Charge and discharge control method and charge and discharge control device
By calculating differential power and controlling charge and discharge according to the priority of electric vehicles, the problem of charge and discharge optimization in smart grids is solved, achieving efficient charge and discharge control and improving the overall efficiency of the power system.
Patent Information
- Application Number
- CN202180092190.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-10
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-02-10
AI Technical Summary
Existing charge and discharge control methods fail to effectively optimize the charge and discharge plan between power supply and demand in smart grids, resulting in low charge and discharge efficiency.
By obtaining the differential power information of the maximum value and the current value of the total power supply, and calculating according to the power receiving priority of the electric vehicle, the charging and discharging process of the electric vehicle is controlled to ensure that the charging and discharging comply with the charging and discharging plan of the smart grid.
Efficient charge and discharge control is achieved, charge and discharge losses are reduced, and the overall efficiency of the power system is improved.
Smart Images

Figure CN116745796B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a charge and discharge control method and a charge and discharge control device. Background Art
[0002] Currently, a method is known in which the power consumption of each power consumption element is controlled based on the limitation of the total power consumption of the entire group including multiple power consumption elements (Patent Document 1). In Patent Document 1, a broadcast transmission element broadcasts a function of the difference between the current value of the total power consumption and the reference value of the total power consumption to the group. Each power consumption element controls its own power consumption using the function and the priority assigned to itself.
[0003] Patent Document 1: Japanese Patent No. 6168528 Summary of the invention
[0004] However, the invention described in Patent Document 1 does not control a charge and discharge plan based on a smart grid (a grid that controls and optimizes electric power based on both supply and demand).
[0005] The present invention has been made in view of the above-mentioned problems, and an object of the present invention is to provide a charge and discharge control method and a charge and discharge control device capable of efficiently controlling charge and discharge.
[0006] A charge and discharge control method according to one embodiment of the present invention obtains information indicating differential power obtained by subtracting a current value of a total power supplied to an entire load group via a power supply base station from a maximum value of a total power supplied to an entire load group via a power supply base station, multiplies the differential power indicated by the obtained information by a priority level of a power receiving element indicating a degree to which its own power receiving is prioritized over power receiving of other power receiving elements, calculates element differential power of the power receiving element, and controls its own charge and discharge based on the element differential power and a charge and discharge plan of the power system.
[0007] Effects of the Invention
[0008] According to the present invention, charging and discharging can be efficiently controlled. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a schematic configuration diagram of a power system according to an embodiment of the present invention.
[0010] Figure 2 This is a flowchart for explaining an operation example of the power receiving control device.
[0011] Figure 3 It is a graph for explaining a comparative example.
[0012] Figure 4 It is a graph illustrating the improvement of SOC.
[0013] Figure 5 It is a graph illustrating the improvement of SOC.
[0014] Figure 6 This is a table explaining control based on the charging state of other electric vehicles. DETAILED DESCRIPTION
[0015] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the description of the drawings, the same parts are denoted by the same reference numerals and their description will be omitted.
[0016] Reference Figure 1 , the structure of the power receiving control device and its peripheral devices of the electric vehicle (an example of a power receiving element) involved in this embodiment is described. Regarding the power system that supplies electric energy to the load group 11 including multiple electric vehicles (EV1, EV2, EV3, ...) via the power equipment 12 (an example of the power supply base station 10), the power receiving control device repeatedly performs a predetermined processing cycle to control the power received by the electric vehicle EV1 included in the load group 11, that is, the element receiving power.
[0017] The power receiving control device includes: a receiving device 21 that receives an electric signal from the outside; a vehicle state acquisition device 22 that acquires information indicating the state of the electric vehicle EV1; and a calculation device 23 that calculates the element received power of the electric vehicle EV1. The electric vehicle EV1 includes: a power receiving device 24 that receives power from the outside; a battery 25 that stores the power received by the power receiving device 24 (element received power); and a motor 26 that is driven based on the electric energy stored in the battery 25 or the element received power.
[0018] The "processing cycle" includes the processing steps (a) to (e).
[0019] (a) The receiving device 21 acquires information indicating differential power (ΔP) obtained by subtracting the current value (Pall_now) of the total power supplied to the entire load group 11 via the power device 12 from the maximum value (Pall_max) of the total power supplied to the entire load group 11 via the power device 12 .
