Grid-source-storage-charging coordinated optimization scheduling method considering flexible energy storage regulation

By considering the spatial mobile characteristics and road network model of the energy storage vehicle in the network-source-storage-charge coordination optimization scheduling, and using genetic algorithms to optimize the scheduling solution of the energy storage vehicle, the integrated optimization of the mobile energy storage vehicle and new energy power generation is solved. The problem is that the optimal energy storage vehicle dispatch and charging and discharging operations are achieved, reducing the total cost.

CN116632813BActive Publication Date: 2024-11-19TIANJIN UNIV +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310429680.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2024-11-19
Estimated Expiration
2043-04-20

AI Technical Summary

Technical Problem

The existing technology has not yet effectively solved the integration optimization problems of mobile energy storage vehicles, energy storage power stations, and wind and solar new energy power generation, and lacks relevant theoretical and technical support.

Method used

The network-source-storage-charge-charge double-layer optimization method that takes into account the mobile attributes of energy storage vehicles, and the upper layer optimization is carried out through genetic algorithms, and the intraday energy storage optimization scheduling is used as the lower layer optimization, combining the road network model, vehicle traffic and itinerary time-consuming , energy consumption model, determine the optimal scheduling plan and charging and discharging operation of the energy storage vehicle.

Benefits of technology

The optimal scheduling of the energy storage vehicle to the target node is achieved, the total scheduling cost is reduced, the charging and discharging requirements of the target node are met, and the charging and discharging operations of the energy storage vehicle are optimized to achieve the most economical scheduling effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116632813B_ABST
    Figure CN116632813B_ABST
Patent Text Reader

Abstract

The invention discloses a network-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation: on the premise that the initial road network nodes of the energy storage vehicle and the distribution network nodes with charging and discharging requirements are known, all initial scheduling schemes of the energy storage vehicle are obtained; according to the initial power of the energy storage vehicle, the road network traffic flow and the vehicle speed-flow practical model, the time required for the energy storage vehicle to travel on each road section from the starting node to the target node is obtained, and a path selection optimization model is established; after determining the driving path of the energy storage vehicle, according to various loss data of the energy storage vehicle, an energy storage vehicle travel energy consumption model is established, the power consumption of the energy storage vehicle in each road section and the whole-trip power consumption are obtained, and the loss cost of the energy storage vehicle during driving is obtained; the scheduling cost of the energy storage vehicle is calculated; the total scheduling cost corresponding to the initial scheduling schemes of each energy storage vehicle is used as the fitness of the genetic algorithm, and the optimal scheduling scheme of the energy storage vehicle with the lowest total scheduling cost is obtained by using the genetic algorithm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to energy optimization scheduling technology, and more specifically, to a network-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation. Background Art

[0002] As a major energy consumer, my country has a strategic trend to develop large-scale wind power, photovoltaic and other new energy sources. However, due to the inherent randomness, volatility and intermittent characteristics of intermittent new energy sources, the power generation characteristics of large-scale new energy sources are difficult to meet the requirements of grid access, which restricts the development of new energy sources in my country.

[0003] In response to the above problems, theoretical research and practice have proved that the introduction of energy storage technology can effectively improve the operating performance of intermittent power sources, enhance the control capabilities of power systems, and enhance the adaptability of power grids. Among them, electrochemical energy storage has become the key research direction of research institutions in various countries at this stage due to its high power density, flexible site selection, and fast response speed. At the same time, in recent years, mobile energy storage has shown great advantages and development potential in distribution network fault repair, post-disaster power supply guarantee, communication base stations, government, hospitals and other fields. However, the research on the integrated optimization of mobile energy storage vehicles and energy storage power stations, wind-solar new energy power generation, etc., currently has no relevant theories and technologies to support it, and is still in its infancy. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and propose a two-layer optimization method of grid-source-storage-charging taking into account the spatial mobility properties of energy storage vehicles, that is, a grid-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation. By taking genetic algorithm as the upper-layer optimization and intraday energy storage optimization scheduling as the lower-layer optimization, the collaborative strategy research of grid-source-storage-charging resources is carried out.

[0005] The objectives of the present invention are achieved through the following technical solutions.

