Method for preventing gas outburst in coal seam wells with close distance and joint operation in combined gas extraction area

Through the combined operation of the upper and lower coal seam wells at extremely close distances, the combined gas drainage method solves the problems of low gas concentration and incomplete coverage, achieves efficient gas drainage and environmental protection, and reduces the economic and environmental costs of coal mine gas drainage.

CN116122774BActive Publication Date: 2024-10-18XIAN RES INST OF CHINA COAL TECH & ENG GRP CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310004841.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-03
Publication Date
2024-10-18
Estimated Expiration
2043-01-03

AI Technical Summary

Technical Problem

In the current technology of coal mine gas drainage, the gas concentration is too low to meet the power generation requirements, and it cannot cover the entire working face, resulting in environmental pollution and high economic costs.

Method used

The method of combined gas extraction from the upper and lower coal seams at extremely close distances is adopted, and a three-dimensional fissure network is formed through the construction of accurate three-dimensional geological models, directional horizontal long drilling construction, flexible drill tool sidetracking and surface-underground fracturing equipment. Improve gas drainage concentration and efficiency.

Benefits of technology

It has achieved a reliable path to increase the concentration of gas extraction at a low economic cost, directly use the extracted gas to generate electricity, reduce methane emissions, protect the environment, increase the economic benefits of coal mines, and support the "double carbon" goal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116122774B_ABST
    Figure CN116122774B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for preventing gas outbursts in a joint operation of upper and lower coal seam wells at extremely close distances: step one: constructing a three-dimensional geological model of an accurate and transparent working face of a coal seam at extremely close distances; step two: constructing multiple directional horizontal long boreholes along the minimum horizontal principal stress in the rock mass between coal seams; step three: constructing radial upper branch holes and lower branch holes; step four: constructing a ground-tunnel through-hole; step five: connecting the ground-underground through-hole to the directional horizontal long borehole orifice device; step six: carrying out segmented fracturing construction on the directional horizontal long borehole; step seven: completing the construction of all branch holes of the horizontal long borehole; step eight: completing the fracturing construction of all other directional horizontal long boreholes; forming a three-dimensional fracture network; step nine: combined layer extraction. The method of the present invention can effectively improve the concentration of gas extraction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mine gas extraction, and relates to a method for preventing gas outbursts in upper and lower combined fracturing areas of extremely close-range coal seam wells. Background Art

[0002] The coal seams and gas occurrence in the coal mining area of ​​Guizhou Province in my country have the following main characteristics: ① There are many coal seams with small spacing between coal seams. Affected by the structure, the thickness and spacing of coal seams are unstable, and most of them are thin and medium-thick coal seam groups. ② The coal seams have poor permeability, generally with a permeability of less than 0.1mD, high gas content, and serious coal and gas outburst disasters. In addition, the top and bottom plates of coal seams are mostly soft rocks, such as mudstone, sandy mudstone, muddy siltstone, etc. These factors increase the difficulty of gas extraction.

[0003] In the existing technology, in order to solve the problem of high gas content in coal mines, the conventional underground gas extraction drilling has a small effective radius, a large drilling construction workload, serious dust hazards, low extraction gas concentration, poor extraction effect, and cannot meet the requirements of power generation. Most of the underground gas is directly discharged into the atmosphere, causing serious pollution to the atmosphere and ecological environment. Using ground coalbed methane development technology to perform fracturing transformation on coal reservoirs and their roof and floor plates can increase gas concentration and achieve the expected effect of gas utilization, but it cannot cover all working faces and its economic cost is relatively high. Summary of the invention

[0004] The purpose of the present invention is to provide a method for preventing coal seam outbursts in extremely close proximity areas in Guizhou Province, so as to solve the problems in the prior art that the extracted gas concentration is low and cannot meet the power generation requirements and cannot cover the entire working face.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] A method for preventing gas outbursts in a coal seam well with upper and lower joint operations in a close distance coal seam well, comprising the following steps:

[0007] Step 1: Construction of a three-dimensional geological model of the coal seam with high accuracy and transparency at the working surface at very close range;

[0008] Step 2: According to the three-dimensional geological model obtained in step 1, the borehole trajectory is designed in the model according to the stratum distribution to ensure that the directional horizontal long borehole is located in the rock mass between coal seams; combined with the ground stress direction of the working face, the geological guidance technology is used to construct multiple directional horizontal long boreholes in the rock mass between coal seams along the minimum horizontal principal stress; adjacent directional horizontal long boreholes are spaced a certain distance apart and can cover the working face;

[0009] Step 3: Use flexible drilling tools to perform extremely small radius side drilling on all directional horizontal long boreholes, construct radial upper branch holes and lower branch holes, and connect the upper and lower coal seams;

[0010] Step 4: construct a ground-tunnel through-hole in the bottom extraction tunnel facing the target coal seam on the ground;

[0011] Step 5: Connecting the ground-underground through-hole to the orifice device of one of the directional horizontal long boreholes obtained in step 2 through a pressure-resistant pipeline underground;

[0012] Step 6: Use the surface fracturing equipment and downhole coiled tubing equipment to work together to carry out staged fracturing construction on the current directional horizontal long borehole;

[0013] Step 7: Unseal the bottom seal, drag the fracturing tool string, pull back the coiled tubing, and perform fracturing construction on the next branch hole until all the branch holes of the horizontal long borehole are completed;

[0014] Step 8: Recover all the coiled tubing, close the orifice valve, move the coiled tubing equipment to the orifice of the next directional horizontal long borehole, and repeat steps 5 to 7 to complete the fracturing construction of all other directional horizontal long boreholes; so that a three-dimensional fracture network is formed between the extremely close upper coal seam and the extremely close lower coal seam;

[0015] Step 9: Use the special gas extraction pipeline in the coal mine to carry out combined layer extraction.