[0020] (b) The calculation device 23 calculates the priority (β) of the electric vehicle EV1 indicating the degree to which power reception of the electric vehicle EV1 (electric vehicle EV1) is prioritized over power reception of other electric vehicles (EV2, EV3, . . . ) based on the numerical value indicating the request of the user of the electric vehicle EV1.
[0021] (c) The calculation device 23 multiplies the differential power (ΔP) indicated by the acquired information by the priority (β) to calculate the element differential power (βΔP).
[0022] (d) The calculation device 23 adds the element differential power (βΔP) to the element received power (Pt) in the previous processing cycle to update the element received power (Pt+1).
[0023] (e) The calculation device 23 controls the electric vehicle EV1 so as to receive the updated element received power (Pt+1).
[0024] Here, in the present embodiment, the "electric vehicle" is an example of an "electricity storage element" or "electricity receiving element" that receives the electric power transmitted via the electric power equipment 12. The electric power storage element stores the received electric power in a battery (including a secondary battery, a storage battery, and a rechargeable battery). The "electricity storage element" includes all equipment and devices having a battery, such as vehicles (including electric vehicles, hybrid vehicles, construction machinery, and agricultural machinery), railway vehicles, entertainment equipment, tools, household products, and daily necessities.
[0025] The "power storage element" is an example of a "power receiving element" that receives power transmitted via the power equipment 12. In addition to the "power storage element", the "power receiving element" also includes a "power consumption element" that does not store the received power but consumes it. The "power consumption element" includes railway vehicles, entertainment equipment, tools, household products, daily necessities, etc. The "power consumption element" can have a battery like an electric car. In the case where the power received by the electric car is not stored in the battery, but is directly supplied to the motor and consumed as the driving force of the motor, the electric car is an example of a "power consumption element". In this way, the "power consumption element" includes so-called equipment and devices that do not store the received power but consume it regardless of whether it has a battery.
[0026] Both "power storage element" and "power receiving element" represent unit structures of power receiving control based on the power receiving control device. That is, the power receiving control involved in this embodiment is performed on the power storage element or the power receiving element as a unit. For example, the power receiving control involved in this embodiment is performed independently and in parallel for multiple electric vehicles (EV1, EV2, EV3, ...).
[0027] In the present embodiment, a power storage element is cited as an example of a power receiving element, and an electric vehicle (EV) that runs using electricity as an energy source and a motor 26 as a power source is cited as an example of a power storage element. However, it is not intended that the power receiving element and the power storage element of the present invention are limited to electric vehicles (EVs), respectively.
[0028] In the present embodiment, the "power equipment 12" is an example of the power supply base station 10. The "power equipment 12" includes, for example, the following <1> to <6>.
[0029] <1> “Charging stations” for electric vehicles (EVs)
[0030] <2> "Substations" installed in residences, office buildings, commercial facilities, factories, or parking lots on highways
[0031] <3> "Power plants" that generate water, thermal, or nuclear power, and "substations" that convert the generated electricity to a specified voltage
[0032] <4> Various "distribution equipment" for distributing the electricity transmitted through the substation
[0033] <5> "Wiring (including cables and feeders)" connecting the above devices or equipment, and <6> "Virtual Power Plant (VPP)" that functions like a large-scale power plant by confining the energy of small-scale power storage elements located nearby
[0034] In this embodiment, an example in which the power receiving control device is mounted on the electric vehicle EV1 is described. Of course, the power receiving control device can use short-range wireless communication technologies such as short-range wireless, wireless LAN, wireless WAN, or use a mobile phone communication network to control the element power received by the electric vehicle EV1 from the outside of the electric vehicle EV1.
[0035] In addition, the structure of one electric vehicle EV1 among the multiple electric vehicles (EV1, EV2, EV3, ...) included in the load group 11 is explained as an example, but the other electric vehicles (EV2, EV3, ...) included in the load group 11 also have the same structure as the electric vehicle EV1.
[0036] The power receiving control device controls the power received by the electric vehicle EV1 via the power equipment 12. The electric vehicle EV1 has a power receiving device 24 called an on-board charger (OBC). The calculation device 23 controls the power received by the power receiving device 24 via the power equipment 12. The power received by the power receiving device 24 is stored in the battery 25. Alternatively, the electric vehicle EV1 may not store the power received by the power receiving device in the battery 25, but directly supply power to the motor 26 as a driving source.
