A method for installing a slope curtain wall basket
By installing a steel frame on the suspended platform and setting up a winch to adjust the wire rope, the problem of controlling the distance between the suspended platform and the sloping curtain wall was solved, achieving efficient and safe construction of the sloping curtain wall.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- THE CONSTR DECORATION OF CHINA CONSTR NO 7 ENG BUREAU
- Filing Date
- 2022-10-11
- Publication Date
- 2026-05-05
AI Technical Summary
Existing technologies cannot effectively control the distance between the suspended platform and the inverted slope curtain wall, resulting in construction difficulties. Traditional suspended platforms cannot meet the construction requirements of high-altitude inverted slope curtain walls, and their safety and stability are poor.
A steel frame is installed on the suspended platform, and a winch and adjusting wire rope are set up. The winch pulls the adjusting wire rope to drive the steel frame to move the suspended platform. Combined with the hoist and safety components, the distance between the suspended platform and the sloping curtain wall can be controlled and the height adjusted.
It improves the efficiency of inclined curtain wall construction, reduces construction costs, ensures construction safety and quality, and avoids collisions between the suspended scaffold and the inclined curtain wall.
Smart Images

Figure CN115627919B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of suspended platform installation technology, and in particular to a method for installing a suspended platform for a sloping curtain wall. Background Technology
[0002] With the rapid development of my country's construction industry, electric suspended platforms have become widely used as important auxiliary equipment in building construction. As building heights increase and curtain wall designs become more complex, ordinary suspended platforms can no longer meet the diverse construction needs of curtain walls. Currently, many curtain walls are designed with inverted slopes for aesthetic purposes, but this brings significant challenges to construction. For the erection of working platforms for high-altitude inverted slope curtain wall construction, traditional suspended platforms cannot control and adjust the distance between the working platform and the sloped curtain wall, hindering worker operation. Traditional ground-based scaffolding is costly, unstable, and lacks safety guarantees, while also incurring substantial labor costs for workers. Summary of the Invention
[0003] Therefore, the purpose of this invention is to provide a method for installing a suspended platform for a sloping curtain wall, so as to solve the technical problem in the prior art that the distance between the suspended platform and the sloping curtain wall components cannot be controlled, which leads to inconvenience in construction.
[0004] To achieve the above objectives, the technical solution adopted by the present invention is as follows:
[0005] A method for installing a suspended platform for a sloping curtain wall includes the following steps:
[0006] S1. Select a suitable suspended platform according to the construction requirements of the sloping curtain wall, and assemble the suspended platform;
[0007] S2. Construct a steel frame, which includes a vertically arranged rectangular fixed frame, an extension frame set on top of the fixed frame and parallel to the fixed frame, and a vertically arranged guide frame. A pulley roller is horizontally arranged on the side of the extension frame near the suspended platform, parallel to the extension frame. A first pulley is set on the top of the side of the guide frame away from the fixed frame. A first adjustment groove is set on the side of the guide frame away from the fixed frame, corresponding to the first pulley and communicating with the first pulley. A second pulley is set on the bottom of the side of the guide frame near the fixed frame. A second adjustment groove is set on the bottom of the guide frame, corresponding to the second pulley and communicating with the second pulley. The two steel frames are fixedly installed at both ends of the side of the suspended platform away from the sloping curtain wall by the fixed frame.
[0008] S3. Install the guide and fixing components, which include the cantilevered guide anchor at the top of the sloping curtain wall, the fixed anchor on the ground, and the horizontal guide anchor at the bottom of the sloping curtain wall. Both the cantilevered guide anchor and the horizontal guide anchor are equipped with pulleys.
[0009] S4. Install the lifting assembly. The lifting assembly includes two lifting machines and lifting wire ropes that are respectively set with respect to the lifting machines. The lifting machines are installed at both ends along the length direction inside the suspended basket. One end of the lifting wire rope is bundled in the lifting machine, and the other end passes through the pulley drum on the side close to the sloping curtain wall and the side of the cantilevered guide anchor away from the sloping curtain wall and is connected to the truss beam at the top of the sloping curtain wall.
[0010] S5. Install the adjustment components. Two sets of adjustment components are set up for the steel frame, including a winch and an adjustment wire rope. Fix the winch at the bottom of the sloping curtain wall at the position corresponding to the horizontal guide anchor and away from the horizontal guide anchor. One end of the adjustment wire rope is tied to the winch, and the other end passes through the horizontal guide anchor, the second pulley, the second adjustment groove, the first adjustment groove, the first pulley, and the side of the cantilever guide anchor away from the sloping curtain wall and is connected to the truss beam at the top of the sloping curtain wall.
