A test method for testing the stress and vibration of aviation fuel pipelines crushed by heavy vehicles
By installing strain gauge and accelerometer on the test pipeline, simulating the rolling process of heavy vehicles and measuring the strain and acceleration values, the problem that the existing technology cannot evaluate the stress and vibration of buried aerial oil pipelines is solved, and third-party construction risk prevention is improved Control ability.
Patent Information
- Application Number
- CN202211614549.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-15
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-12-15
AI Technical Summary
The existing technology cannot effectively test and evaluate the stress and vibration conditions of buried aerial oil pipelines under heavy vehicles rolling, resulting in difficult control of the risk of construction damage of third parties and affecting the safe operation of the pipeline.
By pasting strain gauge and accelerometer on the test pipeline, the heavy truck rolling process is simulated, the strain and acceleration values of the pipeline are recorded, and the evaluation is combined with a variety of working conditions is provided to provide on-site guidance to reduce the risk of damage.
It realizes accurate measurement of the true stress and vibration of the pipeline under heavy vehicle crushing, improves the third-party construction risk prevention and control capabilities, and provides a highly applicable test method.
Smart Images

Figure CN116026543B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a test method for testing the stress and vibration of an aviation fuel pipeline when a heavy vehicle rolls over it, and belongs to the technical field of mechanical testing. Background Art
[0002] Long-distance aviation fuel pipelines (hereinafter referred to as "aviation fuel pipelines") play a vital role in airport fuel supply projects. Whether they operate safely or not will directly affect the airport's aviation fuel supply and flight safety. With the vigorous development of the country's aviation industry in recent years, the construction of aviation fuel pipeline projects has increased significantly, and the corresponding construction scale has also continued to expand. Specifically, the aviation fuel pipeline has a long transportation distance, from the first station refinery to the terminal airport, the transportation distance can reach hundreds of kilometers; second, the regional types along the pipeline are complex and diverse, and it is often inevitable to pass through mountainous and hilly areas, urban and rural administrative areas, and the social environment along the way is complex and the natural environment is changeable. Ground activities around buried aviation fuel pipelines are becoming more frequent. Temporary construction roads are newly built above the pipelines. Heavy construction vehicles repeatedly run over the pipelines without any additional protective measures. The risk of third-party construction damage such as vehicle running over the aviation fuel pipelines is increasing. Once a damage accident occurs, it will not only cause huge economic losses to the pipeline operating companies, but also cause great losses to the lives and property of the people along the line. It will also cause airport suspensions and have a great negative impact on the ecological environment, social stability, public safety and other aspects along the pipeline. It may even cause a social disaster due to an explosion accident. Similarly, to a certain extent, it will also greatly affect the safe, healthy, rapid and sustainable development of the pipeline logistics industry.
[0003] The loads borne by the section where the aviation fuel pipeline intersects with the road mainly include dead loads such as the dead weight of the pipeline structure and soil pressure, and live loads such as vehicle rolling load, ground heap load, temperature load, and pipeline internal pressure. Among the live loads, the impact of vehicle load on the normal operation of the pipeline occupies a major position. Today's road transportation is characterized by increased traffic volume, increased load, and increased speed, resulting in serious dynamic damage to the road surface under the action of vehicle rolling, and overloaded vehicles have become the main cause of damage to highway bridges in the construction area. Although the vehicle does not directly roll over the pipeline, the vehicle load will eventually be transmitted to the pipe body through the transmission of the road surface and soil, causing the pipe body to be stressed, which will create safety hazards to the safe operation of the pipeline.
[0004] There are no additional protection measures for the aviation fuel pipeline buried under the new road. Heavy vehicles have been rolling over it for a long time. The company has no way of knowing the amount of vehicle load on the pipeline and the damage caused to the pipeline by repeated rolling of vehicles. This is bound to bring serious challenges to the safe operation of the pipeline. Therefore, a test method is needed to test the stress condition of the buried aviation fuel pipeline under the rolling of heavy vehicles. Summary of the invention
[0005] In order to overcome the problems in the prior art, the present invention provides a test method for testing the stress and vibration of a heavy truck rolling over an aviation fuel pipeline. The method involves pasting strain gauges and accelerometers on the test pipeline, and a heavy truck rolling over the buried pipeline at a certain load and speed, so as to obtain the maximum stress and vibration acceleration received by the pipeline during the entire rolling process under various working conditions, thereby providing certain on-site guidance experience for reducing the risk of third-party damage to the aviation fuel pipeline and improving the ability to prevent and control third-party risks of the aviation fuel pipeline.