[0006] The present invention provides a network-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation, comprising the following processes:

[0007] Step 1: Under the premise of knowing the initial road network nodes of the energy storage vehicle and the distribution network nodes with charging and discharging needs, all initial scheduling plans for the energy storage vehicle are obtained;

[0008] Step 2: Based on the initial power of the energy storage vehicle, the traffic flow of the road network and the practical model of vehicle speed-flow, the time required for the energy storage vehicle to travel on each road section from the starting node to the target node is obtained, and the path selection optimization model is established based on the principle of shortest total driving time of the energy storage vehicle;

[0009] Step 3: Determine the driving route of the energy storage vehicle based on the route selection optimization model, establish the energy consumption model of the energy storage vehicle based on the various loss data of the energy storage vehicle, obtain the power consumption of the energy storage vehicle in each section and the whole journey, and then obtain the loss cost of the energy storage vehicle during driving;

[0010] Step 4: Calculate the dispatching cost of the energy storage vehicle, including the initial charging cost and the intra-day dispatching cost;

[0011] Step 5: The total dispatch cost corresponding to the initial dispatch plan of each energy storage vehicle is used as the fitness of the genetic algorithm, and the optimal dispatch plan for the energy storage vehicle with the lowest total dispatch cost is obtained using the genetic algorithm; wherein the total dispatch cost includes the loss cost and the energy storage vehicle dispatch cost.

[0012] The practical model of vehicle speed-flow described in the second step is:

[0013]

[0014] In the formula, v jlt represents the speed of the vehicle on the road section between the road network nodes j and l at time t; v jl,max N represents the maximum vehicle speed on the road section between road network nodes j and l, which is set as the vehicle traffic speed limit of the road section; cr,jlt represents the number of vehicles on the road between nodes j and l at time t; C jl It represents the vehicle carrying capacity of the road section between road network nodes j and l, where the carrying capacity is expressed as the maximum number of vehicles that can be carried in the road section; a, b, and n are adjustment coefficients, which are determined according to the specific characteristics of the road.

[0015] The path selection optimization model described in the second step:

[0016]

[0017] Where N road represents the set of all road segments in the road network; o and d represent the starting node and target node of a dispatching route in the traffic road graph respectively; t k represents the travel time on road section k from o to d; Route_i represents the i-th path from o to d, where i∈I, I represents the number of all feasible paths from o to d; represents the total travel time from o to d.

[0018] The energy consumption model of the energy storage vehicle travel described in the third step: the loss of the energy storage vehicle on the road includes tire loss, air resistance loss, active system loss and auxiliary loss;

[0019] Tire resistance F fric and air resistance F aeroThe following empirical calculation is used:

[0020] F fric +F aero =A+Bv+Cv 2

[0021] Where, v is the velocity in m / s; A, B, and C are resistance parameters respectively;

[0022] The loss of the active system mainly considers the loss of the energy storage vehicle under acceleration. The force F required for acceleration acce It is expressed as:

[0023] F acce =m MES a MES

[0024] In the formula, m MES is the mass of the energy storage vehicle, in kg; a MES Indicates the acceleration of the energy storage vehicle, in m / s 2 ;

[0025] Therefore, the torque M required at the motor is:

[0026]

[0027] Where M CF is the converted no-load moment; r is the tire radius, in m; n g and η g represent the transmission coefficient ratio and transmission efficiency respectively;

[0028] The angular velocity ω of the energy storage vehicle is expressed as:

[0029]

[0030] The DC side active power P is obtained dc as follows:

[0031]

[0032] Where η m is the efficiency of the motor; PF m is the power factor of the motor; η inv is the inverter transmission efficiency; P aux As auxiliary loss, 0.18kW is taken in the present invention.

[0033] In the fourth step, we first determine whether the energy storage vehicle has an initial charging cost based on the remaining power of the energy storage vehicle at the initial node and the road network model. After the energy storage vehicle arrives at the target node, we then obtain the optimal charging and discharging operation and the lowest intraday scheduling cost of the energy storage vehicle under each initial scheduling scheme based on the real-time electricity price.

[0034] The road network model is described using a classical graph theory method, using an adjacency matrix D representing road weights to describe the length of each road section and the relationship between node connections.

[0035] The optimal charging and discharging operation of the energy storage vehicle should meet the energy storage vehicle power constraint, the energy storage vehicle charging and discharging power constraint, and the energy storage vehicle control time constraint;

[0036] ①Energy storage vehicle power constraints

[0037] SOC min ≤SOC t ≤SOC max

[0038] In the formula, SOC t Indicates the real-time state of charge of each energy storage vehicle, SOC min Indicates the lower limit of the energy storage vehicle’s power, SOC max Indicates the upper limit of the energy storage vehicle's power;

[0039] ②Charging and discharging power constraints of energy storage vehicles

[0040] 0≤P t ≤P max

[0041] Where P t Represents the charging and discharging power of the energy storage vehicle, P max Indicates the maximum charging and discharging power of the energy storage vehicle;

[0042] ③ Energy storage vehicle control time constraints

[0043] t in ≤t dis ≤t out

[0044] Where, t dis represents the energy storage vehicle control time, t in With t out They respectively represent the time when the energy storage vehicle is connected to and connected to the power grid.

