By calculating the fundamental and harmonic currents of the distribution network, evaluating sensitivity and building multi-objective functions, the problem of power quality control device configuration in the existing technology is solved, the optimal voltage and harmonic governance of the distribution network is achieved, and the improvement of the Governance effects and model adaptability.

CN115907306BActive Publication Date: 2024-11-01JIANGSU DANYANG ELECTRIC POWER SUPPLY CORP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310005723.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-04
Publication Date
2024-11-01
Estimated Expiration
2043-01-04

AI Technical Summary

Technical Problem

It is difficult for the prior art to effectively configure power quality control devices, especially in distributed photovoltaic distribution network scenarios, which is difficult to meet the needs of voltage stability and harmonic compensation, resulting in increased governance difficulties and affecting the promotion and application of equipment.

Method used

By calculating the fundamental wave and harmonic current of the distribution network, evaluating the voltage/reactive sensitivity and harmonic sensitivity, building a multi-objective function, determining the site selection objective function and constraints of the power quality management device, and using genetic algorithm to solve it to determine the best The preferred address scheme is to achieve the optimal control configuration of voltage and harmonics.

Benefits of technology

Under the same investment cost, the optimal harmonic voltage distortion rate and voltage deviation rate of the distribution network are achieved, the power quality management effect is improved, and the adaptability and generalization ability of the model are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115907306B_ABST
    Figure CN115907306B_ABST
Patent Text Reader

Abstract

The present invention relates to a site selection method and system for a power quality management device of a distribution network, and belongs to the technical field of power system optimization. The method includes: calculating the fundamental current and harmonic current of the distribution network, and obtaining the parameter value when the distribution network is not connected to the power quality management device; performing power quality evaluation on the distribution network based on the parameter value, and determining the site selection objective function of the power quality management device; determining the constraint conditions of the site selection objective function, and constructing a site selection model of the power quality management device according to the site selection objective function and the constraint conditions; solving the site selection model of the power quality management device, and obtaining the optimal solution of the site selection model, and determining the site selection plan of the power quality management device according to the optimal solution. This method can realize adaptive adjustment of the model according to a specific distribution network scenario, and improve the power quality management effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power system optimization, and in particular relates to a site selection method and system for a power quality management device in a distribution network. Background Art

[0002] With the continuous penetration of high-proportion distributed photovoltaics and the widespread application of power electronic equipment, the harmonic pollution and voltage deviation problems of distribution networks are becoming increasingly serious, and the difficulty of governance is increasing. As a flexible AC transmission system (FACTS) device with a series-parallel structure, the power quality management device (United Power Quality Regulator, UPQR) can not only compensate for harmonic voltages, adjust voltage fluctuations or flickers, and maintain system voltage stability on the series side, but also compensate for harmonic currents, offset load reactive power, and adjust the DC side voltage of the converter on the parallel side, so it has broad development prospects. Among them, how to use FACTS devices such as UPQR to improve system voltage stability, reduce network losses, and achieve harmonic compensation has become a problem of great concern to researchers. To this end, the document "Zhang Tao, Xu Xueqin, Ran Huajun. Multi-objective optimization configuration of FACTS equipment based on improved differential harmonic search algorithm. Proceedings of the CSEE, 2018, 38(03)" takes static synchronous compensator and thyristor-controlled series capacitor as research objects to establish a three-objective optimization model considering network loss, compensation cost and voltage stability, and gives site selection schemes under different equipment combinations; Authorization announcement number "CN107706915" selects the lowest total harmonic voltage distortion rate of each node in the distribution network as an indicator, constructs the objective function by giving the weighted coefficient of node importance, and uses the improved particle swarm algorithm to solve the model, and obtains the configuration method of the active filter. Unfortunately, for UPQR, which has both reactive power compensation and harmonic control capabilities, the configuration strategy obtained from only one perspective lacks representativeness; in addition, when facing distributed photovoltaic distribution network scenarios with different control requirements, the inherent configuration strategy is difficult to meet the engineering design requirements, which is not conducive to the promotion and application of UPQR equipment. Summary of the invention

[0003] The main purpose of the present invention is to overcome the shortcomings and deficiencies of the prior art and to provide a site selection method and system for a power quality management device in a distribution network, which can realize adaptive adjustment of the model according to a specific distribution network scenario and has strong generalization ability; at the same time, under the same investment and management cost, a location configuration strategy for a power quality management device that can achieve the optimal harmonic voltage distortion rate and voltage deviation rate of the distribution network can be given, thereby improving the power quality management effect.

[0004] According to one aspect of the present invention, the present invention provides a method for selecting a site for a power quality control device in a distribution network, the method comprising the following steps:

[0005] S1: Calculate the fundamental power flow and harmonic power flow of the distribution network to obtain parameter values ​​when the distribution network is not connected to the power quality management device, and the parameter values ​​include the voltage deviation rate, harmonic voltage content rate, harmonic distortion rate, and active power loss of each node of the distribution network;

[0006] S2: Evaluate the power quality of the distribution network based on the parameter values, weight the voltage / reactive power sensitivity and harmonic sensitivity, calculate the weight coefficients of the multi-objective function, and then determine the site selection objective function of the power quality control device;

[0007] S3: Determine the constraint conditions of the site selection objective function, and construct a site selection model for the power quality management device according to the site selection objective function and the constraint conditions;

[0008] S4: Solve the site selection model of the power quality management device to obtain the optimal solution of the site selection model, and determine the site selection plan of the power quality management device based on the optimal solution.

