A three-phase line short-circuit fault current phase-controlled breaking control strategy and system
By collecting and analyzing three-phase current signals in real time, we develop current zero point prediction strategies for single-phase, two-phase and three-phase faults, solve the problem of current zero point drift in short-circuit faults, and improve the breaking accuracy and equipment of the three-phase system. life.
Patent Information
- Application Number
- CN202211048614.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-30
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-08-30
AI Technical Summary
In a three-phase system, short-circuit faults cause current zero-point drift, which is difficult to accurately predict and control with existing technology, especially in the case of two-phase or three-phase short circuits, which affects the effectiveness of the breaking strategy.
By collecting three-phase current signals in real time, the fault type is judged and the current zero point prediction program is started according to the current characteristics of each phase, and a phase-controlled breaking strategy is formulated, including the specific control moments of single-phase, two-phase and three-phase faults, using the shortest possible time. The zero-crossing point and average value of the interruption plus advance Δt are used to determine the control time to avoid the influence of zero point drift.
It achieves accurate phase-controlled breaking in the event of a three-phase line short-circuit fault, improves the breaking performance and service life of the switch equipment, without increasing hardware costs, and only relies on software judgment and calculation.
Smart Images

Figure CN115459227B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to three-phase AC phase-controlled breaking technology. The breaking device can be a component that quickly breaks the current through any arc extinguishing medium, including a fast vacuum switch, an SF6 switch, etc., or other devices that require accurate phase control operation. Specifically, it relates to a three-phase line short-circuit fault current phase-controlled breaking control strategy and system. Background Art
[0002] The phase selection control technology is adopted, that is, the phase of the circuit breaker when breaking the fault current is controlled, so that the circuit breaker reaches the full opening distance close to the current zero crossing point, which can realize the micro-arc energy breaking of the fault current, thereby improving the circuit breaker's breaking capacity, reducing the arc erosion of the contacts, and increasing the service life of the circuit breaker.
[0003] In order to achieve precise time control, short-circuit fault phase-controlled disconnection requires accurate and fast short-circuit current zero point prediction technology. Due to changes in circuit topology or parameters during the short-circuit process and the circuit breaker opening process, the current flowing through the circuit breaker contains transient change components, and the actual zero-crossing point of the short-circuit current will deviate from the zero point of the expected steady-state short-circuit current, which is called zero-point drift. There are two factors that cause zero-point drift. The first is that when a short-circuit fault occurs, due to the influence of the attenuated DC component, the current is not periodically zero-crossing, which is significantly different from the expected steady-state short-circuit current periodic zero-crossing point; the second is that after a two-phase or three-phase short-circuit fault occurs, if one or two faulty phases are disconnected, the circuit topology will change, affecting the current waveform of the unbroken phase, causing the zero-point drift of the short-circuit current. For a short-circuit fault in a three-phase system, the phase-controlled disconnection must be controlled independently by phase. For the first type of zero-point drift, the current zero-crossing point of each phase can be predicted based on the waveform of each phase. This is the problem that the prediction algorithm needs to solve, and there are patents in this regard. However, the research on the second type of zero point drift is very limited. Since the short-circuit currents of each phase will not cross zero at the same time, after disconnecting one of the faulty phases, the zero crossing points of the currents of the other two phases originally predicted will drift again. However, the time interval between the zero crossing points of the currents of each phase is short, which is usually not enough to start the single-phase zero point prediction again. The present invention will formulate a control strategy for phase-controlled disconnection of three-phase lines based on the fact that each phase has only one zero point prediction after a short circuit. Summary of the invention
[0004] The above technical problems of the present invention are mainly solved by the following technical solutions:
[0005] A three-phase line short-circuit fault current phase-controlled breaking control strategy, characterized by comprising the following steps:
[0006] The real-time acquisition system collects the three-phase current signals on the AC transmission line to determine whether a short circuit fault occurs on the transmission line;
[0007] If no short-circuit fault occurs, continue to collect three-phase current signals in real time and make a judgment;
[0008] If a short circuit fault occurs, the type of fault in the three-phase line is determined by the number of phases of the short circuit fault, including single-phase fault, two-phase fault or three-phase fault. The current zero point prediction program of each phase is started simultaneously according to the current characteristics of each fault phase. Specifically:
[0009] If a single-phase fault occurs, the zero-point prediction data of the faulty phase is directly used as the control moment of phase-controlled breaking;
[0010] If a two-phase fault occurs, the first zero-crossing point of the two phases that can be disconnected in the shortest time is used as the control moment for simultaneous phase-controlled disconnection of the two faulty phases;
[0011] If a three-phase fault occurs, the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is used as the control time of the first phase to be opened. The phase control time of the remaining two phases is the average value of the corresponding phase prediction value plus the Δt advance value, and the unit of Δt is ms.
