A steelmaking continuous casting plant roof dust removal pipeline installation structure and its use method
Through the combination of transport brackets, horizontal push brackets and pipe support structures, the problems of steelmaking continuous casting plant roof dust removal pipe installation affecting construction period and maintenance affecting production were solved, and rapid installation and impact-free dust removal pipe replacement were achieved.
Patent Information
- Application Number
- CN202310170800.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-02-27
- Publication Date
- 2025-10-03
- Estimated Expiration
- 2043-02-27
AI Technical Summary
When installing the dust removal ducts on the roof of a steelmaking continuous casting plant, failure to install the reserved roof beams in the new construction project will affect the construction period, and removing the beams during maintenance will affect the normal operation of the production crane.
The transport bracket, horizontal push bracket and pipe support structure are adopted. Through the combination of the pipe support bracket and the arc support plate, the winch and roller assembly are used to achieve rapid installation and traction of the dust removal pipe, avoiding the removal of roof beams.
The dust removal duct can be quickly installed when the roof beams are already installed, avoiding construction delays and ensuring that the normal operation of the production crane is not affected during maintenance.
Smart Images

Figure CN116293094B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of converter equipment installation, and in particular relates to a steelmaking continuous casting plant roof dust removal pipeline installation structure and a use method thereof. Background Art
[0002] The dust removal ducts on the roof of the steelmaking continuous casting plant are installed in the pipe supports above the longitudinal beams of the roof steel structure. In the new construction project, in order to install the dust removal ducts, the roof beams of the plant can only be reserved and not installed to facilitate the lifting of the dust removal ducts. This method causes the roof structure of the plant to be unable to be closed in time, seriously affecting the construction period. When the dust removal ducts on the roof of the continuous casting plant are replaced and repaired during the maintenance project, since the roof structure is completely closed, the removal of the roof beams of the plant to replace the dust removal ducts will affect the normal operation of the production cranes in the plant. Summary of the Invention
[0003] The main purpose of the present invention is to propose a steelmaking continuous casting plant roof dust removal pipeline installation structure and a use method thereof, which can effectively solve the problems in the background technology.
[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0005] A steelmaking continuous casting plant roof dust removal pipeline installation structure, comprising
[0006] Several roof longitudinal beams,
[0007] A plurality of roof beams, each of which is installed between two adjacent roof longitudinal beams, and the roof longitudinal beams and roof beams are divided into a dust removal duct installation area and a dust removal duct teaming area;
[0008] Several pipe supports, each of which is fixedly mounted on two adjacent roof longitudinal beams. The pipe supports include:
[0009] Two pipe support brackets are of a gate-shaped structure and are respectively fixedly mounted on two adjacent roof longitudinal beams;
[0010] Two arc-shaped support plates can be fixedly mounted on the top of the pipe support bracket respectively, and a plurality of roller assemblies are fixedly mounted along the arc on the side of the arc-shaped support plate;
[0011] The transport bracket is fixedly mounted on the outer side of the pipe support at the edge of the dust removal duct group area, and the transport bracket includes
[0012] A plurality of transport columns are fixedly installed on the roof longitudinal beams and roof transverse beams;
[0013] A plurality of connecting beams are fixedly installed between the transport columns and the pipe support brackets;
[0014] Two track beams, fixedly mounted on top of the plurality of connecting beams;
[0015] The horizontal push bracket is fixedly installed on two adjacent pipe supports in the dust removal pipe team area. The horizontal push bracket includes
[0016] A plurality of cross beams are fixedly installed between the two pipe support brackets;
[0017] A plurality of horizontal push columns are fixedly installed on the top of the beam;
[0018] A plurality of longitudinal beams are fixedly mounted on the top of the horizontal push columns;
[0019] The longitudinal beam is slightly higher than the lowest point of the arc of the arc-shaped support plate, and the top of the longitudinal beam is higher than the top of the pipe support bracket.
[0020] Preferably, the pipe support bracket includes
[0021] Two vertical legs, fixedly mounted on two adjacent roof longitudinal beams;
[0022] A horizontal beam is fixedly installed between the tops of the two vertical legs.