[0011] S6. Install safety components. The safety components include two safety locks and corresponding safety wire ropes. Install the two safety locks at both ends along the length of the basket. One end of the safety wire rope passes through the safety lock and is suspended at the bottom of the basket. The other end passes through the pulley roller on the side near the sloping curtain wall and the cantilevered guide anchor on the side away from the sloping curtain wall and is connected to the truss beam at the top of the sloping curtain wall.
[0012] The beneficial effects of the above technical solution are as follows: The installation method of the sloping curtain wall scaffolding of the present invention installs a steel frame on the basis of the original scaffolding, sets a winch and adjusting steel wire rope at the bottom of the sloping curtain wall, drives the steel frame by winding the adjusting steel wire rope through the winch and moves the scaffolding closer to the sloping curtain wall, so as to control the distance between the scaffolding and the sloping curtain wall. The working height of the scaffolding is adjusted by the synchronous operation of the hoist and the winch, which facilitates the construction of the sloping curtain wall by workers. While reducing the construction cost, it greatly improves the efficiency of sloping curtain wall construction.
[0013] Furthermore, a third pulley is provided at the top of the extension frame. In S6, the safety component also includes a safety wire rope. One end of the safety wire rope is connected to a fixed ground anchor, and the other end passes through the side of the third pulley away from the suspended platform and the side of the guide anchor away from the sloping curtain wall, and is connected to the pergola beam at the top of the sloping curtain wall.
[0014] Beneficial effects: By installing a safety wire rope, when the adjusting wire rope breaks during use, the safety wire rope can stop the suspended platform through the third pulley, preventing the suspended platform from swinging too much in the vertical plane and ensuring construction safety.
[0015] Furthermore, the S6 safety component also includes a protective steel wire rope, one end of which is connected to a fixed ground anchor, and the other end passes through the cantilevered guide anchor on the side away from the sloping curtain wall and is connected to the pergola beam at the top of the sloping curtain wall.
[0016] Beneficial effects: The protective steel wire rope forms a protective layer on the surface of the sloping curtain wall. When the distance between the suspended platform and the sloping curtain wall is adjusted by adjusting the steel wire rope, the suspended platform can be stopped, ensuring the minimum distance between the suspended platform and the sloping curtain wall, avoiding damage to the surface of the sloping curtain wall by the suspended platform, and protecting the surface of the sloping curtain wall.
[0017] Furthermore, in S2, the fixed frame, the extension frame, and the guide frame are welded together, and a support rib is provided between the fixed frame and the guide frame.
[0018] Beneficial effects: Welding facilitates the processing of the steel frame, and the setting of support ribs ensures the connection strength between the fixed frame and the guide frame in the steel frame.
[0019] Furthermore, in S3, a limiting anchor is provided between the horizontal guide anchor and the inclined surface of the curtain wall, and two rollers are provided on the limiting anchor, through which the adjusting steel wire rope passes.
[0020] Beneficial effects: By setting limit anchors, the adjustment wire rope is always kept at a distance from the bottom of the sloping curtain wall, avoiding wear between the adjustment wire rope and the bottom of the sloping curtain wall and increasing the service life of the adjustment wire rope.
[0021] Furthermore, in S6, a counterweight is fixedly installed on the portion of the safety wire rope located below the suspended platform.
[0022] Beneficial effects: By setting a counterweight to tighten and stabilize the wire rope, the normal operation of the safety wire rope is ensured, preventing the wire rope from being pulled up during the lifting or lowering of the suspended platform. Attached Figure Description
[0023] Figure 1 This is a schematic diagram illustrating the operation of the suspended platform during use in the installation method of the inclined curtain wall suspended platform of the present invention;
[0024] Figure 2 This is a schematic diagram of the steel frame structure in the inclined curtain wall suspended platform installation method of the present invention;
[0025] Figure 3 This is a schematic diagram of the guide and fixing components in the inclined curtain wall suspended platform installation method of the present invention.
