Stepped steel strip equipment for integrated circuit lead frames

By designing the stepped steel strip equipment, the independent transmission and electroplating of the two lead frames is realized, which solves the problems of large footprint and high labor cost of the existing equipment, and improves space utilization and production efficiency.

CN116564869BActive Publication Date: 2024-10-11DONGGUAN ALLMERIT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310682333.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-09
Publication Date
2024-10-11
Estimated Expiration
2043-06-09

AI Technical Summary

Technical Problem

Existing integrated circuit lead frame electroplating equipment occupies a large area when processing two lead frames at the same time, and requires two independent equipment, resulting in low space utilization and high labor costs.

Method used

A stepped steel belt equipment is designed, which uses a loading platform, an electroplating platform and a discharging platform. By setting up a transmission mechanism and an electroplating line with inconsistent conveying heights, two steel belts can be transported and electroplated independently, which reduces space occupation and improves efficiency. efficiency.

Benefits of technology

Processing two leadframes simultaneously on the same equipment reduces floor space, lowers labor costs, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116564869B_ABST
    Figure CN116564869B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of lead frame processing, and in particular to a stepped steel strip equipment for integrated circuit lead frames, comprising a loading platform, an electroplating platform and an unloading platform, wherein the loading platform is provided with a first front-end conveying mechanism and a second front-end conveying mechanism for independently conveying the steel strips with the lead frames respectively; the electroplating platform comprises a supporting platform, and the supporting platform is provided with a first electroplating line for the first steel strip to pass through and a second electroplating line for the second steel strip to pass through; the receiving platform is provided with a first transfer platform for transferring the lead frame after the first steel strip is unloaded and a second transfer platform for transferring the lead frame after the second steel strip is unloaded; so that the two steel strips with the lead frames do not affect each other during the transmission, one staff member can complete the loading of two groups of lead frames, and one staff member can complete the unloading of two groups of lead frames; the overall occupied space is reduced, and the labor cost is also reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of lead frame processing, in particular to a step-type steel strip device for an integrated circuit lead frame. Background Art

[0002] The lead frame is the carrier of the integrated circuit chip. Before the integrated circuit chip is packaged, the chip is usually placed on the lead frame, and then the bonding material is used to electrically connect the chip circuit lead end and the external terminal of the lead frame. In order to increase the conductivity of the lead frame, a more conductive material is usually used for electroplating on the lead frame.

[0003] During electroplating, an electroplating device with a loading mechanism and a unloading mechanism is used for processing. In this regard, the Chinese invention patent number CN202122640524.5 discloses an integrated circuit lead frame electroplating loading and unloading integrated machine, including a loading device and an unloading device, wherein the loading device and the unloading device are provided with a transmission mechanism for transmitting the integrated circuit lead frame of the loading device to the unloading device; the loading device includes a frame, a first loading mechanism and a second loading mechanism arranged on the frame; the first loading mechanism includes a material box assembly, and a feeding assembly used to transmit the integrated circuit lead frame in the material box assembly to the transmission mechanism in cooperation with the material box assembly; the second loading mechanism includes a material rack for storing the integrated circuit lead frame, a delivery assembly for conveying the integrated circuit lead frame in the material rack to a predetermined position, and a suction assembly for conveying the integrated circuit lead frame located at the predetermined position to the transmission mechanism. It can load materials at multiple positions to improve production efficiency.

[0004] The steel strips are arranged in a circular track shape, clamping the lead frame and passing through different electroplating modules in sequence to achieve electroplating of the lead frame. When two lead frames need to be processed at the same time, two production lines are usually arranged in the workshop to meet the demand. Usually, different production lines are distributed on different equipment. This arrangement occupies a large area. Summary of the invention

[0005] The object of the present invention is to provide a step-type steel strip device for an integrated circuit lead frame in view of the deficiencies in the prior art.

[0006] To achieve the above object, the technical solution of the present invention is as follows:

[0007] The step-type steel strip equipment for integrated circuit lead frame comprises a loading platform, an electroplating platform and a unloading platform, wherein the loading platform is provided with a first loading platform and a second loading platform, the first loading platform is provided with a first front-end conveying mechanism for loading the lead frame, the second loading platform is provided with a second front-end conveying mechanism, and the conveying heights of the first front-end conveying mechanism and the second front-end conveying mechanism are inconsistent;

[0008] The first front-end transmission mechanism is connected to the first steel belt in a transmission manner, and the second front-end transmission mechanism is connected to the second steel belt in a transmission manner;

[0009] The electroplating platform comprises a supporting platform, and the supporting platform is provided with a first electroplating line for the first steel strip to pass through and a second electroplating line for the second steel strip to pass through, the first electroplating line comprises a first forward electroplating area for the first steel strip to pass through in a forward direction and a first retracting electroplating area for the first steel strip to pass through in a retracting direction; the second electroplating line comprises a second forward electroplating area for the second steel strip to pass through in a forward direction and a second retracting electroplating area for the second steel strip to pass through in a retracting direction;

[0010] The material receiving platform is provided with a first unloading platform and a second unloading platform, the first unloading platform is provided with a first rear end conveying mechanism for unloading the lead frame, the second unloading platform is provided with a second rear end conveying mechanism, one end of the first steel belt is provided with a transmission connection with the first rear end conveying mechanism, and one end of the second steel belt is transmission connected with the second rear end conveying mechanism;

[0011] The first unloading station is also provided with a first transfer platform for transferring the lead frame after unloading by the first rear-end conveying mechanism, and the second unloading station is also provided with a second transfer platform for transferring the lead frame after unloading by the second rear-end conveying mechanism.

