Charging pile intelligent operation and maintenance management method, system, computer equipment and storage medium
By constructing a charging pile fault early warning model and an intelligent operation and maintenance management system, the problem of fault detection and early warning in charging pile operation has been solved, rapid fault detection and safety risk early warning of charging piles have been achieved, operating costs have been reduced and management efficiency has been improved.
Patent Information
- Application Number
- CN202310578416.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-22
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-05-22
AI Technical Summary
The lack of a unified safety supervision system and platform in the operation of existing charging piles makes it difficult for charging station managers to detect faults and safety hazards in a timely manner, which increases operating costs. Moreover, the existing method of obtaining fault information is costly and inefficient, and cannot provide effective early warning and warning. analyze.
By obtaining the historical operation and maintenance data and rated information of charging piles, we build a fault warning model, analyze the operation and maintenance data, detect faults, generate maintenance work orders, and adjust the order dispatch process based on maintenance feedback to establish a unified intelligent operation and maintenance management system to realize fault detection. real-time notifications and security risk warnings.
It improves charging pile management capabilities, enables rapid discovery, analysis and resolution of faults, reduces operating costs, and improves operation and maintenance efficiency and safety.
Smart Images

Figure CN116894659B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of charging pile management, and in particular to a charging pile intelligent operation and maintenance management method, system, computer equipment and storage medium. Background Art
[0002] During the operation of new energy vehicle charging piles, the supervision of charging pile safety and fault conditions is extremely important for both operating companies and charging users. However, there is currently a lack of a unified safety supervision system or platform in the operation of charging stations. At the same time, operating companies are unable to locate faults in a timely manner and provide fault handling solutions, which will cause losses to operating companies and charging users.
[0003] Specifically, (1) the management level and basic knowledge of charging piles of charging station managers vary, which may lead to the inability of charging station managers to timely discover the faults and safety hazards of charging piles, thereby endangering the personal and property safety of operators and users. (2) There are many brands of charging piles, which leads to differences in structure, components and fault warning mechanisms of charging piles, which will bring huge operation and maintenance costs to operators. In other words, there is currently a lack of a unified and standardized management and warning mechanism system and platform for charging piles. (3) The existing fault information acquisition method is too single and cannot provide effective feedback or early warning for hidden fault problems of charging piles. It is limited to obtaining feedback from the sensors on the mainboard of the charging pile, that is, it lacks early warning and prediction of many hidden problems. (4) The cost of the existing fault information acquisition method is too high. All fault information is obtained by modifying the mainboard or hardware modification of a single pile, which lacks economic benefits and is not conducive to the establishment of a convenient, safe and comprehensive charging pile operation and maintenance system. (5) In the existing charging station operation system, there is no systematic data analysis and health analysis report for charging pile fault data. Manual statistics have low accuracy and efficiency, and are not convenient for querying and remote viewing of historical data. (6) The existing offline maintenance of charging piles cannot be linked to the charging station information, charging pile data and information, which makes it difficult for operators to control the maintenance status and progress. (7) The maintenance skills of the existing charging pile operation and maintenance teams or individuals in the market are uneven, the maintenance efficiency is inconsistent, and there is a lack of unified maintenance standards and prices. Operators cannot control the quality of maintenance and cannot obtain effective maintenance services. Summary of the invention
[0004] The embodiments of the present invention provide a charging pile intelligent operation and maintenance management method, system, computer equipment and storage medium, aiming to provide unified standardized management and a platform with an early warning mechanism, thereby improving the charging pile management capability.
