A building construction method and building construction structure using a residential building construction machine
By improving the external protective hanger in sections, the safety risks and efficiency problems of boom construction in traditional hanging installations are solved, and efficient and safe construction of residential building machines is achieved.
Patent Information
- Application Number
- CN202211210425.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-30
- Publication Date
- 2025-07-18
- Estimated Expiration
- 2042-09-30
AI Technical Summary
The exterior protective hanger of the traditional hanging installation residential building machine is prone to conflict with the floor-standing steel pipe scaffolding, affecting the installation and construction of the boom, with a large amount of work at high altitudes, inconvenient construction and high safety risks.
The sectional lifting method is adopted, and the external protective hanger is lifted upwards one by one by one by one, combining the wall parts and the boom to install it instead of the floor-standing scaffolding.
It improves construction efficiency, shortens construction period, reduces safety risks and economic costs, and enhances the reliability and adaptability of construction.
Smart Images

Figure CN115538792B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of the installation and construction of residential building machines, and particularly relates to an installation and construction method and structure of a residential building machine. Background Art
[0002] The hanging frame system of a residential building machine mainly consists of a hanging head, a suspension rod, a connecting splint, a walkway board, a cross beam, etc. Different from a climbing frame, the external protection frame of a residential building machine adopts a hanging design, and the entire frame is suspended under the lower chord of a Bailey truss through a hanging head. The traditional suspension rod is designed as 50×50×4, and the walkway board is designed in two forms: diamond steel plate mesh and lenticular pattern steel plate.
[0003] When the traditional hanging frame system is designed, in order to meet the requirements of main structure construction and lean construction, the total height of the entire frame is 17.23m, and a total of 8 layers of walkway boards are set. The height of each layer of the hanging frame (counting from top to bottom) is 2m for the first layer, 2.23m for the second layer, 2m for the third layer, 2m for the fourth layer, 3m for the fifth layer, 2m for the sixth layer, 2m for the seventh layer, and 2m for the eighth layer. The suspension rod is formed by butt-jointing 3 square tubes.
[0004] Its installation sequence is: hanging head → suspension rod → cross beam → walkway board → external protection mesh. Since the external protection hanging frame needs to be installed after the installation of the Bailey truss of the residential building machine, and the residential building machine is usually installed after the completion of the second-layer structure of the main structure construction. Therefore, when constructing the first and second floors of the main structure, it is necessary to first set up an external protection floor-standing steel pipe scaffold for the main structure construction, and when the residential building machine starts to install the external protection hanging frame, the floor-standing scaffold is demolished. This construction method has the following problems:
[0005] 1) The hanging frame adopts a hanging design. During installation, it is necessary for workers to use a winch or pulley to lift the suspension rod from the ground upwards manually, and then the construction workers operate inside the Bailey truss to install the combination of the suspension rod and the hanging head. This construction process is cumbersome and has a relatively high risk factor;
[0006] 2) When installing the hanging frame, it is necessary to demolish the floor-standing scaffold in advance. At this time, there are no protective facilities around the floors, balconies, etc., posing certain safety hazards;
[0007] 3) Manually using a pulley to lift the suspension rod for installation requires a large number of construction workers. Generally, 2 - 3 people are needed inside the truss, and 5 - 7 people are needed for the ground lifting. The construction cost is high and the installation time is long;
[0008] 4) When installing the external hanging frame, it is necessary to demolish the floor-standing scaffold, and the installation time of the hanging frame is relatively long. During this process, the main structure cannot be constructed, affecting the construction period of the main structure and easily causing late-stage main labor claims.
[0009] In summary, for the traditional hanging-type installation of the external protection hanging rack of the residential building construction machine, the hanging rack is prone to conflict with the floor-standing steel pipe scaffold, which affects the installation construction of the suspender. Moreover, the amount of high-altitude work is large, the construction is inconvenient, and the safety risk is high. Summary of the Invention
[0010] The present invention provides a method and structure for installing a residential building construction machine, which solves the technical problems of the traditional hanging-type installation of the external protection hanging rack of the residential building construction machine described above, where the hanging rack is prone to conflict with the floor-standing steel pipe scaffold, affecting the installation construction of the suspender, with a large amount of high-altitude work, inconvenient construction, and high safety risk.