[0012] In the above three-phase line short-circuit fault current phase-controlled breaking control strategy,
[0013] When a two-phase fault or a three-phase fault occurs, there is no need to consider the impact of the first phase opening on the current zero points of the other two phases. For a two-phase fault, the first zero-crossing point of the two phases that can be disconnected in the shortest time is directly used as the control time for simultaneous phase-controlled disconnection of the two faulty phases; for a three-phase fault, the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is used as the control time for the first phase opening, and the phase-controlled control time of the remaining two phases is the average value of the corresponding phase prediction value plus the Δt advance amount.
[0014] In the above-mentioned three-phase line short-circuit fault current phase-controlled breaking control strategy, Δt is taken as 2ms in advance. If the fault current is broken quickly and the breaking time is less than a line attenuation time constant, Δt is taken as greater than 2ms and less than 3ms.
[0015] In the above-mentioned three-phase line short-circuit fault current phase-controlled breaking control strategy, the acquisition process of the zero-point prediction data of the fault phase is: from the real-time data sampling device.
[0016] In the above-mentioned three-phase line short-circuit fault current phase-controlled breaking control strategy, the short-circuit fault type is first determined. If there is a two-phase short circuit, the process of obtaining the first zero-crossing point that can be broken in the shortest time in the two phases is: the two short-circuited phases independently predict the current zero point, compare the two predicted values, and take the phase with the shorter time.
[0017] In the above-mentioned three-phase line short-circuit fault current phase-controlled breaking control strategy, the short-circuit fault type is first determined. If it is a three-phase short circuit, the process of obtaining the first zero-crossing point of any phase that can be broken in the shortest time among the three phases is: the three phases independently predict the current zero point, compare the three predicted values, and take the phase with the shortest time. In the above-mentioned three-phase line short-circuit fault current phase-controlled breaking control strategy, when a three-phase fault occurs, the process of obtaining the corresponding phase prediction value at the phase control time of the remaining two phases is: the three phases independently predict the current zero point, without considering the influence of the first phase to be opened, and directly average the predicted values of the remaining two phases, and add a certain advance amount Δt.
[0018] A three-phase line short-circuit fault current phase-controlled breaking control, characterized in that it includes
[0019] Data collection and judgment module: The real-time data collection system collects the three-phase current signals on the AC transmission line to determine whether a short circuit fault occurs on the transmission line;
[0020] If no short-circuit fault occurs, the data acquisition and judgment module continues to collect three-phase current signals in real time and then makes a judgment;
[0021] If a short circuit fault occurs, the number of phases with short circuit fault is determined;
[0022] The real-time judgment module judges the fault type of the three-phase line, including single-phase fault, two-phase fault or three-phase fault, and starts the current zero point prediction program according to the current characteristics of each fault phase at the same time, specifically:
[0023] If a single-phase fault occurs, the zero-point prediction data of the faulty phase is directly used as the control moment of phase-controlled breaking;
[0024] If a two-phase fault occurs, the first zero-crossing point of the two phases that can be disconnected in the shortest time is used as the control moment for simultaneous phase-controlled disconnection of the two faulty phases;
[0025] If a three-phase fault occurs, the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is used as the control time of the first phase to be opened. The phase control time of the remaining two phases is the average value of the corresponding phase prediction value plus the Δt advance value, and the unit of Δt is ms.
[0026] Therefore, the present invention has the following advantages:
[0027] 1. Taking into account the influence of zero point drift of the first phase on the remaining two phases, in order to avoid the need to re-predict the zero point after the circuit topology changes and the problem of limited real-time prediction, the present invention is based on the principle that each phase only needs one zero point prediction after a short circuit, adopts a certain algorithm, and formulates a phase-controlled breaking control strategy for the three-phase line.
