Road network traffic control method, device and storage medium integrating path selection behavior

The license plate recognition system obtains traffic data, calculates the back pressure value and optimizes the signal cycle. Combined with the path selection behavior, the existing traffic signal control method solves the problem of uneven pressure on the road network and difficult real-time optimization during peak periods, and realizes the road The network pressure balance and the improvement of traffic efficiency.

CN116189426BActive Publication Date: 2024-11-12CENT SOUTH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211743192.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-30
Publication Date
2024-11-12
Estimated Expiration
2042-12-30

AI Technical Summary

Technical Problem

The existing traffic signal control method is difficult to effectively utilize the low-saturation section to divert high-saturation traffic during peak periods, resulting in uneven road pressure in the road network, and it is difficult to optimize in real time. Frequent signal changes lead to driver errors, data update speed and hardware requirements. High, difficult to satisfy.

Method used

The license plate recognition system obtains traffic data, calculates the reverse pressure value, optimizes the signal cycle based on the reverse pressure value and the intersection phase collection, combines the path selection behavior, and uses two signal cycles as the optimization cycle to reduce the data transmission volume and calculation difficulty, and reduces the Saturation and congestion of hot-spot road sections.

Benefits of technology

The road network pressure equalization is achieved, the saturation and high congestion state duration of hot-spot road sections are reduced, real-time control is ensured, data transmission volume and calculation difficulty are reduced, and traffic efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116189426B_ABST
    Figure CN116189426B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a road network traffic control method, device and computer storage medium integrating path selection behavior, including: obtaining the traffic flow data of each lane of a road section in an intersection in the current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle; obtaining the backpressure value of the road section according to the traffic flow data; obtaining the backpressure value of the intersection based on the backpressure values ​​of multiple road sections; confirming the order of each intersection phase in the next cycle based on the backpressure value of the intersection and the intersection phase collection of the current cycle; obtaining the timing plan of the intersection in the next cycle based on the order; using two signal cycles as an optimization cycle can not only ensure real-time control to a certain extent, but also reduce the data transmission volume and calculation difficulty. At the same time, the path selection behavior of the vehicle is taken into account, and the saturation of the hot section and the duration of the high congestion state can be reduced when the control is implemented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent traffic management and control technology, and in particular to a road network traffic control method, device and computer storage medium integrating path selection behavior. Background Art

[0002] In recent years, with the rapid development of my country's economy, people's living standards have been improving, and the number of motor vehicles has also increased. In terms of travel mode, more people choose private cars, which leads to frequent local congestion on urban roads.

[0003] Urban roads have very distinct characteristics. For roads with higher road grades, such as trunk roads and secondary trunk roads, during peak hours, they are often accompanied by multiple stops, crowded roads, and long waiting times. For urban roads, although there is a more obvious congestion during peak hours, not all roads are congested. Trunk roads, secondary trunk roads and other roads may have higher delays, but there are still secondary trunk roads and branch roads with low utilization rates. In this regard, how to effectively use sections with low saturation to divert traffic from sections with high saturation and achieve road network pressure balance has become a hot research issue.

[0004] Existing studies have improved traffic efficiency to a certain extent by optimizing intersection signal control schemes. However, most of them are single-cycle optimization or several-cycle optimization. In the study of periodic optimization, due to the need for multiple repeated calculations, there may be problems such as frequent signal changes and difficulty in real-time optimization. Signal control is a multi-cycle process. When the signal changes too frequently, it may cause drivers to make wrong judgments when passing through the intersection. Real-time optimization has high requirements for data update speed. At the same time, the running speed and feedback speed of large amounts of data also have high requirements for hardware, which are difficult to meet under objective conditions.

[0005] Although the trajectories of vehicles are different, there are always some hotspots with high path repetition rates in the road network of a certain area, and these sections are often road congestion points. For the traffic passing through these hotspots, due to the lack of good guidance measures, most vehicles choose to travel on these sections, resulting in traffic congestion. Summary of the invention

[0006] In view of this, the embodiments of the present invention provide a road network traffic control method, device and computer storage medium integrating path selection behavior, which periodically optimizes traffic signals through the connection between license plate recognition system-hierarchical optimization control-path selection behavior-road signal controller.