[0011] The present invention provides a method for installing a residential building construction machine to solve the above technical problems, including the following steps:
[0012] S1, after the top slab construction is completed, carry out positioning and layout, mark the position of each suspender, and set the suspender installation points according to the projection position of the hanging head;
[0013] S2, place the middle suspender according to the position determined by the layout, and install the walkway cross beam at the same time. After the cross beam installation is completed, install the walkway board;
[0014] S3, reserve sleeve holes at the shear wall and / or balcony positions at the segmented positions for installing the wall connecting members;
[0015] S4, start installing the upper suspender, as well as the corresponding cross beam and walkway board after the construction of the first-floor structure is completed, and then carry out the construction of the second-floor main structure;
[0016] S5, start the installation work of the residential building construction machine after the construction of the second-floor main structure is completed;
[0017] S6, when the Bailey truss and hanging head of the residential building construction machine are installed, use the lifting device to lift the external protection hanging rack upward in segments, and then connect the upper suspender with the hanging head;
[0018] S7, carry out the construction of the third-floor structure, and carry out the first jacking of the residential building construction machine after the construction is completed;
[0019] S8, install the lower suspender;
[0020] S9, carry out the second jacking of the residential building construction machine. After the jacking is completed, install the cross beam, walkway board, and external protection mesh of the lower suspender, that is, the installation of the external protection hanging rack is completed; then carry out the normal construction stage of the main structure.
[0021] Preferably, the S2 specifically includes: installing the standard walkway board and the corresponding suspender, and continuously installing 3 spans to ensure the stability of the external protection hanging rack, and installing the walkway board and the outer protection mesh layer by layer from bottom to top.
[0022] Preferably, the installation work of the residential building construction machine in S5 specifically includes: installing a support system, a power and control system, a steel platform system, a formwork system, and a safety protection system. A hanging head connected to the suspension rod of the external protection hanging rack is installed on the lower chord of the Bailey truss.
[0023] Preferably, the lifting device includes an electric hoist and a hook. The upper end of the electric hoist is hung under the Bailey truss through the hook, and the lower end is tied to the intersection position of the upper suspension rod and the cross beam on the inner and outer sides of the hanging rack.
[0024] Preferably, S6 specifically includes: the external protection hanging rack is lifted upward in sections. Four electric hoists are installed on each section of the hanging rack, respectively located at the four corners of the hanging rack. The lower ends of the electric hoists are all connected to the intersection position of the suspension rod and the cross beam. Synchronous operation is required during lifting to ensure the stability of the frame body.
[0025] Preferably, the length of the upper suspension rod is 5.5 m, the length of the middle suspension rod is 6 m, and the length of the lower suspension rod is 6 m.
[0026] Preferably, the upper end of the lower suspension rod is hung on the lower end of the middle suspension rod, the upper end of the middle suspension rod is hung on the lower end of the upper suspension rod, and the upper end of the upper suspension rod is hung on the hanging head.
[0027] Preferably, both the middle suspension rod and the upper suspension rod are tied to the shear wall through connecting wall members, and there is no connecting wall member at the lower suspension rod.
[0028] The present invention also provides an installation construction structure of a residential building construction machine, including a residential building construction machine and an external protection hanging rack. The external protection hanging rack includes a suspension rod, a cross beam is installed on the suspension rod, a walkway board is installed on the cross beam, and one end of the suspension rod is connected to the wall through a connecting wall member. The suspension rod includes an upper suspension rod, a middle suspension rod, and a lower suspension rod that are sequentially connected from top to bottom;
[0029] The lifting device of the residential building construction machine is used to lift the external protection hanging rack in sections.
[0030] Preferably, cross beams, walkway boards, and external protection mesh sheets are installed on each of the suspension rods.
