A smart manhole cover monitoring system
Patent Information
- Application Number
- CN202310609285.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-05-26
AI Technical Summary
[0005]为了解决通过采用巡检的方式进行井盖维修,效率较低,严重浪费资源的问题,本申请提供一种智慧井盖监测系统
[0031]1.每个井盖自身设置井盖监测模块,井盖监测模块用于对井盖的异常状态数据进行监测,当监测到存在异常状态数据时,井盖监测模块发出警报信号,井盖监测终端在接收到报警信号时,立即生成维修任务,从而安排井盖维修人员前去维修,并且为了实现井盖的统一管理,通过井盖监测平台定期收集不同区域的井盖监测终端的警报信号,并针对每个井盖监测终端生成诊断数据报告,通过观察诊断数据报告,能够更加直接的分析出不同区域内井盖所存在的问题,便于后续对存在的问题进行解决,从而达到自主检测、统一管理、提高井盖监测效率的效果。
Smart Images

Figure CN116682242B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of manhole cover abnormality monitoring, and in particular to a smart manhole cover monitoring system. Background Art
[0002] In recent years, with the continuous acceleration of my country's urbanization process and the continued rapid development of urban infrastructure construction, various types of municipal public underground pipeline facilities such as water supply and drainage, gas, heat, electricity, and communications in cities are increasing. The corresponding types of inspection wells on urban roads are increasing, and the management of urban road manhole covers is becoming more and more important.
[0003] There are 3,000 to 4,000 manhole covers on 1 square kilometer of urban road surface. Since the manhole covers are installed on the road, they are often stolen, tilted by vehicles or other external pressures, and blocked by sewage, causing water to leak from the manhole covers. Therefore, the management of manhole covers is an indispensable part of the city. At present, the management of manhole covers is mainly through setting up monitoring points and conducting regular inspections.
[0004] In the process of implementing the present application, the inventors discovered that the above technology has at least the following problems: the efficiency of repairing manhole covers by patrol inspection is low, resulting in serious waste of resources. Summary of the invention
[0005] In order to solve the problem of low efficiency and serious waste of resources in manhole cover maintenance by patrol inspection, the present application provides a smart manhole cover monitoring system.
[0006] This application provides a smart manhole cover monitoring system, which adopts the following technical solutions:
[0007] A smart manhole cover monitoring system, comprising a manhole cover monitoring module, a manhole cover monitoring terminal and a manhole cover monitoring platform;
[0008] The manhole cover monitoring module is used to monitor the abnormal state data of the manhole cover and send out an alarm signal when abnormal state data is detected;
[0009] The manhole cover monitoring terminal is used to receive alarm signals sent by all manhole cover monitoring modules in a preset area and generate maintenance tasks;
[0010] The manhole cover monitoring platform is used to regularly collect alarm signals from manhole cover monitoring terminals in different areas and generate a diagnostic data report for each manhole cover monitoring terminal.
[0011] By adopting the above technical solution, each manhole cover is provided with a manhole cover monitoring module, which is used to monitor the abnormal status data of the manhole cover. When abnormal status data is detected, the manhole cover monitoring module sends an alarm signal. When the manhole cover monitoring terminal receives the alarm signal, it immediately generates a maintenance task, thereby arranging manhole cover maintenance personnel to go for maintenance. In order to achieve unified management of manhole covers, the alarm signals of manhole cover monitoring terminals in different areas are regularly collected through the manhole cover monitoring platform, and a diagnostic data report is generated for each manhole cover monitoring terminal. By observing the diagnostic data report, the problems existing in the manhole covers in different areas can be analyzed more directly, which is convenient for subsequent resolution of the existing problems, thereby achieving the effect of autonomous detection, unified management, and improving the efficiency of manhole cover monitoring.
[0012] In a specific feasible implementation scheme, the manhole cover monitoring module includes a data detection submodule, an abnormality analysis submodule and an alarm submodule. The data detection submodule is used to detect the inclination angle of the manhole cover. The data detection submodule is also used to detect the liquid level at the bottom of the manhole cover. The abnormality analysis submodule is used to analyze the detection data detected by the data detection submodule and determine whether there is abnormal data. The alarm submodule is used to send an alarm signal when the abnormality analysis submodule determines that there is abnormal data.