[0007] To achieve the above object, the technical solution of the present invention is achieved as follows:

[0008] In a first aspect, an embodiment of the present invention provides a road network traffic control method integrating path selection behavior, the method comprising:

[0009] Obtaining the traffic flow data of each lane in the road section of the intersection in the current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle;

[0010] Obtaining a counterpressure value of the road section according to the vehicle flow data, and obtaining a counterpressure value of the intersection based on the counterpressure values ​​of multiple road sections;

[0011] Determine the order of each intersection phase in the next cycle based on the back pressure value of the intersection and the intersection phase collection of the current cycle;

[0012] A timing plan for the intersection in the next cycle is obtained based on the sorting.

[0013] Before obtaining the traffic flow data of each lane of the road section in the intersection in the current cycle, the method further includes:

[0014] Divide the sub-regional road network based on the target road network;

[0015] Obtain data on the order in which vehicles pass through the collection points in the intersection in the current cycle, and determine the starting and ending points of the vehicle trip based on the data;

[0016] Determine the vehicle's cross-region travel route based on the result of dividing the sub-regions;

[0017] The path selection probability of the vehicle in the next cycle is calculated, and the route selected by the vehicle is determined based on this.

[0018] Wherein, dividing the sub-region road network based on the target road network includes:

[0019] The target road network is obtained, and the area where the target road network is located is divided into multiple sub-areas with expressways and trunk roads as sub-area boundaries, and intersections are selected at the area boundaries as control points for vehicles to travel across areas.

[0020] The step of determining the cross-region travel route of the vehicle according to the result of dividing the sub-regions includes:

[0021] Based on the vehicle start and end point data and the sub-areas, a regional driving route of the vehicle from the area where the starting point is located to the area where the end point is located is determined, wherein the vehicle only includes cross-regional travel vehicles.

[0022] The calculating of the path selection probability of the vehicle in the next cycle and determining the route selected by the vehicle based on the probability includes:

[0023] Calculate the probability of the vehicle choosing path k and determine the vehicle's driving route in the next cycle.

[0024]

[0025]

[0026] Where: P k The probability of the vehicle choosing path k; c k is the characteristic variable of path k, V k is the system utility; μ is a positive parameter; K rs is a set of paths; S k is the correction item;

[0027]

[0028] Where: l a is the length of section a; L k is the length of path k; Γ k is the set of road segments of path k; if road segment a is on path k, then δ aj =1, otherwise 0; C n is a set of paths; C n The shortest path length on .

[0029] Wherein, obtaining the back pressure value of the road section according to the vehicle flow data includes:

[0030] Get the traffic flow data of each lane in the intersection section in the current cycle, including:

[0031] The entrance lane l and the exit lane m of the intersection are numbered as l=1, 2, ...a, m=1, 2, ...b, respectively, where a, b≥1, the traffic flow data of the current lane is calculated by the license plate recognition system in the direction of each entrance lane, and the traffic flow data from l to m is obtained based on the turning rate corresponding to the lane; the back pressure value of the road section is obtained according to the traffic flow data;

[0032]

[0033] Where: The back pressure value w of the road section l,m (k); x l,m (k) represents the number of vehicles from section l to section m at time k; r m,h (k) represents the turning rate from section l to section m from time k to time k+1; r m,h (k)∈(0,1);O m Represents the downstream collection of segment m.

[0034] Wherein, the counterpressure value of the intersection is obtained based on the counterpressure values ​​of multiple road sections, including:

[0035]

[0036] Among them, U u represents the phase set of intersection u in the current cycle; u u represents the phase of intersection u; s l,m (k) represents the signal value from section l to section m from time k to time k+1; c l,m (k) represents the saturated flow rate of the traffic flow from section l to section m from time k to time k+1.

[0037] In a second aspect, an embodiment of the present invention provides a road network traffic control device integrating path selection behavior, the device comprising:

[0038] A first acquisition module is used to acquire the traffic flow data of each lane in the road section of the intersection in the current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle;

[0039] A first determination module, configured to obtain a back pressure value of the road section according to the vehicle flow data, and obtain a back pressure value of the intersection based on the back pressure values ​​of multiple road sections;

[0040] A second acquisition module is used to determine the order of each intersection phase in the next cycle based on the back pressure value of the intersection and the intersection phase collection of the current cycle;

[0041] The second determination module is used to obtain a timing plan for the intersection in the next cycle based on the sorting.

