An event-driven equipment support assessment method

Through the event-driven equipment support assessment method, the equipment support simulation system is used to simulate the equipment use and maintenance process, which solves the problem of difficulty in evaluating the support capabilities of multiple types of equipment with existing technology, and achieves a systematic and comprehensive assessment of the success rate and performance of equipment missions. Evaluation, reducing the evaluation cost and cycle.

CN116245430BActive Publication Date: 2024-10-29SHENZHEN PROSPECT INTERNET INFORMATION TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310288271.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-15
Publication Date
2024-10-29
Estimated Expiration
2043-03-15

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively evaluate the support capabilities of multiple types of equipment. Traditional analytical methods and statistical methods have limitations and cannot systematically and comprehensively consider the impact of equipment, resources, manpower and other factors on task execution. Moreover, simulation methods are costly and have a long cycle.

Method used

Using an event-driven equipment support assessment method, the equipment support simulation system includes a simulation input module, a task generation module, an event queue processing module, and a task evaluation module to simulate the equipment use and maintenance process, generate an event queue, and call the simulation calculation module. Resource allocation and maintenance management, and evaluation of equipment mission success rate and performance.

Benefits of technology

It achieves a systematic and comprehensive assessment of multiple types of equipment, and can comprehensively consider the impact of equipment combat methods, manpower, spare parts and resources on mission success, provide accurate quantitative indicators, and reduce assessment costs and cycles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116245430B_ABST
    Figure CN116245430B_ABST
Patent Text Reader

Abstract

The present invention discloses an equipment support assessment method based on event-driven, which is based on an equipment support simulation system, and the equipment support simulation system includes a simulation input module, a task generation module, an event queue processing module and a task assessment module. The equipment support assessment method includes: the simulation input module provides simulation input, the task generation module generates task queue information; the fault sampling module generates fault queue information according to the task queue information and the related equipment data information, so as to be read by the event queue processing module; the event queue processing module creates an event queue list according to the read queue information, and calls the corresponding simulation calculation module; after simulation, enters the task assessment module, and the task assessment module calculates and counts various output data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of simulation model application, and more specifically, to an equipment support assessment method based on event-driven. Background Art

[0002] With the rapid development of informatization, the existing equipment use system has gradually changed from the use of single-model equipment to the joint use of multiple-system equipment. For the new use mode, it is necessary to consider the constraints of various factors on task execution. In order to improve the use efficiency of the equipment support system, multiple aspects need to be considered jointly. How to evaluate the support evaluation of multiple models of equipment, how to evaluate the success of the mission of using multiple models of equipment? How to consider the impact of equipment failure on the performance of the equipment system? These are all problems that need to be solved urgently.

[0003] There are two main methods for evaluating equipment support performance: analytical method and statistical method. The evaluation indicators are mainly formulated based on the factors that affect the performance of equipment.

[0004] Analytical method: The most commonly used method at present, combined with the analytical formula of indicators for single equipment performance evaluation in GJB1909 as a reference, constructs equipment system performance indicators, namely equipment system integrity rate, system availability, mission success rate, and system mission continuity probability. Based on the degree of influence of the equipment system on task execution, the mathematical analytical formulas of each indicator are established. The current analytical method is a broad and extensive mathematical formula construction, which cannot take into account the impact of equipment, resources, and support tasks when the task is executed. It is difficult to systematically and comprehensively evaluate the performance of the equipment system, and has certain application scenarios and limitations.

[0005] Statistical method: With one-time use mission as the main line and the equipment's execution of use mission as the driving force, the data on actual use, maintenance and support of the equipment after its installation is analyzed, and a mathematical statistical analysis is conducted on the indicator system constructed based on the comprehensive use capability of the equipment system to determine the indicators that affect the performance of the equipment system. However, the statistical method requires the analysis of a large number of data samples after the equipment is installed. The amount of data on the use, maintenance and support of the equipment is small, which is a small sample problem. It is difficult to determine a more accurate result through statistics, and it is impossible to evaluate and verify the results.

