A system for hanging ceramic tiles

By incorporating inclined grooves and clamping components into the terracotta bricks, the problems of low installation efficiency and high cost of terracotta brick hanging systems are solved, achieving stable hanging, simplifying the construction process, reducing costs, and improving safety.

CN116446568BActive Publication Date: 2026-01-09HAOHENG (FUJIAN) BUILDING MATERIALS TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310082993.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-30
Publication Date
2026-01-09
Estimated Expiration
2043-01-30

AI Technical Summary

Technical Problem

Existing ceramic brick mounting systems are inefficient and costly during installation and dismantling, especially posing safety risks during high-altitude operations. Furthermore, the complex mounting structure increases construction difficulty and cost.

Method used

The design employs a slanted groove and clamping element. By creating slanted grooves in the ceramic brick and using the snap-fit ​​springs of the clamping element to fix it in different directions, the installation process is simplified, the reliance on bolts and adhesives is reduced, and the installation efficiency and safety are improved.

Benefits of technology

It achieves a stable connection of ceramic tiles, simplifies the installation and dismantling process, reduces costs, improves construction efficiency, reduces safety risks of working at heights, and enhances the overall aesthetics through the grouting effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116446568B_ABST
    Figure CN116446568B_ABST
Patent Text Reader

Abstract

The application discloses a kind of ceramic brick hanging system, comprising: locking on the mounting surface of mounting piece, mounting piece includes the several clamping pieces that extend from mounting piece top surface upward, clamping piece is integrally formed with mounting piece;Hanging on the mounting piece of ceramic brick, ceramic brick and the side surface of ceramic brick mutually adhere, ceramic brick is provided with a inclined groove, inclined groove is hung on clamping piece;Inclined groove includes the first installation part that is provided in the side away from ceramic brick finish, the spring sheet installation part that is extended from the side of first installation part;Clamping piece includes the first clamping part that is provided in the upward extension of mounting piece, first clamping part is in contact with first installation part, the clamping spring sheet that is connected in the side of first clamping part, clamping spring sheet is clamped in spring sheet installation part, and the speed of mounting and dismounting can be greatly accelerated, and because the structure of hanging is relatively simple, so overall cost is greatly reduced, and compared with, more market competitiveness.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to a kind of building brick installation system, in particular to a kind of ceramic brick hanging system. BACKGROUND

[0002] Ceramic brick is usually made of high-quality clay and purple clay and other raw materials, compared with traditional clay brick, ceramic brick is more delicate, color is more stable, line is beautiful, it is a new energy-saving building curtain wall material, no pollution, green environmental protection, light weight, high strength, corrosion resistance, good anti-seismic and anti-freezing performance, sound insulation and noise reduction, meet the national building energy-saving requirements, make traditional ceramic culture and modern architecture clever and perfect combination.

[0003] When forming curtain wall, ceramic brick is often used to groove in the back of ceramic brick, then the hanging piece is clamped in the groove of ceramic brick, then the hanging piece is hung on the connecting piece, finally the connecting piece is fixed on the keel, thus completing the process of rapid installation.

[0004] However, the existing slotting method either directly grooves deep in the inside of ceramic brick to improve the effect of hanging, or directly sets a variety of complex hanging structures to improve the hanging force by stacking the hanging structures, if directly grooving deep for fixing and matching, although the hanging force is sufficient, but the solid part of the brick body is thinned, the thickness of the brick body is thinned, which is easy to break or even break, and if a large number of hanging structures are connected, it needs a more complex process in the process of installation or disassembly and replacement, if the installation and replacement position is a higher point, the worker is difficult to work in the air, the installation efficiency is low, and a large number of hanging structures will also lead to the increase of the installation cost of the whole curtain wall, which is not convenient for the construction party to control the cost.

[0005] Therefore, the present application aims to provide a low-cost ceramic brick hanging system with simple hanging structure and stable hanging force. SUMMARY

[0006] The present application provides a kind of ceramic brick hanging system, which can effectively solve the above problems.

