A method for controlling the operation flexibility of a wind-storage combined system
By establishing a wind storage joint system operation model and applying the Pontriakin maximum principle to optimize control, the problem of high volatility of the wind turbine is solved, and the stable operation of the wind storage joint system and the reduction of the grid impact force is achieved.
Patent Information
- Application Number
- CN202310605302.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2043-05-26
AI Technical Summary
The existing wind storage combined system operation elastic control method is difficult to accurately find the load reduction period of the wind turbine, resulting in high volatility of the wind turbine and increasing the impact on the power grid.
Establish a joint wind storage system operation model, optimize the control model through the Pontriakin maximum value principle (PMP), and use the GUROBI solver in GAMS software to determine the load reduction capacity of the wind turbine and the operating power of the thermal power turbine to accurately find the wind turbine load reduction moment.
By optimizing the control process, the load reduction moment of the wind turbine is accurately found, the volatility of the wind turbine is reduced, the impact on the power grid is reduced, and the operation stability of the wind storage joint system is improved.
Smart Images

Figure SMS_1 
Figure SMS_6 
Figure SMS_7
Abstract
Description
Technical Field
[0001] The present invention specifically relates to a method for elastic control of wind-storage combined system operation, and belongs to the technical field of elastic control. Background Art
[0002] In order to cope with problems such as energy depletion and environmental pollution, the installed capacity of new energy sources such as wind power is constantly expanding. Wind power has the characteristics of randomness, volatility and anti-regulation, which leads to an increase in the equivalent peak-to-valley difference of the power grid after large-scale wind power is connected to the power grid, which increases the probability of peak-shaving pressure and impact on the power grid. In order to solve the impact caused by the access of wind power to the power grid, most of the existing technologies introduce battery energy storage systems to form a wind-storage joint system. The random and volatile electric energy generated by wind turbines is stabilized by the battery energy storage system and then incorporated into the power grid, reducing the impact of the wind-storage joint system on the power grid; however, the excessively volatile electric energy generated by wind turbines will still increase the impact of the wind-storage joint system on the power grid, so reducing the load of wind turbines during the period when the wind turbines are too volatile has become the key point to reduce the impact of the wind-storage joint system on the power grid; the existing wind-storage joint system operation elasticity control method is still in the empirical stage. According to the previous records of wind turbine operation, the load reduction period of wind turbines is judged by experience, resulting in the wind turbines sometimes not being reduced at the best load-off time, and still generating highly volatile electric energy, which increases the impact of the wind-storage joint system on the power grid. Summary of the invention
[0003] The technical problem to be solved by the present invention is to find the accurate load reduction period of the wind turbine generator set in the wind-storage combined system and reduce the volatility of the wind turbine generator set.
[0004] The technical solution proposed by the present invention is: a method for controlling the operation flexibility of a wind-storage combined system, which involves known wind turbines, energy storage power stations and thermal power units in the wind-storage combined system. The method for controlling the operation flexibility includes the following steps:
[0005] Step 1: Establish the wind-storage combined system operation model, as shown in the following formula (1):
[0006] P L (t) = P f (t)+P w (t)+P b (t)(1),
[0007] In formula (1), P L (t) Load power of wind-storage combined system; P b (t) is the operating power of the energy storage power station; P f (t) is the operating power of the thermal power unit; P w (t) is the operating power of the wind turbine;
[0008] Obtain the constraints of the wind-storage combined system operation model, as shown in the following formula (2):
[0009]
[0010] In formula (2), It is the lower limit of power output of thermal power units. is the upper limit of the power output of thermal power units; c max is the maximum load reduction ratio of the fan, is the maximum power of the wind turbine corresponding to the wind speed v; is the rated power of the energy storage power station;