[0045] The total dispatch cost described in the fifth step includes the loss cost and the energy storage vehicle dispatch cost, as shown in the following formula:

[0046]

[0047] In the formula, c represents the total dispatch cost of N energy storage vehicles. When the total dispatch cost is the smallest, the corresponding energy storage vehicle charging and discharging operation is the optimal charging and discharging operation plan; c 0i The cost of pre-charging the i-th energy storage vehicle at its starting node; c 1iis the charging cost of the i-th energy storage vehicle after reaching the target node. This charging cost is related to the loss cost of the energy storage vehicle during driving. The lower the loss cost, the lower the charging cost. 2i is the discharge cost of the i-th energy storage vehicle at the corresponding node; c 3i After the i-th energy storage vehicle is discharged, the charging cost of charging it again to the power threshold to ensure the scheduling of the next day;

[0048] c 0i =P 0i *cp 0i *T 0i

[0049] Where P 0i represents the electricity price of the i-th energy storage vehicle at the time of pre-charging at its starting node, cp 0i represents the charging power of the i-th energy storage vehicle at the time of pre-charging at its starting node, T 0i It means that the i-th energy storage vehicle has a size of cp at its starting node 0i The power charging time;

[0050] c 1i =P 1i *cp 1i *T 1i

[0051] Where P 1i represents the electricity price when the i-th energy storage vehicle arrives at the target node and starts charging, cp 1i represents the charging power of the i-th energy storage vehicle when it arrives at the target node, T 1i It means that the i-th energy storage vehicle arrives at the target node with a size of cp 1i The power charging time;

[0052] c 2i =P 2i *dcp 1i *T 2i

[0053] Where P 2i represents the electricity price of the i-th energy storage vehicle at the corresponding node discharge time, dcp 1i represents the discharge power of the i-th energy storage vehicle at the corresponding node discharge time, T 2i Indicates that the i-th energy storage vehicle is at the corresponding node with a size of dcp 1i The power discharge time;

[0054] c 3i =P 3i *cp 2i *T 3i

[0055] Where P 3i represents the electricity price at the last charging time of the i-th energy storage vehicle, cp 2i represents the charging power of the i-th energy storage vehicle at the last charging time, T 3i Indicates that the i-th energy storage vehicle has a size of cp 2i The power charging time.

[0056] The calculation process of the genetic algorithm described in the fifth step:

[0057] 1) Set some nodes to have initial energy storage vehicle resources and charging and discharging requirements, and obtain the initial group: the initial scheduling plan for energy storage vehicles;

[0058] 2) Taking the fitness function as the total dispatch cost corresponding to the initial dispatch plan of each energy storage vehicle;

[0059] 3) Set the crossover rate and mutation rate to 0.3 and 0.1 respectively, and perform crossover and mutation operations;

[0060] 4) Setting termination criteria: whether the energy storage vehicle can meet the charging and discharging requirements of the target node under a certain initial scheduling plan;

[0061] 5) If the termination criteria are not met, go to step 2), otherwise go to the next step;

[0062] 6) Output the individual with the best fitness function value as the optimal solution to the problem

[0063] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:

[0064] (1) In the process of coordinated optimization and dispatching of network-source-storage-charging, the present invention fully considers the spatial mobility characteristics of the energy storage vehicle, and comprehensively considers factors such as the road network model, the daily traffic flow, the travel time of the energy storage vehicle, and the energy consumption model, so as to obtain the optimal solution for dispatching the energy storage vehicle to the target node.

[0065] (2) After the energy storage vehicle arrives at the target node, the present invention uses the intraday energy storage optimization scheduling to perform lower-level optimization to obtain the most economical energy storage vehicle charging and discharging scheduling plan, and comprehensively considers the loss cost of the energy storage vehicle during driving and the intraday energy storage optimization scheduling cost. The two parts of the cost together constitute the fitness function in the genetic algorithm.

[0066] (3) After obtaining the fitness function, the present invention uses a genetic algorithm to perform upper-level optimization. Through double-layer optimization, the optimal scheduling plan for the energy storage vehicle and the daily charging and discharging operation with the lowest total scheduling cost are obtained. This method not only ensures that the charging and discharging needs of the target node are met, but also minimizes the scheduling cost of the energy storage vehicle. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] Figure 1It is a road topology diagram of the road network nodes in the case area used in the embodiment of the present invention.

[0068] Figure 2 This is a topological diagram of the distribution network in the case area used in the embodiment of the present invention.

[0069] Figure 3 It is a 24-hour wind and solar power generation power diagram of the case area adopted in the present invention;

[0070] Among them, (a) the wind turbine output power in the case area within 24 hours a day, and (b) the photovoltaic output power in the case area within 24 hours a day.

[0071] Figure 4 This is the charging and discharging demand diagram of energy storage after the three nodes of the distribution network are connected to wind and solar power generation.

