A prestressed hollow beam-column connection structure and construction method thereof
By arranging hollow structures and short columns in the open-webbed beams, using prestressed steel bars and bolt connections, and arranging short columns and prestressed rods at unequal intervals, the problem of insufficient shear resistance of the open-webbed beams is solved, and the overall integrity of the structure is improved. performance and flexural bearing capacity, simplifying the construction process and suitable for high-rise buildings.
Patent Information
- Application Number
- CN202310259689.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-17
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-03-17
AI Technical Summary
Due to structural limitations in high-rise buildings, reinforced concrete beam-column frame structures have insufficient material bearing capacity in the mid-span area, poor shear resistance of open-web beams, and low energy consumption, making it difficult to effectively apply in high-rise structures.
A prestressed open-web beam-column connection structure is adopted. Hollow structures and short columns are set up in the open-web beams, and prestressed steel bars and bolts are used to connect short columns and prestressed rods at unequal intervals to enhance the shear resistance. Polypropylene fiber mortar and epoxy gaskets were used at the joints to improve structural performance.
It improves the shear resistance of the open-web beam and the overall performance of the structure, enhances the bending load-bearing capacity, reduces the amount of steel bars, simplifies the construction process, reduces the cost, and improves the energy dissipation capacity under earthquake action.
Smart Images

Figure CN116220199B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a prestressed hollow beam, in particular to a prestressed hollow beam-column connection structure and a construction method thereof. Background Art
[0002] Reinforced concrete beam-column frame structures are widely used in various building structures. However, as building structures tend to be high-rise structures, the frame structure has the disadvantages of small span and heavy weight due to the limitation of its structural system, which limits its development in high-rise structures. Studies have found that under the action of conventional external loads, the central area of the beam web within the 2 / 3 span range of the span is a low stress area, that is, in this area, the material contributes little to the bearing capacity of the beam, but has a heavy weight. Therefore, the concept of hollow beams came into being. However, hollow beams have the disadvantages of poor shear resistance and low energy consumption. With the rapid development of prestressed concrete technology, the continuous maturity of prestressed technology, and the continuous decline in prestressed materials and construction costs, more and more structures are considering applying prestressing effects to improve the bearing capacity of components. Therefore, how to organically combine prestressed technology with hollow beams is a very worthy issue to study. Summary of the invention
[0003] Purpose of the invention: In view of the above problems, the purpose of the present invention is to provide a prestressed hollow beam-column connection structure to improve the shear resistance of the hollow beam and the overall performance of the structure, and to provide a construction method thereof.
[0004] Technical solution: A prestressed hollow-web beam-column connection structure, comprising a hollow-web beam and a precast column. The hollow-web beam is connected to each other between two precast columns by prestressed steel bars running across the three. Both ends of the hollow-web beam are fixed to the two precast columns by a plurality of angle steels respectively. A hollow structure is provided in the middle of the hollow-web beam, in which a plurality of short columns are provided. The short columns are placed vertically and arranged at intervals along the length direction of the hollow-web beam, and each short column is connected to the hollow-web beam by a prestressed rod.
[0005] Furthermore, the hollow beam includes an upper chord beam and a lower chord beam. The upper chord beam is arranged in parallel and spaced apart above the lower chord beam, and a plurality of short columns are arranged between the two. The two ends of the upper chord beam and the lower chord beam are respectively fixed to two prefabricated columns by a plurality of angle steels, and prestressed steel bars are respectively penetrated inside the two beams.
[0006] Furthermore, the two ends of the short column are respectively embedded in the lower surface of the upper chord beam and the upper surface of the lower chord beam, the prestressed rod is vertically penetrated through the upper chord beam, the short column and the lower chord beam in sequence, and the two ends of the prestressed rod are respectively fixed to the upper surface of the upper chord beam and the lower surface of the lower chord beam by a fastening bolt.
[0007] Optimally, a plurality of mounting holes for arranging the ends of the short columns are provided at intervals on the lower surface of the upper chord beam and the upper surface of the lower chord beam, and the mounting holes on the two surfaces correspond to each other one by one.
[0008] Preferably, an epoxy resin gasket is provided between each fastening bolt and the connection surface of the upper chord beam or the lower chord beam, and the thickness of the epoxy resin gasket is 7 to 10 mm.
[0009] Furthermore, gaps are respectively provided between the two ends of the hollow beam and the corresponding prefabricated columns, the width of the gaps is 15 to 20 mm, and the gaps are filled with polypropylene fiber mortar.