[0012] The beneficial effects of the present invention are as follows: a first front-end conveying mechanism and a second front-end conveying mechanism with different conveying heights are installed on the same loading platform, and the steel strips with lead frames are conveyed independently, so that the steel strips with lead frames do not affect each other during conveyance; one worker can complete the loading of two groups of lead frames;

[0013] Two electroplating lines are arranged on one supporting platform, which are used for different steel strips to advance and retreat respectively. On the one hand, the two electroplating lines do not interfere with each other, and on the other hand, the two original equipment are combined into one, which reduces the occupation of the ground space and improves the space utilization rate.

[0014] A first rear-end conveying mechanism and a second rear-end conveying mechanism with inconsistent conveying heights are installed on the same unloading platform at the same time, and the steel strips with lead frames are conveyed independently, so that the steel strips with lead frames do not affect each other during conveyance, and one worker can complete the unloading of two groups of lead frames; the overall floor space is reduced, and the labor cost is also reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the stepped steel strip equipment. Figure 2 It is a structural diagram of the feeding platform.

[0016] Figure 3 Schematic diagram of the structure of the guided feeding mechanism. Figure 4 It is a schematic diagram of the structure of the top guide component.

[0017] Figure 5 It is a schematic diagram of the structure of the bottom guide component. Figure 6 It is a structural schematic diagram of the pulling plate mechanism.

[0018] Figure 7 Schematic diagram of the structure of the electroplating platform. Figure 8 Schematic diagram of the structure of the forward electroplating tank.

[0019] Fig. 9 It is a schematic diagram of the partial structure of the first forward electroplating area and the second forward electroplating area.

[0020] Fig.10 It is a schematic diagram of the partial structure of the first retreat plating area and the second retreat plating area.

[0021] Fig.11 Schematic diagram of the structure of the support platform. Fig.12 It is a structural schematic diagram of the unloading platform.

[0022] Fig.13 It is a structural schematic diagram of the second unloading platform. Fig.14 It is a structural schematic diagram of the first transfer platform.

[0023] Reference numerals include:

[0024] 1- loading platform, 11- first loading platform,

[0025] 110-second loading platform, 111-first front end conveying mechanism, 112-second front end conveying mechanism,

[0026] 113-first loading and conveying turntable, 114-second loading and conveying turntable, 115-loading area,

[0027] 116-first feeding mechanism, 117-second feeding mechanism, 118-feeding auxiliary transfer turntable,

[0028] 12-Top guide parts,

[0029] 121-top mounting member, 122-top fixing column, 123-top supporting plate, 124-top mounting plate, 125-first transverse adjustment hole, 126-top guide plate, 127-pressing adjustment top plate, 128-adjusting rod, 129-spring member,

[0030] 13-Bottom guide parts,

[0031] 130-bottom lifting plate, 131-bottom support bar, 132-discharging plate, 133-bottom support plate,

[0032] 134-second transverse adjustment hole, 135-bottom guide plate, 136-bottom drive plate,

[0033] 137- bottom drive, 138- limit sensor, 139- induction block,

[0034] 14-Pull plate mechanism,

[0035] 141-pull plate seat, 142-drive through slot, 143-first clamping plate, 144-second clamping plate,

[0036] 145-belt transmission mechanism, 146-transmission seat, 147-finger cylinder,

[0037] 2-plating platform, 21-support platform,

[0038] 210-support frame, 211-first support leg, 212-second support leg, 213-third support leg,

[0039] 214-Fourth supporting leg,

[0040] 22-First electroplating line,

[0041] 221-first forward electroplating area, 222-first backward electroplating area, 223-forward electroplating tank,

[0042] 224- forward drying box, 225- first forward passage, 226- second forward passage,

[0043] 23- Second electroplating line,

[0044] 231-second forward plating area, 232-second backward plating area, 233-backward plating tank,

[0045] 234-return drying box, 235-first return passage, 236-second return passage,

[0046] 3- unloading platform, 31- first unloading platform,

[0047] 310-second unloading platform, 311-first rear end conveying mechanism, 312-second rear end conveying mechanism,

[0048] 313-first unloading conveying turntable, 314-second unloading conveying turntable, 315-unloading area,

[0049] 316-Unloading auxiliary transfer turntable,

[0050] 32-Elastic guide assembly,

[0051] 321-first guide shaft, 322-first support seat, 323-first limit seat, 324-first guide sleeve,

[0052] 325-first telescopic driving member,

[0053] 33-First transfer platform,

[0054] 330-second transfer platform, 331-transport side plate, 332-conveyor belt, 333-guide rail,

[0055] 334-bottom telescopic member, 335-unloading slide seat, 336-inclined plate, 337-unloading sliding plate,

[0056] 338-sliding seat, 339-unloading guide seat. DETAILED DESCRIPTION

[0057] The present invention is described in detail below with reference to the accompanying drawings.

[0058] like Figure 1-14 As shown, the step-type steel strip equipment for integrated circuit lead frame includes a loading platform 1, an electroplating platform 2 and a unloading platform 3.

[0059] Preferably, the loading platform 1, the electroplating platform 2 and the unloading platform 3 are aligned in the horizontal direction.

