A kind of platform unit and folding arch frame transportation method
By designing the lifting, transportation and arching mechanisms of the bench unit, efficient handover and smooth transportation of the arches are achieved, which solves the problem of low arch transportation efficiency during tunnel construction and improves construction efficiency and arch efficiency.
Patent Information
- Application Number
- CN202310633218.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-05-31
AI Technical Summary
The arch transportation efficiency in existing tunnel construction technology is low, resulting in reduced construction efficiency, and other operations need to be stopped when transporting the arch, which affects the overall construction progress.
A bench unit is designed, including a lifting mechanism, a transport mechanism and an arch mechanism. The stable transportation and arching operation of the arch are realized through the inner hollow structure of the bench. The grab arm structure, slewing seat, sliding seat, Components such as guide rail frames and sliding rods enable efficient handover and transportation of the arch, and other construction operations can be performed simultaneously during the transportation process.
It improves the efficiency of arch transportation and the overall efficiency of tunnel construction, avoids the phenomenon of stopping other operations when transporting arches, enhances the efficiency of vertical arches, and does not occupy additional construction space.
Smart Images

Figure CN116557045B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to a platform unit and a folding arch transport method. Background Art
[0002] In tunnel construction, the existing technology for installing the arch frame is usually to use a loader to transport the arch frame to the tunnel face, and then the gantry unit grabs and installs the arch frame.
[0003] However, when adopting the existing technology to transport the arch frame, not only the cooperation of multiple operating machines is required, but also in the process of transporting the arch frame, the tunnel needs to be emptied to provide space for transporting the arch, and other construction operations also need to be stopped. Such transportation of the arch frame will lead to low efficiency of arch transportation. While transporting the arch, other operations need to be stopped, which will also reduce the overall construction efficiency of the tunnel construction. Summary of the invention
[0004] The purpose of the present invention is to provide a gantry unit and a folding arch frame transportation method to address the above-mentioned shortcomings, thereby solving the problems of low arch transportation efficiency in the prior art and stopping other operations when transporting the arch frame, thereby reducing the overall construction efficiency of the tunnel construction.
[0005] The present invention is achieved through the following scheme:
[0006] A gantry unit comprises a gantry, a lifting mechanism, a transport mechanism and an arch erecting mechanism; the lifting mechanism and the arch erecting mechanism are respectively arranged on the two ends of the gantry, the transport mechanism is arranged at the top position of the gantry, the lifting mechanism can lift the arch frame to a position for connection with the transport mechanism to achieve the connection of the arch frame, and the transport mechanism can transport the arch frame to a position close to the tunnel face to cooperate with the arch erecting mechanism to perform arch erecting operations.
[0007] Based on the above-mentioned platform unit, the transportation mechanism includes a grab arm structure, a rotating seat, a sliding seat, a guide rail frame and a sliding rod; the guide rail frame is arranged at the center position of the platform in the length direction, the sliding seat is provided with a sliding groove matching the guide rail frame, the guide rail frame is provided with a transmission chain at the center position, and the sliding seat is provided with a driving wheel cooperating with the transmission chain; the sliding rod is arranged on both sides of the platform in the width direction, and the grab arm structure is arranged on the sliding seat.
[0008] Based on the above-mentioned platform unit, the slewing seat includes a steering motor and a slewing chassis, the slewing chassis is arranged on the sliding seat, and the steering motor is connected to the slewing chassis.
[0009] Based on the above-mentioned test bench unit, the sliding seat also includes a deceleration arm, a deceleration seat, a deceleration cylinder and a driving motor, the output end of the driving motor is connected to the driving wheel, and the driving wheel is fixed to the sliding seat through a support frame; the deceleration seat is arranged on the side wall of the sliding seat, the deceleration arm is hinged to the sliding seat, the deceleration cylinder is arranged on the sliding seat, one end of the deceleration cylinder is hinged to the sliding seat, and the other end is hinged to the deceleration arm.
[0010] Based on the above-mentioned stand unit, the arch mechanism includes an arch telescopic oil cylinder, an arch sliding seat and an arch base. The bottom of the arch telescopic oil cylinder is connected to the stand, and the other end is connected to the arch sliding seat. The end of the stand is provided with an arch guide rail cooperating with the arch sliding seat; the arch base is arranged on the sliding base, and a first arch arm is hinged on the arch base. A first arch oil cylinder is arranged between the first arch arm and the arch base, and the first arch oil cylinder is hinged to the first arch arm and the arch base through a connecting wall respectively; the first arch arm is embedded with an arch telescopic oil cylinder and a second arch arm;
[0011] An arch connecting seat is provided on the end of the second arch arm away from the first arch arm; a second arch oil cylinder is provided between the second arch arm and the arch connecting seat, the second arch oil cylinder is hinged to the arch connecting seat and the second arch arm respectively, the arch connecting seat is connected to the arch seat, the arch seat is hinged to the arch connecting seat, an auxiliary connecting arm is coaxially hinged at the hinge between the arch seat and the arch connecting seat, a third arch oil cylinder is provided between the auxiliary connecting arm and the end of the arch seat away from the arch connecting seat, and both ends of the third arch oil cylinder are hinged to the auxiliary connecting arm and the arch seat respectively.
[0012] Based on the above-mentioned gantry unit, the lifting mechanism includes a slide and a slider, the slider is configured to be able to move back and forth along the length direction of the slide, and a rotating arm is provided on the slider, and the rotating arm is configured to be able to rotate around the connection with the slider.
[0013] Based on the above-mentioned bench unit, the slider includes a power box, a support column, a guide wheel and a connecting chain; the guide wheels are respectively arranged at the upper and lower ends of the support column, the connecting chain is annularly sleeved on the guide wheel and the support column, the power box is connected to the connecting chain through gears, and the connecting chain is connected to the slider.
[0014] Based on the above-mentioned gantry unit, a guide cavity is arranged on the side wall of the support column, the side wall of the guide cavity close to the slider forms a guide wall, and the contact surface between the support column and the slider forms a guide surface.
[0015] The present invention also provides a folding arch transport method, which comprises the following steps:
[0016] Step 1: arch frame transportation: transporting the folding arch frame to the lifting mechanism through the loading mechanism;
[0017] Step 2: Arch lifting: The lifting mechanism lifts the arch and connects it to the transport mechanism;
[0018] Step 3, arch frame transportation: the transportation mechanism is activated to transport the folding arch frame along the length direction of the guide rail frame. When the transportation structure moves to at least half of the length of the guide rail frame, the folding arch frame is placed on the platform, and the transportation mechanism moves to the predetermined position in the direction of the initial position, and the main support arm is rotated by the slewing seat, and then the folding arch frame is clamped and lifted again, and moves in the direction close to the tunnel face;
[0019] Step 4: Arch erection operation, when the transport mechanism moves the folding arch frame to the arch erection mechanism for arch erection.