[0037] The electric power supplied to the electric vehicle EV1 via the electric power equipment 12 is measured by the current measuring device 13. The electric power value measured by the current measuring device 13 is transmitted to the difference information transmitting device 14.
[0038] Electric energy is supplied to a plurality of electric vehicles (EV1, EV2, EV3, ...) included in a load group 11 via one electric power device 12. Furthermore, electric energy may be supplied not only to a plurality of electric vehicles (EV1, EV2, EV3, ...) but also to one or more than two other electric power consumption elements 15 included in the load group 11 via one electric power device 12. A plurality of electric vehicles (EV1, EV2, EV3, ...) supplied with electric energy via the electric power device 12 and one or more than two other electric power consumption elements 15 form one group (load group 11).
[0039] The current measuring device 13 measures the current value (Pall_now) of the total power supplied to all electric vehicles (EV1, EV2, EV3, ...) and other power consumption elements 15 included in one load group 11 via the power equipment 12, in other words, the total power supplied to the entire load group 11.
[0040] Here, the power capacity of the entire load group 11, that is, the maximum value (Pall_max) of the total power supply that can be transmitted to the entire load group 11 via the power equipment 12 is predetermined. The power receiving control device involved in this embodiment controls the element power receiving of the electric vehicle EV1 based on the limitation of the maximum value (Pall_max) of the total power supply. For example, the power receiving control device controls the power receiving of the electric vehicle EV1 in such a way that the current value (Pall_now) of the total power supply measured by the current measuring device 13 does not exceed the maximum value (Pall_max) of the power. Of course, the power receiving of the electric vehicle EV1 can be controlled in such a way that the current value (Pall_now) of the total power supply is allowed to temporarily exceed the maximum value (Pall_max) of the power. In addition, the maximum value (Pall_max) of the total power supply may be a fixed value or may not be a fixed value. In facilities such as office buildings, commercial facilities, factories, and parking areas on highways, there are not only charging piles for electric vehicles EV, but also equipment in the facilities that consume power, such as lighting devices, air conditioning devices, and lifting devices. It is possible that the maximum value of the total power supply may sometimes change due to the above equipment.
[0041] like Figure 1 As shown, in this embodiment, the differential information transmitting device 14 is connected to the power device 12, the current measuring device 13 and the electric vehicle EV1 respectively in a manner that can communicate wirelessly or wired. The power device 12 sends an electrical signal indicating the maximum value (Pall_max) of the total power supply to the differential information transmitting device 14. The current measuring device 13 sends an electrical signal indicating the current value (Pall_now) of the measured total power supply to the differential information transmitting device 14.
[0042] The differential information transmitting device 14 includes a calculation unit 31 and a transmission unit 32. As shown in formula (1), the calculation unit 31 calculates the differential power (ΔP) by subtracting the current value (Pall_now) of the total power supply from the maximum value (Pall_max) of the total power supply. The transmission unit 32 transmits (broadcasts) an electrical signal indicating the differential power (ΔP) to all electric vehicles (EV1, EV2, EV3, ...) included in the load group 11 through mobile communication. The electrical signal indicating the differential power (ΔP) is received by the receiving device 21 and transmitted to the calculation device 23. As a result, the power receiving control device can obtain information indicating the differential power (ΔP) obtained by subtracting the current value (Pall_now) of the total power supply transmitted to the entire load group 11 via the power device 12 from the maximum value (Pall_max) of the total power supply that can be transmitted to the entire load group 11 via the power device 12.
[0043] [Mathematical formula 1]
[0044] △P=P all_max -P all_now ...(1)
[0045] Furthermore, the differential information transmitting device 14 transmits (broadcasts) the information indicating the differential power (ΔP) to the receiving devices 21 of all electric vehicles (EV1, EV2, EV3, ...) included in the load group 11 by wireless communication using the transmitting unit 32. Alternatively, the information indicating the differential power (ΔP) may be transmitted by wired communication.
[0046] exist Figure 1 In the example shown, the difference information transmitting device 14 may not have the function of receiving information such as the charge rate (SOC: STATE OF CHARGE) of the battery 25 and the time when the power reception is terminated (T d ) and other devices for receiving signals indicating the status of each electric vehicle. That is, it is sufficient as long as communication can be performed unidirectionally from the differential information transmitting device 14 to each electric vehicle. In addition, bidirectional communication is also possible.