[0009] Preferably, the calculation of the fundamental power flow and the harmonic power flow of the distribution network includes:

[0010] Input the grid topology and grid parameters to form the fundamental wave and harmonic admittance matrices; use the Newton-Raphson method to solve the fundamental wave power flow and obtain the voltage, power and loss of each node in the distribution network; based on the Norton harmonic source model, use the Gaussian elimination method to solve the harmonic power flow and obtain the harmonic current, harmonic voltage and harmonic loss of each node.

[0011] Preferably, the weighting of voltage / reactive power sensitivity and harmonic sensitivity comprises:

[0012] The expression of the voltage / reactive power sensitivity is as follows:

[0013]

[0014] The expression of the harmonic sensitivity is as follows:

[0015] E=ΔU h / ΔG h

[0016] Among them, U b is the fundamental voltage, Q is the reactive power; J pθ , J qθ are the sensitivity of node voltage phase angle to active and reactive injected power respectively; J pv , J qv are the sensitivity of node voltage amplitude to active and reactive injected power respectively; U h is the hth harmonic voltage, G his the equivalent conductance of the hth harmonic.

[0017] Preferably, the determining of the site selection objective function of the power quality management device includes:

[0018] The expression of the site selection objective function is as follows:

[0019] min{f}=k1 max{L THD}+k2 max{L TVD}

[0020]

[0021]

[0022]

[0023] Among them, f is the site selection objective function, L THD is the voltage total harmonic distortion rate; L TVD is the total voltage deviation rate of the power grid; k1 and k2 are the weight components of the power grid harmonics and voltage deviation: N is the number of distribution network nodes, K is the highest harmonic number; U i (j) is the voltage of node i at the jth time; ξ THD and TVD They are the total harmonic distortion rate of voltage and the total voltage deviation rate of the power grid given by the system design; U iN (1) is the rated value of the fundamental voltage at node i.

[0024] Preferably, the constraint conditions for determining the site selection objective function include:

[0025] The constraints include: power flow balance constraints, harmonic power flow balance constraints, system voltage and pollution level constraints, and access capacity constraints; wherein,

[0026] The expression of the power flow balance constraint is as follows:

[0027]

[0028] The expression of the harmonic power flow balance constraint is as follows:

[0029] U h =G h I h

[0030] The expressions for the system voltage and pollution level constraints are as follows:

[0031]

[0032] The expression of the access capacity constraint is as follows:

[0033]

[0034] Among them, P inj,i and P inj,i-1 are the active power injected into node i and node i-1 respectively, Q inj,i and Q inj,i-1 are the reactive power injected into node i and node i-1 respectively; Δp i-1,i and Δq i-1,i are the active power loss and reactive power loss of the line between node i-1 and node i respectively; Q UPQR is the reactive power injected by the power quality management device; λ is a Boolean variable. When the λ value is 1, it means that the node i has a power quality management device connected, and when the λ value is 0, it means that there is no power quality management device connected; I h Harmonic current injected into the node; and are the minimum and maximum fundamental voltage of node i respectively; L HD,i is the harmonic voltage distortion rate of node i; H HD,i is the harmonic voltage content rate of node i; ξ HD and The harmonic voltage distortion rate and harmonic voltage content rate given for system design; I UPQR,i and are the access capacity and maximum allowable access capacity of the power quality management device of node i, δ UPQR,i is the capacity margin of the power quality management device at node i; P load,i and Q load,i They represent the active power and reactive power of the original load of node i respectively.

[0035] According to another aspect of the present invention, the present invention also provides a site selection system for a power quality management device in a distribution network, the system comprising:

[0036] A calculation module is used to calculate the fundamental power flow and harmonic power flow of the distribution network, and obtain parameter values ​​when the distribution network is not connected to the power quality management device, wherein the parameter values ​​include the voltage deviation rate, harmonic voltage content rate, harmonic distortion rate, and active power loss of each node of the distribution network;

[0037] A determination module, used to evaluate the power quality of the distribution network based on the parameter value, weight the voltage / reactive power sensitivity and harmonic sensitivity, calculate the weight coefficients of the multi-objective function, and then determine the site selection objective function of the power quality control device;

[0038] A construction module, used to determine the constraint conditions of the site selection objective function, and to construct a site selection model for a power quality management device according to the site selection objective function and the constraint conditions;

[0039] The solution module is used to solve the site selection model of the power quality management device to obtain the optimal solution of the site selection model, and determine the site selection plan of the power quality management device according to the optimal solution.

