Maintenance platform and installation method for guide pulleys of winch-type gate hoists

By designing a top-down hoist guide pulley maintenance platform, which uses components such as support beams, uprights, and pedals, the problems of instability and high cost of high-altitude maintenance platforms are solved, maintenance efficiency is improved, and safety is ensured.

CN116354286BActive Publication Date: 2026-03-13CHINA YANGTZE POWER
View PDF 3 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2026-03-13

AI Technical Summary

Technical Problem

The maintenance of the guide pulley of the winch-type gate hoist needs to be carried out at a high altitude. Conventional methods such as lowering the basket and erecting scaffolding have problems such as unstable working platform, high cost and long construction period, which affect the maintenance efficiency.

Method used

Design a hoist-type gate hoist guide pulley maintenance platform, which adopts a top-to-bottom installation method and includes components such as support beams, uprights, pedals and foot kick frames. The uprights are positioned and fixed through movable sections and limiting protrusions, and are securely connected using U-shaped positioning parts and anchor bolts.

Benefits of technology

It improved the installation efficiency of the maintenance platform, simplified high-altitude operations, reduced labor intensity, and ensured operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116354286B_ABST
    Figure CN116354286B_ABST
Patent Text Reader

Abstract

A maintenance platform for the guide pulley of a winch-type gate hoist includes a support beam spanning across an opening in the ground. Multiple vertically downward-pointing uprights pass through the support beam, and multiple parallel bottom crossbars pass through the lower ends of the uprights. A footrest is mounted perpendicular to each bottom crossbar on the bottom crossbar, and a kick plate is provided on the platform surface formed by the footrest. This invention, employing the above structure and a top-down installation method, effectively simplifies the installation operation of the maintenance platform, improves the efficiency of winch-type gate hoist guide pulley maintenance, and ensures safety during operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of hoist-type gate hoist guide pulley maintenance technology, specifically a hoist-type gate hoist guide pulley maintenance platform and installation method. Background Technology

[0002] The maintenance of guide pulleys for winch-type gate hoists needs to be carried out at high altitudes. Currently, the conventional method is to lower a suspended platform, but the stability of the work platform cannot be guaranteed during the process. Therefore, maintenance work is more often carried out by erecting scaffolding. Since the maintenance location is high above the ground, erecting scaffolding from the ground up has the problems of high cost and long construction period, which greatly affects the efficiency of maintenance work on guide pulleys for winch-type gate hoists. Summary of the Invention

[0003] The technical problem to be solved by the present invention is to provide a maintenance platform and installation method for the guide pulley of a winch-type gate hoist. The top-to-bottom installation method effectively simplifies the installation operation of the maintenance platform, improves the efficiency of the maintenance of the guide pulley of the winch-type gate hoist, and ensures the safety of the operation.

[0004] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a hoist-type gate hoist guide pulley maintenance platform, including a support beam, the support beam being laid across and above a hole in the ground, multiple vertically downward uprights passing through the support beam, multiple parallel bottom crossbars passing through the lower end of the uprights, a pedal perpendicular to the bottom crossbar being provided on the bottom crossbar, and a kick frame plate being provided on the platform surface formed by the pedal.

[0005] In a preferred embodiment, the support beam is provided with a movable section, the two ends of which are hinged at the break of the support beam, and a vertical pole tube is inserted through the movable section, with the vertical pole passing through the vertical pole tube.

[0006] In a preferred embodiment, a limiting protrusion ring with the same outer diameter as the outer diameter of the upright tube is provided near the upper end of the upright. The limiting protrusion ring rests on the top surface of the upright tube to achieve vertical positioning of the upright.

[0007] In a preferred embodiment, U-shaped positioning components are installed on the ground on both sides of the hole, and the two ends of a single support beam are fixed inside the U-shaped positioning components.

[0008] In the preferred embodiment, both the support beam and the movable section have rectangular cross-sections. Two uprights are threaded through a single support beam. A pressure plate is installed on the top surface of the support beam. The pressure plate has a through hole with an inner diameter that is the same as the outer diameter of the upright tube and the limiting protrusion ring. The pressure plate is pressed and set on the top surface of the support beam. Both ends of the pressure plate are also set in U-shaped positioning parts.

