A formwork support method for arc-shaped corners of high-rise cantilever beam-slab structures
By dividing the cantilever beam structure into different areas and using a combination of steel profiles and steel pipe supports, the problem of formwork support at the curved corners of high-rise cantilever beam structures was solved, achieving a simple and stable construction support effect.
Patent Information
- Application Number
- CN202310130549.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-02-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2043-02-17
AI Technical Summary
The curved corners of high-rise cantilever beam-slab structures lack effective formwork support structures, and traditional support systems are insufficient to meet construction requirements.
The cantilever beam structure is divided into Region I, Region II, Region III and Region IV. Steel cantilever main beams and steel secondary beams are used to build a steel platform as the bottom support of the steel pipe upright frame. Combined with disc-type steel pipe supports, a stable support system is constructed.
A simple formwork support method that meets the load-bearing requirements is provided, solving the construction problem at the curved corner of a high-rise cantilever beam-slab structure.
Smart Images

Figure CN116025157B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a method for supporting a formwork at an arc-shaped corner of a high-rise cantilever beam-slab structure. Background Art
[0002] The formwork support is a temporary support structure, which is often used to bear the self-weight of the building formwork and the reinforced concrete above it and the construction load when pouring concrete in the structure. Under normal circumstances, the bottom of the formwork support often falls on the ground or the floor of the next floor through an adjustable base. However, for the cast-in-place concrete cantilever beam-slab structure in the high-rise structure, there is often no structure below that can support the formwork support. Supporting it on the ground will cause the frame height to be too high and exceed the frame's bearing capacity. Especially for the curved corners of the cantilever beam-slab structure, the structure is more complicated, which brings greater difficulties to the construction of the formwork support system. It is difficult to complete the construction using the traditional formwork support system. Therefore, it is urgent to propose a formwork support method for the curved corners of high-rise cantilever beam-slab structures. Summary of the invention
[0003] In order to solve the above problems, the present invention provides a formwork support method at the arc-shaped corner of a high-rise cantilever beam-slab structure.
[0004] The technical solution adopted by the present invention is:
[0005] A method for supporting formwork at arc-shaped corners of a high-rise cantilever beam-slab structure, comprising the following steps:
[0006] S1. Divide the cantilever beam-slab structure to be cast into areas:
[0007] From the center P of the concrete curved edge beam, perpendicular lines PA and PB are drawn to the concrete curved edge beam in the x-direction and y-direction respectively to divide the concrete slab and concrete beam. The resulting 1 / 4 circle PAB is area I.
[0008] Draw perpendicular lines OC and OD from the positive corner point O at the edge of the main building to the concrete curved edge beam in the x-direction and y-direction respectively, and the obtained "L-shaped" area OCAPBD is area II;
[0009] The area outside the vertical line OC is area III; the area outside the vertical line OD is area IV;
[0010] Among them, Area I and Area II are corner areas, and a steel platform constructed by a steel cantilever main beam and a steel secondary beam is used as the support structure at the bottom of the steel pipe upright frame; Area III and Area IV are ordinary areas, and a steel cantilever main beam is used as the support structure at the bottom of the steel pipe upright frame;
[0011] S2. Set up area I steel secondary beam:
[0012] A steel secondary beam is set at the lower layer of the concrete cantilever beam-slab structure to be poured;
[0013] The first steel secondary beam and the second steel secondary beam are respectively arranged along the transverse and longitudinal radii of the quarter circle area I;
[0014] An additional steel secondary beam is arranged between the first steel secondary beam and the second steel secondary beam. With the center P of the 1 / 4 circle area I as the rotation point, an additional steel secondary beam is arranged every 90 / m° rotation, with a total of m-1 additional steel secondary beams;
[0015] A first connecting steel secondary beam and a second connecting steel secondary beam are then arranged to be transversely connected at both ends of the first steel secondary beam, the second steel secondary beam and the m-1 additional steel secondary beam;
