A method and device for generating floor grinding path based on robot

Through the robot floor grinding path generation method, the problem of difficulty in ensuring the flatness of the ground and dust at the construction site is solved, and more efficient and safe construction results are achieved.

CN115509215BActive Publication Date: 2024-11-08GUANGDONG BRIGHT DREAM ROBOTICS CO LTD
View PDF 14 Cites 0 Cited by

Patent Information

Application Number
CN202110641150.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-08
Publication Date
2024-11-08
Estimated Expiration
2041-06-08

AI Technical Summary

Technical Problem

The existing floor grinding methods rely on manual operations, making it difficult to ensure the flatness of the ground, and the dust at the construction site affects the physical condition of workers.

Method used

Using robot-based floor grinding path generation method, the construction path that meets the requirements of linear grinding, overlapping of grinding areas, minimum number of turn heads and anti-winding through site area division, path adjustment and robot column routing calculation, ensures that the ground is flat and Reduce dust exposure.

Benefits of technology

It achieves higher flatness after ground grinding and safety at the construction site, avoids the impact of dust on workers' health, and improves construction efficiency and effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115509215B_ABST
    Figure CN115509215B_ABST
Patent Text Reader

Abstract

The embodiment of the present application provides a method and device for generating a floor grinding path based on a robot, which relates to the field of building construction technology. The method for generating a floor grinding path based on a robot includes: dividing the site into regions according to the site contour line of the site to obtain a construction area; generating a preliminary operation path in the construction area according to a preset straight line grinding requirement, a preset grinding area overlap requirement, a preset minimum number of U-turns requirement, and a preset anti-winding requirement; calculating according to the robot size information and the column size information to obtain a robot column-circling route; adjusting the preliminary operation path according to the robot column-circling route to obtain an operation construction path. It can be seen that the implementation of this embodiment can make the ground smoother after floor grinding, and can also prevent the dust at the construction site from affecting the physical condition of the workers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building construction, and in particular, to a method and device for generating a floor grinding path based on a robot. Background Art

[0002] At present, in order to ensure the flatness and smoothness of the ground of the underground garage, it is usually necessary to grind the ground concrete base before applying floor paint. However, at present, manual hand-push ground grinders are used on the market to grind the ground concrete base. However, this grinding method cannot effectively ensure the flatness of the ground due to manual operation, and the dust on the construction site will also affect the physical condition of the workers. Summary of the invention

[0003] The purpose of the embodiments of the present application is to provide a robot-based floor grinding path generation method and device, which can effectively ensure the flatness of the ground after grinding and prevent the dust at the construction site from affecting the physical condition of the workers.

[0004] A first aspect of an embodiment of the present application provides a method for generating a floor grinding path based on a robot, comprising:

[0005] Divide the site into regions according to the site contour lines of the site to obtain a construction area;

[0006] Generate a preliminary operation path in the construction area according to a preset straight line grinding requirement, a preset grinding area overlap requirement, a preset minimum number of U-turns requirement, and a preset anti-winding requirement;

[0007] Calculate based on the robot size information and the column size information to obtain the robot's route around the column;

[0008] The preliminary operation path is adjusted according to the robot's route around the column to obtain an operation construction path.

[0009] In the above implementation process, the method can give priority to dividing the area to be ground, obtain the construction area, and use the construction area as the minimum operation unit to generate the preliminary operation path, and then adjust the preliminary operation path while taking into account the requirements of straight line grinding, grinding area overlap, minimum number of U-turns, anti-winding requirements, and avoiding obstacle columns, so as to obtain the operation construction route that finally meets all requirements. It can be seen that by implementing this implementation method, the best operation path that meets all requirements can be obtained in each minimum operation unit, so that the ground can be smoother after the robot performs floor grinding according to the best operation path, and the dust at the construction site can be prevented from affecting the physical condition of the workers.

[0010] Furthermore, before the step of dividing the site into regions according to the site contour lines to obtain the construction areas, the method further includes:

[0011] Obtain site information based on building information model, LiDAR scanning results or SLAM scanning results;

[0012] A site contour line of the site is determined according to the site information.