[0006] The technical solution provided by the present invention to solve the above technical problems is: a test method for testing the stress and vibration of a fuel pipeline rolled over by a heavy vehicle, comprising the following steps:
[0007] Step S10, designing a vehicle driving route according to basic parameters of the test heavy vehicle;
[0008] Step S20, determining the size of the test pit according to the ditch bottom width, burial depth and slope ratio, and excavating the test pit according to the size;
[0009] Step S30, selecting a test aviation fuel pipeline and installing a stress and vibration test system for testing a heavy vehicle rolling over the aviation fuel pipeline;
[0010] Step S40, placing the test aviation fuel pipeline in the test operation pit, and performing a pressure test on the test aviation fuel pipeline;
[0011] Step S50, attaching strain gauges and accelerometers to the test portion of the test aviation fuel pipeline, and electrically connecting the strain gauges and accelerometers to a multi-channel stress-strain dynamic acquisition instrument;
[0012] Step S60, debugging the strain gauge, accelerometer, and multi-channel stress-strain dynamic acquisition instrument;
[0013] Step S70, backfilling the test pit;
[0014] Step S80, pressurizing the pipeline, rolling the aviation fuel pipeline with a heavy vehicle, and recording the strain and acceleration values of the pipeline during the rolling process;
[0015] Step S90: quickly assess the damage of vehicle crushing of the buried aviation fuel pipeline according to the strain and acceleration values of the pipeline during the crushing process.
[0016] A further technical solution is that the calculation formula for the width of the trench bottom within a depth of 5 m in step S20 is:
[0017] B=D m +K
[0018] Where: B is the width of the trench bottom, m; Dm is the outer diameter of the test aviation fuel pipeline, m; K is the trench bottom widening allowance, m.
[0019] A further technical solution is that the test operation pit has four shapes: straight groove, trapezoidal groove, mixed groove and stepped groove.
[0020] A further technical solution is that the test aviation fuel pipeline is formed by welding three 8-12m long test pipelines end to end in pairs.
[0021] A further technical solution is that the stress and vibration test system for testing heavy vehicle rolling over aviation fuel pipeline includes a test aviation fuel pipeline, a power supply device, a pipeline pump, a high-pressure hose, and a pressure gauge. A pressure test pipe and a water injection pipe are provided at the left end of the test aviation fuel pipeline, and a drainage pipe is provided at the right end; the outlet of the pipeline pump is connected to the water injection pipe through a high-pressure hose, and the water injection pipe, drainage pipe, and pressure test pipe are all provided with ball valves; the power supply device is electrically connected to the pipeline pump; and the pressure gauge is installed on the water injection pipe.
[0022] A further technical solution is that in the step S40, in the excavated test operation pit, a cushion layer is stacked with earth bags at intervals of 5 meters to a height of 30 cm, and then the test aviation fuel pipeline is hoisted and placed in the test operation pit.
[0023] A further technical solution is that the specific process of the pressure test in step S40 is: turn on the power supply device switch and the pipeline pump, fill the test aviation fuel pipeline with water, turn off the pipeline pump, close the ball valves on the water injection pipe and the drainage pipe, connect the high-pressure hose to the pipeline pump and the pressure test pipe respectively, and perform a strength pressure test. The pressure is 1.5 times the design pressure of the aviation fuel pipeline. Turn on the pipeline pump, and the pressure should gradually increase slowly. The pressure should be increased in four stages of 30%, 60%, 90%, and 100%. Each stage should be stabilized for 10 minutes, and the pressure increase rate is not greater than 0.1MPa / min. After checking that there is no leakage, the pressure can continue to be increased. After the pressure is increased to the strength pressure value, the pressure is stabilized for 4 hours. If the test aviation fuel pipeline has no deformation and no leakage, the strength pressure test is qualified; then a tightness pressure test is performed, and the water pressure in the test aviation fuel pipeline is gradually increased to the design pressure, and the pressure is stabilized for 24 hours. If the pressure drop of the test aviation fuel pipeline during the pressure stabilization period is not greater than 1% of the test pressure value, and is not greater than 0.1MPa, the tightness pressure test is qualified.