[0006] The existing analytical and statistical methods cannot effectively evaluate the support capabilities of various types of equipment. The use of simulation methods for support evaluation and decision-making assistance is the focus of current research. The advantage of using simulation modeling to evaluate combat readiness and mission success parameters is that it can change the use and maintenance of equipment and measure the impact of these parameters, evaluate the interaction between the five parameters of equipment and performance parameters, and through trade-off research, make the five requirements of equipment and performance requirements reach an optimal balance point, so as to obtain the most reasonable equipment support plan. In the process of equipment support evaluation, when it is necessary to comprehensively consider the impact of equipment combat use, manpower, spare parts, support equipment and other resources on equipment combat readiness (availability, sortie rate, etc.), mission success and sustainability, the use of simulation technology to estimate these parameters is the best method, while traditional analytical methods have great difficulties or even cannot be analyzed. Traditional qualitative evaluation methods cannot give accurate descriptions and quantitative indicators. Experimental evaluation methods are too costly and have too long a cycle. Summary of the invention

[0007] In view of the above problems, the present invention proposes an equipment support assessment method based on event-driven, wherein the equipment support assessment method is based on an equipment support simulation system, the equipment support simulation system includes a simulation input module, a task generation module, an event queue processing module and a task assessment module; the task generation module includes a task queue generation submodule and an equipment call model; the event queue processing module includes a fault sampling module, a data collection module and a simulation calculation module; the equipment support assessment method includes:

[0008] The simulation input module provides simulation input, and each data in the simulation input is equipment support related event information containing time information;

[0009] The task generation module calls the task queue generation submodule according to the input information input by the simulation input module to generate task queue information; and simultaneously starts the equipment calling model;

[0010] The fault sampling module generates fault queue information according to the task queue information and the relevant equipment data information;

[0011] The fault queue information and the task queue information together form event queue information containing a time series, so as to be read by an event queue processing module;

[0012] The event queue processing module creates an event queue list according to the read queue information; the event queue processing module processes the event ranked first in the event queue list, and calls the corresponding simulation calculation module according to the first time;

[0013] After the first time queue event is processed, the event queue processing module deletes the first time queue event accordingly, enters the queue event of the second time, and calls the corresponding event queue processing module again to process the queue event of the second time;

[0014] Enter the task evaluation module, and the task evaluation module calculates and counts various output data.

[0015] Preferably, the equipment support assessment method also includes: after the event queue processing module has processed the first time queue event, the event queue processing module determines whether a new event is generated. If so, all events are reordered in chronological order and enter the task generation module; if not, the event queue processing module determines whether the queue has ended.

[0016] Preferably, the simulation calculation module includes a plurality of simulation calculation models and a simulation time advancer, and the plurality of simulation calculation models include: a task execution model, a resource allocation model, a spare parts shortage model, a preventive maintenance model and a corrective maintenance model.

[0017] Preferably, the simulation input includes: combat scenarios, equipment models, support organizations, maintenance models, maintenance work and support resource information; combat scenarios include combat units and mission profile information; equipment models include component information and equipment structure; support organizations include site information and supply structure; maintenance models include preventive maintenance and corrective maintenance; maintenance work includes maintenance activities and resource requirements; support resources include resource types and resource deployment.

[0018] Preferably, the step of generating fault queue information further includes: a fault sampling module samples and calculates the failure time points of components according to the failure rate distribution of equipment components; traverses all components of all equipment, sorts the failure information of all components in chronological order, and forms the fault queue information; the fault queue information contains the earliest failure point information as the equipment failure event point, thereby triggering maintenance and support requirements; the event queue processing module withdraws the equipment with the failure event point from the task according to the maintenance and support requirements.

[0019] Preferably, the calling of the corresponding simulation calculation module includes: resource acquisition, determining the resources required for repairing the faulty parts, including personnel, equipment, and spare parts. If all are met, repair is carried out directly. If any one of them is not met, resources are applied to the superior, and the waiting time is recorded until the requirements are met; maintenance execution, according to the maintenance time distribution type, the faulty parts of the equipment are repaired based on the fault queue information until the maintenance is completed; equipment standby, after the maintenance is completed, the equipment enters the standby state, and continues to execute the task arrangement according to the task type until the simulation ends.

