Prefabricated building water and electricity pipeline pre-buried construction device
By designing a multifunctional fixing device and adjustment device, the problems of low construction efficiency and unstable fixing caused by the different bending degrees of the embedded pipes in prefabricated buildings are solved, and stable fixation and efficient construction of pipes of different bending degrees are achieved.
Patent Information
- Application Number
- CN202310577996.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-22
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2043-05-22
AI Technical Summary
In existing prefabricated buildings, the bending degree of the embedded pipes is different, resulting in the lack of fully equipped molds, resulting in low construction efficiency and unstable fixation.
A pre-embedded construction device for finely-packed water and electricity pipelines in prefabricated buildings is designed, including a fixing box and a plurality of fixing devices. The fixing device is slidably connected by arc grooves and is equipped with extension rods, arc clips, movable blocks and contraction clips. It can adapt to pipes of different bending degrees and improve fixing stability through adjustment devices and clamping components.
The device can effectively fix pipes with different bending degrees, prevent position deviation, improve construction efficiency, and enhance the stability of the pipe through multi-layer fixing methods.
Smart Images

Figure CN116464832B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pre-buried water and electricity pipelines for decoration, and in particular relates to a pre-buried construction device for prefabricated building fine decoration water and electricity pipelines. Background Art
[0002] As the development of prefabricated buildings is in its infancy, prefabricated houses often encounter various problems during construction. There is little construction experience to draw on, and the construction is difficult. Through research, we summarize the construction experience. During the construction, we may encounter unstable wire pipes that are easily deflected during the pouring of concrete. After the deflection, they cannot be connected to the pre-buried pipelines of the vertical components, and need to be manually chiseled. The contact end of the wire pipe is not accurately connected to the mold during the concrete pouring, which makes it easy to loosen and make the ground pipeline out of the building unusable when it is blocked or damaged. Because some existing pre-buried pipes have different bending degrees, there is no fully matched mold for pre-buried. The mold is made on-site with foam grooving, so it cannot be fully adapted. It will take time to make, and the production efficiency is low. Therefore, a pre-buried construction device for prefabricated water and electricity pipelines is needed to solve the above problems. Summary of the invention
[0003] In view of this, the purpose of the present invention is to provide a pre-buried construction device for water and electricity pipelines in prefabricated buildings to solve the problem encountered in the existing devices during construction that some existing pre-buried pipes have different bending degrees, so there is no fully matching mold for pre-buried, and the mold is made on-site by digging foam grooves, so it cannot be fully adapted.
[0004] In order to achieve the above-mentioned purpose, the pre-buried construction device for prefabricated water and electricity pipelines in assembled buildings of the present invention provides the following technical solutions:
[0005] The prefabricated construction device for pre-buried water and electricity pipelines in assembled buildings of the present invention comprises a fixing box, a fixing device is installed in the fixing box, an arc groove is provided on the upper part of the fixing box, there are multiple arc grooves, one end of the fixing device is located in the fixing box, and the other end of the fixing device extends out of the arc groove and is slidably connected to the arc groove, the fixing device comprises: an extension rod and an arc clamp, the extension rod is slidably connected to the arc groove, the arc clamp is located at the lower end of the extension rod and is hinged to the extension rod, exit holes are provided around the fixing box, a fixing groove is provided on the top of the fixing box, the fixing groove is located on both sides of the arc groove, a protrusion is connected to one side of the fixing groove, arc hooks are hinged on both sides of the extension rod, the extension rod is connected to an adjusting device for clamping the extension rod, support rods are hinged around the fixing box, and a conical head is inserted into the support rod.
[0006] Furthermore, there are multiple fixing devices, and each of the fixing devices also includes: a movable block, a first spring and a retractable clamp, two of the first springs are respectively located on both sides of the extension rod, the other end of the first spring is connected to the arc clamp, the lower end of the arc clamp is hinged to the movable block, the lower end of the movable block is hinged to the retractable clamp, the inner side of the retractable clamp is connected to a second spring, there are two retractable clamps, a fixing plate is connected between the two retractable clamps, the fixing plate is made of soft material, a ratchet is connected at the hinge between the arc clamp and the movable block, the movable block is fixedly connected to the ratchet, a connecting rod is fixedly connected to the central axis of the ratchet, the connecting rod is hinged with a resist, a first spring is connected between the connecting rod and the resist, the other end of the resist is located above the ratchet teeth, and a torsion spring is connected between the arc clamp and the movable block.