[0023] Preferably, connecting plates are fixedly installed at both ends of the two side surfaces of the horizontal beam. The connecting plates are semicircular structures with a circular hole in the middle. A shackle is installed in the circular hole. The pipe supports are connected together by fixing a steel wire rope on the shackle, and both ends of the steel wire rope are anchored on the roof longitudinal beam.
[0024] Preferably, a turnbuckle is provided between the steel wire rope and the shackle.
[0025] Preferably, the roller assembly includes
[0026] Two ear seats, fixedly mounted on the sides of the arc-shaped support plate;
[0027] The roller is rotatably mounted between the two ear seats.
[0028] A method for using a dust removal duct installation structure for a steelmaking continuous casting plant roof comprises the following steps:
[0029] S1. Installation of pipe supports: After the longitudinal beams and transverse beams of the steel structure roof of the steelmaking continuous casting plant are installed, the pipe supports are installed in the dust removal pipe installation area. Both the pipe support brackets and the arc support plates are installed. In the dust removal pipe teaming area, only the pipe support brackets are installed without the arc support plates.
[0030] S2. Installation of transport bracket:
[0031] S3, installation of horizontal push bracket;
[0032] S4. Trolley installation: Use the two rail beams of the transport bracket as the running track of the trolley. Install the trolley on the two rail beams to transport the dust removal pipe. The top of the trolley should be flush with the longitudinal beam of the horizontal push bracket.
[0033] S4. Dust removal duct assembly: Hoist the dust removal duct onto the top of the trolley and transport it to the location via the track beam. Then roll the dust removal duct onto the longitudinal beam and align the center of the dust removal duct with the center of the pipe support. Roll multiple sections of dust removal duct into place in sequence and connect them to form an integral duct.
[0034] S5. Pulling the dust removal duct into place: A winch is installed on the longitudinal beam on one side of the steelmaking continuous casting plant roof. The winch is used to pull the integral duct assembled on the longitudinal beam to the area where the dust removal duct is to be installed. The integral duct is sequentially brought into contact with the roller assemblies located on the sides of the curved support plate. Guided by the roller assemblies, the integral duct is pulled into place above the installed curved support plate in the dust removal duct installation area.
[0035] S6. Removal of roller assemblies: When all the pipe supports with curved support plates installed in the dust removal pipe installation area are covered with dust removal pipes, remove the roller assemblies so that the dust removal pipes are completely located on the curved support plates;
[0036] S7. Installation of dust removal ducts and arc support plates in the dust removal duct team area;
[0037] S8. Remove the transport bracket and horizontal push bracket, and the dust removal duct installation work is completed.
[0038] The present invention provides a steelmaking continuous casting plant roof dust removal duct installation structure and a method for using the same, which have the following beneficial effects:
[0039] The present invention adopts the structure of the transport bracket, the horizontal push bracket and the pipe support and the use method thereof, so that the dust removal duct can be quickly installed when the roof beams have been installed. The factory roof structure cannot be closed in time due to the reserved factory roof beams not being installed, which seriously affects the construction period. At the same time, when the dust removal ducts on the continuous casting factory roof are replaced and repaired during the maintenance project, the roof beams do not need to be removed, and the normal operation of the production crane in the factory will not be affected. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a schematic diagram of the dust removal duct assembly of the present invention;
[0041] Figure 2 This is a schematic diagram of the structure of the transport bracket of the present invention;
[0042] Figure 3 This is a schematic diagram of the structure of the horizontal push bracket of the present invention;
[0043] Figure 4This is a schematic diagram of the pipe support structure of the present invention;
[0044] Figure 5 This is a schematic diagram of the pipe support reinforcement of the present invention;
[0045] Figure 6 This is a schematic diagram of the dust removal pipeline traction of the present invention.
[0046] In the figure: 1. Roof longitudinal beam; 2. Roof transverse beam; 3. Pipe support; 31. Pipe support bracket; 311. Vertical support leg; 312. Horizontal beam; 32. Arc support plate; 33. Roller assembly; 331. Ear seat; 332. Roller; 34. Connecting plate; 4. Transport bracket; 41. Transport column; 42. Connecting beam; 43. Track beam; 5. Transverse push bracket; 51. Transverse beam; 52. Transverse push column; 53. Longitudinal beam; 6. Wire rope; 7. Basket bolt; 8. Trolley; 9. Winch; 10. Dust removal duct; 100. Dust removal duct installation area; 200. Dust removal duct teaming area. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical solutions and advantages of the present invention more clear, the technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the present invention.