[0042] In a third aspect, an embodiment of the present invention provides a vehicle lane change prediction device, the device comprising: a processor and a memory for storing a computer program that can be run on the processor,

[0043] Wherein, the processor is used to implement the road network traffic control method integrating path selection behavior described in the first aspect when running the computer program.

[0044] In a fourth aspect, an embodiment of the present invention provides a computer storage medium storing a computer program, which, when executed by a processor, implements the road network traffic control method for integrating path selection behavior as described in the first aspect.

[0045] The embodiments of the present invention provide a road network traffic control method, device and computer storage medium integrating path selection behavior, including: obtaining the traffic flow data of each lane of a road section in an intersection in the current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle; obtaining the backpressure value of the road section according to the traffic flow data; obtaining the backpressure value of the intersection based on the backpressure values ​​of multiple road sections; confirming the order of each intersection phase in the next cycle based on the backpressure value of the intersection and the intersection phase collection of the current cycle; obtaining the timing plan of the intersection in the next cycle based on the order; in this way, using two signal cycles as an optimization cycle can not only ensure real-time control to a certain extent, but also reduce the data transmission volume and calculation difficulty. At the same time, the path selection behavior of the vehicle is taken into account, and the saturation of the hot section and the duration of the high congestion state can be reduced when implementing control. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 A schematic diagram of a flow chart of a road network traffic control method integrating path selection behavior provided by an embodiment of the present invention;

[0047] Figure 2 A schematic diagram of dividing a target road network into sub-areas provided in an embodiment of the present invention;

[0048] Figure 3 A plurality of cross-region route selection schemes for a vehicle to travel from region 1 to region 4 in an embodiment of the present invention;

[0049] Figure 4 A schematic diagram of the structure of a road network traffic control device integrating path selection behavior provided by an embodiment of the present invention;

[0050] Figure 5 A schematic diagram of the structure of another road network traffic control device integrating path selection behavior provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0051] The technical solution of the present invention is further elaborated in detail below in conjunction with the accompanying drawings and specific embodiments of the specification. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the technical field of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0052] See also Figure 1, a road network traffic control method integrating path selection behavior provided by an embodiment of the present invention can be executed by a road network traffic control device integrating path selection behavior provided by an embodiment of the present invention. The road network traffic control device integrating path selection behavior can be implemented in software and / or hardware. In a specific application, the road network traffic control device integrating path selection behavior can be a terminal such as a vehicle computer, a desktop computer, a laptop computer, a smart phone, a personal digital assistant, a tablet computer, or a cloud server. In this embodiment, taking the execution subject of the road network traffic control method integrating path selection behavior as a vehicle as an example, the road network traffic control method integrating path selection behavior includes the following steps:

[0053] Step 101: Obtaining traffic flow data of each lane of a road section in an intersection in a current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle;

[0054] Here, the traffic flow data of each lane in the road section of the intersection in the current cycle can be collected by a data collection device such as a camera set on the target road section. It should be noted that the traffic flow data may include vehicle operation data on the target road section for a period of time such as one day or one month, and may specifically include the number of vehicles and turning rate corresponding to the lane in the current cycle, and may also include information such as the size of each vehicle, the direction of travel, the speed of travel, the lane of travel, and whether there is lane change behavior.

[0055] Step 102: obtaining a counterpressure value of the road section according to the vehicle flow data, and obtaining a counterpressure value of the intersection based on the counterpressure values ​​of multiple road sections;

[0056] Step 103: Determine the order of each intersection phase in the next cycle based on the back pressure value of the intersection and the intersection phase collection of the current cycle;

[0057] Step 104: Obtain a timing plan for the intersection in the next cycle based on the sorting.

[0058] Through the above implementation methods, on the one hand, the method obtains intersection traffic flow data through the urban road license plate recognition system, takes the counter-pressure index as the road pressure feedback index, and combines the double-layer optimization model to construct an urban area road network traffic control model; at the same time, the path selection behavior is taken into consideration, and part of the traffic flow is taken as the optimization object, so as to further optimize the road network control strategy with the goal of ensuring the best traffic efficiency of the traffic flow; on the other hand, using two signal cycles as an optimization cycle can not only ensure a certain degree of real-time control, but also reduce the amount of data transmission and the difficulty of calculation. At the same time, the path selection behavior of the vehicle is taken into consideration, and the saturation of the hot section and the duration of the high congestion state can be reduced when implementing the control.

