Train operation control system based on flexible route control

The train operation control system based on flexible route control solves the problems of high construction costs and inflexible cancellation caused by route dependence on signals in the existing technology. It enables trains to turn around at any point in the section and improves operational efficiency, while saving investment.

CN115946743BActive Publication Date: 2025-11-25CASCO SIGNAL LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211697755.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-28
Publication Date
2025-11-25
Estimated Expiration
2042-12-28

AI Technical Summary

Technical Problem

In existing train operation control systems, route division and control rely on signals, resulting in high construction costs, inflexible route cancellation, and the inability to turn back in case of blockage or fire in long sections, affecting train rescue and operational efficiency.

Method used

The train operation control system based on flexible route control is adopted, including the Train Planning and Management System (ATS), the Train Route Management System (RMS), the Trackside Equipment Management System (TEMS), the Train Control System, and the Vehicle-to-Ground Wireless Transmission System. Through virtual route management, it supports trains to turn around at any point in the section. Route setting does not depend on signal layout. The train is the target, and the route resource utilization efficiency is high.

Benefits of technology

This allows trains to turn around at any point within the section, improving the efficiency of train rescue and operation organization on long sections, saving construction investment, and improving the utilization efficiency of route resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115946743B_ABST
    Figure CN115946743B_ABST
Patent Text Reader

Abstract

The application relates to a train operation control system based on flexible route control, which comprises a train plan management system ATS, a train route management system RMS, a trackside equipment management system TEMS, a train control system and a train-ground wireless transmission system; the train control system comprises a trackside area control system ZC and a vehicle-mounted control system CC; the train plan management system ATS is connected with the trackside area control system ZC and the train route management system RMS respectively; the train route management system RMS is connected with the trackside area control system ZC, the vehicle-mounted control system CC and the trackside equipment management system TEMS respectively. Compared with the prior art, the application has the advantages of improving operation organization efficiency, improving the use efficiency of route resources and the like.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to a train signal control system, in particular to a train operation control system based on flexible route control. BACKGROUND

[0002] In the urban rail transit control system, the train operation route is realized through the route, which is generally controlled by the interlocking system, and then the train operation is controlled by the train control system. The division and control of the interlocking route are mostly based on the signal machine, but according to the actual operation demand, the existing control mode has the following problems:

[0003] 1. The train route is based on the signal machine, and the number of signal machines directly affects the range of the route, which has high construction investment cost.

[0004] 2. The interlocking controlled route cannot be flexibly canceled for the train after the route is established and used by the train, and the route can be released only after the train completely leaves the route, which is not flexible for operation use.

[0005] 3. For the line with long and large interval for full automatic operation, the train cannot be turned back at any point when the interval is blocked or on fire, which affects the rescue of the train. SUMMARY

[0006] The purpose of the present application is to overcome the defects of the prior art and provide a train operation control system based on flexible route control.

[0007] The purpose of the present application can be realized by the following technical scheme:

[0008] According to the first aspect of the present application, a train operation control system based on flexible route control is provided, which comprises a train plan management system ATS, a train route management system RMS, a trackside equipment management system TEMS, a train control system and a train-ground wireless transmission system; the train control system comprises a trackside area control system ZC and a vehicle-mounted control system CC;

[0009] The train plan management system ATS is connected with the trackside area control system ZC and the train route management system RMS respectively, and the train route management system RMS is connected with the trackside area control system ZC, the vehicle-mounted control system CC and the trackside equipment management system TEMS respectively.

[0010] As a preferred technical scheme, the train plan management system ATS and the train route management system RMS are designed in a centralized and integrated manner, have a full-line management function, and are deployed in a control center.

[0011] As a preferred technical scheme, the train plan management system ATS is connected with the train route management system RMS and the trackside equipment management system TEMS through a network to manage the running plan and route of the train.

[0012] As a preferred technical scheme, the trackside area control system ZC controls the areas according to the length of the line.

[0013] As a preferred technical scheme, the trackside area control system ZC is connected with the train plan management system ATS through a wired network and connected with the on-board control system CC through a train-ground wireless transmission system to protect the train in the area.

[0014] As a preferred technical scheme, the trackside equipment management system TEMS is designed in a split type and deployed in an equipment centralized area and connected with the train route management system RMS through a backbone network.

[0015] As a preferred technical scheme, the train route management system RMS is connected with the train plan management system ATS, the trackside equipment management system TEMS and the trackside area control system ZC through a wired network and connected with the on-board control system through a train-ground wireless network to manage the route on the line.