[0011] Step 2: Select the operating power P of the energy storage power station b (t) and the operating power P of the wind turbine w (t) is used as the control quantity of the wind-storage combined system operation model, and then the state of charge SOC of the energy storage power station and the total load reduction energy W of the wind turbine generator set are selected as the state quantities of the wind-storage combined system operation model, and the state equation of the wind-storage combined system operation model is established, as shown in the following formula (3):
[0012]
[0013] In formula (3), Q b is the capacity factor of the energy storage power station; I b (P b , SOC) is the discharge current of the energy storage station; t0 and t f are the initial and terminal state moments of the wind-storage combined system operation model; P w,l is the load shedding power of the wind turbine; W is the total load shedding energy of the wind turbine;
[0014] Step 3: According to the operating power P of the thermal power unit in formula (1), f (t) Establish the operating cost model of thermal power units, as shown in the following formula (4):
[0015]
[0016] In formula (4), J1 is the operating cost of the thermal power unit; C1 is the price of coal; a0, a1 and a2 are the operating cost coefficients of the thermal power unit;
[0017] The wind power operation cost model is established based on the total load reduction energy W of the wind turbine in formula (3), as shown in the following formula (5):
[0018] J2=C2W (5),
[0019] In formula (5), J2 is the operating cost of the wind turbine; C2 is the wind turbine load reduction cost per unit energy;
[0020] The energy storage power station operation cost model is established as shown in the following formula (6):
[0021]
[0022] In formula (6), J3 is the operating cost of the energy storage power station; R(SOC) is the internal resistance of the energy storage power station; C3 is the internal resistance loss cost coefficient, C4 is the energy storage aging cost coefficient, and N B is the number of batteries, V B is the capacity of the energy storage power station; Q loss is the energy storage loss life; B is the pre-exponential coefficient; c rate is the discharge rate; R is the gas constant; T is the absolute temperature; Ah is the discharge ampere-hour; z is the exponential factor; Γ nom is the life of the energy storage at a certain current; I N is the rated current of energy storage; q loss is the energy storage life loss percentage;
[0023] Since the operating costs of the energy storage power station and the thermal power unit are relatively complex, a penalty function cost S1 is added to the state of charge SOC of the energy storage power station, as shown in the following formula (7):
[0024]
[0025] In formula (7), m1 is the penalty function constraint factor of the state of charge SOC of the energy storage power station;
[0026] A penalty function cost S2 is added to the thermal power unit, as shown in the following formula (8):
[0027]
[0028] In formula (8), m2 is the penalty function constraint factor of the operating power of the thermal power unit;
[0029] The operation cost model of the wind-storage combined system is obtained by combining formulas (4), (5), (6), (7) and (8), as shown in formula (9):
[0030]
[0031] Step 4: Determine the initial and terminal state values of the state of charge SOC of the energy storage power station, as shown in the following formula (10):
[0032]
[0033] In formula (10), SOC(t0) is the initial state value of the state of charge SOC of the energy storage power station; SOC(t f) is the terminal state value of the state of charge SOC of the energy storage power station;
[0034] The elastic control model of the wind-storage combined system during operation is obtained by combining equations (2), (3), (9) and (10), as shown in equation (11):
[0035]
[0036] The Hamiltonian function H of the elastic control model is established as shown in the following equation (12):
[0037]
[0038] In formula (12), λ1 represents the associated variable corresponding to the state of charge SOC of the energy storage power station, and λ2 represents the associated variable corresponding to the load reduction power of the wind turbine group;
[0039] The adjoint equation of the Hamiltonian function and the boundary conditions of the adjoint equation are obtained as shown in the following equations (13) and (14):
[0040]
[0041]
[0042] In formula (14), W(t f ) represents the load shedding energy of wind turbines at the end of the wind-storage combined system operation. W(t f )
[0043] The Hamiltonian function H is modified by formulas (13) and (14) to obtain the modified Hamiltonian function H * , as shown in the following formula (15),
[0044]
[0045] According to the Pontryagin Maximum Principle (PMP), the necessary conditions for optimal control of the elastic control model are obtained as shown in the following formula (16):
[0046]
[0047] The elastic control model is optimized by formulas (15) and (16), and the optimal elastic control model is obtained as shown in formula (17):
[0048]
[0049] Step 5: Use the GUROBI solver in the GAMS software to solve the optimal elastic control model, and output the optimal elastic control value of the wind-storage combined system according to the solution results in the GAMS software.