[0016] Furthermore, the step 1 specifically includes the following sub-steps:

[0017] Step 11: Use the continuous tubing to push the geological radar sonic transmitter, the geological radar sonic receiver and the drilling trajectory inclinometer into the upper coal seam horizontal drill hole and the lower coal seam horizontal drill hole;

[0018] Step 12: measuring the drilling trajectories of the upper coal seam horizontal drilling hole and the lower coal seam horizontal drilling hole, and simultaneously using the sonic radar to collect data on the geological body to obtain the sonic radar time domain profile;

[0019] Step 13: Recover the coiled tubing, export the drilling trajectory data, and calculate the absolute coordinates of the drilling trajectory based on the drilling trajectory data;

[0020] Step 14: Track the reflected wave event axis of the upper coal seam at a very close distance or the lower coal seam at a very close distance and the rock mass between the coal seams on the acoustic radar time domain profile obtained in step 1, and obtain the radar wave propagation velocity of the coal seam by converting the tunnel wave; perform spatial position constrained imaging processing on the acoustic radar time domain profile obtained in step 1 to obtain a migration imaging profile;

[0021] Step 15: Perform time-depth conversion on the acoustic wave profile according to the velocity field, and calculate the spatial coordinate positions of the top and bottom plates of the inter-coal seam rock mass 12 in combination with the drilling trajectory data derived in step 13;

[0022] Step 16: Repeat steps 11 to 15 to detect multiple coal seam horizontal boreholes, combine the spatial coordinate positions of the top and bottom plate boreholes of the inter-coal seam rock mass obtained in multiple steps 15, perform interpolation calculations on the area without borehole detection, and establish a three-dimensional data volume of the upper and lower coal seams and interlayer rock mass of the working face;

[0023] Step 17: Based on the three-dimensional data bodies of the upper and lower coal seams and interlayer rock masses established in step 1, three-dimensional modeling software is used to perform geological modeling to obtain an accurate three-dimensional geological model.

[0024] Furthermore, the step 2 specifically includes the following sub-steps:

[0025] Step 21: construct a Φ120 mm short borehole in the rock mass between coal seams in the coal roadway, use hydraulic fracturing method to measure the maximum horizontal principal stress direction, and set the direction perpendicular to the maximum horizontal principal stress direction as the minimum principal stress direction;

[0026] Step 22: Applying geosteering technology to construct directional horizontal long boreholes in the rock mass between coal seams along the direction of the minimum horizontal principal stress, which means setting a group of directional horizontal long boreholes in the transparent geological working face model constructed according to step 1, with the open hole diameter being greater than or equal to Φ150mm, the strike of the directional horizontal long boreholes being along the minimum horizontal principal stress of the working face, and the length of the hole center from the upper and lower coal seams being 50% of the rock mass thickness;

[0027] Step 23: The directional horizontal long drilling can fully cover the working surface, with a length greater than 500m;

[0028] Step 24, after the construction is completed, the entire directional horizontal long borehole is flushed until no sand chips are returned.

[0029] Furthermore, the step three specifically includes the following sub-steps:

[0030] Step 31: Install a gas-liquid separator at the orifice of the current directional horizontal long borehole to avoid gas exceeding the limit when drilling into the coal seam;

[0031] Step 32: Use a drill pipe to lower the deflection device to the opening of the first branch hole in the directional horizontal long borehole, rotate the drill pipe to adjust the orientation of the deflection device so that the deflection cone surface is vertically upward; seal the deflection device and recover the drill pipe;

[0032] Step 33: Install a bendable flexible drill tool at the front of the drill pipe, and then lower the bendable flexible drill tool to the opening of the first branch hole. The drilling pressure is increased to 20 MPa to bend the bendable flexible drill tool. The pressure is continuously increased, and the drill bit of the bendable flexible drill tool drills to the upper coal seam to form an upper branch hole. When the drilling pressure is reduced to 2 MPa, the drill pipe is recovered to the opening of the branch hole. Then, the bendable flexible drill tool changes the construction direction to construct a lower branch hole.

[0033] Step 34: lower the whipstock unsealing unit into the directional horizontal long borehole, unseal the whipstock, adjust the orientation of the whipstock device so that the whipstock cone surface is vertically downward; seal the whipstock device, and recover the drill pipe; and complete the construction of the lower branch hole in the same manner as step 33;

[0034] Step 35: Recover the coiled tubing to the opening of the second branch hole, repeat steps 32 to 34, and complete the construction of each branch hole in sequence from the right side to the left side of the directional horizontal long borehole;

[0035] Step 36: Repeat steps 31 to 35 to complete the extremely small radius side drilling of each directional horizontal long borehole in turn to provide a fracture initiation channel for hydraulic fracturing.