[0007] The present application is realized as follows:

[0008] A kind of ceramic brick hanging system, comprising:

[0009] The mounting piece is locked on the mounting surface, the mounting piece includes a plurality of clamping pieces extending upward from the top surface of the mounting piece, and the clamping pieces are integrally formed with the mounting piece;

[0010] The ceramic brick is hung on the mounting piece, the ceramic brick is in contact with the side surface of the ceramic brick, a slanted groove is formed on the ceramic brick, and the slanted groove is hung on the clamping piece.

[0011] The inclined groove comprises a first mounting portion opened on a side away from the ceramic tile facing, and a spring mounting portion extending from a side of the first mounting portion;

[0012] The clamping member comprises a first clamping portion extending upward from the mounting member, the first clamping portion abutting against the first mounting portion, and a clamping spring connected to a side of the first clamping portion, the clamping spring being clamped in the spring mounting portion.

[0013] As a further improvement, the inclined groove further comprises a second mounting portion extending from an end of the first mounting portion to the interior of the ceramic tile, and the clamping member further comprises a second clamping portion extending from an end of the first clamping portion and located in the second mounting portion.

[0014] As a further improvement, the first mounting portion is obliquely arranged, the spring mounting portion is in communication with the first mounting portion and is flush with the horizontal plane, the first clamping portion is clamped in the first mounting portion, and the clamping spring is clamped in the spring mounting portion and is flush with the horizontal plane.

[0015] As a further improvement, the first mounting portion is obliquely arranged, the spring mounting portion is in communication with a side of the first mounting portion and is obliquely arranged downward, the first clamping portion is clamped in the first mounting portion, and the clamping spring is clamped in the spring mounting portion and is obliquely arranged downward.

[0016] As a further improvement, the first mounting portion is obliquely arranged, the spring mounting portion is in communication with a side of the first mounting portion and is obliquely arranged upward, the first clamping portion is clamped in the first mounting portion, and the clamping spring is clamped in the spring mounting portion and is obliquely arranged upward.

[0017] As a further improvement, the first mounting portion is obliquely arranged, the spring mounting portion is in communication with a side of the first mounting portion, the second mounting portion is obliquely arranged downward from an end of the first mounting portion, the first clamping portion is clamped in the first mounting portion, the clamping spring is clamped in the spring mounting portion, and the second clamping portion is obliquely arranged downward and is clamped in the second mounting portion.

[0018] As a further improvement, the first mounting portion is obliquely arranged, the spring mounting portion is in communication with a side of the first mounting portion, the second mounting portion is obliquely arranged upward from an end of the first mounting portion, the first clamping portion is clamped in the first mounting portion, the clamping spring is clamped in the spring mounting portion, and the second clamping portion is obliquely arranged upward and is clamped in the second mounting portion.

[0019] As a further improvement, the first mounting portion is obliquely arranged, the elastic sheet mounting portion is communicated at the side of the first mounting portion, the second mounting portion is obliquely upward from the end of the first mounting portion, the first clamping portion is clamped in the first mounting portion, the second clamping portion is provided with two, the second clamping portions are arranged at intervals and clamped in the second mounting portion, and the clamping elastic sheet is arranged between the two second clamping portions and clamped in the elastic sheet mounting portion.

[0020] As a further improvement, the mounting member is a C-shaped steel, a plurality of clamping members are uniformly arranged on the C-shaped steel at equal intervals, and the C-shaped steel is locked on a keel frame, and the keel frame is locked on the mounting surface.

[0021] As a further improvement, the mounting member is a mounting bottom plate, a plurality of clamping members are arranged on the mounting bottom plate, and the mounting bottom plate is locked on the mounting surface or the keel frame, and the keel frame is locked on the mounting surface.

[0022] The beneficial effects of the present application are:

[0023] The present application has the following beneficial effects: BRIEF DESCRIPTION OF DRAWINGS

[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following will briefly introduce the drawings needed to be used in the embodiments. It should be understood that the following drawings only show some embodiments of the present application, and therefore should not be regarded as a limitation to the scope. For those skilled in the art, other related drawings can also be obtained without creative labor.