[0050] A further improvement of the above technical solution is that the process of establishing the wind-storage combined system operation model in step 1 is as follows:
[0051] The wind turbine operation model is established as shown in the following equation (18):
[0052]
[0053] In formula (18): P w (t) is the operating power of the wind turbine; ρ is the air density; R is the rotor radius; v is the wind speed; C p is the wind energy utilization coefficient, which is related to the tip speed ratio λ and the pitch angle β; γ is the introduced intermediate variable; ω is the angular velocity of the wind wheel; coefficients c1 = 0.5176, c2 = 116, c3 = 0.4, c4 = 5, c5 = 21, c6 = 0.0068; P N w is the rated power of the fan; N is the rated angular velocity of the fan;
[0054] The energy storage power station operation model is established as shown in the following formula (19):
[0055]
[0056] In formula (19): U oc (SOC) is the open circuit voltage of the energy storage station; R b (SOC) is the internal resistance of the energy storage station; I b (P b , SOC) is the discharge current of the energy storage station; P b (t) is the operating power of the energy storage;
[0057] The operation model of thermal power unit is established as shown in the following equation (20):
[0058] P f (t) = P L (t)-P w (t)-P b (t)(20),
[0059] In formula (20), P f (t) is the operating power of the thermal power unit; P L (t) Load power of wind-storage combined system and P L (t) is a known quantity;
[0060] Finally, formulas (18), (19) and (20) are combined to obtain the wind-storage combined system operation model.
[0061] The further improvement of the above technical solution is that the specific solution steps of step 5 are as follows:
[0062] Step 5.1: The differential equation in the optimal elastic control model is transformed into a difference equation using the GRUOBI solver in the GAMS software, as shown in the following equation (21):
[0063]
[0064] Step 5.2: Substitute the modified Hamiltonian function H * Transformed into the following formula (22),
[0065]
[0066] Step 5.3: Determine the initial value of the adjoint variable by binary search, perform target solving, and output the final solution value;
[0067] A further improvement of the above technical solution is that the specific steps of performing the target shooting solution in step 5.3 are as follows:
[0068] Step 5.3.1: Initialize the search interval [d1, d2] of the initial value of the adjoint variable;
[0069] Step 5.3.2: Initialize the counter and select ΔP w , ΔP b They are the search intervals for wind turbine load shedding power and energy storage power station discharge power, respectively;
[0070] Step 5.3.3: In the first iteration, select λ0=(d1+d2) / 2, the initial SOC value is SOC0, and from the initial moment, substitute different wind turbine load reduction powers and energy storage charging powers for searching, determine the operating power according to the Hamiltonian function, repeat the calculation process of the adjoint equation, state equation, and difference equation until the end moment, and obtain the SOC(T) at the end moment;
[0071] Step 5.3.4: Compare the SOC(T) at the end point with SOC f By comparison, if SOC(T) <SOC f , then let d1 = (d1 + d2) / 2, otherwise let d2 = (d1 + d2) / 2;
[0072] Step 5.3.5: Repeat steps 5.3.2 to 5.3.4 until the convergence condition is met and output the solution value;
[0073] The convergence condition is shown in equation (23):
[0074] |SOC(T)-SOC f |<ε (23).
[0075] Beneficial effect: Since the flexible control method for the operation of a wind-storage combined system of the present invention adopts the Pontryagin maximum principle for flexible control, the control process can better find the control quantity (i.e., the load reduction amount of the wind turbine and the operating power of the thermal power unit), making the result of the flexible control more accurate, and finding a more precise load reduction time for the wind turbine. DETAILED DESCRIPTION
[0076] The following is a further description of a method for controlling the operation flexibility of a wind-storage combined system according to the present invention in conjunction with a specific embodiment.