[0024] A further technical solution is that the backfill in step S70 requires backfilling with excavated soil, and the backfill soil should be flat and dense, flush with the test site, while ensuring that the injection and drainage pipes are not damaged.
[0025] A further technical solution is that in step S80, a variety of operating conditions such as pipeline internal pressure, vehicle gross weight and vehicle speed are used, and a certain operating condition is determined as the main variable using the control variable method, and other variable values are changed to obtain multiple groups of test pipeline strain and acceleration values. Each group of tests is repeated 3 times to eliminate interference from accidental factors.
[0026] A further technical solution is that the rapid assessment standard for heavy vehicle crushing hazard in step S90 is:
[0027] When the pipeline stress is less than 180MPa and the pipeline acceleration is less than 0.05g, the pipeline damage state is no obvious deformation and no additional protective measures are required;
[0028] When the pipeline stress is 180MPa~400MPa and the pipeline acceleration is 0.05g~0.10g, the pipeline damage state is elastic deformation, with obvious deformation, and the additional protection measure is a temporary road cover;
[0029] When the pipeline stress is 400MPa~510MPa and the pipeline acceleration is 0.10g~0.20g, the pipeline damage state is plastic deformation, which produces irreversible deformation, and the additional protection measure is the cover culvert;
[0030] When the pipeline stress is greater than 510MPa and the pipeline acceleration is greater than 0.20g, the pipeline damage state exceeds the ultimate strength. Additional protective measures are to inspect the pipeline and perform tensile and compressive strength verification.
[0031] The present invention has the following beneficial effects:
[0032] 1. The present invention can realistically simulate the whole rolling process of a heavy vehicle rolling over a buried pipeline, and obtain the dynamic response process of the vehicle rolling over the buried pipeline;
[0033] 2. This method can accurately obtain the actual stress and vibration conditions of the pipeline during the rolling process, and obtain the maximum stress and acceleration value of the pipeline during the rolling process, which can provide certain on-site guidance experience to reduce the risk of damage to the third-party construction of aviation fuel pipelines and improve the ability to prevent and control the risks of the third-party construction of aviation fuel pipelines;
[0034] 3. This method is highly flexible and applicable. The test conditions that can be implemented are rich and varied. It can test the stress and vibration of the buried aviation fuel pipeline under various working conditions such as different vehicle weights, vehicle speeds, pipe materials, pipe diameters, wall thicknesses, buried depths, and pipeline internal pressures.
[0035] 4. The present invention is highly practical, and each operation step of the test method can be accurately and truly implemented through the test system. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 This is a schematic diagram of the structure of a test system for testing the stress and vibration of an aviation fuel pipeline when a heavy vehicle rolls over it;
[0037] Figure 2 A vehicle driving route planning diagram in an embodiment of the present invention;
[0038] Figure 3 It is a side cross-sectional view of the test working pit in an embodiment of the present invention.