[0013] By adopting the above technical scheme, the inclination angle of the manhole cover is detected to determine whether the manhole cover is tilted, and the liquid level at the bottom of the manhole cover is monitored to determine whether there is a risk of water leakage from the manhole cover. When it is detected that the manhole cover is tilted or the liquid level at the bottom of the manhole cover reaches a certain value, an alarm signal is issued to notify the manhole cover monitoring terminal itself that there is an abnormality, so that the manhole cover monitoring terminal can produce maintenance tasks, thereby arranging manhole cover maintenance personnel to go for maintenance, thereby achieving the effect of monitoring and maintaining the manhole cover.
[0014] In a specific possible implementation scheme, the data detection submodule is electrically connected to a manhole cover monitoring terminal, and the manhole cover monitoring terminal is used to obtain detection data of the data detection submodule in real time.
[0015] By adopting the above technical solution, the detection data of the data detection submodule is obtained in real time, so that the staff can directly observe the real-time data of all manhole covers in the area through the manhole cover monitoring terminal, which is convenient for manhole cover planning and management.
[0016] In a specific feasible implementation scheme, the manhole cover monitoring terminal includes a sub-area division module and an abnormality prediction module. The sub-area division module is used to divide the area corresponding to the manhole cover monitoring terminal into several sub-areas. The abnormality prediction module is used to obtain the detection data of all data detection sub-modules in the same sub-area, and determine the change trend of the detection data corresponding to each data detection sub-module over time. The abnormality prediction module is also used to select the data detection sub-module with abnormal change trend according to the change trend of all data detection sub-modules in the same sub-area, use the data detection sub-module with abnormal change trend as the target detection sub-module, and generate a personnel scheduling task according to the change trend of the target detection sub-module.
[0017] By adopting the above technical scheme, the area corresponding to the manhole cover monitoring terminal is divided into several sub-areas according to the characteristic factors of the manhole cover installation. The characteristic factors in the same sub-area are similar. The abnormal prediction module obtains the detection data of all the data detection sub-modules in the same sub-area, and analyzes the change trend of the detection data corresponding to each data detection sub-module over time. The data detection sub-module with abnormal change trend is selected, which means that the data detection sub-module has a certain abnormal risk. By generating a personnel scheduling task to monitor the manhole cover in advance, the effect of preventing manhole cover abnormalities can be achieved.
[0018] In a specific feasible implementation scheme, the anomaly prediction module includes a trend generation submodule and an anomaly identification submodule. The trend generation submodule is used to obtain the detection data of the data detection submodule in the corresponding sub-area, and generate a change trend degree in real time based on the detection data. The anomaly identification submodule is used to select a data detection submodule, and compare the change trend degree of the selected data detection submodule with the change trend degrees of other data detection submodules. If the change fluctuation amplitude of the change trend degree of the selected data detection submodule relative to the corresponding change trend degrees of other data detection submodules is greater than a preset amplitude, the selected data detection submodule is used as a target detection submodule.
[0019] By adopting the above technical scheme, since the characteristic factors in the same sub-area are similar, the change trend of the data detection sub-module should also be almost consistent. If it is detected that the change trend of the selected data detection sub-module has a fluctuation amplitude greater than the preset amplitude relative to the change trend of other data detection sub-modules, it means that the selected data detection sub-module may be abnormal. By taking the selected data detection sub-module as the target detection sub-module, it is convenient to carry out key monitoring of the manhole cover in the future, thereby achieving the effect of preventing abnormalities of the manhole cover.
[0020] In a specific implementation scheme, the change trend degree of the target detection submodule is greater than the change trend degree of the data detection submodule.
[0021] By adopting the above technical solution, since the detection is carried out on the inclination angle of the manhole cover and the liquid level at the bottom of the manhole cover, the larger the value, the more likely it is that an abnormality will occur. Therefore, if the change trend of the target detection submodule is smaller than the change trend of the data detection submodule, it means that the possibility of an abnormality in the target detection submodule is also small, so it is not marked.