[0020] In step 2, the specific steps of lifting the arch frame are that the lifting mechanisms on both sides move synchronously to the same height position to form a lifting structure for the arch frame, keep the predetermined position immovable, and the loading mechanism carries the folded arch frame onto the lifting structure, so that the folded arch frame overlaps with the rotating arms on both sides to complete the initial handover of the arch frame;
[0021] The lifting mechanisms on both sides rise synchronously and stop at the predetermined position. The transport mechanism is adjusted in multiple dimensions so that the clamping head contacts and clamps the folding arch frame, releasing the movable end of the folding arch frame; and the rotating arm is rotated synchronously so that the movable end of the folding arch frame moves at least beyond the boundary of the slide rod.
[0022] Based on the above transportation method, the method is applied to a 5-section folding arch frame, the 5-section folding arch frame includes a middle arch, a side arch and a connecting arch, and the connecting arch is respectively arranged between the middle arch and the side arch;
[0023] In step 4, the arch erection operation is performed. When the transport mechanism moves the folding arch frame to the arch erection mechanism, the locking parts for fixing the middle arch and the connecting arch are unlocked and then the arch is erected.
[0024] In step 4, when the 5-section folding arch frame is transported to a place close to the heading face through the transport structure, the side arch is first clamped by the arch erecting mechanism, and then the locking part is unlocked. The arch erecting mechanism clamps the side arch and rotates it downward to make the connecting arch fit against the tunnel wall. The arch erecting mechanism clamps the side arch and cooperates with the transport mechanism to make the entire 5-section folding arch frame attached to the inner surface of the tunnel, and then the arch frame welding operation is carried out.
[0025] Based on the above transportation method, the method is applied to a 5-section folding arch frame, which includes a middle arch, a side arch and a supporting arch, wherein the side arches are arranged on both sides of the middle arch, and the supporting arches are respectively arranged on the end faces of the side arches away from the middle arch; at the same time, the arch erecting mechanism also includes auxiliary side arms arranged on both sides of the frame;
[0026] Among them, in step 4, the arch erection operation is carried out. When the transport mechanism moves the folding arch frame to the arch erection mechanism, the locking parts used to fix the side arches and the supporting arches are unlocked and the arch erection is carried out; the supporting arch is auxiliary supported by the auxiliary side arms.
[0027] In step 4, when the 5-section folding arch frame is transported to a place close to the tunnel face through the transport structure, the locking parts are unlocked to allow the side arches and the supporting arches to move freely. The supporting arches are supported by the auxiliary side arms, and the side arches are clamped by the arch erecting mechanism. The entire 5-section folding arch frame is attached to the inner surface of the tunnel in cooperation with the transport mechanism, and then the arch frame welding operation is carried out.
[0028] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0029] 1. This scheme uses an external transport structure, such as a loader, to transport the arch frame to the end near the platform, and lifts the arch frame through a lifting mechanism. When it is lifted to the predetermined position, the transport mechanism clamps the arch frame, and then transports the arch frame through the transport mechanism. During the transportation process, the two sides of the arch frame are overlapped at both ends of the platform in the length direction to achieve smooth transportation. When it arrives near the heading face, the arch erecting mechanism erects the arch frame. Since the platform of this scheme adopts an inner hollow structure, the arch frame is transported above the platform, and other construction processes can be carried out simultaneously in the lower inner hollow structure of the platform, that is, the arch frame transportation operation will not affect the progress of other operations, and only the lifting mechanism and transport mechanism on the upper part of the platform are needed to complete the transportation operation. Compared with the traditional method, it can greatly improve the arch transportation efficiency and improve the overall construction efficiency of the tunnel.
[0030] 2. In this scheme, the lifting mechanism is installed on a platform and used in conjunction with the transportation mechanism to complete the vertical transportation operation and the support operation of the adjacent sections of the folding arch frame, so that the folding arch frame can be unfolded to a predetermined shape, and the folding arch frame can be lifted by the rotating arm. After lifting to the predetermined position, the arch erecting arm clamps the folding arch frame, and then the rotating arm is rotated to open the arch frame. This scheme is installed on the arch erecting mechanism and does not take up additional construction space. At the same time, it can lift and rotate by itself, and can adapt to various working environments in the tunnel, which greatly improves the arch erecting efficiency of the folding arch frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the present invention;
[0032] Figure 2 It is a three-dimensional structural schematic diagram of the grab arm structure in the present invention;
[0033] Figure 3 It is a schematic diagram of the three-dimensional structure of the clamping head in the present invention;
[0034] Figure 4 It is a schematic diagram of the three-dimensional structure of the support base in the present invention;
[0035] Figure 5 It is an enlarged structural schematic diagram of the driving wheel in the present invention;
[0036] Figure 6 It is an enlarged structural schematic diagram of the deceleration arm in the present invention;
[0037] Figure 7 It is a three-dimensional structural schematic diagram of the neutral arch mechanism of the present invention;
[0038] Figure 8 is an axonometric view of the neutral arch mechanism of the present invention;
[0039] Fig. 9 It is a three-dimensional structural schematic diagram of the lifting mechanism of the present invention;
[0040] Fig.10 It is an enlarged structural schematic diagram of the power box in the present invention;
[0041] Fig.11 It is an enlarged structural schematic diagram of the guide wheel in the present invention;
[0042] Fig.12 It is an enlarged structural schematic diagram of the guide roller in the present invention;
[0043] Fig.13 It is an enlarged structural schematic diagram of the rotary motor in the present invention;
[0044] Fig.14 It is an enlarged structural schematic diagram of the rotating arm in the present invention;
[0045] Fig.15 It is a schematic diagram of Example 5 of the present invention;
[0046] Fig.16 It is a schematic diagram of Example 6 of the present invention;
[0047] Markings in the figure: 1, sliding seat; 2, sliding block; 3, rotating arm; 4, stand; 5, lifting mechanism; 6, transportation mechanism; 7, arch mechanism; 101, power box; 102, support column; 103, guide wheel; 104, connecting chain; 105, guide cavity; 106, guide wall; 107, guide surface; 108, guide front wheel; 109, guide rear wheel; 110, support seat; 201, support body; 202, guide arm; 203, guide roller; 204, first guide wheel; 205, second guide wheel; 206, guide groove; 207, rotary motor; 208, rotary chamber; 209, rotary cover; 301, reinforcing rod; 401, first frame portion; 402, second frame portion; 601, grab arm structure; 602, rotary seat; 603, sliding seat; 604, guide rail frame; 605, sliding rod; 606, transmission chain; 607, driving wheel; 608, main support arm; 609, pitch cylinder; 610, clamping head; 611, first support seat; 612, second support seat; 613, clamping base; 614, first regulating oil cylinder; 615, second regulating oil cylinder; 616, receiving plate; 617, supporting plate; 618, fixed limit frame; 619, movable limit frame; 620, two-way oil cylinder; 621, clamping arm; 622, clamping arm support seat; 623, auxiliary support arm; 624, steering motor; 625, slewing chassis; 626, deceleration arm; 627, deceleration seat; 628, deceleration oil cylinder; 629, driving motor; 630, guide roller; 701, vertical arch telescopic oil cylinder; 702, vertical Arch sliding seat; 703, arch base; 704, arch guide rail; 705, first arch arm; 706, first arch cylinder; 707, second arch arm; 708, arch connecting seat; 709, second arch cylinder; 710, arch seat; 711, auxiliary connecting arm; 712, third arch cylinder; 713, arch plate; 714, arch limit frame; 715, arch movable frame; 801; middle arch; 802, side arch; 803, connecting arch; 804, supporting arch; 805, auxiliary side arm. DETAILED DESCRIPTION
[0048] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.