[0060] The loading platform 1 is provided with a first loading platform 11 and a second loading platform 110. The first loading platform 11 is provided with a first front-end conveying mechanism 111 for loading lead frames, and the second loading platform 110 is provided with a second front-end conveying mechanism 112. The conveying heights of the first front-end conveying mechanism 111 and the second front-end conveying mechanism 112 are inconsistent. The first front-end conveying mechanism 111 and the second front-end conveying mechanism 112 convey the steel strips with lead frames independently and separately. The first front-end conveying mechanism 111 and the second front-end conveying mechanism 112 with inconsistent conveying heights are installed on the same loading platform 1 at the same time, and the steel strips with lead frames are conveyed independently and separately, so that the steel strips with lead frames do not affect each other during conveyance; one staff member can complete the loading of two groups of lead frames, which not only reduces the occupied space, but also reduces the labor cost.

[0061] The first loading platform 11 is located outside the second loading platform 110, that is, the first loading platform 11 and the second loading platform 110 are at different lateral positions, and the height of the first loading platform 11 is greater than that of the second loading platform 110, so that the steel strips with lead frames do not affect each other during transmission.

[0062] Specifically, the first front-end conveying mechanism 111 is connected to the first steel belt in transmission, and the second front-end conveying mechanism 112 is connected to the second steel belt in transmission; the conveying directions of the first steel belt and the second steel belt are parallel to each other.

[0063] Furthermore, the first front-end conveying mechanism 111 includes a first loading and conveying turntable 113 that can rotatably convey the first steel belt, wherein one end of the first steel belt is wound around the first loading and conveying turntable 113. Through the rotation of the first loading and conveying turntable 113, the first steel belt presents a circular runway structure, continuously moving to convey the lead frame forward.

[0064] Furthermore, the second front-end conveying mechanism 112 includes a second loading and conveying turntable 114 that can rotatably convey the second steel belt, wherein one end of the second steel belt is wound around the second loading and conveying turntable 114. Through the rotation of the second loading and conveying turntable 114, the second steel belt presents a circular runway structure, continuously moving to convey the lead frame forward.

[0065] Preferably, the transmission turntable cooperates with the steel belt transmission by meshing, and the transmission turntable can also be a ratchet, and the ratchet and the steel belt realize transmission cooperation.

[0066] The conveying directions of the first front-end conveying mechanism 111 and the second front-end conveying mechanism 112 are parallel to each other. The first front-end conveying mechanism 111 and the second front-end conveying mechanism 112 , which are independent of each other, both convey in the same direction.

[0067] Preferably, in addition to this, according to the layout of the workshop, the conveying directions of the first front-end conveying mechanism 111 and the second front-end conveying mechanism 112 may be different. The first front-end conveying mechanism 111 conveys one of the lead frames to the first position, and the second front-end conveying mechanism 112 conveys one of the lead frames to the second position. Since the loading positions are all located on the loading platform 1, the loading can be completed by only one staff member.

[0068] Among them, an auxiliary feeding conveyor disc 118 is arranged beside the second feeding conveyor disc 114, and the second feeding conveyor disc 114 and the auxiliary feeding conveyor disc 118 are highly flush for the second steel belt to be wound. In this embodiment, one end of the second steel belt is respectively wound on the second feeding conveyor disc 114 and the auxiliary feeding conveyor disc 118, so that the overall width of the second steel belt is larger and larger than the first steel belt, and can be further separated from the first steel belt, and the first steel belt and the second steel belt do not affect each other during the conveying movement.

[0069] The first loading platform 11 is provided with a first loading mechanism 116 cooperating with the first front-end conveying mechanism 111, and the first loading mechanism 116 is used to load the lead frame onto the first steel strip. The second loading platform 110 is provided with a second loading mechanism 117 cooperating with the second front-end conveying mechanism 112, and the second loading mechanism 117 is used to load the lead frame onto the second steel strip.

[0070] One of the lead frames is loaded to cooperate with the first front-end conveying mechanism 111 through the first loading mechanism 116, and one of the lead frames is loaded to cooperate with the second front-end conveying mechanism 112 through the second loading mechanism 117. Different lead frames can be loaded separately, and different lead frames can be loaded independently on the same platform to achieve diversified processing.

[0071] The width of the second loading platform 110 is greater than that of the first loading platform 11. The parts on both sides of the second loading platform 110 that are wider than the first loading platform 11 are the loading area 115. The second loading mechanism 117 is arranged in the loading area 115. The staff can be located outside the loading area 115 of the second loading platform 110. This position is close to the first loading mechanism 116 and the second loading mechanism 117, which is convenient for loading the lead frame.

[0072] The first loading mechanism 116 and the second loading mechanism 117 respectively include a top guide component 12 and a bottom guide component 13 which are longitudinally aligned for guiding the lead frame to pass through, and the heights of the top guide component 12 and the bottom guide component 13 are adjustable.

[0073] The conveying turntable is located beside the top guide component 12. The top of the lead frame passes through the top guide component 12 and cooperates with the steel belt of the conveying turntable to load the lead frame onto the steel belt.

[0074] The top guide component 12 includes a top guide plate 126 for guiding the lead frame to pass through in a gap arrangement and a top mounting member 121 for mounting the top guide plate 126; the top mounting member 121 includes a top fixing column 122 and a top support plate 123 elastically mounted on the top fixing column 122, and the top guide plate 126 is mounted on the top support plate 123.