[0022] In a specific implementation scheme, the manhole cover monitoring terminal also includes an abnormal inducement feedback module, which is used to obtain abnormal inducements, and the sub-area division module is used to regularly re-divide the sub-areas according to the abnormal inducements obtained by the abnormal inducement feedback module.
[0023] By adopting the above technical solution, maintenance personnel can inspect the manhole covers during the maintenance process, obtain the reasons for the abnormalities of the manhole covers, and feed back the reasons for the abnormalities of the manhole covers to the manhole cover monitoring terminal. By analyzing the reasons for the abnormalities of the manhole covers, the sub-areas can be re-divided, and some manhole covers with frequent abnormalities or consistent abnormal reasons can be managed in the same way to improve the efficiency of manhole cover monitoring.
[0024] In a specific possible implementation scheme, the manhole cover monitoring terminal includes an urgency assessment module, which is used to evaluate the priority of maintenance tasks and allocate the maintenance tasks in order according to the evaluated priorities.
[0025] By adopting the above technical solution, due to the different severity of the manhole cover abnormalities, the manhole covers with higher severity of abnormalities are repaired first, thereby minimizing the losses caused and reducing the existing safety hazards.
[0026] In a specific implementation scheme, the manhole cover monitoring platform includes an alarm information storage module and a report generation module. The alarm information storage module is used to periodically receive and store alarm signals from manhole cover monitoring terminals in different areas, and the report generation module is used to generate diagnostic data reports for each manhole cover monitoring terminal respectively.
[0027] By adopting the above technical solution, diagnostic data reports are generated regularly, which makes it easier for management personnel to conduct statistical analysis on the abnormal data of manhole covers of each manhole cover monitoring terminal, and carry out targeted management from multiple dimensions such as abnormal frequency and alarm level, thereby improving the efficiency of manhole cover monitoring and reducing the occurrence of manhole cover abnormalities.
[0028] In a specific feasible implementation scheme, the manhole cover monitoring platform includes a terminal maintenance module, which is used to regularly obtain the detection data of all data detection submodules in each manhole cover monitoring terminal, and determine whether the detection data of all data detection submodules in each manhole cover monitoring terminal are successfully obtained. The terminal maintenance module is also used to generate a terminal maintenance task for the manhole cover monitoring terminal when the detection data of all data detection submodules in the manhole cover monitoring terminal are not successfully obtained.
[0029] By adopting the above technical solution, the manhole cover monitoring terminal is regularly inspected and maintained to determine whether the manhole cover monitoring terminal can normally monitor all the manhole cover information in the corresponding area. If the manhole cover monitoring terminal cannot normally monitor the manhole covers in the area, the manhole cover monitoring terminal is promptly repaired to ensure normal monitoring as much as possible.
[0030] In summary, the present application includes at least one of the following beneficial technical effects:
[0031] 1. Each manhole cover is provided with a manhole cover monitoring module, which is used to monitor the abnormal status data of the manhole cover. When abnormal status data is detected, the manhole cover monitoring module sends an alarm signal. When the manhole cover monitoring terminal receives the alarm signal, it immediately generates a maintenance task, thereby arranging manhole cover maintenance personnel to go for maintenance. In order to achieve unified management of manhole covers, the alarm signals of manhole cover monitoring terminals in different areas are regularly collected through the manhole cover monitoring platform, and a diagnostic data report is generated for each manhole cover monitoring terminal. By observing the diagnostic data report, the problems existing in the manhole covers in different areas can be analyzed more directly, which is convenient for subsequent resolution of the existing problems, thereby achieving the effect of autonomous detection, unified management, and improving the efficiency of manhole cover monitoring.
[0032] 2. According to the characteristic factors of manhole cover installation, the area corresponding to the manhole cover monitoring terminal is divided into several sub-areas. The characteristic factors in the same sub-area are similar. The abnormal prediction module obtains the detection data of all data detection sub-modules in the same sub-area, and analyzes the change trend of the detection data corresponding to each data detection sub-module over time. The data detection sub-module with abnormal change trend is selected, which means that the data detection sub-module has a certain abnormal risk. By generating a personnel scheduling task to monitor the manhole cover in advance, the effect of preventing manhole cover abnormalities can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the overall structure of an intelligent manhole cover monitoring system in an embodiment of the present application.
