Intelligent support decision-making method for TBM tunnel in unfavorable geological section

By establishing a TBM construction database and using machine learning algorithms, intelligent identification and support decisions of unfavorable geological sections of TBM tunnels are realized, which solves the problem of predicting unfavorable geological sections in the existing technology and improves the accuracy and efficiency of the support plan. Reduced construction risks.

CN115758515BActive Publication Date: 2024-10-25STATE KEY LAB OF SHIELD & TUNNELING TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211372982.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-31
Publication Date
2024-10-25
Estimated Expiration
2042-10-31

AI Technical Summary

Technical Problem

During TBM tunnel construction, it is difficult to accurately predict the timing and scale of adverse geological sections with existing technology, leading to improper selection of support plans and increasing construction costs and safety risks.

Method used

Establish a TBM construction database, use machine learning algorithms to establish unfavorable geological section identification and scale prediction models and support plan intelligent decision-making models, and provide suitable support plans and parameters through real-time data analysis and model prediction to achieve intelligent support decision-making. .

Benefits of technology

It improves the prediction accuracy of unfavorable geological sections and the objectivity of support decisions, reduces construction costs and safety risks, and continuously improves the effect of the decision-making model through data iteration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115758515B_ABST
    Figure CN115758515B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for intelligent support decision-making of a poor geological section of a TBM tunnel, comprising the following steps: establishing a TBM construction database, establishing a prediction and decision-making model, applying the prediction and decision-making model, applying the model on site, and feeding back the application effect and data iteration. The present invention predicts the occurrence of poor geological sections and provides corresponding support decision-making schemes by establishing a TBM construction database, using a machine learning algorithm to establish a poor geological section identification and scale prediction model, and a support scheme intelligent decision-making model. After the support decision-making scheme is applied, the effect of the support scheme decision can be verified and data can be iterated, thereby realizing autonomous learning of the support scheme intelligent decision-making model.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of TBM tunnel excavation, and in particular to an intelligent support decision-making method for a poor geological section of a TBM tunnel. Background Art

[0002] TBM (abbreviation of Tunnel Boring Machine) is an advanced tunnel construction equipment that integrates multiple technologies such as mechanical, electrical, hydraulic, control, information technology, and sensor technology. It is widely used in the construction of railway, highway, and water conservancy tunnels / tunnels.

[0003] The TBM construction process can be divided into three major operation procedures: excavation, initial support, and step-changing. The excavation process refers to the roller cutter on the TBM cutterhead breaking the rock mass, while the TBM moves forward along the tunnel axis, and the broken rock slag is sent out of the tunnel with the belt conveyor; the initial support process refers to the construction of support structures for the newly excavated tunnel according to the designed support plan to avoid local instability of the surrounding rock. The step-changing process refers to when the stroke of the TBM propulsion cylinder reaches the limit, the TBM rear support is a temporary support point to facilitate the retraction of the support shoe cylinder and the propulsion cylinder. After the propulsion cylinder retracts to the initial position, the support shoe cylinder re-extends to support both sides of the tunnel surrounding rock to provide reaction force for the next excavation process, and the rear support is retracted to complete the step-changing process. The TBM tunnel construction process is a process in which the above procedures are cyclically alternating.

[0004] Due to the complex and changeable geology during the construction process and the limited technical level of current geological survey and advanced geological forecasting, it is often difficult to accurately survey and forecast some unfavorable geological sections (locally broken areas of surrounding rock, faults, and densely populated joints) that the TBM is about to cross.

[0005] The design and selection of the current TBM tunnel support scheme also have shortcomings: First, its support scheme is designed by engineering analogy, that is, the designers design the support scheme of the new tunnel according to the support scheme of similar tunnels in the past. However, due to the influence of geological factors and the work experience of designers, it is difficult to make an accurate comparison, resulting in the mismatch between the support scheme and the current surrounding rock conditions, that is, insufficient support or excessive support; second, during the on-site construction process, the observation-decision-making method of technicians is difficult to adapt to the complexity and suddenness of the surrounding rock changes in the unfavorable geological section. Limited by the characteristics of TBM equipment, the TBM host almost occupies all the space within 5 to 6 meters behind the excavation working face (head face), and the metal mechanical structure has great interference with the electromagnetic wave field, resulting in some effective advance detection technologies that can be used in the drilling and blasting method of tunnel construction. It is not applicable to the TBM construction tunnel environment. The on-site determination of the support method of the unfavorable geological area mainly relies on the technicians to observe the surrounding rock conditions, depth, distribution points, circumferential length, etc. of the unfavorable geology after the surrounding rock is exposed from the TBM shield in real time, and select the support scheme and determine the support parameters accordingly. This method is restricted by the work experience and subjective judgment accuracy of technical personnel, and is prone to improper support scheme selection, which has an adverse impact on the safety and cost management of tunnel construction.