[0016] S3. Set up area II steel secondary beam:
[0017] The first outward extension steel secondary beam is set parallel to the first steel secondary beam, with a spacing of 900mm; the second outward extension steel secondary beam is set parallel to the second steel secondary beam, with a spacing of 900mm;
[0018] S4. Set up steel pipe uprights above the secondary steel beams in Area I and Area II:
[0019] Steel pipe uprights are arranged at the four intersections of the first steel secondary beam, the second steel secondary beam, the first outward steel secondary beam, and the second outward steel secondary beam, and based on the four steel pipe uprights, a steel pipe upright is arranged every 300n along the first steel secondary beam, the second steel secondary beam, the m-1 additional steel secondary beams, the first outward steel secondary beam, and the second outward steel secondary beam, where n is a positive integer and 1≤n≤3;
[0020] S5. Set up area I and area II for the steel cantilever main beam supporting the steel secondary beam:
[0021] A total of 4 steel cantilever main beams are arranged, the first steel cantilever main beam for supporting the first outward-extending steel secondary beam, the second steel cantilever main beam for supporting the first steel secondary beam, the second steel secondary beam, the second connecting steel secondary beam, the first outward-extending steel secondary beam, and the second outward-extending steel secondary beam; the third steel cantilever main beam for supporting the first steel secondary beam, the second steel secondary beam, the second connecting steel secondary beam, the first outward-extending steel secondary beam, and the second outward-extending steel secondary beam; the fourth steel cantilever main beam for supporting the second outward-extending steel secondary beam, and one end of each steel cantilever main beam is connected to the main building;
[0022] S6. Set up steel pipe uprights in Area III and Area IV and steel cantilever main beams for supporting the steel pipe uprights:
[0023] Taking area III as an example, the first outward extension steel cantilever main beam is arranged in parallel with the first outward extension steel secondary beam, with a spacing of 300n, where n is a positive integer and 1≤n≤3; the second outward extension steel cantilever main beam is arranged in parallel with the first outward extension steel cantilever main beam, with a spacing of 300n, and so on. One end of each outward extension steel cantilever main beam is connected to the main building, and a steel pipe vertical pole is arranged every 300n for each outward extension steel cantilever main beam, where n is a positive integer and 1≤n≤3. The third outward extension steel cantilever main beam and the fourth outward extension steel cantilever main beam are arranged in the same manner as in area III, and so on.
[0024] The calculation method of m in step S2 is as follows: to ensure that the maximum spacing between the vertical poles of the additional steel secondary beam does not exceed 900 mm, the spacing at the edge of the steel does not exceed 900 mm, that is, πR / 2m≤900, and m≥πR / 1800. Since m is an integer, m=[πR / 1800]+1 can be set, where “[]” is the Gaussian function rounding symbol, and [πR / 1800] represents the maximum integer not exceeding πR / 1800.
[0025] The first steel secondary beam, the second steel secondary beam, the m-1 additional steel secondary beam, the first outward extension steel secondary beam and the second outward extension steel secondary beam are made of I-beams or box-section steel pipes.
[0026] In step S4, the steel pipe upright pole adopts a disc-type steel pipe bracket.
[0027] In the step S5, the first steel cantilever main beam, the second steel cantilever main beam, the third steel cantilever main beam and the fourth steel cantilever main beam are made of I-beams.
[0028] Beneficial effects of the present invention: The present invention divides the area, and the corner area adopts a steel platform constructed by a steel cantilever main beam and a steel secondary beam as the supporting structure at the bottom of the steel pipe upright frame, and the ordinary area adopts a steel cantilever main beam as the supporting structure at the bottom of the steel pipe upright frame. The construction structure is simple and can meet the bearing capacity requirements of the frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a plan view schematically showing the area division of the cantilever beam-slab structure of the present invention.
[0030] Figure 2 This is a plan view of the steel secondary beams in area I and area II of the present invention.
[0031] Figure 3 This is a plan view of the steel cantilever main beams of area I and area II of the present invention.
[0032] Figure 4 This is a plan view of the steel cantilever main beams in area III and area IV of the present invention.