[0049] Any feature disclosed in this specification (including any additional claims and abstract), unless otherwise stated, may be replaced by other equivalent or alternative features having similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.
[0050] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by the terms "up", "down", "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
[0051] In addition, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features.
[0052] Example 1
[0053] like Figures 1 to 8 As shown, the present invention provides a technical solution:
[0054] A gantry unit, which at least includes but is not limited to a gantry 4, a lifting mechanism 5, a transportation mechanism 6 and an arch erecting mechanism 7; an inner hollow structure is provided in the gantry 4, the lifting mechanism 5 and the arch erecting mechanism 7 are respectively arranged on the two ends of the gantry 4, the transportation mechanism 6 is arranged at the top position of the gantry 4, the lifting mechanism 5 can lift the arch frame to a position for connection with the transportation mechanism 6 to achieve the connection of the arch frame, the transportation mechanism 6 can transport the arch frame to a position close to the tunnel face, and cooperate with the arch erecting mechanism 7 to perform the arch erecting operation.
[0055] Based on the above structure, the arch frame is transported to the end near the platform 4 through an external transportation structure, such as a loader, and the arch frame is lifted by the lifting mechanism 5. When lifted to the predetermined position, the transportation mechanism 6 clamps the arch frame, and then the arch frame is transported by the transportation mechanism 6. During the transportation process, the two sides of the arch frame are overlapped at the two ends of the length direction of the platform 4 to achieve smooth transportation. When it arrives near the heading face, the arch erecting mechanism 7 erects the arch frame. Since the platform 4 of this scheme adopts an inner hollow structure, the arch frame is transported above the platform 4, and other construction processes can be carried out simultaneously in the lower inner hollow structure of the platform 4, that is, the arch frame transportation operation will not affect the progress of other operations. Only the lifting mechanism 5 and the transportation mechanism 6 on the upper part of the platform 4 are needed to complete the transportation operation. Compared with the traditional method, it can greatly improve the arch transportation efficiency and improve the overall construction efficiency of the tunnel.
[0056] The arch frame used in this solution is a three-section folding arch frame. When the transport mechanism 6 transports the arch frame, the two ends of the folding arch frame need to be auxiliary supported to prevent the movable ends of the arch frame from affecting the interior and hindering the progress of other processes.
[0057] As an example, the transport mechanism 6 may include a grab arm structure 601, a rotating seat 602, a sliding seat 603, a guide rail frame 604 and a sliding rod 605; the guide rail frame 604 is arranged at the center position of the length direction of the platform 4, the sliding seat 603 is provided with a sliding groove matching the guide rail frame 604, a transmission chain 606 is arranged at the center position of the guide rail frame 604, and the sliding seat 603 is provided with a driving wheel 607 cooperating with the transmission chain 606; the sliding rod 605 is arranged on both sides of the platform 4 in the width direction, and the grab arm structure 601 is arranged on the sliding seat 603.
[0058] Based on the above structure, the grab arm structure 601 is used to grab the folding arch frame. When the lifting mechanism 5 lifts the folding arch frame to a predetermined position and completes the connection with the grab arm structure 601, the grab arm structure 601 can firmly clamp the folding arch frame. Then the lifting mechanism 5 can rotate to turn the movable ends of the two sides of the folding arch frame to the slide bar 605. The grab arm structure 601 grabs the arch frame and moves it along the length direction of the track frame. The driving wheel 607 provides power for it, so that the arch frame is steadily transported above the platform 4. Since only one track and the grab arm structure 601 are provided. Therefore, in the process of transporting the arch frame, the arch frame is first grabbed and moved to a predetermined position (at least half the length of the track frame) by the grab arm structure 601. At this time, the folding arch frame is located behind the sliding seat 603. Then the grab arm structure 601 releases the folding arch frame so that the folding arch frame is placed horizontally on the trolley frame as a whole. After returning to the predetermined position, the grab arm structure 601 turns and grabs the folding arch frame again for the next step of transportation. At this time, the folding arch frame is located in front of the sliding seat 603 until the arch frame is transported to the face where the arch is to be erected.
[0059] As an example, the grab arm structure 601 may include a main support arm 608 and a pitch cylinder 609, the main support arm 608 is hinged to the swivel seat 602, the pitch cylinder 609 is hinged to the swivel seat 602 at one end and hinged to the side wall of the main support arm 608 at the other end, and the pitch cylinder 609 is symmetrically arranged along the axis of the length direction of the main support arm 608;
[0060] A telescopic oil cylinder and an auxiliary support arm 623 are embedded in the main support arm 608. The auxiliary support arm 623 is sleeved on the end of the main support arm 608. Under the action of the telescopic oil cylinder, the auxiliary support arm 623 can move along the length direction of the main support arm 608.
[0061] A clamping head 610 may be provided at the end of the auxiliary support arm 623, a first support seat 611 and a second support seat 612 are provided between the clamping head 610 and the auxiliary support arm 623, the first support seat 611 is provided at the end of the auxiliary support arm 623 and extends a predetermined distance in a direction away from the end of the auxiliary support arm 623, and the second support arm is provided on the side wall of the auxiliary support arm 623 and extends a predetermined distance in a direction away from the side wall of the auxiliary support arm 623;
[0062] The clamping head 610 may include a clamping base 613, a first adjusting oil cylinder 614, a second adjusting oil cylinder 615 and a receiving plate 616; one end of the clamping base 613 is hinged to the first support base 611, the base of the first adjusting oil cylinder 614 is hinged to the second support base 612, and the telescopic part of the first adjusting oil cylinder 614 is hinged to the bottom position of the clamping base 613;
[0063] The receiving plate 616 is arranged at the top position of the clamping base 613, the receiving plate 616 is hinged to the clamping base 613, the hinge position of the receiving plate 616 and the clamping base 613 is at the center position of the receiving plate 616, the base of the second adjusting cylinder 615 is hinged to the side wall of the clamping base 613, a connecting block is arranged between the receiving plate 616 and the telescopic part of the second adjusting cylinder 615, and the second adjusting cylinder 615 is hinged to the connecting block.