[0020] Preferably, the tasks, corrective maintenance, preventive maintenance, spare parts inventory supply, and resource allocation logic processes in the event processing module are respectively determined by the task execution model, the corrective maintenance model, the preventive maintenance model, the spare parts shortage model, and the resource allocation model; the relationship between the events in the event processing module is as follows: after the simulation starts, the simulation input module first provides input information including the task plan, the task generation module generates task queue information based on the input information, starts the equipment calling model, and calls the equipment according to the task queue information; during the entire task process, there are three possible equipment states: (1) normal task execution, failure, and preventive maintenance execution; (2) equipment status is either normal or faulty; (3) equipment status is either normal or faulty; (4) equipment status is either normal or faulty; (5) equipment status is either normal or faulty; (6) equipment status is either normal or faulty; (7) equipment status is either normal or faulty; (8) equipment status is either normal or faulty; (9) equipment status is either normal or faulty; (10) equipment status is either normal or faulty; (11) equipment status is either normal or faulty; (12) equipment status is either normal or faulty; (13) equipment status is either normal or faulty; (14) equipment status is either normal or faulty; (15) equipment status is either normal or faulty; (16) equipment status is either normal or faulty; (17) equipment status is either normal or faulty; (18) equipment status is either normal or faulty; (19) equipment status is either normal or faulty; (20) equipment status is either normal or faulty. (1) When the equipment is in normal mission execution, no other time series will be triggered and the simulation will move forward; (2) When a fault occurs, corrective maintenance activities need to be carried out, which will trigger the corrective maintenance model. During the maintenance process, spare parts and related support resources will be used, which will trigger the spare parts shortage model and resource allocation model; (3) When the equipment is in preventive maintenance, the preventive maintenance model will be triggered, and the resource allocation model will be triggered at the same time. The data collection module records all data in the database, and then the simulation time advancer continues to move forward according to the time step until the simulation end condition is met. Finally, the task evaluation module performs statistical analysis on the equipment support effectiveness.

[0021] Preferably, the process of creating an event queue list includes: generating a task queue: based on the data of combat assumptions, equipment models, support organizations, maintenance models, maintenance work and support resource information in the simulation input, jointly querying combat units and task profiles, and forming a series of independent task event tables according to the required time of occurrence; giving each task event a unique serial number for data analysis and statistics by the task evaluation module; determining the number of subtasks and subtask execution time of the task event according to the task type and task profile content of each task event, and giving each subtask a unique serial number for tracking the execution progress of the task event, and the subtask execution time is counted by the data collection module.

[0022] Preferably, the algorithm of the task execution model includes: event queue information triggers the start of the task; performs a system status check to determine equipment failure or perform preventive maintenance to prevent the equipment from being in an unavailable state, and if it is unavailable, performs corrective maintenance; if the system status check is available, enters standby to determine whether the task start conditions are met; if so, executes the task; when a failure occurs during the task, determine whether it affects the task execution based on the degree of impact of the number of available equipment on the task, and if so, interrupt the task based on the actual situation of the equipment; repair serious failures that do not affect the task execution after the task is completed; after the task is completed, determine whether the preventive conditions are met, and if so, perform preventive maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Various embodiments or examples ("examples") of the present disclosure are disclosed in the following detailed description and accompanying drawings. The drawings are not necessarily drawn to scale. In general, unless otherwise specified in the claims, the products or methods disclosed in the present disclosure may be performed in any order. In the drawings:

[0024] Figure 1 It is an equipment support simulation system based on event-driven and a simulation flow chart according to the present invention;

[0025] Figure 2 A block diagram illustrating simulation input of the present invention;

[0026] Figure 3 It is the trigger relationship diagram of the event series;

[0027] Figure 4 It is a task process sub-model block diagram according to the present invention;

[0028] Figure 5 It is the execution process diagram of the task;

[0029] Figure 6 Execute process diagram for fixed tasks;

[0030] Figure 7 Execute process diagram for continuous tasks;

[0031] Figure 8 Execution process diagram for extended tasks. DETAILED DESCRIPTION

[0032] Before explaining one or more embodiments of the present disclosure in detail, it should be understood that the embodiments are not limited to the construction details in their specific applications, and the steps or methods proposed in the following embodiments or drawings. The system and method of the present invention will be described in detail below with reference to the drawings.