[0031] Beneficial effects: The present invention provides a method and structure for installing a residential building construction machine. The construction structure includes a residential building construction machine and an external protective hanging rack. The external protective hanging rack includes a suspension rod, on which a cross beam is installed, and a walkway board is installed on the cross beam. One end of the suspension rod is connected to the wall through a connecting member. The suspension rod includes an upper suspension rod, a middle suspension rod, and a lower suspension rod that are connected in sequence from top to bottom. The lifting device of the residential building construction machine is used to lift the external protective hanging rack in sections. Using the hanging rack of the residential building construction machine instead of the floor-standing steel pipe scaffold can improve the construction efficiency of the residential building construction machine, shorten the construction period, reduce the safety risks during construction, and save the construction economic cost. Moreover, this construction method is simple to operate, highly reliable, and highly feasible, which is conducive to further improving the adaptability of the residential building construction machine in residential projects and enhancing the industry competitiveness of the residential building construction machine in the field of residential construction equipment.
[0032] The above description is only an overview of the technical solution of the present invention. In order to be able to understand the technical means of the present invention more clearly and implement it in accordance with the content of the specification, the following takes the preferred embodiments of the present invention and combines the drawings to describe in detail as follows. The specific implementation manners of the present invention are given in detail by the following embodiments and their drawings. Brief Description of the Drawings
[0033] The drawings described herein are used to provide a further understanding of the present invention, form a part of this application, and the illustrative embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0034] Figure 1 is the flow chart of the method for installing a residential building construction machine provided by the present invention;
[0035] Figure 2 is the schematic diagram of the installation of the middle suspension rod provided by the present invention;
[0036] Figure 3 is the construction drawing of the installation of the upper suspension rod and the second floor structure provided by the present invention;
[0037] Figure 4 is the installation drawing of the main structure of the building construction machine provided by the present invention;
[0038] Figure 5 is the schematic diagram of the first jacking of the external protective hanging rack provided by the present invention;
[0039] Figure 6 is the hanging schematic diagram provided by the present invention;
[0040] Figure 7 is the schematic diagram of the first jacking of the building construction machine provided by the present invention;
[0041] Figure 8 is the schematic diagram of the installation of the lower suspension rod provided by the present invention;
[0042] Figure 9 Schematic diagram of the second jacking of the residential building construction machine provided by the present invention;
[0043] Figure 10 Schematic diagram of the installation of the cross beam of the lower suspension rod provided by the present invention;
[0044] Description of the reference numerals in the drawings:
[0045] Middle suspension rod 1, cross beam 2, connecting wall member 3, residential building construction machine 4, upper suspension rod 5, electric hoist 6, lower suspension rod 7, Bailey truss 8, hanging head 9. Detailed implementation manners
[0046] The principles and features of the present invention will be described below with reference to the accompanying drawings. The examples given are only for explaining the present invention and are not intended to limit the scope of the present invention. In the following paragraphs, the present invention will be described more specifically by way of example with reference to the accompanying drawings. The advantages and features of the present invention will be clearer according to the following description and the claims. It should be noted that the accompanying drawings are all in a very simplified form and use non-precise scales, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.
[0047] It should be noted that when a component is referred to as being "fixed to" another component, it can be directly on the other component or there can also be an intermediate component. When a component is considered to be "connected to" another component, it can be directly connected to the other component or there may be an intermediate component at the same time. When a component is considered to be "disposed on" another component, it can be directly disposed on the other component or there may be an intermediate component at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are only for the purpose of illustration.
[0048] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field to which the present invention belongs. The terms used herein in the description of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.
[0049] As Figures 1 to 10 shown, the present invention provides a method for installing and constructing a residential building construction machine, including the following steps:
[0050] S1. After the top plate construction is completed, position and set out the lines, mark the positions of each suspension rod, and set the installation points of the suspension rods according to the projection positions of the hanging heads 9;
[0051] S2. Place the middle suspension rod 1 according to the positions located by the setting out, and at the same time install the walkway cross beam 2. After the installation of the cross beam 2 is completed, install the walkway board;
[0052] S3. Reserve sleeve holes at the shear wall and / or balcony positions at the segmented locations for installing the connecting wall members 3.
[0053] S4. After the construction of the first-floor structure is completed, start installing the upper suspension rods 5, as well as the corresponding cross beams and walkway plates, and then carry out the construction of the second-floor main structure.
[0054] S5. After the construction of the second-floor main structure is completed, start the installation work of the residential building construction machine 4.