[0034] Figure 2 It is a schematic diagram of the overall structure of the manhole cover monitoring terminal in the embodiment of the present application.
[0035] Description of reference numerals:
[0036] 1. Manhole cover monitoring module; 11. Data detection submodule; 12. Abnormal analysis submodule; 13. Alarm submodule; 2. Manhole cover monitoring terminal; 21. Sub-area division module; 22. Abnormal prediction module; 221. Trend generation submodule; 222. Abnormal identification submodule; 23. Abnormal cause feedback module; 24. Emergency assessment module; 3. Manhole cover monitoring platform; 31. Alarm information storage module; 32. Report generation module; 33. Terminal maintenance module. DETAILED DESCRIPTION
[0037] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.
[0038] An embodiment of the present application discloses an intelligent manhole cover monitoring system, referring to Figure 1 The system includes a manhole cover monitoring module 1, a manhole cover monitoring terminal 2 and a manhole cover monitoring platform 3. The manhole cover monitoring module 1 is connected to the manhole cover monitoring terminal 2 in communication, and the manhole cover monitoring terminal 2 is connected to the manhole cover monitoring platform 3 in communication. The manhole cover monitoring module 1 is used to monitor the abnormal state data of the manhole cover and send out an alarm signal when abnormal state data is detected; the manhole cover monitoring terminal 2 is used to receive the alarm signals sent by all manhole cover monitoring modules 1 in a preset area and generate maintenance tasks; the manhole cover monitoring platform 3 is used to regularly collect the alarm signals of the manhole cover monitoring terminals 2 in different areas and generate a diagnostic data report for each manhole cover monitoring terminal 2.
[0039] In implementation, due to the large number of manhole covers in the city, the city is divided into regions, and a manhole cover monitoring terminal 2 is set in each region. The manhole cover monitoring module 1 performs unified monitoring of the manhole covers in the same region. Each manhole cover is provided with a manhole cover monitoring module 1. The manhole cover monitoring module 1 can monitor whether its own state is abnormal through self-inspection, and when abnormal state data is detected, it will promptly send an alarm signal to the manhole cover monitoring terminal 2. The manhole cover monitoring terminal 2 generates maintenance tasks based on the alarm signal and arranges maintenance personnel to go for maintenance. The manhole cover monitoring platform 3 uniformly manages the manhole cover monitoring terminals 2 in all regions, and generates diagnostic data reports by regularly collecting the alarm signals of the manhole cover monitoring terminals 2 in different regions, so as to facilitate the management personnel to understand the situation in each region more intuitively and facilitate the subsequent resolution of existing problems, thereby achieving the effect of autonomous detection, unified management, and improving the efficiency of manhole cover monitoring.
[0040] Reference Figure 2The manhole cover monitoring module 1 includes a data detection submodule 11, an abnormality analysis submodule 12 and an alarm submodule 13. The data detection submodule 11 is used to detect the inclination of the manhole cover and the liquid level at the bottom of the manhole cover, and transmit the detected detection data to the abnormality analysis submodule 12 in real time. The abnormality analysis submodule 12 is used to analyze the received detection data and determine whether there is abnormal data. The alarm submodule 13 is used to obtain the abnormal data generated by the abnormality analysis submodule 12, and after successfully obtaining the abnormal data, send a corresponding alarm signal according to the specific information of the abnormal data.
[0041] Specifically, the abnormal analysis submodule 12 pre-stores the alarm inclination angle and the alarm water level. The abnormal analysis submodule 12 compares the acquired inclination angle data of the manhole cover with the alarm inclination angle. When the acquired inclination angle data of the manhole cover is greater than the alarm inclination angle, it means that abnormal data exists, and a tilt abnormality signal is generated. The abnormal analysis submodule 12 compares the acquired liquid level data at the bottom of the manhole cover with the alarm water level. When the acquired liquid level data at the bottom of the manhole cover is greater than the alarm water level, it means that abnormal data exists, and a liquid level abnormality signal is generated. Among them, the alarm inclination angle and the alarm water level can be set according to the site requirements.
[0042] In the embodiment of the present application, the data detection submodule 11 is composed of a liquid level detection sensor and an inclination sensor. The liquid level at the bottom of the manhole cover is detected by the liquid level detection sensor, and whether the manhole cover is tilted is detected by the inclination sensor.