[0072] Figure 5 It is the time and power consumption diagram of each energy storage vehicle in the road section under the optimal scheduling plan of energy storage vehicles;

[0073] Among them, (a) the time and power consumption of the energy storage vehicle at each road section from node 4 to node 24, (b) the time and power consumption of the energy storage vehicle at each road section from node 11 to node 23, and (c) the time and power consumption of the energy storage vehicle at each road section from node 18 to node 14.

[0074] Figure 6 It is the charge and discharge diagram of each energy storage vehicle at each time period in a day under the optimal dispatching scheme of energy storage vehicles;

[0075] Among them, (a) the charging and discharging amount of the energy storage vehicle at nodes 4-24 in each period of a day, (b) the charging and discharging amount of the energy storage vehicle at nodes 11-23 in each period of a day, and (c) the charging and discharging amount of the energy storage vehicle at nodes 18-14 in each period of a day. DETAILED DESCRIPTION

[0076] The present invention will be further described below in conjunction with the accompanying drawings.

[0077] Large-scale energy storage systems are connected to the grid, usually combining energy storage with intermittent new energy. In view of the randomness, volatility and intermittency of wind and solar power generation, battery energy storage is used as a carrier to achieve intermittent new energy and energy storage output complementarity, so that new energy power generation reaches or approaches conventional power sources. However, there is currently no strong relevant theory and technology to support the research on the integrated optimization of mobile energy storage vehicles and energy storage power stations, wind-solar new energy power generation, etc., and it is still in its infancy. To this end, the present invention uses genetic algorithms as the upper-level optimization and intraday energy storage optimization scheduling as the lower-level optimization to carry out research on the network-source-storage-charging coordinated scheduling strategy based on large-capacity battery energy storage vehicles.

[0078] The present invention takes into account the network-source-storage-charging coordinated optimization scheduling method of flexible energy storage regulation, and the specific method process is as follows:

[0079] Step 1: Under the premise of knowing the initial road network nodes of the energy storage vehicle and the distribution network nodes with charging and discharging needs, all initial scheduling plans for the energy storage vehicle, that is, the initial population of the genetic algorithm, can be obtained.

[0080] Step 2: Based on the initial power of the energy storage vehicle, the traffic flow of the road network and the practical model of vehicle speed-flow, it can be known how long it takes for the energy storage vehicle to travel on each road section from the starting node to the target node. Based on the principle of minimizing the total driving time of the energy storage vehicle, a path selection optimization model is established.

[0081] ① Speed-flow practical model

[0082] Since the travel path and driving speed of a vehicle will directly affect the time it takes for the vehicle to arrive at the destination, the relationship between vehicle speed and traffic flow needs to be considered when analyzing vehicle travel characteristics. The present invention uses a practical model of vehicle speed-flow for analysis and calculation. The driving speed v on the road section between road network nodes j and l at time t is jlt The calculation formula is shown in formula (1).

[0083]

[0084] In the formula, v jlt represents the speed of the vehicle on the road section between the road network nodes j and l at time t; v jl,max N represents the maximum vehicle speed on the road section between road network nodes j and l, which is set as the vehicle traffic speed limit of the road section; cr,jlt represents the number of vehicles on the road between nodes j and l at time t; C jl It represents the vehicle carrying capacity of the road section between road network nodes j and l, where the carrying capacity is expressed as the maximum number of vehicles that can be carried in the road section; a, b, and n are adjustment coefficients, which are determined according to the specific characteristics of the road.

[0085] ②Path selection optimization model

[0086] The present invention adopts the breadth traversal search method to obtain the shortest path, and the model is expressed as follows:

[0087]

[0088] Where N road represents the set of all road segments in the road network; o and d represent the starting node and target node of a dispatching route in the traffic road graph respectively; t krepresents the travel time on road section k from o to d; Route_i represents the i-th path from o to d, where i∈I, I represents the number of all feasible paths from o to d; represents the total travel time from o to d.

[0089] Step 3: Determine the driving route of the energy storage vehicle based on the path selection optimization model. According to the various loss data of the energy storage vehicle, establish the energy consumption model of the energy storage vehicle, obtain the power consumption of the energy storage vehicle in each section of the road and the power consumption of the whole journey, and then obtain the loss cost of the energy storage vehicle during driving.

[0090] The energy consumption characteristics of the energy storage vehicle analyzed in this invention are as follows. The on-board battery of the energy storage vehicle discharges through the DC side, and is converted into AC power after the on-board inverter, which supplies the permanent magnet AC motor, thereby driving the mechanical device (spring, tire, etc.) to move. The energy storage vehicle travel energy consumption model, that is, the loss of the energy storage vehicle when driving on the road, mainly includes four parts: the loss of the energy storage vehicle when driving on the road includes tire loss, air resistance loss, active system loss and auxiliary loss.