[0039] As shown in the figure: 1-power supply device, 2-pipeline pump, 3-high-pressure hose, 4-water injection pipe, 5-drainage pipe, 6-ball valve, 7-pressure gauge, 8-pressure test tube, 9-strain gauge, 10-accelerometer, 11-test aviation fuel pipeline, 12-test operation pit, 13-heavy truck. DETAILED DESCRIPTION
[0040] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] A test method for testing the stress and vibration of an aviation fuel pipeline caused by a heavy vehicle rolling over it comprises the following steps:
[0042] Step S10, designing a vehicle driving route according to basic parameters of the heavy truck 13;
[0043] Specifically: the heavy vehicle driving route is the median perpendicular line of the pipeline laying direction, and the heavy vehicle linear acceleration, uniform speed and deceleration distance are determined at the same time to ensure that the heavy vehicle with a certain load can safely accelerate to the test speed value, and the whole vehicle passes directly above the pipeline at a uniform speed, and then the heavy vehicle can decelerate to a safe speed and leave the test site;
[0044] Step S20, determining the size of the test operation pit 12 according to the trench bottom width, the buried depth and the slope ratio, and excavating the test operation pit 12 according to the size;
[0045] The shapes of the test operation pit 12 are mainly straight trench, trapezoidal trench, mixed trench and stepped trench. The shape to be used depends on the soil properties, trenching method, groundwater level, pipe diameter and burial depth, etc. The size of the trench depends on the trench bottom width, burial depth and slope ratio. The trench bottom width of the trench within 5m is calculated as follows:
[0046] B=D m +K
[0047] Where: B is the width of the trench bottom, m; Dm is the outer diameter of the test aviation fuel pipeline, m; K is the trench bottom widening allowance, m, and the value is taken according to Table 1;
[0048] Table 1 Trench bottom widening margin K value (m)
[0049]
[0050]
[0051] The slope of the trench side slope should be determined according to the soil type, mechanical properties and trench excavation depth. The steepest slope of the trench with a depth of less than 5m should be determined according to Table 2;
[0052] Table 2 Steepest slope of trench with depth less than 5m
[0053]
[0054] Step S30, selecting the test aviation fuel pipeline 11 and installing a stress and vibration test system for testing the aviation fuel pipeline under heavy vehicle rolling;
[0055] Three 8-12m long test pipes were selected for the pipeline, and then welded end to end in pairs to simulate the operation status of a real long-distance pipeline and reduce the boundary effect of the pipe end seal. The pipeline was welded according to the argon electric welding process requirements, and both ends of the pipeline were sealed by welding elliptical heads. At the same time, prefabricated injection and drainage ports, pressure test ports, and water inlets were welded on both ends of the upper surface of the pipeline.
[0056] like Figure 1 As shown, the stress and vibration test system for testing the heavy vehicle rolling over the aviation fuel pipeline includes a test aviation fuel pipeline 11, a power supply device 1, a pipeline pump 2, a high-pressure hose 3, and a pressure gauge 7. The left end of the test aviation fuel pipeline 11 is provided with a test pressure pipe 8 and a water injection pipe 4, and the right end is provided with a drain pipe 5; the outlet of the pipeline pump 2 is connected to the water injection pipe 4 through the high-pressure hose 3, and the water injection pipe 4, the drain pipe 5, and the test pressure pipe 8 are all provided with a ball valve 6; the power supply device 1 is electrically connected to the pipeline pump 2; the pressure gauge 7 is installed on the water injection pipe 4
[0057] The ball valve 6 is used for flow regulation; the pipeline pump 2 is used for filling the aviation fuel pipeline with water, as well as for pipeline pressure testing and test pressurization; the pressure test pipe 8 is used for pipeline pressure testing. When pressure testing is required, one end is connected to the test pipeline through the pressure test port, and the other end is connected to the pipeline pump 2 through the high-pressure hose 3; the pressure gauge 7 is used for pipeline pressure testing and pressure stabilization monitoring during the test; the power supply device 1 is used for powering the pipeline pump 2 during the whole test process;
[0058] Step S40, placing the test aviation fuel pipeline 11 in the test operation pit 12, and performing a pressure test on the test aviation fuel pipeline 11;
[0059] For the pipeline trench, it is necessary to stack the cushion layer with earth bags every 5 meters in the excavated working pit, with a height of 30cm, and then lift the pipe section and place it in the trench;
[0060] The pipeline pressure test is a water pressure test, and the pipe section is tested for strength and tightness. The strength test pressure is 1.5 times the design pressure of the aviation fuel pipeline. The pressure should be gradually increased in four stages: 30%, 60%, 90%, and 100%. Each stage should be kept stable for 10 minutes, and the pressure increase rate should not exceed 0.1MPa / min. After checking that there is no leakage, the pressure can continue to be increased. After reaching the strength pressure value, the pressure should be kept stable for 4 hours. The specific pressure test standards are shown in Table 3:
[0061] Table 3 Pressure value, pressure stabilization time and qualified standard for segmented water pressure test of oil pipeline
[0062]
[0063] Step S50, attaching the strain gauge 9 and the accelerometer 10 to the test portion of the test aviation fuel pipeline 11, and electrically connecting the strain gauge 9 and the accelerometer 10 to the multi-channel stress-strain dynamic acquisition instrument;
[0064] The multi-channel stress-strain dynamic acquisition instrument contains multiple channels, each channel is connected to a strain gauge or an accelerometer. According to the actual demand for the number of test channels, multiple instruments can be cascaded to further expand the number of acquisition channels. The structure is box-type, which is convenient for carrying and placing during the test.