[0033] According to the event-driven equipment support simulation system and simulation process of the present invention, Figure 1 shown. Figure 1 The equipment support simulation system shown is mainly composed of four parts: simulation input module, task generation module, event queue processing module and task evaluation module. The task generation module includes a task queue generation submodule and an equipment call model. The event queue processing module includes a fault sampling module, a data collection module and a simulation calculation module. The equipment support simulation system performs the following simulation process, which specifically includes the following steps: First, the simulation input module provides simulation input, that is, various data required in the simulation. All data in the simulation input are equipment support related event information containing time information. The specific simulation input module is as follows: Figure 2As shown. Second, the task generation module calls the task queue generation submodule according to the input information input by the simulation input module to generate task queue information; and starts the equipment call model at the same time. The equipment call model mobilizes the relevant equipment according to the number required by the task queue information, and determines whether the task is started according to the number and type of existing equipment. The task starts and enters the next step. If the task cannot be started, the failure data of this task is recorded. Third, the fault sampling module generates fault queue information according to the task queue information and the relevant equipment data information; specifically, the fault sampling module samples and calculates the fault time point of the component according to the failure rate distribution of the equipment components; traverses all components of all equipment, and sorts the fault information of all components in chronological order to form the fault queue information. The fault queue information contains the earliest fault point information as the equipment fault event point, thereby triggering the maintenance and support requirements. The event queue processing module withdraws the equipment with the fault event point from the task according to the maintenance and support requirements. The fault queue information and the task queue information together form the event queue information containing the time series for the event queue processing module to read. Fourth, according to the read event queue information, the event queue processing module processes the event queue ranked first in time and calls the corresponding simulation calculation module. The simulation calculation module includes multiple simulation calculation models and simulation time pushers, and the simulation calculation models include: task execution model, resource allocation model, spare parts shortage model, preventive maintenance model and corrective maintenance model. Fifth, after completing the event queue of the first time, the event queue processing module deletes the event queue of the first time accordingly, enters the event queue of the second time, and calls the corresponding simulation calculation module again to process the queue; after each event queue is processed, the event queue processing module deletes the processed events in the queue. Sixth, the event queue processing module determines whether a new event is generated. If so, all events are reordered according to the time sequence and sent to the task generation module; if not, it enters step seven: the event queue processing module determines whether the queue is over. If the queue is not over, it further returns to step three. If the queue has ended, it enters step eight: enter the task evaluation module, and the task evaluation module calculates and counts various output data. Among them, the event queue processing module is the core module of the simulation operation, and this module triggers the execution of various functions of the simulator. The task evaluation module includes: task capability evaluation, equipment capability evaluation, spare parts capability evaluation and resource capability evaluation.

[0034] For step 1, the simulation input of the present invention is as follows Figure 2As shown in the figure, it specifically includes: combat scenarios, equipment models, support organizations, maintenance models, maintenance work, and support resource information. The combat scenarios include combat units and mission profile information; the equipment models include component information and equipment structure; the support organizations include site information and supply structure; the maintenance models include preventive maintenance and corrective maintenance; the maintenance work includes maintenance activities and resource requirements; and the support resources include resource types and resource deployment.

[0035] For the combat scenario in the simulation input, there are two combat units, deployed in SITE1 and SITE2 respectively. Combat unit 1 has 18 tanks and combat unit 2 has 15 tanks. For the mission profile, the basic task is to send 10 tanks to execute each time, and at least 8 tanks will start or continue to execute the mission. The duration of each mission is 6 hours, twice a day, for one year.

[0036] For example, the equipment model in the simulation input includes an equipment: MAIN BATTLE TANK, which contains two parts A01 and A02, where the failure rate of A01 (10 -6 ) is 13.96, the failure rate of A02 (10 -6 ) is 12.62.

[0037] The support organization model in the simulation input includes two levels of support organizations: DEPOT, which contains two support sites: SITE1 and SITE2. The specific information is shown in Tables 1 and 2.

[0038] Table 1 Security site location information

[0039] Site Name longitude Dimensions MAINDEPOT 13.83 63.07 SITE1 13.46 55.93 SITE1 12.18 57.74 Mission execution location 19.43 47.26

[0040] Table 2 Site transportation information

[0041]

[0042] For the maintenance model in the simulation input, it includes:

[0043] Corrective maintenance refers to the replacement of parts or direct repair caused by occasional failures. It mainly describes the maintenance location, maintenance time, maintenance method, and related maintenance activities.

[0044] Preventive maintenance refers to regular maintenance including parts replacement or direct maintenance, which mainly describes the type of work, maintenance interval, maintenance location, maintenance time, maintenance method, and related maintenance activities.