[0077] A method for controlling the operation flexibility of a wind-storage combined system, involving a database storing operation data of the wind-storage combined system, a wind turbine, a battery energy storage system and a thermal power unit in the wind-storage combined system, and the method for controlling the operation flexibility comprises the following steps:
[0078] Step 1: Establish the wind turbine operation model, as shown in equation (18):
[0079]
[0080] In formula (18): P w (t) is the operating power of the wind turbine; ρ is the air density; R is the rotor radius; v is the wind speed; C p is the wind energy utilization coefficient, which is related to the tip speed ratio λ and the pitch angle β; γ is the introduced intermediate variable; ω is the angular velocity of the wind wheel; coefficients c1 = 0.5176, c2 = 116, c3 = 0.4, c4 = 5, c5 = 21, c6 = 0.0068; P N w is the rated power of the fan; N is the rated angular velocity of the fan;
[0081] The energy storage power station operation model is established as shown in the following formula (19):
[0082]
[0083] In formula (19): U oc (SOC) is the open circuit voltage of the energy storage station; R b (SOC) is the internal resistance of the energy storage station; I b (P b , SOC) is the discharge current of the energy storage station; P b (t) is the discharge power of the energy storage;
[0084] The operation model of thermal power unit is established as shown in the following equation (20):
[0085] P f (t) = P L (t)-P w (t)-P b (t) (20),
[0086] In formula (20), P f (t) is the operating power of the thermal power unit; P L (t) is the load power of the wind-storage combined system and P L (t) is a known quantity;
[0087] The wind-storage combined system operation model can be obtained by combining formulas (18), (19) and (20), as shown in formula (1):
[0088] P L (t) = P f (t)+P w (t)+P b (t) (1);
[0089] Obtain the constraints of the wind-storage combined system operation model, as shown in the following formula (2):
[0090]
[0091] In formula (2), It is the lower limit of power output of thermal power units. is the upper limit of the power output of thermal power units; c max is the maximum load reduction ratio of the fan, is the maximum power of the wind turbine corresponding to the wind speed v; is the rated power of the energy storage power station;
[0092] Step 2: Select the operating power P of the energy storage power station b (t) and the operating power P of the wind turbine w (t) is used as the control quantity of the wind-storage combined system operation model. Then, the state of charge SOC of the energy storage power station and the total load reduction energy W of the wind turbine are selected as the state quantities of the wind-storage combined system operation model. The state equation of the wind-storage combined system operation model is established, as shown in Equation (3):
[0093]
[0094] In formula (3), Q b is the capacity factor of the energy storage power station; t0 and t f are the initial and terminal state moments of the wind-storage combined system operation model; P w,l is the load reduction power of the wind turbine.
[0095] Step 3: According to the operating power P of the thermal power unit in formula (1), f (t) Establish the operating cost model of thermal power units, as shown in the following formula (4):
[0096]
[0097] In formula (4), J1 is the operating cost of the thermal power unit; C1 is the price of coal; a0, a1 and a2 are the operating cost coefficients of the thermal power unit;
[0098] The wind power operation cost model is established based on the total load reduction energy W of the wind turbine in formula (3), as shown in the following formula (5):
[0099] J2=C2W (5),
[0100] In formula (5), J2 is the operating cost of the wind turbine; C2 is the wind turbine load reduction cost per unit energy;
[0101] The energy storage power station operation cost model is established as shown in the following formula (6):
[0102]
[0103] In formula (6), J3 is the operating cost of the energy storage power station; R(SOC) is the internal resistance of the energy storage power station; C3 is the internal resistance loss cost coefficient, C4 is the energy storage aging cost coefficient, and N B is the number of batteries, V B is the capacity of the energy storage power station; Q loss is the energy storage loss life; B is the pre-exponential coefficient; c rate is the discharge rate; R is the gas constant; T is the absolute temperature; Ah is the discharge ampere-hour; z is the exponential factor; Γ nom is the life of the energy storage at a certain current; I N is the rated current of energy storage; q loss is the energy storage life loss percentage;
[0104] Since the operating costs of the energy storage power station and the thermal power unit are relatively complex, a penalty function cost S1 is added to the state of charge SOC of the energy storage power station, as shown in the following formula (7):
[0105]
[0106] In formula (7), m1 is the penalty function constraint factor of the state of charge SOC of the energy storage power station;
[0107] A penalty function cost S2 is added to the thermal power unit, as shown in the following formula (8):