[0006] Therefore, it is very important to find an intelligent decision-making method that can accurately predict the timing and scale of the occurrence of adverse geological sections and quickly formulate a matching support plan. Summary of the invention

[0007] At present, the TBM tunnel support scheme designed based on the engineering analogy method is not very targeted. When the TBM passes through a poor geological section, the selection of the support scheme mainly depends on the work experience and subjective judgment of the technicians, which makes it difficult to match the support structure with the actual needs of the surrounding rock, resulting in over-support or under-support, which increases the construction cost of the TBM tunnel and high safety risks.

[0008] To solve the above problems, the present invention proposes an intelligent support decision-making method for poor geological sections of TBM tunnels. By establishing a TBM construction database, using a machine learning algorithm to establish a poor geological section identification and scale prediction model, and a support scheme intelligent decision-making model, the occurrence of poor geological sections is predicted, and corresponding support decision-making schemes are given. After the support decision scheme is applied, the effect of the support scheme decision can be verified and data iterated, thereby realizing autonomous learning of the support scheme intelligent decision-making model.

[0009] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0010] Design a TBM tunnel intelligent support decision method for unfavorable geological sections, including the following steps:

[0011] (1) Establish a TBM construction database: including the TBM operation database, tunnel surrounding rock database, rock slag database, support scheme database, and tunnel surrounding rock convergence and deformation monitoring database;

[0012] (2) Establish prediction and decision-making models: Analyze and mine the characteristics of TBM operation data, tunnel surrounding rock data, rock slag data, support structure data, and tunnel surrounding rock convergence and deformation monitoring data using statistical analysis, regression analysis, support vector, principal component analysis, and cluster analysis methods, and use machine learning algorithms to establish a poor geological section identification model, a poor geological section scale prediction model, and a support scheme intelligent decision-making model; the machine learning algorithms include neural network algorithms and multi-threaded extreme gradient boosting algorithms;

[0013] (3) Application of prediction and decision-making models: Real-time collection and analysis of TBM data during the excavation process. Based on TBM operation data and rock slag data, the bad geological section identification model and the bad geological section scale prediction model are used to identify and predict whether the current TBM is in a bad geological section. Based on the tunnel surrounding rock data, support structure data, and tunnel surrounding rock convergence and deformation monitoring data, the support scheme intelligent decision model is used to predict the support scheme and related support parameters suitable for the current surrounding rock conditions. The support scheme and support parameters can be displayed in real time on the TBM control terminal interface.

[0014] (4) On-site application: construct the initial support structure of the TBM tunnel according to the support scheme provided by the intelligent decision-making model of the support scheme;

[0015] (5) Feedback on application effects and data iteration: The tunnel surrounding rock convergence and deformation data are collected and analyzed and uploaded to the tunnel surrounding rock convergence and deformation monitoring database. The support scheme intelligent decision-making model is used to evaluate the support effect of the recommended support scheme, thereby realizing data iteration and autonomous learning of the support scheme intelligent decision-making model.

[0016] Preferably, the TBM operation database described in step (1) contains the following data: total thrust of TBM excavation, penetration, excavation speed, cutter head torque, main belt conveyor forward pressure, top shield, left shield, right shield pressure and displacement; the above parameters are read from the PLC control system of the TBM, wherein the penetration, excavation speed and cutter head rotation speed of the TBM satisfy the following relationship: penetration = excavation speed / cutter head rotation speed.

[0017] Preferably, the tunnel surrounding rock database described in step (1) contains the following data: lithology, surrounding rock grade S, rock integrity coefficient Kv, rock volume joint number Jv, rock basic quality index BQ, rock quality index RQD, rock saturated uniaxial compressive strength Rc and the scale of the poor geological section.