[0007] Furthermore, the movable block is connected with a close-fitting component, which includes: an arc block, a telescopic rod, a third spring and a convex circle. The arc block is located on the inner side of the movable block, the interior of the arc block is hollow, the telescopic rod is located in the arc block, the top end of the telescopic rod is connected to the convex circle, and the third spring is located between the convex circle and the telescopic rod.
[0008] Furthermore, an adjusting device is connected to the upper part of the extension rod, and the adjusting device includes: a rack, a fourth spring, a fixed shell and a clamping component, the rack is located on one side of the extension rod, the fixed shell is located on the upper part of the fixed box, the extension rod passes through the fixed shell, the fourth spring is located in the fixed shell and is connected to the extension rod, the clamping component includes: a clamping block, a fifth spring and a lever, a sliding groove is connected in the fixed shell, one end of the clamping block is located in the sliding groove and the other end extends out of the sliding groove, one end of the fifth spring is connected to the inner wall of the sliding groove and the other end is connected to the clamping block, and one end of the lever is connected to the clamping block and the other end passes through the fixed box.
[0009] Furthermore, a mask is connected above the outlet hole, the mask is in a wrinkled shape, and a side of the mask close to the outlet hole is sticky.
[0010] Furthermore, wedge blocks are connected to both sides of the conical head.
[0011] The beneficial effects of the present invention are:
[0012] The prefabricated construction device for pre-buried water and electricity pipelines in assembled buildings of the present invention can slide a fixing device in a plurality of arc-shaped grooves, so that pipes with different bending degrees can be fixed; the fixing grooves provided on both sides of the arc-shaped groove can fix the fixing device when the fixing device is located at different orientations of the arc-shaped groove, thereby preventing the fixing device from being displaced; the pipe can be pressed and fixed by a fixing plate, and then the fixing plate can be pulled by a shrinkage clamp to increase the pressure of the fixing plate; the extension rod can be fixed at different heights by an adjusting device, so that the extension rod can adapt to pipes of different heights; the pipe can be squeezed by a close component, thereby increasing the stability of the pipe.
[0013] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:
[0015] Figure 1 It is a schematic diagram of the structure of the present invention;
[0016] Figure 2 A top view of the present invention;
[0017] Figure 3 This is an enlarged view of point A of the present invention;
[0018] Figure 4 It is a schematic diagram of the components of the regulating device of the present invention;
[0019] Figure 5 It is a schematic diagram of the ratchet and other components of the present invention.
[0020] The markings in the accompanying drawings are as follows: 1. fixing box; 2. cover plate; 3. fixing device; 31. extension rod; 32. arc clamp; 33. movable block; 4. fixing groove; 5. arc hook; 6. convex block; 7. support rod; 8. close-fitting part; 81. arc block; 82. convex circle; 83. third spring; 84. telescopic rod; 9. adjustment device; 91. fixing shell; 92. rack; 93. sliding groove; 94. fifth spring; 95. lever; 96. block; 97. fourth spring; 10. arc groove; 11. conical head; 12. wedge block; 13. contraction clamp; 14. second spring; 15. outlet hole; 16. fixing plate; 17. ratchet; 18. connecting rod; 19. abutment plate; 20. first spring; 21. torsion spring. DETAILED DESCRIPTION
[0021] like Figures 1 to 5As shown, the pre-buried construction device for water and electricity pipelines in assembled buildings of the present invention comprises a fixing box 1, in which a fixing device 3 is installed, and there are multiple fixing devices 3. An arc groove 10 is opened on the upper part of the fixing box 1, and there are multiple arc grooves 10. The arc grooves 10 are evenly arranged vertically. One end of the fixing device 3 is located in the fixing box 1, and the other end of the fixing device 3 extends the arc groove 10 and is slidably connected to the arc groove 10. The fixing device 3 comprises: a movable block 33, an extension rod 31, an arc clamp 32 and a retractable