[0026] Explanation of reference numerals in the attached drawings: 1-Suspended basket, 2-Steel frame, 3-Fixed frame, 4-Extension frame, 5-Guide frame, 6-Pulley roller, 7-First pulley, 8-First adjusting groove, 9-Second pulley, 10-Second adjusting groove, 11-Cantilevered guide anchor, 12-Fixed anchor, 13-Horizontal guide anchor, 14-Lifting wire rope, 15-Adjusting wire rope, 16-Wind, 17-Safety wire rope, 18-Scaffold beam, 19-Sloping curtain wall, 20-Third pulley, 21-Safety wire rope, 22-Protective wire rope, 23-Support rib, 24-Limiting anchor, 25-Flat weight. Detailed Implementation
[0027] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0028] A specific embodiment of the installation method for the inclined curtain wall suspended platform of the present invention is as follows:
[0029] A method for installing a suspended platform for a sloping curtain wall includes the following steps:
[0030] S1. Select a suitable suspended platform according to the construction requirements of the sloping curtain wall, and assemble the suspended platform;
[0031] S2. Construct a steel frame, which includes a vertically arranged rectangular fixed frame, an extension frame set on top of the fixed frame and parallel to the fixed frame, and a vertically arranged guide frame. A pulley roller is horizontally arranged on the side of the extension frame near the suspended platform, parallel to the extension frame. A first pulley is set on the top of the side of the guide frame away from the fixed frame. A first adjustment groove is set on the side of the guide frame away from the fixed frame, corresponding to the first pulley and communicating with the first pulley. A second pulley is set on the bottom of the side of the guide frame near the fixed frame. A second adjustment groove is set on the bottom of the guide frame, corresponding to the second pulley and communicating with the second pulley. The two steel frames are fixedly installed at both ends of the side of the suspended platform away from the sloping curtain wall by the fixed frame.
[0032] S3. Install the guide and fixing components, which include the cantilevered guide anchor at the top of the sloping curtain wall, the fixed anchor on the ground, and the horizontal guide anchor at the bottom of the sloping curtain wall. Both the cantilevered guide anchor and the horizontal guide anchor are equipped with pulleys.
[0033] S4. Install the lifting assembly. The lifting assembly includes two lifting machines and lifting wire ropes that are respectively set with respect to the lifting machines. The lifting machines are installed at both ends along the length direction inside the suspended basket. One end of the lifting wire rope is bundled in the lifting machine, and the other end passes through the pulley drum on the side close to the sloping curtain wall and the guide anchor on the side away from the sloping curtain wall and connects to the truss beam at the top of the sloping curtain wall.
[0034] S5. Install the adjustment components. Two sets of adjustment components are set up for the steel frame, including a winch and an adjustment wire rope. Fix the winch at the bottom of the sloping curtain wall at the position corresponding to the horizontal guide anchor and away from the horizontal guide anchor. One end of the adjustment wire rope is tied to the winch, and the other end passes through the horizontal guide anchor, the second pulley, the second adjustment groove, the first adjustment groove, the first pulley, and the side of the guide anchor away from the sloping curtain wall in sequence and is connected to the truss beam at the top of the sloping curtain wall.
[0035] S6. Install safety components. The safety components include two safety locks and corresponding safety wire ropes. Install the two safety locks at both ends along the length of the basket. One end of the safety wire rope passes through the safety lock and is suspended at the bottom of the basket. The other end passes through the pulley roller on the side near the sloping curtain wall and the guide anchor on the side away from the sloping curtain wall and is connected to the truss beam at the top of the sloping curtain wall.
[0036] Selection, fabrication, and installation of suspended platform 1:
[0037] Based on the on-site construction requirements of suspended platform 1, the specification and model of suspended platform 1 are selected as ZLP630. The distance between the platform of suspended platform 1 and the finished surface of the curtain wall is determined to be 0.2 meters, and the distance between two adjacent suspended platforms 1 is 0.5 meters.
[0038] (1) Select a relatively flat site, assemble the base frame, front and rear guardrails into basic sections of the required length according to the project, and connect them in advance;
[0039] (2) All joints are fixed with bolts;
[0040] (3) Install the hoist mounting frame at both ends, and at the same time adjust the front and rear guardrails of each basic section so that they are as straight as possible.