[0043] Reference Figure 2 The data detection submodule 11 is electrically connected to the manhole cover monitoring terminal 2, and the manhole cover monitoring terminal 2 is used to obtain the detection data of the data detection submodule 11 in real time. In implementation, the real-time data of all manhole covers in the area can be directly observed through the manhole cover monitoring terminal 2, which enhances the visualization of manhole cover data and improves the efficiency of manhole cover planning and management.
[0044] Reference Figure 2 The manhole cover monitoring terminal 2 includes a sub-region division module 21 and an abnormal prediction module 22, and the sub-region division module 21 and the abnormal prediction module 22 are electrically connected. The manhole cover monitoring terminal 2 performs feature marking on all manhole covers in the region. The sub-region division module 21 is used to divide the region corresponding to the manhole cover monitoring terminal 2 into a plurality of sub-regions according to the manhole cover characteristics. The abnormal prediction module 22 is used to obtain the detection data of all data detection sub-modules 11 in the same sub-region, determine the change trend of the detection data corresponding to each data detection sub-module 11 over time, and select the data detection sub-module 11 with abnormal change trend according to the change trend of all data detection sub-modules 11 in the same sub-region, and use the data detection sub-module 11 with abnormal change trend as the target detection sub-module, and generate a personnel scheduling task according to the change trend of the target detection sub-module.
[0045] In one embodiment of the present application, all manhole covers within the area are marked with features, mainly based on the terrain where the manhole covers are located. The terrain heights of all manhole covers are marked by the manhole cover monitoring terminal 2, and the sub-area division module 21 divides the manhole covers at the same terrain height into the same sub-area. In practice, the liquid level changes at the bottom of manhole covers located at the same terrain are generally consistent, so in the subsequent monitoring process, the manhole covers with abnormalities can be selected by comparing the liquid level changes at the bottom of different manhole covers in the same sub-area.
[0046] Among them, the abnormal prediction module 22 includes a trend generation submodule 221 and an abnormal identification submodule 222. The trend generation submodule 221 is used to obtain the detection data of the data detection submodule 11 in the corresponding sub-area in real time, and generate the change trend degree over time in real time based on the acquired detection data. The change trend degree will change according to the change of time. The abnormal identification submodule 222 is used to select the data detection submodule 11 one by one, and compare the selected data detection submodule 11 with other data monitoring submodules. Specifically, the abnormal identification submodule 222 compares the change trend degree of the selected data detection submodule 11 with the change trend degree of other data detection submodules 11. If the change fluctuation range of the change trend degree of the selected data detection submodule 11 relative to the change trend degree corresponding to other data detection submodules 11 is greater than the preset range, the selected data detection submodule 11 is used as the target detection submodule.
[0047] In one embodiment of the present application, the trend generation submodule 221 is used to obtain the liquid level information of all manhole covers in the corresponding sub-area in real time and generate a liquid level curve that changes over time. The abnormality identification submodule 222 is used to select liquid level curves one by one and compare the change fluctuation amplitude of the selected liquid level curve with other liquid level curves. If the change fluctuation amplitude of the selected liquid level curve and other liquid level curves is greater than the preset amplitude, it is determined that the manhole cover corresponding to the liquid level curve has an abnormality.
[0048] In practice, if the liquid level curve increases with time, it means that the liquid level at the bottom of the manhole cover is rising, and if the liquid level curve decreases with time, it means that the liquid level at the bottom of the manhole cover is falling. Therefore, after determining the target detection submodule, it is necessary to determine that the change trend of the target detection submodule is greater than the change trend of the data detection submodule 11, that is, the liquid level curve corresponding to the target detection submodule is in an upward state, and the rising rate is greater than other liquid level curves, so it is necessary to perform early warning processing on the manhole cover corresponding to the target detection submodule.
[0049] Reference Figure 2The manhole cover monitoring terminal 2 also includes an abnormality inducement feedback module 23, which is in communication connection with the sub-area division module 21. In implementation, the maintenance personnel detect the manhole cover during the maintenance process, obtain the inducement of the abnormality of the manhole cover, and feed back the abnormality inducement of the manhole cover to the manhole cover monitoring terminal 2. The abnormality inducement feedback module 23 is used to obtain the abnormality inducement of the abnormal manhole cover, and the sub-area division module 21 is used to regularly re-divide the sub-areas according to the abnormality inducement obtained by the abnormality inducement feedback module 23.
