Shear-proof waterproof device of pc construction method combined pile

By introducing shear-resistant and water-stopping components into the PC method piles, the shear resistance and waterproofing issues at the connection between the retaining piles and the walers are solved, achieving higher construction efficiency and safety, while also facilitating component recycling.

CN115874628BActive Publication Date: 2026-01-02SHANGHAI SHANNAN GEOTECHNICAL ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111136548.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-27
Publication Date
2026-01-02
Estimated Expiration
2041-09-27

AI Technical Summary

Technical Problem

In the PC method pile system, the vertical shear resistance at the connection between the retaining pile and the waler is weak, the waterproofing effect at the connection between the sheet pile and the waler is poor, and the existing methods of using welded steel plates and other shear-resistant components lead to construction difficulties and inconvenience in recycling.

Method used

Shear-resistant and water-stopping components are used, including hoops, shear-resistant members, and water-stop plates. The hoops are connected to the steel pipe piles, and the water-stop plates are attached to the steel sheet piles to form a reliable connection and waterproof structure, avoiding welding connections.

Benefits of technology

It improves the vertical shear resistance at the connection between steel pipe piles and walers, enhances the waterproofing effect of steel sheet piles and walers, improves the safety and construction efficiency of foundation pit projects, and facilitates the recycling and reuse of components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115874628B_ABST
    Figure CN115874628B_ABST
Patent Text Reader

Abstract

The application relates to a shearing and waterproof device of a PC construction method combined pile, which comprises two steel pipe piles, a steel sheet pile, a shearing component for improving the shearing capacity of the steel pipe pile and a water stopping component for improving the waterproof capacity of the steel sheet pile, the steel pipe piles and the steel sheet pile are vertically arranged, the two ends of the steel sheet pile are fixedly connected with the side surfaces of the two steel pipe piles respectively, the shearing component is arranged on the top end of the steel pipe pile, and the water stopping component is arranged on one side of the steel sheet pile. Compared with the prior art, the shearing and waterproof device has the advantages of good shearing performance, reliable waterproof effect and the like.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the civil engineering technical field, especially to a PC method combined pile shearing waterproof device. BACKGROUND

[0002] In the current PC method pile system, the steel pipe pile and the surrounding purlin are connected in a natural way, the steel sheet pile and the steel pipe pile are connected in a tongue and groove connection, and the steel sheet pile is not connected with the surrounding purlin, which has the following problems:

[0003] Firstly, the vertical shearing capacity of the connection between the fender pile and the surrounding purlin is weak. The contact area between the round shape of the steel pipe pile and the surrounding purlin is small, resulting in weak vertical shearing capacity of the connection between the fender pile and the surrounding purlin; if an inclined support structure is arranged in the pit, the surrounding purlin will be lifted, and even the surrounding purlin and the fender pile will be separated, which is not conducive to the safety of the foundation pit.

[0004] Secondly, the waterproofing of the connection between the steel sheet pile and the surrounding purlin is weak. At present, considering the need for the surrounding purlin steel reinforcement to be connected, the steel sheet pile usually does not extend into the surrounding purlin, resulting in poor water stop effect between the surrounding purlin and the steel sheet pile, which is not conducive to the protection of the surrounding environment.

[0005] In addition, the current method of welding a steel plate or other shearing member on the steel pipe pile cannot solve the waterproofing problem, and will cause certain difficulties in the recycling of the steel pipe pile. SUMMARY

[0006] The purpose of the present application is to overcome the defects of the prior art and provide a PC method combined pile shearing waterproof device.

[0007] The purpose of the present application can be achieved by the following technical solutions:

[0008] A PC method combined pile shearing waterproof device, comprising two steel pipe piles, a steel sheet pile, a shearing member for improving the shearing capacity of the steel pipe pile, and a water stop member for improving the waterproofing capacity of the steel sheet pile, the steel pipe piles and the steel sheet pile are vertically arranged, the two ends of the steel sheet pile are fixedly connected with the side surfaces of the two steel pipe piles, the shearing member is arranged on the top end of the steel pipe pile, and the water stop member is arranged on one side of the steel sheet pile.

[0009] Preferably, the shearing member comprises two hoops matched with the shape of the steel pipe pile and a plurality of shearing pieces, the hoops are sleeved on the top end of the steel pipe pile, and the shearing pieces are fixedly arranged on the side surface of the hoops.

[0010] Preferably, the shearing pieces are steel reinforcement pieces or steel plate pieces.

[0011] Preferably, the shearing pieces are fixedly connected with the hoops by welding.

[0012] Preferably, the hoop comprises a plurality of hoop segments and hoop connectors, the hoop segments are fixedly connected through the hoop connectors, and the hoop segments are sequentially connected head to tail to form the hoop.

[0013] Preferably, the hoop comprises two half-ring hoop segments.

