A high molecular weight colloid preparation device and use method
By using the combined technology of skid-mounted pumps and injectors in oilfield leakage plugging equipment, the problems of insufficient power and uneven mixing of existing equipment are solved, efficient and uniform preparation of large molecular weight colloids is achieved, and the quality of oil well construction is improved.
Patent Information
- Application Number
- CN202211432576.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-16
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2042-11-16
AI Technical Summary
When equipped with high molecular weight colloids, existing oilfield leakage plugging equipment lacks power and uneven mixing, resulting in low liquid preparation efficiency and inability to adapt to the needs of high molecular weight colloids, posing safety risks.
A large molecular weight colloid preparation device is designed, which uses the boosting function of the skid pump and the diameter reduction and diversion technology of the ejector to form a closed loop to fully mix and disperse the liquid to ensure uniform preparation of the colloid.
It improves the efficiency and safety of liquid preparation, achieves full mixing and uniform preparation of high molecular weight colloids, meets the high molecular weight colloid needs of modern oil well measures, and improves construction quality.
Smart Images

Figure CN115653538B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of oilfield exploitation, and in particular to a macromolecular polymer preparation device for oilfield plugging, and more specifically to a macromolecular colloid preparation device and a method of use. Background Art
[0002] Conventional oil drilling is equipped with polymer plugging fluid, and well repair operations are equipped with polymer gel-type agents for water plugging. A large amount of organic and inorganic high molecular weight agents are required, and the liquid dosage is 100-1000 cubic meters, or even tens of thousands of cubic meters. At present, the only equipment used to equip these substances on site is 400-type and 700-type cement trucks with rubber hoses. The traditional liquid preparation method has the following disadvantages: First, the power is insufficient, and the displacement when preparing liquid is generally 300-400l / min, and the overall preparation efficiency is low; second, the prepared liquid is not mixed evenly, which is easy to cause insufficient dispersion and stratification, which ultimately affects the construction effect and even causes accidents; third, with the continuous development of technology and technology, the molecular weight of chemical products used in oil well measures has increased exponentially, and has generally reached hundreds of thousands, but the equipment is still stagnant and cannot meet the current needs of preparing large molecular weight colloids. Summary of the invention
[0003] In order to solve the problems and shortcomings existing in the above-mentioned prior art, the present application proposes a high molecular weight colloid preparation device and a method of use. The device uses the pressurization function of the skid-mounted pump to provide high-energy compression to the liquid, and then further reduces the diameter and guides the flow through the ejector so that the liquid can be fully mixed and dispersed in the water tank to the maximum extent, thereby ensuring the preparation requirements of the high molecular weight colloid and the configured colloid can be fully mixed and evenly mixed.
[0004] In order to achieve the above-mentioned invention object, the technical solution of this application is as follows:
[0005] A high molecular weight colloid preparation device, the preparation device comprises a liquid preparation tank and a skid-mounted pump connected by pipelines to form a closed loop, the outlet of the liquid preparation tank is connected to the inlet of the skid-mounted pump through a liquid outlet pipeline, the outlet of the skid-mounted pump is connected to the liquid preparation tank through a liquid return pipeline, a first ball valve, a feeding funnel and a second ball valve are sequentially arranged on the liquid outlet pipeline, a third ball valve and a water hose interface are sequentially arranged on the liquid return pipeline, the outlet end of the water hose interface is connected to a water hose, the outlet of the water hose is connected to the interface of an injector, and the injector is arranged in the liquid preparation tank.
[0006] Preferably, the injector is located at the center of the liquid distribution tank.
[0007] Preferably, the skid-mounted pump is also provided with a pressure gauge.
[0008] Preferably, the inlet of the liquid preparation tank is provided with a screen.
[0009] Preferably, a flow meter is also provided on the liquid return pipeline, and the flow meter is located between the third ball valve and the hose interface.
[0010] Preferably, the skid-mounted pump is also connected to the diesel engine via a universal shaft.
[0011] Preferably, the liquid preparation tank comprises a tank body, thermal insulation cotton and a protective cover, which are the protective cover, thermal insulation cotton and tank body from the outside to the inside.