[0091] Among them, the tire resistance F fric and air resistance F aero The following empirical calculation can be used:

[0092] F fric +F aero =A+Bv+Cv 2 (3)

[0093] Where v is the velocity in m / s; A, B, and C are resistance parameters respectively.

[0094] The loss of the active system mainly considers the loss of the energy storage vehicle under acceleration. The force F required for acceleration acce It can be expressed as:

[0095] F acce =m MES a MES (4)

[0096] In the formula, m MES is the mass of the energy storage vehicle, in kg; a MES Indicates the acceleration of the energy storage vehicle, in m / s 2 .

[0097] Therefore, the torque M required at the motor is:

[0098]

[0099] Where M CF is the converted no-load moment; r is the tire radius, in m; n g and ηg represent the transmission coefficient ratio and transmission efficiency respectively.

[0100] The angular velocity ω of the energy storage vehicle can be expressed as:

[0101]

[0102] From this we can get the DC side active power P dc as follows:

[0103]

[0104] Where η m is the efficiency of the motor; PF m is the power factor of the motor; η inv is the inverter transmission efficiency; P aux As auxiliary loss, 0.18kW is taken in the present invention.

[0105] Step 4: Calculate the dispatching cost of the energy storage vehicle, including the initial charging cost and the intra-day dispatching cost.

[0106] When calculating the dispatch cost of the energy storage vehicle, first determine whether the energy storage vehicle has an initial charging cost based on the remaining power of the energy storage vehicle at the initial node and the road network model. The road network model is described using a classical graph theory method, that is, the adjacency matrix D representing the road weight is used to describe the length of each road section and the relationship between node connections.

[0107] After the energy storage vehicle arrives at the target node, the optimal charging and discharging operation of the energy storage vehicle and the lowest intraday scheduling cost under each initial scheduling scheme are obtained according to the real-time electricity price. Among them, the optimal charging and discharging operation of the energy storage vehicle should meet the energy storage vehicle power constraint, energy storage vehicle charging and discharging power constraint, and energy storage vehicle control time constraint.

[0108] ①Energy storage vehicle power constraints

[0109] In order to extend the service life of the energy storage vehicle battery, the actual storage capacity of the energy storage vehicle battery needs to be kept within an appropriate range. Therefore, the state of charge (SOC) of each energy storage vehicle meets the following constraints:

[0110] SOC min ≤SOC t ≤SOC max (8)

[0111] In the formula, SOC t Indicates the real-time state of charge of each energy storage vehicle; SOC min Indicates the lower limit of the energy storage vehicle's power, which is 0.05; SOC max Indicates the upper limit of the energy storage vehicle's power, which is 0.95.

[0112] ②Charging and discharging power constraints of energy storage vehicles

[0113] The charging and discharging power of the energy storage vehicle cannot exceed its rated power. The charging and discharging power of the energy storage vehicle meets the following constraints:

[0114] 0≤P t ≤P max (9)

[0115] Where P t Indicates the charging and discharging power of the energy storage vehicle; P max Indicates the maximum charging and discharging power of the energy storage vehicle. For an energy storage vehicle with a maximum battery capacity of 200kWh, the maximum charging and discharging power is set to 100kW.

[0116] ③ Energy storage vehicle control time constraints

[0117] Energy storage vehicles can participate in grid regulation only when they are connected to the grid. The regulation time must meet the following requirements:

[0118] t in ≤t dis ≤t out (10)

[0119] Where, t dis represents the energy storage vehicle control time, t in With t out They respectively represent the time when the energy storage vehicle is connected to and connected to the power grid.

[0120] Step 5: The total dispatch cost corresponding to the initial dispatch plan of each energy storage vehicle is used as the fitness of the genetic algorithm, and the optimal dispatch plan for the energy storage vehicle with the lowest total dispatch cost is obtained using the genetic algorithm.

[0121] The total dispatch cost mainly includes loss cost and energy storage vehicle dispatch cost, and the expression is as follows:

[0122]

[0123] In the formula, c represents the total dispatch cost of N energy storage vehicles. When the total dispatch cost is the smallest, the corresponding energy storage vehicle charging and discharging operation is the optimal charging and discharging operation plan; c 0i The cost of pre-charging the i-th energy storage vehicle at its starting node; c 1i is the charging cost of the i-th energy storage vehicle after reaching the target node. This charging cost is related to the loss cost of the energy storage vehicle during driving. The lower the loss cost, the lower the charging cost. 2i is the discharge cost of the i-th energy storage vehicle at the corresponding node; c 3i After the i-th energy storage vehicle is discharged, the charging cost of charging it again to the power threshold to ensure the scheduling of the next day;

[0124] According to the initial position of each energy storage vehicle, its corresponding target node and the road network model, it is determined whether the initial power of the energy storage vehicle can support it to reach the target node, that is, whether it needs to be pre-charged. The charging cost of this part of the energy storage vehicle is calculated as shown in the following formula.