[0025] Figure 1 is a structural schematic diagram of a ceramic tile hanging system provided by the present application (first view).

[0026] Figure 2It is a structure schematic view of a ceramic brick hanging system provided by the present application (second view angle).

[0027] Figure 3 It is a structure schematic view of a mounting base plate provided by the present application.

[0028] Figure 4 It is a front structure schematic view of a ceramic brick hanging system provided by the first embodiment of the present application.

[0029] Figure 5 It is a front structure schematic view of a ceramic brick provided by the first to third embodiments of the present application.

[0030] Figure 6 It is a front structure schematic view of a ceramic brick provided by the fourth to sixth embodiments of the present application.

[0031] Figure 7 It is a structure schematic view of a clamping piece provided by the first embodiment of the present application.

[0032] Figure 8 It is a structure schematic view of a clamping piece provided by the second embodiment of the present application.

[0033] Figure 9 It is a structure schematic view of a clamping piece provided by the third embodiment of the present application.

[0034] Figure 10 It is a structure schematic view of a clamping piece provided by the fourth embodiment of the present application.

[0035] Figure 11 It is a structure schematic view of a clamping piece provided by the fifth embodiment of the present application.

[0036] Figure 12 It is a structure schematic view of a clamping piece provided by the sixth embodiment of the present application. DETAILED DESCRIPTION

[0037] For the embodiments of the present application, all belong to the protection scope of the present application. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the claimed application, but only represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative labor, belong to the protection scope of the present application.

[0038] In the description of the present application, the terms "first", "second" are only used for the purpose of description, and cannot be understood as the purpose of indicating the manner, technical solutions and advantages are clearer, the technical solutions in the embodiments of the present application will be described clearly and completely, obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments or implied relative importance or implicitly indicated the number of technical features obtained by those skilled in the art without creative labor. Therefore, the features with "first", "second" can be explicitly or implicitly included one or more features. In the description of the present application, the meaning of "multiple" is two or more than two, unless otherwise specifically limited.

[0039] Under the construction requirements, dry hanging method gradually replaces wet hanging method, various dry hanging structures are also endless, but, in order to ensure the safety performance of the existing dry hanging structure, it is completely connected to various installation locking structures upwards, for example, through various bolts, glue, adhesive, to form a stable structure between the ceramic tile and the hanging piece, in this way, although the ceramic tile can be installed stably, but it needs to go through a long installation process during the installation stage, the worker's construction period is long, the cost is high, and once one of them is damaged or needs to be replaced, the replacement procedure is complex, the labor intensity of the worker is too high, the high altitude operation increases the risk by one part of time, in order to solve the above technical problems, the present application proposes the following technical scheme:

[0040] Referring to Figures 1-12 A ceramic tile hanging system, comprising: an installation piece 1 locked on the installation surface, the installation piece 1 comprising a plurality of clamping pieces 11 extending upward from the top surface of the installation piece 1, the clamping pieces 11 being integrally formed with the installation piece 1; a ceramic tile 3 hung on the installation piece 1, the ceramic tile 3 being in close contact with the side surface of the ceramic tile 3, the ceramic tile 3 being provided with an inclined groove 31, the inclined groove 31 being hung on the clamping piece 11; the inclined groove 31 comprising a first installation portion 311 provided on the side away from the surface of the ceramic tile 3, and a spring installation portion 312 extending from the side of the first installation portion 311; the clamping piece 11 comprising a first clamping portion 111 extending upward from the installation piece 1, the first clamping portion 111 being in abutment with the first installation portion 311, and a clamping spring 112 connected to the side of the first clamping portion 111, the clamping spring 112 being clamped in the spring installation portion 312.

[0041] Firstly, during installation, the mounting piece 1 can be directly installed on a conventional keel frame, and in some uneven mounting surfaces, such as in some uneven brick wall structures, since the surface is uneven and cannot be fixed with a keel frame, the mounting piece 1 can be directly fixed to the uneven mounting surface without the transition of the keel frame, and the installation method is more flexible.