[0041] Steel frame system 2 fabrication and installation:
[0042] (1) Fabrication of steel frame system 2:
[0043] Two steel frames are constructed using hot-dip galvanized steel square tubing with dimensions of 50*50*4mm. The steel frame 2 includes a vertically arranged rectangular fixed frame 3, an extension frame 4 positioned on top of and parallel to the fixed frame 3, and a vertically arranged guide frame 5. A pulley roller 6, parallel to the extension frame 4, is horizontally arranged on the side of the extension frame 4 closest to the suspended platform 1. A first pulley 7 is located at the top of the guide frame 5 on the side furthest from the fixed frame 3. A first adjusting groove 8, corresponding to and communicating with the first pulley 7, is located on the side of the guide frame 5 furthest from the fixed frame 3. A second pulley 9 is located at the bottom of the guide frame 5 on the side closest to the fixed frame 3. A second adjusting groove 10, corresponding to and communicating with the second pulley 9, is located at the bottom of the guide frame 5. A third pulley 20 is located at the top of the extension frame 4. The fixed frame 3, extension frame 4, and guide frame 5 are welded together, and a supporting rib 23 is provided between the fixed frame 3 and the guide frame 5.
[0044] (2) Installation of steel frame system 2:
[0045] Using M12*100mm 304 stainless steel bolts, the two steel frames 2 are fixedly installed at both ends of the suspended basket 1 on the side away from the sloping curtain wall 19 through the fixing frame 3. The stainless steel pipe nuts are installed with 20*20*3mm stainless steel washers.
[0046] Ground anchoring and fixation:
[0047] (1) Fabrication of cantilevered guide anchor 11: Two hot-dip galvanized steel plates with a specification of 300*200*10mm are welded to two channel steels with a specification of 100*50*4.5mm and two hot-dip galvanized angle steels with a specification of 50*50*4mm. The two 300*200*10mm hot-dip galvanized steel plates are set vertically, the two 50*50*4mm hot-dip galvanized angle steels are welded to the side of the hot-dip galvanized steel plates, and the two 100*50*4.5mm channel steels are set at an angle between the two hot-dip galvanized angle steels. A fixed pulley steel pipe with a diameter of 60mm is welded between the two channel steels as a roller.
[0048] Installation of cantilevered guide anchor 11: The cantilevered guide anchor 11 is fixed to the top of the sloping curtain wall 19 using M12*160mm chemical anchors.
[0049] (2) Making fixed ground anchor 12: Weld a 100*80*10mm hot-dip galvanized steel plate and a 200*200*10mm hot-dip galvanized steel plate to make a fixed ground anchor 12. The 100*80*10mm hot-dip galvanized steel plate is vertically placed at the center of one side of the 200*200*10mm hot-dip galvanized steel plate. The 100*80*10mm hot-dip galvanized steel plate is also perforated at intervals in the vertical direction, and the perforation extends in the horizontal direction.
[0050] Installation of fixed ground anchor 12: Use M12*160mm chemical anchor bolts to fix the fixed ground anchor 12 to the ground corresponding to the cantilever guide anchor 11.
[0051] (3) Fabrication of horizontal guide anchor 13: Weld a hot-dip galvanized steel plate with a specification of 200*300*10mm to two No. 10 channel steels with a length of 100mm, and weld a steel pipe with a diameter of 48mm between the two channel steels as a roller.
[0052] Installation of horizontal guide anchor 13: Use M12*160mm chemical anchors to fix the horizontal guide anchor 13 to the horizontal surface at the bottom of the sloping curtain wall 19, corresponding to the cantilever guide anchor 11.
[0053] (4) Making the limiting ground anchor 24: Weld a hot-dip galvanized steel plate with a specification of 250*250*10mm to a hot-dip galvanized angle steel with a specification of 50*50*4. Two fixed pulley steel pipes with a diameter of 48mm are fixed between the angle steels in the vertical direction as rollers and are fixed with stainless steel bolts.
[0054] Installation of limiting anchor 24: Use M12*160mm chemical anchors to fix the limiting anchor 24 to the horizontal guide anchor 13 between the horizontal guide anchor 13 and the sloping curtain wall 19.
[0055] Installation of the suspended platform 1 operating system:
[0056] (1) Installation of electrical control box: Hang the electrical control box in the middle of the rear side of the suspended basket 1. First, connect one end of the lead wire on the upper limit switch of the hoist and one end of the lead wire on the motor of the winch 16 to the aviation plug on the control box. Place one end of the cable from the middle floor to the electrical control box position and connect the control box to the cable (the position of the main power supply shall be based on the site survey).