[0036] Furthermore, the step four includes the following operations: constructing a ground-tunnel through-hole from the ground to the bottom pumping tunnel, and the hole depth structure adopts a three-opening design. The first opening is constructed from the surface to 10m below the bedrock, with a hole diameter greater than or equal to Φ300mm, a Φ255mm casing is installed, and cement is used for well cementing; the second opening is drilled to 10m above the bottom pumping tunnel, with a hole diameter greater than or equal to Φ210mm, a Φ195mm casing is installed, and cement is used for well cementing; the third opening is drilled to the bottom pumping tunnel, with a hole diameter greater than or equal to Φ150mm, and a Φ137mm casing is installed.

[0037] Furthermore, the step six includes the following sub-steps:

[0038] Step 61: First, perform a pipeline pressure test, open the surface fracturing wellhead, the surface-tunnel through-well and the pressure-resistant valve in the tunnel where the long borehole is planned to be constructed, close the long borehole fracturing wellhead, and start the surface fracturing equipment to perform a pipeline test. The pressure gradually increases to 70MPa. There is no obvious pressure drop or leakage on the surface high-pressure manifold and the downhole high-pressure pipe and connecting device for 15 minutes, and the pressure test is qualified;

[0039] Step 62: Install a bottom seal and drag fracturing tool string at the front end of the downhole coiled tubing; start the coiled tubing vehicle and push the bottom seal and drag fracturing tool string to the target layer section;

[0040] Step 63: The packer is sealed; the wellhead device of the directional horizontal long borehole is opened, the ground fracturing equipment is turned on, and high-pressure water is continuously injected into the directional horizontal long borehole through the coiled tubing. The high-pressure fracturing liquid is injected into the coiled tubing in an up-and-down well combined operation mode, and the pressure of the jet fluid is increased to exceed the fracture pressure of the coal seam and the rock mass between the coal seams, so as to fully fracture and break the coal seam;

[0041] Step 64: After sufficient fracturing of the coal seam is observed, the surface fracturing equipment is shut down.

[0042] In summary, it can be seen that the method of the present invention is an important breakthrough in the field of coal mine gas extraction technology. It can achieve the effect of regional gas management at a relatively low economic cost, effectively improve the gas extraction concentration, and directly use the extracted gas for power generation, which is beneficial to significantly reduce methane emissions, protect the ecological environment, increase the supply of clean energy, and increase the economic benefits of coal mines. It has huge social and environmental benefits in the future and is a reliable path to achieve the 3060 "dual carbon" goal. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 A schematic diagram of a combined operation of a well and a bottom in an embodiment of the present invention;

[0044] Figure 2 This is a schematic diagram of detecting coal-rock layer boundaries by a borehole radar in an embodiment of the present invention;

[0045] Figure 3 Schematic diagram of the time section of borehole radar waves in an embodiment of the present invention;

[0046] Figure 4 is a schematic diagram of a depth profile of a borehole radar wave in an embodiment of the present invention;

[0047] Figure 5 A schematic diagram of all horizontal directional long boreholes arranged in the underground engineering in an embodiment of the present invention.

[0048] Figure numerals: 1-ground wellhead; 2-ground-tunnel through-hole; 3-high-pressure pipeline in the tunnel; 4-coiled tubing vehicle; 5-coiled tubing; 6-injection head vehicle; 7-horizontal wellhead device; 8-surface soil layer; 9-overburden of coal seam; 10-extremely close upper coal seam; 11-directional horizontal long drilling hole; 12-rock mass between coal seams; 13-extremely close lower coal seam; 14-hydraulic fracturing crack; 15-coal seam floor; 16-bottom seal dragging fracturing tool string; 17-bottom extraction lane; 18-upper branch hole; 19-lower branch hole; 20-opening of the first branch hole; 21-opening of the second branch hole; 22-coal lane; 23-geological radar wave host; 24-optical fiber cable; 25-geological radar sound wave transmitter; 26-geological radar sound wave receiver; 27-upper coal seam horizontal drilling hole; 28-lower coal seam horizontal drilling hole; 29-gas extraction system; 30-working face; 11-1~11-6-directional horizontal long drilling holes. DETAILED DESCRIPTION

[0049] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0050] Taking a coal mine in Guizhou as an example and combining with the attached drawings, the present invention is further described. The designed annual production capacity of the mine is 300Mt. It contains 20 mineable coal seams, of which the average thickness of coal 9 is 2.35m, the thickness of coal 10 is 2.91m, the average distance between coal 9 and coal 10 is about 4.30m, and the rock mass between coal seams is muddy siltstone. The top plate 9 of the coal seam is fine-grained sandstone, and the bottom plate 10 of the coal seam is mudstone.