[0042] During actual installation, the ceramic brick 3 can be hung vertically or horizontally, as long as the position of the corresponding clamping piece 11 is adjusted. According to the user's needs, the worker can change the installation direction.

[0043] In the embodiment, the clamping piece 11 does not need to be separately welded on the mounting piece 1, nor is it fixed on the mounting piece 1, but it is part of the mounting piece 1. In the embodiment, the mounting piece 1 can adopt a conventional mounting piece 1 structure, but before leaving the factory, the manufacturer can assemble the mounting piece 1 according to the requirements of the building facade that the customer needs, such as knowing in advance the spacing between the bricks and the bricks, so as to determine the specific layout position of the clamping piece 11. Before leaving the factory, the shape of the clamping piece 11 is cut by a cutting machine, and then the clamping piece 11 is rolled into a shape suitable for the brick hanging groove by a plate rolling machine. After the hanging piece is transported to the site, it can be immediately put into use without the need for craftsmen to process on site.

[0044] In the embodiment, the ceramic brick 3 is divided into an outer decorative brick layer 32 and an outer connecting brick layer 33. Both the outer decorative brick layer 32 and the outer connecting brick layer 33 are made of clay and have good thermal insulation performance after being installed as a curtain wall or other decorative surface.

[0045] The outer decorative brick layer 32 can be dyed in different colors or carved with different patterns according to the purpose and installation environment, which is not limited.

[0046] The thickness of the outer connecting brick layer 33 is at least 2-3 cm longer than the inclined groove 31 to ensure the overall strength of the outer connecting brick layer 33.

[0047] In the embodiment, the outer connecting brick layer 33 on a single ceramic brick 3 is provided with two inclined grooves 31 to ensure that the hanging piece can provide sufficient hanging force to hold the outer decorative brick layer 32 and the outer connecting brick layer 33.

[0048] Since the longitudinal hanging force needs to be provided, the inclined groove 31 can only be inclined. If the inclined groove 31 is simply a straight groove or a T-shaped groove, the structure of the clamping piece 11 needs to be changed, making the structure of the clamping piece 11 complex and increasing the cost.

[0049] However, if the node is pulled and fixed in a single direction, when the ceramic tile 3 is subjected to an external force in the same direction, all the clamping parts in the same direction may fail at the same time, causing the ceramic tile 3 to fall. Therefore, in the embodiment, the ceramic tile 3 is not only provided with the inclined first clamping part 111 for hanging, but also provided with the clamping spring 112 extending to the other side based on the first clamping part 111, which is divided into two directions to hang the ceramic tile 3. Even if all of them are deformed and fail due to external force in one direction, the other direction can still be fixed by the fixed node for pulling and connecting, so as not to lose the binding effect at once, and the ceramic tile 3 is fixed with an additional layer of protection.

[0050] In the above, the clamping spring 112 is arranged on the side of the first clamping part 111. In fact, the clamping spring 112 can be arranged at the midpoint of the first clamping part 111, or near the slot of the first clamping part 111, or at the end of the first clamping part 111. It is not limited to the position of the arrangement, as long as it is opposite to the extension position of the first clamping part 111.

[0051] However, due to the limited length of the extension of the first clamping part 111 and the first mounting part 311, the pulling force is limited when pulling and connecting on one side of the extension direction, and the first clamping part 111 is easy to deform. Therefore, in order to improve the effect of pulling and connecting, the inclined slot 31 further comprises a second mounting part 313 extending from the end of the first mounting part 311 to the inside of the ceramic tile 3, and the clamping part 11 further comprises a second clamping part 113 extending from the end of the first clamping part 111 and located in the second mounting part 313. The second clamping part 113 extending inwardly is further fixed based on the first clamping part 111, so that the first clamping part 111, the first mounting part 311, the clamping spring 112 and the spring mounting part 312, and the second clamping part 113 and the second mounting part 313 form three points and two directions of fixation. The overall fixation effect is equivalent to a complex hanging structure, but it is completely superior to the complex hanging structure in terms of disassembly and cost control.