[0064] Based on the above structure, when it is necessary to clamp the folding arch frame, the length of the auxiliary support arm 623 is adjusted according to the actual needs of the site so that the clamping head 610 can quickly contact the folding arch frame. By arranging a pitch cylinder 609 on the main support arm 608, the pitch cylinder 609 can be adjusted when the angle difference is large so that the clamping head 610 can initially reach the predetermined position, and then the first adjustment cylinder 614 on the clamping head 610 can finely adjust the contact angle between the receiving plate 616 and the arch frame to make the contact as stable as possible. The second adjustment cylinder 615 can adjust the swing angle of the receiving plate 616 so that the receiving plate 616 can adapt to the arch frame as much as possible, thereby increasing the stability of the arch frame when it is articulated. In this solution, two pitch adjustments are set, coordinated with telescopic adjustment and swing adjustment, and finally coordinated with the swivel seat 602, so that the receiving plate 616 can be in stable contact with the arch frame at any angle in space, thereby ensuring stability, safety and efficiency during contact.
[0065] As an example, the supporting plate 616 may include a support plate 617, a fixed limit frame 618 and a movable limit frame 619; the fixed limit frame 618 is arranged on the end face of the support plate 617 away from the clamping base 613, the fixed limit frame 618 is symmetrically arranged at the center position along the length direction of the support plate 617, and the movable limit frame 619 is arranged close to the fixed limit frame 618.
[0066] Based on the above structure, the extreme position of the arch frame can be limited by the fixed limit frame 618 to prevent the arch frame from detaching from the receiving plate 616, and the arch frame can be firmly clamped by the movable limit frame 619.
[0067] As an example, the movable limit frame 619 may include a two-way cylinder 620, a clamping arm 621 and a clamping arm support seat 622; the clamping arm support seat 622 is arranged at the bottom position of the support plate 617, the clamping arm 621 is respectively hinged to the two ends of the clamping arm support seat 622, and the two-way cylinder 620 is respectively hinged to the clamping arm 621, and under the action of the two-way cylinder 620, the two clamping arms 621 move closer to or away from each other.
[0068] Based on the above structure, when fixing the arch frame, first control the receiving plate 616 to move to a predetermined position so that the fixed limit frame 618 is inserted into the arch frame, and then control the bidirectional oil cylinder 620 to move to clamp the arch frame.
[0069] As an example, an anti-skid plate may be provided on the contact end between the clamp arm 621 and the arch frame, and an anti-skid plate may also be provided on the contact portion between the support plate 617 and the arch frame. The provision of the anti-skid plate may further ensure the stability of the clamping.
[0070] As an example, the swivel seat 602 may include a steering motor 624 and a swivel chassis 625. The swivel chassis 625 is disposed on the sliding seat 603. The steering motor 624 is connected to the swivel chassis 625. The steering motor 624 drives the swivel chassis 625 to rotate, thereby driving the main support arm 608 to rotate.
[0071] As an example, the sliding seat 603 may include a deceleration arm 626, a deceleration seat 627, a deceleration cylinder 628 and a driving motor 629. The output end of the driving motor 629 is connected to a driving wheel 607. The driving wheel 607 is arranged at the center of the sliding base. The driving wheel 607 is fixed to the sliding seat 603 through a supporting frame. Under the drive of the driving motor 629, the driving wheel 607 can contact the transmission chain 606 to drive the sliding seat 603 to move along the direction of the guide rail.
[0072] The deceleration seat 627 is arranged on the side wall of the sliding seat 603, the deceleration arm 626 is hinged to the sliding seat 603, the deceleration cylinder 628 is arranged on the sliding seat 603, one end of the deceleration cylinder 628 is hinged to the sliding seat 603, and the other end is hinged to the deceleration arm 626, and a wear-resistant layer is provided on the contact part of the deceleration arm 626 and the guide rail.
[0073] The deceleration arm 626 , the deceleration seat 627 and the deceleration cylinder 628 are symmetrically arranged along the center of the sliding seat 603 .
[0074] Based on the above structure, when the driving motor 629 rotates forward, it drives the sliding seat 603 to move forward. When the driving motor 629 rotates reversely, it drives the sliding seat 603 to move backward. When the driving motor 629 stops rotating, the sliding seat 603 stops moving. However, due to the inertia of heavy machinery, the deceleration arm 626 is required to assist in deceleration to make the movement process safer. When braking is required, the deceleration cylinders 628 on both sides are activated to force the friction resistance of the deceleration arm 626 to contact the guide rail, thereby reducing the speed of the entire sliding seat 603 and achieving reduction.
[0075] As an example, a guide roller 630 may be provided at the bottom of the sliding seat 603 , and the guide roller 630 is inserted into the guide rail. The guide roller 630 can make the sliding seat 603 move more stably and smoothly.
[0076] Example 2
[0077] Based on the above-mentioned Example 1, this example is similar to Example 1, except that the stand 4 may include a first frame portion 401 and a second frame portion 402, the vertical height of the first frame portion 401 is not greater than the vertical height of the second frame portion 402, the lifting mechanism 5 is arranged on the end of the first frame portion 401, and the arch mechanism 7 is arranged on the end of the second frame portion 402.
[0078] Based on the above structure, frame structures of different heights are set in this scheme, and the frame structure close to the tunnel face is higher, so that the internal cavity range is larger, which is convenient for other machines to operate at the tunnel face.
[0079] As an example, the arch erecting mechanism 7 may include an arch erecting telescopic cylinder 701, an arch erecting sliding seat 702 and an arch erecting base 703. The bottom of the arch erecting telescopic cylinder 701 is connected to the stand 4, and the other end is connected to the arch erecting sliding seat 702. The end of the stand 4 is provided with an arch erecting guide rail 704 that cooperates with the arch erecting sliding seat 702. Under the action of the arch erecting telescopic cylinder 701, the arch erecting sliding seat 702 can move along the length direction of the arch erecting guide rail 704.
[0080] The arch base 703 is arranged on the sliding base, the arch base 703 is hinged with a first arch arm 705, a first arch oil cylinder 706 is arranged between the first arch arm 705 and the arch base 703, and the first arch oil cylinder 706 is hinged with the first arch arm 705 and the arch base 703 through a connecting wall;
[0081] The first arch arm 705 is embedded with an arch lifting and telescopic oil cylinder (not shown) and a second arch arm 707. The second arch arm 707 is sleeved in the first arch arm 705. The arch lifting and telescopic oil cylinder can drive the second arch arm 707 to move along the length direction of the first arch arm 705.
