An AGC allocation method for controlling the operating time of a hydro-generator unit.
By using the AGC program to calculate and dynamically adjust the unit's operating time in real time, and combining the unit's oscillation and head load data, the AGC allocation of the hydropower unit is optimized, which solves the complexity problem of high-head units in the restricted operating area and achieves consistency and stability of the unit's operating time.
Patent Information
- Application Number
- CN202310267807.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-20
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-03-20
AI Technical Summary
The complexity of operation and vibration range of high-head, large-capacity hydropower units in restricted operating areas leads to complex AGC control and unit operating condition selection. Existing technologies are unable to effectively adjust the unit start-up and shutdown priorities to reduce the duration of restricted operation.
The AGC program calculates the running time of each unit in the restricted operating area in real time, dynamically adjusts the priority of unit start-up and shutdown, and adjusts the restricted operating area in combination with unit oscillation data and water head and load-related data to ensure that the running time of each unit is consistent, avoid excessively long operating intervals, and optimize operating conditions.
This achieved consistency in the restricted operating time of each unit, reduced the time the units spent in the restricted operating area, improved the safety and stability of unit operation, and optimized the AGC control effect.
Smart Images

Figure CN116201680B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of hydro-generators, and more specifically, to an AGC (Automatic Guided Control) allocation method for controlling and limiting the operating time of a hydro-generator set. Background Technology
[0002] Currently, most hydropower stations utilize AGC (Automatic Generation Control) functions to remotely regulate the active power of their generator units, maintaining system frequency or ensuring predetermined power exchange between regions. For high-head, large-capacity hydropower units, the operating conditions are complex, including operable zones, restricted operating zones, and vibration zones. This makes AGC control and the selection of unit operating conditions particularly important and complex. Therefore, we propose an improved AGC allocation method for the restricted operating time of hydropower generator units. This method minimizes the requirements of power plant units during restricted operating periods, allowing for timely adjustment of unit start-up and shutdown priorities based on load demand, and dynamic adjustment of the restricted operating zone range in the AGC program. This real-time dynamic adjustment of the restricted operating zone ensures the safe and stable operation of the units. Summary of the Invention
[0003] The purpose of this invention is to address the problems raised in the existing background technology. In order to achieve the above-mentioned purpose, this invention provides the following technical solution: an AGC allocation method for the limited operating time of a hydro-generator unit. Step 1: The AGC program calculates the annual operating time of each unit in the limited operating area in real time. Through the limited operating area interval defined in the program, the intermediate variable "# unit enters the limited operating area" is used. The program automatically accumulates the action time of the measuring point until the return time. The operating time T = the previous accumulated time (t1) + the time from the current action to the return time (t2). The accumulated data is cleared to zero at 0:00 on January 1st of each year, and the calculation starts again.
[0004] Step 2: The AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time in the unit's restricted operating area. Units with shorter cumulative running time are given priority to start up, and units with longer cumulative running time are given priority to shut down.
[0005] Step 3: The AGC program dynamically adjusts the unit's restricted operating area based on the unit's oscillation data, head, and load-related data to ensure the unit's restricted operating area is correct.
[0006] As a preferred technical solution of the present invention, in step two, the AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time of the unit's restricted operating area, setting "unit start-up priority" and "unit shutdown priority". When the unit with the longest accumulated running time in the restricted operating area has the highest shutdown priority, the unit with the shortest accumulated running time in the restricted operating area has the highest start-up priority.
[0007] As a preferred technical solution of the present invention, in step three, based on the relationship between the unit vibration data (Z), head (H), and load (P), the range of Z measurement values corresponding to the restricted operating area under the same H is statistically analyzed, which is the current restricted operating area of the unit.
[0008] As a preferred technical solution of the present invention, the AGC program adjusts the restricted operating area to a prohibited operating area for units that have been running in the restricted operating area for too long, thereby reducing the operating time in the restricted operating area and realizing dynamic adjustment.