[0052] Furthermore, the ceramic tile 3 and the mounting part 1 in the embodiment are completely fixed by mechanical hanging, clamping, abutting and adhering, and no bolts are used in the entire hanging process. Even after being installed to a high height, workers can still easily install it without needing to lock the screws for a long time. In the entire process, no adhesive or glue is used to avoid the difficulty of disassembly caused by the fixing effect of the glue during replacement. In the embodiment, if the ceramic tile 3 needs to be replaced, the corresponding vertical row of ceramic tiles 3 can be taken out layer by layer from the top or side, and then the complete ceramic tile 3 can be inserted in turn.

[0053] After the hanging is completed, in the longitudinal direction, the ceramic tiles 3 are stacked one by one and fixed by the clamping members 11, and in the longitudinal direction, the ceramic tiles 3 are fixed by the clamping members 11, and in the transverse direction, the ceramic tiles 3 are tightly attached to each other to form a tight structure, and are pressed against each other, thereby forming a complete curtain wall structure, and the hanging process described above can also be changed in direction, for example, the ceramic tiles 3 are fixed by the clamping members 11 in the transverse direction, and the ceramic tiles 3 are attached to each other in the longitudinal direction.

[0054] In a conventional curtain wall or other decorative wall, after the ceramic tiles or other tiles are fixed, some caulking needs to be done to improve the thermal insulation and waterproofing capacity of the decorative wall, and also to improve the overall aesthetics, but in this embodiment, the caulking is directly realized by the ceramic tile body, specifically, the outer decorative tile layer 32 and the outer connecting tile layer 33 are integrally formed, and the outer connecting tile layer 33 is at least partially longer than the outer decorative tile layer 32, and the protruding part serves as one side of the caulking, and the extension block 3321 of the outer connecting tile layer 33 is clamped in the matching groove 3322, but its width is wider, and after being clamped in the matching groove 3322, part of it is still exposed outside, serving as the other side of the caulking, and the four sides of the adjacent ceramic tiles form the caulking, without the need for separate caulking construction structure and steps, and the caulking is formed by itself.

[0055] Because different buildings and different installation positions have different requirements for the ceramic tiles 3 and the clamping members 11, correspondingly, the installation of the installation part in the inclined groove 31 and the installation of the clamping part and the clamping spring 112 in the clamping member 11 also need to be adjusted adaptively, and specific embodiments are as follows, first, the case where the second clamping part 113 does not exist in the clamping member 11.

[0056] Embodiment one

[0057] Referring to Figure 5 , 7 , the first installation part 311 is inclined, the spring installation part 312 is in communication with the first installation part 311 and is flush with the horizontal plane, the first clamping part 111 is clamped in the first installation part 311, and the clamping spring 112 is clamped in the spring installation part 312 and is flush with the horizontal plane, wherein the clamping spring 112 is installed horizontally, the overall structure is stable, the extension direction is actually flush with the base surface of the entire ceramic tile 3, and it can uniformly unload force regardless of the external force from the front or the back, and the pulling force is stable.

[0058] Embodiment two

[0059] Referring to Figure 5 , 8The difference between this embodiment and Embodiment 1 is that both the spring plate mounting part 312 and the snap-fit ​​spring plate 112 are arranged downwards. Specifically, the first mounting part 311 is inclined, the spring plate mounting part 312 is connected to the side of the first mounting part 311 and is inclined downwards, the first snap-fit ​​part 111 is snapped into the first mounting part 311, and the snap-fit ​​spring plate 112 is snapped into the spring plate mounting part 312 and is inclined downwards. When pulling together relatively heavy ceramic bricks 3, the snap-fit ​​spring plate 112 arranged in the same direction can be tightly hooked with the spring plate mounting part 312 protruding outwards, so that even for heavy ceramic bricks 3, there can be a good pulling effect.