[0059] In one embodiment, before obtaining the traffic flow data of each lane of the road section in the intersection in the current cycle, the method further includes:

[0060] Divide the sub-regional road network based on the target road network;

[0061] Obtain data on the order in which vehicles pass through the collection points in the intersection in the current cycle, and determine the starting and ending points of the vehicle trip based on the data;

[0062] Determine the vehicle's cross-region travel route based on the result of dividing the sub-regions;

[0063] The path selection probability of the vehicle in the next cycle is calculated, and the route selected by the vehicle is determined based on this.

[0064] In one embodiment, dividing the sub-region road network based on the target road network includes:

[0065] The target road network is obtained, and the area where the target road network is located is divided into multiple sub-areas with expressways and trunk roads as sub-area boundaries, and intersections are selected at the area boundaries as control points for vehicles to travel across areas.

[0066] In one embodiment, determining the vehicle's cross-region travel route according to the result of dividing the sub-regions includes:

[0067] Based on the vehicle start and end point data and the sub-areas, a regional driving route of the vehicle from the area where the starting point is located to the area where the end point is located is determined, wherein the vehicle only includes cross-regional travel vehicles.

[0068] In one embodiment, calculating the path selection probability of the vehicle in the next cycle and determining the route selected by the vehicle based on the path selection probability includes:

[0069] Calculate the probability of the vehicle choosing path k and determine the vehicle's driving route in the next cycle.

[0070]

[0071]

[0072] Where: P k The probability of the vehicle choosing path k; c k is the characteristic variable of path k, V k is the system utility; μ is a positive parameter; K rs is a set of paths; S k is the correction item;

[0073]

[0074] Where: l a is the length of section a; Lk is the length of path k; Γ k is the set of road segments of path k; if road segment a is on path k, then δ aj =1, otherwise 0; C n is a set of paths; C n The shortest path length on .

[0075] In one implementation, obtaining the back pressure value of the road section according to the vehicle flow data includes:

[0076] Get the traffic flow data of each lane in the intersection section in the current cycle, including:

[0077] The entrance lane l and the exit lane m of the intersection are numbered as l=1, 2, ...a, m=1, 2, ...b, respectively, where a, b≥1, the traffic flow data of the current lane is calculated by the license plate recognition system in the direction of each entrance lane, and the traffic flow data from l to m is obtained based on the turning rate corresponding to the lane; the back pressure value of the road section is obtained according to the traffic flow data;

[0078]

[0079] Where: The back pressure value w of the road section l,m (k); x l,m (k) represents the number of vehicles from section l to section m at time k; r m,h (k) represents the turning rate from section l to section m from time k to time k+1; r m,h (k)∈(0,1);O m Represents the downstream collection of segment m.

[0080] In one embodiment, obtaining the counterpressure value of the intersection based on the counterpressure values ​​of the plurality of road sections includes:

[0081]

[0082] Among them, U u represents the phase set of intersection u in the current cycle; u u represents the phase of intersection u; s l,m (k) represents the signal value from section l to section m from time k to time k+1; c l,m (k) represents the saturated flow rate of the traffic flow from section l to section m from time k to time k+1.

[0083] Based on the same inventive concept as the above-mentioned embodiment, this embodiment describes the technical solution of the above-mentioned embodiment in detail through specific examples.

[0084] Embodiment 1

[0085] The road network traffic control method integrating path selection behavior specifically comprises the following steps:

[0086] S1: Based on the actual road network conditions, the study area is divided into multiple sub-areas with expressways, trunk roads and other roads with large traffic capacity as sub-area boundaries, and intersections are selected at the regional boundaries as control points for vehicles to travel across regions.

[0087] S2: Obtain the order in which vehicles pass through the collection points in the current cycle. According to the flow data, the intersection location where the vehicle is recorded can be determined, thereby forming the vehicle travel start and end point data.

[0088] S3: Combine the start and end point data with the sub-region division results to determine the regional travel route of the vehicle from the region where the start point is located to the region where the end point is located. The vehicles analyzed here only include cross-regional travel vehicles, and vehicles whose start and end points are located in the same sub-region are not analyzed.

[0089] S4: Determine the vehicle's driving route in the next cycle by calculating the probability of selecting path k.

[0090]

[0091]

[0092] Where: P k is the probability of selecting path k; c k and V k are the characteristic variables and system utility of path k respectively; μ is a positive parameter; K rs is the set of paths on OD to rs; S k For correction items.