[0009] As a preferred technical solution of the present invention, the AGC allocation method for controlling and limiting the operating time of a hydro-generator unit utilizes unit oscillation data, head, and load-related data, and combines the relevant data with the operating time of each unit under each load interval to calculate the unit oscillation and load data under different heads, thereby obtaining the real-time optimal unit operating conditions.
[0010] As a preferred technical solution of the present invention, statistical and computational data are sent to the AGC program for logical judgment. The AGC program includes single-machine load instructions and unit start-up and shutdown priority.
[0011] As a preferred technical solution of the present invention, the AGC program outputs the single-machine load command and the priority of the start-up and shutdown of the AGC unit, so as to ensure that the limited running time of each generator unit is the shortest and the time of each unit is basically consistent.
[0012] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0013] In the solution of the present invention:
[0014] 1. The AGC program calculates the running time of each unit in the restricted operating area in real time, adjusts the unit start-up and shutdown priority in a timely manner based on the running time, dynamically adjusts the restricted operating area of the unit based on the unit oscillation data, head, load and related data, and adjusts the restricted operating area to the prohibited operating area for units with excessive running time in the restricted operating area, thereby ensuring that the running time of all units in the restricted operating area is consistent.
[0015] 2. The AGC (Automatic Guided Control) allocation method for limiting the operating time of hydro-generator units utilizes unit oscillation data, head, and load-related data, combined with the operating time of each unit in each load interval. First, it calculates the unit oscillation and load conditions under different heads to obtain the real-time optimal unit operating conditions. All statistical and computational data are sent to the AGC program for logical judgment. The AGC program outputs individual unit load commands and unit start-up / shutdown priorities for participating units, ensuring that the limited operating time of each generator unit is minimized and that the time for each unit is basically consistent. Attached image description:
[0016] Figure 1 The structural flowchart provided for this invention. Detailed Implementation
[0017] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are specific implementations of the present invention and are not limited to all embodiments.
[0018] Therefore, the following detailed description of embodiments of the present invention is not intended to limit the scope of the claimed invention, but merely illustrates some embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.
[0019] It should be noted that, in the absence of conflict, the embodiments and features and technical solutions in the embodiments of the present invention can be combined with each other. It should be noted that similar reference numerals and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.
[0020] Example 1: Please refer to Figure 1 An AGC allocation method for controlling the limited operating time of a hydro-generator unit includes the following steps: Step 1: The AGC program calculates the annual operating time of each unit in the restricted operating area in real time. Using the unit restricted operating area interval defined in the program, the intermediate variable "# unit enters the restricted operating area" is used. The program automatically accumulates the measurement point action to the reset time. The operating time T = the previous accumulated time (t1) + the current action to the reset time (t2). The accumulated data is cleared to zero at 0:00 on January 1st of each year, and the calculation starts again.
[0021] Step 2: The AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time in the unit's restricted operating area. Units with shorter cumulative running time are given priority to start up, and units with longer cumulative running time are given priority to shut down.
[0022] Step 3: The AGC program dynamically adjusts the unit's restricted operating area based on the unit's oscillation data, head, and load-related data to ensure the unit's restricted operating area is correct.
[0023] In step two, the AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time of the unit's restricted operating area, setting "unit start-up priority" and "unit shutdown priority". The unit with the longest accumulated running time in the restricted operating area has the highest shutdown priority, and the unit with the shortest accumulated running time in the restricted operating area has the highest start-up priority.
[0024] In step three, based on the relationship between the unit vibration data (Z), head (H), and load (P), the range of Z values corresponding to the restricted operating area under the same H is statistically analyzed, which is the current restricted operating area of the unit.
[0025] The AGC program adjusts the restricted operating zone to a prohibited operating zone for units that have been running in the restricted operating zone for too long, thereby reducing the time spent in the restricted operating zone and enabling dynamic adjustment.
[0026] The AGC allocation method for controlling and limiting the operating time of hydro-generator units utilizes unit oscillation data, head, and load-related data, and combines these data with the operating time of each unit under different load intervals to calculate the unit oscillation and load data under different heads, thereby obtaining the real-time optimal unit operating conditions.