[0060] Example 3

[0061] Reference Figure 5 , 9 The difference between this embodiment and Embodiment 1 is that both the spring plate mounting part 312 and the snap-fit ​​spring plate 112 are arranged upwards. Specifically, the first mounting part 311 is inclined, the spring plate mounting part 312 is connected to the side of the first mounting part 311 and is inclined upwards, the first snap-fit ​​part 111 is snapped into the first mounting part 311, and the snap-fit ​​spring plate 112 is snapped into the spring plate mounting part 312 and is inclined upwards, so that the first snap-fit ​​part 111 and the snap-fit ​​spring plate 112 form a "V"-shaped fork effect, which can achieve the same effect as Embodiment 1.

[0062] In the above embodiments one to three, the inclined groove 31 is only provided with a first mounting part 311 and a spring piece mounting part 312, and the clamping member 11 is only provided with a first snap-fit ​​part 111 and a snap-fit ​​spring piece 112. This is suitable for thinner and lighter materials. However, for thicker and heavier ceramic bricks 3, the above two-layer fixation is obviously insufficient. Due to the increase in thickness, a second mounting part 313 is provided extending inward on the ceramic brick 3. The second snap-fit ​​part 113 is provided extending on the basis of the first snap-fit ​​part 111, thereby providing three-point tie-fixation for the thicker and heavier ceramic brick 3, as shown in the following embodiments:

[0063] Example 4

[0064] Reference Figure 6 , 10The difference between the embodiment and the embodiments one to three is that the second mounting portion 313 and the second clamping portion 113 are arranged, specifically, the first mounting portion 311 is arranged obliquely, the elastic sheet mounting portion 312 is connected to the side of the first mounting portion 311, the second mounting portion 313 is obliquely downward from the end of the first mounting portion 311, the first clamping portion 111 is clamped in the first mounting portion 311, the clamping elastic sheet 112 is clamped in the elastic sheet mounting portion 312, the second clamping portion 113 is obliquely downward and clamped in the second mounting portion 313, the side line of the first clamping portion 111 is fixed, the point at the end of the second clamping portion 113 is fixed, the opposite side of the clamping elastic sheet 112 is combined, three-point fixing effect is formed, and quick and stable mounting is achieved.

[0065] Embodiment five

[0066] With reference to Figure 6 , 11 The difference between the embodiment and the embodiment four is that the second clamping portion 113 is obliquely upward, specifically, the first mounting portion 311 is arranged obliquely, the elastic sheet mounting portion 312 is connected to the side of the first mounting portion 311, the second mounting portion 313 is obliquely upward from the end of the first mounting portion 311, the first clamping portion 111 is clamped in the first mounting portion 311, the clamping elastic sheet 112 is clamped in the elastic sheet mounting portion 312, the second clamping portion 113 is obliquely upward and clamped in the second mounting portion 313, and the same technical effect as the above embodiment can be achieved.

[0067] Embodiment six

[0068] With reference to Figure 6 , 12 The difference between the embodiment and the embodiment five is that the second clamping portion 113 is arranged in two, specifically, the first mounting portion 311 is arranged obliquely, the elastic sheet mounting portion 312 is connected to the side of the first mounting portion 311, the second mounting portion 313 is obliquely upward from the end of the first mounting portion 311, the first clamping portion 111 is clamped in the first mounting portion 311, the second clamping portion 113 is arranged in two, the second clamping portions 113 are arranged at intervals and clamped in the second mounting portion 313, the clamping elastic sheet 112 is arranged between the two second clamping portions 113 and clamped in the elastic sheet mounting portion 312, in the embodiment, the two second clamping portions 113 are arranged, compared with the original arrangement of one second clamping portion 113, different fixing points in the same direction are increased, the clamping elastic sheet 112 is arranged in the middle of the two second clamping portions 113, the internal structure of the clamping piece 11 can form balance, the whole pulling effect is ensured, and more fixing points are extended.

[0069] In actual use, the clamping elastic pieces 112 in embodiments one to six can be sheet-shaped or arc-shaped, and the positions of the clamping elastic pieces 112 can be adjusted according to the installation requirements.