[0018] Preferably, the rock slag database in step (1) contains the following data: geometric dimensions of rock slag, proportion of rock slag with different particle sizes, the amount of rock slag discharged / rock slag mass m1 in a continuous excavation cycle, and the theoretical amount of rock slag discharged m0; the geometric dimensions of rock slag, the particle size of rock slag, and the proportion of rock slag with different particle sizes are all collected and acquired in real time by a rock slag image recognition system, and the amount of rock slag discharged / rock slag mass per unit time is collected in real time by a rock slag weighing system;

[0019] The calculation method of theoretical slag discharge is as follows:

[0020]

[0021] m0——theoretical slag discharge during continuous excavation cycle (kg);

[0022] ρ——density of rock slag (kg / m 3 );

[0023] l0——the length of TBM excavation during the continuous excavation cycle (m);

[0024] D——TBM cutterhead excavation diameter (m);

[0025] Among them, the image collector of the slag image recognition system is installed directly above the slag conveyor on the TBM trailer. The sampling area is not less than 1.5m long and 1m wide and can cover the width of the slag on the belt conveyor. The sampling frequency is not less than 2Hz. The particle size of the slag is its maximum size in any direction on the imaging plane of the slag image recognition system. The slag weighing system is installed on the TBM main machine belt conveyor and is equipped with a temperature compensation device. It can detect temperature differences in real time and compensate for the weighing data to ensure the accuracy of the weighing data in different seasons and at different temperatures.

[0026] Preferably, the support scheme database in step (1) contains the following data: steel arch type, spacing, steel mesh laying position, steel bar diameter, spacing; anchor type, length, spacing; shotcrete application position and thickness;

[0027] The tunnel surrounding rock convergence deformation monitoring database described in step (1) includes the following data: arch crown settlement value, left and right arch waist convergence values ​​of the tunnel, and the above data are collected by a total station.

[0028] Preferably, the method for establishing the bad geological section identification model and the bad geological section scale prediction model in step (2) is as follows:

[0029] S11: Collect TBM operation data, rock slag data and tunnel surrounding rock data in the TBM excavation section;

[0030] S12: Analyze and mine TBM operation data, rock slag data and tunnel surrounding rock data using statistical analysis, regression analysis, support vector analysis, principal component analysis and cluster analysis to find the corresponding TBM operation data, rock slag data and tunnel surrounding rock data characteristics when the surrounding rock condition is good and when there is a bad geological section;

[0031] S13: Establish a neural network recognition and prediction model with no less than three layers, use TBM operation data and rock slag data as input parameters, and tunnel surrounding rock data as output parameters, train and test the neural network prediction model, wherein no less than 70% of the TBM operation data, rock slag data and tunnel surrounding rock data are used as training sets, and the remaining data are used as test sets, so as to form a relatively stable neural network recognition and prediction model.

[0032] Preferably, the method for establishing the intelligent decision-making model for the support scheme in step (2) is as follows:

[0033] S21: Collect tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data in the TBM excavated section;

[0034] S22: Analyze and mine tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data by using statistical analysis, regression analysis, support vector, principal component analysis and cluster analysis methods to find the corresponding tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data characteristics when the surrounding rock condition is good and when there are poor geological sections;

[0035] S23: Establish a neural network decision model with no less than three layers, use the tunnel surrounding rock data as input parameters and the support scheme data as output parameters, train and test the neural network decision model, with no less than 70% of the tunnel surrounding rock data and support scheme data as training sets and the remaining data as test sets, so as to form a relatively stable neural network decision model.