[0040] Preferably, the calculation module calculates the fundamental power flow and harmonic power flow of the distribution network including:

[0041] Input the grid topology and grid parameters to form the fundamental wave and harmonic admittance matrices; use the Newton-Raphson method to solve the fundamental wave power flow and obtain the voltage, power and loss of each node in the distribution network; based on the Norton harmonic source model, use the Gaussian elimination method to solve the harmonic power flow and obtain the harmonic current, harmonic voltage and harmonic loss of each node.

[0042] Preferably, the determining module weights the voltage / reactive power sensitivity and the harmonic sensitivity, including:

[0043] The expression of the voltage / reactive power sensitivity is as follows:

[0044]

[0045] The expression of the harmonic sensitivity is as follows:

[0046] E=ΔU h / ΔG h

[0047] Among them, U b is the fundamental voltage, Q is the reactive power; J pθ , J qθ are the sensitivity of node voltage phase angle to active and reactive injected power respectively; J pv , J qv are the sensitivity of node voltage amplitude to active and reactive injected power respectively; U h is the hth harmonic voltage, G h is the equivalent conductance of the hth harmonic.

[0048] Preferably, the determination module determines the site selection objective function of the power quality management device including:

[0049] The expression of the site selection objective function is as follows:

[0050] min{f}=k1 max{L THD}+k2 max{L TVD}

[0051]

[0052]

[0053]

[0054] Among them, f is the site selection objective function, L THD is the voltage total harmonic distortion rate; L TVD is the total voltage deviation rate of the power grid; k1 and k2 are the weight components of the power grid harmonics and voltage deviation: N is the number of distribution network nodes, K is the highest harmonic number; U i (j) is the voltage of node i at the jth time; ξ THD and TVD They are the total harmonic distortion rate of voltage and the total voltage deviation rate of the power grid given by the system design; U iN (1) is the rated value of the fundamental voltage at node i.

[0055] Preferably, the construction module determines the constraint conditions of the site selection objective function including:

[0056] The constraints include: power flow balance constraints, harmonic power flow balance constraints, system voltage and pollution level constraints, and access capacity constraints; wherein,

[0057] The expression of the power flow balance constraint is as follows:

[0058]

[0059] The expression of the harmonic power flow balance constraint is as follows:

[0060] U h =G h I h

[0061] The expressions for the system voltage and pollution level constraints are as follows:

[0062]

[0063] The expression of the access capacity constraint is as follows:

[0064]

[0065] Among them, P inj,i and P inj,i-1 are the active power injected into node i and node i-1 respectively, Q inj,i and Q inj,i-1 are the reactive power injected into node i and node i-1 respectively; Δp i-1,i and Δq i-1,i are the active power loss and reactive power loss of the line between node i-1 and node i respectively; Q UPQRis the reactive power injected by the power quality management device; λ is a Boolean variable. When the λ value is 1, it means that the node i has a power quality management device connected, and when the λ value is 0, it means that there is no power quality management device connected; I h Harmonic current injected into the node; and are the minimum and maximum fundamental voltage of node i respectively; L HD,i is the harmonic voltage distortion rate of node i; H HD,i is the harmonic voltage content rate of node i; ξ HD and The harmonic voltage distortion rate and harmonic voltage content rate given for system design; I UPQR,i and are the access capacity and maximum allowable access capacity of the power quality management device of node i, δ UPQR,i is the capacity margin of the power quality management device at node i; P load,i and Q load,i They represent the active power and reactive power of the original load of node i respectively.

[0066] Beneficial effects: The present invention can realize adaptive adjustment of the model according to specific distribution network scenarios and has strong generalization ability. In addition, under the same investment and management cost, the present invention can provide a location configuration strategy for power quality management devices that can achieve the optimal harmonic voltage distortion rate and voltage deviation rate of the distribution network, thereby improving the power quality management effect.

[0067] The features and advantages of the present invention will become clear through reference to the following drawings and detailed description of specific embodiments of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0068] Figure 1 A flow chart of the site selection method for the power quality management device of the distribution network of this application;

[0069] Figure 2 This is a flow chart of the genetic algorithm solution model of this application;

[0070] Figure 3 This is a topological connection diagram of a high-proportion distributed photovoltaic distribution network for this application;

[0071] Figure 4 When the total access capacity of the power quality management device is the same in this application, the node voltage deviation rate of different site selection strategies in scenario 1 environment;

[0072] Figure 5 When the total access capacity of the power quality management device is the same in this application, the node harmonic voltage distortion rate of different site selection strategies in scenario 2 environment;

[0073] FIG6(a) shows the node harmonic voltage distortion rate of different site selection strategies under scenario 3 when the total access capacity of the power quality management device is the same in this application;

[0074] FIG6( b ) shows the node voltage deviation rate of different site selection strategies under scenario 3 when the total access capacity of the power quality management device is the same in this application;

[0075] Figure 7 This is a schematic diagram of the site selection system for the distribution network power quality management device of this application. DETAILED DESCRIPTION

[0076] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0077] The following embodiments of the present invention are described by taking a high-proportion distributed photovoltaic distribution network as an example. It can be understood that the technical solution of the present invention can be applied to other types of distribution networks, and the present invention does not impose any special limitation on this.