[0075] The lead frame is conveyed forward under the guidance of the top guide component 12 and the bottom guide component 13. When the size of the lead frame changes, the height of the bottom guide component 13 is adjusted to facilitate the conveyance of lead frames of different sizes. During conveyance, the top guide plate 126 installed on the top support plate 123 can be elastically moved longitudinally to facilitate pressed conveyance and prevent the lead frame from falling between the top guide component 12 and the bottom guide component 13.

[0076] Preferably, the top support plate 123 is also provided with a top mounting plate 124, and the top mounting plate 124 is provided with a plurality of first transverse adjustment holes 125. The top guide plate 126 is installed in the first transverse adjustment holes 125 with adjustable spacing, and the transverse position of the top guide plate 126 can be adjusted through the first transverse adjustment holes 125 so that the gap can allow lead frames of different thicknesses to pass through.

[0077] Furthermore, there are two top guide plates 126 which are arranged parallel to each other and spaced apart. The first transverse adjustment hole 125 is arranged perpendicular to the forward direction of the lead frame and is a long hole structure. The position is adjusted by bolt connection.

[0078] The top fixed column 122 is also equipped with a pressure material adjustment top plate 127 located at the top, and the pressure material adjustment top plate 127 is equipped with an adjustment rod 128 connected to the top support plate 123, and a spring member 129 nested in the adjustment rod 128 is arranged between the pressure material adjustment top plate 127 and the top support plate 123.

[0079] In this embodiment, the adjusting rod 128 is rotated to change the distance between the material pressing adjusting top plate 127 and the top support plate 123, that is, the height of the top support plate 123 changes, and the distance from the bottom guide component 13 changes, so that lead frames of different sizes can be transported. Under the elastic drive of the spring member 129, the top support plate 123 is always pressed down. When the thickness of the lead frames of the same batch varies slightly, the top support plate 123 has an elastic buffering effect and can be adaptively moved up or down, so that the top support plate 123 is always in contact with the top plate edge of the lead frame to achieve guided sliding.

[0080] The bottom guide member 13 includes a bottom guide plate 135 for the lead frame to pass through and a bottom support plate 133 for mounting the bottom guide plate 135. The bottom support plate 133 is provided with a plurality of second transverse adjustment holes 134, and the bottom guide plate 135 is mounted in the second transverse adjustment holes 134 with adjustable spacing.

[0081] In this embodiment, the bottom guide plate 135 has the same function as the top guide plate 126 . The lateral position of the bottom guide plate 135 can be changed by adjusting the second lateral adjustment hole 134 , so that lead frames of different sizes can be guided to pass through.

[0082] Preferably, there are two bottom guide plates 135 arranged in parallel and spaced apart, the second transverse adjustment hole 134 is a long hole arranged perpendicular to the front direction of the lead frame, and the bottom guide plate 135 is fixedly installed by bolts to limit the bottom two side plates of the lead frame.

[0083] The bottom guide component 13 also includes a bottom lifting plate 130. The bottom lifting plate 130 is provided with a bottom support bar 131 located below the bottom guide plate 135 along the forward direction of the lead frame. A discharge plate 132 for discharging the lead frame is provided at the end of the bottom support bar 131. The bottom plate edge of the lead frame is slidably matched with the bottom support bar 131, and the bottom support bar 131 is used for sliding support, so that the plate edges at the top and bottom of the lead frame are both limited, and forward guided sliding is realized.

[0084] A bottom driving plate 136 is arranged below the bottom lifting plate 130, and the bottom of the top fixed column 122 is fixed on the bottom driving plate 136. The bottom driving plate 136 is provided with a bottom driving member 137 for driving the bottom lifting plate 130 to move longitudinally. The top fixed column 122 is longitudinally arranged with a plurality of spaced limit sensors 138, and the bottom lifting plate 130 is installed with a sensing block 139 for sensing and cooperating with the limit sensor 138. Driven by the bottom driving member 137, the bottom lifting plate 130 can be lifted and lowered above the bottom driving plate 136, thereby adjusting the position of the bottom guide component 13 to adapt to lead frames of different sizes; during adjustment, the cooperation of the limit sensor 138 and the sensing block 139 can prevent the position adjustment of the bottom lifting plate 130 from exceeding the travel range.

[0085] Preferably, the limit sensor 138 is an existing outsourced photoelectric switch PM-T, and the induction block 139 can send a signal to issue a warning prompt when it contacts the limit sensor 138 .

[0086] Preferably, the bottom driving member 137 can be a height adjustment mechanism such as a lifting cylinder, a screw adjustment, etc.

[0087] The bottom lifting plate 130 is also provided with a pulling plate mechanism 14 for driving the lead frame to move forward. The pulling plate mechanism 14 includes a pulling plate seat 141 which moves back and forth along the forward direction of the lead frame. The pulling plate seat 141 is provided with a clamping member which can be opened and closed to clamp the lead frame. The lead frame located between the top guide component 12 and the bottom guide component 13 is clamped by the clamping member. The pulling plate seat 141 moves along the forward direction of the lead frame to drive the lead frame to be transported forward.

[0088] Furthermore, the bottom lifting plate 130 is provided with a driving groove 142 along its length direction for the reciprocating movement of the pull plate seat 141. The clamping member includes a finger cylinder 147 installed on the pull plate seat 141. The driving ends of the finger cylinder 147 are respectively installed with first clamping plates 143, and the ends of the first clamping plates 143 are installed with transversely arranged second clamping plates 144. Under the drive of the finger cylinder 147, the second clamping plate 144 installed on the first clamping plate 143 moves outward or inward, so that the clamping member makes an opening and closing movement, clamps the bottom plate edge of the lead frame, reduces contact with the electroplating area, and prevents damage to the lead frame.