[0070] Embodiment seven

[0071] With reference to Figures 1-2 The mounting member 1 is a C-shaped steel 1A, a plurality of clamping members 11 are uniformly and equidistantly arranged on the C-shaped steel 1A, the C-shaped steel 1A is locked on a keel frame, the keel frame is locked on the mounting surface, and the fixing mode of the C-shaped steel 1A can be used on a small building or a local mounting surface. According to the above-mentioned, the factory opens the positions and intervals of the clamping members 11 according to the size of the ceramic tile 3 of the customer, and directly locks the C-shaped steel 1A on the keel frame or the mounting surface after being transported to the site, and then the ceramic tile 3 is hung step by step.

[0072] The style of the clamping member 11 arranged on the C-shaped steel 1A can be any of the styles in the above-mentioned embodiments, and the corresponding style of the inclined groove 31 of the ceramic tile 3 matched therewith can also be any of the styles in the above-mentioned embodiments, which can be used in combination.

[0073] Embodiment eight

[0074] With reference to Figure 3 The difference between this embodiment and embodiment seven is that the mounting member 1 is a mounting bottom plate 1B. Specifically, the mounting member 1 is a mounting bottom plate 1B, a plurality of clamping members 11 are arranged on the mounting bottom plate 1B, and the mounting bottom plate 1B is locked on the mounting surface or the keel frame, which is locked on the mounting surface. When the position where the ceramic tile 3 needs to be hung is a large-area wall body, for example, a full-surface curtain wall needs to be hung, if the C-shaped steel 1A is installed column by column, it is relatively troublesome for workers, although the hanging effect is the same, but the construction period and the cost of workers are increased by more than one time. If the horizontal rods and the vertical rods are directly punched into the keel frame, the full-surface mounting bottom plate 1B can be directly installed on the horizontal rods and the vertical rods of the keel frame, the overall span of the horizontal rods and the vertical rods is large, and the stress of the mounting bottom plate 1B is completely sufficient due to the support of the horizontally and vertically arranged horizontal rods and vertical rods.

[0075] The style of the clamping member 11 arranged on the mounting bottom plate 1B can be any of the styles in the above-mentioned embodiments, and the corresponding style of the inclined groove 31 of the ceramic tile 3 matched therewith can also be any of the styles in the above-mentioned embodiments, which can be used in combination.

[0076] Whether the C-shaped steel 1A or the mounting base 1B, a reinforcing rib is formed thereon to improve the overall strength when the C-shaped steel 1A or the mounting base 1B is subjected to a shaking force or a vibration force.

[0077] The above description is merely the preferred embodiments of the present application, but not for limiting the present application. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A system for hanging ceramic tiles, characterized in that, The utility model relates to a kind of ceramic tile and mounting piece, comprising: Mounting piece (1) is locked on mounting surface, the mounting piece (1) includes several clamping pieces (11) extending upward from the top surface of the mounting piece (1), and the clamping pieces (11) are integrally formed with the mounting piece (1); Ceramic tile (3) is hung on the mounting piece (1), the ceramic tile (3) is attached to the side surface of the ceramic tile (3), a bevel groove (31) is provided on the ceramic tile (3), and the bevel groove (31) is hung on the clamping piece (11); The bevel groove (31) includes a first mounting portion (311) provided on the side away from the finish surface of the ceramic tile (3), and a spring mounting portion (312) extending from the side of the first mounting portion (311); The clamping piece (11) includes a first clamping portion (111) extending upward from the mounting piece (1), the first clamping portion (111) is in abutment with the first mounting portion (311), a clamping spring (112) connected to the side of the first clamping portion (111), and the clamping spring (112) is clamped in the spring mounting portion (312); The bevel groove (31) further includes a second mounting portion (313) extending from the end of the first mounting portion (311) to the inside of the ceramic tile (3), and the clamping piece (11) further includes a second clamping portion (113) extending from the end of the first clamping portion (111) and located in the second mounting portion (313); The first mounting portion (311) is inclined, the spring mounting portion (312) is connected to the side of the first mounting portion (311), the second mounting portion (313) is inclined upward from the end of the first mounting portion (311), the first clamping portion (111) is clamped in the first mounting portion (311), the second clamping portion (113) is provided with two, the second clamping portion (113) is spaced apart and clamped in the second mounting portion (313), and the clamping spring (112) is arranged between the two second clamping portions (113) and clamped in the spring mounting portion (312); The ceramic tile (3) is divided into an outer decorative tile layer (32) and an outer connecting tile layer (33), the outer decorative tile layer (32) and the outer connecting tile layer (33) are integrally formed, and the outer connecting tile layer (33) is at least partially longer than the outer decorative tile layer (32), the part protruding out is used as one side of the joint, a cooperation block (3321) of the outer connecting tile layer (33) is clamped in a cooperation groove (3322), and part of the cooperation block (3321) is exposed outside after being clamped in the cooperation groove (3322), which is used as the other side of the joint, and four sides of the joint are formed between adjacent ceramic tiles (3).