[0082] An arch connecting seat 708 is arranged on the end of the second arch arm 707 away from the first arch arm 705; a second arch cylinder 709 is arranged between the second arch arm 707 and the arch connecting seat 708, and the second arch cylinder 709 is hinged to the arch connecting seat 708 and the second arch arm 707 respectively. The second arch cylinder 709 can drive the arch connecting seat 708 to rotate a certain angle around the hinge between it and the second arch arm 707, so that it can adapt to different arch frames and adjust the arch frames to the correct predetermined positions.
[0083] An arch seat 710 is connected to the arch connecting seat 708, and the arch seat 710 is hinged to the arch connecting seat 708. An auxiliary connecting arm 711 is coaxially hinged at the hinge between the arch seat 710 and the arch connecting seat 708. A third arch cylinder 712 is arranged between the auxiliary connecting arm 711 and the end of the arch seat 710 away from the arch connecting seat 708, and both ends of the third arch cylinder 712 are respectively hinged to the auxiliary connecting arm 711 and the arch seat 710.
[0084] Based on the above structure, through the action of the third arch erecting cylinder 712, the arch erecting seat 710 can be driven to rotate in the vertical plane to achieve pitch adjustment, thereby supporting the arch frame clamped thereon so that it can reach the predetermined position and complete the subsequent arch erecting operation.
[0085] As an example, the arch seat 710 may include an arch plate 713, an arch limit frame 714 and an arch movable frame 715; the arch limit is set on the end face of the arch seat 710 away from the arch connecting seat 708, the arch limit frame 714 is symmetrically arranged at the center position along the length direction of the arch plate 713, and the arch movable frame 715 is arranged close to the arch limit frame 714.
[0086] Based on the above structure, the extreme position of the arch frame can be limited by the arch limit frame 714 to prevent the arch frame from detaching from the arch plate 713, and the arch frame can be firmly clamped by the arch movable frame 715.
[0087] As an example, the arch movable frame 715 may include a two-way cylinder 620, a clamping arm 621 and a clamping arm support seat 622; the clamping arm support seat 622 is arranged at the bottom position of the arch plate 713, the clamping arm 621 is respectively hinged to the two ends of the clamping arm support seat 622, and the two-way cylinder 620 is respectively hinged to the clamping arm 621, and under the action of the two-way cylinder 620, the two clamping arms 621 move closer to or away from each other.
[0088] Based on the above structure, when fixing the arch frame, first control the receiving plate 616 to move to a predetermined position so that the vertical arch limit frame 714 is inserted into the arch frame, and then control the bidirectional cylinder 620 to move to clamp the arch frame.
[0089] As an example, an anti-skid plate may be provided on the contact end between the clamp arm 621 and the arch frame, and an anti-skid plate may also be provided on the contact portion between the vertical arch plate 713 and the arch frame. The provision of the anti-skid plate may further ensure the stability of the clamping.
[0090] Example 3
[0091] like Figures 9 to 14 As shown, based on the above-mentioned embodiment 2 or 3, this embodiment is similar to embodiment 1, and the difference is that the lifting mechanism 5 may include a slide seat 1 and a slider 2, the slider 2 is configured to be able to move back and forth along the length direction of the slide seat 1, and a rotating arm 3 is provided on the slider 2, and the rotating arm 3 is configured to be able to rotate around the connection with the slider 2;
[0092] Based on the above structure, the lifting mechanism 5 is assembled on the platform and used in conjunction with the transportation mechanism 6 to complete the vertical transportation operation and the supporting operation of the adjacent sections of the folding arch frame, so that the folding arch frame can be unfolded to a predetermined shape, and the folding arch frame can be lifted by the rotating arm 3. After lifting to the predetermined position, the arch erecting arm clamps the folding arch frame, and then rotates the rotating arm 3 to open the arch frame. This solution is assembled on the arch erecting mechanism 7 and does not occupy additional construction space. At the same time, it can lift and rotate by itself, and can adapt to various working environments in the tunnel, which greatly improves the arch erecting efficiency of the folding arch frame.
[0093] As an example, the slider 2 may include a power box 101, a support column 102, a guide wheel 103 and a connecting chain 104; the guide wheels 103 are respectively arranged at the upper and lower ends of the support column 102, and the connecting chain 104 is annularly sleeved on the guide wheel 103 and the support column 102. The power box 101 is connected to the connecting chain 104 through gears, and the connecting chain 104 is connected to the slider 2.
[0094] Based on the above structure, under the action of the power box 101 , the connection chain 104 moves around the circumferential position of the support column 102 , and at the same time drives the slider 2 to move in the length direction of the support column 102 .
[0095] As an example, a guide cavity 105 is provided on the side wall of the support column 102 , the side wall of the guide cavity 105 close to the slider 2 forms a guide wall 106 , and the contact surface between the support column 102 and the slider 2 forms a guide surface 107 .
[0096] Based on the above structure, by setting the guide cavity 105 and the guide wall 106, the rolling mechanism on the slider 2 and the support seat 110 can form a stable clamping structure, so that the slider 2 can still move stably, smoothly and efficiently along the length direction of the support column 102 when carrying heavy objects.
[0097] As an example, the guide cavity 105 is provided on both side walls of the support column 102 , so as to enable the slider 2 to be guided in all directions.
[0098] As an example, the power box 101 can be fixedly connected to the support column 102, and the output end of the power box 101 is in contact with the connecting chain 104 through at least two gears. At least two gears are arranged in parallel, and the connecting chain 104 is provided with chain holes for the reciprocating motion of the gears.
[0099] Based on the above structure, at least two gears are configured to contact the connecting chain 104, which can increase the contact surface. At the same time, the parallel gears can ensure the balance of output force and prevent the chain from coming off. At the same time, it also prevents damage to the gears to a certain extent and reduces the subsequent maintenance costs.
[0100] As an example, the guide wheel 103 may include a guide front wheel 108 and a guide rear wheel 109, and the guide front wheel 108 and the guide rear wheel 109 are both provided with a support seat 110 connected to the support column 102, and the support seat 110 connected to the guide front wheel 108 and the guide rear wheel 109 are both set at a certain inclination angle so that the guide directions of the guide front wheel 108 and the guide rear wheel 109 are set in opposite directions.
[0101] The inclination angle and length of the support base 110 are set according to actual assembly conditions and are not limited here.
[0102] Based on the above structure, the connecting chain 104 is supported and tightened by the guide front wheel 108 and the guide rear wheel 109 respectively arranged at the upper and lower ends of the support seat 110, so that the connecting chain 104 can run smoothly and the damage caused by direct contact between the connecting chain 104 and the support column 102 can be prevented.