[0016] As a preferred technical scheme, the trackside equipment management system TEMS is connected with the train route management system RMS through a wired network and connected with the trackside equipment through a hard-wired interface to manage the trackside equipment.

[0017] As a preferred technical scheme, the train-ground wireless transmission system adopts LTE and / or WLAN.

[0018] As a preferred technical scheme, the plan task of the train plan management system ATS contains the destination information of each train and the running route information of the whole line, wherein the destination information is divided into the next stop destination and the terminal destination of the single-trip train.

[0019] The train plan management system ATS sends the destination information and the running route information to the train route management system RMS in real time as a necessary condition for establishing the route.

[0020] As a preferred technical scheme, the train route management system RMS includes a turnout route management module and an interval route management module, wherein the turnout route management module is used to manage the route in the area where the turnout is located, and the interval route management module is used to manage the route in the interval area without turnout.

[0021] As a preferred technical scheme, the train route management system RMS is responsible for dividing and managing routes in the whole line, taking trains as establishment objects, and managing in a virtual route mode, with a single axle counting section as a minimum route unit.

[0022] As a preferred technical scheme, the train route management system RMS uniformly manages all routes, including route establishment, route locking, route unlocking, route cancellation and route conflict checking.

[0023] The train route management system RMS establishes and locks routes according to destination information and occupancy information of trigger sections in a train operation plan, checks conflict routes in combination with whole line route information, and checks whether switch positions are in a specified position, and if not, sends route information to a trackside equipment management system TEMS to operate relevant switches to the specified position.

[0024] As a preferred technical scheme, the train route management system RMS checks occupancy states of routes in the whole line in real time, checks whether a route is occupied between the route establishment and a next stopping point in real time, and if the route is occupied, the end of the route is a tail protection point of a previous train, and if the route is not occupied, the end of the route is the next stopping point.

[0025] The train route management system RMS sends route locking states, direction information, signal state information and switch position information to a train control system to control train operation.

[0026] As a preferred technical scheme, the train route management system RMS controls routes to dynamically unlock with the movement of trains according to real-time position information of trains sent by the train control system, and the routes can be manually cancelled by cancelling a train destination to delay or immediately automatically cancel the routes.

[0027] The train route management system RMS has a memory function for destination information, and when the train route management system RMS loses communication with a train plan management system ATS, the train route management system RMS can maintain current train operation to a next stopping point.

[0028] As a preferred technical scheme, the trackside equipment management system TEMS checks the turnout position information in real time according to the route establishment information sent by the train route management system RMS, and immediately locks the route when the turnout position is consistent with the route requirement; when the turnout position is not consistent with the route requirement, the turnout operating command is output, and the route is locked after the turnout is operated to the required position; after the route is locked, the trackside equipment management system TEMS controls the opening of the corresponding signal according to the route establishment and locking information sent by the train route management system RMS.

[0029] Compared with the prior art, the present application has the following advantages:

[0030] 1. The present application supports train turnaround operation at any point in the section, which is beneficial to train rescue and evacuation in long and large sections.

[0031] 2. The present application supports the demand for car shunting operation at any point on the line, improving the efficiency of operation organization.

[0032] 3. The present application no longer depends on the arrangement of signal machines for route setting, saving construction investment.

[0033] 4. The train route setting of the present application takes the train as the object, and occupies the relevant route only when it is needed, improving the efficiency of route resource use. BRIEF DESCRIPTION OF DRAWINGS

[0034] Figure 1 It is a structural diagram of the flexible route control system;

[0035] Figure 2 It is a schematic diagram of train destination control;

[0036] Figure 3 It is a schematic diagram of route division and train forward operation;

[0037] Figure 4 It is a schematic diagram of train reverse operation. DETAILED DESCRIPTION

[0038] The technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work should belong to the scope of protection of the present application.

[0039] As Figure 1As shown, a train operation control system based on flexible route control includes a train plan management system ATS, a route management system RMS, a trackside equipment management system TEMS, a train control system, and a train-ground wireless transmission system. The route management system further includes a turnout area management module and an interval management module. The train control system further includes a trackside area management system and an on-board control system.

[0040] The ATS and the route management system are designed in a centralized and integrated manner and have a full-line management function, and are generally deployed in a control center. The trackside area control system of the train control system can be controlled in regions according to the length of a line. The trackside equipment management system is designed in a split manner and is deployed in a device centralized area and connected to the train route management system through a backbone network.

[0041] The train plan management system adopts an ATS system and is connected to the train route management system and the trackside area management system through a network to manage the operation plan and the route of a train.

[0042] The trackside area management system is connected to the ATS system and the route management system through a wired network and is connected to the on-board control system through a train-ground wireless network to protect a train in a region.