[0028] 2. The present invention does not increase new hardware costs, and only relies on adding software judgment and calculation, which can effectively improve the breaking performance of the switch device and increase the service life of the switch device. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Attached Figure 1 is a steady-state three-phase short-circuit current waveform diagram in an embodiment of the present invention;
[0030] Attached Figure 2 is a current waveform diagram when the three-phase short-circuit current does not enter a steady state in an embodiment of the present invention;
[0031] Attached Figure 3 is a phase-controlled breaking control strategy diagram in an embodiment of the present invention;
[0032] Attached Figure 4a : is a typical waveform diagram of a two-phase short circuit in an embodiment of the present invention (a two-phase interphase short circuit current waveform);
[0033] Attached Figure 4b : is a typical waveform diagram of a two-phase short circuit in an embodiment of the present invention (a two-phase ground short circuit current waveform);
[0034] Attached Figure 5a It is a three-phase ungrounded fault diagram of a neutral point ungrounded system in an embodiment of the present invention (short-circuit current uninterrupted waveform);
[0035] Attached Figure 5b It is a three-phase ungrounded fault diagram of a neutral point ungrounded system in an embodiment of the present invention (current waveform after one faulty phase is disconnected in a three-phase fault);
[0036] Attached Figure 6a It is a three-phase grounding fault diagram of a neutral point grounding system in an embodiment of the present invention (short-circuit current waveform without interruption);
[0037] Attached Figure 6b It is a three-phase grounding fault diagram of a neutral point grounding system in an embodiment of the present invention (current waveform after one faulty phase is disconnected due to a three-phase fault). DETAILED DESCRIPTION
[0038] The technical solution of the present invention is further specifically described below through embodiments and in conjunction with the accompanying drawings.
[0039] Example:
[0040] A three-phase line may experience a single-phase ground short circuit fault, a two-phase short circuit fault, a two-phase ground short circuit fault, a three-phase ungrounded short circuit fault and a three-phase ground short circuit fault. The breaking processes of the latter two are relatively complicated, while the breaking processes of other short circuit forms are relatively simple. Therefore, the key to the breaking strategy lies in formulating a breaking strategy for a three-phase short circuit.
[0041] When the three-phase current is disconnected, the current will not pass through the zero point at the same time. The arc extinguishing principle of the AC arc determines that the AC current can only be disconnected at the zero point of the AC current. For the convenience of expression, the definition is: the first phase to be disconnected refers to the first fault phase to be disconnected, the second phase to be disconnected refers to the second, and the last phase to be disconnected refers to the third. For a positive sequence three-phase system with an AB-C phase sequence, after entering the steady state, its three-phase currents pass through the zero point in turn and circulate in the ACBA sequence, such as Figure 1 Even if the three-phase short-circuit current does not enter the steady state, such as Figure 2 The figure shows a typical waveform of a three-phase short circuit that has not entered a steady state. By observing the waveform trend, it is not difficult to find that although the attenuated DC component has changed the interval of the zero-crossing points of the three-phase current, it is no longer 60° apart, that is, 3.33ms, but the order of the zero-crossing points has not changed, that is, it still follows the law of the ACBA cycle.
[0042] Assuming that the current of a certain phase (such as phase A in positive sequence) crosses zero first and extinguishes the arc, it will affect the zero crossing points of the other two phases (such as phases B and C in positive sequence), resulting in the second type of zero point drift. Studies have shown that whether it is a three-phase ungrounded short-circuit fault or a three-phase grounded short-circuit fault, the first phase will cause a phase jump in the steady-state short-circuit current of the other two phases after the first phase is disconnected. The second phase crosses zero immediately after the first phase, and its phase shifts backward, which means that the time of the zero crossing of the second phase is pushed back. The last phase is disconnected last after the second phase, and its phase shifts forward, which means that the time of the zero crossing of the last phase is moved forward. When the short-circuit current has not entered the steady state, the first phase has the same impact on the zero point drift of the other two phases, that is, it causes the zero point of the second phase to shift backward and the zero point of the last phase to shift forward. This can guide the formulation of the three-phase short circuit breaking strategy.
[0043] Considering that there are many short-circuit forms in three-phase lines, the formulation of the breaking strategy is shown in the following flow chart. First, determine which phases are short-circuited based on the detection situation, determine the short-circuit type, and select different breaking strategies based on different types.
[0044] 1. Single-phase short circuit
[0045] When a single-phase short circuit occurs, only one phase has a short-circuit current. Since the current interrupted by the non-short-circuited phase is small, there is no need to consider phase-controlled operation. The switch only needs to perform phase-controlled operation on the short-circuited phase.