[0014] Preferably, the water stop member comprises a connecting plate and a water stop plate, two ends of the connecting plate are fixedly connected with two hoops respectively, the connecting plate is arranged parallel to the side surface of the steel sheet pile, the top end of one side surface of the water stop plate is fixedly connected with the side surface of the connecting plate, and the bottom end of the other side surface of the water stop plate is attached to the top end of the steel sheet pile.

[0015] Preferably, the two ends of the connecting plate are provided with first through holes, the top end of the water stop plate is provided with a second through hole corresponding to the first through hole of the connecting plate, the side surface of the hoop is provided with a connecting hole, and the water stop member further comprises a bolt and a nut, the bolt is sequentially threaded through the connecting hole, the first through hole and the second through hole, and then screwed with the nut.

[0016] Preferably, the water stop plate is a polymer modified asphalt plate.

[0017] Preferably, the side surface of the steel pipe pile is provided with a connecting groove, and the end portion of the steel sheet pile is fixedly connected with the steel pipe pile through the connecting groove.

[0018] Compared with the prior art, the present application has the following advantages:

[0019] (1) The connection between the pile and the surrounding purlin is more reliable: when the top end of the steel pipe pile is provided with the surrounding purlin, the shear force received by the surrounding purlin is borne by the hoop and the shear member around the side surface of the hoop, so that the vertical shear stress at the connection between the steel pipe pile and the surrounding purlin is more reliable, and the safety of the foundation pit engineering is high.

[0020] (2) The connection between the steel sheet pile and the surrounding purlin is more reliable: the water stop member of the present application effectively solves the problem that the steel sheet pile does not usually extend into the surrounding purlin, resulting in poor water stop effect between the surrounding purlin and the steel sheet pile, and the water stop plate is arranged by the connecting member, which effectively blocks the space between the steel sheet pile and the surrounding purlin, so that the water stop is more reliable and more conducive to the protection of the environment around the foundation pit.

[0021] (3) Better construction convenience, higher construction efficiency and better economy: the joint form of the present application does not need to use welding or other forms to connect the shear member and the enclosing pile, so that the construction efficiency is high and the construction convenience is good; in the process of recycling the steel pipe pile, the components can be recycled at the same time, which is good in economy. BRIEF DESCRIPTION OF DRAWINGS

[0022] Fig. 1 is a top view structural schematic diagram of the present application;

[0023] Fig. 2 A side view of the present invention.

[0024] Fig. 3 This is a top view of the structure of the ring hoop joint of the present invention.

[0025] Fig. 4 This is a top view of the connecting plate of the present invention.

[0026] Fig. 5 This is a side view of the connecting plate of the present invention.

[0027] Fig. 6 This is a side view of the structure of the waterstop plate of the present invention.

[0028] Among them, 1. steel pipe pile, 2. steel sheet pile, 3. connecting tongue and groove, 4. ring hoop joint, 5. shear-resistant component, 6. ring hoop connector, 7. connecting plate, 8. waterstop plate, 9. connecting hole, 10. first through hole, 11. second through hole. Detailed Implementation

[0029] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments. Note that the following description of the embodiments is merely illustrative and is not intended to limit its applicability or use, nor is the present invention limited to the following embodiments.

[0030] Example

[0031] A shear-resistant and waterproof device for PC method composite piles, such as Figs. 1-2 As shown, the PC method combined pile includes two steel pipe piles 1 and steel sheet piles 2. The invention also includes a shear-resistant component for improving the shear resistance of the steel pipe pile 1 and a water-stopping component for improving the waterproofing of the steel sheet pile 2. The steel pipe pile 1 and steel sheet pile 2 are vertically arranged. The side of the steel pipe pile 1 is provided with a connecting tongue and groove 3. The two ends of the steel sheet pile 2 are fixedly connected to the steel pipe pile 1 through the connecting tongue and groove 3. The shear-resistant component is located on the top periphery of the steel pipe pile 1, and the water-stopping component is located on one side of the steel sheet pile 2.

[0032] Specifically, the shear-resistant member includes two rings whose shapes are adapted to the steel pipe pile 1 and multiple shear-resistant components 5. The rings are sleeved on the top periphery of the steel pipe pile 1, and the shear-resistant components 5 are fixed on the periphery of the rings. Specifically, the shear-resistant components 5 are directly welded to the periphery of the rings, or fixed to the periphery of the rings by means of mechanical connection.

[0033] The water stop member comprises a connecting plate 7 and a water stop plate 8, two ends of the connecting plate 7 are fixedly connected with two hoops respectively, and the connecting plate 7 is arranged in parallel to the side surface of the steel sheet pile 2, the water stop plate 8 is a polymer modified asphalt plate, the top end of one side surface of the water stop plate 8 is fixedly connected with the side surface of the connecting plate 7, and the bottom end of the other side surface of the water stop plate 8 is attached to the top end of the steel sheet pile 2. In the embodiment, the shear member 5 is a steel bar member or a steel plate member.