[0043] The route management system is connected to the ATS system, the trackside equipment management system, and the trackside area management system through a wired network and is connected to the on-board control system through a train-ground wireless network to manage a route on a line.

[0044] The trackside equipment management system is connected to the route management system through a wired network and is connected to trackside equipment such as an axle counter, a turnout, and a signal machine through a hard-wired interface to manage the trackside equipment.

[0045] The train-ground wireless transmission subsystem adopts LTE and / or WLAN.

[0046] The destination information and the full-line operation route information of each train are included in the plan task of the ATS system, and the destination information is divided into the destination of a next stop point and the destination of a one-way train. The ATS system sends the destination information and the operation route information to the route management system in real time as a necessary condition for establishing a route.

[0047] The route management system includes a turnout route management module and an interval route management module, and the turnout route management module mainly manages the route of a region where a turnout is located, and the interval route management module mainly manages the route of an interval region without a turnout.

[0048] The train route management system is responsible for dividing and managing the routes in the whole line. The division of the routes is independent of the signal machines. The train route management system takes the train as the establishment object and manages the routes in a virtual route manner. The minimum route unit is a single axle-counting section. The train route management system shares the route information in the whole line with the ATS system in real time and can obtain the path information of all routes in the whole line.

[0049] The train route management system uniformly manages all routes, including route establishment, route locking, route unlocking, route cancellation, and route conflict checking.

[0050] The train route management system establishes and locks the routes according to the destination information in the train operation plan and the occupancy information of the trigger section. In combination with the route information in the whole line, the train route management system checks the conflicting routes and checks whether the switch position is in the specified position. If the switch position is not in the specified position, the train route management system sends the route information to the trackside equipment management system and controls the relevant switch to be operated to the specified position.

[0051] The train route management system checks the occupancy state of the routes in the whole line in real time. When the route is established, the train route management system checks whether the route between the current route and the next stopping point is occupied in real time. If the route is occupied, the end of the route is the tail protection point of the previous train. If the route is not occupied, the end of the route is the next stopping point.

[0052] The train route management system sends the route locking state, direction information, signal machine state, switch position and other information to the train control system to control the train operation.

[0053] The train route management system controls the route to be dynamically unlocked along with the movement of the train according to the real-time position information of the train sent by the train control system. The route can be manually cancelled by cancelling the destination of the train, and the route can be automatically cancelled in a delayed or immediate manner.

[0054] The train route management system has a memory function for the destination information. When the train route management system loses communication with the ATS system, the train route management system can maintain the current train operation to the next stopping point.

[0055] The trackside equipment management system checks the switch position information in real time according to the route establishment information sent by the train route management system. When the switch position is consistent with the requirement of the route, the route is immediately locked. When the switch position is not consistent with the requirement of the route, the trackside equipment management system outputs a switch operation command. After the switch is operated to the specified position, the route is locked. After the route is established and locked, the trackside equipment management system controls the opening of the corresponding signal machine according to the route establishment and locking information sent by the train route management system. Specific embodiments

[0057] For example, Figure 1As shown, the train operation control system based on flexible route control includes an ATS, a ZC, a CC, an RMS, and a TEMS. The ATS is a train plan management system, the ZC is a trackside area control system, the CC is a vehicle-mounted control system, the RMS is a train route management system, and the TEMS is a trackside equipment management system.

[0058] The route management system RMS is connected to the ATS through a wired network. The RMS receives destination information sent by the ATS and establishes and locks a route according to the destination. The RMS feeds back route status, trackside equipment status, and axle counter status to the ATS system.

[0059] The RMS is connected to the train control system and receives train position information and train stop information. The RMS dynamically unlocks a route according to train position information and determines whether to delay unlocking a route according to train stop information.

[0060] The TEMS is connected to the RMS. When route conditions are met, the TEMS receives switch operation information from the RMS, outputs switch operation commands, controls trackside switches, and collects switch status and feeds back the switch status to the RMS system.

[0061] When signal opening conditions are met, the TEMS controls outdoor signals, collects signal status, and feeds back the signal status to the RMS system.

[0062] The RMS is also responsible for collecting axle counter status and feeding back the axle counter status to the RMS system.

[0063] The ZC dynamically calculates a train movement authority according to route locking status, route direction, signal status, and switch position information. The CC controls train operation according to the train movement authority.

[0064] For a planned train, the train operation plan task contains a destination 1 and a destination 2 for each train. The destination 1 is a next target stop point, and the destination 2 is a one-way terminal target point.