[0046] 2. Two-phase short circuit and two-phase ground short circuit
[0047] When two phases are short-circuited without being grounded, the currents of the two short-circuited phases are nearly symmetrical. When not disconnected, the current zero crossing points of the two phases are very close. The typical waveform is shown in Figure 3. And as long as one of the short-circuited phases is disconnected, the other phase cannot form a short-circuit loop, and the current will naturally not be very large. The two-phase grounding is similar to the ungrounded short-circuit situation. The zero-crossing points of the two fault phases are close to each other, and the distance is slightly larger in the case of grounding fault. Therefore, for this situation, the zero points of the two short-circuited phases can be predicted by phase separation, and the phase that crosses the zero point first is used as the reference, and the two fault phases can be disconnected at the same time.
[0048] 3. Three-phase short circuit and three-phase ground short circuit
[0049] When the three-phase short circuit is in place, under the premise of meeting the conditions for breaking, such as the switch receiving the relay breaking command, the time from the first zero-crossing point of the expected breaking is sufficient for the switch to reach the full opening distance, etc., each phase predicts its own zero point, and the phase that can first have the current zero-crossing point that guarantees the breaking conditions is used as the first phase (phase A, phase B or phase C) for phase-controlled breaking. If the short circuit has entered a steady state, for a three-phase ungrounded system, the currents of the last two phases will cross zero at the same time after a delay of 5ms, so the phase-controlled breaking command for the other two phases can be issued after a delay of 5ms; for a three-phase grounded system, the current of the second phase (phase C, phase A or phase B) will cross zero after 4.2ms, and the current of the last phase (phase B, phase C or phase A) will cross zero after another 2.4ms. This is a very precise control, which requires distinguishing the system grounding conditions and requiring that the short circuit has entered a steady state.
[0050] In order to simplify the control command logic, the above situations can take the middle time of the predicted current zero point of the two phases disconnected later, and add a time advance (such as 2-3ms) to ensure that the switch reaches the full opening distance requirement, and the two phases are disconnected at the same time. Based on the above situation, the three-phase short circuit phase-controlled disconnection strategy is shown in Table 1.
[0051] Table 1 Short-circuit fault phase-controlled breaking strategy
[0052]
[0053]
[0054] Example 1
[0055] For an ungrounded three-phase system, a three-phase short-circuit fault occurs. The actual current zero point can be obtained through simulation calculation. Assuming that the breaking condition is reached after 0.12s, the three-phase zero-crossing current is then disconnected. As shown in Table 2, the actual zero point has three columns, and the zero-crossing points of the second open phase and the last open phase completely coincide. The first open phase can be disconnected according to the zero point predicted once, and the second open phase and the last open phase are disconnected according to the disconnection strategy. The rightmost side of the table gives the error between the calculated midpoint of this strategy and the actual disconnection point. Considering that the 2ms advance amount is set in the strategy, it is completely acceptable in engineering applications. The waveform of the disconnection process is shown in Figure 4.
[0056] Table 2 Implementation of three-phase fault interruption strategy in ungrounded system
[0057]
[0058]
[0059] Example 2
[0060] For a grounded three-phase system, a three-phase ground short circuit fault occurs. The actual current zero point can be obtained through simulation calculation. It is assumed that the breaking condition is reached after 0.12s, and then the three-phase zero-crossing current is disconnected. As shown in Table 3, there are three columns of actual zero points. This breaking and the zero-crossing point of the last phase do not completely coincide, but are very close. The first phase can be broken according to the predicted zero point, and the second phase and the last phase can be broken according to the breaking strategy. The rightmost side of the table gives the error between the calculated midpoint of this strategy and the actual zero-crossing point of the second phase. Considering that the 2ms advance amount is set in the strategy, it is completely acceptable in engineering. The waveform of the breaking process is shown in Figure 5.
[0061] Table 3 Implementation of three-phase fault interruption strategy for three-phase grounding fault in grounding system
[0062]
[0063] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.