[0089] Preferably, the driving grooves 142 are respectively located on both sides of the bottom support bar 131, the pull plate seat 141 is located at the bottom of the bottom lifting plate 130 on which the support bar is installed, the first clamping plate 143 is respectively located on both sides of the bottom support bar 131, and the second clamping plate 144 clamps the lead frame of the bottom support bar 131 in a transverse relative movement.

[0090] When the pull plate seat 141 slides along the bottom lifting plate 130 at the bottom of the bottom support bar 131, the first clamping plate 143 and the second clamping plate 144 slide along the through groove, which can reduce the space occupied by the bottom lifting plate 130, and there is no need to set up a traditional push plate mechanism, and the rationality of the layout is further improved.

[0091] Preferably, a belt conveyor mechanism 145 is provided at the bottom of the bottom lifting plate 130, and a transmission seat 146 is installed along the belt member of the belt conveyor mechanism 145. The transmission seat 146 extends to connect with the pull plate seat 141. The belt conveyor mechanism 145 drives the pull plate seat 141 to reciprocate in the length direction of the bottom lifting plate 130 in a positive and negative direction, thereby realizing guided transportation of the lead frame.

[0092] The support platform 21 is provided with a first electroplating line 22 for the first steel strip to pass through and a second electroplating line 23 for the second steel strip to pass through. The first electroplating line 22 includes a first forward electroplating area 221 for the first steel strip to pass through in the forward direction and a first backward electroplating area 222 for the first steel strip to pass through in the backward direction; the second electroplating line 23 includes a second forward electroplating area 231 for the second steel strip to pass through in the forward direction and a second backward electroplating area 232 for the second steel strip to pass through in the backward direction. Two electroplating lines are arranged on one support platform 21, respectively for the first steel strip and the second steel strip to advance and retreat, so that two electroplating lines can be arranged on one support platform 21. On the one hand, the two electroplating lines do not interfere with or affect each other, and on the other hand, the two original devices are combined into one, which reduces the occupation of ground space and improves space utilization.

[0093] The heights of the first electroplating line 22 and the second electroplating line 23 are inconsistent. The overall height of the first electroplating line 22 is higher than the overall height of the second electroplating line 23. Due to the inconsistent heights and positions, the degree of non-interference between the first electroplating line 22 and the second electroplating line 23 can be further improved.

[0094] Preferably, the positions of the first electroplating line 22 and the second electroplating line 23 are interchangeable.

[0095] The first electroplating line 22 and the second electroplating line 23 are parallel to each other along the movement direction of the lead frame. When the first electroplating line 22 and the second electroplating line 23 are working, the movement stroke and movement trajectory of the two steel belts are relatively simple and convenient, which can also facilitate the layout of the corresponding electroplating modules in the first electroplating line 22 and the second electroplating line 23.

[0096] The second forward plating area 231 and the second retreat plating area 232 are respectively located on both sides of the length direction of the first plating line 22. Since the overall structures of the first steel strip and the second steel strip are both in the shape of a circular runway, the overall width of the second steel strip passing through the second plating line 23 is larger during layout, and the overall width of the first steel strip passing through the first plating line 22 is smaller. Since the heights of the first plating line 22 and the second plating line 23 are inconsistent, the space occupancy can be further reduced and the space utilization rate can be improved without interfering with each other.

[0097] The first forward plating area 221 and the second forward plating area 231 are attached to each other, and the first retreat plating area 222 and the second retreat plating area 232 are attached to each other, which can further reduce space occupancy and improve space utilization without interfering with each other.

[0098] The first forward plating area 221 and the second forward plating area 231 respectively include a forward plating tank 223 and a forward drying box 224. The two ends of the forward plating tank 223 are respectively provided with first forward passages 225 for the steel strip loaded with the lead frame to pass through. The forward drying box 224 is coaxially aligned with the forward plating tank 223, and the two ends of the forward drying box 224 are respectively provided with second forward passages 226 coaxially aligned with the first forward passage 225.

[0099] The steel strip enters the forward electroplating tank 223 through the first forward passage 225 for electroplating, and then enters the forward drying box 224 through the second forward passage 226 for drying.

[0100] The first forward passage opening 225 and the second forward passage opening 226 are coaxially aligned, and the steel belt will not hit the opening when passing through, which can effectively protect the lead frame and reduce damage.

[0101] Similarly, when the other long side of the steel strip is retreated, the first retreat electroplating area 222 and the second retreat electroplating area 232 respectively include a retreat electroplating tank 233 and a retreat drying box 234, and the retreat electroplating tank 233 has first retreat openings 235 at both ends for the steel strip loaded with the lead frame to pass through. The retreat drying box 234 is coaxially aligned with the retreat electroplating tank 233, and second retreat openings 236 coaxially aligned with the first retreat opening 235 are respectively opened at both ends of the retreat drying box 234. The steel strip enters the retreat electroplating tank 233 through the first retreat opening 235 for electroplating, and then enters the retreat drying box 234 through the second retreat opening 236 for drying.

[0102] The first retracting opening 235 and the second retracting opening 236 are coaxially aligned, and the steel belt will not hit the opening when passing through, which can effectively protect the lead frame and reduce damage.