clamp 13. The arc clamp 32 is hinged to the bottom end of the extension rod 31. The lower end of the arc clamp 32 is hinged to the movable block 33, and the movable block 33 is in an inward state. The lower end of the movable block 33 is hinged to the retractable clamp 13, and there are two retractable clamps 13 arranged opposite to each other. The inner side of the contraction clamp 13 is connected to a second spring 14. There are two contraction clamps 13. A fixing plate 16 is connected between the two contraction clamps 13. The fixing plate 16 is made of a soft material and is integrally arranged. Figure 5 As shown, the arc clamp 32 is connected to the ratchet 17 at the hinged joint with the movable block 33, and the movable block 33 is fixedly connected to the ratchet 17. The central axis of the ratchet 17 is fixedly connected to the connecting rod 18, and the connecting rod 18 is hinged with a retaining plate 19. A first spring 20 is connected between the connecting rod 18 and the retaining plate 19. The other end of the retaining plate 19 is located above the teeth of the ratchet 17, and the inclined surface of the teeth of the ratchet 17 is in a clockwise direction. The retaining plate 19 is in conflict with one side of the tooth plane of the ratchet 17. A torsion spring 21 is connected between the arc clamp 32 and the movable block 33. The extension rod 31 is slidably connected to the arc groove 10, and the arc clamp 32 is located at the lower end of the extension rod 31 and is hinged to the extension rod 31. The fixed box 1 is provided with outlet holes 15 all around, and a cover plate 2 is connected above the outlet hole 15. The cover plate 2 is wrinkled, and the side of the cover plate 2 close to the outlet hole 15 is sticky. The top of the fixing box 1 is provided with a fixing groove 4, and there are multiple fixing grooves 4 that are evenly arranged on both sides of the arc groove 10, and a protrusion 6 is connected to one side of the fixing groove 4. The two sides of the extension rod 31 are hinged with arc hooks 5, and the arc hooks 5 can hook the protrusion 6. The extension rod 31 is connected to an adjustment device 9 for clamping the extension rod. The fixing box 1 is hinged with support rods 7 around, and the support rods 7 are plugged with cone heads 11, and wedge blocks 12 are connected to both sides of the cone head 11.
[0022] The working principle of the above scheme is as follows: the fixing box 1 is placed on the pipe, and the position of the fixing device 3 on the sliding groove 93 is adjusted according to the bending degree of the pipe, so that the fixing device 3 is aligned with the pipe. After determining the position of the fixing device 3, the arc hook 5 is rotated so that the arc hook 5 is rotated into the fixing groove 4 and hooked with the protrusion 6, so that the fixing device 3 does not slide. At this time, the extension rod 31 is pressed, and when the fixing plate contacts the pipe, the fixing plate drives the movable block 33 to retract. At this time, the ratchet rotates in the direction of rotation of the movable block 33, and the force on the abutment plate no longer conflicts with the teeth of the ratchet 17. When the ratchet 17 stops rotating, the abutment plate conflicts with the teeth of the ratchet 17 again. At this time, the fixing plate 16 presses and fixes the bent part of the pipe, and the movable block 33 retracts to clamp and fix the pipe. When the diameter of the pipe is larger than that of an ordinary pipe, the fixing plate 16 presses the pipe, so that the shrink clamp 13 opens to increase the length of the fixing plate 16, thereby pressing the pipe. At the same time, the second spring 14 connected in the contraction clamp 13 can also increase the length of the fixing plate 16 while maintaining the tightening force. At this time, the extension rod 31 is clamped by the adjustment device 9 so that the extension rod 31 no longer moves. After the pipe is fixed, the cover plate 2 is pressed so that the cover plate 2 covers the gap between the pipe and the outlet hole 15 to prevent cement from entering the fixing box 1. At this time, the cone head 11 is hit with external force so that the cone head 11 penetrates into the concrete. When the pouring is completed, the fixing box 1 is pulled out again, and the cone head 11 is separated from the support rod 7. At this time, the torsion spring 21 is no longer subjected to force to reset the movable block 33.