[0005] In a first aspect, an embodiment of the present invention provides a charging pile intelligent operation and maintenance management method, including:
[0006] Acquire historical operation and maintenance data of the charging pile and rated information and / or preset information of the charging pile, and construct a charging pile fault warning model based on the historical operation and maintenance data of the charging pile, rated information of the charging pile and / or preset information;
[0007] For a target charging pile, obtain the target charging pile operation and maintenance data, and parse and process the target charging pile operation and maintenance data according to a preset parsing rule to obtain parsed data;
[0008] Inputting the analyzed data into the charging pile fault warning model to perform fault detection on the target charging pile;
[0009] When a fault is detected in the target charging pile, the fault information is obtained, and a fault analysis and processing strategy is output according to the fault information;
[0010] If the fault analysis and processing strategy fails to eliminate the fault, a maintenance work order is generated according to the fault information, and the maintenance work order is dispatched to the corresponding maintenance party;
[0011] A maintenance feedback corresponding to the maintenance work order is obtained to perform a service evaluation on the maintenance party according to the maintenance feedback, and a dispatching process of the maintenance work order is adjusted based on the service evaluation.
[0012] In a second aspect, an embodiment of the present invention provides a charging pile intelligent operation and maintenance management system, including:
[0013] A model building unit, used to obtain historical operation and maintenance data of the charging pile and rated information and / or preset information of the charging pile, and to build a charging pile fault warning model based on the historical operation and maintenance data of the charging pile, rated information of the charging pile and / or preset information;
[0014] The parsing and processing unit is used to obtain the target charging pile operation and maintenance data for the target charging pile, and parse the target charging pile operation and maintenance data according to preset parsing rules to obtain parsed data;
[0015] A fault detection unit, used for inputting the analysis data into the charging pile fault warning model to perform fault detection on the target charging pile;
[0016] A strategy output unit, used to obtain fault information when a fault is detected in the target charging pile, and output a fault analysis and processing strategy according to the fault information;
[0017] A work order generating unit, configured to generate a maintenance work order according to the fault information if the fault analysis and processing strategy fails to eliminate the fault, and dispatch the maintenance work order to a corresponding maintenance party;
[0018] The service feedback unit is used to obtain the maintenance feedback corresponding to the maintenance work order, to perform service evaluation on the maintenance party according to the maintenance feedback, and to adjust the dispatching process of the maintenance work order based on the service evaluation.
[0019] In a third aspect, an embodiment of the present invention provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the intelligent operation and maintenance management method for charging piles as described in the first aspect is implemented.
[0020] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the charging pile intelligent operation and maintenance management method as described in the first aspect is implemented.
[0021] The embodiment of the present invention provides a new intelligent operation and maintenance system for new energy vehicle charging stations. It captures and analyzes the fault data and charging data of charging piles in different scenarios and brands during operation, realizes real-time notification of charging pile faults, and provides accurate early warning of potential faults and safety risks. At the same time, it builds an online operation and maintenance system, provides efficient and fast fault resolution solutions, and realizes a complete closed-loop platform system for fault discovery, analysis, and resolution, thereby systematically improving the charging pile management capabilities. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0023] Figure 1 A flow chart of a charging pile intelligent operation and maintenance management method provided by an embodiment of the present invention;
[0024] Figure 2 A schematic diagram of a sub-process of a charging pile intelligent operation and maintenance management method provided by an embodiment of the present invention;
[0025] Figure 3 A schematic block diagram of a charging pile intelligent operation and maintenance management system provided by an embodiment of the present invention;
[0026] Figure 4 A sub-schematic block diagram of a charging pile intelligent operation and maintenance management system provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0029] It should also be understood that the terms used in this specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the specification of the present invention and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0030] It should be further understood that the term "and / or" used in the present description and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.
[0031] See below Figure 1 , Figure 1 A flow chart of a charging pile intelligent operation and maintenance management method provided by an embodiment of the present invention specifically includes: steps S101 to S106.
[0032] S101, acquiring historical operation and maintenance data of a charging pile and rated information and / or preset information of the charging pile, and constructing a charging pile fault warning model based on the historical operation and maintenance data of the charging pile, rated information of the charging pile and / or preset information;
[0033] S102: acquiring operation and maintenance data of a target charging pile, and parsing the operation and maintenance data of the target charging pile according to preset parsing rules to obtain parsed data;
[0034] S103, inputting the analyzed data into the charging pile fault warning model to perform fault detection on the target charging pile;
[0035] S104, when a fault is detected in the target charging pile, obtaining fault information, and outputting a fault analysis and processing strategy according to the fault information;
[0036] S105: If the fault analysis and processing strategy fails to eliminate the fault, a maintenance work order is generated according to the fault information, and the maintenance work order is dispatched to a corresponding maintenance party;
[0037] S106: Obtain maintenance feedback corresponding to the maintenance work order, perform service evaluation on the maintenance party according to the maintenance feedback, and adjust the dispatching process of the maintenance work order based on the service evaluation.