[0108]
[0109] In formula (8), m2 is the penalty function constraint factor of the operating power of the thermal power unit;
[0110] The operation cost model of the wind-storage combined system is obtained by combining formulas (4), (5), (6), (7) and (8), as shown in formula (9):
[0111]
[0112] Step 4: Determine the initial and terminal state values of the state of charge SOC of the energy storage power station, as shown in the following formula (10):
[0113]
[0114] In formula (10), SOC(t0) is the initial state value of the state of charge SOC of the energy storage power station; SOC(t f ) is the terminal state value of the state of charge SOC of the energy storage power station;
[0115] The elastic control model of the wind-storage combined system during operation is obtained by combining equations (2), (3), (9) and (10), as shown in equation (11):
[0116]
[0117] The Hamiltonian function H of the elastic control model is established as shown in the following equation (12):
[0118]
[0119] In formula (12), λ1 represents the associated variable corresponding to the state of charge SOC of the energy storage power station, and λ2 represents the associated variable corresponding to the load reduction power of the wind turbine group;
[0120] The adjoint equation of the Hamiltonian function and the boundary conditions of the adjoint equation are obtained as shown in the following equations (13) and (14):
[0121]
[0122]
[0123] In formula (14), W(t f ) represents the load shedding energy of wind turbines at the end of the wind-storage combined system operation. W(t f )
[0124] The Hamiltonian function H is modified by formulas (13) and (14) to obtain the modified Hamiltonian function H * , as shown in the following formula (15),
[0125]
[0126] According to the Pontryagin Maximum Principle (PMP), the necessary conditions for optimal control of the elastic control model are obtained as shown in the following formula (16):
[0127]
[0128] The elastic control model is optimized by formulas (15) and (16), and the optimal elastic control model is obtained as shown in formula (17):
[0129]
[0130] Step 5: Use the GRUOBI solver in GAMS software to solve the optimal elastic control model, and output the optimal elastic control value of the wind-storage combined system based on the solution results in GAMS software.
[0131] The specific steps are as follows:
[0132] Step 5.1: The differential equation in the optimal elastic control model is transformed into a difference equation using the GRUOBI solver in the GAMS software, as shown in the following equation (21):
[0133]
[0134] Step 5.2: Transform the modified Hamiltonian function into the following equation (22):
[0135]
[0136] Step 5.3: Determine the initial value of the adjoint variable by binary search, perform target solving, and output the final solution value;
[0137] The specific steps are as follows:
[0138] Step 5.3.1: Initialize the search interval [d1, d2] of the initial value of the adjoint variable;
[0139] Step 5.3.2: Initialize the counter and select ΔP w , ΔP b They are the search intervals for wind turbine load shedding power and energy storage power station discharge power, respectively;
[0140] Step 5.3.3: In the first iteration, select λ0=(d1+d2) / 2, the initial SOC value is SOC0, and from the initial moment, substitute different wind turbine load reduction powers and energy storage charging powers for searching, determine the operating power according to the Hamiltonian function, repeat the calculation process of the adjoint equation, state equation, and difference equation until the end moment, and obtain the SOC(T) at the end moment;
[0141] Step 5.3.4: Compare the SOC(T) at the end point with SOC f By comparison, if SOC(T) <SOC f , then let d1 = (d1 + d2) / 2, otherwise let d2 = (d1 + d2) / 2;
[0142] Step 5.3.5: Repeat steps 5.3.2 to 5.3.4 until the convergence condition is met and output the solution value;
[0143] The convergence condition is shown in equation (23):
[0144] |SOC(T)-SOC f |<ε (23).
[0145] Through an example, a wind-storage combined system is operated with elastic control. The parameters of the wind-storage combined system are shown in Table 1 below.
[0146]
[0147]
[0148] Table 1
[0149] The optimal elastic control model is solved by the GRUOBI solver in the GAMS software, and the load reduction power P of the wind turbine unit within 24 hours is obtained by formula (16). w,l And the energy storage power station operating power P b The timetable is shown in Table 2 below.
[0150]
[0151]
[0152]
[0153]
[0154] Table 2
[0155] It can be clearly seen from Table 2 that the wind turbine reduces the load by 25KW in the time period from 6:40 to 6:45, reduces the load by 23KW in the time period from 6:45 to 6:50, reduces the load by 21KW in the time period from 6:50 to 6:55, reduces the load by 18KW in the time period from 6:55 to 7:00, reduces the load by 14KW in the time period from 7:00 to 7:05, reduces the load by 9KW in the time period from 7:05 to 7:10, and reduces the load by 4KW in the time period from 7:10 to 7:15; the results in Table 2 are output as the elastic control scheme for the operation of the wind-storage combined system.