[0034] In one embodiment of the present application, the specific structure of the shear member and the water stop member is as follows:

[0035] As shown in Figs. 3-6 The hoop comprises two half-ring hoop segments 4 and two hoop connecting pieces 6, the hoop segment 4 is provided with a connecting plate 7 at the end, the connecting plate 7 is provided with a connecting hole 9, the hoop connecting piece 6 is a bolt, in addition, the two ends of the connecting plate 7 are provided with a first through hole 10, and the top end of the water stop plate 8 is provided with a second through hole 11 corresponding to the first through hole 10 of the connecting plate 7.

[0036] When the hoop segment 4 and the water stop member are connected, the installation mode is as follows:

[0037] One end of the two hoop segments 4 is fixedly connected by being screwed with nuts through the connecting plate 7 on the two oppositely arranged connecting plate 7, and the other end is screwed with nuts through the connecting hole 9, the first through hole 10 and the second through hole 11 in sequence, so that the hoop, the connecting plate 7 and the water stop member are fixedly connected.

[0038] Further, when the present application is installed, the following steps are adopted:

[0039] First step: constructing the steel pipe pile 1 and the steel sheet pile 2;

[0040] Second step: installing the hoop in the range of the top end of the steel pipe pile 1 and connecting the hoop by using the hoop connecting piece 6;

[0041] Third step: arranging the connecting plate 7 and the water stop plate 8, and adjusting the direction of the connecting plate 7 and the hoop to ensure that the connecting plate 7 is parallel to the steel sheet pile 2 and the water stop plate 8 is tightly attached to the steel sheet pile 2;

[0042] Fourth step: connecting the hoop, the connecting plate 7 and the water stop plate 8 by using the hoop connecting piece 6;

[0043] Fifth step: pouring the enclosure.

[0044] The above embodiments are only examples and do not represent the limitation of the scope of the present application. These embodiments can be implemented in various other ways, and various omissions, substitutions and changes can be made without departing from the technical idea of the present application.

Claims

1. A shearing waterproofing device for PC construction method composite piles, characterized in that, The utility model provides a steel pipe pile (1), steel sheet pile (2), shearing member for improving the shearing capacity of steel pipe pile (1) and water stop member for improving the waterproof capacity of steel sheet pile (2), the steel pipe pile (1), steel sheet pile (2) vertical setting, the both ends of steel sheet pile (2) are fixedly connected with the side of two steel pipe piles (1) respectively, the shearing member is equipped in the top end circumferential side of steel pipe pile (1), and the water stop member is equipped in one side of steel sheet pile (2); The shearing member includes two hoops matched with the shape of the steel pipe pile (1) and a plurality of shearing pieces (5), the hoop is sleeved on the top end circumferential side of the steel pipe pile (1), and the shearing piece (5) is fixedly arranged on the circumferential side of the hoop; The water stop member includes a connecting plate (7) and a water stop plate (8), both ends of the connecting plate (7) are fixedly connected with two hoops respectively, and the connecting plate (7) is arranged parallel to the side of the steel sheet pile (2), one end of the side of the water stop plate (8) is fixedly connected with the side of the connecting plate (7), and the bottom end of the other side of the water stop plate (8) is attached to the top end of the steel sheet pile (2).

2. The shearing waterproofing device of a PC construction method combined pile according to claim 1, characterized in that, The shearing piece (5) is a reinforcing bar or a steel plate.

3. The shearing waterproofing device of a PC construction method combined pile according to claim 1, characterized in that, The shearing piece (5) is fixedly connected with the hoop by welding.

4. The shearing waterproofing device of a PC construction method combined pile according to claim 1, characterized in that, The hoop includes a plurality of hoop segments (4) and a hoop connecting piece (6), the hoop segments (4) are fixedly connected through the hoop connecting piece (6), and the hoop segments (4) are sequentially connected to form the hoop.

5. The shearing waterproofing device of a PC construction method combined pile according to claim 4, characterized in that, The hoop includes two half-ring hoop segments (4).

6. The shearing waterproofing device of a PC construction method combined pile according to claim 1, characterized in that, First through holes (10) are formed in both ends of the connecting plate (7), a second through hole (11) corresponding to the first through hole (10) of the connecting plate (7) is formed in the top end of the water stop plate (8), a connecting hole (9) is formed in the side of the hoop, and the water stop member further includes a bolt and a nut, the bolt is sequentially threaded through the connecting hole (9), the first through hole (10) and the second through hole (11), and then screwed with the nut.

7. The shearing and waterproofing device of a PC construction method combined pile according to claim 1, characterized in that, The water stop plate (8) is a polymer modified asphalt plate.

8. The shearing waterproofing device of a PC construction method combined pile according to claim 1, characterized in that, The side of the steel pipe pile (1) is provided with a connecting groove (3), and the end of the steel sheet pile (2) is fixedly connected with the steel pipe pile (1) through the connecting groove (3).

Citation Information

Patent Citations

  • Basement reconstruction structure with raft foundation building

    CN106285032A

  • Flat arch type steel sheet pile foundation pit supporting method and support

    CN106906831A