[0023] The beneficial effects of the above scheme are as follows: the fixing device 3 slides in multiple arc grooves 10, so that pipes with different bending degrees can also be fixed; the fixing grooves 4 opened on both sides of the arc groove 10 can fix the fixing device 3 when it is located at different directions of the arc groove 10, preventing the fixing device 3 from being displaced; the pipe can be pressed and fixed by the fixing plate 16, and then the fixing plate 16 is pulled by the shrinking clamp 13 to increase the pressure of the fixing plate 16; at the same time, the shrinking clamp 13 increases the length of the fixing plate 16 when facing a pipe larger than an ordinary pipe, thereby increasing the adaptability of the fixing plate 16.
[0024] In one embodiment of the present invention, Figure 1 and Figure 3 As shown, the movable block 33 is connected with a close-fitting component 8, and the close-fitting component 8 includes: an arc block 81, a telescopic rod 84, a third spring 83 and a convex circle 82. The arc block 81 is located inside the movable block 33, and the arc block 81 is made of a soft material. The arc block 81 is hollow inside, and the telescopic rod 84 is located inside the arc block 81. The telescopic length near the middle of the arc block 81 is greater than the length of the telescopic rod 84 on both sides of the arc block 81. The top of the telescopic rod 84 is connected to the convex circle 82, and the third spring 83 is located between the convex circle 82 and the telescopic rod 84.
[0025] The working principle of the above scheme is: when the movable block 33 is retracted, the pipe contacts the close-fitting component 8. At this time, the telescopic rod 84 is forced to retract, so that the arc block 81 is close to the pipe, and the clamping function is realized at the same time.
[0026] The beneficial effect of the above solution is that the tube can be squeezed by the close fitting component 8, thereby increasing the stability of the tube.
[0027] In one embodiment of the present invention, Figures 1 to 4 As shown, the upper part of the extension rod 31 is connected with an adjustment device 9, and the adjustment device 9 includes: a rack 92, a fourth spring 97, a fixed shell 91 and a clamping component. The rack 92 is located on one side of the extension rod 31, and the teeth of the rack 92 are wedge-shaped, and the side of the teeth away from the fixed box 1 is an inclined surface. The fixed shell 91 is located on the upper part of the fixed box 1, and the interior of the fixed shell 91 is hollow. The extension rod 31 passes through the fixed shell 91, and the fourth spring 97 is located in the fixed shell 91 and connected to the extension rod 31. The bottom end of the fourth spring 97 contacts the fixed box 1, and the upper end of the fourth spring 97 contacts the inner side of the fixed shell 91. The clamping component includes: a clamping block 96, a fifth spring 94 and a lever 95. The fixed shell 91 is connected with a sliding groove 93, and one end of the clamping block 96 is located in the sliding groove 93 and the other end extends out of the sliding groove 93, and the clamping block 96 can slide in the sliding groove 93. The block 96 is wedge-shaped, and the side of the block 96 away from the fixed box 1 is an inclined surface. The fifth spring 94 is connected to the inner wall of the sliding groove 93 at one end and to the block 96 at the other end. The lever 95 is connected to the block 96 at one end and passes through the fixed box 1 at the other end.
[0028] The working principle of the above scheme is as follows: when the extension rod 31 is pressed downward, the fourth spring is compressed and contracted. At this time, the inclined surface of the teeth of the rack 92 contacts the inclined surface of the block 96. The block 96 is forced to retract into the sliding groove 93. When the extension rod 31 is no longer pressed downward, the fifth spring 94 rebounds, the block 96 extends out of the sliding groove 93, and the plane of the block 96 contacts the plane of the teeth of the rack 92, so that the extension rod 31 does not move. When the extension rod 31 is to be moved upward, the lever 95 is moved to retract the block 96 into the sliding groove 93. The fourth spring is no longer compressed and rebounds to reset the extension rod 31.