[0093]

[0094] Where: l a is the length of section a; L k is the length of path k; Γ k is the set of road segments of path k; if road segment a is on path k, then δ aj =1, otherwise 0; C n is a set of paths; C n The shortest path length on .

[0095] S5: The entrance lanes and exit lanes of the intersection are numbered as l=1, 2, ..., m=1, 2, .... The traffic flow data of the current lane is calculated by the license plate recognition system in the direction of each entrance lane, and combined with the actual lane turning, the traffic flow data from l to m is obtained.

[0096] In an optimization cycle, the collected traffic flow data is added to the traffic flow after path selection to solve the road section back pressure value w. l,m (k):

[0097]

[0098] Where: x l,m (k) represents the number of vehicles from section l to section m at time k; r m,h (k) represents the turning rate from section l to section m from time k to time k+1, r m,h (k)∈(0,1); O m Represents the downstream collection of segment m.

[0099] S6: After obtaining the back pressure value of the road section, the back pressure value y of the entire intersection can be further calculated u (k):

[0100]

[0101] Among them, U u represents the phase set of intersection u; u u represents the phase of intersection u; s l,m (k) represents the signal value from section l to section m from time k to time k+1; c l,m (k) represents the saturated flow rate of the traffic flow from section l to section m from time k to time k+1.

[0102] S7: After obtaining the back pressure value of the road section, the back pressure value γ(k) of the road network can be calculated:

[0103]

[0104] Among them, δ l is the weight coefficient of section l, which is used to balance the delay time of different sections in the road network.

[0105] S8: Construct an optimization function based on the calculated road network back pressure value:

[0106] max Z=γ(k)

[0107] st∑u n (k) = 1

[0108]

[0109] Among them, among them, represents the number of vehicles from section l to section m at time k; represents the traffic demand of path p from time k to time k+1; Represents the number of vehicles from section l to section m from time k to time k+1.

[0110] The optimization goal is to obtain the optimal back pressure value obtained in step S7. The constraints include two aspects. On the one hand, for the intersection u, the phase un at time k has two forms: open and closed, which are 1 and 0 respectively. At time k, the cumulative sum of the phase un of the entire intersection is 1, ensuring that only a single phase is in an open state.

[0111] On the other hand, for road p, the pressure index can be calculated through data collected in different periods. However, for sections with both input and output traffic, both input and output situations need to be considered at the same time. Only considering the pressure index value may result in a situation where it exceeds the road performance, making the solution meaningless. Therefore, it is necessary to constrain the road bearing capacity.

[0112] S8: The road section backpressure value calculated in step S5 can be used to determine the phase with the maximum road section backpressure value under the current signal timing scheme. This phase has priority in the next optimization cycle.

[0113] S9: Calculate the signal timing plan for the next optimization cycle based on the determined signal cycle. Considering that some sections of urban roads may be oversaturated, the concept of Webster's effective green light time is added with the maximum intersection capacity and the minimum average vehicle delay as the objective function, and the model with a single phase satisfying the critical condition as the constraint:

[0114] max

[0115] min

[0116] st

[0117] Where Q is the intersection capacity; S ij is the saturation flow rate of the j lane group in the i phase; g i is the effective green light time of phase i, C is the intersection cycle; d is the average delay of each vehicle at the intersection; q ij is the flow rate of lane group j in phase i; d ij is the average delay of the j lane group in the phase; y i is the flow ratio of phase i; Y is the total flow ratio of the intersection; L is the total loss time per cycle; C min is the minimum cycle time; C max is the maximum cycle time.

[0118] Due to the large differences in road grades in urban road networks, intersections are divided into two categories according to signal cycle time: large-cycle intersections and small-cycle intersections. To ensure the stability of coordinated control, the signal cycle of large-cycle intersections is twice that of small-cycle intersections.

[0119] S10: Feedback the obtained signal timing plan to the road signal controller, and then collect the traffic flow data in the next optimization cycle, and return to step S4 to perform the next cycle optimization.

[0120] Furthermore, the duration of an optimized cycle is twice the duration of the signal timing scheme for the large cycle intersection.

[0121] Furthermore, the weight coefficient δ l The value of is 1.