[0047] The difference information transmitting device 14 may be, for example, a server connected to the power device 12, the current measuring device 13, and the load group 11 via a computer network. Alternatively, the difference information transmitting device 14 may be configured as a part of the power device 12.
[0048] The vehicle state acquisition device 22 acquires information indicating the state of the electric vehicle EV1. For example, the "state of the electric vehicle EV1" refers to a numerical value indicating the request of the user of the electric vehicle EV1. The numerical value indicating the request of the user of the electric vehicle EV1 is the time until the end of the power reception of the electric vehicle EV1 (the end time of the power reception T d ). The remaining time (T) can be calculated based on the time when the electric vehicle EV1 finishes receiving power. The remaining time (T) is the remaining time for charging the battery 25 of the electric vehicle EV1.
[0049] For example, a user who has returned home can start charging the battery 25 of the electric vehicle EV1 in the parking lot of the home. If the user plans to go out with the electric vehicle EV1 at 7:00 a.m. the next day, the time before the specified time (5 minutes) of 7:00 a.m. the next day can be set as the end time of power reception. In this way, the "user's request" such as "going out at 7:00 a.m. the next day" indicates the end time of power reception (6:55 a.m. = T d ) and the remaining time (T) until the end of power reception. d )" refers to the moment when the period during which the electric vehicle EV1 can continuously receive power ends. Figure 2 ) is distinguished relative to the moment when it is determined that power reception is not continuous (NO in S03).
[0050] End time of power receiving (T d ) may be a time actually set by the user using an information communication terminal such as a smartphone or a user interface mounted on the electric vehicle EV1. Alternatively, in the absence of a specific instruction or setting from the user, it may be a time estimated from statistical data obtained by investigating the user's past action history (history of past departure times, etc.).
[0051] The calculation device 23 calculates the priority (β) of the electric vehicle EV1, which indicates the degree to which the power receiving of the electric vehicle EV1 is prioritized over the power receiving of other electric vehicles (EV2, EV3, ...), based on the numerical value indicating the request of the user of the electric vehicle EV1 (the state of the electric vehicle EV1). Specifically, the calculation device 23 calculates the priority (β) of the electric vehicle EV1, which indicates the degree to which the power receiving of the electric vehicle EV1 is prioritized over the power receiving of other electric vehicles (EV2, EV3, ...). o ) to the end time of power receiving (T d ) is calculated based on the remaining time (T) of the load group 11. In formula (2), N represents the total number of electric vehicles receiving power in the load group 11.
[0052] [Mathematical formula 2]
[0053]
[0054] As shown in formula (2), the priority (β) is inversely proportional to the remaining time (T). As the remaining time (T) decreases, the priority (β) increases. Formula (2) is just an example, for example, the priority (β) may be inversely proportional to "the remaining time (T) to the power of g" which is greater than or equal to 2 times g (g is a positive number) multiplied by the remaining time (T).
[0055] The total number of electric vehicles (N) may be statistical data (quantity data) obtained by investigating the past power receiving history of the load group 11, or the total number of electric vehicles (N) may be estimated based on the current value of power (Pall_now). The total number (N) is broadcasted from the differential information transmitting device 14 or a device attached to the differential information transmitting device 14, similarly to the differential power (ΔP). Alternatively, the total number (N) may be determined based on the location information of the charging system, an identification signal, and the like.
[0056] As shown in formula (3), the calculation device 23 multiplies the differential power (ΔP) by the priority (β) to calculate the element differential power (βΔP), and adds the element differential power (βΔP) to the element receiving power (Pt) of the previous processing cycle to update the element receiving power (Pt+1). In addition, the subscripts (lower right subscripts) "t" and "t+1" of the symbol "P" representing the element receiving power represent the number of repetitions of the "processing cycle". T is a positive integer including zero.
[0057] [Mathematical formula 3]
[0058] P t+l =P t +β·△P...(3)
[0059] The calculation device 23 sends an instruction signal to the power receiving device 24 so that the power receiving device 24 receives the updated component received power (Pt+1). The power receiving device 24 receiving the instruction signal receives the updated component received power (Pt+1) via the power equipment 12 .