[0036] Preferably, in step (3), the process of using the bad geological section identification model and the bad geological section scale prediction model to identify and predict whether the current TBM is in a bad geological section is as follows:

[0037] In a tunneling section, the TBM excavates and discharges slag at the same time, so a data set can be obtained in real time, including the TBM operation data, slag data and tunnel surrounding rock data in this tunneling section, which is recorded as Q1. The characteristics of the data set Q1 are analyzed using the bad geological section identification and scale prediction model. If its characteristics do not match the bad geological section, "no bad geological section" will be displayed on the TBM control end interface; if it matches the bad geological section, "bad geological section exists, and the estimated scale is S1" will be displayed on the TBM control end interface;

[0038] The process of using the support scheme intelligent decision-making model to predict the support scheme and related support parameters suitable for the current surrounding rock conditions is as follows: the tunnel surrounding rock data in the above-mentioned excavation section and the predicted scale of the unfavorable geological section S1 are combined into a new data set R1, and the support scheme intelligent decision-making model is used to analyze the characteristics of the data set R1, and the corresponding support scheme and support parameter set T1 are given.

[0039] Preferably, the process of effect verification and data iteration of the support scheme decision in step (5) is as follows: after completing the initial support construction of the TBM tunnel according to the support scheme and the support parameter set T1, monitor the surrounding rock convergence and deformation data of the tunnel section according to the tunnel monitoring and measurement specification dimensions to form a data set U1, and evaluate the support effect of the support parameter set T1. Write the surrounding rock convergence and deformation data set U1 corresponding to the support parameter set T1 and the support effect evaluation result into the TBM construction database to complete the data iteration.

[0040] The beneficial effects of the present invention are:

[0041] The intelligent support decision method for the poor geological section of the TBM tunnel in the present invention fully mines and analyzes the value of various types of data such as TBM operation data, tunnel surrounding rock data, rock slag data of the poor geological section, support structure data, tunnel surrounding rock convergence and deformation monitoring data, etc., and uses machine learning technology to predict the timing and scale of the occurrence of the poor geological section, and gives a corresponding support decision plan. The effectiveness of the support decision plan is judged by the tunnel surrounding rock convergence and deformation data, and the accuracy of the prediction is continuously improved through self-learning.

[0042] The present invention can use big data and artificial intelligence algorithms to identify and predict the conditions of tunnel surrounding rock blocked by TBM cutter heads and shields, solving the problem of the prior art that it is difficult to accurately predict the timing and scale of the occurrence of poor geological sections. The present invention uses big data and artificial intelligence algorithms to replace the traditional decision-making method for support parameters of poor geological sections based on the work experience of construction personnel, avoiding the drawbacks caused by the different work experience and judgment abilities of construction personnel, making the support decision results more objective, true and accurate, and improving the efficiency of decision-making. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a process flow chart of the intelligent support decision-making method for the poor geological section of the TBM tunnel of the present invention. DETAILED DESCRIPTION

[0044] The specific implementation of the present invention is described below in conjunction with examples, but the following examples are only used to illustrate the present invention in detail and do not limit the scope of the present invention in any way. Unless otherwise specified, the equipment components involved in the following examples are all conventional equipment components.

[0045] Embodiment 1: A method for intelligent support decision-making in a TBM tunnel with poor geological conditions, comprising the following steps:

[0046] (1) Establish a TBM construction database: including the TBM operation database, tunnel surrounding rock database, rock slag database, support scheme database, and tunnel surrounding rock convergence and deformation monitoring database.

[0047] The data contained in each database are as follows:

[0048] ①The data contained in the TBM operation database include: total thrust of TBM excavation, penetration, excavation speed, cutterhead torque, forward pressure of main belt conveyor, pressure and displacement of top shield, left shield and right shield; the above parameters can be read from the PLC (programmable logic controller) control system of TBM, among which the penetration, excavation speed and cutterhead speed of TBM satisfy the following relationship: penetration = excavation speed / cutterhead speed.

[0049] ② The tunnel surrounding rock database contains the following data: lithology, surrounding rock grade S, rock mass integrity coefficient Kv, rock mass volume joint number Jv, rock mass basic quality index BQ, rock quality index RQD, rock saturated uniaxial compressive strength Rc and the scale of the unfavorable geological section; among them, according to the "Engineering Rock Mass Classification Standard" (GBT 50218-2014), the rock mass integrity coefficient Kv is calculated as follows:

[0050]

[0051] Where: V pm ——elastic longitudinal wave velocity of rock mass (km / s);

[0052] V pr ——Rock elastic longitudinal wave velocity (km / s)

[0053] The basic rock mass quality index BQ is calculated as follows:

[0054] BQ=100+3R c +250K v

[0055] The saturated uniaxial compressive strength of rock is obtained by field coring test. The rock core sample is cylindrical with a diameter of 48mm-54mm. When the conditions for obtaining the measured value are not met, the measured rock point load strength index I is used. s(50) , and convert as follows:

[0056]

[0057] The calculation method of surrounding rock grade S is as follows:

[0058] S=[7.5-0.01BQ]

[0059] Based on this, the surrounding rock grade can be obtained in real time during TBM excavation.