[0048] The following will clearly and completely describe the technical solutions of the present invention in conjunction with the embodiments. Obviously, the embodiments described are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0049] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like to indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operate in a specific direction, and therefore should not be understood as limiting the present invention.
[0050] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the said features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0051] Examples, such as Figure 1-6 As shown, a dust removal duct installation structure for a steelmaking continuous casting plant roof comprises a plurality of roof longitudinal beams 1, a plurality of roof transverse beams 2, a plurality of pipe supports 3, a transport bracket 4, a horizontal push bracket 5, the roof transverse beams 2 are respectively installed between two adjacent roof longitudinal beams 1, and the roof longitudinal beams 1 and the roof transverse beams 2 are divided into a dust removal duct installation area 100 and a dust removal duct teaming area 200; the pipe supports 3 are fixedly installed on two adjacent roof longitudinal beams 1, the pipe supports 3 include two pipe support 3 brackets and two arc-shaped support plates 32, the two pipe support 3 brackets are of a door-shaped structure, and are respectively fixedly installed on two adjacent roof longitudinal beams 1; the two arc-shaped support plates 32 can be respectively fixedly installed on the top of the pipe support 3 bracket, and the side of the arc-shaped support plate 32 is fixedly installed with a plurality of roller assemblies 33 along the arc; the transport bracket 4 is fixedly installed on the outer side of the pipe support 3 at the edge of the dust removal duct team area 200, and the transport bracket 4 includes a plurality of transport columns 41, a plurality of connecting beams 42, and two track beams 43. The transport columns 41 are fixedly installed on the roof longitudinal beams 1 and the roof cross beams 2; the connecting beams 42 are fixedly installed between the transport columns and the pipe support 3 brackets; the two track beams 43 are fixedly installed on the tops of the plurality of connecting beams 42; the horizontal pushing bracket 5 is fixedly installed on two adjacent pipe supports 3 in the dust removal duct team area 200, and the horizontal pushing bracket 5 includes a plurality of horizontal beams 51, a plurality of horizontal pushing columns 52, and a plurality of longitudinal beams 53. The horizontal beam 51 is fixedly installed between the two pipe support 3 brackets; the horizontal pushing columns 52 are fixedly installed on the tops of the horizontal beams 51; and the longitudinal beams 53 are fixedly installed on the tops of the horizontal pushing columns 52;
[0052] The longitudinal beam 53 is slightly higher than the lowest point of the arc of the arc-shaped support plate 32 , and the top of the longitudinal beam 53 is higher than the top of the pipe support 3 .
[0053] In a specific embodiment, the pipe support 3 includes two vertical legs 311 and a horizontal beam 312 . The two vertical legs 311 are fixedly mounted on two adjacent roof longitudinal beams 1 ; the horizontal beam 312 is fixedly mounted between the tops of the two vertical legs 311 .
[0054] In a specific embodiment, connecting plates 34 are fixedly installed at both ends of the two side surfaces of the horizontal beam 312. The connecting plates 34 are semicircular structures with a circular hole in the middle. A shackle is installed in the circular hole. The pipe supports 3 are connected together by fixing a steel wire rope 6 on the shackle. Both ends of the steel wire rope 6 are anchored on the roof longitudinal beam 1, so that the pipe supports 3 have a strong anti-dumping ability.
[0055] In a specific embodiment, a turnbuckle 7 is provided between the steel wire rope 6 and the shackle, and the turnbuckle 7 is used to tension the steel wire rope 6, thereby further improving the anti-dumping capability of the pipe support 3.
[0056] In a specific embodiment, the roller assembly 33 includes two ear seats 331 and a roller 332. The two ear seats 331 are fixedly installed on the side of the arc-shaped support plate 32; the roller 332 is rotatably installed between the two ear seats 331, and the rotation of the roller 332 plays a guiding role.
[0057] The present invention also provides a method for using a steelmaking continuous casting plant roof dust removal pipeline installation structure, comprising the following steps:
[0058] S1. Installing pipe supports 3: After installing the steel structure roof longitudinal beams 1 and roof transverse beams 2 of the steel continuous casting plant, install pipe supports 3 in the dust removal duct installation area 100. Install both the pipe support 3 bracket and the arc-shaped support plate 32. Install only the pipe support 3 bracket in the dust removal duct assembly area 200, without installing the arc-shaped support plate 32.