[0055] S6. When the Bailey truss and the hanging heads of the residential building construction machine are installed, use the lifting device to lift the external protection hanging rack upward in segments, and then connect the upper suspension rod with the hanging head.
[0056] S7. Carry out the construction of the third-floor structure, and after the construction is completed, carry out the first jacking of the residential building construction machine 4.
[0057] S8. Install the lower suspension rod 7.
[0058] S9. Carry out the second jacking of the residential building construction machine 4. After the jacking, complete the installation of the cross beam 2, walkway plates and external protection mesh sheets of the lower suspension rod 7, that is, the installation of the entire external protection hanging rack is completed; then carry out the normal construction stage of the main structure.
[0059] The above scheme changes the previous installation method of the external protection hanging rack (referred to as the hanging rack), and uses the hanging rack instead of the floor-standing scaffold, that is, during the construction of the main structure, the external protection hanging rack of the residential building construction machine 4 is used as the floor-standing external protection operation scaffold. The external scaffold of the residential building construction machine 4 mainly includes suspension rods, cross beam 2, and walkway plates; the suspension rods are composed of 3 upper, middle and lower suspension rods connected together. Among them, the length of the upper suspension rod 5 is 5.5m, the middle suspension rod is 6m, and the lower suspension rod is 6m. The specific construction steps are as follows:
[0060] 1) Positioning and setting out: According to the external scaffold design drawing, after the construction of the roof slab is completed, carry out positioning and setting out, and set the installation points of the suspension rods according to the projection position of the hanging head 9. When setting out on site, mark the position of each suspension rod.
[0061] 2) Hanging rack installation: Only install the middle suspension rod 1 during the first installation. The length of this suspension rod is 6m. Place the middle suspension rod 1 according to the position determined by the setting out, and at the same time install the walkway cross beam 2. After the installation of the cross beam 2 is completed, install the walkway plates. During the installation process, it is required to install the standard walkway plates and the corresponding suspension rods first, and it is required to continuously install 3 spans to ensure the stability of the frame body. Install the walkway plates and the outer protection mesh sheets layer by layer from bottom to top.
[0062] 3) Connecting wall member 3 setting: The connecting wall member 3 is set considering two steps and two spans, and at the same time considering the temporary tying measures during the later segmented lifting of the hanging rack. Reserve sleeve holes at the shear wall, balcony and other positions at the positions that need to be segmented for installing the connecting wall member 3.
[0063] 4) Installation of the upper suspension rod 5: After the construction of the first - floor structure is completed, the upper suspension rod 5 is installed, and then the construction of the second - floor structure is carried out.
[0064] 5) Installation of the residential building construction machine 4: After the construction of the second - floor main structure is completed, the installation work of the residential building construction machine 4 is started, including the installation of the support system, power and control system, steel platform system, formwork system, safety protection system, etc. A lifting device is installed at the lower end of the Bailey truss 8.
[0065] 6) Lifting of the hanging scaffold: After the installation of the Bailey truss of the residential building construction machine 4 is completed, the external protection hanging scaffold is lifted through the lifting device. Specifically, the lifting device is mainly an electric hoist 6. The upper end of the electric hoist 6 is hung under the Bailey truss through a hook, and the lower end of the electric hoist 6 is tied at the intersection position of the upper suspension rod 5 and the cross - beam 2 on the inner and outer sides of the hanging scaffold. Driven by the electric hoist 6, the hanging scaffold is lifted upward in sections. During the installation process, the frame body of the external protection hanging scaffold cannot be lifted upward synchronously. Only after one section is installed can the next section be lifted and installed. However, each section of the frame body is lifted by 4 electric hoists 6, and the electric hoists 6 need to perform lifting operations synchronously to ensure the stability of the frame body. After the first section, that is, the section where the upper suspension rod 5 is located, is lifted, the upper suspension rod 5 is connected to the corresponding hanging head 9. The hanging heads 9 are all installed on the lower chord of the Bailey truss 8 and are connected to the upper suspension rod 5. Its function is to hang the upper suspension rod 5 under the Bailey truss 8.