[0051] Step 1: Construction of a three-dimensional geological model of the coal seam with high accuracy and transparency at the working surface at very close range;

[0052] Specifically, firstly, the long boreholes along the coal seam that have been constructed (including the horizontal borehole 27 of the upper coal seam and the horizontal borehole 28 of the lower coal seam) are used, and the continuous oil pipe 5 is used to push the borehole radar transmitter 25-1, the borehole radar receiver 25-2 and the borehole trajectory measuring instrument 26 into the horizontal borehole 27 of the upper coal seam and the horizontal borehole 28 of the lower coal seam in turn, measure the borehole trajectory, and detect the coal-rock interface of the top and bottom plates of the coal seam. The radar acoustic wave profile obtained is processed and the coal-rock interface is interpreted, and the time profile is converted from time to depth to obtain the coal-rock interface information at a very close distance. The known data body is interpolated by the Kriging method to obtain an accurate and transparent geological working face model. Step one specifically includes the following sub-steps:

[0053] Step 11: Use the coiled tubing 5 to push the geological radar acoustic wave transmitter 25-1, the geological radar acoustic wave receiver 25-2 and the drilling trajectory inclinometer 26 into the upper coal seam horizontal borehole 27 and the lower coal seam horizontal borehole 28;

[0054] Step 12: Measure the drilling trajectories of the upper coal seam horizontal borehole 27 and the lower coal seam horizontal borehole 28, and use acoustic radar to collect data on the geological body (including the coal seam and its roof and floor) to obtain the acoustic radar time domain profile, such as Figure 3 As shown;

[0055] Step 13: Recover the coiled tubing 5, derive the drilling trajectory data, and calculate the absolute coordinates of the drilling trajectory according to the drilling trajectory data;

[0056] Step 14: On the acoustic radar time domain profile obtained in step 12, the reflected wave event axes of the upper coal seam 10 (or the lower coal seam 13) and the inter-coal rock mass 12 are tracked, and the radar wave propagation velocity of the coal seam is calculated by tunnel wave conversion; the acoustic radar time domain profile obtained in step 12 is subjected to spatial position constrained imaging processing to obtain a migration imaging profile, such as Figure 4 shown.

[0057] Step 15: Perform time-depth conversion on the acoustic wave profile according to the velocity field, and calculate the spatial coordinate positions of the top and bottom plates of the inter-coal seam rock mass 12 in combination with the drilling trajectory data derived in step 13;

[0058] Step 16: Repeat steps 11 to 15 to detect multiple coal seam horizontal boreholes (including the upper coal seam 10 at a very close distance and the lower coal seam 13 at a very close distance), combine the spatial coordinate positions of the top and bottom plates of the inter-coal seam rock mass 12 obtained in multiple steps 15, use the Kriging method to perform interpolation calculations on the area without borehole detection, and establish a three-dimensional data body of the upper and lower coal seams and interlayer rock masses of the working face.

[0059] Step 17: Based on the three-dimensional data bodies of the upper and lower coal seams and interlayer rock masses established in step 16, three-dimensional modeling software is used to perform geological modeling to obtain an accurate three-dimensional geological model.

[0060] Step 2: According to the three-dimensional geological model obtained in step 1, the borehole trajectory is designed in the model according to the stratum distribution to ensure that the directional horizontal long borehole 11 is located in the inter-coal seam rock mass 12; combined with the ground stress direction of the working face, the geological guidance technology is used to construct multiple directional horizontal long boreholes 11 in the inter-coal seam rock mass 12 along the minimum horizontal principal stress; adjacent directional horizontal long boreholes 11 are spaced a certain distance apart and can cover the working face. Step 2 specifically includes the following sub-steps:

[0061] Step 21: construct a Φ120 mm short borehole in the coal roadway 22 into the inter-coal rock mass 23, use hydraulic fracturing method to measure the maximum horizontal principal stress direction, and set the direction perpendicular to the maximum horizontal principal stress direction as the minimum principal stress direction.

[0062] Step 22: Applying geological guidance technology to construct directional horizontal long boreholes in the inter-coal seam rock mass 22 along the direction of minimum horizontal principal stress, means setting a group of directional horizontal long boreholes 11-1 to 11-16 in the transparent geological working face model constructed according to step 1, with the open hole diameter greater than or equal to Φ150mm, the strike of the directional horizontal long boreholes 11-1 to 11-16 along the minimum horizontal principal stress of the working face, and the length from the center of the hole to the upper and lower coal seams is 50% of the rock mass thickness; the wellbore trajectory control requires the inclination capability of the screw drill, and the wellbore trajectory position is determined according to the natural gamma, apparent resistivity, gas logging total hydrocarbons, components, rock cuttings and well inclination data measured while drilling, and the vertical depth is adjusted by increasing or decreasing the well inclination to control the wellbore trajectory within the center of the rock mass.