[0103] As an example, the guide front wheel 108 and the guide rear wheel 109 are both configured as a multi-gear structure, and the multi-gear structure can be in stable contact with the connecting chain 104 to achieve guidance and support.
[0104] As an example, the slider 2 may include a support body 201, a guide arm 202 and a guide roller 203; at least two guide arms 202 are arranged along the length direction of the side wall of the support body 201, the guide roller is arranged at the bottom position of the support body 201, and a cavity structure for accommodating the guide roller 203 is arranged at the bottom of the support body 201.
[0105] A first guide wheel 204 adapted to the guide cavity 105 is disposed at the end of the guide arm 202. The first guide wheel 204 is hinged to the end of the guide arm 202 so that the first guide wheel 204 can rotate freely along the hinge point.
[0106] A second guide wheel 205 is provided on the guide arm 202 near the side wall of the guide cavity 105 . A guide groove 206 is provided on the second guide wheel 205 . The size of the guide groove 206 matches the size of the side wall of the guide cavity 105 , so that the second guide wheel 205 can move stably along the side wall of the guide cavity 105 .
[0107] Based on the above mechanism, by embedding the first guide wheel 204 in the guide cavity 105 and simultaneously inserting the second guide wheel 205 into the side wall of the guide cavity 105, multiple guiding effects are achieved, and at the same time, the rolling contact force between the guide roller 203 and the side wall of the support column 102 is combined to finally achieve stable movement of the slider 2.
[0108] As an example, a swivel mechanism is provided on the slider 2, and the swivel arm 3 is provided on the swivel mechanism. The movement of the swivel mechanism can drive the swivel arm 3 to rotate 360°.
[0109] As an example, the rotating mechanism may include a rotating motor 207, a rotating chamber 208 and a rotating cover 209; the rotating cover 209 is connected to the rotating chamber 208 via a bearing, and a gear structure connected to the output end of the rotating motor 207 is provided in the rotating cover 209. The rotating motor 207 rotates, which can drive the rotating cover 209 to rotate around the rotating chamber 208. The rotating arm 3 is connected to the rotating cover 209, and the rotating chamber 208 is connected to the slider 2.
[0110] The rotary mechanism in this solution is a common mechanism in the art, and will not be described in detail here.
[0111] Based on the above structure, the rotation of the rotary motor 207 can drive the rotary cover 209 and the rotating arm 3 to move synchronously, and the slider 2 can drive the rotary chamber 208 to move up and down, ultimately realizing that the rotating arm 3 can perform arch erection operations on the folding arch frame in multiple spaces and at multiple angles.
[0112] As an example, the rotating arm 3 may be an L-shaped rod structure, one end of the rotating arm 3 is connected to the rotary cover 209 , and a reinforcing rod 301 may be further provided on the rotating arm 3 .
[0113] Since the rotating arm 3 needs to lift the arch frame, it is subjected to a large force when lifting multiple arch frames at the same time, and a reinforcing rod 301 needs to be provided to strengthen the support and ensure the supporting strength.
[0114] Example 4
[0115] like Figure 3 to Figure 5 As shown, the present invention provides a technical solution:
[0116] A folding arch transport method, which can be applied to a three-section folding arch, comprises the following steps:
[0117] Step 1: arch transport: transport the folding arch to the platform 4, close to the lifting mechanism 5, through the loading mechanism;
[0118] Step 2, arch lifting: the lifting mechanisms 5 on both sides move synchronously to the same height position to form a lifting structure for the arch, and keep the predetermined position immovable. The loading mechanism carries the folded arch onto the lifting structure, so that the folded arch overlaps with the rotating arms on both sides, completing the initial handover of the arch;
[0119] The lifting mechanisms 5 on both sides rise synchronously and stop at the predetermined position. The transport mechanism 6 is adjusted in multiple dimensions to make the clamping head 610 contact and clamp the folding arch frame, releasing the movable end of the folding arch frame; and synchronously rotate the rotating arm to make the movable end of the folding arch frame move at least outside the boundary of the slide bar 605.
[0120] Step 3, arch frame transportation: the transportation mechanism 6 is actuated to transport the folding arch frame along the length direction of the guide rail frame 604. After the movable end of the folding arch frame is separated from the rotating arm, it is overlapped on the slide bar 605 by gravity. When the transportation structure moves to at least half of the length of the guide rail frame 604, the folding arch frame is placed on the platform 4. The transportation mechanism moves to the predetermined position in the direction of the initial position, rotates the main support arm 608 through the slewing seat 602, and then clamps and lifts the folding arch frame again, and moves it in the direction close to the face.
[0121] Step 4, arch erection operation, when the transport mechanism 6 moves the folding arch frame to the face close to the arch erection mechanism 7, adjust the various dimensions of the arch erection mechanism 7 to clamp the folding arch frame and lift it to the predetermined arch erection position for arch erection.
[0122] In this solution, when the folding arch is transported to the platform; or after the arch is lifted, the connecting wires of the arch itself need to be cut so that the free end of the folding arch can move freely.
[0123] In this solution, there is only one set of transport mechanism 6 on the platform 4. Therefore, when the folded arch frame is transferred to the middle of the face, the main support arm 608 needs to lower the arch frame and turn 180°. Then the main support arm 608 grabs the arch frame and lifts the arch frame to the arch erection position. The entire transport operation is completed through one set of structure, which is not only efficient, but also can reduce the overall complexity of the equipment and reduce costs. At the same time, it can also stably and efficiently perform arch transport and erection operations.
[0124] Example 5
[0125] like Fig.15 As shown, the present invention provides a technical solution:
[0126] A folding arch transport method, which can be applied to a 5-section folding arch, comprises the following steps: the 5-section folding arch comprises a middle arch 801, a side arch 802 and a connecting arch 803, wherein the connecting arches are respectively arranged between the middle arch and the side arches; at the beginning of transporting the arch, the connecting arches are folded and bent, and the middle arch and the side arch are locked together by a locking piece, so as to reduce the space size of the arch;
[0127] Step 1: arch transport: transport the folding arch to the platform 4, close to the lifting mechanism 5, through the loading mechanism;
[0128] Step 2, arch lifting: the lifting mechanisms 5 on both sides move synchronously to the same height position to form a lifting structure for the arch, and keep the predetermined position immovable. The loading mechanism carries the folded arch onto the lifting structure, so that the folded arch overlaps with the rotating arms on both sides, completing the initial handover of the arch;
[0129] The lifting mechanisms 5 on both sides rise synchronously and stop at the predetermined position. The transport mechanism 6 is adjusted in multiple dimensions to make the clamping head 610 contact and clamp the folding arch frame, releasing the movable end of the folding arch frame; and synchronously rotate the rotating arm to make the movable end of the folding arch frame move at least outside the boundary of the slide bar 605.