[0125] c 0i =P 0i *cp 0i *T 0i (12)

[0126] Where P 0i represents the electricity price of the i-th energy storage vehicle at the time of pre-charging at its starting node, cp 0i represents the charging power of the i-th energy storage vehicle at the time of pre-charging at its starting node, T 0i It means that the i-th energy storage vehicle has a size of cp at its starting node 0i The power charging time.

[0127] According to the power demand of the target node, determine whether the remaining power of the energy storage vehicle after arriving at the target node can support the charging and discharging demand of the node. If it can be met, the energy storage vehicle does not need additional charging and discharging after arriving at the target node; if it cannot be met, the energy storage vehicle starts charging and discharging at the node, and stops charging and discharging when the power of the energy storage vehicle just meets the power demand of the node, while leaving the minimum SOC threshold of the energy storage vehicle. Calculate the charging and discharging cost of this part of the energy storage vehicle, as shown in the following formula.

[0128] c 1i =P 1i *cp 1i *T 1i (13)

[0129] Where P 1i represents the electricity price when the i-th energy storage vehicle arrives at the target node and starts charging, cp 1i represents the charging power of the i-th energy storage vehicle when it arrives at the target node, T 1i It means that the i-th energy storage vehicle arrives at the target node with a size of cp 1i The power charging time.

[0130] When there is a demand for charging and discharging at the target node, the charging and discharging cost of the energy storage vehicle at the corresponding target node is calculated as shown in the following formula.

[0131] c 2i =P 2i *dcp 1i *T 2i (14)

[0132] Where P 2i represents the electricity price of the i-th energy storage vehicle at the corresponding node discharge time, dcp1i represents the discharge power of the i-th energy storage vehicle at the corresponding node discharge time, T 2i Indicates that the i-th energy storage vehicle is at the corresponding node with a size of dcp 1i The power discharge time.

[0133] After the energy storage vehicle is discharged, in order to facilitate the scheduling of the energy storage vehicle on the next day, the energy storage vehicle is charged to SOC = 0.5 before the end of the day. The charging cost of the energy storage vehicle for recharging is calculated as shown in the following formula.

[0134] c 3i =P 3i *cp 2i *T 3i (15)

[0135] Where P 3i represents the electricity price at the last charging time of the i-th energy storage vehicle, cp 2i represents the charging power of the i-th energy storage vehicle at the last charging time, T 3i Indicates that the i-th energy storage vehicle has a size of cp 2i The power charging time.

[0136] The calculation process of genetic algorithm:

[0137] 1) Set some nodes to have initial energy storage vehicle resources and charging and discharging requirements, and obtain the initial group: the initial scheduling plan for energy storage vehicles;

[0138] 2) Taking the fitness function as the total dispatch cost corresponding to the initial dispatch plan of each energy storage vehicle;

[0139] 3) Set the crossover rate and mutation rate to 0.3 and 0.1 respectively, and perform crossover and mutation operations;

[0140] 4) Setting termination criteria: whether the energy storage vehicle can meet the charging and discharging requirements of the target node under a certain initial scheduling plan;

[0141] 5) If the termination criteria are not met, go to step 2), otherwise go to the next step;

[0142] 6) The individual with the best fitness function value is output as the optimal solution to the problem.

[0143] Example:

[0144] A case study of a certain district in a city in East my country was conducted. The case study area was divided into 45 road network nodes. The roads between the nodes were all two-way lanes, and the distances between the two sides of the same road section were approximately the same. Figure 1As shown. The square represents the residential area, the circle represents the work area (mainly production units, enterprises and institutions, etc.), and the hexagon represents other types of areas. The core section of the analyzed area is mainly powered by two 10kV lines, which come from two different 110kV substations.

[0145] For the convenience of analysis, the node numbers of the two routes and the corresponding road network nodes are defined as follows: Figure 2 As shown, the numbers above the nodes represent the electrical node numbers in the electrical topology diagram; the numbers below the nodes represent the corresponding road network node numbers; the lines represented by numbers represent lines or switch stations with section switches, where the dotted lines represent normally open lines and the solid lines represent normally closed lines.

[0146] In this case area, three energy storage vehicles are set up to participate in the optimization and dispatching of the distribution network, and the network nodes containing the initial energy storage vehicle resources are set to 4, 11 and 18, with initial power of 100kWh, 60kWh and 40kWh respectively. The nodes with charging and discharging needs are 14, 23 and 24, and wind and solar power generation with different rated capacities are connected to the 14, 23 and 24 nodes of the above network respectively. The power of wind and solar power generation shows a certain degree of volatility due to changes in factors such as time and climate. The wind and solar power generation situation in the case area within 24 hours a day is as follows: Figure 3 shown.