[0038] In this embodiment, a charging pile fault warning model is first constructed through the historical operation and maintenance data of the charging pile. When the operation and maintenance data of the target charging pile is obtained, fault detection is performed through the charging pile warning model after parsing it. When a fault is detected, a corresponding processing strategy is provided according to the fault information, or a corresponding maintenance work order is generated according to the fault information, which is then dispatched to the maintenance party so that the maintenance party can troubleshoot the fault in time according to the maintenance work order. Subsequently, the user's maintenance feedback to the maintenance party can be received, thereby optimizing the dispatching process.
[0039] This embodiment provides a new intelligent operation and maintenance system for new energy vehicle charging stations, which captures and analyzes the fault data and charging data of charging piles in different scenarios and brands during operation, realizes real-time notification of charging pile faults, and provides accurate early warning of potential faults and safety risks. At the same time, it builds an online operation and maintenance system to provide efficient and fast fault resolution solutions, realizing a complete closed-loop platform system for fault discovery, analysis, and resolution. In particular, the method or system provided in this embodiment can be presented in the form of an application program or in the form of an APP applet. It should also be noted that the intelligent operation and maintenance management method for charging piles provided in this embodiment is also applicable to the field of security, for example, the vehicle status is judged through the charging data between the charging pile and the vehicle, and a warning notification is issued in a timely manner when it is determined that there is a safety risk in the vehicle status.
[0040] In one embodiment, the historical operation and maintenance data includes historical output data, historical operation data, historical temperature data, historical charging status data, and historical health status data;
[0041] The step S101 includes:
[0042] Constructing a first sub-fault warning model according to the deviation value between the historical output data and the rated information of the charging pile; wherein the historical output data includes historical output current data, historical output voltage data and historical output power data;
[0043] Constructing a second sub-fault warning model according to the historical operation data and the corresponding historical output data; wherein the historical operation data includes the operation time of the charging pile;
[0044] Construct a third sub - fault warning model based on the historical temperature data and preset information; wherein, the preset information includes temperature threshold information;
[0045] Construct a fourth sub - fault warning model based on the historical charging status data and preset information; wherein, the preset information includes charging status threshold information;
[0046] Construct a fifth sub - fault warning model based on the historical health status data; wherein, the historical health status data includes historical online data, historical usage data and historical fault data.
[0047] In this embodiment, different sub - fault warning models are constructed according to different types of historical operation and maintenance data, so as to conduct targeted fault detection and improve the accuracy of fault detection. Further, the constructed charging pile fault warning model can also be used to make a warning judgment on the vehicle status. For example, when it is judged through the charging pile data that the vehicle is in an over - charging state, a warning notice of potential fire and accident in the future of the vehicle can be issued. That is to say, the charging pile fault warning model provided in this embodiment is particularly applicable to the field of vehicle safety prevention.
[0048] Specifically, when constructing the first sub - fault warning model, through parameters such as the rated maximum output current, current, power of the charging pile; the demand current and voltage of the real - time reported BMS (Battery Management System); the actual output current, voltage, power, etc., calculate the deviation value between the demand output and the actual output, and the deviation value between the actual output and the rated maximum output, and construct the first sub - fault warning model:
[0049] (1) When a single - gun charging pile or a double - gun charging pile - with both guns charging simultaneously, the warning algorithm rules are as follows:
[0050] A) Group the charging current sequence number data;
[0051] B) Intercept the data range: greater than a (a is a preset value, such as 30, etc.) or the charging duration is greater than b minutes (b is a preset value, such as 5, etc.);
[0052] C) Reverse the BMS demand current and the actual output current, and obtain the single - strip data of the maximum BMS demand current;
[0053] D) The maximum actual output current / the maximum BMS demand current < 90% of the BMS demand current = 1 - time module warning;
[0054] E) The cumulative number of module warnings within N days > 5 (or other values, such as 6 or 11, etc.), issue a warning.