[0009] In a preferred embodiment, the top surfaces of both ends of the pressure plate are flush with the top surfaces of the U-shaped positioning parts. A first pressure plate fixing plate is installed on both ends of the pressure plate. The first pressure plate fixing plate is "Z" shaped. The upper horizontal part of the first pressure plate fixing plate presses against the top surface of the end of the pressure plate. The lower horizontal part of the first pressure plate fixing plate is provided with threaded holes. Anchor bolts are installed in the threaded holes to connect and fix the lower horizontal part of the first pressure plate fixing plate to the ground.

[0010] In a preferred embodiment, the bottom surface of the pedal is provided with a clamp with a central angle exceeding 180°, and the clamp is securely fastened to the bottom crossbar.

[0011] In a preferred embodiment, the kick frame is a rectangular frame structure composed of multiple kick frames, and multiple reinforcing plates are also provided in the middle of the kick frame.

[0012] In the preferred embodiment, the two support beams located on the same vertical plane are fixed at the ends by a U-shaped second pressure plate fastener, and the second pressure plate fastener is also fixed to the ground by anchor bolts.

[0013] The installation method for the hoist-type gate hoist guide pulley maintenance platform described above includes the following steps:

[0014] 1) Install multiple sets of U-shaped positioning parts on the sides of the two holes on the ground;

[0015] 2) Install the support beam between the two opposing U-shaped positioning pieces;

[0016] 3) By rotating the movable section on the support beam to tilt the upright cylinder, insert the upright into the upright cylinder;

[0017] 4) Repeat step 3) to complete the installation of multiple uprights in sequence;

[0018] 5) Install a pressure plate above the support beam to press the support beam firmly, thus keeping the movable section fixed relative to the support beam;

[0019] 6) Install the first pressure plate fixing plate and the second pressure plate fixing component. After pressing the two ends of the pressure plate, tighten the first pressure plate fixing plate and the second pressure plate fixing component with anchor bolts.

[0020] 7) Install multiple bottom crossbars at the bottom of multiple uprights;

[0021] 8) Install the pedals perpendicular to the bottom crossbar, and tighten the clamps on the pedals onto the bottom crossbar;

[0022] 9) Install the kick frame and reinforcement plate.

[0023] The present invention provides a hoist-type gate hoist guide pulley maintenance platform and installation method, which, by adopting the above structure and method, has the following beneficial effects:

[0024] (1) The top-down installation method solves the problem of inconvenient scaffolding erection at high altitudes, effectively improves the installation efficiency of the maintenance platform, and speeds up the maintenance operation process;

[0025] (2) Considering the long length of the uprights, the uprights are installed on the support beams by oblique insertion, which alleviates the space requirements for the uprights to stand upright and also reduces the labor intensity during installation. Attached Figure Description

[0026] The present invention will be further described below with reference to the accompanying drawings and embodiments:

[0027] Figure 1 This is a schematic diagram of the overall structure of the present invention.

[0028] Figure 2 This is a schematic diagram of the structure after the pole of the present invention is installed in place.

[0029] Figure 3 This is a schematic diagram of the pedal structure of the present invention.

[0030] Figure 4 This is a schematic diagram of the pole structure of the present invention.

[0031] Figure 5 This is a schematic diagram of the pressure plate structure of the present invention.

[0032] In the diagram: 1. Ground; 2. Hole; 3. U-shaped positioning piece; 4. Support beam; 5. Movable section; 6. Upright tube; 7. Upright; 8. Pressure plate; 801. Through-pole hole; 9. First pressure plate fixing plate; 10. Second pressure plate fixing piece; 11. Bottom crossbar; 12. Pedal; 121. Clamp; 13. Kick frame plate; 14. Reinforcing plate; 15. Limiting protrusion ring; 16. Threaded hole. Detailed Implementation

[0033] Example 1:

[0034] like Figure 1 -6, a hoist-type gate hoist guide pulley maintenance platform includes a support beam 4, which spans across the hole 2 on the ground 1. Multiple vertical poles 7 are inserted through the support beam 4, and multiple parallel bottom crossbars 11 are inserted through the lower end of the poles 7. A pedal 12 perpendicular to the bottom crossbar 11 is provided on the bottom crossbar 11, and a kick frame plate 13 is provided on the platform surface formed by the pedal 12.

[0035] In a preferred embodiment, the support beam 4 is provided with a movable section 5, the two ends of the movable section 5 are hinged at the break of the support beam 4, and a vertical pole tube 6 is passed through the movable section 5, with the vertical pole 7 passing through the vertical pole tube 6.