[0156] The results of the traditional control strategy are shown in Table 3 below. From the data in the table, it can be seen that the wind turbines are operated at reduced load during the time period of 6:30-7:40, and the power and duration of load reduction are greater than the elastic control scheme of the wind-storage combined system operation. This shows that compared with the traditional control strategy, the scheme adopted in this paper can reduce the fluctuation of wind power and is more conducive to the safe and stable operation of the wind-storage combined system.
[0157]
[0158]
[0159]
[0160]
[0161]
[0162] Table 3
Claims
1. A method for controlling the operation flexibility of a wind-storage combined system, involving known wind turbines, energy storage power stations and thermal power units in the wind-storage combined system, characterized in that: The operation elasticity control method comprises the following steps: Step 1: Establish the wind-storage combined system operation model, as shown in the following formula (1): P L (t)=P f (t)+P w (t)+P b (t) (1), In formula (1), P L (t) Load power of wind-storage combined system; P b (t) is the operating power of the energy storage power station; P f (t) is the operating power of the thermal power unit; P w (t) is the operating power of the wind turbine; Obtain the constraints of the wind-storage combined system operation model, as shown in the following formula (2): In formula (2), It is the lower limit of power output of thermal power units. is the upper limit of the power output of thermal power units; c max is the maximum load reduction ratio of the fan, is the maximum power of the wind turbine corresponding to the wind speed v; is the rated power of the energy storage power station; Step 2: Select the operating power P of the energy storage power station b (t) and the operating power P of the wind turbine w (t) is used as the control quantity of the wind-storage combined system operation model, and then the state of charge SOC of the energy storage power station and the total load reduction energy W of the wind turbine generator set are selected as the state quantities of the wind-storage combined system operation model, and the state equation of the wind-storage combined system operation model is established, as shown in the following formula (3): In formula (3), Q b is the capacity factor of the energy storage power station; I b (P b , SOC) is the discharge current of the energy storage station; t0 and t f are the initial and terminal state moments of the wind-storage combined system operation model; P w,l is the load shedding power of the wind turbine; W is the total load shedding energy of the wind turbine; Step 3: According to the operating power P of the thermal power unit in formula (1), f (t) Establish the operating cost model of thermal power units, as shown in the following formula (4): In formula (4), J1 is the operating cost of the thermal power unit; C1 is the price of coal; a0, a1 and a2 are the operating cost coefficients of the thermal power unit; The wind power operation cost model is established based on the total load reduction energy W of the wind turbine in formula (3), as shown in the following formula (5): J2=C2W (5), In formula (5), J2 is the operating cost of the wind turbine; C2 is the wind turbine load reduction cost per unit energy; The energy storage power station operation cost model is established as shown in the following formula (6): In formula (6), J3 is the operating cost of the energy storage power station; R(SOC) is the internal resistance of the energy storage power station; C3 is the internal resistance loss cost coefficient, C4 is the energy storage aging cost coefficient, and N B is the number of batteries, V B is the capacity of the energy storage power station; Q loss is the energy storage loss life; B is the pre-exponential coefficient; c rate is the discharge rate; R is the gas constant; T is the absolute temperature; Ah is the discharge ampere-hour; z is the exponential factor; Γ nom is the life of the energy storage at a certain current; I N is the rated current of energy storage; q loss is the energy storage life loss percentage; Since the operating costs of the energy storage power station and the thermal power unit are relatively complex, a penalty function cost S1 is added to the state of charge SOC of the energy storage power station, as shown in the following formula (7): In formula (7), m1 is the penalty function constraint factor of the state of charge SOC of the energy storage power station; A penalty function cost S2 is added to the thermal power unit, as shown in the following formula (8): In formula (8), m2 is the penalty function constraint factor of the operating power of the thermal power unit; The operation cost model of the wind-storage combined system is obtained by combining formulas (4), (5), (6), (7) and (8), as shown in formula (9): Step 4: Determine the initial and terminal state values of the state of charge SOC of the energy storage power station, as shown in the following formula (10): In formula (10), SOC(t0) is the initial state value of the state of charge SOC of the energy storage power station; SOC(t f ) is the terminal state value of the state of charge SOC of the energy storage power station; The elastic control model of the wind-storage combined system during operation is obtained by combining equations (2), (3), (9) and (10), as shown in equation (11): The Hamiltonian function H of the elastic control model is established as shown in the following equation (12): In formula (12), λ1 represents the associated variable corresponding to the state of charge SOC of the energy storage power station, and λ2 represents the associated variable corresponding to the load reduction power of the wind turbine group; The adjoint equation of the Hamiltonian function and the boundary conditions of the adjoint equation are obtained as shown in the following equations (13) and (14): In formula (14), W(t f ) represents the load shedding energy of wind turbines at the end of the wind-storage combined system operation. W(t f ) The Hamiltonian function H is modified by formulas (13) and (14) to obtain the modified Hamiltonian function H * , as shown in the following formula (15), According to the Pontryagin Maximum Principle (PMP), the necessary conditions for optimal control of the elastic control model are obtained as shown in the following formula (16): [P w,l * ,P b * ]=argminH(SOC * ,P w,l ,P b ,λ1 * ,t)(16), The elastic control model is optimized by formulas (15) and (16), and the optimal elastic control model is obtained as shown in formula (17): Step 5: Use the GUROBI solver in the GAMS software to solve the optimal elastic control model, and output the optimal elastic control value of the wind-storage combined system according to the solution results in the GAMS software.