[0045] For the maintenance work in the simulation input, it includes:

[0046] Maintenance activities, where A01 is a repairable part, the repair is divided into two steps: one is to replace it at the SITE site, the time is 2 hours; the other is to repair it at the MAIN DEPOT site, the time is 648 hours. A02 is a consumable part, which is only a replacement repair: replace it at the SITE site, the time is 2 hours.

[0047] Maintenance work, including the MAIN BATTLE TANK disassembly and replacement maintenance work requires 1 technician, and the replacement maintenance work also requires 1 technician.

[0048] The guaranteed resources in the simulation input include:

[0049] Regarding personnel deployment, technicians deployed 30 at the MAIN DEPOT site and 4 at SITE1 and SITE2 respectively.

[0050] Spare parts deployment, when the bottom site spare parts are insufficient, you need to apply to the superior, as shown in Table 3. When the site spare parts are consumed, you should apply for purchase, for example, when the A02 parts are consumed, you should apply for purchase 720.

[0051] Table 3 Spare parts deployment

[0052] IID (Component ID) STID (deployment location) STSIZ (number of deployments) A01 SITE1 3 A01 SITE2 2 A01 MAINDEPOT 3 A02 SITE1 2 A02 SITE2 2 A02 MAINDEPOT 5

[0053] For step 3 of the present invention, the step of reading queue information further includes:

[0054] (1) Read the first task schedule

[0055] According to the mission profile settings (including the mission start time, end time, and required combat units), read the combat units required for the mission start time and location. According to the combat units and basic missions, mobilize the relevant equipment according to the required quantity, and determine whether the mission is started based on the number and type of existing equipment. If the mission is started, proceed to the next step. If the mission cannot be started, record the failure data of this mission.

[0056] (2) Maintenance support demand sampling, that is, obtaining fault queue information

[0057] According to the failure rate distribution of equipment components, sample and calculate the failure time points of components; traverse all components to determine the earliest failure point as the equipment failure event point, trigger the maintenance support demand, and the equipment exits the mission. At the same time, read the second failure time as the second failure event of the equipment, and determine whether the mission is terminated according to the mission termination conditions. If it is terminated, all equipment returns to the base and the mission ends. If it is not terminated, other equipment continues to perform the mission.

[0058] For step 4 of the present invention, calling the event processing module to process the event queue information includes: resource acquisition, determining the resources required for the repair of the faulty component, including personnel, equipment, and spare parts. If all are met, the repair is carried out directly. If any item is not met, the resource is applied to the superior, and the waiting time is recorded until the requirements are met; maintenance execution, according to the maintenance time distribution type, based on the fault queue information, the faulty component of the equipment is repaired until the maintenance is completed; equipment standby, after the maintenance is completed, the equipment enters the standby state, and continues to execute the task arrangement according to the task type (such as continuous tasks, extended tasks, etc., and then enter the task execution state again after the equipment is repaired) until the simulation ends.

[0059] The tasks, corrective maintenance, preventive maintenance, spare parts inventory supply, and resource allocation logic processes in the event processing module are determined by the task execution model, corrective maintenance model, preventive maintenance model, spare parts shortage model, and resource allocation model respectively.

[0060] The relationship between events in the event processing module is as follows Figure 3 As shown in the figure, after the simulation starts, the simulation input module first provides input information including the mission plan, and the mission generation module generates mission queue information based on the input information, starts the equipment calling model, and calls the equipment according to the mission queue information; during the entire mission process, there are three possible equipment states: (1) normal mission execution, failure, and preventive maintenance - when it is in the normal mission execution state, no other time series are triggered and the simulation moves forward; (2) when a failure occurs, corrective maintenance activities are required, which will trigger the corrective maintenance model. During the maintenance process, spare parts and related support resources will also be used, which will trigger the spare parts shortage model and resource allocation model; (3) when it is in preventive maintenance, the preventive maintenance model will be triggered, and the resource allocation model will be triggered at the same time. The data collection module records all data in the database, and then the simulation time advancer continues to move forward according to the time step until the simulation end condition is met. Finally, the mission evaluation module performs statistical analysis on the equipment support effectiveness.

[0061] The event queue is an ordered record table, each record includes the time when the event occurred, the type of event, etc. The idea of ​​using the event queue is to regard the simulation process of the equipment assurance assessment system as a sequence of event points, and use a table called the event queue to schedule the order of event execution according to the time sequence of event occurrence.

[0062] The event queue of the present invention includes a task sub-item event list, a guarantee equipment failure event list, a repair parts out-of-warehouse event list, a repair resource use event list, a transportation event list, and the like.