[0060] ③ The rock slag database contains the following data: the geometric dimensions of the rock slag (length, width), the proportion of rock slag with different particle sizes, the amount of rock slag / rock slag mass m1 and the theoretical amount of rock slag m0 in a continuous excavation cycle; the geometric dimensions of the rock slag, the particle size of the rock slag and the proportion of rock slag with different particle sizes are collected in real time by the rock slag image recognition system, and the amount of rock slag / rock slag mass per unit time is collected in real time by the rock slag weighing system. The theoretical calculation method of the amount of rock slag is as follows:

[0061]

[0062] m0——theoretical slag discharge during continuous excavation cycle (kg);

[0063] ρ——density of rock slag (kg / m3);

[0064] l0——the length of TBM excavation during the continuous excavation cycle (m);

[0065] D——TBM cutterhead excavation diameter (m).

[0066] The image collector of the slag image recognition system is installed directly above the slag conveyor on the TBM trailer. The length of the sampling area (in the direction of the belt conveyor) is not less than 1.5m, the width is not less than 1m and can cover the width of the slag on the belt conveyor, and the sampling frequency is not less than 2Hz. The slag weighing system is installed on the TBM host belt conveyor, with a temperature compensation device, which can detect the temperature difference in real time and compensate and correct the weighing data to ensure the accuracy of the weighing data in different seasons and different temperatures.

[0067] The particle size of rock slag is its maximum size in any direction on the imaging plane of the rock slag image recognition system. The particle size difference of rock slag is divided into 6 levels: >90mm, [90~75)mm, [75~53)mm, [53~37.5)mm, [37.5~19)mm, <19mm.

[0068] TBM discharges slag while excavating. The geometric size of the slag, the proportion of slag particles in a certain range and the amount of slag discharged can reflect the condition of the rock on the TBM cutter head working face. If the surrounding rock condition of the TBM is good and the rock on the working face is intact, the slag will be flaky, with a relatively concentrated particle size distribution and a stable slag discharge. If the TBM is in a poor geological section with local broken areas, faults and dense joints, the slag will be both flaky and irregular, with abnormal particle size and unstable slag discharge.

[0069] ④ The support scheme database contains the following data: steel arch type, spacing, steel mesh laying position, steel bar diameter, spacing; anchor rod type, length, spacing (circumferential × longitudinal); shotcrete application position and thickness. The steel arch types are divided into HW100 steel, HW125 steel, HW150 steel, I16 steel, I18 steel, I20a, I22a, and the steel arch spacing is divided into 1.8m and 0.9m. The steel mesh laying position is divided into three areas: arch part, above the semicircle, and on the track. The steel mesh spacing is divided into 20×20cm and 25×25cm, and the steel bar diameter is divided into 6mm and 8mm. The anchor rod length is divided into 3m, 4m, and 6m, and the spacing is divided into 1×1m and 1.5×1.5m. The shotcrete thickness is divided into 5cm and 12cm.

[0070] ⑤ The tunnel surrounding rock convergence deformation monitoring database contains the following data: arch crown settlement value, left and right arch waist convergence value of the tunnel, which are collected by total station.

[0071] (2) Establish prediction and decision-making models: Analyze and mine the characteristics of TBM operation data, tunnel surrounding rock data, rock slag data, support structure data, and tunnel surrounding rock convergence and deformation monitoring data using statistical analysis, regression analysis, support vector, principal component analysis, and cluster analysis methods, and use machine learning algorithms to establish a poor geological section identification model, a poor geological section scale prediction model, and a support scheme intelligent decision-making model; the machine learning algorithms include neural network algorithms and multi-threaded extreme gradient boosting algorithms.