[0010] Furthermore, the hollow beam and the prefabricated column are fixed to the angle steel by connecting bolts respectively, and steel washers are provided between the connecting surfaces of the angle steel and the hollow beam, and between the angle steel and the prefabricated column respectively, and the thickness of the steel washers is 5 to 10 mm.
[0011] Furthermore, the width of the short column is equal to the width of the hollow beam. The short columns are arranged in two forms in the hollow beam stirrup reinforcement densification area and the non-densification area, forming an overall unequal arrangement. In the hollow beam stirrup reinforcement densification area, multiple short columns are arranged at equal intervals, and the spacing A is 350-400mm; in the non-densification area, multiple short columns are arranged at equal intervals, and the spacing B is 600-700mm.
[0012] Preferably, a through hole is opened in the middle of the short column along its axis, the prestressed rod is passed through the through hole, and the prestressed rod is clearance-matched with the through hole.
[0013] A construction method of the above-mentioned prestressed hollow beam-column connection structure comprises the following steps:
[0014] Step 1: First, lay out and position the prefabricated columns, and install them at the corresponding positions of the foundation through grouting sleeves or vertical prestressed steel bars;
[0015] Step 2: Install multiple angle steels on the prefabricated columns;
[0016] Step 3: Place the hollow beam, support the hollow beam with angle steel, and then pass the prestressed steel bars through the reserved holes on the hollow beam and prefabricated column in sequence;
[0017] Step 4: Pour mortar at the joints between the two ends of the hollow beam and the precast column. When the mortar reaches the required strength, tension the prestressed steel bars to assemble the hollow beam and the precast column to ensure good contact between the beam and the column without gaps.
[0018] Step 5: Install the short columns one by one at the corresponding positions on the hollow beam through prestressed rods.
[0019] Beneficial effects: Compared with the prior art, the advantages of the present invention are:
[0020] (1) The present invention adds prestress to the short columns of the hollow beam, following the idea of "strong shear and weak bending" in the design of the hollow beam, ensuring that the short columns in the hollow beam do not fail first and do not suffer shear failure, thereby improving the shear bearing capacity of the short columns.
[0021] (2) Short columns are arranged at unequal intervals. The distance between short columns in areas with greater shear force is small, which can improve the shear resistance of the structure in a targeted manner.
[0022] (3) The ends of the hollow beams are connected to the prefabricated columns with prestressed steel bars, and polypropylene fiber mortar is poured at the joints. The strength of this mortar is higher than that of ordinary mortar, which ensures that the concrete at the joints is not crushed and reduces the loss of prestress.
[0023] (4) Angle steel is installed at the connection between the upper chord beam, the lower chord beam and the prefabricated column. The angle steel plastically deforms under the action of earthquake, which enhances the energy dissipation capacity of the structure under earthquake and also improves the bearing capacity of the node.
[0024] (5) The prestressed steel bars in the upper and lower chords of the hollow beam also enhance the bending bearing capacity of the hollow beam and reduce the amount of steel bars used.
[0025] (6) The connection method of the present invention is bolt connection, which is simple, time-saving and labor-saving, has low technical requirements, avoids welding operations and has high construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the main structure of the present invention;
[0027] Figure 2 It is a schematic diagram of the top view structure of the present invention;
[0028] Figure 3 It is a side structural schematic diagram of the present invention. DETAILED DESCRIPTION
[0029] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention.
[0030] A prestressed hollow beam-column connection structure, such as Figures 1 to 3 As shown, it includes a hollow beam 1 and a prefabricated column 2. The hollow beam 1 is connected to each other between two prefabricated columns 2 by a prestressed steel bar 3 that crosses the three. The hollow beam 1 includes an upper chord beam 101 and a lower chord beam 102. The upper chord beam 101 is arranged above the lower chord beam 102 in parallel and at intervals, so that a hollow structure is formed in the middle of the hollow beam 1. The ends of the upper chord beam 101 and the lower chord beam 102 are respectively fixed to the two prefabricated columns 2 by a plurality of angle steels 4. The hollow beam 1 and the prefabricated column 2 are respectively fixed to the angle steel 4 by connecting bolts. Steel gaskets 9 are respectively arranged between the connecting surfaces of the angle steel 4 and the hollow beam 1 and the angle steel 4 and the prefabricated column 2. The thickness of the steel gasket 9 is 5 to 10 mm. Prestressed steel bars 3 are respectively penetrated inside the upper chord beam 101 and the lower chord beam 102.