[0065] When relevant route conditions are met, a switch route and an interval route establish a route to the destination 1 according to the destination 1. When a train reaches a trigger section of the route, the route is locked. According to a switch included in the route, a real-time check is performed on the switch position. If the position is not in a specified position, the trackside equipment management system moves the switch to the specified position and locks it. After the route is locked, the RMS controls the opening of a signal on the route and sends relevant information to the train control system as a voucher for the train control system to calculate a movement authority.

[0066] For CBTC train, CC sends train position information to route management system in real time as train moves, and route management system dynamically unlocks route according to train position movement. For backup train, route is automatically unlocked once train runs through route area.

[0067] Manually cancel the route of planned train as follows:

[0068] When manually canceling destination 1 of train but destination 2 still exists, all routes already handled for the train remain unchanged, the train running in section is stopped by emergency braking, and the train stopped in section is not dispatched.

[0069] When manually canceling destination 2 of train but destination 1 still exists, the route to next target point already handled for the train remains unchanged, and the train runs to the next stopping point and stops until a new target point is manually set.

[0070] When both destination 1 and destination 2 of train are canceled, all routes handled for the train are delayed or immediately canceled, and the train running in section is stopped by emergency braking.

[0071] For non-planned train, manually set destination 1 for the train, when the relevant route condition is met, switch route and section route establish route to destination 1 according to destination 1, when the train reaches the trigger section of the route, start to lock the route, need to operate the switch to the specified position, after locking is completed, the route signal is opened, the relevant information is sent to the train control system as the voucher for the train control system to calculate the movement authority.

[0072] Manually cancel the route of non-planned train as follows:

[0073] When manually canceling destination 1 of train, all routes handled for the train are immediately canceled, and the train running in section is stopped by emergency braking.

[0074] By manually canceling destination 1 and manually setting destination 1, reverse route can be arranged for section train, so as to achieve the purpose of reverse running of train in section.

[0075] If train needs to run reversely in section, destination 1 and destination 2 are canceled at the same time. The route of train running forward is canceled. The reverse destination is specified for the train, and all routes of the train to the reverse destination are established. The train control system controls the reverse running of train according to the movement authority.

[0076] Specific implementation steps:

[0077] For example Figure 2As shown, the planned task management of the ATS contains train operation to the next stop destination 1, and train one-way end destination 2. After the train operation to the next stop, the destination 1 is automatically updated to the next stop. After the train operation to the end turnaround station, the destination 2 is automatically updated to the next one-way end.

[0078] As shown, Figure 3 As shown, the station A to station B is arranged with the counting points AC1-AC5, which divide three routes, namely the route R1 from AC1 to AC2, the route V1 from AC2 to AC3, and the route V2 from AC3 to AC5.

[0079] The train 1 is at the platform A, and the destination of the train 1 to the station B is set according to the plan. The station A is the trigger section of R1, V1, and V2, which triggers the turnout route R1 and the section routes V1 and V2, respectively. The turnout position of the route R1 is required to be positioned, and the turnout is controlled to be positioned by the TEMS according to the route command; after the turnout position is correct, the route R1 is locked, and the signal S1 is opened to allow the signal.

[0080] The train 1 controls the train to enter R1 and run in the section according to the information such as the route locking state, the route direction, and the signal state, and the routes R1 and V1 are dynamically unlocked with the movement of the train.

[0081] The train 2 reaches the station A, and handles the turnout route R1' and the section routes V1' and V2'. Since the train A is still in the section, the route range of V2' is to the tail protection point of the train 1. With the movement of the train 1, V2 is dynamically unlocked, and V2' is dynamically established.

[0082] As shown, Figure 4 As shown, the train 1 and the train 2 are between the station A and the station B, respectively. The destination 1 and the destination 2 of the train 2 are manually cancelled, and at this time, the route V2 handled for the train 2 will be cancelled, and if the train 2 is still running, the train will be stopped by emergency braking.

[0083] The reverse destination of the train 2 to the station A is handled, and the routes V3, R2, and V4 to the station A are established and locked, and the train 2 reversely runs according to the movement authorization.

[0084] The above is only a specific embodiment of the present application, but the protection scope of the present application is not limited to this. Any person skilled in the art can easily think of various equivalent modifications or replacements within the technical range disclosed by the present application, and these modifications or replacements should be covered in the protection scope of the present application. Therefore, the protection scope of the present application should be subject to the protection scope of the claims.