[0130] Step 3, arch frame transportation: the transportation mechanism 6 is actuated to transport the folding arch frame along the length direction of the guide rail frame 604. After the movable end of the folding arch frame is separated from the rotating arm, it is overlapped on the slide bar 605 by gravity. When the transportation structure moves to at least half of the length of the guide rail frame 604, the folding arch frame is placed on the platform 4. The transportation mechanism moves to the predetermined position in the direction of the initial position, rotates the main support arm 608 through the slewing seat 602, and then clamps and lifts the folding arch frame again, and moves it in the direction close to the face.
[0131] Step 4: arch erection operation. When the transport mechanism moves the folding arch frame to the arch erection mechanism, unlock the locking parts and then erect the arch. Adjust the dimensions of the arch erection mechanism 7 so that the folding arch frame can be clamped and lifted to the predetermined arch erection position to erect the arch. Specifically, when the 5-section folding arch frame is transported to a position close to the tunnel face through the transport structure, unlock the locking parts so that the middle arch, side arch and connecting arch are in a free moving state. Clamp the side arch through the arch erection mechanism, cooperate with the transport mechanism to make the entire 5-section folding arch frame attached to the inner surface of the tunnel, and then perform the arch welding operation.
[0132] In this solution, when the folding arch is transported to the platform; or after the arch is lifted, the connecting wires of the arch itself need to be cut so that the free end of the folding arch can move freely.
[0133] In this solution, there is only one set of transport mechanism 6 on the platform 4. Therefore, when the folded arch frame is transferred to the middle of the face, the main support arm 608 needs to lower the arch frame and turn 180°. Then the main support arm 608 grabs the arch frame and lifts the arch frame to the arch erection position. The entire transport operation is completed through one set of structure, which is not only efficient, but also can reduce the overall complexity of the equipment and reduce costs. At the same time, it can also stably and efficiently perform arch transport and erection operations.
[0134] Example 6
[0135] like Fig.16 As shown, the present invention provides a technical solution:
[0136] A folding arch transport method, which can be applied to a 5-section folding arch, comprises the following steps: the method is applied to a 5-section folding arch, the 5-section folding arch comprises a middle arch 801, a side arch 802 and a supporting arch 804, the side arches are arranged on both sides of the middle arch, and the supporting arches are respectively arranged on the end faces of the side arches away from the middle arch; at the beginning of the transport of the arch, the supporting arch is folded and bent, and the supporting arch and the side arch are locked together by a locking piece, so as to reduce the space size of the arch; at the same time, an auxiliary side arm 805 is arranged at the arch erecting mechanism;
[0137] Step 1: arch transport: transport the folding arch to the platform 4, close to the lifting mechanism 5, through the loading mechanism;
[0138] Step 2, arch lifting: the lifting mechanisms 5 on both sides move synchronously to the same height position to form a lifting structure for the arch, and keep the predetermined position immovable. The loading mechanism carries the folded arch onto the lifting structure, so that the folded arch overlaps with the rotating arms on both sides, completing the initial handover of the arch;
[0139] The lifting mechanisms 5 on both sides rise synchronously and stop at the predetermined position. The transport mechanism 6 is adjusted in multiple dimensions to make the clamping head 610 contact and clamp the folding arch frame, releasing the movable end of the folding arch frame; and synchronously rotate the rotating arm to make the movable end of the folding arch frame move at least outside the boundary of the slide bar 605.
[0140] Step 3, arch frame transportation: the transportation mechanism 6 is actuated to transport the folding arch frame along the length direction of the guide rail frame 604. After the movable end of the folding arch frame is separated from the rotating arm, it is overlapped on the slide bar 605 by gravity. When the transportation structure moves to at least half of the length of the guide rail frame 604, the folding arch frame is placed on the platform 4. The transportation mechanism moves to the predetermined position in the direction of the initial position, rotates the main support arm 608 through the slewing seat 602, and then clamps and lifts the folding arch frame again, and moves it in the direction close to the face.
[0141] Step 4, arch erection operation. When the transportation mechanism moves the folding arch frame to the arch erection mechanism, the locking parts are unlocked to erect the arch; the supporting arch is auxiliary supported by the auxiliary side arms, and the various dimensions of the arch erection mechanism 7 are adjusted to clamp the folding arch frame and lift it to the predetermined arch erection position to erect the arch; specifically, when the 5-section folding arch frame is transported to a position close to the heading face by the transportation structure, the locking parts are unlocked to make the side arches and the supporting arches in a free moving state, the supporting arch is auxiliary supported by the auxiliary side arms, and the arch erection mechanism clamps the side arches, and cooperates with the transportation mechanism to make the entire 5-section folding arch frame attached to the inner surface of the tunnel, and then the arch frame welding operation is carried out.
[0142] In this solution, when the folding arch is transported to the platform; or after the arch is lifted, the connecting wires of the arch itself need to be cut so that the free end of the folding arch can move freely.
[0143] In this solution, there is only one set of transport mechanism 6 on the platform 4. Therefore, when the folded arch frame is transferred to the middle of the face, the main support arm 608 needs to lower the arch frame and turn 180°. Then the main support arm 608 grabs the arch frame and lifts the arch frame to the arch erection position. The entire transport operation is completed through one set of structure, which is not only efficient, but also can reduce the overall complexity of the equipment and reduce costs. At the same time, it can also stably and efficiently perform arch transport and erection operations.
[0144] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A bench unit, characterized in that: The invention comprises a platform, a lifting mechanism, a transport mechanism and an arch erecting mechanism; the lifting mechanism and the arch erecting mechanism are respectively arranged on the two ends of the platform, the transport mechanism is arranged at the top position of the platform, the lifting mechanism at least comprises a lifting part and a rotating part, the lifting part can lift the arch frame to the position for connecting with the transport mechanism to realize the connection of the arch frame, and under the action of the rotating part, the movable end of the folding arch frame is moved so that the movable end of the folding arch frame can be rotated out of the outline range of the platform, the transport mechanism can transport the arch frame to a position close to the face, and cooperate with the arch erecting mechanism to perform the arch erecting operation; a sliding rod supporting the sliding of the folding arch frame transportation is arranged in the transport mechanism, and the sliding rod is arranged on both sides of the width direction of the platform; the lifting mechanism comprises a sliding seat and a slider, the slider is configured to be able to move back and forth along the length direction of the sliding seat, and a rotating arm is arranged on the slider, and the rotating arm is configured to be able to rotate around the connection with the slider; the rotating arm is rotated to make the movable end of the folding arch frame move at least out of the boundary of the sliding rod.