[0078] Example 1

[0079] Figure 1 This is a flow chart of the site selection method for the power quality management device of the distribution network of this application. Figure 1 As shown, the present invention provides a method for selecting a site for a power quality management device in a distribution network, the method comprising the following steps:

[0080] S1: Calculate the fundamental power flow and harmonic power flow of the distribution network to obtain parameter values ​​when the distribution network is not connected to the power quality management device, and the parameter values ​​include the voltage deviation rate, harmonic voltage content rate, harmonic distortion rate, and active power loss of each node in the distribution network.

[0081] Preferably, the calculation of the fundamental power flow and the harmonic power flow of the distribution network includes:

[0082] Input the grid topology and grid parameters to form the fundamental wave and harmonic admittance matrices; use the Newton-Raphson method to solve the fundamental wave power flow and obtain the voltage, power and loss of each node in the distribution network; based on the Norton harmonic source model, use the Gaussian elimination method to solve the harmonic power flow and obtain the harmonic current, harmonic voltage and harmonic loss of each node.

[0083] Specifically, the basic power quality related parameters of the high-proportion distributed photovoltaic distribution network to be managed are collected, such as the harmonic injection amount of each node, the distributed photovoltaic access capacity, etc., and the distribution network network parameters and operation scenario information, such as node voltage, node load, line impedance, etc. are obtained at the same time.

[0084] The network parameters, operation scenario information and basic power quality related parameters of the high-proportion distributed photovoltaic distribution network are processed and analyzed to form the admittance matrix of the fundamental wave and each harmonic for power flow calculation; the fundamental wave power flow is solved by the Newton-Raphson method based on the fundamental wave admittance matrix, and the voltage, power and line loss of each node in the high-proportion distributed photovoltaic distribution network are calculated; the harmonic power flow is solved by the Gaussian elimination method based on the harmonic admittance matrix, and the harmonic current, harmonic voltage and harmonic loss of each node are obtained according to the superposition principle.

[0085] S2: Evaluate the power quality of the distribution network based on the parameter values, weight the voltage / reactive power sensitivity and harmonic sensitivity, calculate the weight coefficients of the multi-objective function, and then determine the site selection objective function of the power quality management device.

[0086] Preferably, the weighting of voltage / reactive power sensitivity and harmonic sensitivity comprises:

[0087] The expression of the voltage / reactive power sensitivity is as follows:

[0088]

[0089] The expression of the harmonic sensitivity is as follows:

[0090] E=ΔU h / ΔG h

[0091] Among them, U b is the fundamental voltage, Q is the reactive power; J pθ , J qθ are the sensitivity of node voltage phase angle to active and reactive injected power respectively; J pv , J qv are the sensitivity of node voltage amplitude to active and reactive injected power respectively; U h is the hth harmonic voltage, G h is the equivalent conductance of the hth harmonic.

[0092] Preferably, the determining of the site selection objective function of the power quality management device includes:

[0093] The expression of the site selection objective function is as follows:

[0094] min{f}=k1 max{L THD}+k2 max{L TVD}

[0095]

[0096]

[0097]

[0098] Among them, f is the site selection objective function, L THD is the voltage total harmonic distortion rate; L TVD is the total voltage deviation rate of the power grid; k1 and k2 are the weight components of the power grid harmonics and voltage deviation: N is the number of distribution network nodes, K is the highest harmonic number; U i (j) is the voltage of node i at the jth time; ξ THD and TVD They are the total harmonic distortion rate of voltage and the total voltage deviation rate of the power grid given by the system design; U iN (1) is the rated value of the fundamental voltage at node i.

[0099] Specifically, the voltage / reactive sensitivity and harmonic sensitivity of the high-proportion distributed photovoltaic distribution network nodes are calculated based on the calculation results obtained in the previous steps. On this basis, the maximum voltage deviation rate and the maximum harmonic voltage distortion rate are selected as the decision variables of the site selection objective function. The weight coefficients of each decision variable are determined by the arithmetic weighting of voltage / reactive sensitivity and harmonic sensitivity, and the scenario governance needs are comprehensively considered.

[0100] S3: Determine the constraints of the site selection objective function, and construct a site selection model for the power quality management device based on the site selection objective function and the constraints.

[0101] Preferably, the constraint conditions for determining the site selection objective function include:

[0102] The constraints include: power flow balance constraints, harmonic power flow balance constraints, system voltage and pollution level constraints, and access capacity constraints; wherein,

[0103] The expression of the power flow balance constraint is as follows:

[0104]

[0105] The expression of the harmonic power flow balance constraint is as follows:

[0106] U h =G h I h

[0107] The expressions for the system voltage and pollution level constraints are as follows:

[0108]

[0109] The expression of the access capacity constraint is as follows:

[0110]