[0059] S2. Installation of transport bracket:
[0060] S3, installation of the horizontal push bracket 5;
[0061] S4. Install the trolley 8: Use the two rail beams 43 of the transport bracket as the running track of the trolley 8. Install the trolley 8 on the two rail beams 43 to transport the dust removal pipe. The top of the trolley 8 is flush with the longitudinal beam 53 of the horizontal push bracket 5.
[0062] S4. Assemble the dust removal duct 10: Hoist the dust removal duct 10 onto the top of the trolley 8 and transport it to the position via the track beam 43. Then, roll the dust removal duct 10 onto the longitudinal beam 53 so that the center of the dust removal duct 10 coincides with the center of the pipe support 3. Roll multiple sections of the dust removal duct 10 into position and connect them to form an integral duct.
[0063] S5. Pulling the dust removal duct 10 into place: A hoist 9 is installed on the roof longitudinal beam 1 on one side of the steelmaking continuous casting plant roof. The hoist 9 pulls the integral duct assembled on the longitudinal beam 53 to the dust removal duct installation area 100. The integral duct is sequentially brought into contact with the roller assemblies 33 located on the sides of the arc-shaped support plate 32. Guided by the roller assemblies 33, the integral duct is pulled into position above the installed arc-shaped support plate 32 in the dust removal duct installation area 100.
[0064] S6. Remove the roller assembly 33: When all the pipe supports 3 with the arc-shaped support plates 32 installed in the dust removal pipe installation area 100 are covered with dust removal pipes 10, remove the roller assembly 33 so that the dust removal pipes are completely located on the arc-shaped support plates 32;
[0065] S7, installation of the dust removal ducts in the dust removal duct grouping area 200 and installation of the arc-shaped support plate 32;
[0066] S8. Remove the transport bracket 4 and the horizontal push bracket 5, and the dust removal duct installation work is completed.
[0067] The force support points of the transport bracket 4 and the horizontal pushing bracket 5 are both located on the roof longitudinal beam 1. The roof longitudinal beam 1 is a heavy steel structure beam with high supporting strength; multiple sections of dust removal pipes are combined together on the horizontal pushing bracket 5 and pulled into place as a whole, which improves construction efficiency; a roller assembly 33 is arranged on the arc support plate 32 to assist in pulling the dust removal pipe and reduce friction resistance. The roller assembly 33 is simple to set and highly operational; the transport columns 41, connecting beams 42, track beams 43 of the transport bracket 4 and the cross beams 51, cross pushing columns 52, and longitudinal beams 53 of the horizontal pushing bracket 5 are all light steel structures and can be installed manually without the assistance of lifting machinery. The longitudinal beam 53 is slightly higher than the lowest point of the arc of the arc support plate 32, and will not hinder the traction of the dust removal pipe in the dust removal pipe installation area 100. The top of the longitudinal beam 53 is higher than the top of the pipe support 3 bracket, which facilitates the subsequent installation of the arc support plate 32 in the dust removal pipe teaming area 200.
[0068] The present invention adopts the structure of the transport bracket 4, the horizontal pushing bracket 5 and the pipe support 3 and the use method thereof, so that the dust removal duct can be quickly installed when the roof beam 2 has been installed. The factory roof structure cannot be closed in time due to the reserved factory roof beam 2 not being installed, which seriously affects the construction period. At the same time, when the dust removal duct on the continuous casting factory roof is replaced and repaired during the maintenance project, the roof beam 2 does not need to be removed, and the normal operation of the production crane in the factory will not be affected.