[0013] In the above implementation process, the method can obtain site information through any one of the building information model, laser radar scanning results or SLAM scanning results, so as to obtain higher-precision site information, and then determine the site contour line according to the high-precision site information. It can be seen that by implementing this implementation method, a higher-precision site contour line can be obtained, which is conducive to more accurate division of the construction area.

[0014] Furthermore, the step of generating a preliminary operation path in the construction area according to the preset straight line grinding requirement, the preset grinding area overlap requirement, the preset minimum number of U-turns requirement and the preset anti-winding requirement includes:

[0015] Generating a plurality of straight uniform paths in the construction area according to a preset straight line grinding requirement and a preset grinding area overlap requirement;

[0016] According to the preset minimum number of U-turns and the preset anti-winding requirements, a preliminary operation path is determined among the plurality of straight uniform paths.

[0017] In the above implementation process, the method can give priority to generating multiple straight uniform paths in the construction area according to the straight grinding requirements and the grinding area overlap requirements; wherein, the straight uniform path can be understood as a circuitous path, and the specific straight uniform path is composed of multiple continuous line segments, so the straight uniform path does not have any curves. At the same time, the multiple straight uniform paths can be horizontal or vertical, and the difference lies in the number of line segments and the convenience in the actual application process. And for this reason, the method further selects multiple straight uniform paths according to the number of U-turns and anti-winding requirements, thereby determining a preliminary operation path with the minimum number of U-turns and no winding problems. It can be seen that the implementation of this implementation method can obtain preliminary operation paths that meet various requirements in stages, thereby providing an adjustment basis for subsequent path adjustments.

[0018] Furthermore, the step of calculating according to the robot size information and the column size information to obtain the robot's route around the column includes:

[0019] Calculate based on the preset safety distance and column size information to obtain an avoidance path;

[0020] Determine a rotation center of the robot according to the robot size information, and calculate a first rotation distance between the head of the robot and the rotation center and a second rotation distance between the tail of the robot and the rotation center;

[0021] Calculate according to the preset safety distance, the first rotation distance and the column size information to obtain an avoidance rotation angle;

[0022] Calculate according to the preset safety distance, the second rotation distance and the cylinder size information to obtain a regression rotation angle;

[0023] A robot route around the column is generated according to the original path of the robot, the preset safety distance, the avoidance path, the avoidance rotation angle and the regression rotation angle.

[0024] In the above implementation process, the method can calculate according to the actual column size, the preset safety distance, and the robot size information to obtain a variety of key data, and generate a route according to the various key data to obtain the robot's route around the column. It can be seen that by implementing this implementation method, a specific robot's route around the column can be obtained, which is conducive to adjusting the preliminary operation path.

[0025] Furthermore, the method further comprises:

[0026] The plurality of operation construction paths corresponding to the plurality of construction areas are combined to obtain an overall construction path.

[0027] In the above implementation process, the method can obtain the operation construction paths of multiple construction areas through the above steps, and then merge the multiple operation construction paths through this step to obtain a complete overall construction path. It can be seen that the implementation of this implementation method can generate a complete construction path, which is conducive to the construction of large-scale floor grinding.

[0028] A second aspect of an embodiment of the present application provides a robot-based floor grinding path generation device, the robot-based floor grinding path generation device comprising:

[0029] A division unit, used for dividing the site into regions according to the site contour lines of the site to obtain a construction area;

[0030] A generating unit, configured to generate a preliminary operation path in the construction area according to a preset straight line grinding requirement, a preset grinding area overlap requirement, a preset minimum number of U-turns requirement, and a preset anti-winding requirement;

[0031] A calculation unit, used for calculating according to the size information of the robot and the size information of the column to obtain a route for the robot to go around the column;

[0032] The adjustment unit is used to adjust the preliminary operation path according to the robot's route around the column to obtain an operation construction path.

[0033] In the above implementation process, the device can obtain the optimal working path that meets all requirements in each minimum working unit, so that the ground can be smoother after the robot polishes the floor according to the optimal working path, and the dust at the construction site can be prevented from affecting the physical condition of the workers.

[0034] Furthermore, the generating unit comprises:

[0035] A first generating subunit, for generating a plurality of straight uniform paths in the construction area according to a preset straight line grinding requirement and a preset grinding area overlap requirement;

[0036] The determination subunit is used to determine a preliminary operation path among the multiple straight uniform paths according to a preset minimum number of U-turns and a preset anti-winding requirement.