[0103] The forward plating tanks 223 of the first forward plating area 221 and the second forward plating area 231 are interconnected to form an integrated structure, and the forward plating tanks 223 of the first retreat plating area 222 and the second retreat plating area 232 are interconnected to form an integrated structure. During processing, the forward plating tanks 223 of the first forward plating area 221 and the second forward plating area 231 are molded to form a complete structure, and the retreat plating tanks 233 of the first retreat plating area 222 and the second retreat plating area 232 are molded to form a complete structure, so that the occupied space can be further reduced.

[0104] The support platform 21 includes a support frame 210, on which are provided a plurality of first support legs 211 for supporting the first forward plating area 221, a second support leg 212 for supporting the second forward plating area 231, a third support leg 213 for supporting the first retreat plating area 222, and a fourth support leg 214 for supporting the second retreat plating area 232, so as to improve the stability of support and installation of the first plating line 22 and the second plating line 23.

[0105] The height of the first supporting leg 211 is the same as the height of the third supporting leg 213; the height of the second supporting leg 212 is the same as the height of the fourth supporting leg 214, so that the height of the first forward electroplating area 221 and the first retreat electroplating area 222 are the same, and the height of the second forward electroplating area 231 and the second retreat electroplating area 232 are the same.

[0106] The unloading platform 3 is provided with a first unloading platform 31 and a second unloading platform 310. The first unloading platform 31 is provided with a first rear-end conveying mechanism 311 for unloading lead frames, and the second unloading platform 310 is provided with a second rear-end conveying mechanism 312. The conveying heights of the first rear-end conveying mechanism 311 and the second rear-end conveying mechanism 312 are inconsistent. The first rear-end conveying mechanism 311 and the second rear-end conveying mechanism 312 convey the steel strips with lead frames independently. The first rear-end conveying mechanism 311 and the second rear-end conveying mechanism 312 with inconsistent conveying heights are installed on the same unloading platform 3 at the same time, and the steel strips with lead frames are conveyed independently, so that the steel strips with lead frames do not affect each other during conveyance; one staff member can complete the unloading of two groups of lead frames, which not only reduces the occupied space, but also reduces the labor cost.

[0107] The first unloading platform 31 is located outside the second unloading platform 310, that is, the lateral positions of the first unloading platform 31 and the second unloading platform 310 are different, and the height of the first unloading platform 31 is greater than the height of the second unloading platform 310, so that the steel belts with the lead frame do not affect each other during transmission. The first rear-end transmission mechanism 311 includes a first unloading conveying turntable 313 that can rotatably convey the first steel belt. One end of the first steel belt is wound around the first unloading conveying turntable 313, and the other end is wound around the first loading conveying turntable 113. Under the rotation transmission of the first unloading conveying turntable 313 and the first loading conveying turntable 113, the first steel belt moves in a circular track trajectory, and continuously moves to convey the lead frame forward from the loading platform 1 to the unloading platform 3.

[0108] The second rear-end conveying mechanism 312 includes a second unloading conveying turntable 314 which can rotatably convey the second steel belt, wherein one end of the second steel belt is wound around the second unloading conveying turntable 314, and the other end is wound around the second loading conveying turntable 114. Through the transmission of the second unloading conveying turntable 314 and the second loading conveying turntable 114, the second steel belt moves in a circular track trajectory, continuously moving to convey the lead frame forward from the loading platform 1 to the unloading platform 3.

[0109] The unloading conveying turntable cooperates with the steel belt transmission by meshing. The unloading conveying turntable can also be a ratchet, and the ratchet and the steel belt realize transmission cooperation.

[0110] The conveying directions of the first rear-end conveying mechanism 311 and the second rear-end conveying mechanism 312 are parallel to each other. The first rear-end conveying mechanism 311 and the second rear-end conveying mechanism 312 , which are independent of each other, both convey in the same direction.

[0111] Preferably, in addition to this, according to the layout of the workshop, the conveying directions of the first rear-end conveying mechanism 311 and the second rear-end conveying mechanism 312 may be different. The first rear-end conveying mechanism 311 conveys one of the lead frames to the first position, and the second rear-end conveying mechanism 312 conveys one of the lead frames to the second position. Since the unloading positions are all located on the unloading platform 3, the unloading can be completed by only one staff member.

[0112] Among them, an auxiliary unloading conveyor turntable 316 is arranged beside the second unloading conveyor turntable 314, and the second unloading conveyor turntable 314 and the auxiliary unloading conveyor turntable 316 are highly flush for the second steel belt to be wound. In this embodiment, one end of the second steel belt is respectively wound on the second unloading conveyor turntable 314 and the auxiliary turntable, so that the overall width of the second steel belt is larger and larger than the first steel belt, and can be further separated from the first steel belt, and the first steel belt and the second steel belt do not affect each other during the conveying movement.

[0113] The first rear-end conveying mechanism 311 and the second rear-end conveying mechanism 312 respectively include a tension guide assembly 32 for adjusting the tightness of the steel belt.

[0114] The tensioning guide assembly 32 of the first rear-end conveying mechanism 311 includes a first guide shaft 321 arranged on the first unloading platform 31 along the conveying direction of the first steel belt, and a first support seat 322 slidably mounted on the first guide shaft 321. The first unloading conveying turntable 313 is rotatably mounted on the first support seat 322. When the first steel belt is in motion, it is easy for the transmission to become loose with the first unloading conveying turntable 313. At this time, the first support seat 322 can be pulled outward, and the first support seat 322 slides along the first guide shaft 321 to tighten the first steel belt of the first rear-end conveying mechanism 311, so that its transmission is more stable.