[0111] Among them, P inj,i and P inj,i-1 are the active power injected into node i and node i-1 respectively, Q inj,i and Q inj,i-1 are the reactive power injected into node i and node i-1 respectively; Δp i-1,i and Δq i-1,i are the active power loss and reactive power loss of the line between node i-1 and node i respectively; Q UPQR is the reactive power injected by the power quality management device; λ is a Boolean variable. When the λ value is 1, it means that the node i has a power quality management device connected, and when the λ value is 0, it means that there is no power quality management device connected; I h Harmonic current injected into the node; and are the minimum and maximum fundamental voltage of node i respectively; L HD,i is the harmonic voltage distortion rate of node i; H HD,i is the harmonic voltage content rate of node i; ξ HD and The harmonic voltage distortion rate and harmonic voltage content rate given for system design; I UPQR,i and are the access capacity and maximum allowable access capacity of the power quality management device of node i, δ UPQR,i is the capacity margin of the power quality management device at node i; P load,i and Q load,i They represent the active power and reactive power of the original load of node i respectively.

[0112] Specifically, constraints are established for the site selection objective function to be optimized, including system power flow balance constraints, harmonic power flow balance constraints, system voltage and pollution level constraints, and access capacity constraints.

[0113] S4: Solve the site selection model of the power quality management device to obtain the optimal solution of the site selection model, and determine the site selection plan of the power quality management device according to the optimal solution.

[0114] Specifically, refer to Figure 2 In this step, a genetic algorithm is used to solve the power quality management device site selection model, and a site selection plan for high-proportion distributed photovoltaic distribution network power quality management devices is formulated based on the optimal solution. The specific steps include:

[0115] Step S401: Initialize the basic data of the node system, and input the network parameters, equipment parameters, and operation parameters of the high-proportion distributed photovoltaic distribution network;

[0116] Step S402: Initialize the genetic algorithm encoding method, fitness function, initialize the population, select operation, crossover operation, mutation operation and termination criterion. In this embodiment, a binary encoding method is adopted, the fitness function is selected as the site selection objective function to be optimized, the number of the initial population is 100, the selection operation is set to nonlinear ranking selection, the crossover operation is set to multi-point crossover and uniform crossover, the mutation operation is set to basic bit mutation combined with inversion sorting, and the termination condition is set to 150 evolution generations;

[0117] Step S403: Calculate the fitness function value of each individual in the population, and further select the next generation of individuals;

[0118] Step S404: performing selection operation, crossover operation, and mutation operation on the next generation population in sequence, and judging whether the individual fitness function value meets the termination condition;

[0119] Step S405: If the individual fitness function value does not meet the termination condition, return to step S403; otherwise, stop the iteration process, output the optimal solution, and formulate the optimal site selection plan for the high-proportion distributed photovoltaic distribution network power quality management device that meets the system design indicators.

[0120] This embodiment can realize adaptive adjustment of the model according to the specific distribution network scenario and has strong generalization ability. In addition, under the same investment and management cost, the present invention can provide a location configuration strategy for power quality management devices that can achieve the optimal harmonic voltage distortion rate and voltage deviation rate of the distribution network, thereby improving the power quality management effect.

[0121] The following is a specific example to illustrate the optimization site selection method of this embodiment: The high-proportion distributed photovoltaic distribution network simulation system of this embodiment adopts a standard IEEE33 node system, and the topology diagram of the system is as follows: Figure 3 This example contains 33 nodes, namely nodes 1 to 3, the network headend reference voltage is 12.66 kV, the three-phase power reference value is 10 MVA, the total network load is 5084.26 + j2547.32 kVA, and the constraint condition related parameters are shown in Table 1.

[0122] Table 1: Constraint related parameters

[0123]

[0124] Now we simulate three distribution network scenarios with different governance requirements:

[0125] 1) Scenario 1, high proportion of PV access, including nodes 10, 17, 25, 29 and 31, with PV access capacities of 1.2MW, 1.2MW, 1.5MW, 2.0MW and 1.0MW respectively;

[0126] 2) Scenario 2, high-proportion harmonic injection, each node randomly injects 5th, 7th, 11th, 13th and 17th harmonic currents, as shown in Table 2;

[0127] 3) Scenario 3: high proportion of photovoltaic and harmonic current access, the specific configuration integrates scenario 1 and scenario 2.

[0128] Table 2: Node harmonic current injection

[0129]

[0130] The genetic algorithm parameters were set as: crossover probability 0.8, mutation probability 0.1, and inversion probability 0.2.

[0131] When the total access capacity of the power quality management device is the same, the node voltage deviation rate of different site selection strategies in scenario 1 is as follows: Figure 4 As shown. Among them, the site selection scheme 1 is {24,30,17,31}, the site selection scheme 2 is {14,25,12,29}, and the scheme 1 is the optimal solution of the calculated output. It can be seen that under the same total access capacity conditions, when the scheme 1 is adopted, the maximum value of the node voltage deviation rate is 1.0%, and the total voltage deviation rate of each node is 10.9%, while when the scheme 2 is adopted, the maximum value of the node voltage deviation rate is 1.8%, and the total voltage deviation rate of each node is 24.6%. Therefore, the adoption of the site selection scheme 1 can better improve the voltage deviation problem of the photovoltaic distribution network caused by large-scale photovoltaic access, that is, the above nodes have a better control effect on the voltage deviation;