[0037] In the above implementation process, the device can generate multiple straight uniform paths in the construction area according to the straight grinding requirements and the grinding area overlap requirements through the first generation subunit; wherein, the straight uniform path can be understood as a circuitous path, and the specific straight uniform path is composed of multiple continuous line segments, so the straight uniform path does not have any curves. At the same time, the multiple straight uniform paths can be horizontal or vertical, and the difference lies in the number of line segments and the convenience in the actual application process. And for this reason, the device further selects multiple straight uniform paths according to the number of U-turns and anti-winding requirements through the determination subunit, thereby determining a preliminary operation path with the minimum number of U-turns and no winding problems. It can be seen that the implementation of this implementation method can obtain preliminary operation paths that meet various requirements in stages, thereby providing an adjustment basis for subsequent path adjustments. .

[0038] Furthermore, the calculation unit comprises:

[0039] A calculation subunit, used to calculate according to the preset safety distance and column size information to obtain an avoidance path;

[0040] The calculation subunit is further used to determine the rotation center of the robot according to the robot size information, and calculate a first rotation distance between the head of the robot and the rotation center and a second rotation distance between the tail of the robot and the rotation center;

[0041] The calculation subunit is further used to calculate according to the preset safety distance, the first rotation distance and the column size information to obtain an avoidance rotation angle;

[0042] The calculation subunit is further used to calculate according to the preset safety distance, the second rotation distance and the cylinder size information to obtain a regression rotation angle;

[0043] The second generating subunit is used to generate a robot route around the column according to the original path of the robot, the preset safety distance, the avoidance path, the avoidance rotation angle and the regression rotation angle.

[0044] In the above implementation process, the device can calculate according to the actual column size, the preset safety distance, and the robot size information to obtain a variety of key data, and generate a route according to the various key data to obtain the robot's route around the column. It can be seen that by implementing this implementation method, a specific robot's route around the column can be obtained, which is conducive to adjusting the preliminary operation path.

[0045] A third aspect of an embodiment of the present application provides an electronic device, including a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the robot-based floor grinding path generation method described in any one of the first aspect of the embodiment of the present application.

[0046] A fourth aspect of an embodiment of the present application provides a computer-readable storage medium storing computer program instructions. When the computer program instructions are read and executed by a processor, the robot-based floor grinding path generation method described in any one of the first aspect of the embodiment of the present application is executed. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0048] Figure 1 A schematic diagram of a flow chart of a method for generating a floor grinding path based on a robot provided in an embodiment of the present application;

[0049] Figure 2 A schematic flow chart of another method for generating a floor grinding path based on a robot provided in an embodiment of the present application;

[0050] Figure 3A schematic diagram of the structure of a robot-based floor grinding path generation device provided in an embodiment of the present application;

[0051] Figure 4 A schematic diagram of another robot-based floor grinding path generation device provided in an embodiment of the present application

[0052] Figure 5 A schematic diagram of obtaining a construction area provided in an embodiment of the present application;

[0053] Figure 6 A schematic diagram of a straight uniform path with a length direction priority provided in an embodiment of the present application;

[0054] Figure 7 A schematic diagram of a straight uniform path with short side priority in path direction provided in an embodiment of the present application;

[0055] Figure 8 A schematic diagram of a U-turn path planning based on anti-winding requirements provided in an embodiment of the present application;

[0056] Fig. 9 A schematic diagram of a robot circling a column process provided in an embodiment of the present application;

[0057] Fig.10 A schematic diagram of another robot circling a column process provided in an embodiment of the present application;

[0058] Fig.11 A schematic diagram of another robot circling a column process provided in an embodiment of the present application;

[0059] Fig.12 A schematic diagram of a floor grinding path generation effect provided in an embodiment of the present application;

[0060] Fig.13 A schematic diagram of the floor grinding path generation effect provided in an embodiment of the present application. DETAILED DESCRIPTION

[0061] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application.

[0062] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0063] Example 1

[0064] Please see Figure 1 , Figure 1 A schematic flow chart of a method for generating a floor grinding path based on a robot is provided for an embodiment of the present application. The method for generating a floor grinding path based on a robot includes:

[0065] S101. Divide the site into regions according to the site contour lines to obtain construction areas.