[0012] A method for using a large molecular weight colloid preparation device, wherein the method is implemented using the large molecular weight colloid preparation device, and specifically comprises the following steps:
[0013] Step S1. Install the preparation device on site and enter the debugging phase after confirming that the preparation tank, skid-mounted pump and injector are securely connected;
[0014] Step S2. After opening the switch of the liquid dispensing tank outlet, the second ball valve and the third ball valve respectively, start the diesel engine, then open the first ball valve, observe whether the flow meter and the pressure gauge are working normally and record the values. If they are normal, perform the liquid dispensing operation. Otherwise, check and troubleshoot until the flow meter and the pressure gauge are working normally;
[0015] Step S3. During the dispensing process, observe and record the values of the flow meter and pressure gauge every 15 minutes, and compare them with the previous and next values. When the pressure gauge value remains consistent for at least three time points, and the flow meter value is more than 2-3 times the overall volume of the dispensing tank, it means that the dispensing is completed;
[0016] After the liquid preparation in step S4 is completed, clean water is used to repeatedly circulate and clean the entire preparation device.
[0017] Beneficial effects of this application:
[0018] (1) The preparation device of the present application adopts a skid-mounted structure design, which uses the boosting function of the skid-mounted pump to provide high-energy compression for the liquid. The liquid is then further reduced in diameter and diverted through the ejector to allow the liquid to be fully mixed and dispersed in the preparation tank to the maximum extent possible, thereby ensuring the preparation requirements of large molecular weight colloids and ensuring that the prepared colloids can be fully mixed and evenly mixed.
[0019] (2) This application adopts a skid-mounted design with a simple overall structure, which is convenient for on-site installation and occupies a small area. It can meet the preparation of various on-site working fluids for oil well repair, drilling, measures, etc.
[0020] (3) Compared with the liquid preparation method currently used on site, this application is more efficient and reliable and can improve the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The foregoing and following detailed description of the present application will become more apparent when read in conjunction with the following drawings, in which:
[0022] Figure 1 A schematic diagram of the device is prepared for this application;
[0023] Figure 2 Schematic diagram of the injector for this application.
[0024] In the attached figure:
[0025] 1. Liquid distribution tank; 2. Skid-mounted pump; 3. Liquid outlet pipeline; 4. Liquid return pipeline; 5. First ball valve; 6. Feeding funnel; 7. Second ball valve; 8. Third ball valve; 9. Hose interface; 10. Hose; 11. Injector; 12. Pressure gauge; 13. Screen; 14. Flow meter; 15. Diesel engine; 16; Injection hole; 101. Tank body; 102. Insulation cotton; 103. Protective cover. DETAILED DESCRIPTION
[0026] In order to enable those skilled in the art to better understand the technical solutions in this application, the following will further illustrate the technical solutions for achieving the invention purpose of this application through several specific embodiments. It should be noted that the technical solutions claimed for protection in this application include but are not limited to the following embodiments. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without making creative efforts shall fall within the scope of protection of this application.
[0027] Conventional oil drilling is equipped with polymer plugging fluids, and well repair operations are equipped with polymer gel-type agents for water plugging. A large amount of organic and inorganic high molecular weight agents are required, and the amount of liquid used is 100-1000 cubic meters, or even tens of thousands of cubic meters.
[0028] At present, the only equipment used to equip these liquids on site is the 400 and 700 cement trucks with rubber hoses. The above traditional liquid preparation methods have the following main disadvantages: First, the power is insufficient. The displacement when preparing liquids is generally 300-400l / min, and the overall preparation efficiency is low; second, the prepared liquids are not mixed evenly, which easily leads to insufficient dispersion and stratification, which ultimately affects the construction effect and even causes accidents; third, with the continuous development of technology and technology, the molecular weight of chemical products used in oil well measures has increased exponentially, and has generally reached hundreds of thousands. For example, under the action of cross-linking agents, the molecular weight of polyacrylamide is even as high as 10 million or more. Since the current preparation devices are still stagnant, they cannot meet the current preparation needs of large molecular weight colloids.