[0060] The power reception control device repeatedly executes a “processing cycle” including the processing steps (a) to (e) at a certain period to control the electric power (elementary received power Pt) received by the power reception device 24 of the electric vehicle EV1.
[0061] Next, refer to Figure 2 Flowchart of Figure 1 An example (basic example) of a power receiving control method of a power receiving control device is described below. Figure 1 The specific structure and function of the power receiving control device can easily understand the specific order of the power receiving processing method based on the power receiving control device. Figure 1 The power receiving control device of the power receiving processing method is described, and the main processing actions of the power receiving control device are described, and the detailed processing actions are described and referenced. Figure 1 The description is repeated and therefore omitted.
[0062] First, in step S01, the receiving device 21 obtains information indicating the differential power (ΔP) calculated by the calculation unit 31. The process proceeds to step S02, where the vehicle state acquisition device 22 obtains information indicating the end time (T d ) information.
[0063] The process proceeds to step S03, where the power receiving control device determines whether to continue receiving power. For example, if a power receiving end instruction signal is received from the user of the electric vehicle EV1 (NO in S03), or if the current time is the end time of power receiving (T d ), the power reception is terminated. Alternatively, when the disconnection of the charging port is detected (NO in S03), the possibility of the electric vehicle EV1 starting to move within a few minutes is increased, so the power reception is terminated. In addition, when the charging rate (SOC) of the battery 25 reaches the target value (NO in S03), the power reception is terminated. If the above conditions do not exist (YES in S03), the power reception control device continues to receive power.
[0064] The process proceeds to step S04, where the calculation device 23 uses equation (2) and calculates the end time (T d ) and calculates the priority (β) of the electric vehicle EV1. The process proceeds to step S05, and the calculation device 23 substitutes the differential power (ΔP) and the priority (β) into equation (3) to update the element receiving power (Pt+1).
[0065] Proceeding to step S06, the calculation device 23 controls the power receiving device 24 so that the power receiving device 24 receives the updated element power (Pt+1). The power receiving control device repeatedly executes the processing loop of steps S01 to S06 as a unit until a NO is determined in step S03, and controls the element power (P).
[0066] Furthermore, when updating the element power receiving power (Pt+1), a certain power correction value (αPt) can be subtracted from the last element power receiving power (Pt) to correct the updated element power receiving power (Pt+1). This makes it difficult for the differential power (ΔP) to become zero. This allows the electric vehicle that is about to restart power receiving to start receiving power as soon as possible.
[0067] In this embodiment, the power receiving control device controls the charging and discharging of the electric vehicle based on the charging and discharging plan of the smart grid. A smart grid is a power grid that controls and optimizes power from both supply and demand. A smart grid is sometimes also called a next-generation power supply network or a smart community. As an example of a smart grid, a smart grid includes Figure 1 The illustrated power grid includes the power device 10 , the differential information transmitting device 14 , the current measuring device 13 and the load group 11 .
[0068] The charging and discharging plan of the smart grid is not particularly limited, and is described in this embodiment as a pre-set plan. For example, the charging and discharging plan is pre-set based on peak power demand, off-peak power demand, nighttime power, etc.
[0069] The power receiving control device obtains the charging and discharging plan of the smart grid. For example, the power receiving control device obtains the charging and discharging plan from the differential information sending device 14. Moreover, the power receiving control device controls the charging and discharging of the electric vehicle based on the charging and discharging plan. In other words, the power system sends the charging and discharging plan to each electric vehicle. The power system prompts each electric vehicle to charge and discharge based on the charging and discharging plan. As a result, the power system can supply the required power to a large number of electric vehicles.
[0070] When each electric vehicle is charged and discharged, conversion losses related to charging and discharging are generated. Conversion losses refer to, for example, losses involved in AC-DC conversion or losses involved in DC-AC conversion. Hereinafter, "conversion losses related to charging and discharging" will be referred to as "charging and discharging losses." When each electric vehicle is charged and discharged, it is desirable to reduce charging and discharging losses.
[0071] Next, refer to Figures 3 to 6 An example of the charge and discharge control method according to the present embodiment will be described.