[0072] The method for establishing the bad geological section identification model and the bad geological section scale prediction model is as follows:

[0073] S11: Collect TBM operation data, rock slag data and tunnel surrounding rock data in the TBM excavation section.

[0074] S12: Analyze and mine TBM operation data, rock slag data and tunnel surrounding rock data using statistical analysis, regression analysis, support vector analysis, principal component analysis, cluster analysis and other methods to find the corresponding TBM operation data, rock slag data and tunnel surrounding rock data characteristics when the surrounding rock condition is good and when there are poor geological sections.

[0075] S13: Establish a neural network recognition and prediction model with no less than three layers, use TBM operation data and rock slag data as input parameters, and tunnel surrounding rock data as output parameters, train and test the neural network prediction model, wherein no less than 70% of the TBM operation data, rock slag data and tunnel surrounding rock data are used as training sets, and the remaining data are used as test sets, so as to form a relatively stable neural network recognition and prediction model.

[0076] The method of establishing an intelligent decision-making model for support schemes is as follows:

[0077] S21: Collect tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data within the TBM excavated section.

[0078] S22: Analyze and mine tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data using statistical analysis, regression analysis, support vector, principal component analysis, cluster analysis and other methods to find the corresponding tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data characteristics when the surrounding rock condition is good and when there are poor geological sections.

[0079] S23: Establish a neural network decision model with no less than three layers, use the tunnel surrounding rock data as input parameters and the support scheme data as output parameters, train and test the neural network decision model, with no less than 70% of the tunnel surrounding rock data and support scheme data as training sets and the remaining data as test sets, so as to form a relatively stable neural network decision model.

[0080] (3) Application of prediction and decision-making models: Real-time collection and analysis of TBM data during the excavation process. Based on TBM operation data and rock slag data, the unfavorable geological section identification model and unfavorable geological section scale prediction model are used to identify and predict whether the current TBM is in an unfavorable geological section. Based on tunnel surrounding rock data, support structure data, and tunnel surrounding rock convergence and deformation monitoring data, the support scheme intelligent decision-making model is used to predict the support scheme and related support parameters suitable for the current surrounding rock conditions. The support scheme and support parameters can be displayed in real time on the TBM control terminal interface.

[0081] In step (3), the process of using the bad geological section identification model and the bad geological section scale prediction model to identify and predict whether the current TBM is in a bad geological section is as follows: in a tunneling section, the TBM excavates and discharges slag at the same time, so a data set can be obtained in real time, including the TBM operation data, slag data and tunnel surrounding rock data in this tunneling section, denoted as Q1, and the bad geological section identification and scale prediction model is used to analyze the characteristics of the data set Q1. If its characteristics do not match the bad geological section, "no bad geological section" is displayed on the TBM control end interface; if it matches the bad geological section, "bad geological section exists, and the estimated scale is S1" is displayed on the TBM control end interface.

[0082] The process of using the support scheme intelligent decision model in step (3) to predict the support scheme and related support parameters suitable for the current surrounding rock conditions is as follows: the tunnel surrounding rock data in the above-mentioned excavation section and the predicted scale of the unfavorable geological section S1 are combined into a new data set R1, and the support scheme intelligent decision model is used to analyze the characteristics of the data set R1, and the corresponding support scheme and support parameter set T1 are given.

[0083] (4) On-site application: construct the initial support structure of the TBM tunnel according to the support scheme provided by the intelligent decision-making model of the support scheme;

[0084] (5) Feedback on application effects and data iteration: The tunnel surrounding rock convergence and deformation data are collected and analyzed and uploaded to the tunnel surrounding rock convergence and deformation monitoring database. The support scheme intelligent decision-making model is used to evaluate the support effect of the recommended support scheme, thereby realizing data iteration and autonomous learning of the support scheme intelligent decision-making model.

[0085] The process of effect verification and data iteration of the support scheme decision in step (5) is as follows: after completing the initial support construction of the TBM tunnel according to the support scheme and support parameter set T1, monitor the surrounding rock convergence and deformation data of the tunnel section according to the tunnel monitoring and measurement specification dimensions to form a data set U1, and evaluate the support effect of the support parameter set T1. The surrounding rock convergence and deformation data set U1 corresponding to the support parameter set T1 and the support effect evaluation results are written into the TBM construction database to complete the data iteration.