[0066] Among them, the external protection hanging scaffold is lifted upward in sections. Each section of the external protection hanging scaffold is installed with 4 electric hoists 6, which are located at the four corners of the external protection hanging scaffold. That is, electric hoists 6 are installed at the upper ends of the upper suspension rods 5. The lower ends of the electric hoists 6 are all connected to the intersection positions of each suspension rod and the cross - beam. During lifting, synchronous operation is required to ensure the stability of the frame body.
[0067] 7) Construction of the third - floor structure: After the hanging scaffold is lifted, the construction of the third - floor structure is carried out. After the construction is completed, the first jacking of the residential building construction machine 4 is carried out.
[0068] 8) Installation of the lower suspension rod 7: After the first jacking of the residential building construction machine 4, the installation of the lower suspension rod 7 of the hanging scaffold is carried out. Only the suspension rod is installed in this installation, and the cross - beam 2 and the walkway board are not installed. The upper end of the lower suspension rod 7 is hung on the lower end of the middle suspension rod 1, the upper end of the middle suspension rod 1 is hung on the lower end of the upper suspension rod 5, and the upper end of the upper suspension rod 5 is hung on the hanging head 9. The suspension rod includes a hanging head 9, an upper suspension rod 5, a middle suspension rod 1, and a lower suspension rod 7 that are hung in sequence from top to bottom.
[0069] 9) Jacking of the building construction machine: When the construction of each floor structure is completed, the second jacking of the residential building construction machine 4 is carried out. After the jacking, the installation of the lower suspension rod 7, the cross - beam 2, and the walkway board is completed. After the installation is completed, the overall installation of the residential building construction machine 4 is completed, and it enters the normal construction stage.
[0070] The embodiment of the present invention also provides an installation and construction structure for a residential building construction machine 4, which includes the residential building construction machine 4 and also a suspension rod. A cross beam 2 is installed on the suspension rod, and a walkway board is installed on the cross beam 2. One end of the cross beam 2 is connected to the wall through a coupling member 3. The suspension rod includes an upper suspension rod 5, a middle suspension rod 1, and a lower suspension rod 7 that are sequentially hung from top to bottom.
[0071] Among them, a cross beam, a walkway board, and an outer protection mesh are installed on each of the suspension rods. The cross beam plays a role in transverse connection. The walkway board is for the staff to walk on, and the outer protection mesh is for safety protection to prevent objects from falling outside.
[0072] Beneficial effects:
[0073] 1) Using the outer protection hanging rack of the residential building construction machine instead of the floor-type steel pipe scaffold can reduce the erection and demolition processes of the steel pipe rack, and reduce the steel pipe rental and construction costs;
[0074] 2) After using the outer frame of the residential building construction machine as a floor frame, after the later-stage Bailey truss of the residential building construction machine is installed, it is only necessary to use an electric hoist to lift the hanging rack upward as a whole in sections, which can greatly accelerate the construction period of the residential building construction machine;
[0075] 3) The outer protection hanging rack of the residential building construction machine adopts a lower hanging design. After using the hanging rack instead of the outer frame, it is possible to avoid installing the hanging rack from top to bottom in the later stage, reduce the amount of high-altitude work in the later stage, and reduce the safety risks during the construction process.
[0076] The above is only a preferred embodiment of the present invention, and it is not intended to limit the present invention in any form; any ordinary technical personnel in this industry can smoothly implement the present invention according to the illustrations in the specification and the above description; however, any slight changes, modifications, and equivalent changes made by those skilled in this profession within the scope of the technical solution of the present invention by using the technical content disclosed above are all equivalent embodiments of the present invention; at the same time, any equivalent changes, modifications, and evolutions made to the above embodiments based on the essence of the present invention still fall within the protection scope of the technical solution of the present invention.