[0050] In one embodiment of the present application, the area corresponding to the manhole cover monitoring terminal 2 includes adjacent sub-areas A and B. The frequency of abnormal tilting of manhole covers in sub-area A is higher, and the frequency of abnormal tilting of manhole covers in sub-area B is lower. During the maintenance process, the staff found that the frequency of abnormal tilting of manhole covers in sub-area B increased, and the abnormal cause was that the road reform caused some vehicles in sub-area A to be diverted to sub-area B, causing some manhole covers in sub-area B to be crushed for a long time. When the sub-areas are regularly redivided, the manhole covers in sub-area B that are caused by the road reform causing some vehicles in sub-area A to be diverted to sub-area B, causing some manhole covers in sub-area B to be crushed for a long time are divided into sub-area A, and are monitored together with other manhole covers in sub-area A.
[0051] Reference Figure 2 The manhole cover monitoring terminal 2 includes an urgency assessment module 24, which is used to assess the priority of maintenance tasks and assign maintenance tasks in order according to the assessed priorities. In implementation, since the alarm levels of alarm information are different, when multiple alarm signals are received at the same time, the priority of the alarm information is first set according to the alarm level of the alarm information, and then the alarm information is sorted according to the priority, and the alarm information with a high alarm level is processed first, so as to reduce the losses caused as much as possible and minimize the existing safety hazards.
[0052] Reference Figure 2 The manhole cover monitoring platform 3 includes an alarm information storage module 31 and a report generation module 32. The alarm information storage module 31 is used to regularly receive and store alarm signals from manhole cover monitoring terminals 2 in different areas, and the report generation module 32 is used to generate diagnostic data reports for each manhole cover monitoring terminal 2. In practice, by regularly generating diagnostic data reports, it is convenient for management personnel to conduct statistical analysis on the manhole cover abnormality data of each manhole cover monitoring terminal 2, and to conduct targeted management from multiple dimensions such as abnormality frequency and alarm level, thereby improving the efficiency of manhole cover monitoring and reducing the occurrence of manhole cover abnormalities.
[0053] Reference Figure 2The manhole cover monitoring platform 3 includes a terminal maintenance module 33, which is used to regularly obtain the detection data of all data detection submodules 11 in each manhole cover monitoring terminal 2, and determine whether the detection data of all data detection submodules 11 in each manhole cover monitoring terminal 2 is successfully obtained. If the detection data of all data detection submodules 11 in each manhole cover monitoring terminal 2 can be successfully obtained, it means that all manhole cover monitoring terminals 2 are in normal operation. If the detection data of all data detection submodules 11 in a manhole cover monitoring terminal 2 is not obtained, it means that the manhole cover monitoring terminal 2 is abnormal, and the terminal maintenance module 33 will generate a terminal maintenance task for the abnormal manhole cover monitoring terminal 2.
[0054] During implementation, the manhole cover monitoring terminal 2 is regularly inspected and maintained to determine whether it can normally monitor all manhole cover information in the corresponding area. If the manhole cover monitoring terminal 2 cannot normally monitor the manhole covers in the area, the manhole cover monitoring terminal 2 is promptly repaired to ensure normal monitoring as much as possible.