[0086] The present invention has been described in detail above in conjunction with the embodiments. However, those skilled in the art will appreciate that, without departing from the spirit of the present invention, the specific parameters in the above embodiments may be changed to form multiple specific embodiments, all of which are within the protection scope of the present invention and will not be described in detail herein.

Claims

1. An intelligent support decision-making method for poor geological sections of TBM tunnels. It is characterized in that The following steps are involved: (1) Establish a TBM construction database: including the TBM operation database, tunnel surrounding rock database, rock slag database, support scheme database, and tunnel surrounding rock convergence and deformation monitoring database; (2) Establish prediction and decision-making models: Analyze and mine the characteristics of TBM operation data, tunnel surrounding rock data, rock slag data, support structure data, and tunnel surrounding rock convergence and deformation monitoring data using statistical analysis, regression analysis, support vector, principal component analysis, and cluster analysis methods, and establish a poor geological section identification model, a poor geological section scale prediction model, and a support scheme intelligent decision-making model using machine learning algorithms; the machine learning algorithms include neural network algorithms and multi-threaded extreme gradient boosting algorithms; The method for establishing the bad geological section identification model and the bad geological section scale prediction model in step (2) is as follows: S11: Collect TBM operation data, rock slag data and tunnel surrounding rock data in the TBM excavation section; S12: Analyze and mine TBM operation data, rock slag data and tunnel surrounding rock data by using statistical analysis, regression analysis, support vector, principal component analysis and cluster analysis methods, and find the corresponding TBM operation data, rock slag data and tunnel surrounding rock data characteristics when the surrounding rock condition is good and when there is a bad geological section; S13: Establish a neural network recognition prediction model with no less than three layers, use the TBM operation data, rock slag data and tunnel surrounding rock data as input parameters, obtain an output parameter, train and test the neural network recognition prediction model, wherein no less than 70% of the TBM operation data, rock slag data and tunnel surrounding rock data are used as training sets, and the remaining data are used as test sets, so as to form a relatively stable neural network recognition prediction model; The method for establishing the intelligent decision-making model of the support scheme in step (2) is as follows: S21: Collect tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data in the TBM excavated section; S22: Analyze and mine tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data by using statistical analysis, regression analysis, support vector, principal component analysis and cluster analysis methods, and find the corresponding tunnel surrounding rock data, support scheme data and tunnel surrounding rock convergence and deformation monitoring data characteristics when the surrounding rock condition is good and when there are poor geological sections; S23: Establish a neural network decision model with no less than three layers, use the tunnel surrounding rock data as input parameters and the support scheme data as output parameters, train and test the neural network decision model, wherein no less than 70% of the tunnel surrounding rock data and support scheme data are used as training sets and the remaining data are used as test sets, so as to form a relatively stable neural network decision model; (3) Application of prediction and decision-making models: Real-time collection and analysis of TBM data during the excavation process. Based on TBM operation data and rock slag data, the unfavorable geological section identification model and unfavorable geological section scale prediction model are used to identify and predict whether the current TBM is in an unfavorable geological section. Based on the tunnel surrounding rock data, support structure data and tunnel surrounding rock convergence and deformation monitoring data, the support scheme intelligent decision model is used to predict the support scheme and related support parameters suitable for the current surrounding rock conditions. The support scheme and support parameters can be displayed in real time on the TBM control terminal interface; The process of using the bad geological section identification model and the bad geological section scale prediction model in step (3) to identify and predict whether the current TBM is in a bad geological section is as follows: In a tunneling section, the TBM excavates and discharges slag at the same time, so a data set can be obtained in real time, including the TBM operation data, slag data and tunnel surrounding rock data in this tunneling section, denoted as Q 1 , using the bad geological section identification and size prediction model to analyze the data set Q 1 If the characteristics do not match the unfavorable geological section, the TBM control interface will display "No unfavorable geological section"; if the characteristics match the unfavorable geological section, the TBM control interface will display "Unfavorable geological section exists, with an estimated size of S 1 "; Among them, the TBM discharges slag while excavating. The geometric size of the slag, the proportion of slag particles in a certain range and the amount of slag discharged can reflect the condition of the rock on the TBM cutterhead working face. If the surrounding rock condition of the TBM is good and the rock on the working face is intact, the slag will be in the form of thin flakes, with a relatively concentrated particle size distribution and a stable slag discharge volume; if the TBM is in a poor geological section with local broken areas, faults and joint-dense zones, the slag will be in the form of both thin flakes and irregular blocks, with abnormal particle size and unstable slag discharge volume; The process of using the intelligent decision-making model of support scheme to predict the support scheme and related support parameters suitable for the current surrounding rock conditions is as follows: the tunnel surrounding rock data in the above excavation section and the predicted scale of the unfavorable geological section S 1 Compose a new dataset R 1 , using the intelligent decision-making model of support scheme to analyze the data set R 1 The corresponding support scheme and support parameter set T are given. 1 ; (4) On-site application: construct the initial support structure of the TBM tunnel according to the support scheme provided by the intelligent decision-making model of the support scheme; (5) Feedback on application effects and data iteration: Collect and analyze tunnel surrounding rock convergence and deformation data and upload them to the tunnel surrounding rock convergence and deformation monitoring database. Use the support scheme intelligent decision-making model to evaluate the support effect of the recommended support scheme, and realize data iteration and autonomous learning of the support scheme intelligent decision-making model. The process of effect verification and data iteration of the support scheme decision in step (5) is as follows: according to the support scheme and support parameter set T 1 After the initial support construction of the TBM tunnel is completed, the surrounding rock convergence deformation data of the tunnel section is monitored according to the tunnel monitoring measurement specification to form a data set U 1 , and evaluate the support parameter set T 1 The support effect will be related to the support parameter set T 1 The corresponding surrounding rock convergence deformation data set U 1 The support effect evaluation results are written into the TBM construction database to complete data iteration.