[0066] In this embodiment, the venue is the main working scene of the robot.

[0067] In this embodiment, the venue may include a basement.

[0068] In this embodiment, the basement usually has a complex layout. In order to prevent the cable-powered robot from pressing the cables during operation and to obtain a more reasonable construction path, this step prioritizes the intelligent pre-division of the complex basement site to obtain specific construction areas, thereby facilitating subsequent path generation.

[0069] In this embodiment, this step can divide the area by obtaining the location of the power point, the fire partition information, and the space size information to obtain the construction area.

[0070] For example, within the cable range, this method can divide the same fire partition, a large continuous space into one area. Figure 5 As shown, the area is divided into two areas (the upper area A and the lower area B). It can be seen that the area splitting can create the prerequisite for the effective layout of the cables in the subsequent automatic path planning, thereby facilitating the acquisition of the floor grinding path.

[0071] S102: Generate a preliminary operation path in the construction area according to a preset straight line grinding requirement, a preset grinding area overlap requirement, a preset minimum number of U-turns requirement, and a preset anti-winding requirement.

[0072] In this embodiment, the preset straight line grinding requirement is intended to require that no curves be allowed in the generated path, thereby ensuring that the path is composed of multiple continuous line segments.

[0073] In this embodiment, the preset grinding area overlap requirement is intended to require that there be a certain overlapping area between two adjacent grinding paths.

[0074] In this embodiment, the preset minimum number of U-turns requirement is intended to require that the number of all line segments in the grinding path be minimum.

[0075] In this embodiment, the preset anti-winding requirement is intended to require the robot to avoid winding the wire around an obstacle column during operation, thereby avoiding the situation where the cable cannot be bundled.

[0076] S103, calculating according to the robot size information and the column size information to obtain a route for the robot to go around the column.

[0077] In this embodiment, if it is found that the planned path overlaps with the pillar, it is necessary to replan the local path to avoid the pillar. The local path is the robot's route around the pillar.

[0078] In this embodiment, the robot is a spatial entity with certain robot entities in front and behind its center. Therefore, based on this point, the present application further calculates the robot's route around the column according to the obstacle column and the size of the robot.

[0079] S104, adjusting the preliminary operation path according to the robot's route around the column to obtain the operation construction path.

[0080] In this embodiment, the method may prioritize identifying obstacle routes in the preliminary operation path (routes close to obstacle columns or routes crossing obstacle columns), and then use robot routes around columns to replace these obstacle routes, thereby obtaining the operation construction path.

[0081] In the embodiment of the present application, the execution subject of the method can be a computing device such as a computer or a server, and no limitation is made in this embodiment.

[0082] In the embodiment of the present application, the execution subject of the method can also be a smart device such as a smart phone, a tablet computer, etc., and there is no limitation on this in the present embodiment.

[0083] It can be seen that the implementation of the robot-based floor grinding path generation method described in this embodiment can give priority to the regional division of the site to be ground, obtain the construction area, and use the construction area as the minimum operation unit to generate the preliminary operation path, and then adjust the preliminary operation path while taking into account the requirements of straight line grinding, grinding area overlap, minimum number of U-turns, anti-winding requirements, and avoiding obstacle columns, so as to obtain the operation construction route that finally meets all requirements. It can be seen that the implementation of this embodiment can obtain the best operation path that meets all requirements in each minimum operation unit, so that the ground can be smoother after the robot performs floor grinding according to the best operation path, and it can also avoid the dust at the construction site from affecting the physical condition of the workers.

[0084] Example 2

[0085] Please see Figure 2 , Figure 2 The present invention provides a flow chart of a method for generating a floor grinding path based on a robot. Figure 2 As shown, the robot-based floor grinding path generation method includes:

[0086] S201. Acquire site information according to a building information model, a laser radar scanning result or a SLAM scanning result.

[0087] S202: Determine a site contour line of the site according to the site information.

[0088] In this embodiment, the method determines the site contour of the site according to the location of the power point, the fire partition, and the size of the space.

[0089] S203: Divide the site into regions according to the site contour lines to obtain construction areas.