[0031] A plurality of short columns 5 are arranged between the upper chord beam 101 and the lower chord beam 102 along the length direction. The short columns 5 are placed vertically. A plurality of mounting holes for setting the ends of the short columns 5 are arranged at intervals on the lower surface of the upper chord beam 101 and the upper surface of the lower chord beam 102. The mounting holes on the two correspond to each other one by one, so that the two ends of the short column 5 are respectively embedded in the corresponding mounting hole positions of the upper chord beam 101 and the lower chord beam 102.
[0032] Each short column 5 is connected to the hollow beam 1 through a prestressed rod 6. A through hole is opened in the middle of the short column 5 along its central axis. The prestressed rod 6 is inserted into the through hole, and the prestressed rod 6 is matched with the through hole. The prestressed rod 6 is vertically inserted into the upper chord beam 101, the short column 5, and the lower chord beam 102 in sequence. The two ends of the prestressed rod 6 are fixed to the upper surface of the upper chord beam 101 and the lower surface of the lower chord beam 102 through a fastening bolt 7. An epoxy resin gasket 8 is respectively provided between the connection surface of each fastening bolt 7 and the upper chord beam 101 or the lower chord beam 102. The thickness of the epoxy resin gasket 8 is 7 to 10 mm.
[0033] The width of the short column 5 is equal to the width of the hollow beam 1. The short column 5 is arranged in two forms in the hollow beam 1 stirrup reinforcement area and the non-reinforced area, forming an overall unequal arrangement. In the hollow beam 1 stirrup reinforcement area, multiple short columns 5 are arranged at equal intervals, and the spacing A is 350-400mm; in the non-reinforced area, multiple short columns 5 are arranged at equal intervals, and the spacing B is 600-700mm. The short columns 5 are arranged at unequal intervals, and the spacing of the short columns 5 in the places with larger shear force is small, and the spacing of the short columns 5 in other places is expanded, so that the shear resistance of the structure is improved in a targeted manner, while avoiding excessive setting of short columns 5, the structure is reasonable, and the cost is saved.
[0034] Gaps are respectively provided between the two ends of the hollow beam 1 and the corresponding prefabricated columns 2. The width of the gaps is 15 to 20 mm, and the gaps are filled with polypropylene fiber mortar.
[0035] Pouring mortar and setting angle steel at the connection between the end of the hollow beam and the prefabricated column can ensure the connection stability and reliability between the hollow beam and the prefabricated column. The present invention follows the principle of "strong shear and weak bending" when designing the hollow beam. In order to ensure that the short column in the hollow beam does not fail first and does not suffer shear failure, the present invention adds prestress to the short column of the hollow beam, that is, prestressed rods are set to improve the shear bearing capacity of the short column; the short columns are arranged at unequal intervals, and the short column spacing distance at the place with larger shear force is small, so that the shear resistance of the structure is improved in a targeted manner. The end of the hollow beam is connected to the prefabricated column by prestressed steel bars, and mortar is poured at the connection to ensure that the concrete at the joint is not crushed, reducing the loss of prestress; angle steel is set at the connection to enhance the energy consumption capacity of the structure under earthquakes; the prestressed steel bars in the upper chord beam and the lower chord beam of the hollow beam also enhance the bending bearing capacity of the hollow beam and reduce the amount of steel bars used. Most of the connection methods of the present invention are bolt connections, which save time and effort and have high construction quality.
[0036] The construction method of the above-mentioned prestressed hollow beam-column connection structure comprises the following steps:
[0037] Step 1: First, lay out and position the prefabricated columns, connect them through grouting sleeves or install the vertical prestressed steel bars on the foundation;
[0038] Step 2: Fix the angle steel to the precast column with fastening bolts and place steel washers at the contact surface to support the upper chord beam and the lower chord beam;
[0039] Step 3: Place the upper chord beam and the lower chord beam, and pass the prestressed steel bars through the reserved holes.
[0040] Step 4: Pour polypropylene fiber mortar at the joints of the upper chord beam, lower chord beam and prefabricated column. When the mortar reaches a certain strength, tension the prestressed steel bars to assemble the hollow beam column to ensure good contact between the beam and column without gaps.
[0041] Step 5: Align the vertical through holes in the short column, upper chord beam and lower chord beam one by one, place epoxy resin gaskets on the contact surface, pass the prestressed rod through the through hole, tension the prestress and anchor it with high-strength screws.