2. The intelligent support decision-making method for poor geological sections of TBM tunnels according to claim 1, It is characterized in that The data contained in the TBM operation database described in step (1) include: total thrust of TBM excavation, penetration, excavation speed, cutter head torque, main belt conveyor forward pressure, top shield, left shield, right shield pressure and displacement; the above parameters are read from the PLC control system of the TBM, wherein the penetration, excavation speed and cutter head rotation speed of the TBM satisfy the following relationship: penetration = excavation speed / cutter head rotation speed.

3. The intelligent support decision-making method for poor geological sections of TBM tunnels according to claim 1, It is characterized in that The tunnel surrounding rock database described in step (1) contains the following data: lithology, surrounding rock grade S, rock mass integrity coefficient Kv, rock mass volume joint number Jv, rock mass basic quality index BQ, rock quality index RQD, rock saturated uniaxial compressive strength Rc and the scale of the poor geological section.

4. The intelligent support decision-making method for poor geological sections of TBM tunnels according to claim 1, It is characterized in that The rock slag database described in step (1) includes the following data: the geometric size of the rock slag, the proportion of rock slag with different particle sizes, the amount of rock slag discharged / rock slag mass m1 in a continuous excavation cycle, and the theoretical amount of rock slag discharged m0; the geometric size of the rock slag, the particle size of the rock slag, and the proportion of rock slag with different particle sizes are all collected in real time by a rock slag image recognition system, and the amount of rock slag discharged / rock slag mass per unit time is collected in real time by a rock slag weighing system; Among them, the image collector of the slag image recognition system is installed directly above the slag conveyor on the TBM trailer. The sampling area is not less than 1.5m long and 1m wide and can cover the width of the slag on the belt conveyor. The sampling frequency is not less than 2Hz. The slag weighing system is installed on the TBM main machine belt conveyor and is equipped with a temperature compensation device. It can detect temperature differences in real time and compensate for the weighing data to ensure the accuracy of the weighing data in different seasons and at different temperatures.

5. The intelligent support decision-making method for poor geological sections of TBM tunnels according to claim 1, It is characterized in that The support scheme database described in step (1) contains the following data: steel arch type, spacing, steel mesh laying position, steel bar diameter, spacing; anchor type, length, spacing; shotcrete application position and thickness; The tunnel surrounding rock convergence deformation monitoring database described in step (1) includes the following data: arch crown settlement value, left and right arch waist convergence values ​​of the tunnel, and the above data are collected by a total station.