[0072] First, refer to Figure 3 A comparative example is described below. The comparative example here refers to a case where the charge and discharge control method according to the present embodiment is not used. Figure 3 The figure on the upper side is used for explanation. The figure on the upper side represents the charging and discharging plan of the smart grid. On the vertical axis of the figure on the upper side, positive values represent the charging side. Negative values represent the discharging side. The charging side indicates that the signal sent from the differential information sending device 14 is positive. That is, the differential power (ΔP) is positive. On the other hand, the discharging side indicates that the signal sent from the differential information sending device 14 is negative. That is, the differential power (ΔP) is negative. The horizontal axis represents time. Symbol 40 represents the value involved in the charging and discharging plan. Symbol 41 represents the measured value.
[0073] right Figure 3The figure on the lower side is used for explanation. The vertical axis of the figure on the lower side represents the battery capacity (kWh) of the electric vehicle. The horizontal axis represents the time. Symbol 51 represents the battery capacity of EV1. Symbol 52 represents the battery capacity of EV2. Symbol 53 represents the battery capacity of EV3. Symbol 54 represents the battery capacity of EV4. Symbol 61 represents the battery capacity of EV1 when it starts. Symbol 62 represents the battery capacity of EV2 when it starts. Symbol 63 represents the battery capacity of EV3 when it starts. Symbol 64 represents the battery capacity of EV4 when it starts. In addition, the battery capacity can be recorded as SOC.
[0074] like Figure 3 As shown in the figure, regarding the charge and discharge plan, the chargeable power is large at night (time 0:00-7:00) when the power demand is low. On the other hand, discharge is requested during the time period (time 7:00-11:00) when the power demand is high. EV1 is charged during the time period when the chargeable power is large compared to other EVs (EV2-EV4), so the SOC at the time of departure is higher than the SOC of other EVs. On the other hand, EV2-EV4 span the time period when discharge is requested, so the discharge amount is large. Therefore, EV2-EV4 departs with a low SOC.
[0075] Therefore, as an example of a charge and discharge control method, a priority (β) is assigned using equation (4).
[0076] [Formula 4]
[0077] Priority (β) = required power - Σ (estimated charging power) (4)
[0078] Σ(estimated charging power) takes the total value over time, so it becomes a dimension of power amount. The estimated charging power is transmitted, for example, from the differential information transmitting device 14. The estimated charging power is obtained by dividing the total power available to the electric vehicles by the estimated number of stranded electric vehicles. The estimated charging power is equivalent to the amount of charge that can be expected for each electric vehicle. The result of utilizing the priority (β) involved in formula (4) is explained. For electric vehicles with a lower priority than the surrounding electric vehicles, the charging amount is reduced. For electric vehicles with a higher priority than the surrounding electric vehicles, the charging amount is increased. Therefore, as Figure 4 As shown, in Figure 3 By comparison, EV2~EV4 can start with a higher SOC.
[0079] The priority (β) can be assigned using equation (5).
[0080] [Mathematical formula 5]
[0081] Priority (β) = Σ(estimated charging power) - required power - (power exceeding target power × 5) (5)
[0082] When using the priority (β) involved in formula (5), Figure 5 As shown, EV2~EV4 can be used with Figure 3 Departure in a state higher than SOC.
[0083] In addition, as another example of the charge and discharge control method, the SOC state of other electric vehicles can be estimated to control the amount of electric power (charge and discharge amount) involved in its own charge and discharge. In this embodiment, the electric vehicle cannot know the SOC state of other electric vehicles. Therefore, the power receiving control device estimates the SOC state of other electric vehicles to control the amount of electric power (charge and discharge amount) involved in its own charge and discharge. Figure 6 A specific example will be described.
[0084] exist Figure 6 In the "status", "status" indicates whether the vehicle is on the charging side or the discharging side in the smart grid's charging and discharging plan. Whether other electric vehicles are likely to reach the desired SOC (hereinafter referred to as the desired SOC) is estimated based on the change in differential power (ΔP). The SOC status of other electric vehicles is estimated in all cases (cases 1 to 8).
[0085] First of all, Figure 6 Scenario 1 of FIG. 1 is described. In Scenario 1, the charge and discharge plan is "charge". When charging based on the charge and discharge plan, this electric vehicle is likely to reach the desired SOC. All other electric vehicles are likely to reach the desired SOC. In this case, the power receiving control device is basically charged based on the charge and discharge plan. The power receiving control device does not discharge. However, it is also possible not to charge according to the SOC state of other electric vehicles.