[0029] The beneficial effects of the above scheme are as follows: the extension rod 31 can be fixed at different heights by the adjusting device 9, so that the extension rod 31 can adapt to pipes of different heights; the extension rod 31 can be quickly reset by the lever 95 and the fourth spring. Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made to it in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. Prefabricated building water and electricity pipeline pre-buried construction device, characterized by: The invention comprises a fixing box (1), wherein a fixing device (3) is installed in the fixing box (1), an arc-shaped groove (10) is opened on the upper part of the fixing box (1), and the arc-shaped groove (10) is provided with a plurality of arc-shaped grooves (10), one end of the fixing device (3) is located in the fixing box (1), and the other end of the fixing device (3) extends out of the arc-shaped groove (10) and is slidably connected to the arc-shaped groove (10), and the fixing device (3) comprises: an extension rod (31) and an arc-shaped clamp (32), wherein the extension rod (31) is slidably connected to the arc-shaped groove (10), and the arc-shaped clamp (32) is provided to the fixing box (1). 2) is located at the lower end of the extension rod (31) and is hinged to the extension rod (31), the fixing box (1) is provided with outlet holes (15) on all sides, the fixing box (1) is provided with a fixing groove (4) on the top, the fixing groove (4) is located on both sides of the arc groove (10), a protrusion (6) is connected to one side of the fixing groove (4), arc hooks (5) are hinged on both sides of the extension rod (31), the extension rod (31) is connected to an adjustment device (9) for clamping the extension rod, the fixing box (1) is hinged with support rods (7) on all sides, the The support rod (7) is plugged with a conical head (11); wherein the fixing device (3) is provided in plurality, and each fixing device (3) further comprises: a movable block (33) and a contraction clamp (13); the lower end of the arc clamp (32) is hinged to the movable block (33); the lower end of the movable block (33) is hinged to the contraction clamp (13); a second spring (14) is connected to the inner side of the contraction clamp (13); there are two contraction clamps (13); a fixing plate (16) is connected between the two contraction clamps (13); the fixing plate (16) is a flexible The arc-shaped clamp (32) and the movable block (33) are hinged at a ratchet (17), the movable block (33) is fixedly connected to the ratchet (17), the central axis of the ratchet (17) is fixedly connected to a connecting rod (18), the connecting rod (18) is hinged to a retaining plate (19), a first spring (20) is connected between the connecting rod (18) and the retaining plate (19), the other end of the retaining plate (19) is located above the teeth of the ratchet (17), and a torsion spring (21) is connected between the arc-shaped clamp (32) and the movable block (33).
2. The pre-buried construction device for water and electricity pipelines in prefabricated buildings according to claim 1 is characterized by: The movable block (33) is connected to a close contact component (8), and the close contact component (8) comprises: an arc block (81), a telescopic rod (84), a third spring (83) and a convex circle (82). The arc block (81) is located inside the movable block (33), the arc block (81) is hollow inside, the telescopic rod (84) is located inside the arc block (81), the top end of the telescopic rod (84) is connected to the convex circle (82), and the third spring (83) is located between the convex circle (82) and the telescopic rod (84).
3. The pre-buried construction device for water and electricity pipelines in prefabricated buildings according to claim 1 is characterized by: The upper part of the extension rod (31) is connected with an adjusting device (9), and the adjusting device (9) comprises: a rack (92), a fourth spring (97), a fixed shell (91) and a clamping component. The rack (92) is located at one side of the extension rod (31), and the fixed shell (91) is located at the upper part of the fixed box (1). The extension rod (31) passes through the fixed shell (91), and the fourth spring (97) is located in the fixed shell (91) and connected to the extension rod (31). The clamping component comprises: a clamping block (96), a fifth spring (94) and a lever. A sliding groove (93) is connected in the fixed shell (91), one end of the clamping block (96) is located in the sliding groove (93) and the other end protrudes out of the sliding groove (93), one end of the fifth spring (94) is connected to the inner wall of the sliding groove (93) and the other end is connected to the clamping block (96), and one end of the lever is connected to the clamping block (96) and the other end passes through the fixed box (1).
4. The pre-buried construction device for water and electricity pipelines in prefabricated buildings according to claim 1 is characterized by: A mask (2) is connected above the outlet hole (15), the mask (2) is in a wrinkled shape, and a side of the mask (2) close to the outlet hole (15) is sticky.
5. The pre-buried construction device for water and electricity pipelines in prefabricated buildings according to claim 1 is characterized by: Wedge blocks (12) are connected to both sides of the conical head (11).
Citation Information
Patent Citations
Supporting and protecting device for hydraulic engineering construction and using method of supporting and protecting device
CN113374942A
Assembly type protective barrier convenient to disassemble
CN213626752U
Construction auxiliary device
CN218893390U