[0122] In the road network traffic control method integrating the path selection behavior provided in this embodiment, the actual traffic state of the road is reflected by the road section back pressure value, which is easy to calculate through basic data. Through the coordinated operation of the four parts of the license plate recognition system-hierarchical optimization control-path selection behavior-road signal controller, the signal control can be optimized periodically. Using two signal cycles as an optimization cycle can not only ensure real-time control to a certain extent, but also reduce the amount of data transmission and the difficulty of calculation. At the same time, since the path selection behavior of the vehicle is taken into account, the saturation of the hot section and the duration of the high congestion state can be reduced when the control is implemented, so it has a strong application prospect.

[0123] Embodiment 2

[0124] See also Figures 2 to 3 The road network traffic control method integrating path selection behavior specifically comprises the following steps:

[0125] Step 1: Divide the road network into four sub-area road networks according to the sub-area division method mentioned in this method.

[0126] Step 2: In the first optimization cycle, the time sequence of vehicle passing is counted through the data collection points on the road section. This information is combined with the actual turning situation of the lane to determine the starting and ending points of the vehicle.

[0127] Step 3: Combine the vehicle starting and ending points and the sub-region division results to filter the vehicle information with cross-region travel behavior.

[0128] Step 4: Calculate the vehicle selection probability and determine the vehicle driving route based on the vehicle information obtained by screening according to this method.

[0129] Step 5, calculating the back pressure values ​​of the road section, intersection, and road network respectively by the sum of the number of vehicles obtained in step 2 and the number of vehicles obtained in step 4.

[0130] Step 6: Based on the road section backpressure value result obtained in step 5, the backpressure values ​​of each turn at a single intersection can be compared to obtain the phase with priority.

[0131] Step 7: According to the setting principle of large and small cycles, 180 seconds and 90 seconds are used as the cycle lengths of large and small cycle intersections respectively, and the signal control plan for each intersection in the next optimization cycle is calculated.

[0132] Step 8, the obtained signal control scheme is fed back to the signal control machine of the simulated road network, and the operation continues. Then, the process returns to step 4, and the vehicle path selection situation in the next optimization cycle is obtained and the vehicle flow data is counted.

[0133] In this way, using two signal cycles as an optimization cycle can not only ensure real-time control to a certain extent, but also reduce the amount of data transmission and the difficulty of calculation.

[0134] Based on the same inventive concept as the above embodiments, see Figure 4 , which shows a road network traffic control device integrating path selection behavior provided by an embodiment of the present invention, the device comprising:

[0135] The first acquisition module 21 is used to acquire the traffic flow data of each lane in the road section of the intersection in the current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle;

[0136] A first determination module 22, configured to obtain a back pressure value of the road section according to the vehicle flow data, and obtain a back pressure value of the intersection based on the back pressure values ​​of multiple road sections;

[0137] A second acquisition module 23 is used to determine the order of each intersection phase in the next cycle based on the back pressure value of the intersection and the intersection phase collection of the current cycle;

[0138] The second determining module 24 is used to obtain a timing plan for the intersection in the next cycle based on the sorting.

[0139] It should be noted that: the road network traffic control device with integrated path selection behavior provided in the above embodiment only uses the division of the above program modules as an example to illustrate when implementing the road network traffic control method with integrated path selection behavior. In actual applications, the above processing can be assigned to different program modules as needed, that is, the internal structure of the road network traffic control device with integrated path selection behavior is divided into different program modules to complete all or part of the processing described above. In addition, the road network traffic control device with integrated path selection behavior provided in the above embodiment and the corresponding road network traffic control method with integrated path selection behavior belong to the same concept. The specific implementation process is detailed in the method embodiment and will not be repeated here.

[0140] The embodiment of the present invention provides a road network traffic control device integrating path selection behavior, such as Figure 5 As shown, the device includes: a processor 110 and a memory 111 for storing a computer program that can be run on the processor 110; wherein, Figure 5 The processor 110 shown in the figure is not used to indicate that the number of the processor 110 is one, but is only used to indicate the positional relationship of the processor 110 relative to other devices. In actual applications, the number of the processor 110 may be one or more; similarly, Figure 5 The memory 111 shown in the figure has the same meaning, that is, it is only used to refer to the position relationship of the memory 111 relative to other devices. In practical applications, the number of memories 111 can be one or more. When the processor 110 runs the computer program, the above-mentioned vehicle lane change prediction method is implemented.