[0057] (2) Install the lifting assembly. The lifting assembly includes two lifting machines and lifting wire ropes 14 respectively corresponding to the lifting machines. The lifting machines are installed at both ends along the length direction inside the suspended basket 1. One end of the lifting wire rope 14 is bundled in the lifting machine, and the other end passes through the pulley drum 6 on the side near the sloping curtain wall 19 and the guide anchor on the side away from the sloping curtain wall 19 and connects to the truss beam 18 at the top of the sloping curtain wall 19.
[0058] (3) Install the adjustment components. Two sets of adjustment components are set for the steel frame 2, including a winch 16 with specification YZR180L-6 and power of 15KW and an adjustment wire rope 15. Fix the winch 16 at the bottom of the sloping curtain wall 19 at a position corresponding to the horizontal guide anchor 13 and away from the horizontal guide anchor 13. One end of the adjustment wire rope 15 is tied to the winch 16, and the other end passes through the horizontal guide anchor, the second pulley 9, the second adjustment groove 10, the first adjustment groove 8, the first pulley 7, and the side of the guide anchor away from the sloping curtain wall 19 and is connected to the pergola beam 18 at the top of the sloping curtain wall 19.
[0059] (4) Install safety components. The safety components include two safety locks and corresponding safety wire ropes 17 with a diameter of φ18mm. Install the two safety locks at both ends along the length of the suspended platform 1. One end of the safety wire rope 17 passes through the safety lock and is suspended at the bottom of the suspended platform 1. The other end passes through the pulley roller 6 on the side near the sloping curtain wall 19 and the guide anchor on the side away from the sloping curtain wall 19, and is connected to the truss beam 18 at the top of the sloping curtain wall 19. The counterweight 25 is fixed to the lower end of the safety wire rope 17 to tighten and stabilize the safety wire rope 17, preventing the suspended platform from pulling up the safety wire rope 17 during lifting or lowering, thus affecting the normal operation of the safety wire rope 17. During installation, clamp the two halves of the wire rope 15cm above the ground at the lower end, and then tighten the bolts to the wire rope to make the wire rope vertically taut.
[0060] The safety components also include a safety wire rope 21 and a protective wire rope 22 with a diameter of φ8.3mm. One end of the safety wire rope 21 is connected to the fixed anchor 12, and the other end passes through the side of the third pulley 20 away from the suspended platform 1 and the side of the guide anchor away from the sloping curtain wall 19, and is connected to the truss beam 18 at the top of the sloping curtain wall 19. One end of the bottom of the protective wire rope 22 is connected to the fixed anchor 12, and the other end passes through the cantilevered guide anchor 11 on the side away from the sloping curtain wall 19 and is connected to the truss beam 18 at the top of the sloping curtain wall 19.
[0061] It should be noted that the minimum number of rope clamps installed at one end of the lifting wire rope 14, adjusting wire rope 15, safety wire rope 17, and protective wire rope 22 is 4. The distance between the first 3 rope clamps is 50mm to 60mm, the distance between the third and fourth rope clamps is 60mm to 80mm, the safety bend height is kept at about 40mm, and a 140mm margin is left behind the last fourth rope clamp.
[0062] The present invention relates to a method for installing a suspended scaffold for sloping curtain walls. This method involves installing a steel frame on top of an existing suspended scaffold and using safety wire ropes. These safety wire ropes provide a constraint track for the scaffold's ascent and descent, and also offer protection against sudden breakage of the wire ropes, achieving a double safety measure. A winch and adjusting wire ropes are installed at the bottom of the sloping curtain wall. The winch pulls the adjusting wire ropes, driving the steel frame and moving the scaffold closer to the sloping curtain wall. The working height of the scaffold is adjusted by the synchronous operation of the hoist and winch, facilitating worker construction on the sloping curtain wall. This significantly improves the efficiency of sloping curtain wall construction while reducing construction costs. Safety wire ropes protect the lifting wire ropes of the scaffold, preventing sudden breakage and ensuring the scaffold's fall, thus guaranteeing construction safety. Protective wire ropes also protect the surface of the sloping curtain wall, preventing collisions between the scaffold and the wall during construction and ensuring construction quality.
[0063] In this embodiment, a third pulley is provided at the top of the extension frame, and in S6, the safety component also includes a safety wire rope; in other embodiments, the third pulley and safety wire rope may not be provided. In this case, a safety hook needs to be provided on the side of the suspended platform near the sloping curtain wall. The safety hook is used to attach to the protective wire rope.
[0064] The embodiments of the present invention described above do not constitute a limitation on the scope of protection of the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.