2. A bench unit as claimed in claim 1, characterized in that: The transport mechanism also includes a grab arm structure, a swivel seat, a sliding seat and a guide rail frame; the guide rail frame is arranged at the center position of the platform in the length direction, the sliding seat is provided with a slide groove matching the guide rail frame, the center position of the guide rail frame is provided with a transmission structure, and the sliding seat is provided with a driving structure that cooperates with the transmission structure; the grab arm structure is arranged on the sliding seat.
3. A bench unit as claimed in claim 2, characterized in that: The slewing seat comprises a steering motor and a slewing chassis. The slewing chassis is arranged on the sliding seat, and the steering motor is connected to the slewing chassis.
4. A bench unit as claimed in claim 2 or 3, characterized in that: The sliding seat also includes a deceleration arm, a deceleration seat, a deceleration cylinder and a driving motor, the output end of the driving motor is connected to the driving wheel, and the driving wheel is fixed to the sliding seat through a support frame; the deceleration seat is arranged on the side wall of the sliding seat, the deceleration arm is hinged to the sliding seat, and the deceleration cylinder is arranged on the sliding seat, one end of the deceleration cylinder is hinged to the sliding seat, and the other end is hinged to the deceleration arm.
5. A bench unit as claimed in claim 1, 2 or 3, characterized in that: The arch mechanism comprises an arch telescopic oil cylinder, an arch sliding seat and an arch base. The bottom of the arch telescopic oil cylinder is connected to the stand, and the other end is connected to the arch sliding seat. The end of the stand is provided with an arch guide rail cooperating with the arch sliding seat; the arch base is arranged on the sliding base, a first arch arm is hinged on the arch base, a first arch oil cylinder is arranged between the first arch arm and the arch base, and the first arch oil cylinder is hinged to the first arch arm and the arch base through a connecting wall respectively; the first arch arm is embedded with an arch telescopic oil cylinder and a second arch arm; An arch connecting seat is provided on the end of the second arch arm away from the first arch arm; A second arch oil cylinder is arranged between the second arch arm and the arch connecting seat, the second arch oil cylinder is hinged to the arch connecting seat and the second arch arm respectively, the arch connecting seat is connected to the arch seat, the arch seat is hinged to the arch connecting seat, an auxiliary connecting arm is hinged coaxially with the arch seat at the hinge between the arch seat and the arch connecting seat, a third arch oil cylinder is arranged between the auxiliary connecting arm and the end of the arch seat away from the arch connecting seat, and both ends of the third arch oil cylinder are hinged to the auxiliary connecting arm and the arch seat respectively.
6. A bench unit as claimed in claim 5, characterized in that: The slider includes a power box, a support column, a guide wheel and a connecting chain; the guide wheels are respectively arranged at the upper and lower ends of the support column, the connecting chain is annularly sleeved on the guide wheel and the support column, the power box is connected to the connecting chain through gears, and the connecting chain is connected to the slider.
7. A bench unit as claimed in claim 6, characterized in that: A guide cavity is arranged on the side wall of the support column, the side wall of the guide cavity close to the sliding block forms a guide wall, and the contact surface between the support column and the sliding block forms a guide surface.
8. A folding arch transport method, characterized in that: It includes the following steps, Step 1: arch frame transportation: transport the folding arch frame to the lifting mechanism through the loading mechanism; Step 2, arch lifting: the lifting mechanism lifts the arch and connects it with the transport mechanism; the specific steps of arch lifting are that the lifting mechanisms on both sides move synchronously to the same height position to form a lifting structure for the arch, keep the predetermined position unchanged, and the loading mechanism carries the folded arch onto the lifting structure, so that the folded arch overlaps with the rotating arms on both sides, completing the initial handover of the arch; The lifting mechanisms on both sides rise synchronously and stop at the predetermined position. The transport mechanism is adjusted in multiple dimensions so that the clamping head contacts and clamps the folding arch frame, releasing the movable end of the folding arch frame. and synchronously rotate the rotating arm so that the movable end of the folding arch moves at least beyond the boundary of the sliding rod; Step 3, arch frame transportation: the transportation mechanism is activated to transport the folding arch frame along the length direction of the guide rail frame. When the transportation structure moves to at least half of the length of the guide rail frame, the folding arch frame is placed on the platform, and the transportation mechanism moves to the predetermined position in the direction of the initial position, and the main support arm is rotated by the slewing seat, and then the folding arch frame is clamped and lifted again, and moves in the direction close to the tunnel face; Step 4: Arch erection operation, when the transport mechanism moves the folding arch frame to the arch erection mechanism for arch erection.
9. A folding arch transport method as claimed in claim 8, characterized in that: The method is applied to a five-section folding arch frame, which includes a middle arch, side arches and connecting arches, wherein the connecting arches are respectively arranged between the middle arch and the side arches; In step 4, the arch erection operation is performed. When the transport mechanism moves the folding arch frame to the arch erection mechanism, the locking parts for fixing the middle arch and the connecting arch are unlocked and then the arch is erected.
10. A folding arch transport method as claimed in claim 9, characterized in that: In step 4, when the 5-section folding arch frame is transported to a place close to the heading face through the transport structure, the side arch is first clamped by the arch erecting mechanism, and then the locking part is unlocked. The arch erecting mechanism clamps the side arch and rotates it downward to make the connecting arch fit against the tunnel wall. The arch erecting mechanism clamps the side arch and cooperates with the transport mechanism to make the entire 5-section folding arch frame attached to the inner surface of the tunnel, and then the arch frame welding operation is carried out.
11. A folding arch transport method as claimed in claim 8, characterized in that: The method is applied to a 5-section folding arch frame, which includes a middle arch, side arches and a supporting arch, wherein the side arches are arranged on both sides of the middle arch, and the supporting arches are respectively arranged on the end faces of the side arches away from the middle arch; and the arch erecting mechanism also includes auxiliary side arms arranged on both sides of the frame; Among them, in step 4, the arch erection operation is carried out. When the transport mechanism moves the folding arch frame to the arch erection mechanism, the locking parts used to fix the side arches and the supporting arches are unlocked and the arch erection is carried out; the supporting arch is auxiliary supported by the auxiliary side arms.
12. A folding arch transport method as claimed in claim 11, characterized in that: In step 4, when the 5-section folding arch frame is transported to a place close to the tunnel face through the transport structure, the locking parts are unlocked to allow the side arches and the supporting arches to move freely. The supporting arches are supported by the auxiliary side arms, and the side arches are clamped by the arch erecting mechanism. The entire 5-section folding arch frame is attached to the inner surface of the tunnel in cooperation with the transport mechanism, and then the arch frame welding operation is carried out.
Citation Information
Cited By
System for lagging jack transfer, lagging jack trolley and lagging jack transfer method
CN119878248A
A system for arch transfer, an arch trolley and an arch transfer method
CN119878248B
Lifting mechanism facilitating transfer of lagging jack and tunnel construction all-in-one machine
CN224000970U