[0141] The device also includes: at least one network interface 112. The various components in the device are coupled together via a bus system 113. It is understood that the bus system 113 is used to achieve connection and communication between these components. In addition to the data bus, the bus system 113 also includes a power bus, a control bus, and a status signal bus. However, for the sake of clarity, Figure 5 Various buses are labeled as bus system 113 .

[0142] The memory 111 may be a volatile memory or a nonvolatile memory, or may include both volatile and nonvolatile memories. The nonvolatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a ferromagnetic random access memory (FRAM), a flash memory, a magnetic surface memory, an optical disk, or a compact disc read-only memory (CD-ROM); the magnetic surface memory may be a disk memory or a tape memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), synchronous static random access memory (SSRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM, SyncLink Dynamic Random Access Memory), and direct RAM bus random access memory (DRRAM, Direct Rambus Random Access Memory).The memory 111 described in the embodiments of the present invention is intended to include but is not limited to these and any other suitable types of memories.

[0143] The memory 111 in the embodiment of the present invention is used to store various types of data to support the operation of the device. Examples of these data include: any computer program used to operate on the device, such as an operating system and an application; contact data; phone book data; messages; pictures; videos, etc. Among them, the operating system includes various system programs, such as a framework layer, a core library layer, a driver layer, etc., which are used to implement various basic services and process hardware-based tasks. The application program may include various applications, such as a media player (Media Player), a browser (Browser), etc., which are used to implement various application services. Here, the program that implements the method of the embodiment of the present invention may be included in the application program.

[0144] This embodiment also provides a computer storage medium, in which a computer program is stored. The computer storage medium may be a ferromagnetic random access memory (FRAM), a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a flash memory, a magnetic surface memory, an optical disk, or a compact disc read-only memory (CD-ROM); it may also be various devices including one or any combination of the above memories, such as a mobile phone, a computer, a tablet device, a personal digital assistant, etc. When the computer program stored in the computer storage medium is executed by the processor, the above-mentioned vehicle lane change prediction method is implemented. For the specific steps implemented when the computer program is executed by the processor, please refer to Figure 1 The description of the illustrated embodiment will not be repeated here.

[0145] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0146] In this document, the terms "comprises," "comprising," or any other variations thereof, are intended to cover a non-exclusive inclusion of elements other than those listed and may also include additional elements not expressly listed.

[0147] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A road network traffic control method integrating path selection behavior, characterized in that: The method comprises: Obtaining the traffic flow data of each lane in the road section of the intersection in the current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle; Obtaining a counterpressure value of the road section according to the vehicle flow data, and obtaining a counterpressure value of the intersection based on the counterpressure values ​​of multiple road sections; Determine the order of each intersection phase in the next cycle based on the back pressure value of the intersection and the intersection phase collection of the current cycle; Based on the sorting, a timing plan for the intersection in the next cycle is obtained; Before obtaining the traffic flow data of each lane in the road section of the intersection in the current cycle, the method further includes: Divide the sub-regional road network based on the target road network; Obtain data on the order in which vehicles pass through the collection points in the intersection in the current cycle, and determine the starting and ending points of the vehicle trip based on the data; Determine the vehicle's cross-region travel route based on the result of dividing the sub-regions; Calculate the path selection probability of the vehicle in the next cycle and determine the route selected by the vehicle based on this; The calculating of the path selection probability of the vehicle in the next cycle and determining the route selected by the vehicle based on the path selection probability includes: Calculate the probability of the vehicle choosing path k and determine the vehicle's driving route in the next cycle. Where: P k The probability of the vehicle choosing path k; c k is the characteristic variable of path k, V k is the system utility; μ is a positive parameter; k rs is a set of paths; S k is the correction item; Among them: a is the length of section a; L k is the length of path k; Γ k is the set of road segments of path k; if road segment a is on path k, then δ aj =1, otherwise 0; C n is a set of paths; C n The shortest path length on ; The step of obtaining the back pressure value of the road section according to the vehicle flow data includes: Get the traffic flow data of each lane in the intersection section in the current cycle, including: The entrance lane l and the exit lane m of the intersection are numbered as l=1, 2, ...a, m=1, 2, ...b, respectively, where a, b≥1, the traffic flow data of the current lane is calculated by the license plate recognition system in the direction of each entrance lane, and the traffic flow data from l to m is obtained based on the turning rate corresponding to the lane; the back pressure value of the road section is obtained according to the traffic flow data; Where: The back pressure value w of the road section l,m (k); x l,m (k) represents the number of vehicles from section l to section m at time k; r m,h (k) represents the turning rate from section l to section m from time k to time k+1; r m,h (k)∈(0,1); O m Represents the downstream collection of segment m.