[0065] Step S60, debugging the strain gauge 9, the accelerometer 10, and the multi-channel stress-strain dynamic acquisition instrument;
[0066] Step S70, backfilling the test pit 12, which requires backfilling with excavated soil. The backfill soil should be flat and dense, flush with the test site, and ensure that the injection and drainage pipes are not damaged;
[0067] Step S80, pressurizing the pipeline, and rolling the aviation fuel pipeline 11 with a heavy vehicle to test it, and recording the strain and acceleration values of the pipeline during the rolling process;
[0068] Using a variety of working conditions such as pipeline internal pressure, vehicle gross weight and vehicle speed, and using the control variable method, a certain working condition is determined as the main variable, and the values of other variables are changed to obtain multiple groups of test pipeline strain and acceleration values. Each group of tests is repeated 3 times to eliminate the interference of accidental factors.
[0069] Step S90: A rapid assessment of the vehicle crushing hazard of the buried aviation fuel pipeline is performed based on the strain and acceleration values of the pipeline during the crushing process, as shown in Table 4 below.
[0070] Table 4 Quick Assessment Table for Hazards of Heavy Vehicle Rolling Over During the Construction of Buried Aviation Fuel Pipeline by Third Party
[0071]
[0072] Example
[0073] This example provides a test method for testing the stress and vibration of a fuel pipeline caused by a heavy vehicle rolling over it, including the following steps:
[0074] S10. Design vehicle driving routes, such as Figure 2 As shown, the road width of the heavy truck 13 is 4m. The heavy truck 13 passes through the middle of the test working pit 12. The straight-line acceleration and steady-speed distance is 80m, and the deceleration distance is 40m. After the heavy truck 13 passes directly above the working pit 12 at a constant speed, it decelerates in a straight line to a safe turning speed and drives to the loading and unloading area to change the vehicle load for the next set of working condition tests.
[0075] S20: excavate the test operation pit 12, such as Figure 2 and Figure 3 As shown, the test operation pit 12 is in the shape of a trapezoidal trench, 26 m long, 1.8 m wide at the bottom of the trench, and 1.5 m deep;
[0076] S30, such as Figure 2 As shown, three test aviation fuel pipelines 11 (L360 steel, pipe diameter 273mm, wall thickness 8mm) are selected. The middle pipeline is the main pressure pipeline. Each test aviation fuel pipeline 11 is 8m long and the total length is 24m. It can better simulate the long-distance transportation state of the real long-distance pipeline and weaken the boundary effect of the seals at both ends to a certain extent.
[0077] S40. In the excavated test operation pit 12, use earth bags to stack cushion layers every 5 meters, with a height of 30 cm, and then lift the test aviation fuel pipeline 11 into the trench; the water injection pipe 4 is connected to the pipeline pump 2 through the high-pressure hose 3, turn on the power supply device 1 switch and the pipeline pump 2, fill the test aviation fuel pipeline 11 with water, turn off the pipeline pump 2, close the ball valves on the water injection pipe 4 and the drainage pipe 5, and connect the high-pressure hose 3 to the pipeline pump 2 and the pressure test nipple 8 respectively, and conduct a strength pressure test with a pressure of 1.5 times the design pressure of the aviation fuel pipeline (i.e. 15MPa). Turn on the pipeline pump 2, and the pressure should be gradually increased at 30%. The pressure is increased in four stages: 1, 60%, 90%, and 100%. The pressure should be maintained stable for 10 minutes in each stage, and the pressure increasing speed should not exceed 0.1MPa / min. After inspection and confirmation of no leakage, the pressure can be increased continuously. After reaching the strength pressure value, the pressure is maintained stable for 4 hours. If there is no deformation or leakage in the test aviation fuel pipeline 11, the strength pressure test is qualified. Subsequently, a tightness pressure test is carried out, and the water pressure in the test aviation fuel pipeline 11 is gradually increased to the design pressure (i.e. 10MPa), and the pressure is maintained stable for 24 hours. If the pressure drop of the test aviation fuel pipeline 11 during the pressure stabilization period is not more than 1% of the test pressure value, and is not more than 0.1MPa, the tightness pressure test is qualified.
