchard before frost comes, and break up solid soil blocks through freezing and drying.

[0057] (5) Planting of young trees: In Shanghai, the planting time is from the time when peach trees fall their leaves in autumn to before they sprout in spring. Draw lines on the planting rows according to the planting plan, and sprinkle lime on the planting points to mark them. Then dig a small hole at the planting point, plant the seedlings in the center, stretch the roots, straighten them, and plant them in rows horizontally and vertically. Then fill in the topsoil, gently lift the seedlings to ensure that the roots are stretched, then tamp them down so that the grafting point is exposed to the soil surface, water them thoroughly, and then cover them with soil to retain moisture.

[0058] (6) Ground management for young trees: Orchard grass can be divided into artificial grass and natural grass. For artificial grass, choose edamame, soybean, rapeseed, alfalfa, and clover. Remove malignant weeds in time during the growth of grass (continuously pull them up manually). When the grass reaches a height of more than 50 cm, mow it in time, leaving 20 cm of stubble. When applying organic fertilizer in autumn from September to November, deep plowing can be used to turn the grass to less than 30 cm to increase soil organic matter.

[0059] (7) Fertilizer and water management for young trees: Water and topdress once every half month, using 50-150g urea per tree. For autumn basal fertilizer, use 1-2 tons / mu of organic fertilizer (fermented chicken manure) + 5kg / mu of microbial fertilizer (Bacillus subtilis, content ≥ 1 billion / g) + 250kg / mu of fermented soybean fertilizer. Apply by broadcasting or trenching.

[0060] Example 2

[0061] This embodiment provides a method for increasing the waterlogging resistance of a peach orchard (see Figure 3 )method:

[0062] (1) Build drainage ditches around the orchard: The drainage ditch of the orchard is connected to the external river channel, with a depth of 0.8 to 1.2 m and a width of 1.0 to 1.5 m. It can drain the accumulated water in the orchard and lower the groundwater level in the orchard.

[0063] (2) Construction of small enclosure facilities around the orchard: The small enclosure facilities are built with bricks and cement, with a thickness of 30 cm and a height of about 50 to 60 cm. The height of the small enclosure is determined according to the backflow height of the river water. Gates and water pumps are built at the intersection of the small enclosure and the ditch or river channel to facilitate the discharge of more accumulated water in the orchard.

[0064] (3) Filling up the land with soil: Use the foundation soil of the construction land to pile up the land. The height of the soil pile is determined according to the height of the river water during the heavy rain and waterlogging periods in the past years. The height of the soil pile after settlement is 20 to 30 cm higher than the flooded position. According to the area of ​​the land and the target height of the soil pile, roughly calculate the volume of soil and the number of trucks used for transportation. Pile the upper part of the foundation soil (0 to 50 cm) in a space for later use. Unload the middle and lower part of the foundation soil from the transport vehicle and invert it on the land in a uniform dot shape. After unloading, use a bulldozer to level it, and then lay the upper layer of foundation soil on the top, with a thickness of about 20 cm.

[0065] (4) Fertilization: Spread 5-10 tons of organic fertilizer (fermented sheep manure) and 1-5 tons of mushroom residue per mu on the land. Use a large plow to deep plow and rotary till the land 3-5 times. Then level the land and set a slope of 5‰ in the direction of the row to facilitate drainage.

[0066] (5) Dig a trench in the middle of the row: perpendicular to the row, 1m to 2m wide and 0.3 to 0.4cm deep. Place a culvert in the trench and cover it with soil to facilitate the movement of machinery.

[0067] (6) Ridge formation: Use ridging machinery to form ridges with a row spacing of 5 to 6 m, a ridge width of 1 to 1.5 m, and a ridge height of 30 to 50 cm, leaving a 2 to 3 m space at the end of the field for the orchard machinery to turn around. Complete orchard leveling and other work before winter, irrigate the orchard before frost comes, and break up solid soil blocks through freezing and drying.

[0068] (7) Planting of young trees: In Shanghai, the planting time is from the time peach trees fall their leaves in autumn to before they sprout in spring. Draw lines on the planting rows according to the planting plan, and sprinkle lime on the planting points to mark them. Then dig a small hole at the planting point, plant the seedlings in the center, stretch the roots, straighten them, and plant them in rows horizontally and vertically. Then fill in the topsoil, gently lift the seedlings to ensure that the roots are stretched, then tamp them down so that the grafting point is exposed to the soil surface, water them thoroughly, and then cover them with soil to retain moisture.

[0069] (8) Ground management for young trees: Orchard grass can be divided into artificial grass and natural grass. For artificial grass, edamame, soybean, rapeseed, alfalfa, and clover are selected. Malignant weeds should be removed in time during the growth of the grass (continuously uprooting them manually). When the grass height reaches more than 50 cm, it should be mowed in time, leaving 15 cm of stubble.