[0063] Step 23: The directional horizontal long boreholes 11-1 to 11-6 can fully cover the working face and have a length greater than 500m. Specifically, since they are arranged horizontally in the inter-coal seam rock mass, the expansion speed of the cracks in the inter-coal seam rock mass 13 is greater than the expansion speed of the cracks in the upper and lower coal seams, thereby pulling the cracks in the coal seam to extend rapidly in the horizontal direction, so the length of the cracks in the roof is greater than the length of the cracks in the coal seam. After a large number of physical similarity simulation tests and numerical simulation tests, the ratio of the length of the coal seam cracks in the coal seam to the length of the roof cracks is generally between 0.7 and 0.9. The spacing L of adjacent directional horizontal long boreholes 11-1 to 11-2, 11-2 to 11-3, 11-3 to 11-4, 11-4 to 11-5, and 11-5 to 11-5 is calculated according to formula (4), and the number N of directional horizontal long boreholes arranged in the mining area is calculated according to formula (5).

[0064]

[0065]

[0066] Where:

[0067] H=7.32e 1.03Q

[0068] Wherein, L is the spacing between adjacent horizontal directional long boreholes, m; N is the number of horizontal directional long boreholes, m; M is the length of the working face 30, m; γ is the ratio of the length of the coal seam crack to the length of the roof crack, generally between 0.7 and 0.9, dimensionless; C is the loss coefficient of the fracturing fluid, m / s 0.5 ; Q is the construction displacement, m 3 / s; H is the crack height, m; S p is the initial filtration loss of fracturing fluid, m 3 / m 2 ; μ is the viscosity of Newtonian fluid, Pa·s; G is the shear modulus of rock, Pa; v is the Poisson's ratio of rock; w(0, t) is the maximum width of the crack at the elliptical section at the crack mouth at time t, m; t is the time for the formal start of fracturing, s; x is the half length of the rectangular box under the KGD hydraulic fracture model, m; erfc(x) is the error compensation function of x.

[0069] Step 24, after the construction is completed, the directional horizontal long boreholes 11-1 to 11-16 are fully flushed until no sand chips are returned.

[0070] Step 3: Use flexible drilling tools to perform extremely small radius side drilling on all directional horizontal long boreholes, construct radial upper branch holes 18 and lower branch holes 19, and connect the upper and lower coal seams. The specific steps include the following:

[0071] Step 31: Install a gas-liquid separator at the orifice of the current directional horizontal long borehole 11 to prevent gas from exceeding the limit when drilling into a coal seam;

[0072] Step 32: Use a drill pipe to lower the deflection device into the directional horizontal long borehole 11 to the opening 20 of the first branch hole, rotate the drill pipe to adjust the orientation of the deflection device so that the deflection cone surface is vertically upward; seal the deflection device and recover the drill pipe;

[0073] Step 33: Install a bendable flexible drill tool at the front of the drill pipe, and then lower the bendable flexible drill tool to the opening 20 of the first branch hole. The drilling pressure is increased to 20 MPa to bend the flexible drill tool. The pressure is continuously increased, and the drill bit of the flexible drill tool drills to the upper coal seam to form an upper branch hole 18. When the drilling pressure is reduced to 2 MPa, it means that the coal seam has been connected, and the drill pipe is recovered to the opening 20 of the branch hole.

[0074] Preferably, the flexible drilling tool can adopt the elastic bend-joint directional coal mine underground directional drilling device disclosed in the Chinese patent application (application number: 202111213913.8, title: An elastic bend-joint directional coal mine underground directional drilling device and method).

[0075] Step 34: lower the whipstock unsealing unit into the directional horizontal long borehole 11, unseal the whipstock, adjust the orientation of the whipstock device so that the whipstock cone surface is vertically over the bottom; seal the whipstock device, and recover the drill pipe; and complete the construction of the lower branch hole 19 in the same manner as step 33;

[0076] Step 35: Recover the coiled tubing to the second branch hole opening 21. In order to prevent stress interference between the segments, the distance X between the first branch hole opening 20 and the second branch hole opening 21 is calculated using formula (6) according to the mine geological conditions. Repeat steps 32 to 34 to complete the construction of each branch hole from the right side to the left side of the directional horizontal long borehole 11.

[0077]

[0078] Where:

[0079]

[0080] Where X is the crack spacing, m; D is the number of crack segments, segments; K h is the horizontal permeability of the formation, 10 -3 μm 2 ; r w is the wellbore radius, m; U is the horizontal well section length, m; K i is the permeability difference coefficient, K v is the vertical permeability of the formation, 10 -3 μm 2; h is the coal seam thickness, m; α is the converted length, m; W f is the width of the supporting crack, m; K f is the permeability of the supporting fracture, 10 -3 μm 2 .

[0081] Step 36: Repeat steps 31 to 35 to complete the extremely small radius side drilling work of each directional horizontal long borehole 11-1 to 11-6 in turn to provide a fracture initiation channel for hydraulic fracturing.