[0063] During the simulation process, when the simulation clock moves forward one step, the occurrence status of each event in all event queues is checked once.

[0064] The following describes the algorithm for creating the event list of the normal execution task queue.

[0065] (1) Generate a task queue

[0066] Based on the data of combat assumptions, equipment models, support organizations, maintenance models, maintenance work and support resource information in the simulation input, the combat units and mission profiles are jointly queried to form a series of independent mission event tables according to the required time.

[0067] (2) Each task event is given a unique serial number for use in data analysis and statistics by the task evaluation module.

[0068] (3) According to the task type and task profile content of each task event, the number of subtasks and the subtask execution time of the task event are determined, and each subtask is given a unique serial number for tracking the execution progress of the task event. The subtask execution time is counted by the data collection module.

[0069] The core element of the event-driven equipment support assessment method is the event algorithm of the simulation process, which includes the task process model algorithm, the equipment resource configuration process model algorithm, the parts supply process algorithm, the corrective maintenance process algorithm, the maintenance resource allocation algorithm, the transportation event execution algorithm, etc. The task process model algorithm is discussed in detail below.

[0070] 1. Task Process

[0071] The processing flow of basic equipment tasks takes into account the use guarantee and fault repair issues during task execution. If the use guarantee cannot be completed, the task will enter a limited time waiting period for task guarantee. When a fault occurs during the task, it is necessary to determine whether it affects the task execution based on the impact of the number of available equipment on the task. If it does, the task will be interrupted based on the actual situation of the equipment. Serious faults that do not affect the execution of the task will be repaired after the task is completed (currently all faults are sent for repair). After the task is completed, it is determined whether the preventive conditions are met. If so, preventive maintenance is required (preventive maintenance is only issued in the task list at this stage and is not triggered after the task is completed). The equipment task process sub-model is as follows Figure 4 shown.

[0072] 2. Task Types

[0073] In the equipment support program evaluation and decision support model, task types are divided into two categories: basic tasks and task profiles. Basic tasks are the underlying units and detailed requirements of tasks, and task profiles are the execution plans of tasks.

[0074] 1. Basic tasks

[0075] The execution process of any task can be divided into the following three stages: departure, execution and return. Figure 4 As shown. The mission begins in the departure phase and remains in this phase until it reaches the mission execution area. The mission then enters the execution phase, which it remains in until the return phase begins. Before returning to the base, the mission is in the return phase. (The trigger and return times considered in this phase are both 0, and no departure and return time inputs are found).

[0076] According to the impact of equipment failure on the mission, the equipment support plan evaluation and decision support platform defines basic tasks as one of the following three types: fixed, continuous, and extendable.

[0077] Fixed tasks (this stage is to complete this type of task) in the entire task execution cycle, once the equipment fails and does not meet the task execution conditions, then return, the task fails, such as Figure 6 shown.

[0078] Continuous mission: During the entire mission execution cycle, once the equipment fails and the mission execution conditions are not met, the mission will not be terminated. First, consider replacing the equipment or performing equipment maintenance and support activities. After the mission execution conditions are met, continue to execute the mission until the mission execution time ends. The time spent on replacing or repairing equipment is also considered as part of the mission execution time, that is, the actual mission execution time of the equipment is less than the planned mission execution time, such as Figure 7 shown.

[0079] Extended tasks are similar to continuous tasks, with the only difference being that extended tasks will compensate for equipment downtime caused by unexpected reasons into the task execution time, i.e. the actual equipment usage time is always equal to the task execution time, while the length of continuous tasks is fixed, e.g. Figure 8 shown.

[0080] In basic tasks, it is necessary to define the duration, the number of equipment required to start the task, and the task execution mode.

[0081] 2. Mission Profile

[0082] Basic tasks describe the basic properties and characteristics of a single task, but how these basic tasks are arranged and planned in each simulation cycle is described by the task profile. The underlying unit-type basic tasks of the task profile are divided into three types according to different task initiation methods in the equipment support program evaluation and auxiliary decision-making platform: planned tasks, regenerative tasks, and random tasks.

[0083] The planned task is to formulate the task profile based on a single basic task in the execution profile. Each basic task is started according to the set start time and the number of tasks is determined.