[0090] After step S203, the following steps are also included:

[0091] S204: Generate multiple straight uniform paths in the construction area according to the preset straight line grinding requirement and the preset grinding area overlap requirement.

[0092] In this embodiment, in order to overcome the walking accuracy error problem of the machine, ensure the coverage area, and meet other requirements such as avoiding pillars and U-turn strategies, the paths are required to be evenly divided and adjacent paths are required to have a certain overlapping area.

[0093] In this embodiment, the center distance (for example, between two adjacent grinding paths) should be maintained within the optimal grinding data range.

[0094] In this embodiment, the method ensures that the robot walks along a strict straight line or oblique line to perform grinding operations by providing the coordinates and posture angles of the robot during its walking process. The data structure is defined as follows:

[0095]

[0096] Among them, x, y, z, and Angle represent the robot's station posture.

[0097] In this embodiment, the robot's walking accuracy is (+5mm to +20mm) and (-5mm to -20mm). This method can accurately control the robot's walking straight and oblique lines according to the walking position and angle.

[0098] S205: Determine a preliminary operation path among a plurality of straight uniform paths according to a preset minimum number of U-turns and a preset anti-winding requirement.

[0099] In this embodiment, when the robot's tail is dragging the wire, the robot can only move forward to work, and cannot move backward or go back halfway. Otherwise, the wheels will run over the wire. At the same time, the robot cannot walk around the pillar, otherwise the wires at the rear of the robot will get tangled around the pillar. Therefore, the method needs to determine the initial operation path among multiple straight uniform paths based on the preset minimum number of U-turns and the preset anti-winding requirements.

[0100] See also Figure 6 and Figure 7 , Figure 6 It shows a straight uniform path with the length direction of the path being preferred. Figure 7 A straight uniform path with short edge priority is shown. Figure 6 and Figure 7 It can be seen that after determining the overall direction of the robot operation, Figure 6 The robot turns around less frequently, so its construction efficiency is high. Figure 6 The straight uniform path in the middle is determined as the preliminary operation path.

[0101] See also Figure 8 , Figure 8 This is a U-turn path planning diagram based on the requirement of anti-winding. Because the length of the cable carried by the robot is limited, the robot may drag or retract the cable during walking to ensure that the cable is sufficient.

[0102] In this embodiment, due to the above reasons, the method must consider the release path of the cable when designing the path, mainly planning the turning path of the path. Figure 8 It can be seen that the left diagram will cause the cable to be entangled with the pillar A, while the right diagram will not. Therefore, based on this example, it is clear what the anti-entanglement requirements of this solution are.

[0103] In the embodiment of the present application, the implementation of the above steps S204 to S205 can generate a preliminary operation path in the construction area according to the preset straight line grinding requirements, the preset grinding area overlap requirements, the preset minimum number of U-turn requirements and the preset anti-winding requirements.

[0104] After step S205, the following steps are also included:

[0105] S206: Calculate according to the preset safety distance and column size information to obtain an avoidance path.

[0106] See also Fig. 9 , the avoidance path in this step is Fig. 9 Middle avoidance path 1.

[0107] S207 . Determine the rotation center of the robot according to the robot size information, and calculate a first rotation distance between the head of the robot and the rotation center and a second rotation distance between the tail of the robot and the rotation center.

[0108] In this embodiment, the first rotation distance is the distance between the head of the robot and the rotation center; the second rotation distance is the distance between the tail of the robot and the rotation center.

[0109] S208: Calculate according to the preset safety distance, the first rotation distance and the cylinder size information to obtain an avoidance rotation angle.

[0110] See also Fig. 9 , Fig. 9 The preset safety distance is safety distance D1, and the column size information is represented by the "column" in the figure. The angle between the straight line AB and the original path during the counterclockwise rotation of the robot is called the avoidance rotation angle. After the robot rotates, the heading of the robot changes from the positive direction to the heading C.

[0111] In this embodiment, please refer to Fig. 9 , this step may specifically include:

[0112] Adjust the robot's heading angle so that the robot moves forward along the original path until it is at a distance D1 from the pillar;

[0113] Control the robot to move forward in heading C until the center of rotation of the robot intersects with avoidance path 1 (i.e. point B);

[0114] Adjust the robot's heading angle so that the robot enters avoidance path 1.