[0027] The statistical and computational data are sent to the AGC program for logical judgment. The AGC program includes single-unit load commands and unit start-up and shutdown priorities.
[0028] The AGC program outputs individual load commands and start / stop priority for participating AGC units, ensuring that the limited operating time of each generator unit is minimized and that the time for each unit is basically consistent.
[0029] Example 2: Please refer to Figure 1 An AGC allocation method for controlling the limited operating time of a hydro-generator unit includes the following steps: Step 1: The AGC program calculates the annual operating time of each unit in the restricted operating area in real time. Using the unit restricted operating area interval defined in the program, the intermediate variable "# unit enters the restricted operating area" is used. The program automatically accumulates the measurement point action to the reset time. The operating time T = the previous accumulated time (t1) + the current action to the reset time (t2). The accumulated data is cleared to zero at 0:00 on January 1st of each year, and the calculation starts again.
[0030] Step 2: The AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time of the unit in the restricted operating area. Units with shorter cumulative running time are given priority to start up, and units with longer cumulative running time are given priority to shut down. The AGC program sets "unit start-up priority" and "unit shutdown priority" in the dynamic adjustment of the priority of unit start-up and shutdown based on the running time of the unit in the restricted operating area. When the unit with the longest cumulative running time in the restricted operating area has the highest shutdown priority, the unit with the shortest cumulative running time in the restricted operating area has the highest start-up priority.
[0031] Step 3: The AGC program dynamically adjusts the unit's restricted operating zone based on unit vibration data, head, and load-related data to ensure the correctness of the restricted operating zone. Based on the relationship between unit vibration data (Z), head (H), and load (P), the program calculates the Z-value range corresponding to the restricted operating zone at the same H, which is the current restricted operating zone for the unit. Step 4: For units that have been operating in the restricted operating zone for too long, the AGC program adjusts the restricted operating zone to a prohibited operating zone, reducing the time spent in the restricted operating zone and implementing dynamic adjustment.
[0032] Step 5: The AGC allocation method for controlling the limited operating time of hydro-generator units utilizes unit oscillation data, head, and load-related data, and combines this data with the operating time of each unit under different load intervals to calculate the unit oscillation and load data under different heads. This yields the real-time optimal unit operating condition. The statistical and calculated data is then sent to the AGC program for logical judgment. The AGC program includes individual unit load commands and unit start-up / shutdown priorities. The AGC program outputs individual unit load commands and unit start-up / shutdown priorities for the participating AGC units, ensuring that the limited operating time for each generator unit is minimized and that the time for each unit is essentially consistent.
[0033] Working Principle: In the process of using this invention, Step 1: The AGC program calculates the annual running time of each unit in the restricted operating area in real time. Using the unit's restricted operating area defined in the program, and employing the intermediate variable "# Unit enters the restricted operating area," the program automatically accumulates the measurement point action to the return time. The running time T = previous accumulated time (t1) + current action to return time (t2). The accumulated data is cleared at 00:00 on January 1st each year, and the calculation restarts. Step 2: The AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time in the unit's restricted operating area. Units with shorter accumulated running times are given priority for start-up, and units with longer accumulated running times are given priority for shutdown. Step 3: The AGC program dynamically adjusts the unit's restricted operating area based on unit oscillation data, head, and load-related data to ensure the accuracy of the unit's restricted operating area. In step two, the AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time of the unit's restricted operating area, setting "unit start-up priority" and "unit shutdown priority." The unit with the longest accumulated running time in the restricted operating area has the highest shutdown priority, and the unit with the shortest accumulated running time in the restricted operating area has the highest start-up priority. In step three, based on the relationship between unit vibration data (Z), head (H), and load (P), the program statistically analyzes the Z measurement range of the restricted operating area corresponding to P under the same H, which is the current restricted operating area of the unit. The AGC program adjusts the restricted operating area to a prohibited operating area for units with excessively long running time in the restricted operating area, reducing the running time in the restricted operating area and achieving dynamic adjustment. The AGC allocation method for controlling the restricted running time of hydro-generator units utilizes unit vibration data, head, and load-related data, and combines this data with the running time of each unit's load intervals to calculate the unit vibration and load data under different heads, thus obtaining the real-time optimal unit operating conditions. Statistical and computational data are sent to the AGC program for logical judgment. The AGC program includes individual unit load commands and unit start-up and shutdown priorities. The AGC program outputs individual unit load commands and unit start-up and shutdown priorities for the units participating in AGC, ensuring that the limited operating time of each generator unit is minimized and that the time for each unit is basically consistent.