[0036] In a preferred embodiment, the upright 7 is provided with a limiting protrusion 15 with the same outer diameter as the upright cylinder 6 near its upper end. The limiting protrusion 15 rests on the top surface of the upright cylinder 6 to achieve vertical positioning of the upright 7.

[0037] In the preferred embodiment, U-shaped positioning components 3 are installed on the ground 1 on both sides of the hole 2, and the two ends of the single support beam 4 are fixed inside the U-shaped positioning components 3.

[0038] In the preferred embodiment, both the support beam 4 and the movable section 5 have rectangular cross sections. Two uprights 7 are threaded through a single support beam 4. A pressure plate 8 is installed on the top surface of the support beam 4. The pressure plate 8 has a rod hole 801 with an inner diameter that is the same as the outer diameter of the upright cylinder 6 and the limiting protrusion ring 15. The pressure plate 8 is pressed and set on the top surface of the support beam 4. Both ends of the pressure plate 8 are also set in the U-shaped positioning member 3.

[0039] In a preferred embodiment, the top surfaces of both ends of the pressure plate 8 are flush with the top surface of the U-shaped positioning member 3. A first pressure plate fixing plate 9 is installed on both ends of the pressure plate 8. The first pressure plate fixing plate 9 is "Z" shaped. The upper horizontal part of the first pressure plate fixing plate 9 presses against the top surface of the end of the pressure plate 8. The lower horizontal part of the first pressure plate fixing plate 9 is provided with threaded holes 16. Anchor bolts are installed in the threaded holes 16 to connect and fix the lower horizontal part of the first pressure plate fixing plate 9 to the ground 1.

[0040] In a preferred embodiment, the bottom surface of the pedal 12 is provided with a clamp 121 with a central angle exceeding 180°, and the clamp 121 is clamped onto the bottom crossbar 11.

[0041] In a preferred embodiment, the kick frame 13 is a rectangular frame structure composed of multiple kick plates, and multiple reinforcing plates 14 are also provided in the middle of the kick frame 13.

[0042] Example 2:

[0043] Based on Example 1, the two support beams 4 located on the same vertical plane are fixed at the ends by a U-shaped second pressure plate fastener 10, and the second pressure plate fastener 10 is also fixed to the ground 1 by anchor bolts.

[0044] Example 3:

[0045] The installation method of the hoist-type gate hoist guide pulley maintenance platform described in Example 1 includes the following steps:

[0046] 1) Install multiple sets of U-shaped positioning parts 3 on the sides of the two holes 2 on the ground 1;

[0047] 2) Install the support beam 4 between the two opposing U-shaped positioning pieces 3;

[0048] 3) By rotating the movable section 5 on the support beam 4, so that the upright cylinder 6 is in an inclined state, insert the upright 7 into the upright cylinder 6;

[0049] 4) Repeat step 3) to complete the installation of multiple uprights 7 in sequence;

[0050] 5) Install a pressure plate 8 above the support beam 4, and press the support beam 4 with the pressure plate 8 to keep the movable section 5 fixed relative to the support beam 4;

[0051] 6) Install the first pressure plate fixing plate 9 and the second pressure plate fixing component 10. After pressing the two ends of the pressure plate 8, tighten the first pressure plate fixing plate 9 and the second pressure plate fixing component 10 with anchor bolts.

[0052] 7) Install multiple bottom crossbars 11 at the bottom of multiple uprights 7;

[0053] 8) Install the pedal 12 perpendicular to the bottom crossbar 11 on the bottom crossbar 11, so that the clamp 121 on the pedal 12 is clamped to the bottom crossbar 11;

[0054] 9) Install the kick frame plate 13 and the reinforcing plate 14.

[0055] Example 4:

[0056] In Example 3, the bottom crossbar 11 in step 7) can be installed using fasteners. Considering the difficulty of installing fasteners at high altitudes, installation holes can be pre-drilled at the bottom of the upright 7, and the bottom crossbar 11 can be directly installed through the installation holes during the installation process.

[0057] If a mounting hole structure is used, the bottom crossbar 11 should be installed immediately after a set of uprights 7 is installed in step 3) to reduce the difficulty of manual installation work below the platform.

Claims

1. A hoist-type gate hoist guide pulley maintenance platform, characterized in that: Includes a support beam (4), which spans across the hole (2) on the ground (1). Multiple vertical poles (7) are installed on the support beam (4), and multiple parallel bottom crossbars (11) are installed at the lower end of the poles (7). A footboard (12) perpendicular to the bottom crossbar (11) is installed on the bottom crossbar (11), and a kick frame (13) is provided on the platform surface formed by the footboard (12). The support beam (4) is provided with a movable section (5), the two ends of the movable section (5) are hinged at the break of the support beam (4), and a vertical tube (6) is provided on the movable section (5), and the vertical pole (7) is provided through the vertical tube (6).