[0070] When applying organic fertilizer in autumn from September to November, deep plowing can be used to turn the grass to less than 25 cm to increase soil organic matter.

[0071] (9) Fertilizer and water management for young trees: Water and topdress once every half a month, using 50-150g urea per tree. For autumn basal fertilizer, use 1-2 tons / mu of organic fertilizer (fermented sheep manure) + 5kg / mu of microbial fertilizer (Bacillus subtilis, content ≥ 1 billion / g) + 250kg / mu of fermented soybean fertilizer. Apply by broadcasting or digging.

[0072] Example 3

[0073] This embodiment provides a method for reconstructing a peach orchard to increase waterlogging resistance:

[0074] Steps (1) to (9) are the same as those in Example 2.

[0075] (10) Set up windbreaks outside the orchard, with trees mainly native and fast-growing species, and a width of 10m. On the windward side of the orchard, there is a main forest belt with 6 to 8 rows. The forest belts are a combination of trees and shrubs, and trees that are hosts to fruit tree pests and diseases should not be planted.

[0076] The normal growth, fruiting and production level of the fruit trees in the orchards rebuilt by the methods described in Examples 1 to 3 were compared with those in the traditional orchards. The rebuilt orchards and the traditional orchards were managed in the same way in other aspects. The results are shown in Table 1:

[0077] Table 1 Comparison of Examples 1 to 3 with Traditional Orchards

[0078]

[0079] As shown in Table 1, in typhoon years, conventional orchards will cause a large number of saplings and fruit trees to die due to waterlogging, and the orchards will have almost no harvest, while the sapling mortality rate and fruit tree mortality rate of the waterlogging-resistant orchard of the present invention are significantly reduced, and the fruit quality is not reduced. In years without typhoons, when the orchard is managed normally, the fruit tree death phenomenon is almost non-existent in the present invention and the conventional orchard, and the quality of the fruit trees in the orchard rebuilt by the present invention is slightly improved compared with the conventional orchard.

[0080] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for improving the waterlogging resistance of an orchard, characterized in that: The following steps are involved: Lay raw soil in the orchard, apply fertilizer, and level the land; after the young trees are planted, weed the orchard, and deep-turn the grass when applying organic fertilizer in autumn, turning the grass to less than 20-30cm; The raw soil is the foundation soil of the construction land, and the foundation soil is divided into the soil of 0 to 50 cm on the upper surface and the original soil in the middle and lower parts that has not been disturbed; when laying the raw soil, the original soil in the middle and lower parts of the foundation soil is laid first, and then the soil in the upper part of the foundation soil is laid; The orchard grass includes artificial grass and natural grass, and the artificial grass species are edamame, soybean, rapeseed, alfalfa, and clover; After laying the raw soil, spread 5-10 tons of organic fertilizer and 1-5 tons of high-fiber agricultural waste per mu, deep plow and rotary tillage, and level the land; Complete orchard leveling before winter and water the orchard thoroughly before frost; Water the young trees once every half month; apply topdressing once every half month, with 50-150g of nitrogen fertilizer per tree; in autumn, apply 1-2 tons of organic fertilizer + 3-6kg of microbial fertilizer + 200-300kg of fermented soybean fertilizer per mu as base fertilizer; The orchard is a peach orchard, and the variety planted in the peach orchard is 'Yu Lu' flat peach; The height of the raw soil in the orchard is 20 to 30 cm higher than the flooded position in previous years, and the ground slope is set to 3 to 6‰; When the orchard grass is higher than 50 cm, it should be cut in time, and the stubble height should be 15 to 20 cm; Construction of drainage ditches, small enclosure facilities and / or protective forests around the orchard; The drainage ditch is constructed around the orchard: the drainage ditch of the orchard is connected to the external river channel, with a depth of 0.8-1.2m and a width of 1.0-1.5m, to drain the accumulated water in the orchard and lower the groundwater level of the orchard; Small enclosure facilities are built around the orchard to prevent river water from flowing back. The small enclosure facilities are built with bricks and cement, with a thickness of 30 cm and a height of 50 to 60 cm. The height of the small enclosure is determined according to the height of the river water flowing back. Gates and water pumps are built at the intersection of the small enclosure and the surrounding ditch and the river channel to facilitate the discharge of more accumulated water in the orchard. A windbreak forest is constructed around the orchard, with trees mainly native fast-growing species, 10m wide. There is a main forest belt on the windward side of the orchard, with 4 to 8 rows, a combination of trees and shrubs, and no trees that are hosts to fruit tree pests and diseases shall be planted.