[0034] The above embodiments are only used to illustrate the present invention and are not intended to limit the technical solutions described in the present invention. Although the present invention has been described in detail with reference to the above embodiments, the present invention is not limited to the specific embodiments described above. Therefore, any modifications or substitutions to the present invention, and all technical solutions and improvements that do not depart from the spirit and scope of the invention, are covered within the scope of the claims of the present invention.
Claims
1. A method for allocating AGC (Automatic Guided Control) to limit the operating time of a hydro-generator unit, characterized in that, Includes the following steps: Step 1: The AGC program calculates the running time of each unit in the restricted operating area in real time each year. Through the restricted operating area interval defined in the program, the intermediate variable "# unit enters the restricted operating area" is used. The program automatically accumulates the measurement point action to the return time. The running time T = the previous accumulated time t1 + the time from this action to the return time t2. The accumulated data is cleared to zero at 0:00 on January 1st each year, and the calculation starts again. Step 2: The AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time in the unit's restricted operating area. Units with shorter cumulative running time are given priority to start up, and units with longer cumulative running time are given priority to shut down. Step 3: The AGC program dynamically adjusts the unit's restricted operating area based on the unit's oscillation data, head, and load-related data to ensure the unit's restricted operating area is correct; The statistical and calculated data of the above-mentioned unit restricted operating area running time, unit oscillation data, head data and load data are sent to the AGC program for logical judgment. The AGC program includes single unit load command and unit start-up and shutdown priority. The AGC program outputs individual load commands and start / stop priority for participating AGC units, ensuring that the limited operating time of each generator unit is minimized and that the time for each unit is basically consistent.
2. The AGC allocation method for controlling and limiting the operating time of a hydro-generator unit according to claim 1, characterized in that, Step 2: The AGC program dynamically adjusts the priority of unit start-up and shutdown based on the running time of the unit in the restricted operating area. It sets "unit start-up priority" and "unit shutdown priority". The unit with the longest accumulated running time in the restricted operating area has the highest shutdown priority, and the unit with the shortest accumulated running time in the restricted operating area has the highest start-up priority.
3. The AGC allocation method for controlling and limiting the operating time of a hydro-generator unit according to claim 2, characterized in that, In step three, based on the correspondence between unit vibration data, head, and load, the vibration data measurement range corresponding to different loads under the same head is statistically analyzed, which is the unit's restricted operating zone under the current head.
4. The AGC allocation method for controlling and limiting the operating time of a hydro-generator unit according to claim 3, characterized in that, When the unit's operating time in the restricted operating area exceeds the set time constant, the AGC program adjusts the unit's restricted operating area to the prohibited operating area to reduce the unit's operating time in the restricted operating area and achieve dynamic adjustment.
5. The AGC allocation method for controlling and limiting the operating time of a hydro-generator unit according to claim 4, characterized in that, The AGC allocation method for controlling and limiting the operating time of hydro-generator units utilizes unit oscillation data, head, and load-related data, and combines these data with the operating time of each unit under different load intervals to calculate the unit oscillation and load data under different heads, thereby obtaining the real-time optimal unit operating conditions.
Citation Information
Patent Citations
Method for detecting accumulated operation duration of each stability region of hydro-generator
CN112525567A