[0115] S209: Calculate according to the preset safety distance, the second rotation distance and the cylinder size information to obtain a regression rotation angle.

[0116] Please participate Fig.10 , Fig.10 Point C coincides with the center of the robot, that is, the second rotation distance is the distance from point C to the tail of the robot; the preset safety distance is the safety distance D1. Fig.10 In the example, the robot travels a distance on avoidance path 1 until the center of the robot coincides with point B, and then rotates clockwise to the angle value of the regression rotation angle, and then travels a distance again until the center of the robot coincides with point C.

[0117] S210, generating a robot route around the column according to the original path of the robot, the preset safety distance, the avoidance path, the avoidance rotation angle, and the regression rotation angle.

[0118] See also Fig.11 , which shows a schematic diagram of the robot returning to its original path around a column.

[0119] In this embodiment, after the robot and the vehicle body it carries complete the avoidance, the tail of the robot and the vehicle body still need to maintain a minimum distance D1 from the column. Fig. 9 , Fig.10 as well as Fig.11 The overall robot circling process can be known. Moreover, based on the known circling process, the method needs to pre-calculate the original path, preset safety distance, avoidance path, avoidance rotation angle and regression rotation angle so that the robot can perform circling operations according to these parameters. Therefore, using time reverse reasoning here, it can be known that:

[0120] ① Fig.10 and Fig.11 The position of point C in needs to be calculated, and the calculation formula is as follows:

[0121] The distance between point C and the nearest edge of the column = safety distance D1 + robot tail rotation radius (i.e. the second rotation distance);

[0122] The position of point C can be determined according to the above formula.

[0123] ② Fig.10 and Fig.11 The direction of the avoidance path 2 in can be determined by calculating the regression rotation angle. The reason is that the rotation center of the vehicle body remains unchanged at C, and it rotates clockwise at a certain angle, and ensures that the right boundary of the vehicle body keeps a safe distance D1 from the pillar when moving forward or backward in the direction. Su Souyi can calculate this rotation angle using a geometric formula, which is as follows:

[0124] Θ = arctan (vertical distance of BC / horizontal distance of BC);

[0125] ③ Fig.10 and Fig.11 The intersection point of avoidance path 2 and avoidance path 1, namely point B, can also be directly calculated using geometric formulas.

[0126] In the embodiment of the present application, by implementing the above steps S206 to S210, calculations can be performed based on the robot size information and the column size information to obtain the robot's route around the column.

[0127] S211. Adjust the preliminary operation path according to the robot's route around the column to obtain the operation construction path.

[0128] See also Fig.12 and Fig.13 , Fig.12 and Fig.13 The renderings show the working construction paths in two different areas.

[0129] S212, merging multiple operation construction paths corresponding to multiple construction areas one by one to obtain an overall construction path.

[0130] In this embodiment, because the site can be divided into multiple construction areas, the multiple construction areas can be merged to obtain an overall construction path.

[0131] It can be seen that the implementation of the robot-based floor grinding path generation method described in this embodiment can obtain the optimal operation path that meets all requirements in each minimum operation unit, so that the ground can be smoother after the robot grinds the floor according to the optimal operation path, and it can also avoid the dust at the construction site from affecting the physical condition of the workers.

[0132] Example 3

[0133] Please see Figure 3 , Figure 3 The schematic diagram of the structure of a robot-based floor grinding path generation device provided in the embodiment of the present application. Figure 3 As shown, the robot-based floor grinding path generation device includes:

[0134] A division unit 310 is used to divide the site into regions according to the site contour lines of the site to obtain a construction area;

[0135] A generating unit 320, for generating a preliminary operation path in the construction area according to a preset straight line grinding requirement, a preset grinding area overlap requirement, a preset minimum number of U-turns requirement, and a preset anti-winding requirement;

[0136] A calculation unit 330 is used to calculate according to the robot size information and the column size information to obtain a path for the robot to go around the column;

[0137] The adjustment unit 340 is used to adjust the preliminary operation path according to the robot's route around the column to obtain the operation construction path.