[0086] Next, case 3 is described. In case 3, the charge and discharge plan is "charge". When charging based on the charge and discharge plan, the electric vehicle may not reach the desired SOC. All other electric vehicles may reach the desired SOC. In this case, the power receiving control device charges based on the charge and discharge plan.
[0087] Next, scenario 4 is described. In scenario 4, the charge and discharge plan is "charge". When charging based on the charge and discharge plan, the electric vehicle may not reach the desired SOC. There are other electric vehicles that may not reach the desired SOC. In this case, the power receiving control device is basically charged based on the charge and discharge plan. The power receiving control device does not discharge.
[0088] Next, scenario 5 is described. In scenario 5, the charge and discharge plan is "discharge". When discharging based on the charge and discharge plan, this electric vehicle is likely to reach the desired SOC. All other electric vehicles are likely to reach the desired SOC. In this case, the power receiving control device is basically discharged based on the charge and discharge plan. The power receiving control device is not charged.
[0089] Next, scenario 6 is described. In scenario 6, the charge and discharge plan is "discharge". When discharging based on the charge and discharge plan, the electric vehicle may reach the desired SOC. There are other electric vehicles that may not reach the desired SOC. In this case, the power receiving control device discharges based on the charge and discharge plan.
[0090] As described above, in Cases 1 and 3 to 6, the power reception control device charges or discharges based on the charge and discharge plan.
[0091] Next, scenario 2 is described. In scenario 2, the charge and discharge plan is "charge". When charging based on the charge and discharge plan, this electric vehicle may reach the desired SOC. There are other electric vehicles that may not reach the desired SOC. In this case, the power receiving control device does not implement control based on the charge and discharge plan. The power receiving control device ignores the charge and discharge plan and discharges. As a result, this electric vehicle can supply power to other electric vehicles. As a result, other electric vehicles can start at a higher SOC state.
[0092] Next, scenario 7 is described. In scenario 7, the charge and discharge plan is "discharge". When discharging based on the charge and discharge plan, this electric vehicle may not reach the desired SOC. All other electric vehicles may reach the desired SOC. In this case, the power receiving control device does not implement control based on the charge and discharge plan. The power receiving control device ignores the charge and discharge plan and charges. As a result, this electric vehicle can start at a higher SOC state.
[0093] Next, scenario 8 is described. In scenario 8, the charge and discharge plan is "discharge". In the case of discharging based on the charge and discharge plan, this electric vehicle may not be able to reach the desired SOC. There are other electric vehicles that may not be able to reach the desired SOC. In this case, the power receiving control device does not implement control based on the charge and discharge plan. In the case where there is no electric vehicle that is discharged among other electric vehicles that may not reach the desired SOC, the power receiving control device charges. As a result, this electric vehicle can set off at a higher SOC state. In addition, in the case where there is an electric vehicle that is discharged among other electric vehicles that may not reach the desired SOC, the power receiving control device does not charge. The "not charging" mentioned here means not charging with the power supplied from the power equipment 12. In the case where there is an electric vehicle that is discharged among other electric vehicles that may not reach the desired SOC, the power receiving control device uses the power discharged by other electric vehicles to charge. As a result, this electric vehicle can set off at a higher SOC state.
[0094] As described above, in situations 2, 7, and 8, the power receiving control device estimates the SOC state of other electric vehicles. Based on the estimation result, the power receiving control device performs charge and discharge control in a manner that ignores the charge and discharge plan. As a result, the electric vehicle or other electric vehicles can start at a higher SOC state. In addition, appropriate charge and discharge control can be performed, and charge and discharge losses are reduced.
[0095] (Effect)
[0096] As described above, according to the power reception control device (charge and discharge control device) according to the present embodiment, the following effects can be obtained.
[0097] In an electric power system that supplies electric energy to a load group 11 including a plurality of power receiving elements via a power supply base station 10, a power receiving control device controls the power received or discharged by the power receiving elements included in the load group 11. The power receiving control device acquires information indicating a differential power (ΔP) obtained by subtracting the current value of the total power supplied to the entire load group 11 via the power supply base station 10 from the maximum value of the total power supplied to the entire load group 11 via the power supply base station 10. The power receiving control device calculates the element differential power of the power receiving element by multiplying the differential power (ΔP) indicated by the acquired information by the priority (β) of the power receiving element indicating the degree to which its own power receiving is prioritized over the power receiving of other power receiving elements. The power receiving control device controls its own charging and discharging based on the element differential power and the charging and discharging plan of the power system. This realizes efficient charging and discharging control using the charging and discharging plan.