2. The method for controlling the operation flexibility of the wind-storage combined system according to claim 1 is characterized by: The process of establishing the wind-storage combined system operation model in step 1 is as follows: The wind turbine operation model is established as shown in the following equation (18): In formula (18): P w (t) is the operating power of the wind turbine; ρ is the air density; R is the radius of the wind rotor; v is the wind speed; C p is the wind energy utilization coefficient, which is related to the tip speed ratio λ and the pitch angle β; γ is the introduced intermediate variable; ω is the angular velocity of the wind wheel; coefficients c1 = 0.5176, c2 = 116, c3 = 0.4, c4 = 5, c5 = 21, c6 = 0.0068; P N w is the rated power of the fan; N is the rated angular speed of the fan; The energy storage power station operation model is established as shown in the following formula (19): In formula (19): U oc (SOC) is the open circuit voltage of the energy storage station; R b (SOC) is the internal resistance of the energy storage station; I b (P b , SOC) is the discharge current of the energy storage station; P b (t) is the operating power of the energy storage; The operation model of thermal power unit is established as shown in the following equation (20): P f (t)=P L (t)-P w (t)-P b (t) (20), In formula (20), P f (t) is the operating power of the thermal power unit; P L (t) Load power of wind-storage combined system and P L (t) is a known quantity; Finally, formulas (18), (19) and (20) are combined to obtain the wind-storage combined system operation model.
3. The method for controlling the operation flexibility of the wind-storage combined system according to claim 1 is characterized by: The specific solution steps of step 5 are as follows: Step 5.1: The differential equation in the optimal elastic control model is transformed into a difference equation using the GRUOBI solver in the GAMS software, as shown in the following equation (21): Step 5.2: Substitute the modified Hamiltonian function H * Transformed into the following formula (22), Step 5.3: Determine the initial value of the adjoint variable through the binary search method, perform a target-shooting solution, and output the final solution value.
4. The method for controlling the operation flexibility of the wind-storage combined system according to claim 3 is characterized by: The specific steps of performing the target shooting solution in step 5.3 are as follows: Step 5.3.1: Initialize the search interval [d1, d2] of the initial value of the adjoint variable; Step 5.3.2: Initialize the counter and select ΔP w , ΔP b They are the search intervals for wind turbine load shedding power and energy storage power station discharge power, respectively; Step 5.3.3: In the first iteration, select λ0=(d1+d2) / 2, the initial SOC value is SOC0, and from the initial moment, substitute different wind turbine load reduction powers and energy storage charging powers for searching, determine the operating power according to the Hamiltonian function, repeat the calculation process of the adjoint equation, state equation, and difference equation until the end moment, and obtain the SOC(T) at the end moment; Step 5.3.4: Compare the SOC(T) at the end point with SOC f By comparison, if SOC(T) <SOC f , then let d1 = (d1 + d2) / 2, otherwise let d2 = (d1 + d2) / 2; Step 5.3.5: Repeat steps 5.3.2 to 5.3.4 until the convergence condition is met and output the solution value; The convergence condition is shown in equation (23): |SOC(T)-SOC f |<ε (23).