[0115] Preferably, there are two first guide shafts 321, and first limit seats 323 are respectively installed at both ends of the first guide shaft 321, and the first support seat 322 is installed with a first guide sleeve 324 that slides with the first guide shaft 321; the first unloading table 31 is provided with a first telescopic driving member 325 that drives the first support seat 322 to slide along the first guide shaft 321, and the first support seat 322 can be driven by the first telescopic driving member 325 to move laterally, and the tightness of the first steel belt of the first rear-end conveying mechanism 311 can be adjusted to facilitate the conveying of the lead frame.

[0116] Preferably, the first telescopic driving member 325 is a telescopic cylinder.

[0117] Preferably, the tension guide assembly 32 of the second rear-end conveying mechanism 312 has the same structure and function as the first rear-end conveying mechanism 311. The tension guide assembly 32 of the second rear-end conveying mechanism 312 is used to adjust the tightness of the second steel belt. Therefore, the specific structure of the tension guide assembly 32 of the second rear-end conveying mechanism 312 is not described in detail here.

[0118] The first unloading platform 31 is further provided with a first transfer platform 33 for transferring the lead frame after unloading by the first rear-end conveying mechanism 311 , and the second unloading platform 310 is further provided with a second transfer platform 330 for transferring the lead frame after unloading by the second rear-end conveying mechanism 312 .

[0119] The first transfer platform 33 includes a conveying side plate 331 installed on the first unloading platform 31. There are two conveying side plates 331, which are arranged in parallel and spaced apart. A conveying belt 332 for supporting and conveying the lead frame is installed between the two conveying side plates 331. The conveying belt 332 is arranged along the length direction of the conveying side plates 331. A unloading slide 335 for guiding the lead frame to slide into the conveying belt 332 is provided near the first steel belt of the conveying side plate 331. The lead frame conveyed by the first rear-end conveying mechanism 311 falls onto the first transfer platform 33. The conveying belt 332 of the first transfer platform 33 supports and conveys the fallen lead frame, and transfers the lead frame from the first unloading platform 31 to the outside for processing in the next process.

[0120] Preferably, the conveying side plate 331 is arranged with a guide rail 333 and a bottom telescopic member 334 along the length direction, and a sliding seat 338 slidably installed on the guide rail 333 is provided at the bottom of the unloading slide 335, and the driving end of the bottom telescopic member 334 is connected to the unloading slide 335; driven by the bottom telescopic member 334, the unloading slide 335 can slide along the guide rail 333 through the sliding seat 338, so that the unloading slide 335 is aligned with the unloading place of the first rear-end conveying mechanism 311, so that the lead frame can fall into the unloading slide 335 and enter the conveyor belt 332 for unloading.

[0121] Preferably, the unloading slide 335 includes an unloading guide seat 339 and an inclined plate 336 obliquely arranged on the unloading guide seat 339. The inclined plate 336 is installed with an unloading sliding plate 337 along the way for the lead frame to slide into the conveyor belt 332. The lead frame slides along the inclined plate 336, and after reaching the unloading sliding plate 337, it continues to slide into the conveyor belt 332 for unloading and transportation.

[0122] Preferably, the second transfer platform 330 and the first transfer platform 33 have substantially the same structure and function, both of which are used to transport lead frames cut from steel strips, so the specific structure of the second transfer platform 330 is not described in detail herein.

[0123] The present invention can cut materials for different lead frames respectively, and can cut materials for different lead frames independently on the same platform, thereby realizing diversified processing.

[0124] The width of the second unloading platform 310 is greater than that of the first unloading platform 31. The parts on both sides of the second unloading platform 310 that are wider than the first unloading platform 31 are the unloading areas 315. The second transfer platform 330 is arranged in the unloading area 315. The staff can be located outside the unloading area 315 of the second unloading platform 310. This position is close to the distance between the first transfer platform 33 and the second transfer platform 330, which is convenient for unloading operations on the lead frame.

[0125] Furthermore, the first loading table 11 is flush with the first unloading table 31, the second loading table 110 is flush with the second unloading table 310, the first front end conveying mechanism 111 is flush with the first rear end conveying mechanism 311, and the second front end conveying mechanism 112 is flush with the second rear end conveying mechanism 312; so that the first steel belt and the second steel belt can both move in the horizontal direction to transport the lead frame horizontally.

[0126] In summary, it can be seen that the present invention has the above-mentioned excellent characteristics, which can enhance the performance unprecedented in the prior art and become a product with great practical value.

[0127] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, according to the concept of the present invention, there will be changes in the specific implementation methods and application scopes. The content of this specification should not be understood as limiting the present invention.