2. The hoist-type gate hoist guide pulley maintenance platform according to claim 1, characterized in that: The pole (7) is provided with a limiting protrusion (15) with the same outer diameter as the pole tube (6) near the upper end. The limiting protrusion (15) rests on the top surface of the pole tube (6) to achieve vertical positioning of the pole (7).

3. The hoist-type gate hoist guide pulley maintenance platform according to claim 2, characterized in that: U-shaped positioning parts (3) are installed on the ground (1) on both sides of the hole (2), and the two ends of the single support beam (4) are fixed in the U-shaped positioning parts (3).

4. The hoist-type gate hoist guide pulley maintenance platform according to claim 3, characterized in that: The cross-sections of the support beam (4) and the movable section (5) are both rectangular. Two uprights (7) are installed on a single support beam (4). A pressure plate (8) is installed on the top surface of the support beam (4). The pressure plate (8) has a through hole (801) with an inner diameter that is the same as the outer diameter of the upright cylinder (6) and the limiting protrusion ring (15). The pressure plate (8) is pressed and set on the top surface of the support beam (4). Both ends of the pressure plate (8) are also set in the U-shaped positioning piece (3).

5. The hoist-type gate hoist guide pulley maintenance platform according to claim 4, characterized in that: The top surfaces of both ends of the pressure plate (8) are flush with the top surface of the U-shaped positioning piece (3). A first pressure plate fixing plate (9) is installed on both ends of the pressure plate (8). The first pressure plate fixing plate (9) is "Z" shaped. The upper horizontal part of the first pressure plate fixing plate (9) presses against the top surface of the end of the pressure plate (8). A threaded hole (16) is provided on the lower horizontal part of the first pressure plate fixing plate (9). Anchor bolts are installed in the threaded hole (16) to achieve the connection and fixation between the lower horizontal part of the first pressure plate fixing plate (9) and the ground (1).

6. The hoist-type gate hoist guide pulley maintenance platform according to claim 5, characterized in that: The bottom surface of the pedal (12) is provided with a clamp (121) with a central angle of more than 180°, and the clamp (121) is clamped on the bottom crossbar (11).

7. A hoist-type gate hoist guide pulley maintenance platform according to claim 6, characterized in that: The kick frame (13) is a rectangular frame structure composed of multiple kick frames, and multiple reinforcing plates (14) are also provided in the middle of the kick frame (13).

8. A hoist-type gate hoist guide pulley maintenance platform according to claim 7, characterized in that: The two support beams (4) located on the same vertical plane are fixed at the ends by a U-shaped second pressure plate fastener (10), and the second pressure plate fastener (10) is also fixed to the ground (1) by anchor bolts.

9. The installation method of the guide pulley maintenance platform for a winch-type gate hoist according to claim 8, characterized in that... Includes the following steps: 1) Install multiple sets of U-shaped positioning parts (3) on the side of the two holes (2) on the ground (1); 2) Install the support beam (4) between the two opposite U-shaped positioning pieces (3); 3) By rotating the movable section (5) on the support beam (4) to make the upright cylinder (6) tilted, insert the upright (7) into the upright cylinder (6); 4) Repeat step 3) to complete the installation of multiple uprights (7) in sequence; 5) Install a pressure plate (8) above the support beam (4) and press the support beam (4) with the pressure plate (8) to keep the movable section (5) fixed relative to the support beam (4); 6) Install the first pressure plate fixing plate (9) and the second pressure plate fixing piece (10). After pressing the two ends of the pressure plate (8), tighten the first pressure plate fixing plate (9) and the second pressure plate fixing piece (10) with anchor bolts. 7) Install multiple bottom crossbars (11) at the bottom of multiple uprights (7); 8) Install a pedal (12) perpendicular to the bottom crossbar (11) on the bottom crossbar (11) so that the clamp (121) on the pedal (12) clamps the bottom crossbar (11). 9) Install the kick frame plate (13) and the reinforcing plate (14).

Citation Information

Patent Citations

  • Access apparatus

    CN101538937A

  • Scaffold

    CN115012638A

  • Overhanging scaffold for constructional engineering

    CN212802454U