[0082] Step 4: constructing a ground-tunnel through-hole 2 in the bottom extraction tunnel 17 facing the target coal seam on the ground;

[0083] This step specifically includes: constructing a ground-tunnel through-hole 2 from the ground to the bottom pumping tunnel 17, and the hole depth structure adopts a three-opening design to ensure that the continuous oil pipe 15 of the ground fracturing equipment is led to the underground working surface. The first opening is constructed from the surface to 10m below the bedrock, with a hole diameter greater than or equal to Φ300mm, a Φ255mm casing, and cementing; the second opening is drilled to 10m above the bottom pumping tunnel 17, with a hole diameter greater than or equal to Φ210mm, a Φ195mm casing, and cementing; the third opening is drilled to the bottom pumping tunnel 17, with a hole diameter greater than or equal to Φ150mm, and a Φ137mm casing; an anti-shake gasket is installed on the top of the bottom pumping tunnel 17, and a well-tunnel connection device is installed at the bottom of the well. The upper end of the well-tunnel connection device is sealed and connected to the ground oil pipe, and the end is sealed and connected to the underground high-pressure pipe to ensure the safety of the construction process. The whole hole is cored for geological logging, rock mechanics samples are taken from the coal seam roof and coal seam, and rock physical parameters such as tensile strength, shear modulus, Young's modulus, Poisson's ratio and filtration coefficient of the coal seam roof and coal seam are measured.

[0084] Step 5: Connecting the ground-underground through-hole 2 to the orifice device 7 of one of the directional horizontal long boreholes obtained in step 2 through a pressure-resistant pipeline underground;

[0085] Specifically, the high-pressure outlet of the ground fracturing equipment is connected to the horizontal wellhead device 7 of the directional horizontal long borehole 11-1 constructed in step 2 through a high-pressure resistant pipe, forming a transmission channel for the ground high-pressure fluid to the directional horizontal long borehole 11-1. During the extension of the underground tunnel, the straight section is connected with a steel oil pipe, and the high-pressure hose is used to connect at the place where the tunnel direction changes. Specifically, each section of the steel pipeline is 3m, connected with oil-resistant hose and placed on the side wall of the tunnel, and the inner diameter of the connecting pipeline is 1. Meet the requirements of large-volume fracturing.

[0086] Step 6: Use the surface fracturing equipment and the downhole coiled tubing equipment (including the coiled tubing vehicle 4, the coiled tubing 5 and the injection head vehicle 6) to work together to carry out staged fracturing construction on the current directional horizontal long borehole 11;

[0087] Step 61: First, perform a pipeline pressure test, open the surface fracturing wellhead 1, the surface-tunnel through-hole 2, and the pressure-resistant valve in the tunnel where the long borehole is planned to be constructed, close the long borehole fracturing wellhead, and start the surface fracturing equipment to perform a pipeline test. The pressure gradually increases from 70 MPa. There is no obvious pressure drop or leakage in the surface high-pressure manifold and the downhole high-pressure pipe and connecting device for 15 minutes, and the pressure test is qualified;

[0088] Step 62: Install the bottom seal dragging fracturing tool string 16 at the front end of the downhole coiled tubing 5; start the coiled tubing vehicle 4, and push the bottom seal dragging fracturing tool string 16 to the target layer section.

[0089] Step 63: Seal the packer; open the wellhead device 7 of the directional horizontal long borehole 11, open the ground fracturing equipment 1, and continuously inject high-pressure water into the directional horizontal long borehole 11 through the coiled tubing. Use the up-and-down well joint operation mode to inject high-pressure fracturing liquid into the coiled tubing, and use the jet fluid to increase the pressure to exceed the fracture pressure of the coal seam and the rock mass between the coal seams, so as to fully fracture and break the coal seam. Specifically, the displacement of the ground fracturing truck is greater than or equal to 5.0m 3 / min, the pressure is greater than or equal to 60MPa, the sand content of the sand mixing liquid is greater than or equal to 10%, and the abrasive is quartz sand of 50-70 mesh.

[0090] Step 64: After observing that the coal (rock) layer is fully fractured, the ground fracturing equipment 1 is closed.

[0091] Step 7: Unseal the bottom seal, drag the fracturing tool string 16, pull back the coiled tubing 15, and perform fracturing construction on the next branch hole until all the branch holes of the horizontal long borehole are completed;

[0092] After observing that the coal (rock) layer is fully fractured, push back the coiled tubing 15 to release the packer, pull back the coiled tubing (without blowing) and the bottom-drag fracturing tool string 16 to the next branch hole, repeat step six to perform ground-downhole combined fracturing operations, and complete the fracturing work of each branch hole of the current directional horizontal long borehole 11 from the inside out.

[0093] Step 8: Recover all the coiled tubing 15, close the orifice valve, move the coiled tubing equipment to the orifice of the next directional horizontal long borehole, repeat steps 5 to 7 to complete the fracturing construction of all other directional horizontal long boreholes 11-2 to 11-6; so that the upper coal seam 10 and the lower coal seam 13 at very close distances form a three-dimensional fracture network.

[0094] Specifically, in order to reduce the interference between the seams, the interval method is used to perform alternating fracturing on the well group. By changing the valve direction of the surface well-underground long borehole high-pressure connection device pre-installed in the bottom pumping lane 17, each directional horizontal long borehole is subjected to alternating staged fracturing. That is, the 11-1 hole is firstly fractured, followed by the 11-3 hole, then the 11-2 hole is fractured, then the 11-4 hole is fractured, and so on, to complete the continuous staged fracturing of all working faces in the mining area.