[0138] In the embodiments of the present application, the explanation of the robot-based floor grinding path generation device can refer to the description in Embodiment 1 or Embodiment 2, and no further elaboration will be given in this embodiment.

[0139] It can be seen that the implementation of the robot-based floor grinding path generation device described in this embodiment can obtain the optimal working path that meets all requirements in each minimum working unit, so that the ground can be smoother after the robot grinds the floor according to the optimal working path, and it can also avoid the dust at the construction site from affecting the physical condition of the workers.

[0140] Example 4

[0141] Please also read Figure 4 , Figure 4 : is a schematic diagram of a structure of a robot-based floor grinding path generation device provided in an embodiment of the present application. Figure 4 The robot-based floor grinding path generation device shown is composed of Figure 3 The robot-based floor grinding path generation device shown in FIG. Figure 4 As shown, the generating unit 320 includes:

[0142] The first generating subunit 321 is used to generate a plurality of straight uniform paths in the construction area according to a preset straight line grinding requirement and a preset grinding area overlap requirement;

[0143] The determination subunit 322 is used to determine a preliminary operation path among a plurality of straight uniform paths according to a preset minimum number of U-turns and a preset anti-winding requirement.

[0144] As an optional embodiment, the robot-based floor grinding path generation device also includes:

[0145] The acquisition unit 350 is used to obtain site information according to the building information model, the laser radar scanning result or the SLAM scanning result before dividing the site into regions according to the site contour line of the site to obtain the construction area;

[0146] The determining unit 360 is configured to determine a site contour line of the site according to the site information.

[0147] As an optional implementation, the calculation unit 330 includes:

[0148] A calculation subunit 331 is used to calculate according to the preset safety distance and the column size information to obtain an avoidance path;

[0149] The calculation subunit 331 is further used to determine the rotation center of the robot according to the robot size information, and calculate a first rotation distance between the head of the robot and the rotation center and a second rotation distance between the tail of the robot and the rotation center;

[0150] The calculation subunit 331 is further used to calculate according to the preset safety distance, the first rotation distance and the cylinder size information to obtain the avoidance rotation angle;

[0151] The calculation subunit 331 is further used to calculate according to the preset safety distance, the second rotation distance and the cylinder size information to obtain the regression rotation angle;

[0152] The second generating subunit 332 is used to generate a robot route around the column according to the original path of the robot, a preset safety distance, an avoidance path, an avoidance rotation angle, and a regression rotation angle.

[0153] As an optional embodiment, the robot-based floor grinding path generation device also includes:

[0154] The merging unit 370 is used to merge multiple operation construction paths corresponding to multiple construction areas one by one to obtain an overall construction path.

[0155] In the embodiments of the present application, the explanation of the robot-based floor grinding path generation device can refer to the description in Embodiment 1 or Embodiment 2, and no further elaboration will be given in this embodiment.

[0156] It can be seen that the implementation of the robot-based floor grinding path generation device described in this embodiment can obtain the optimal working path that meets all requirements in each minimum working unit, so that the ground can be smoother after the robot grinds the floor according to the optimal working path, and it can also avoid the dust at the construction site from affecting the physical condition of the workers.

[0157] An embodiment of the present application provides an electronic device, including a memory and a processor, the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute any robot-based floor grinding path generation method in Embodiment 1 or Embodiment 2 of the present application.

[0158] An embodiment of the present application provides a computer-readable storage medium storing computer program instructions. When the computer program instructions are read and executed by a processor, any one of the robot-based floor grinding path generation methods in Embodiment 1 or Embodiment 2 of the present application is executed.

[0159] In several embodiments provided in the present application, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0160] In addition, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.

[0161] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0162] The above description is only an embodiment of the present application and is not intended to limit the scope of protection of the present application. For those skilled in the art, the present application may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.