[0084] The creation and triggering of subtasks in a regenerative task profile are mainly completed by the previous subtask in the same series. The first subtask in a regenerative task is similar to a fixed task, which is created and triggered at a specified time. In order to keep the subtasks in a regenerative task in the task execution phase, there must be overlap between subtasks. Therefore, a subtask needs to trigger the start clock of its successor task before its task execution phase ends.

[0085] This method allows the subsequent subtask to enter the task execution phase when the current subtask enters the return phase. Before triggering its successor task, the subtask will verify whether its subsequent subtask has entered the specified trigger time of the regeneration task. In order for the sub-equipment to start working, there must be enough time so that the next sub-equipment is already in the task departure phase before the previous sub-equipment returns. If a task in the regeneration task sequence is abnormally interrupted, its subsequent task will start execution immediately at the interruption time (unless the subsequent task has already started execution).

[0086] Random tasks only set the task execution time period and the number of task executions, and the specific task trigger time is randomly generated.

[0087] 3. Task Execution Algorithm Implementation

[0088] Whether the task continues to be executed is determined based on the task type and the status of the equipment executing the task. In the system, when a task is executed, the status of the task is 1 and the status of the equipment executing the task is 1.

[0089] (1) Fixed tasks

[0090] If(Task Type = 'Fixed Task')then

[0091] {

[0092] If (task execution time < agreed time) then

[0093] {

[0094] V_Sbnum = Check the device that executes the task (task number)

[0095] If V_Sbnum < minimum number of devices then

[0096] {

[0097] Task status = aborted;

[0098] All devices in use = Idle

[0099] }

[0100] Else

[0101] {

[0102] Task running time = Task running time + time increment

[0103] For(i=1;i<=V_Sbnum;i++)

[0104] {

[0105] Device usage time (i) = Device usage time (i) + time increment

[0106] }

[0107] } / / End of judgment

[0108] } / / (task execution time < agreed time)

[0109] Else

[0110] {

[0111] Set task execution status = completed

[0112] Set the device operating state = idle

[0113] } / / (task execution time < agreed time)

[0114] } / / Fixed task

[0115] The task evaluation module of the present invention includes the task requirement time within the task time period, the actual task execution time, the number of spare parts required in each time period, the number of spare parts actually satisfied, the number of personnel required in each time period, and the number of personnel actually satisfied. In addition, the simulation also outputs the task success rate, task execution time ratio, equipment availability, and spare parts shortage.

[0116] Although the present invention has been described with reference to the embodiments shown in the accompanying drawings, equivalent or alternative means may be used without departing from the scope of the claims. The components described and illustrated in the present invention are merely examples of systems / devices and methods that can be used to implement the embodiments of the present disclosure, and may be replaced with other devices and components without departing from the scope of the claims.

Claims

1. An event-driven equipment support assessment method, wherein: The equipment support assessment method is based on an equipment support simulation system, which includes a simulation input module, a task generation module, an event queue processing module and a task assessment module; the task generation module includes a task queue generation submodule and an equipment call model; the event queue processing module includes a fault sampling module, a data collection module and a simulation calculation module; the equipment support assessment method includes: The simulation input module provides simulation input, and each data in the simulation input is equipment support related event information containing time information; The task generation module calls the task queue generation submodule according to the input information input by the simulation input module to generate task queue information; and simultaneously starts the equipment calling model; The fault sampling module generates fault queue information according to the task queue information and the relevant equipment data information; the generation of fault queue information includes: the fault sampling module samples and calculates the fault time point of the component according to the failure rate distribution of the equipment components; traverses all components of all equipment, sorts the fault information of all components in chronological order, and forms the fault queue information; the fault queue information contains the earliest fault point information as the equipment fault event point, thereby triggering the maintenance guarantee demand; the event queue processing module withdraws the equipment with the fault event point from the task according to the maintenance guarantee demand; The fault queue information and the task queue information together form event queue information containing a time series, so as to be read by an event queue processing module; The event queue processing module creates an event queue list according to the read queue information; the event queue processing module processes the event ranked first in the event queue list, and calls the corresponding simulation calculation module according to the first time; The simulation calculation module includes a plurality of simulation calculation models and a simulation time advancer, wherein the plurality of simulation calculation models include: a task execution model, a resource allocation model, a spare parts shortage model, a preventive maintenance model and a corrective maintenance model; After the first time queue event is processed, the event queue processing module deletes the first time queue event accordingly, enters the queue event of the second time, and calls the corresponding event queue processing module again to process the queue event of the second time; Enter the task evaluation module, and the task evaluation module calculates and counts various output data; The data collection module records all the data in the database, and then the simulation time advancer continues to advance according to the time step until the simulation end conditions are met. Finally, the task evaluation module conducts statistical analysis of equipment support effectiveness.