[0069] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims
1. A steelmaking continuous casting plant roof dust removal pipeline installation structure, characterized by: Including several roof longitudinal beams, A plurality of roof beams, each of which is installed between two adjacent roof longitudinal beams, and the roof longitudinal beams and roof beams are divided into a dust removal duct installation area and a dust removal duct teaming area; Several pipe supports, each of which is fixedly mounted on two adjacent roof longitudinal beams. The pipe supports include: Two pipe support brackets are of a gate-shaped structure and are respectively fixedly mounted on two adjacent roof longitudinal beams; Two arc-shaped support plates can be fixedly mounted on the top of the pipe support bracket respectively, and a plurality of roller assemblies are fixedly mounted along the arc on the side of the arc-shaped support plate; The transport bracket is fixedly mounted on the outer side of the pipe support at the edge of the dust removal duct group area, and the transport bracket includes A plurality of transport columns are fixedly installed on the roof longitudinal beams and roof transverse beams; A plurality of connecting beams are fixedly installed between the transport columns and the pipe support brackets; Two track beams, fixedly mounted on top of the plurality of connecting beams; The horizontal push bracket is fixedly installed on two adjacent pipe supports in the dust removal pipe team area. The horizontal push bracket includes A plurality of cross beams are fixedly installed between the two pipe support brackets; A plurality of horizontal push columns are fixedly installed on the top of the beam; A plurality of longitudinal beams are fixedly mounted on the top of the horizontal push columns; The longitudinal beam is slightly higher than the lowest point of the arc of the arc-shaped support plate, and the top of the longitudinal beam is higher than the top of the pipe support bracket.
2. The steelmaking continuous casting plant roof dust removal duct installation structure according to claim 1, characterized in that: The pipe support bracket includes Two vertical legs, fixedly mounted on two adjacent roof longitudinal beams; A horizontal beam is fixedly installed between the tops of the two vertical legs.
3. The steelmaking continuous casting plant roof dust removal duct installation structure according to claim 2, characterized in that: The two ends of the two sides of the horizontal beam are respectively fixed with connecting plates. The connecting plates are semicircular structures with a circular hole in the middle. A shackle is installed in the circular hole. The pipe supports are connected together by fixing a steel wire rope on the shackle. The two ends of the steel wire rope are anchored on the roof longitudinal beam.
4. The steelmaking continuous casting plant roof dust removal duct installation structure according to claim 3, characterized in that: A turnbuckle is provided between the steel wire rope and the shackle.
5. The steelmaking continuous casting plant roof dust removal duct installation structure according to claim 1, characterized in that: The roller assembly includes Two ear seats, fixedly mounted on the sides of the arc-shaped support plate; The roller is rotatably mounted between the two ear seats.
6. The method for using the steelmaking continuous casting plant roof dust removal duct installation structure according to any one of claims 1 to 5, characterized in that: The steps include: S1. Installation of pipe supports: After the longitudinal beams and transverse beams of the steel structure roof of the steelmaking continuous casting plant are installed, the pipe supports are installed in the dust removal pipe installation area. Both the pipe support brackets and the arc support plates are installed. In the dust removal pipe teaming area, only the pipe support brackets are installed without the arc support plates. S2. Installation of transport bracket: S3, installation of horizontal push bracket; S4. Trolley installation: Use the two rail beams of the transport bracket as the running track of the trolley. Install the trolley on the two rail beams to transport the dust removal pipe. The top of the trolley should be flush with the longitudinal beam of the horizontal push bracket. S4. Dust removal duct assembly: Hoist the dust removal duct onto the top of the trolley and transport it to the location via the track beam. Then roll the dust removal duct onto the longitudinal beam and align the center of the dust removal duct with the center of the pipe support. Roll multiple sections of dust removal duct into place in sequence and connect them to form an integral duct. S5. Pulling the dust removal duct into place: A winch is installed on the longitudinal beam on one side of the steelmaking continuous casting plant roof. The winch is used to pull the integral duct assembled on the longitudinal beam to the area where the dust removal duct is to be installed. The integral duct is sequentially brought into contact with the roller assemblies located on the sides of the curved support plate. Guided by the roller assemblies, the integral duct is pulled into place above the installed curved support plate in the dust removal duct installation area. S6. Removal of roller assemblies: When all the pipe supports with curved support plates installed in the dust removal pipe installation area are covered with dust removal pipes, remove the roller assemblies so that the dust removal pipes are completely located on the curved support plates; S7. Installation of dust removal ducts and arc support plates in the dust removal duct team area; S8. Remove the transport bracket and horizontal push bracket, and the dust removal duct installation work is completed.
Citation Information
Patent Citations
An installation method for a main air-discharge pipe of a sintering machine
CN108571894A
Old plant dust removal pipeline transformation and mounting method and special pipeline moving and hoisting device thereof
CN112377672A