Claims
1. A building construction method using a residential building construction machine, characterized in that, Adopt the building construction structure of the residential building construction machine. The building construction structure of the residential building construction machine includes a residential building construction machine and an external protection hanging rack. The external protection hanging rack includes a hanging head and a hanging rod. A cross beam is installed on the hanging rod, and a walkway board is installed on the cross beam. One end of the hanging rod is connected to the wall through a connecting wall member. The hanging rod includes an upper hanging rod, a middle hanging rod, and a lower hanging rod that are connected in sequence from top to bottom. The upper hanging rod is connected to the lower chord of the Bailey truss through a hanging head; the lifting device of the residential building construction machine is used to lift the external protection hanging rack in sections. Cross beams, walkway boards, and external protection mesh sheets are installed on each of the hanging rods; The construction method includes the following steps: S1. After the top slab construction is completed, carry out positioning and setting out. Set the installation points of the hanging rods according to the projection position of the hanging head, and mark the position of each hanging rod during on-site setting out; S2. Place the middle hanging rod according to the position determined by the setting out. At the same time, install the walkway cross beam. After the cross beam is installed, install the walkway board; S3. The connecting wall members are arranged in two steps and two spans. Reserved sleeve holes are provided at the shear wall and / or balcony positions at the positions that need to be segmented for installing the connecting wall members; S4. After the construction of the first-floor structure is completed, start installing the upper hanging rod, as well as the corresponding cross beam and walkway board, and then carry out the construction of the second-floor main structure; S5. After the construction of the second-floor main structure is completed, carry out the installation work of the residential building construction machine on the building body formed by the first-floor structure and the second-floor main structure. The installation work includes the installation of the support system, power and control system, steel platform system, formwork system, and safety protection system. A lifting device is installed at the lower end of the Bailey truss; S6. When the Bailey truss and the hanging head of the residential building construction machine are installed, connect the upper hanging rod to the hanging head, and use the lifting device to lift the external protection hanging rack upward in sections; S7. Carry out the construction of the third-floor structure. After the construction is completed, carry out the first jacking of the residential building construction machine through the power and control system; S8. Install the lower hanging rod; S9. Carry out the second jacking of the residential building construction machine through the power and control system. After the jacking is completed, install the cross beam, walkway board, and external protection mesh sheet of the lower hanging rod, that is, the installation of the external protection hanging rack is completed; then carry out the normal construction stage of the main structure.
2. The building construction method using a residential building construction machine according to claim 1, characterized in that The specific content of S2 includes: Install the standard walkway board and the corresponding hanging rods, and continuously install 3 spans to ensure the stability of the external protection hanging rack, and install the walkway board and the outer protection mesh sheet layer by layer from bottom to top.
3. The building construction method using a residential building construction machine according to claim 1, characterized in that, The specific installation work of the residential building construction machine in S5 includes: Install the support system, power and control system, steel platform system, formwork system, and safety protection system. A hanging head connected to the hanging rod of the external protection hanging rack is installed on the lower chord of the Bailey truss.
4. The building construction method using a residential building construction machine according to claim 1, characterized in that, The lifting device includes an electric hoist and a hook. The upper end of the electric hoist is hung under the Bailey truss through the hook, and the lower end is tied at the intersection position of the upper hanging rod and the cross beam on the inner and outer sides of the external protection hanging rack.
5. The building construction method using a residential building construction machine according to claim 4, characterized in that, The specific content of S6 includes: The external protection hanging rack is lifted upward in sections. Four electric hoists are installed on each section of the external protection hanging rack, which are located at the four corners of the external protection hanging rack respectively. The lower ends of the electric hoists are all connected to the intersection position of the hanging rod and the cross beam. Synchronous operation is required during lifting to ensure the stability of the frame body.
6. The building construction method using a residential building construction machine according to claim 1, characterized in that, The length of the upper suspension rod is 5.5 m, the length of the middle suspension rod is 6 m, and the length of the lower suspension rod is 6 m.
7. The building construction method using a residential building construction machine according to claim 1, characterized in that, The upper end of the lower suspension rod is hung on the lower end of the middle suspension rod, the upper end of the middle suspension rod is hung on the lower end of the upper suspension rod, the upper end of the upper suspension rod is hung on the lower end of the hanging head, and the upper end of the hanging head is connected to the lower chord of the Bailey truss.
8. The building construction method using a residential building construction machine according to claim 1, characterized in that, Both the middle suspension rod and the upper suspension rod are tied to the shear wall through connecting wall members, and there is no connecting wall member at the lower suspension rod.