[0029] Based on this, the present application proposes a high molecular weight colloid preparation device and a method of use. The device adopts a skid-mounted structure design, and uses the pressurization function of the skid-mounted pump to provide high-energy compression to the liquid. The liquid is further reduced in diameter and diverted through the ejector to maximize the mixing and dispersion of the liquid in the water tank, thereby ensuring the preparation requirements of the high molecular weight colloid and ensuring that the prepared colloid can be fully mixed and evenly mixed.
[0030] In order to facilitate the understanding of the technical solution of the present application, the present application first introduces and illustrates the preparation device. In this embodiment, the high molecular weight colloid refers to a substance with a molar mass of five million or more.
[0031] Refer to the instruction manual Figure 1 The present embodiment discloses a high molecular weight colloid preparation device, the preparation device comprises a liquid preparation tank 1 and a skid mounted pump 2, the liquid preparation tank 1 is provided with an inlet, an outlet and a liquid return port, the skid mounted pump 2 is provided with an inlet and an outlet; the outlet of the liquid preparation tank 1 is connected to the inlet of the skid mounted pump 2 through a liquid outlet pipeline 3, the outlet of the skid mounted pump 2 is connected to the liquid return port of the liquid preparation tank 1 through a liquid return pipeline 4, the liquid preparation tank 1 and the skid mounted pump 2 form a closed circulation loop through the liquid outlet pipeline 3 and the liquid return pipeline 4, the liquid is pressurized from the outlet of the liquid preparation tank 1 through the skid mounted pump 2 and then passes through the liquid preparation tank 1 The liquid return port on the liquid tank 1 returns to the liquid preparation tank 1, circulates back and forth, and the pressure of the skid-mounted pump 2 is used to achieve the preparation of high molecular weight colloids; further, in order to better achieve the preparation effect of high molecular weight colloids, the liquid outlet pipeline 3 of the preparation device is sequentially provided with a first ball valve 5, a feeding funnel 6 and a second ball valve 7, and the liquid return pipeline 4 is sequentially provided with a third ball valve 8 and a water hose interface 9, and the outlet end of the water hose interface 9 is connected to a water hose 10, and the outlet of the water hose 10 is connected to the interface of an injector 11, and the injector 11 is arranged in the liquid preparation tank 1.
[0032] Further, refer to the attached manual Figure 1 and Figure 2 In this embodiment, the injector 11 is installed at the center of the liquid dispensing tank 1, and the injection nozzle of the injector 11 is designed as a conical structure. The injector 11 is a hollow cubic structure. The front, back, left, right and top surfaces of the cube are all provided with injection holes 16. When working, the injection pressures generated by the injection holes 16 on the front, back, left and right surfaces offset each other. The injection pressure generated by the injection holes 16 on the top surface, under the action of the reaction force, makes the injector 11 always subject to a downward pressure, ensuring that the injector 11 can always be located at the bottom of the liquid dispensing tank 1 to ensure the liquid dispensing effect.
[0033] Furthermore, in this embodiment, the skid-mounted pump 2 is also provided with a pressure gauge 12. The pressure gauge 12 is used to observe the flow pressure, judge the liquid dispensing process, and also prevent local high pressure caused by blockage.
[0034] Furthermore, in this embodiment, a screen 13 is provided at the inlet of the liquid preparation tank 1 through a pipeline. The screen 13 filters the liquid entering the preparation device to prevent foreign matter from entering the skid-mounted pump 2 and causing the skid-mounted pump 2 to malfunction. The screen 13 needs to be inspected and cleaned accordingly before use.
[0035] Furthermore, in this embodiment, a flow meter 14 is also provided on the liquid return pipeline, and the flow meter 14 is located between the third ball valve 8 and the hose interface 9. During the use of the flow meter 14, the on-site staff can judge the mixing degree of the liquid through the volume of the pumped liquid and the liquid dispensing tank 1.
[0036] Furthermore, in this embodiment, the skid-mounted pump 2 is also connected to a diesel engine 15 via a universal shaft. The diesel engine 15 provides a power source for the skid-mounted pump 2.