2. The event-driven equipment support assessment method according to claim 1 is characterized in that: The equipment support assessment method further includes: After the event queue processing module processes the first time queue event, the event queue processing module determines whether a new event is generated. If so, all events are reordered in chronological order and enter the task generation module; if not, the event queue processing module determines whether the queue is ended.

3. The event-driven equipment support assessment method according to claim 1 is characterized in that: The simulation input includes: combat scenarios, equipment models, support organizations, maintenance models, maintenance work and support resource information; combat scenarios include combat units and mission profile information; equipment models include component information and equipment structure; support organizations include site information and supply structure; maintenance models include preventive maintenance and corrective maintenance; maintenance work includes maintenance activities and resource requirements; support resources include resource types and resource deployment.

4. The event-driven equipment support assessment method according to claim 1 is characterized in that: The calling of the corresponding simulation calculation module comprises: Resource acquisition: determine the resources required for repairing faulty parts, including personnel, equipment, and spare parts. If all are met, repair will be carried out directly. If any of them is not met, apply for resources from superiors and record the waiting time until the requirements are met. Maintenance execution, repairing the faulty parts of the equipment according to the maintenance time distribution type and based on the fault queue information until the maintenance is completed; The equipment is on standby. After maintenance is completed, the equipment enters the standby state and continues to execute the task arrangement according to the task type until the simulation ends.

5. The event-driven equipment support assessment method according to claim 1 is characterized in that: The logical processes of tasks, corrective maintenance, preventive maintenance, spare parts inventory supply, and resource allocation in the event processing module are determined by the task execution model, corrective maintenance model, preventive maintenance model, spare parts shortage model, and resource allocation model respectively; the relationship between the events in the event processing module is as follows: after the simulation starts, the simulation input module first provides input information including the task plan, and the task generation module generates task queue information based on the input information, starts the equipment calling model, and calls the equipment according to the task queue information; during the entire task process, there are three possible equipment states: (1) normal task execution, failure, and preventive maintenance execution - when it is in the normal task execution state, no other time series are triggered and the simulation moves forward; (2) when a failure occurs, corrective maintenance activities need to be carried out, which will trigger the corrective maintenance model. During the maintenance process, spare parts and related support resources will also be used, which will trigger the spare parts shortage model and resource allocation model; (3) when it is in preventive maintenance, the preventive maintenance model will be triggered, and the resource allocation model will be triggered at the same time.

6. The event-driven equipment support assessment method according to claim 1 is characterized in that: The process of creating an event queue list includes: Generate task queue: Based on the data of combat scenarios, equipment models, support organizations, maintenance models, maintenance work and support resource information in the simulation input, jointly query the combat units and task profiles to form a series of independent task event tables according to the required occurrence time; Give each task event a unique serial number, which is used by the task evaluation module for data analysis and statistics; According to the task type and task profile content of each task event, the number of subtasks and subtask execution time of the task event are determined, and each subtask is given a unique serial number for tracking the execution progress of the task event. The subtask execution time is counted by the data collection module.

7. The event-driven equipment support assessment method according to claim 1 is characterized in that: The algorithm of the task execution model includes: event queue information triggers the start of the task; performs a system status check to determine equipment failure or perform preventive maintenance to prevent the equipment from being in an unavailable state, and if it is unavailable, performs corrective maintenance; if the system status check is available, enters standby to determine whether the task start conditions are met; if so, executes the task; when a failure occurs during the task, determine whether it affects the task execution based on the degree of impact of the number of available equipment on the task, and if so, interrupt the task execution based on the actual equipment situation; repair serious failures that do not affect the task execution after the task is completed; after the task is completed, determine whether the preventive conditions are met, and if so, perform preventive maintenance.

Citation Information

Patent Citations

  • Monte-Carlo-method-based aircraft maintenance support process evaluation method

    CN110188457A

  • Repairing maintenance model for equipment support and implementation method thereof

    CN116187713A

  • Equipment support auxiliary decision-making method based on simulation modeling

    CN116415427A