[0055] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A smart manhole cover monitoring system, It is characterized in that It comprises a manhole cover monitoring module (1), a manhole cover monitoring terminal (2) and a manhole cover monitoring platform (3); The manhole cover monitoring module (1) is used to monitor abnormal state data of the manhole cover and send out an alarm signal when abnormal state data is detected; The manhole cover monitoring terminal (2) is used to receive alarm signals sent by all manhole cover monitoring modules (1) in a preset area and generate maintenance tasks; The manhole cover monitoring platform (3) is used to regularly collect alarm signals from manhole cover monitoring terminals (2) in different areas, and generate a diagnostic data report for each manhole cover monitoring terminal (2); the manhole cover monitoring module (1) comprises a data detection submodule (11), an abnormality analysis submodule (12) and an alarm submodule (13); the data detection submodule (11) is used to detect the inclination of the manhole cover, and the data detection submodule (11) is also used to detect the liquid level at the bottom of the manhole cover; the data detection submodule (11) is electrically connected to the manhole cover monitoring terminal (2), and the manhole cover monitoring terminal (2) is used to obtain the detection data of the data detection submodule (11) in real time; the manhole cover monitoring terminal (2) comprises a subregion division module (21) and an abnormality prediction module (22); the subregion division module (21) is used to divide the area corresponding to the manhole cover monitoring terminal (2) into a plurality of subregions, and the abnormality prediction module (22) is used to obtain all the data detection submodules (11) in the same subregion. ) detection data, and determining the change trend of the detection data corresponding to each data detection submodule (11) over time, the abnormal prediction module (22) is also used to select the data detection submodule (11) with abnormal change trend according to the change trend of all data detection submodules (11) in the same subregion, use the data detection submodule (11) with abnormal change trend as the target detection submodule (223), and generate a personnel scheduling task according to the change trend of the target detection submodule (223); the manhole cover monitoring terminal (2) also includes an abnormal inducement feedback module (23), the abnormal inducement feedback module (23) is used to obtain abnormal inducement, and the subregion division module (21) is used to regularly re-divide the subregion according to the abnormal inducement obtained by the abnormal inducement feedback module (23); the method for obtaining the abnormal inducement comprises: the maintenance personnel detect the manhole cover during the maintenance process, obtain the cause of the abnormality of the manhole cover, and feed back the cause of the abnormality of the manhole cover to the manhole cover monitoring terminal.
2. According to claim 1, a smart manhole cover monitoring system, It is characterized in that The abnormal analysis submodule (12) is used to analyze the detection data detected by the data detection submodule (11) and determine whether abnormal data exists, and the alarm submodule (13) is used to send an alarm signal when the abnormal analysis submodule (12) determines that abnormal data exists.
3. According to claim 1, a smart manhole cover monitoring system, It is characterized in that The abnormality prediction module (22) comprises a trend generation submodule (221) and an abnormality identification submodule (222), wherein the trend generation submodule (221) is used to obtain detection data of the data detection submodule (11) in the corresponding subregion and generate a change trend degree in real time according to the detection data, and the abnormality identification submodule (222) is used to select a data detection submodule (11), compare the change trend degree of the selected data detection submodule (11) with the change trend degrees of other data detection submodules (11), and if the change fluctuation amplitude of the change trend degree of the selected data detection submodule (11) relative to the change trend degrees corresponding to other data detection submodules (11) is greater than a preset amplitude, the selected data detection submodule (11) is used as a target detection submodule.
4. The smart manhole cover monitoring system according to claim 1, It is characterized in that The change trend degree of the target detection submodule is greater than the change trend degree of the data detection submodule (11).
5. The smart manhole cover monitoring system according to claim 1, It is characterized in that The manhole cover monitoring terminal (2) comprises an urgency assessment module (24), which is used to assess the priority of maintenance tasks and to allocate the maintenance tasks in sequence according to the assessed priorities.
6. The smart manhole cover monitoring system according to claim 1, It is characterized in that The manhole cover monitoring platform (3) comprises an alarm information storage module (31) and a report generation module (32), wherein the alarm information storage module (31) is used to regularly receive and store alarm signals from manhole cover monitoring terminals (2) in different areas, and the report generation module (32) is used to generate a diagnostic data report for each manhole cover monitoring terminal (2).
7. The smart manhole cover monitoring system according to claim 1, It is characterized in that The manhole cover monitoring platform (3) comprises a terminal maintenance module (33), wherein the terminal maintenance module (33) is used to regularly obtain detection data of all data detection submodules (11) in each manhole cover monitoring terminal (2), and to determine whether the detection data of all data detection submodules (11) in each manhole cover monitoring terminal (2) has been successfully obtained. The terminal maintenance module (33) is also used to generate a terminal maintenance task for the manhole cover monitoring terminal (2) when the detection data of all data detection submodules (11) in the manhole cover monitoring terminal (2) has not been successfully obtained.