[0095] Step 9: Combined layer extraction is performed using a dedicated underground coal mine gas extraction pipeline. Specifically, since the upper and lower coal seams have been fracturing-modified in advance, a three-dimensional fracture network is formed in the coal seams, and the underground gas extraction system 29 is used to extract gas using negative pressure.

Claims

1. A method for preventing gas outbursts in coal seam wells with joint operation in close proximity. It is characterized in that The steps include: Step 1: Construction of a three-dimensional geological model of the coal seam with high accuracy and transparency at the working surface at very close range; Step 2: According to the three-dimensional geological model obtained in step 1, a borehole trajectory is designed in the model according to the stratum distribution to ensure that the directional horizontal long drill hole (11) is located in the inter-coal seam rock mass (12); in combination with the in-situ stress direction of the working face, a plurality of directional horizontal long drill holes (11) are constructed in the inter-coal seam rock mass (12) along the minimum horizontal principal stress using the geological guidance technology; adjacent directional horizontal long drill holes (11) are spaced a certain distance apart and can cover the working face; Step 3: Use flexible drilling tools to perform extremely small radius side drilling on all directional horizontal long boreholes, construct radial upper branch holes (18) and lower branch holes (19) to connect the upper and lower coal seams; Step 4: constructing a ground-tunnel through-hole (2) in the bottom extraction tunnel (17) facing the target coal seam on the ground; Step 5: Connecting the ground-underground through-hole (2) to the orifice device (7) of one of the directional horizontal long boreholes obtained in step 2 through a pressure-resistant pipeline underground; Step 6: Using the surface fracturing equipment and the downhole coiled tubing equipment to work together to carry out staged fracturing construction on the current directional horizontal long borehole (11); Step 7: Unseal the bottom seal and drag the fracturing tool string (16), pull back the coiled tubing (15), and perform fracturing construction on the next branch hole until all the branch holes of the horizontal long borehole are completed; Step 8: All the coiled tubing (15) is recovered, the orifice valve is closed, and the coiled tubing equipment is moved to the orifice of the next directional horizontal long borehole, and steps 5 to 7 are repeated to complete the fracturing construction of all other directional horizontal long boreholes (11-2 to 11-6); so that the upper coal seam (10) and the lower coal seam (13) at a very close distance form a three-dimensional fracture network; Step 9: Use the special gas extraction pipeline in the coal mine to carry out combined layer extraction.

2. The method for preventing gas outbursts in the coal seam wells with close distances and joint operation in the upper and lower layers according to claim 1, It is characterized in that The step 1 specifically includes the following sub-steps: Step 11: Use the continuous tubing (5) to push the geological radar sonic transmitter (25-1), the geological radar sonic receiver (25-2) and the borehole trajectory inclinometer (26) into the upper coal seam horizontal borehole (27) and the lower coal seam horizontal borehole (28); Step 12: measuring the drilling trajectories of the upper coal seam horizontal drilling hole (27) and the lower coal seam horizontal drilling hole (28), and simultaneously using an acoustic radar to collect data on the geological body to obtain an acoustic radar time domain profile; Step 13: Recover the coiled tubing (5), derive drilling trajectory data, and calculate the absolute coordinates of the drilling trajectory based on the drilling trajectory data; Step 14: on the acoustic radar time domain profile obtained in step 12, the reflected wave event axis of the upper coal seam (10) or the lower coal seam (13) and the rock mass (12) between the coal seams are tracked, and the radar wave propagation velocity of the coal seam is calculated by tunnel wave conversion; the acoustic radar time domain profile obtained in step 12 is subjected to spatial position constrained imaging processing to obtain a shifted imaging profile; Step 15: Perform time-depth conversion on the acoustic wave profile according to the velocity field, and calculate the spatial coordinate positions of the top and bottom plates of the inter-coal seam rock mass (12) in combination with the drilling trajectory data derived in step 13; Step 16: Repeat steps 11 to 15 to detect multiple coal seam horizontal boreholes, combine the spatial coordinate positions of the top and bottom plates of the inter-coal seam rock mass (12) obtained in multiple steps 15, perform interpolation calculations on the area without borehole detection, and establish a three-dimensional data body of the upper and lower coal seams and interlayer rock mass of the working face; Step 17: Based on the three-dimensional data bodies of the upper and lower coal seams and interlayer rock masses established in step 16, three-dimensional modeling software is used to perform geological modeling to obtain an accurate three-dimensional geological model.

3. The method for preventing coal seam gas extraction in close-range coal seam wells by joint operation in upper and lower layers as claimed in claim 1, It is characterized in that The step 2 specifically includes the following sub-steps: Step 21: construct a Φ120 mm short borehole in the coal roadway (22) into the inter-coal rock mass (23), use hydraulic fracturing method to measure the maximum horizontal principal stress direction, and set the direction perpendicular to the maximum horizontal principal stress direction as the minimum principal stress direction; Step 22: using the geosteering technology to construct directional horizontal long boreholes in the inter-coal seam rock mass (22) along the direction of the minimum horizontal principal stress, which means setting a group of directional horizontal long boreholes (11-1 to 11-16) in the transparent geological working face model constructed according to step 1, with the open hole diameter being greater than or equal to Φ150 mm, the strike of the directional horizontal long boreholes (11-1 to 11-16) being along the minimum horizontal principal stress of the working face, and the length from the center of the hole to the upper and lower coal seams is 50% of the rock mass thickness; Step 23: Directional horizontal long drilling (11-1 to 11-6) can fully cover the working surface, with a length greater than 500m; Step 24, after the construction is completed, the entire directional horizontal long borehole (11-1 to 11-16) is flushed until no sand debris is returned.