[0163] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

Claims

1. A method for generating a floor grinding path based on a robot, characterized in that: The method comprises: Divide the site into regions according to the site contour lines of the site to obtain a construction area; Generate a preliminary operation path in the construction area according to a preset straight line grinding requirement, a preset grinding area overlap requirement, a preset minimum number of U-turns requirement, and a preset anti-winding requirement; Calculate based on the preset safety distance and column size information to obtain an avoidance path; Determine a rotation center of the robot according to the robot size information, and calculate a first rotation distance between the head of the robot and the rotation center and a second rotation distance between the tail of the robot and the rotation center; Calculate according to the preset safety distance, the first rotation distance and the column size information to obtain an avoidance rotation angle; Calculate according to the preset safety distance, the second rotation distance and the cylinder size information to obtain a regression rotation angle; Generate a robot route around the column according to the original path of the robot, the preset safety distance, the avoidance path, the avoidance rotation angle, and the regression rotation angle; The obstacle route in the preliminary operation path is identified, and the obstacle route is replaced by the robot's column-circling route to obtain the operation construction path.

2. The method for generating a floor grinding path based on a robot according to claim 1, characterized in that: Before the step of dividing the site into regions according to the site contour lines to obtain the construction areas, the method further includes: Obtain site information based on building information model, LiDAR scanning results or SLAM scanning results; A site contour line of the site is determined according to the site information.

3. The method for generating a floor grinding path based on a robot according to claim 1, characterized in that: The step of generating a preliminary operation path in the construction area according to the preset straight line grinding requirement, the preset grinding area overlap requirement, the preset minimum number of U-turns requirement and the preset anti-winding requirement includes: Generating a plurality of straight uniform paths in the construction area according to a preset straight line grinding requirement and a preset grinding area overlap requirement; According to the preset minimum number of U-turns and the preset anti-winding requirements, a preliminary operation path is determined among the plurality of straight uniform paths.

4. The method for generating a floor grinding path based on a robot according to claim 1, characterized in that: The method further comprises: The plurality of operation construction paths corresponding to the plurality of construction areas are combined to obtain an overall construction path.

5. A robot-based floor grinding path generation device, characterized in that: The robot-based floor grinding path generation device comprises: A division unit, used for dividing the site into regions according to the site contour lines of the site to obtain a construction area; A generating unit, configured to generate a preliminary operation path in the construction area according to a preset straight line grinding requirement, a preset grinding area overlap requirement, a preset minimum number of U-turns requirement, and a preset anti-winding requirement; A calculation unit, used for calculating according to the size information of the robot and the size information of the column to obtain a route for the robot to go around the column; An adjustment unit, used for identifying an obstacle route in the preliminary operation path, and replacing the obstacle route with the robot's pillar-circling route to obtain an operation construction path; Wherein, the computing unit comprises: A calculation subunit, used to calculate according to the preset safety distance and column size information to obtain an avoidance path; The calculation subunit is further used to determine the rotation center of the robot according to the robot size information, and calculate a first rotation distance between the head of the robot and the rotation center and a second rotation distance between the tail of the robot and the rotation center; The calculation subunit is further used to calculate according to the preset safety distance, the first rotation distance and the column size information to obtain an avoidance rotation angle; The calculation subunit is further used to calculate according to the preset safety distance, the second rotation distance and the cylinder size information to obtain a regression rotation angle; The second generating subunit is used to generate a robot route around the column according to the original path of the robot, the preset safety distance, the avoidance path, the avoidance rotation angle and the regression rotation angle.

6. The robot-based floor grinding path generation device according to claim 5, characterized in that: The generating unit comprises: A first generating subunit, for generating a plurality of straight uniform paths in the construction area according to a preset straight line grinding requirement and a preset grinding area overlap requirement; The determination subunit is used to determine a preliminary operation path among the multiple straight uniform paths according to a preset minimum number of U-turns and a preset anti-winding requirement.

7. An electronic device, characterized in that: The electronic device comprises a memory and a processor, the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the robot-based floor grinding path generation method according to any one of claims 1 to 4.

8. A readable storage medium, characterized in that: The readable storage medium stores computer program instructions, and when the computer program instructions are read and executed by a processor, the robot-based floor grinding path generation method according to any one of claims 1 to 4 is executed.

Citation Information

Patent Citations

  • Robot cleaning path planning method and chip

    CN107368079A

  • Automated terrace robot concrete polishing system

    CN107414624A

  • Ground leveling robot and control method thereof

    CN108398950A

  • Unmanned control method and system for agricultural vehicle and agricultural vehicle

    CN109634276A

  • Robot full-coverage path planning method and device based on raster map as well as equipment

    CN109947114A