[0037] Furthermore, in this embodiment, in order to improve the liquid preparation effect of the device in a low temperature environment, this embodiment makes certain improvements to the liquid preparation tank 1, and the liquid preparation tank 1 includes a tank body 101, thermal insulation cotton 102 and a protective cover 103, which are the protective cover 103, thermal insulation cotton 102 and the tank body 101 from the outside to the inside.
[0038] The inlet of the liquid preparation tank 1 is connected to the interface of the screen 13 through the ground pipeline. The screen 13 physically filters the liquid entering the preparation device to prevent foreign matter from entering the pump body of the skid-mounted pump 12 and causing failure. The screen 13 should be checked and cleaned before preparing the liquid. The first ball valve 5 is a protective device to prevent the liquid in the water tank from overflowing from the funnel mouth when not in operation. The open-type feeding funnel 6 is an interface for adding materials. This interface mixes materials such as solid powder, liquid, solid-liquid mixture and the liquid in the device through the self-priming function (negative pressure generated by the fluid in the pipeline) and enters the skid-mounted pump 2. The skid-mounted pump 2 is a one-time pressurizing device for the entire preparation device. The functions of this device are: first, to pressurize the liquid in the water tank once; second, to provide power for the open feeding funnel 6 to generate a self-priming function through the flow of liquid. The skid-mounted pump 2 and the diesel engine 15 are connected through a universal shaft. The diesel engine 15 provides a power source for the skid-mounted pump 2. The liquid flowing out of the skid-mounted pump 2 is all high-pressure liquid. A second ball valve 7 and a flow meter 14 are installed between the skid-mounted pump 2 and the hose interface 9, respectively. The flow meter 14 reflects the mixing degree of the liquid through the comparison of the entire pump liquid and the tank capacity. The pressure gauge 12 shows the pressure output of the entire pump during the liquid preparation process, and can also reflect the mixing of the prepared drugs through continuous observation of the pressure. Under the fixed output power of the diesel engine 15, as the liquid preparation process continues to deepen, the reading of the pressure gauge 12 will increase with the increase of time. After the drug addition is completed and the drugs are fully mixed, when the liquid properties in the liquid preparation tank 1 are completely consistent, the pressure of the pressure gauge 12 should remain unchanged. The hose 10 connects the hose interface 9 and the interface of the injector 11, and the injector 11 is placed in the liquid preparation tank 1. This device is a cubic structure, and five injection holes 16 are distributed on the five faces of the cube except the lower part. The high-pressure fluid input by the skid-mounted pump 2 is secondary pressurized through the five injection holes 16 of the injector 11 through the principle of variable diameter supercharging, thereby forming a fully mixed environment of the high-pressure fluid in five directions in the liquid preparation tank 1.
[0039] After the above whole process, the liquid provided from the liquid preparation tank 1 is circulated back to the liquid preparation tank 1 after passing through the above device, so that the whole liquid preparation process is circulated.
[0040] Based on the same inventive concept, the embodiments of the present application also propose a method for using a high molecular weight colloid preparation device. The preparation device used in the method is the high molecular weight colloid preparation device disclosed in the above embodiments, and the method of use specifically includes the following steps.
[0041] Step S1. Install the preparation device on site. After the installation of the device is completed, confirm that the liquid preparation tank 1, the skid-mounted pump 2 and the injector 11 are securely connected, and then enter the debugging stage of step S2.
[0042] Step S2. After opening the switch of the liquid dispensing tank outlet, the second ball valve 7 and the third ball valve 8 respectively, start the diesel engine 15, then open the first ball valve 5, observe whether the flow meter 14 and the pressure gauge 12 are working normally and record the values. If normal, perform the liquid dispensing operation. Otherwise, check and eliminate the fault until the flow meter and pressure gauge are working normally.
[0043] In this embodiment, it should be noted that the normal operation of the flow meter 14 and the pressure gauge 12 means that the values of the pressure gauge 12 and the flow meter 14 are stable, and each injection hole 16 of the injector 11 in the liquid mixing tank 1 is normal.