Claims
1. A prestressed hollow-web beam-column connection structure, comprising a hollow-web beam (1) and a prefabricated column (2), characterized in that: The hollow beam (1) is connected to each other between two prefabricated columns (2) by means of prestressed steel bars (3) that cross the three, and the two ends of the hollow beam (1) are fixed to the two prefabricated columns (2) by means of a plurality of angle steels (4), and a hollow structure is provided in the middle of the hollow beam (1), and a plurality of short columns (5) are provided in the hollow structure, the short columns (5) are vertically placed and arranged at intervals along the length direction of the hollow beam (1), and each short column (5) is connected to the hollow beam (1) by means of a prestressed rod (6); The hollow beam (1) comprises an upper chord beam (101) and a lower chord beam (102); the upper chord beam (101) is arranged above the lower chord beam (102) in parallel and at intervals; a plurality of short columns (5) are arranged between the upper chord beam (101) and the lower chord beam (102); two ends of the upper chord beam (101) and the lower chord beam (102) are respectively fixed to two prefabricated columns (2) via a plurality of angle steels (4); and prestressed steel bars (3) are respectively penetrated inside the upper chord beam (101) and the lower chord beam (102); The two ends of the short column (5) are respectively embedded in the lower surface of the upper chord beam (101) and the upper surface of the lower chord beam (102); the prestressed rod (6) is vertically penetrated in the upper chord beam (101), the short column (5), and the lower chord beam (102) in sequence; the two ends of the prestressed rod (6) are respectively fixed to the upper surface of the upper chord beam (101) and the lower surface of the lower chord beam (102) by a fastening bolt (7).
2. A prestressed hollow-web beam-column connection structure according to claim 1, characterized in that: A plurality of mounting holes for arranging the ends of the short columns (5) are respectively provided at intervals on the lower surface of the upper chord beam (101) and the upper surface of the lower chord beam (102), and the mounting holes on the two correspond to each other one by one.
3. A prestressed hollow-web beam-column connection structure according to claim 2, characterized in that: An epoxy resin gasket (8) is provided between each fastening bolt (7) and the connection surface of the upper chord beam (101) or the lower chord beam (102), and the thickness of the epoxy resin gasket (8) is 7 to 10 mm.
4. The prestressed hollow-web beam-column connection structure according to claim 1, characterized in that: Gaps are respectively provided between the two ends of the hollow beam (1) and the corresponding prefabricated columns (2); the width of the gaps is 15 to 20 mm, and the gaps are filled with polypropylene fiber mortar.
5. The prestressed hollow-web beam-column connection structure according to claim 1, characterized in that: The hollow beam (1) and the prefabricated column (2) are respectively fixed to the angle steel (4) by connecting bolts, and steel washers (9) are respectively provided between the connecting surfaces of the angle steel (4) and the hollow beam (1) and the angle steel (4) and the prefabricated column (2), and the thickness of the steel washers (9) is 5 to 10 mm.
6. The prestressed hollow-web beam-column connection structure according to claim 1, characterized in that: The width of the short column (5) is equal to the width of the hollow beam (1). The short column (5) is arranged in two forms in the hollow beam (1) stirrup reinforcement densification area and the non-reinforced area, forming an overall unequally spaced arrangement. In the hollow beam (1) stirrup reinforcement densification area, a plurality of short columns (5) are arranged at equal intervals, and the spacing A is 350 to 400 mm; in the non-reinforced area, a plurality of short columns (5) are arranged at equal intervals, and the spacing B is 600 to 700 mm.
7. The prestressed hollow-web beam-column connection structure according to claim 1, characterized in that: A through hole is provided in the middle of the short column (5) along its central axis, and the prestressed rod (6) is inserted into the through hole, with the prestressed rod (6) being loosely matched with the through hole.
8. A construction method for a prestressed hollow-web beam-column connection structure as claimed in any one of claims 1 to 7, characterized in that The following steps are involved: Step 1: First, lay out and position the prefabricated column (2) and install it at the corresponding position of the foundation through a grouting sleeve or vertical prestressed steel bars; Step 2: Install a plurality of angle steels (4) on the prefabricated columns (2); Step 3: placing the hollow beam (1), the hollow beam (1) is supported by the angle steel (4), and then the prestressed steel bars (3) are passed through the reserved holes on the hollow beam (1) and the prefabricated column (2) in sequence; Step 4: pouring mortar at the joints between the two ends of the hollow beam (1) and the prefabricated column (2), and when the mortar reaches the required strength, tensioning the prestressed steel bars (3) to assemble the hollow beam (1) and the prefabricated column (2) to ensure that the beam and column are in good contact with each other without any gap; Step 5: Install the short columns (5) one by one at the corresponding positions on the hollow beam (1) through the prestressed rods (6).
Citation Information
Patent Citations
Prestressed concrete rigid frame cable beam
CN101858123A
Pre-stress fabricated high-performance circular steel tube concrete pillar-concrete beam node and construction method thereof
CN106968332A