[0078] S50, test the aviation fuel pipeline 11 test site paste strain gauge 9, accelerometer 10, the strain gauge 9 axial paste, measure the axial stress of the pipeline, the test site of this example selects the central section of the middle pipeline, and pastes one strain gauge 9 and one accelerometer 10 at 0°, 90° and 180° of the section respectively.
[0079] S60, connecting the strain gauge 9 and the accelerometer 10 pasted in the above step S50 one by one through cables and channels of the dynamic stress and strain acquisition instrument, and testing whether the acquisition instrument can collect data normally.
[0080] S70. Backfill the test pit 12 with excavated soil. The compaction degree should be similar to that before excavation. The backfill soil should be flat and dense, flush with the site, and at the same time, ensure that the injection and drainage pipes are not damaged.
[0081] S80. The test aviation fuel pipeline 11 is pressurized, and the heavy truck 13 rolls over the pipeline, and the strain and acceleration values of the pipeline during the rolling process are recorded. It should be noted that after the test aviation fuel pipeline 11 is pressurized to 4MPa, the heavy truck 13 with a total load of 30t drives through the test aviation fuel pipeline 11 at a uniform speed of 15km / h. The strain and acceleration values are recorded from the time the heavy truck 13 starts to accelerate until the heavy truck 13 decelerates to a safe turning speed.
[0082] S90. Finally, based on the real stress value and acceleration value of the buried aviation fuel pipeline measured by the above test method, the damage caused by the heavy vehicle rolling over the buried aviation fuel pipeline during operation by the third-party construction heavy vehicle is identified and quickly evaluated, mainly considering the damaged state of the pipeline and its corresponding additional protection measures.
[0083] The above description is not intended to impose any form of limitation on the present invention. Although the present invention has been disclosed through the above embodiments, it is not intended to limit the present invention. Any technician familiar with the profession can make some changes or modifications to equivalent embodiments of equivalent changes using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of the technical solution of the present invention.
Claims
1. A test method for testing the stress and vibration of a fuel pipeline when a heavy vehicle rolls over it, characterized in that: The following steps are involved: Step S10, designing a vehicle driving route according to basic parameters of the test heavy vehicle; Step S20, determining the size of the test operation pit (12) according to the trench bottom width, the buried depth and the slope ratio, and excavating the test operation pit (12) according to the size; Step S30, selecting a test aviation fuel pipeline (11) and installing a stress and vibration test system for testing a heavy vehicle rolling over the aviation fuel pipeline; The stress and vibration test system for testing a fuel pipeline under heavy vehicle rolling comprises a fuel pipeline (11), a power supply device (1), a pipeline pump (2), a high-pressure hose (3), and a pressure gauge (7). The left end of the fuel pipeline (11) is provided with a pressure test pipe (8) and a water injection pipe (4), and the right end is provided with a drainage pipe (5). The outlet of the pipeline pump (2) is connected to the water injection pipe (4) through the high-pressure hose (3). The water injection pipe (4), the drainage pipe (5), and the pressure test pipe (8) are all provided with a ball valve (6). The power supply device (1) is electrically connected to the pipeline pump (2). The pressure gauge (7) is installed on the water injection pipe (4). Step S40, placing the test aviation fuel pipeline (11) in the test operation pit (12), and performing a pressure test on the test aviation fuel pipeline (11); In the step S40, in the excavated test operation pit (12), earth bags are stacked at a cushioning layer of 30 cm with a spacing of 5 meters, and then the test aviation fuel pipeline (11) is hoisted and placed in the test operation pit (12); The specific process of the pressure test in step S40 is as follows: turn on the power supply device (1) switch and the pipeline pump (2), fill the test aviation fuel pipeline (11) with water, turn off the pipeline pump (2), close the ball valves on the water injection pipe (4) and the drainage pipe (5), connect the high-pressure hose (3) to the pipeline pump (2) and the pressure test pipe (8) respectively, and perform a strength pressure test at a pressure of 1.5 times the design pressure of the aviation fuel pipeline. Turn on the pipeline pump (2), and the pressure should be gradually increased in four stages of 30%, 60%, 90%, and 100%. The pressure should be stabilized for 10 minutes at the first