[0033] Among them: 1-main building; 2-concrete slab; 3-concrete beam; 301-concrete arc-shaped side beam; 4-steel secondary beam; 401-first steel secondary beam; 402-second steel secondary beam; 403-first additional steel secondary beam; 404-second additional steel secondary beam; 405-third additional steel secondary beam; 406-fourth additional steel secondary beam; 407-first connecting steel secondary beam; 408-second connecting steel secondary beam; 409-first One outward extension steel secondary beam; 410-the second outward extension steel secondary beam; 5-steel cantilever main beam; 501-the first steel cantilever main beam; 502-the second steel cantilever main beam; 503-the third steel cantilever main beam; 504-the fourth steel cantilever main beam; 505-the first outward extension steel cantilever main beam; 506-the second outward extension steel cantilever main beam; 507-the third outward extension steel cantilever main beam; 508-the fourth outward extension steel cantilever main beam; 6-steel pipe vertical pole. DETAILED DESCRIPTION
[0034] A method for supporting formwork at arc-shaped corners of a high-rise cantilever beam-slab structure, comprising the following steps:
[0035] S1. Divide the cantilever beam-slab structure to be cast into different areas, such as Figure 1 As shown:
[0036] From the center P of the concrete arc-shaped edge beam 301, perpendicular lines PA and PB are drawn to the concrete arc-shaped edge beam 301 in the x-direction and the y-direction respectively, dividing the concrete slab 2 and the concrete beam 3, and the obtained 1 / 4 circle PAB is area I;
[0037] Draw perpendicular lines OC and OD from the positive corner point O at the edge of the main building 1 to the concrete arc-shaped edge beam 301 in the x-direction and y-direction respectively, and the obtained "L-shaped" area OCAPBD is area II;
[0038] The area outside the vertical line OC is area III; the area outside the vertical line OD is area IV;
[0039] Among them, area I and area II are corner areas, and a steel platform constructed by a steel cantilever main beam 5 and a steel secondary beam 4 is used as the support structure at the bottom of the steel pipe upright frame; area III and area IV are ordinary areas, and a steel cantilever main beam 5 is used as the support structure at the bottom of the steel pipe upright frame;
[0040] S2. Set up the area I steel secondary beam, such as Figure 2 As shown:
[0041] A steel secondary beam 4 is provided at the lower layer of the concrete cantilever beam-slab structure to be poured;
[0042] A first steel secondary beam 401 and a second steel secondary beam 402 are respectively arranged along the transverse and longitudinal radii of the quarter circle area I;
[0043] An additional steel secondary beam is arranged between the first steel secondary beam 401 and the second steel secondary beam 402. With the center P of the 1 / 4 circle area I as the rotation point, an additional steel secondary beam is arranged every 90 / m° rotation, with a total of m-1 additional steel secondary beams. The calculation method of m is as follows: to ensure that the maximum spacing of the additional steel secondary beam uprights does not exceed 900mm, the spacing at the edge of the steel does not exceed 900mm, that is, πR / 2m≤900, and m≥πR / 1800 can be obtained. Since m is an integer, m=[πR / 1800]+1 can be set, where "[]" is the Gaussian function rounding symbol, and [πR / 1800] represents the maximum integer not exceeding πR / 1800;
[0044] In this embodiment, R=2400mm, m=5 is calculated, and the center P of the 1 / 4 circle area I is used as the rotation point. A steel secondary beam 4 is set every 18° rotation, and there are 4 additional steel secondary beams in total, namely, the first additional steel secondary beam 403, the second additional steel secondary beam 404, the third additional steel secondary beam 405 and the fourth additional steel secondary beam 406;
[0045] A first connecting steel secondary beam 407 and a second connecting steel secondary beam 408 are then provided to connect transversely at both ends of the first steel secondary beam 401, the second steel secondary beam 402 and the m-1 additional steel secondary beams;
[0046] S3. Set up area II steel secondary beams, such as Figure 2 As shown:
[0047] The first outward extension steel secondary beam 409 is arranged parallel to the first steel secondary beam 401, with a spacing of 900 mm; the second outward extension steel secondary beam 410 is arranged parallel to the second steel secondary beam 402, with a spacing of 900 mm;
[0048] S4. Set steel pipe uprights above the secondary steel beams in Area I and Area II, such as Figure 2 As shown:
[0049] Steel pipe uprights 6 are arranged at the four intersections of the first steel secondary beam 401, the second steel secondary beam 402, the first outward-extended steel secondary beam 409, and the second outward-extended steel secondary beam 410, and based on the four steel pipe uprights 6, a steel pipe upright 6 is arranged every 300n along the first steel secondary beam 401, the second steel secondary beam 402, the m-1 additional steel secondary beams, the first outward-extended steel secondary beam 409, and the second outward-extended steel secondary beam 410, wherein n is a positive integer and 1≤n≤3; the first steel secondary beam 401, the second steel secondary beam 402, the m-1 additional steel secondary beams, the first outward-extended steel secondary beam 409, and the second outward-extended steel secondary beam 410 are made of I-beams or box-section steel pipes; the steel pipe uprights 6 are disc-type steel pipe brackets;
[0050] S5. Set up area I and area II for the steel cantilever main beam supporting the steel secondary beam, such as Figure 3 As shown:
[0051] A total of 4 steel cantilever main beams 5 are provided, including a first steel cantilever main beam 501 for supporting the first outward extension steel secondary beam 409, a second steel cantilever main beam 502 for supporting the first steel secondary beam 401, the second steel secondary beam 402, the second connecting steel secondary beam 408, the first outward extension steel secondary beam 409, and the second outward extension steel secondary beam 410; a second steel cantilever main beam 502 for supporting the first steel secondary beam 401, the second steel secondary beam 402, the second connecting steel secondary beam 408, the first outward extension steel secondary beam 409, and the second outward extension steel secondary beam 410; The third steel cantilever main beam 503 of the steel secondary beam 408, the first outward-shaped steel secondary beam 409, and the second outward-shaped steel secondary beam 410; the fourth steel cantilever main beam 504 used to support the second outward-shaped steel secondary beam 410, and one end of each steel cantilever main beam 5 is connected to the main building 1; the first steel cantilever main beam 501, the second steel cantilever main beam 502, the third steel cantilever main beam 503, and the fourth steel cantilever main beam 504 are made of I-beams;
[0052] S6. Set up steel pipe uprights in area III and area IV and steel cantilever main beams for supporting the steel pipe uprights, such as Figure 4 As shown:
[0053] Taking area III as an example, a first outward extension steel cantilever main beam 505 is arranged in parallel with the first outward extension steel secondary beam 409, with a spacing of 300n, wherein n is a positive integer and 1≤n≤3; a second outward extension steel cantilever main beam 506 is arranged in parallel with the first outward extension steel cantilever main beam 505, with a spacing of 300n, and so on. One end of each outward extension steel cantilever main beam is connected to the main building 1, and a steel pipe vertical pole 6 is arranged every 300n for each outward extension steel cantilever main beam, wherein n is a positive integer and 1≤n≤3. The third outward extension steel cantilever main beam 507 and the fourth outward extension steel cantilever main beam 508 are arranged in area IV in the same way as in area III, and so on.
[0054] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0055] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0056] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0057] The embodiments of the present invention are described in detail above, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A formwork support method for arc-shaped corners of high-rise cantilever beam-slab structures. It is characterized in that The steps are: S1. Divide the cantilever beam-slab structure to be cast into areas: From the center P of the concrete arc-shaped edge beam (301), perpendicular lines PA and PB are drawn to the concrete arc-shaped edge beam (301) along the x-direction and the y-direction respectively, to divide the concrete slab (2) and the concrete beam (3), and the obtained 1 / 4 circle PAB is region I; From the positive corner point O at the edge of the main building (1), perpendicular lines OC and OD are drawn to the concrete arc-shaped edge beam (301) in the x-direction and y-direction respectively, and the obtained "L-shaped" area OCAPBD is area II; The area outside the vertical line OC is area III; the area outside the vertical line OD is area IV; Wherein, area I and area II are corner areas, and a steel platform constructed by a steel cantilever main beam (5) and a steel secondary beam (4) is used as the support structure at the bottom of the steel pipe upright frame; area III and area IV are ordinary areas, and a steel cantilever main beam (5) is used as the support structure at the bottom of the steel pipe upright frame; S2. Set up area I steel secondary beam: A steel secondary beam (4) is arranged at the lower layer of the concrete cantilever beam-slab structure to be poured; A first steel secondary beam (401) and a second steel secondary beam (402) are respectively arranged along the transverse and longitudinal radii of the quarter circle area I; An additional steel secondary beam is arranged between the first steel secondary beam (401) and the second steel secondary beam (402), with the center P of the 1 / 4 circle area I as the rotation point, and an