Claims
1. A three-phase line short-circuit fault current phase-controlled breaking control strategy, characterized in that: The following steps are involved: The real-time acquisition system collects the three-phase current signals on the AC transmission line to determine whether a short circuit fault occurs on the transmission line; If no short-circuit fault occurs, continue to collect three-phase current signals in real time and make a judgment; If a short circuit fault occurs, the type of fault in the three-phase line is determined by the number of phases of the short circuit fault, including single-phase fault, two-phase fault or three-phase fault. The current zero point prediction program of each phase is started simultaneously according to the current characteristics of each fault phase. Specifically: If a single-phase fault occurs, the zero-point prediction data of the faulty phase is directly used as the control moment of phase-controlled breaking; If a two-phase fault occurs, the first zero-crossing point of the two phases that can be disconnected in the shortest time is used as the control moment for simultaneous phase-controlled disconnection of the two faulty phases; If a three-phase fault occurs, the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is used as the control time of the first phase to be opened, and the phase control time of the remaining two phases is the average value of the corresponding phase prediction value plus the Δt advance value, and the unit of Δt is ms; When a two-phase fault or a three-phase fault occurs, there is no need to consider the impact of the first phase on the zero points of the other two phases. For a two-phase fault, the first zero-crossing point of the two phases that can be disconnected in the shortest time is directly used as the control time for the simultaneous phase-controlled disconnection of the two faulty phases; for a three-phase fault, the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is used as the control time for the first phase, and the phase-controlled control time of the remaining two phases is the average value of the corresponding phase prediction value plus the Δt advance amount; First determine the type of short-circuit fault. If it is a two-phase short circuit, the process of obtaining the first zero-crossing point that can be disconnected in the shortest time between the two phases is as follows: the two short-circuited phases independently predict the current zero point, compare the two predicted values, and take the phase with the shorter time; First determine the type of short-circuit fault. If it is a three-phase short circuit, the process of obtaining the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is: the three phases independently predict the current zero point, compare the three predicted values, and take the phase with the shorter time.
2. According to claim 1, a three-phase line short-circuit fault current phase-controlled breaking control strategy is characterized in that: Δt is measured in advance as 2ms. If the fault current is interrupted quickly and the interruption time is less than a line attenuation time constant, Δt is greater than 2ms and less than 3ms.
3. According to claim 2, a three-phase line short-circuit fault current phase-controlled breaking control strategy is characterized in that: The process of acquiring the zero-point prediction data of the fault phase is: from the real-time data sampling device.
4. According to claim 2, a three-phase line short-circuit fault current phase-controlled breaking control strategy is characterized in that: When a three-phase fault occurs, the process of obtaining the corresponding phase prediction value at the phase control moment of the remaining two phases is as follows: the three phases independently predict the current zero point without considering the influence of the first open phase, and directly average the prediction values of the remaining two phases, plus a certain advance amount Δt.
5. A three-phase line short-circuit fault current phase-controlled breaking control system, characterized in that: include Data collection and judgment module: The real-time data collection system collects the three-phase current signals on the AC transmission line to determine whether a short circuit fault occurs on the transmission line; If no short-circuit fault occurs, the data acquisition and judgment module continues to collect three-phase current signals in real time and then makes a judgment; If a short circuit fault occurs, the number of phases with short circuit fault is determined; The real-time judgment module judges the fault type of the three-phase line, including single-phase fault, two-phase fault or three-phase fault, and starts the current zero point prediction program according to the current characteristics of each fault phase at the same time, specifically: If a single-phase fault occurs, the zero-point prediction data of the faulty phase is directly used as the control moment of phase-controlled breaking; If a two-phase fault occurs, the first zero-crossing point of the two phases that can be disconnected in the shortest time is used as the control moment for simultaneous phase-controlled disconnection of the two faulty phases; If a three-phase fault occurs, the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is used as the control time of the first phase to be opened, and the phase control time of the remaining two phases is the average value of the corresponding phase prediction value plus the Δt advance value, and the unit of Δt is ms; When a two-phase fault or a three-phase fault occurs, there is no need to consider the impact of the first phase on the zero points of the other two phases. For a two-phase fault, the first zero-crossing point of the two phases that can be disconnected in the shortest time is directly used as the control time for the simultaneous phase-controlled disconnection of the two faulty phases; for a three-phase fault, the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is used as the control time for the first phase, and the phase-controlled control time of the remaining two phases is the average value of the corresponding phase prediction value plus the Δt advance amount; First determine the type of short-circuit fault. If it is a two-phase short circuit, the process of obtaining the first zero-crossing point that can be disconnected in the shortest time between the two phases is as follows: the two short-circuited phases independently predict the current zero point, compare the two predicted values, and take the phase with the shorter time; First determine the type of short-circuit fault. If it is a three-phase short circuit, the process of obtaining the first zero-crossing point of any phase that can be disconnected in the shortest time among the three phases is: predict the current zero point of the three phases independently, compare the three predicted values, and take the phase with the shorter time.