Claims

1. Step-type steel strip equipment for integrated circuit lead frame, including a loading platform, an electroplating platform and a unloading platform, characterized in that: The loading platform is provided with a first loading platform and a second loading platform, the first loading platform is provided with a first front-end conveying mechanism for loading the lead frame, the second loading platform is provided with a second front-end conveying mechanism, and the conveying heights of the first front-end conveying mechanism and the second front-end conveying mechanism are inconsistent; The first front-end transmission mechanism is connected to the first steel belt in a transmission manner, and the second front-end transmission mechanism is connected to the second steel belt in a transmission manner; The electroplating platform comprises a supporting platform, and the supporting platform is provided with a first electroplating line for the first steel strip to pass through and a second electroplating line for the second steel strip to pass through, the first electroplating line comprises a first forward electroplating area for the first steel strip to pass through in a forward direction and a first retracting electroplating area for the first steel strip to pass through in a retracting direction; the second electroplating line comprises a second forward electroplating area for the second steel strip to pass through in a forward direction and a second retracting electroplating area for the second steel strip to pass through in a retracting direction; The unloading platform is provided with a first unloading platform and a second unloading platform, the first unloading platform is provided with a first rear end conveying mechanism for unloading the lead frame, the second unloading platform is provided with a second rear end conveying mechanism, one end of the first steel belt is provided with a transmission connection with the first rear end conveying mechanism, and one end of the second steel belt is transmission connected with the second rear end conveying mechanism; The first unloading platform is also provided with a first transfer platform for transferring the lead frame after unloading by the first rear-end conveying mechanism, and the second unloading platform is also provided with a second transfer platform for transferring the lead frame after unloading by the second rear-end conveying mechanism; The first forward electroplating area and the second forward electroplating area respectively include a forward electroplating tank and a forward drying box, wherein the forward electroplating tanks of the first forward electroplating area and the second forward electroplating area are connected to each other to form an integrated structure, and first forward passage openings for passing the steel strip loaded with the lead frame are respectively provided at both ends of the forward electroplating tank; The forward drying box is coaxially aligned with the forward electroplating tank, and second forward passage openings coaxially aligned with the first forward passage opening are respectively provided at both ends of the forward drying box; The first retreat plating area and the second retreat plating area respectively include a retreat plating tank and a retreat drying box, wherein the forward plating tanks of the first retreat plating area and the second retreat plating area are connected to each other to form an integrated structure, and first retreat passages for passing the steel strip loaded with the lead frame are respectively provided at both ends of the retreat plating tank; The retreat drying box is coaxially aligned with the retreat electroplating tank, and second retreat passage openings coaxially aligned with the first retreat passage opening are respectively provided at both ends of the retreat drying box.

2. The step-type steel strip equipment for integrated circuit lead frame according to claim 1, characterized in that: The first loading platform is located outside the second loading platform, the height of the first loading platform is greater than the height of the second loading platform, and the first front-end conveying mechanism includes a first loading conveying turntable that can rotatably convey the first steel strip; The conveying directions of the first steel belt and the second steel belt are parallel to each other; the second front-end conveying mechanism comprises a second loading conveying turntable rotatably conveying the second steel belt, and an auxiliary loading conveying turntable is arranged beside the second loading conveying turntable.

3. The step-type steel strip equipment for integrated circuit lead frame according to claim 2, characterized in that: The first loading platform is provided with a first loading mechanism cooperating with the first front-end conveying mechanism, and the first loading mechanism is used for loading the lead frame onto the first steel strip; The second loading platform is provided with a second loading mechanism cooperating with the second front-end conveying mechanism, and the second loading mechanism is used for loading the lead frame onto the second steel strip; The width of the second loading platform is greater than that of the first loading platform. The parts on both sides of the second loading platform that are wider than the first loading platform are loading areas, and the second loading mechanism is arranged in the loading area.

4. The step-type steel strip equipment for integrated circuit lead frames according to claim 1, characterized in that: The heights of the first electroplating line and the second electroplating line are inconsistent, and the first electroplating line and the second electroplating line are parallel to each other along the movement direction of the lead frame; the second forward electroplating area and the second retreat electroplating area are respectively located on both sides of the length direction of the first electroplating line; the first forward electroplating area and the second forward electroplating area are in contact with each other, and the first retreat electroplating area and the second retreat electroplating area are in contact with each other.

5. The step-type steel strip equipment for integrated circuit lead frame according to claim 1, characterized in that: The support platform includes a support frame, on which are disposed a plurality of first support legs for supporting a first forward electroplating area, a second support leg for supporting a second forward electroplating area, a third support leg for supporting a first retreat electroplating area, and a fourth support leg for supporting a second retreat electroplating area; The height of the first supporting leg is the same as the height of the third supporting leg; the height of the second supporting leg is the same as the height of the fourth supporting leg.

6. The step-type steel strip equipment for integrated circuit lead frames according to claim 1, characterized in that: The first unloading platform is located outside the second unloading platform, the height of the first unloading platform is greater than the height of the second unloading platform, the first rear-end conveying mechanism includes a first unloading conveying turntable rotatably conveying the first steel strip; the second rear-end conveying mechanism includes a second unloading conveying turntable rotatably conveying the second steel strip, and an unloading auxiliary conveying turntable is arranged beside the second unloading conveying turntable; The second unloading conveying turntable and the unloading auxiliary conveying turntable are highly flush with each other for the second steel belt to be wound around, and the conveying directions of the first rear end conveying mechanism and the second rear end conveying mechanism are parallel to each other.

7. The step-type steel strip equipment for integrated circuit lead frames according to claim 1, characterized in that: The first rear-end conveying mechanism and the second rear-end conveying mechanism respectively include a tension guide assembly for adjusting the tightness of the steel belt. The tension guide assembly of the first rear-end conveying mechanism includes a first guide shaft arranged on the first unloading platform along the conveying direction of the steel belt, a first support seat slidably installed on the first guide shaft, and a first unloading conveying turntable rotatably installed on the first support seat.

8. The step-type steel strip equipment for integrated circuit lead frames according to claim 7, characterized in that: There are two first guide shafts, both ends of the first guide shaft are respectively installed with first limit seats, the first support seat is installed with a first guide sleeve that slides with the first guide shaft; the first unloading table is provided with a first telescopic driving member that drives the first support seat to slide along the first guide shaft.