[0132] Figure 5 The node harmonic voltage distortion rate of different siting strategies in scenario 2 is given when the total access capacity of the power quality management device is the same. Among them, siting plan three is {14,25,12,29}, siting plan four is {24,30,17,31}, and plan three is the optimal solution of the calculated output. It can be seen that under the same total access capacity conditions, when plan three is adopted, the maximum value of the node harmonic voltage distortion rate is 3.61%, and the total harmonic voltage distortion rate of each node is 89.85%, while when plan four is adopted, the maximum value of the node harmonic voltage distortion rate is 4.03%, and the total harmonic voltage distortion rate of each node is 99.54%. Therefore, the use of siting plan three can better reduce the harmonic voltage distortion rate of the photovoltaic distribution network, that is, the configuration of power quality management devices at the above nodes can better control the harmonic voltage;

[0133] Figure 6(a) and Figure 6(b) show the node harmonic voltage distortion rate and voltage deviation rate of different site selection strategies when the total access capacity of the power quality management device is the same in scenario 3. Among them, site selection plan 5 is {15,32,1,30}, site selection plan 6 is {24,30,17,31}, site selection plan 7 is {14,25,12,29}, and plan 5 is the optimal solution of the calculated output. It can be seen that when scheme five is adopted, the maximum values ​​of node voltage deviation rate and node harmonic voltage distortion rate are 1.3% and 3.51% respectively, and the total voltage deviation rate and total harmonic distortion rate of each node are 15.3% and 82.38% respectively; when scheme six is ​​adopted, the maximum values ​​of node voltage deviation rate and node harmonic voltage distortion rate are 2.35% and 4.02% respectively, and the total voltage deviation rate and total harmonic distortion rate of each node are 30.0% and 97.42% respectively; when scheme seven is adopted, the maximum values ​​of node voltage deviation rate and node harmonic voltage distortion rate are 5.23% and 3.89% respectively, and the total voltage deviation rate and total harmonic distortion rate of each node are 58.5% and 89.15% respectively. The siting scheme of scheme five can obtain the lowest voltage deviation rate and harmonic voltage distortion rate under the same total access capacity, thereby verifying the effectiveness of the siting strategy proposed in the present invention.

[0134] In summary, the method for site selection of power quality management devices for a high-proportion distributed photovoltaic distribution network provided in this embodiment, combined with the scenario management requirements, adaptively determines the site selection objective function and the optimal site selection plan for power quality management devices that takes into account harmonic management and voltage deviation from the perspective of voltage / reactive power sensitivity and harmonic sensitivity, and has the advantages of low management cost and strong generalization capability.

[0135] Example 2

[0136] Figure 7 This is a schematic diagram of the site selection system for the power quality management device of the distribution network of this application. Figure 7 As shown, this embodiment provides a site selection system for a power quality management device in a distribution network, the system comprising:

[0137] A calculation module 701 is used to calculate the fundamental power flow and harmonic power flow of the distribution network, and obtain parameter values ​​when the distribution network is not connected to the power quality management device, wherein the parameter values ​​include the voltage deviation rate, harmonic voltage content rate, harmonic distortion rate, and active power loss of each node of the distribution network;

[0138] A determination module 702 is used to evaluate the power quality of the distribution network based on the parameter values, weight the voltage / reactive power sensitivity and the harmonic sensitivity, calculate the weight coefficients of the multi-objective function, and then determine the site selection objective function of the power quality control device;

[0139] A construction module 703 is used to determine the constraint conditions of the site selection objective function, and to construct a site selection model for a power quality management device according to the site selection objective function and the constraint conditions;

[0140] The solution module 704 is used to solve the site selection model of the power quality management device, obtain the optimal solution of the site selection model, and determine the site selection plan of the power quality management device according to the optimal solution.

[0141] Preferably, the calculation module 701 calculates the fundamental power flow and harmonic power flow of the distribution network including:

[0142] Input the grid topology and grid parameters to form the fundamental wave and harmonic admittance matrices; use the Newton-Raphson method to solve the fundamental wave power flow and obtain the voltage, power and loss of each node in the distribution network; based on the Norton harmonic source model, use the Gaussian elimination method to solve the harmonic power flow and obtain the harmonic current, harmonic voltage and harmonic loss of each node.

[0143] Preferably, the determining module 702 weights the voltage / reactive power sensitivity and the harmonic sensitivity by:

[0144] The expression of the voltage / reactive power sensitivity is as follows:

[0145]

[0146] The expression of the harmonic sensitivity is as follows:

[0147] E=ΔU h / ΔG h

[0148] Among them, U b is the fundamental voltage, Q is the reactive power; J pθ , J qθ are the sensitivity of node voltage phase angle to active and reactive injected power respectively; J pv , J qv are the sensitivity of node voltage amplitude to active and reactive injected power respectively; U h is the hth harmonic voltage, G h is the equivalent conductance of the hth harmonic.