[0147] Figure 4 This is a diagram of the charging and discharging demand of energy storage after the three nodes of the distribution network of the present invention are connected to wind and solar power generation. The positive direction of the vertical axis in the figure is the charging demand, and the negative direction is the discharging demand.

[0148] Figure 5 This is a diagram of the time and power consumption of each energy storage vehicle in the road section under the optimal scheduling scheme of the energy storage vehicle of the present invention. According to the initial node where the energy storage vehicle is located, the initial power status of the energy storage vehicle, and the nodes with charging and discharging requirements, 6 groups of energy storage vehicle scheduling schemes can be obtained as the initial population of the genetic algorithm. According to the path selection optimization model and fitness function, the optimal deployment scheme of the energy storage vehicle is obtained: 3 energy storage vehicles are dispatched from nodes 4, 11, and 18 of the road network to nodes 24, 23, and 14 of the road network respectively.

[0149] Figure 6 This is a diagram of the charge and discharge of three energy storage vehicles in different time periods in one day after three nodes of the distribution network of the present invention are connected to wind and solar power generation. Figure 6 After charging and discharging operations, according to the time-of-use electricity price, the minimum total dispatch cost of the energy storage vehicle can be obtained as -242.5714 yuan.

[0150] Although the functions and working processes of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific functions and working processes. The above-mentioned specific implementation methods are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which are all within the protection of the present invention.

Claims

1. A network-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation, characterized in that: The process includes: Step 1: Under the premise of knowing the initial road network nodes of the energy storage vehicle and the distribution network nodes with charging and discharging needs, all initial scheduling plans for the energy storage vehicle are obtained; Step 2: Based on the initial power of the energy storage vehicle, the traffic flow of the road network and the practical model of vehicle speed-flow, the time required for the energy storage vehicle to travel on each road section from the starting node to the target node is obtained, and the path selection optimization model is established based on the principle of shortest total driving time of the energy storage vehicle; Step 3: Determine the driving route of the energy storage vehicle based on the route selection optimization model, establish the energy consumption model of the energy storage vehicle based on the various loss data of the energy storage vehicle, obtain the power consumption of the energy storage vehicle in each section and the whole journey, and then obtain the loss cost of the energy storage vehicle during driving; The energy consumption model of the energy storage vehicle travel: the loss of the energy storage vehicle on the road includes tire loss, air resistance loss, active system loss and auxiliary loss; Tire resistance F fric and air resistance F aero The following empirical calculation is used: F fric +F aero =A+Bv+Cv 2 In the formula, v is the velocity in m / s; A, B, and C are resistance parameters respectively; The loss of the active system mainly considers the loss of the energy storage vehicle under acceleration. The force F required for acceleration acce It is expressed as: F acce =m MES a MES In the formula, m MkS is the mass of the energy storage vehicle, in kg; a MES Indicates the acceleration of the energy storage vehicle, in m / s 2 ; Therefore, the torque M required at the motor is: Where M CF is the converted no-load moment; r is the tire radius, in m; n g and η g represent the transmission coefficient ratio and transmission efficiency respectively; The angular velocity ω of the energy storage vehicle is expressed as: The DC side active power P is obtained dc as follows: Where η m is the efficiency of the motor; PF m is the power factor of the motor; η inv is the inverter transmission efficiency; P aux For auxiliary loss, take 0.18kW; Step 4: Calculate the dispatching cost of the energy storage vehicle, including the initial charging cost and the intra-day dispatching cost; Step 5: The total dispatch cost corresponding to the initial dispatch plan of each energy storage vehicle is used as the fitness of the genetic algorithm, and the optimal dispatch plan of the energy storage vehicle with the lowest total dispatch cost is obtained by using the genetic algorithm; the total dispatch cost includes the loss cost and the energy storage vehicle dispatch cost, as shown in the following formula: In the formula, c represents the total dispatch cost of N energy storage vehicles. When the total dispatch cost is the smallest, the corresponding energy storage vehicle charging and discharging operation is the optimal charging and discharging operation plan; c 0i The cost of pre-charging the i-th energy storage vehicle at its starting node; c 1i is the charging cost of the i-th energy storage vehicle after reaching the target node. This charging cost is related to the loss cost of the energy storage vehicle during driving. The lower the loss cost, the lower the charging cost. 2i is the discharge cost of the i-th energy storage vehicle at the corresponding node; c 3i After the i-th energy storage vehicle is discharged, the charging cost of charging it again to the power threshold to ensure the scheduling of the next day; c 0i =P 0i *cp 0i *T 0i Where P 0i represents the electricity price of the i-th energy storage vehicle at the time of pre-charging at its starting node, cp 0i represents the charging power of the i-th energy storage vehicle at the time of pre-charging at its starting node, T 0i It means that the i-th energy storage vehicle has a size of cp at its starting node 0i The power charging time; c 1i =P 1i *cp 1i *T 1i Where P 1i represents the electricity price when the i-th energy storage vehicle arrives at the target node and starts charging, cp 1i represents the charging power of the i-th energy storage vehicle when it arrives at the target node, T 1i It means that the i-th energy storage vehicle arrives at the target node with a size of cp 1i The power charging time; c 2i =P 2i *dcp 1i *T 2i Where P 2i represents the electricity price of the i-th energy storage vehicle at the corresponding node discharge time, dcp 1i represents the discharge power of the i-th energy storage vehicle at the corresponding node discharge time, T 2i Indicates that the i-th energy storage vehicle is at the corresponding node with a size of dcp 1i The power discharge time; c 3i =P 3i *cp 2i *T 3i Where P 3i represents the electricity price at the last charging time of the i-th energy storage vehicle, cp 2i represents the charging power of the i-th energy storage vehicle at the last charging time, T 3i Indicates that the i-th energy storage vehicle has a size of cp 2i The power charging time.