[0044] In the present embodiment, it should also be noted that the liquid preparation operation refers to introducing clean water into the liquid preparation tank 1, and then adding solid powder or solid particles into the liquid outlet pipeline 3 through the feeding funnel 6, so as to achieve solid-liquid mixing under the action of fluid pressure, and through the closed loop formed by the present device, the substance circulates back and forth in the liquid preparation tank 1 and the skid-mounted pump 2, and finally forms a high molecular weight colloid for drilling in the liquid preparation tank 1.
[0045] Step S3. During the liquid preparation process, observe and record the values of the flow meter 14 and the pressure gauge 12 every 15 minutes, and compare them with the previous and subsequent values. When the value of the pressure gauge 12 remains consistent for at least three time points, and the value of the flow meter 14 is more than 2-3 times the overall volume of the liquid preparation tank 1, it indicates that the liquid preparation is completed.
[0046] In this embodiment, it should be noted that when the value of the pressure gauge 12 remains consistent for at least three time points, it means that the value of the pressure gauge 12 is consistent in at least three consecutive observations and records.
[0047] After the liquid preparation in step S4 is completed, clean water is used to repeatedly circulate and clean the entire preparation device.
[0048] The above is only a preferred embodiment of the present application and does not constitute any form of limitation to the present application. Any simple modification or equivalent changes made to the above embodiments based on the technical essence of the present application shall fall within the protection scope of the present application.
Claims
1. A high molecular weight colloid preparation device, characterized in that: The preparation device comprises a liquid preparation tank (1) and a skid-mounted pump (2) connected by pipelines to form a closed loop, the outlet of the liquid preparation tank (1) being connected to the inlet of the skid-mounted pump (2) via a liquid outlet pipeline (3), the outlet of the skid-mounted pump (2) being connected to the liquid preparation tank (1) via a liquid return pipeline (4), the liquid outlet pipeline (3) being provided with a first ball valve (5), a feeding funnel (6) and a second ball valve (7) in sequence, the liquid return pipeline (4) being provided with a third ball valve (8) and a hose interface (9), the outlet end of the hose interface (9) being connected to the hose (1) 0), the outlet of the water hose (10) is connected to the interface of the injector (11), and the injector (11) is arranged in the liquid distribution tank (1); the injector (11) is located at the center of the liquid distribution tank (1), the injection nozzle of the injector (11) is designed as a conical structure, the injector (11) is a hollow cubic structure, and the front, back, left, right and top surfaces of the cube are all provided with injection holes (16); the skid-mounted pump (2) is provided with a pressure gauge (12), and the skid-mounted pump (2) is also connected to the diesel engine (15) via a universal shaft; The method for using the high molecular weight colloid configuration device is as follows: Step S1. Install the preparation device on site and enter the debugging phase after confirming that the preparation tank (1), the skid-mounted pump (2) and the injector (11) are securely connected; Step S2. After opening the switch of the outlet of the liquid dispensing tank (1), the second ball valve (7) and the third ball valve (8) respectively, the diesel engine (15) is started, and then the first ball valve (5) is opened to observe whether the flow meter (14) and the pressure gauge (12) on the return liquid pipeline are working normally and record the values. If they are normal, the liquid dispensing operation is performed. Otherwise, the fault is checked and eliminated until the flow meter (14) and the pressure gauge (12) are working normally; Step S3. During the liquid preparation process, the values of the flow meter (14) and the pressure gauge (12) are observed and recorded every 15 minutes, and compared with the previous and next values. When the value of the pressure gauge (12) remains consistent for at least three time points, and the value of the flow meter (14) is more than 2-3 times the total volume of the liquid preparation tank (1), the liquid preparation is completed; After the liquid preparation in step S4 is completed, clean water is used to repeatedly circulate and clean the entire preparation device.
2. A high molecular weight colloid preparation device according to claim 1, characterized in that: The inlet of the liquid preparation tank (1) is provided with a screen (13).
3. A high molecular weight colloid preparation device according to claim 1, characterized in that: The flow meter (14) is located between the third ball valve (8) and the hose interface (9).
4. A high molecular weight colloid preparation device according to claim 1, characterized in that: The liquid dispensing tank (1) comprises a tank body (101), thermal insulation cotton (102) and a protective cover (103), wherein from the outside to the inside, the protective cover (103), the thermal insulation cotton (102) and the tank body (101) are arranged in order.