4. The method for preventing gas outbursts in the coal seam wells in close proximity to each other in the upper and lower combined operation and combined gas extraction area according to claim 1, It is characterized in that The step three specifically includes the following sub-steps: Step 31: Install a gas-liquid separator at the orifice of the current directional horizontal long borehole (11) to prevent gas from exceeding the limit when drilling into a coal seam; Step 32: using a drill pipe to lower a deflection device into the directional horizontal long borehole (11) to the opening of the first branch hole (20), rotating the drill pipe to adjust the orientation of the deflection device so that the deflection cone surface is vertically upward; sealing the deflection device and retrieving the drill pipe; Step 33: Install a bendable flexible drill tool at the front of the drill pipe, and then lower the bendable flexible drill tool to the opening of the first branch hole (20). The drilling pressure is increased to 20 MPa to bend the bendable flexible drill tool. The pressure is continuously increased, and the drill bit of the bendable flexible drill tool drills to the upper coal seam to form an upper branch hole (18). When the drilling pressure is reduced to 2 MPa, the drill pipe is recovered to the opening of the branch hole (20); then the bendable flexible drill tool changes the construction direction to construct a lower branch hole (19); Step 34: lowering the whipstock unsealing unit into the directional horizontal long borehole (11), unsealing the whipstock, adjusting the orientation of the whipstock device so that the whipstock cone surface is vertically downward; sealing the whipstock device, and recovering the drill pipe; and constructing the lower branch hole (19) in the same manner as step (33); Step 35: Recover the coiled tubing to the opening of the second branch hole (21), repeat steps 32 to 34, and complete the construction of each branch hole in sequence from the right side to the left side of the directional horizontal long borehole 11; Step 36: Repeat steps 31 to 35 to complete the extremely small radius side drilling work of each directional horizontal long borehole (11-1 to 11-6) in sequence to provide a fracture initiation channel for hydraulic fracturing.

5. The method for preventing gas outbursts in the coal seam wells with close distances and joint operation in the upper and lower layers according to claim 1, It is characterized in that The step 4 comprises the following operations: constructing a ground-tunnel through-hole (2) from the ground to the bottom pumping tunnel (17), wherein the hole depth structure adopts a three-opening design, wherein the first opening is constructed from the ground surface to 10 m below the bedrock, the hole diameter is greater than or equal to Φ300 mm, a Φ255 mm casing is installed, and cement is used for well cementing; the second opening is drilled to 10 m above the bottom pumping tunnel (17), the hole diameter is greater than or equal to Φ210 mm, a Φ195 mm casing is installed, and cement is used for well cementing; the third opening is drilled to the bottom pumping tunnel (17), the hole diameter is greater than or equal to Φ150 mm, and a Φ137 mm casing is installed.

6. The method for preventing coal seam gas extraction in close-range coal seam wells by joint operation in upper and lower layers as claimed in claim 1, It is characterized in that The step six includes the following sub-steps: Step 61: First, perform a pipeline pressure test, open the surface fracturing wellhead (1), the surface-tunnel through-hole (2) and the pressure-resistant valve in the tunnel where the long borehole is planned to be constructed, close the long borehole fracturing wellhead, start the surface fracturing equipment to perform a pipeline test, and the pressure gradually increases from 70MPa. There is no obvious pressure drop or leakage in the surface high-pressure manifold and the downhole high-pressure pipe and connecting device for 15 minutes, and the pressure test is qualified; Step 62: Install a bottom seal dragging fracturing tool string (16) at the front end of the downhole coiled tubing (5); start the coiled tubing vehicle (4), and push the bottom seal dragging fracturing tool string (16) to the target layer section position; Step 63: Sealing the packer; Open the wellhead device (7) of the directional horizontal long borehole (11), open the ground fracturing equipment (1), continuously inject high-pressure water into the directional horizontal long borehole (11) through the continuous oil pipe, use the up-and-down well combined operation mode to inject high-pressure fracturing liquid into the continuous oil pipe, use the injection fluid to increase the pressure to exceed the fracture pressure of the coal seam and the rock mass between the coal seams, and fully fracture and crush the coal seam; Step 64: After observing that the coal seam is sufficiently fractured, shut down the surface fracturing equipment (1).

Citation Information

Patent Citations

  • Elastic elbow directional coal mine underground directional drilling device and method

    CN114016910A

  • Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area

    CN102852546A

  • Efficient gas extraction method for up-and-down combined fracturing area of broken soft low-permeability coal seam well

    CN111535791A