2. The grid-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation according to claim 1 is characterized in that: The practical model of vehicle speed-flow described in the second step is: In the formula, v jlt represents the speed of the vehicle on the road section between the road network nodes j and l at time t; v jl,max N represents the maximum vehicle speed on the road section between road network nodes j and l, which is set as the vehicle traffic speed limit of the road section; cr,jlt represents the number of vehicles on the road between nodes j and l at time t; C jl It represents the vehicle carrying capacity of the road section between road network nodes j and l, where the carrying capacity is expressed as the maximum number of vehicles that can be carried in the road section; a, b, and n are adjustment coefficients, which are determined according to the specific characteristics of the road.

3. The grid-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation according to claim 1 is characterized in that: The path selection optimization model described in the second step: Where N road represents the set of all road segments in the road network; o and d represent the starting node and target node of a dispatching route in the traffic road graph respectively; t k represents the travel time on road section k from o to d; Route_i represents the i-th path from o to d, where i∈I, I represents the number of all feasible paths from o to d; represents the total travel time from o to d.

4. The grid-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation according to claim 1 is characterized in that: In the fourth step, we first determine whether the energy storage vehicle has an initial charging cost based on the remaining power of the energy storage vehicle at the initial node and the road network model. After the energy storage vehicle arrives at the target node, we then obtain the optimal charging and discharging operation and the lowest intraday scheduling cost of the energy storage vehicle under each initial scheduling scheme based on the real-time electricity price.

5. The grid-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation according to claim 4 is characterized in that: The road network model is described using a classical graph theory method, using an adjacency matrix D representing road weights to describe the length of each road section and the relationship between node connections.

6. The grid-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation according to claim 4 is characterized in that: The optimal charging and discharging operation of the energy storage vehicle should meet the energy storage vehicle power constraint, the energy storage vehicle charging and discharging power constraint, and the energy storage vehicle control time constraint; ①Energy storage vehicle power constraints SOC min ≤SOC t ≤SOC max In the formula, SOC t Indicates the real-time state of charge of each energy storage vehicle, SOC min Indicates the lower limit of the energy storage vehicle’s power, SOC max Indicates the upper limit of the energy storage vehicle's power; ②Charging and discharging power constraints of energy storage vehicles 0≤P t ≤P max Where P t Represents the charging and discharging power of the energy storage vehicle, P max Indicates the maximum charging and discharging power of the energy storage vehicle; ③ Energy storage vehicle control time constraints t in ≤t dis ≤t oit Where, t dis represents the energy storage vehicle control time, t in With t out They respectively represent the time when the energy storage vehicle is connected to and connected to the power grid.

7. The grid-source-storage-charging coordinated optimization scheduling method taking into account flexible energy storage regulation according to claim 1 is characterized in that: The calculation process of the genetic algorithm described in the fifth step: 1) Set some nodes to have initial energy storage vehicle resources and charging and discharging requirements, and obtain the initial group: the initial scheduling plan for energy storage vehicles; 2) Taking the fitness function as the total dispatch cost corresponding to the initial dispatch plan of each energy storage vehicle; 3) Set the crossover rate and mutation rate to 0.3 and 0.1 respectively, and perform crossover and mutation operations; 4) Setting termination criteria: whether the energy storage vehicle can meet the charging and discharging requirements of the target node under a certain initial scheduling plan; 5) If the termination criteria are not met, go to step 2), otherwise go to the next step; 6) The individual with the best fitness function value is output as the optimal solution to the problem.