2. A system for hanging ceramic tiles according to claim 1, characterized in that The first mounting portion (311) is inclined, the spring mounting portion (312) is connected to the first mounting portion (311) and is flush with the horizontal plane, the first clamping portion (111) is clamped in the first mounting portion (311), and the clamping spring (112) is clamped in the spring mounting portion (312) and is flush with the horizontal plane.

3. A system for hanging ceramic tiles according to claim 1, characterized in that The first installation part (311) is obliquely arranged, the elastic sheet installation part (312) is communicated at the side of the first installation part (311) and is obliquely arranged downward, the first clamping part (111) is clamped in the first installation part (311), and the clamping elastic sheet (112) is clamped in the elastic sheet installation part (312) and is obliquely arranged downward.

4. A system for hanging ceramic tiles according to claim 1, characterized in that The first installation part (311) is obliquely arranged, the elastic sheet installation part (312) is communicated at the side of the first installation part (311) and is obliquely arranged upward, the first clamping part (111) is clamped in the first installation part (311), and the clamping elastic sheet (112) is clamped in the elastic sheet installation part (312) and is obliquely arranged upward.

5. A system for hanging ceramic tiles according to claim 1, characterized in that The first installation part (311) is obliquely arranged, the elastic sheet installation part (312) is communicated at the side of the first installation part (311), the second installation part (313) is obliquely arranged downward from the end of the first installation part (311), the first clamping part (111) is clamped in the first installation part (311), the clamping elastic sheet (112) is clamped in the elastic sheet installation part (312), and the second clamping part (113) is obliquely arranged downward and is clamped in the second installation part (313).

6. A system for hanging ceramic tiles according to claim 1, characterized in that The first installation part (311) is obliquely arranged, the elastic sheet installation part (312) is communicated at the side of the first installation part (311), the second installation part (313) is obliquely arranged upward from the end of the first installation part (311), the first clamping part (111) is clamped in the first installation part (311), the clamping elastic sheet (112) is clamped in the elastic sheet installation part (312), and the second clamping part (113) is obliquely arranged upward and is clamped in the second installation part (313).

7. A system for hanging ceramic tiles according to claim 1, characterized in that The installation piece (1) is a C-shaped steel (1A), a plurality of clamping pieces (11) are uniformly and equidistantly arranged on the C-shaped steel (1A), the C-shaped steel (1A) is locked on a keel frame, and the keel frame is locked on the installation surface.

8. A system for hanging ceramic tiles according to claim 1, characterized in that The installation piece (1) is a mounting bottom plate (1B), a plurality of clamping pieces (11) are arranged on the mounting bottom plate (1B), the mounting bottom plate (1B) is locked on the installation surface, or the mounting bottom plate (1B) is locked on a keel frame, and the keel frame is locked on the installation surface.

Citation Information

Patent Citations

  • Dry hanging ceramic tile and hanging member thereof

    CN203924576U

  • Earthenware brick hanging system

    CN219298544U

  • Bracket rail for attaching tiles and construction method of dry tiles using the same, and dry tile wall surface structure

    JP2020186637A