Claims
1. A method for installing a suspended platform for a sloping curtain wall, characterized in that, Includes the following steps: S1. Select a suitable suspended platform according to the construction requirements of the sloping curtain wall, and assemble the suspended platform; S2. Construct a steel frame, which includes a vertically arranged rectangular fixed frame, an extension frame set on top of the fixed frame and parallel to the fixed frame, and a vertically arranged guide frame. A pulley roller is horizontally arranged on the side of the extension frame near the suspended platform, parallel to the extension frame. A first pulley is set on the top of the side of the guide frame away from the fixed frame. A first adjustment groove is set on the side of the guide frame away from the fixed frame, corresponding to the first pulley and communicating with the first pulley. A second pulley is set on the bottom of the side of the guide frame near the fixed frame. A second adjustment groove is set on the bottom of the guide frame, corresponding to the second pulley and communicating with the second pulley. The two steel frames are fixedly installed at both ends of the side of the suspended platform away from the sloping curtain wall by the fixed frame. S3. Install the guide and fixing components, which include the cantilevered guide anchor at the top of the sloping curtain wall, the fixed anchor on the ground, and the horizontal guide anchor at the bottom of the sloping curtain wall. Both the cantilevered guide anchor and the horizontal guide anchor are equipped with pulleys. S4. Install the lifting assembly. The lifting assembly includes two lifting machines and lifting wire ropes that are respectively set with respect to the lifting machines. The lifting machines are installed at both ends along the length direction inside the suspended basket. One end of the lifting wire rope is bundled in the lifting machine, and the other end passes through the pulley drum on the side close to the sloping curtain wall and the side of the cantilevered guide anchor away from the sloping curtain wall and is connected to the truss beam at the top of the sloping curtain wall. S5. Install the adjustment components. Two sets of adjustment components are set up for the steel frame, including a winch and an adjustment wire rope. Fix the winch at the bottom of the sloping curtain wall at the position corresponding to the horizontal guide anchor and away from the horizontal guide anchor. One end of the adjustment wire rope is tied to the winch, and the other end passes through the horizontal guide anchor, the second pulley, the second adjustment groove, the first adjustment groove, the first pulley, and the side of the cantilever guide anchor away from the sloping curtain wall and is connected to the truss beam at the top of the sloping curtain wall. S6. Install safety components. The safety components include two safety locks and corresponding safety wire ropes. Install the two safety locks at both ends along the length of the basket. One end of the safety wire rope passes through the safety lock and is suspended at the bottom of the basket. The other end passes through the pulley roller on the side near the sloping curtain wall and the side of the cantilevered guide anchor away from the sloping curtain wall and is connected to the truss beam at the top of the sloping curtain wall. The top of the extension frame is provided with a third pulley. In S6, the safety component also includes a safety wire rope. One end of the safety wire rope is connected to a fixed ground anchor, and the other end passes through the side of the third pulley away from the sloping curtain wall and the side of the cantilevered guide anchor away from the sloping curtain wall, and is connected to the pergola beam at the top of the sloping curtain wall. In S6, the safety component also includes a protective steel wire rope. One end of the protective steel wire rope is connected to a fixed ground anchor, and the other end passes through the cantilevered guide anchor on the side away from the sloping curtain wall and is connected to the pergola beam at the top of the sloping curtain wall. The protective steel wire rope forms a protective layer on the surface of the sloping curtain wall. When the distance between the suspended platform and the sloping curtain wall is adjusted by adjusting the steel wire rope, it can stop the suspended platform, ensure the minimum distance between the suspended platform and the sloping curtain wall, avoid damage to the surface of the sloping curtain wall by the suspended platform, and protect the surface of the sloping curtain wall.
2. The method for installing a suspended platform for a sloping curtain wall according to claim 1, characterized in that: In S2, the fixed frame, extension frame and guide frame are welded together, and a support rib is provided between the fixed frame and the guide frame.
3. The method for installing a suspended platform for a sloping curtain wall according to claim 1, characterized in that: In S3, a limiting anchor is installed between the horizontal guide anchor and the inclined surface of the curtain wall. The limiting anchor has two rollers, and the adjusting steel wire rope passes between the two rollers.
4. The method for installing a suspended platform for a sloping curtain wall according to claim 1, characterized in that: In S6, a counterweight is fixedly installed on the portion of the safety wire rope located below the suspended platform.
Citation Information
Patent Citations
Outward-inclining type hanging basket construction device
CN213115449U
Construction device for inclined surface curtain wall
CN215670955U