stage, and the pressure increase speed should not exceed 0.1MPa / min. After checking that there is no leakage, the pressure can be increased. After reaching the strength pressure value, the pressure should be stabilized for 4 hours. If there is no deformation and no leakage in the test aviation fuel pipeline (11), the strength pressure test is qualified; then a tightness pressure test is carried out, and the water pressure in the test aviation fuel pipeline (11) is gradually increased to the design pressure, and the pressure is stabilized for 24 hours. If the pressure drop of the test aviation fuel pipeline (11) during the pressure stabilization period is not greater than 1% of the test pressure value and is not greater than 0.1MPa, the tightness pressure test is qualified; Step S50, attaching a strain gauge (9) and an accelerometer (10) to the test portion of the test aviation fuel pipeline (11), and electrically connecting the strain gauge (9) and the accelerometer (10) to a multi-channel stress-strain dynamic acquisition instrument; Step S60, debugging the strain gauge (9), the accelerometer (10), and the multi-channel stress-strain dynamic acquisition instrument; Step S70, backfilling the test operation pit (12); Step S80, pressurizing the pipeline, and rolling the aviation fuel pipeline (11) with a heavy vehicle, and recording the strain and acceleration values of the pipeline during the rolling process; Step S90, quickly assessing the damage of vehicle rolling over the buried aviation fuel pipeline according to the strain and acceleration values of the pipeline during the rolling process; When the pipeline stress is less than 180MPa and the pipeline acceleration is less than 0.05g, the pipeline damage state is no obvious deformation and no additional protective measures are required; When the pipeline stress is 180MPa~400MPa and the pipeline acceleration is 0.05g~0.10g, the pipeline damage state is elastic deformation, with obvious deformation, and the additional protection measure is a temporary road cover; When the pipeline stress is 400MPa~510MPa and the pipeline acceleration is 0.10g~0.20g, the pipeline damage state is plastic deformation, which produces irreversible deformation, and the additional protection measure is the cover culvert; When the pipeline stress is greater than 510MPa and the pipeline acceleration is greater than 0.20g, the pipeline damage state exceeds the ultimate strength. Additional protective measures are to inspect the pipeline and perform tensile and compressive strength verification.
2. The test method for testing the stress and vibration of aviation fuel pipelines when a heavy vehicle rolls over it according to claim 1 is characterized in that: The calculation formula for the width of the trench bottom within 5 m in step S20 is: B=D m +K Where: B is the width of the trench bottom, m; D m is the outer diameter of the test aviation fuel pipeline, m; K is the trench bottom widening allowance, m.
3. The test method for testing stress and vibration of aviation fuel pipelines when a heavy vehicle rolls over it according to claim 1 is characterized in that: The test operation pit (12) has four shapes: straight groove, trapezoidal groove, mixed groove and stepped groove.
4. The test method for testing stress and vibration of aviation fuel pipelines when a heavy vehicle rolls over it according to claim 1 is characterized in that: The test aviation fuel pipeline (11) is formed by welding three test pipelines of 8-12 m in length end to end in pairs.
5. The test method for testing the stress and vibration of aviation fuel pipelines when a heavy vehicle rolls over it according to claim 1 is characterized in that: The backfill in step S70 requires backfilling with excavated soil, and the backfill soil should be flat and dense, flush with the test site, and at the same time ensure that the injection and drainage pipes are not damaged.
6. The test method for testing the stress and vibration of aviation fuel pipelines when a heavy vehicle rolls over it according to claim 1 is characterized in that: In step S80, a variety of working conditions such as pipeline internal pressure, vehicle gross weight and vehicle speed are used, and a certain working condition is determined as the main variable by using the control variable method, and other variable values are changed to obtain multiple groups of test pipeline strain and acceleration values. Each group of tests is repeated 3 times to eliminate interference from accidental factors.
Citation Information
Patent Citations
Intelligent early warning method and system for preventing external damage of aviation oil long-distance pipeline
CN114235821A
System and method for testing stress of buried pipeline under vehicle load
CN114777634A
Method of hydraulic impact test and rehabilitation of pipeline, which is implemented during its increased pressure loading in field conditions
RU2467299C1