[0149] Preferably, the determination module 702 determines the site selection objective function of the power quality management device including:

[0150] The expression of the site selection objective function is as follows:

[0151] min{f}=k1 max{L THD}+k2 max{L TVD}

[0152]

[0153]

[0154]

[0155] Among them, f is the site selection objective function, L THD is the voltage total harmonic distortion rate; L TVD is the total voltage deviation rate of the power grid; k1 and k2 are the weight components of the power grid harmonics and voltage deviation: N is the number of distribution network nodes, K is the highest harmonic number; U i (j) is the voltage of node i at the jth time; ξ THD and TVD They are the total harmonic distortion rate of voltage and the total voltage deviation rate of the power grid given by the system design; U iN (1) is the rated value of the fundamental voltage at node i.

[0156] Preferably, the construction module 703 determines the constraint conditions of the site selection objective function including:

[0157] The constraints include: power flow balance constraints, harmonic power flow balance constraints, system voltage and pollution level constraints, and access capacity constraints; wherein,

[0158] The expression of the power flow balance constraint is as follows:

[0159]

[0160] The expression of the harmonic power flow balance constraint is as follows:

[0161] U h =G h I h

[0162] The expressions for the system voltage and pollution level constraints are as follows:

[0163]

[0164] The expression of the access capacity constraint is as follows:

[0165]

[0166] Among them, P inj,i and P inj,i-1 are the active power injected into node i and node i-1 respectively, Q inj,i and Q inj,i-1 are the reactive power injected into node i and node i-1 respectively; Δp i-1,i and Δq i-1,iare the active power loss and reactive power loss of the line between node i-1 and node i respectively; Q UPQR is the reactive power injected by the power quality management device; λ is a Boolean variable. When the λ value is 1, it means that the node i has a power quality management device connected, and when the λ value is 0, it means that there is no power quality management device connected; I h Harmonic current injected into the node; and are the minimum and maximum fundamental voltage of node i respectively; L HD,i is the harmonic voltage distortion rate of node i; H HD,i is the harmonic voltage content rate of node i; ξ HD and The harmonic voltage distortion rate and harmonic voltage content rate given for system design; I UPQR,i and are the access capacity and maximum allowable access capacity of the power quality management device of node i, δ UPQR,i is the capacity margin of the power quality management device at node i; P load,i and Q load,i They represent the active power and reactive power of the original load of node i respectively.

[0167] The specific implementation process of the functions realized by each module in this embodiment 2 is the same as the implementation process of each step in embodiment 1, and will not be repeated here.

[0168] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A method for selecting a site for a power quality management device in a distribution network. It is characterized in that The method comprises the following steps: S1: Calculate the fundamental power flow and harmonic power flow of the distribution network to obtain parameter values ​​when the distribution network is not connected to the power quality management device; S2: Evaluate the power quality of the distribution network based on the parameter values, weight the voltage / reactive power sensitivity and harmonic sensitivity, calculate the weight coefficients of the multi-objective function, and then determine the site selection objective function of the power quality control device; S3: Determine the constraint conditions of the site selection objective function, and construct a site selection model for the power quality management device according to the site selection objective function and the constraint conditions; S4: Solving the site selection model of the power quality control device to obtain the optimal solution of the site selection model, and determining the site selection plan of the power quality control device according to the optimal solution; the calculation of the fundamental power flow and harmonic power flow of the distribution network includes: Input grid topology and grid parameters to form fundamental wave and harmonic admittance matrices; use Newton-Raphson method to solve fundamental wave power flow and obtain voltage, power and loss of each node in the distribution network; based on Norton harmonic source model, use Gaussian elimination method to solve harmonic power flow and obtain harmonic current, harmonic voltage and harmonic loss of each node; The weighting of voltage / reactive power sensitivity and harmonic sensitivity comprises: The expression of the voltage / reactive power sensitivity is as follows: The expression of the harmonic sensitivity is as follows: E=ΔU h / ΔG h Among them, U b is the fundamental voltage, Q is the reactive power; J pθ , J qθ are the sensitivity of node voltage phase angle to active and reactive injected power respectively; J pv , J qv are the sensitivity of node voltage amplitude to active and reactive injected power respectively; U h is the hth harmonic voltage, G h is the equivalent conductance of the hth harmonic; The objective function for determining the site selection of the power quality control device includes: The expression of the site selection objective function is as follows: min{f}=k 1 max{L THD }+k 2 max{L TVD } Among them, f is the site selection objective function, L THD is the voltage total harmonic distortion rate; L TVD is the total voltage deviation rate of the power grid; k 1 , k 2 is the weight component of grid harmonics and voltage deviation: N is the number of distribution network nodes, K is the highest harmonic number; U i (j) is the voltage of node i at the jth time; ξ THD and TVD They are the total harmonic distortion rate of voltage and the total voltage deviation rate of the power grid given by the system design; U iN (1) is the rated value of the fundamental voltage at node i; The constraint conditions for determining the site selection objective function include: The constraints include: power flow balance constraints, harmonic power flow balance constraints, system voltage and pollution level constraints, and access capacity constraints; wherein, The expression of the power flow balance constraint is as follows: The expression of the harmonic power flow balance constraint is as follows: U h =G h I h The expressions for the system voltage and pollution level constraints are as follows: The expression of the access capacity constraint is as follows: Among them, P inj,i and P inj,i-1 are the active power injected into node i and node i-1 respectively, Q inj,i and Q inj,i-1 are the reactive power injected into node i and node i-1 respectively; Δp i-1,i and Δq i-1,i are the active power loss and reactive power loss of the line between node i-1 and node i respectively; Q UPQR is the reactive power injected by the power quality management device; λ is a Boolean variable. When the λ value is 1, it means that the node i has a power quality management device connected, and when the λ value is 0, it means that there is no power quality management device connected; I h Harmonic current injected into the node; and are the minimum and maximum fundamental voltage of node i respectively; L HD,i is the harmonic voltage distortion rate of node i; H HD,i is the harmonic voltage content rate of node i; ξ HD and The harmonic voltage distortion rate and harmonic voltage content rate given for system design; I UPQR,i and are the access capacity and maximum allowable access capacity of the power quality management device of node i, respectively, UPQR,i is the capacity margin of the power quality management device at node i; P load,i and Q load,i They represent the active power and reactive power of the original load of node i respectively.