additional steel secondary beam is arranged every 90 / m° rotation, with a total of m-1 additional steel secondary beams; A first connecting steel secondary beam (407) and a second connecting steel secondary beam (408) are arranged to be transversely connected at both ends of the first steel secondary beam (401), the second steel secondary beam (402) and the m-1 additional steel secondary beams; S3. Set up area II steel secondary beam: The first outward extension steel secondary beam (409) is arranged parallel to the first steel secondary beam (401) with a spacing of 900 mm; the second outward extension steel secondary beam (410) is arranged parallel to the second steel secondary beam (402) with a spacing of 900 mm; S4. Set up steel pipe uprights above the secondary steel beams in Area I and Area II: Steel pipe uprights (6) are arranged at the four intersections of the first steel secondary beam (401), the second steel secondary beam (402), the first outward-extended steel secondary beam (409), and the second outward-extended steel secondary beam (410); and based on the four steel pipe uprights (6), a steel pipe upright (6) is arranged every 300n along the first steel secondary beam (401), the second steel secondary beam (402), the m-1 additional steel secondary beams, the first outward-extended steel secondary beam (409), and the second outward-extended steel secondary beam (410), respectively, wherein n is a positive integer and 1≤n≤3; S5. Set up area I and area II for the steel cantilever main beam supporting the steel secondary beam: A total of four steel cantilever main beams (5) are provided, namely, a first steel cantilever main beam (501) for supporting a first outward-extending steel secondary beam (409); a second steel cantilever main beam (502) for supporting a first steel secondary beam (401), a second steel secondary beam (402), a second connecting steel secondary beam (408), a first outward-extending steel secondary beam (409), and a second outward-extending steel secondary beam (410); a third steel cantilever main beam (503) for supporting the first steel secondary beam (401), the second steel secondary beam (402), the second connecting steel secondary beam (408), the first outward-extending steel secondary beam (409), and the second outward-extending steel secondary beam (410); and a fourth steel cantilever main beam (504) for supporting the second outward-extending steel secondary beam (410). One end of each steel cantilever main beam (5) is connected to the main building (1); S6. Set up steel pipe uprights in Area III and Area IV and steel cantilever main beams for supporting the steel pipe uprights: In area III, a first outward-shaped steel cantilever main beam (505) is arranged in parallel with the first outward-shaped steel secondary beam (409), with a spacing of 300n, wherein n is a positive integer and 1≤n≤3; a second outward-shaped steel cantilever main beam (506) is arranged in parallel with the first outward-shaped steel cantilever main beam (505), with a spacing of 300n, and so on. One end of each outward-shaped steel cantilever main beam is connected to the main building (1), and each outward-shaped steel cantilever main beam is provided with a steel pipe vertical pole (6) every 300n, wherein n is a positive integer and 1≤n≤3. The third outward-shaped steel cantilever main beam (507) and the fourth outward-shaped steel cantilever main beam (508) are arranged in area IV in the same manner as in area III, and so on.
2. The formwork support method at the arc corner of a high-rise cantilever beam-slab structure according to claim 1, It is characterized in that The calculation method of m in step S2 is as follows: to ensure that the maximum spacing between the vertical poles of the additional steel secondary beam does not exceed 900 mm, the spacing at the edge of the steel does not exceed 900 mm, that is, πR / 2m≤900, and m≥πR / 1800. Since m is an integer, m=[πR / 1800]+1 can be set, where "[]" is the Gaussian function rounding symbol, and [πR / 1800] represents the maximum integer not exceeding πR / 1800.
3. The formwork support method at the arc corner of a high-rise cantilever beam-slab structure according to claim 1, It is characterized in that The first steel secondary beam (401), the second steel secondary beam (402), the m-1 additional steel secondary beam, the first outward extension steel secondary beam (409) and the second outward extension steel secondary beam (410) are made of I-beams or box-section steel pipes.
4. The formwork support method for arc-shaped corners of high-rise cantilever beam-slab structures according to claim 1, It is characterized in that In the step S4, the steel pipe upright pole (6) adopts a disc-type steel pipe bracket.
5. The formwork support method at the arc corner of a high-rise cantilever beam-slab structure according to claim 1, It is characterized in that In the step S5, the first steel cantilever main beam (501), the second steel cantilever main beam (502), the third steel cantilever main beam (503) and the fourth steel cantilever main beam (504) are made of I-beams.