2. The road network traffic control method integrating path selection behavior according to claim 1 is characterized in that: The dividing of the sub-region road network based on the target road network includes: The target road network is obtained, and the area where the target road network is located is divided into multiple sub-areas with expressways and trunk roads as sub-area boundaries, and intersections are selected at the area boundaries as control points for vehicles to travel across areas.

3. The road network traffic control method integrating path selection behavior according to claim 1 is characterized in that: The step of determining a vehicle's cross-region travel route according to the result of dividing the sub-regions includes: Based on the vehicle start and end point data and the sub-areas, a regional driving route of the vehicle from the area where the starting point is located to the area where the end point is located is determined, wherein the vehicle only includes cross-regional travel vehicles.

4. The road network traffic control method integrating path selection behavior according to claim 2 is characterized in that: The method of obtaining the counterpressure value of the intersection based on the counterpressure values ​​of the plurality of road sections includes: Among them, U u represents the phase set of intersection u in the current cycle; u u represents the phase of intersection u; s l,m (k) represents the signal value from section l to section m from time k to time k+1; c l,m (k) represents the saturated flow rate of the traffic flow from section l to section m from time k to time k+1.

5. A road network traffic control device integrating path selection behavior, characterized in that: The device comprises: The first acquisition module is used to acquire the traffic flow data of each lane of the road section in the intersection in the current cycle, wherein the traffic flow data includes the number of vehicles and the turning rate corresponding to the lane in the current cycle; before acquiring the traffic flow data of each lane of the road section in the intersection in the current cycle, it also includes: Divide the sub-regional road network based on the target road network; Obtain data on the order in which vehicles pass through the collection points in the intersection in the current cycle, and determine the starting and ending points of the vehicle trip based on the data; Determine the vehicle's cross-region travel route based on the result of dividing the sub-regions; Calculate the path selection probability of the vehicle in the next cycle and determine the route selected by the vehicle based on this; The calculating of the path selection probability of the vehicle in the next cycle and determining the route selected by the vehicle based on the path selection probability includes: Calculate the probability of the vehicle choosing path k and determine the vehicle's driving route in the next cycle. Where: P k The probability of the vehicle choosing path k; c k is the characteristic variable of path k, V k is the system utility; μ is a positive parameter; K rs is a set of paths; S k is the correction item; Among them: a is the length of section a; L k is the length of path k; Γ k is the set of road segments of path k; if road segment a is on path k, then δ aj =1, otherwise 0; C n is a set of paths; C n The shortest path length on ; The step of obtaining the back pressure value of the road section according to the vehicle flow data includes: Get the traffic flow data of each lane in the intersection section in the current cycle, including: The entrance lane l and the exit lane m of the intersection are numbered as l=1, 2, ...a, m=1, 2, ...b, respectively, where a, b≥1, the traffic flow data of the current lane is calculated by the license plate recognition system in the direction of each entrance lane, and the traffic flow data from l to m is obtained based on the turning rate corresponding to the lane; the back pressure value of the road section is obtained according to the traffic flow data; Where: The back pressure value w of the road section l,m (k); x l,m (k) represents the number of vehicles from section l to section m at time k; r m,h (k) represents the turning rate from section l to section m from time k to time k+1; r m,h (k)∈(0,1); O m represents the downstream collection of segment m; A first determination module, configured to obtain a back pressure value of the road section according to the vehicle flow data, and obtain a back pressure value of the intersection based on the back pressure values ​​of multiple road sections; A second acquisition module is used to determine the order of each intersection phase in the next cycle based on the back pressure value of the intersection and the intersection phase collection of the current cycle; The second determination module is used to obtain a timing plan for the intersection in the next cycle based on the sorting.

6. A computer device, characterized in that: include: a processor and a memory for storing a computer program capable of being executed on the processor; Wherein, when the processor is used to run the computer program, it implements the road network traffic control method integrating path selection behavior as described in any one of claims 1 to 4.

7. A computer storage medium, characterized in that: The computer storage medium stores a computer program, wherein the computer program is executed by a processor to implement the road network traffic control method of the fused path selection behavior described in any one of claims 1 to 4.