Claims

1. A train operation control system based on flexible route control, characterized by, The system supports train turnaround operation at any point in the section and supports the demand of train shunting operation at any point on the line, and comprises a train plan management system ATS, a train route management system RMS, a trackside equipment management system TEMS, a train control system and a train-ground wireless transmission system; the train control system comprises a trackside area control system ZC and a vehicle-mounted control system CC; The train plan management system ATS is connected with the trackside area control system ZC and the train route management system RMS respectively, and the train route management system RMS is connected with the trackside area control system ZC, the vehicle-mounted control system CC and the trackside equipment management system TEMS respectively; The train route management system RMS comprises a turnout route management module and a section route management module, wherein the turnout route management module is used for managing the route of the area where the turnout is located, and the section route management module is used for managing the route of the section without turnout. The train route management system RMS is responsible for dividing and managing the routes in the whole line, takes the train as the establishment object, manages in the mode of virtual route, and takes a single axle counting section as the minimum route unit. The train route management system RMS shares the route information of the whole line with the train plan management system ATS in real time, and can obtain the path information of all routes in the whole line. The train route management system RMS uniformly manages all routes, including route establishment, route locking, route unlocking, route cancellation and route conflict checking. The train route management system RMS establishes and locks the route according to the destination information in the train operation plan and the occupation information of the trigger section, checks the conflict route in combination with the route information of the whole line, and checks whether the turnout position is in the specified position. If the position is not in the specified position, the route information is sent to the trackside equipment management system TEMS, and the related turnout is operated to the specified position. The train route management system RMS controls the route to be dynamically unlocked along with the movement of the train according to the real-time position information of the train sent by the train control system. The route can be manually cancelled by the train destination, and the route is automatically cancelled in a delayed or immediate manner. The train route management system RMS has a memory function for the destination information. When the train route management system RMS loses communication with the train plan management system ATS, the train route management system RMS can maintain the current train operation to the next stopping point. The train route management system RMS checks the occupation state of the route in the whole line in real time. When the route is established, it is checked in real time whether the route is occupied between the current route and the next stopping point. If the route is occupied, the end of the route is the tail protection point of the previous train. If the route is not occupied, the end of the route is the next stopping point. The train route management system RMS sends the route locking state, direction information, signal state and turnout position information to the train control system to control the train operation.

2. The train control system based on flexible route control according to claim 1, characterized in that, The train plan management system ATS and the train route management system RMS are designed in a centralized and integrated manner, have a whole line management function, and are deployed in a control center.

3. The train control system based on flexible route control according to claim 1, characterized in that, The train plan management system ATS is connected with the train route management system RMS and the trackside equipment management system TEMS through a network to manage the operation plan and route of the train.

4. The train control system based on flexible route control according to claim 1, characterized in that, The trackside area control system ZC controls the trackside area according to the length of the line.

5. The train control system based on flexible route control according to claim 1 or 4, characterized in that, The trackside area control system ZC is connected with the train plan management system ATS through a wired network and with the on-board control system CC through a train-ground wireless transmission system to protect the train in the area.

6. The train control system based on flexible route control according to claim 1, wherein The trackside equipment management system TEMS is of a split design and is deployed in a device concentration area and is connected with the train route management system RMS through a backbone network.

7. The train control system based on flexible route control according to claim 1, wherein The train route management system RMS is connected with the train plan management system ATS, the trackside equipment management system TEMS and the trackside area control system ZC through a wired network and with the on-board control system through a train-ground wireless network to manage the route on the line.

8. The train control system based on flexible route control according to claim 1, wherein, The trackside equipment management system TEMS is connected with the train route management system RMS through a wired network and with the trackside equipment through a hard-wired interface to manage the trackside equipment.

9. The train control system based on flexible route control according to claim 1, wherein, The train-ground wireless transmission system adopts LTE and / or WLAN.

10. The train control system based on flexible route control according to claim 1, wherein, The plan task of the train plan management system ATS contains the destination information of each train and the whole-line operation route information, wherein the destination information is divided into the next stop destination and the terminal destination of the single-trip train. The train plan management system ATS sends the destination information and the operation route information to the train route management system RMS in real time as a necessary condition for establishing the route.

11. The train control system based on flexible route control according to claim 1, characterized in that, The trackside equipment management system TEMS checks the switch position information in real time according to the route establishment information sent by the train route management system RMS, locks the route immediately when the switch position is consistent with the route requirement, outputs the switch operation command when the switch position is inconsistent with the route requirement, locks the route after the switch is operated to the required position, and controls the opening of the corresponding signal according to the route establishment and locking information sent by the train route management system RMS after the route is locked.

Citation Information

Patent Citations

  • Distributed area computer interlocking system

    CN110435723A

  • System and method for controlling passage of autonomous rail rapid transit in virtual turnout area

    CN111688757A

  • Path resource management method and device, electronic equipment and storage medium

    CN115071780A