[0098] In addition, the power receiving control device estimates the charging state of other power receiving elements. The power receiving control device controls its own charging and discharging based on the estimated charging state of other power receiving elements. In this way, the charging and discharging plan is basically met, but the power receiving control device performs its own charging and discharging control in a manner that ignores the charging and discharging plan based on the estimated charging state of other power receiving elements. In this way, appropriate charging and discharging control can be achieved, and charging and discharging losses can be reduced.
[0099] Estimating the charging state of other power receiving elements means estimating whether the charging amount of other power receiving elements reaches the charging amount desired by other power receiving elements when other power receiving elements depart in the future.
[0100] The power system is, for example, a smart grid.
[0101] Each function described in the above embodiments can be implemented using one or more processing circuits. The processing circuit includes a programmed processing device such as a processing device including a circuit. In addition, the processing circuit includes a device such as an application-specific integrated circuit (ASIC), a circuit component, etc. arranged in a manner to perform the described functions.
[0102] As described above, the embodiments of the present invention have been described, but the description and drawings constituting part of this disclosure should not be construed as limiting the present invention. Various alternative embodiments, examples, and operational techniques will become apparent to those skilled in the art from this disclosure.
[0103] Description of the label
[0104] 10 Power supply to base stations
[0105] 11 Load Group
[0106] 13. Current measuring device
[0107] 14 Differential information sending device
[0108] 15 Electricity consumption factors
[0109] 21Receiving device
[0110] 22 Vehicle status acquisition device
[0111] 23 Computing Device
[0112] 24 Power receiving device
[0113] 25 Battery
[0114] 26 Motor
[0115] 31Computing Department
[0116] 32 Sending Department
Claims
1. A charge and discharge control method, in a power system that supplies electric energy to a load group including a plurality of power receiving elements via a power supply base station, controlling the power received or discharged by the power receiving elements included in the load group, The charging and discharging control method is characterized in that: acquiring information indicating differential power obtained by subtracting a current value of the total power supplied to the entire load group via the power supply base station from a maximum value of the total power supplied to the entire load group via the power supply base station, The element differential power of the power receiving element is calculated by multiplying the differential power indicated by the acquired information by the priority of the power receiving element indicating the degree to which the power receiving of the power receiving element is prioritized over the power receiving of other power receiving elements. estimating the charging state of the other power receiving element based on the amount of change in the differential power, The charging and discharging of the own power receiving element is controlled based on the element differential power, the charging and discharging plan of the power system, and the estimated charging state of the other power receiving element.
2. The charge and discharge control method according to claim 1, characterized in that: Estimating the charge state of the other power receiving element means estimating whether the charge amount of the other power receiving element reaches the charge amount desired by the other power receiving element when the other power receiving element departs in the future.
3. The charge and discharge control method according to claim 1 or 2, characterized in that: The power system is a smart grid.
4. A charge and discharge control device, comprising: a power receiving control device for controlling power received or discharged by a power receiving element included in a load group including a plurality of power receiving elements in a power system that supplies electric energy to the load group including a plurality of power receiving elements via a power supply base station; The charge and discharge control device is characterized in that: The power receiving control device acquires information indicating differential power obtained by subtracting a current value of the total power supplied to the entire load group via the power supply base station from a maximum value of the total power supplied to the entire load group via the power supply base station, The element differential power of the power receiving element is calculated by multiplying the differential power indicated by the acquired information by the priority of the power receiving element indicating the degree to which the power receiving of the power receiving element is prioritized over the power receiving of other power receiving elements. estimating the charging state of the other power receiving element based on the amount of change in the differential power, The charging and discharging of the own power receiving element is controlled based on the element differential power, the charging and discharging plan of the power system, and the estimated charging state of the other power receiving element.
Citation Information
Patent Citations
Power reception control method of power storage elements, and power reception control device
WO2020194009A1
Power reception control method of power reception elements, and power reception control device
WO2020194010A1