2. A site selection system for power quality management devices in distribution networks, It is characterized in that The system comprises: A calculation module, used to calculate the fundamental power flow and harmonic power flow of the distribution network, and obtain parameter values ​​when the distribution network is not connected to the power quality management device; A determination module, used to evaluate the power quality of the distribution network based on the parameter value, weight the voltage / reactive power sensitivity and harmonic sensitivity, calculate the weight coefficients of the multi-objective function, and then determine the site selection objective function of the power quality control device; A construction module, used to determine the constraint conditions of the site selection objective function, and to construct a site selection model for a power quality management device according to the site selection objective function and the constraint conditions; A solution module, used to solve the site selection model of the power quality control device, obtain the optimal solution of the site selection model, and determine the site selection plan of the power quality control device according to the optimal solution; The calculation module calculates the fundamental power flow and harmonic power flow of the distribution network including: Input grid topology and grid parameters to form fundamental wave and harmonic admittance matrices; use Newton-Raphson method to solve fundamental wave power flow and obtain voltage, power and loss of each node in the distribution network; based on Norton harmonic source model, use Gaussian elimination method to solve harmonic power flow and obtain harmonic current, harmonic voltage and harmonic loss of each node; The determination module weights the voltage / reactive power sensitivity and the harmonic wave sensitivity, including: The expression of the voltage / reactive power sensitivity is as follows: The expression of the harmonic sensitivity is as follows: E=ΔU h / ΔG h Among them, U b is the fundamental voltage, Q is the reactive power; J pθ , J qθ are the sensitivity of node voltage phase angle to active and reactive injected power respectively; J pv , J qv are the sensitivity of node voltage amplitude to active and reactive injected power respectively; U h is the hth harmonic voltage, G h is the equivalent conductance of the hth harmonic; The determination module determines the site selection objective function of the power quality management device, including: The expression of the site selection objective function is as follows: min{f}=k 1 max{L THD }+k 2 max{L TVD } Among them, f is the site selection objective function, L THD is the voltage total harmonic distortion rate; L TVD is the total voltage deviation rate of the power grid; k 1 , k 2 is the weight component of grid harmonics and voltage deviation: N is the number of distribution network nodes, K is the highest harmonic number; U i (j) is the voltage of node i at the jth time; ξ THD and TVD They are the total harmonic distortion rate of voltage and the total voltage deviation rate of the power grid given by the system design; U iN (1) is the rated value of the fundamental voltage at node i; The construction module determines the constraint conditions of the site selection objective function including: The constraints include: power flow balance constraints, harmonic power flow balance constraints, system voltage and pollution level constraints, and access capacity constraints; wherein, The expression of the power flow balance constraint is as follows: The expression of the harmonic power flow balance constraint is as follows: U h =G h I h The expressions for the system voltage and pollution level constraints are as follows: The expression of the access capacity constraint is as follows: Among them, P inj,i and P inj,i-1 are the active power injected into node i and node i-1 respectively, Q inj,i and Q inj,i-1 are the reactive power injected into node i and node i-1 respectively; Δp i-1,i and Δq i-1,i are the active power loss and reactive power loss of the line between node i-1 and node i respectively; Q UPQR is the reactive power injected by the power quality management device; λ is a Boolean variable. When the λ value is 1, it means that the node i has a power quality management device connected, and when the λ value is 0, it means that there is no power quality management device connected; I h Harmonic current injected into the node; and are the minimum and maximum fundamental voltage of node i respectively; L HD,i is the harmonic voltage distortion rate of node i; H HD,i is the harmonic voltage content rate of node i; ξ HD and The harmonic voltage distortion rate and harmonic voltage content rate given for system design; I UPQR,i and are the access capacity and maximum allowable access capacity of the power quality management device of node i, respectively, UPQR,i is the capacity margin of the power quality management device at node i; P load,i and Q load,i They represent the active power and reactive power of the original load of node i respectively.