[0055] (2) When a double - gun charging pile - with a single gun charging, the warning algorithm rules are as follows:
[0056] A) Group the charging current sequence number data;
[0057] B) Intercept data range: greater than a number of a (a is a preset value, such as 30, etc.) or the charging duration is greater than b minutes (b is a preset value, such as 5, etc.);
[0058] C) Reverse the BMS required current and the actual output current, and obtain a single piece of data of the maximum BMS required current;
[0059] D) Maximum actual output current / (Is the maximum BMS required current < the maximum output current of a single gun? The maximum BMS required current: the total output power of a dual-gun charging pile) < 90% of the BMS required current = one-time module warning;
[0060] E) The cumulative number of module warnings within N days > 5, and the system issues a warning.
[0061] Here, the process of obtaining a single piece of data of the maximum BMS required current is as follows: First, group the charging current data and the charging current serial number, then judge whether the charging duration is greater than b minutes. If it is greater, reverse the BMS required current and the actual output current to obtain a single piece of data of the maximum BMS required current.
[0062] When constructing the second sub-fault warning model, judge whether the electricity meter of the charging pile is faulty by the running time of the charging pile, the current reported by the charging pile, and the voltage reported by the charging pile. For example, when the charging pile is in the charging operation, the charging duration is T, in a continuous time period T≥2 minutes, but the monitored current reported by the charging pile is 0 and the voltage reported by the charging pile is 0, and the charging pile is still in the charging operation state, at this time, trigger the warning of the charging pile electricity meter fault:
[0063] (T>2min && charging current == 0 && charging voltage == 0) = one-time electricity meter warning.
[0064] When constructing the third sub-fault warning model, judge whether there is a temperature anomaly in the charging pile by comparing the temperature data of the charging pile with the set temperature.
[0065] (1) The temperature at the air outlet of the charging pile > N (the maximum normal temperature, which can be dynamically set, unit: °C) = one-time warning of the air outlet temperature of the charging pile;
[0066] (2) The temperature of the charging gun head > N (the maximum normal temperature, which can be dynamically set, unit: °C) = one-time temperature of the gun head;
[0067] (3) The ambient temperature > N (the maximum normal temperature, which can be dynamically set, unit: °C) = one-time warning of the ambient temperature of the charging pile.
[0068] When constructing the fourth sub-fault warning model, when the vehicle SOC (charging state, remaining power) reaches M% (such as 90%) during charging, and the current and voltage of the charging pile exceed the warning value, trigger this warning:
[0069] Exceeding warning value = vehicle charging peak value (current, voltage) * M%, M% can be automatically calculated and adjusted according to different vehicle models.
[0070] When constructing the fifth sub-fault warning model, the online rate of the charging pile is analyzed according to the following formula:
[0071] Real-time online rate = 1-(offline charging pile line / total number of charging piles)
[0072] Online rate on day N = (online rate on the first day + online rate on the second day + ... + online rate on the Nth day) / N
[0073] The utilization rate of the charging pile is analyzed according to the following formula:
[0074] Real-time utilization rate = charging pile / total number of charging piles*100%
[0075] N-day usage rate = (first-day usage rate + second-day usage rate + ... + N-th-day usage rate) / N. The failure rate of the charging pile is analyzed according to the following formula:
[0076] Real-time failure rate = (number of faulty charging piles / total number of charging piles) * 100%
[0077] Failure rate on day N = (failure rate on the first day + failure rate on the second day + ... + failure rate on the Nth day) / N
[0078] The fifth sub-fault warning model is constructed by combining the online rate analysis, usage rate analysis and failure rate analysis.
[0079] In one embodiment, if Figure 2 As shown, the step S102 includes: steps S201 to S204.
[0080] S201, pre-acquire a plurality of different charging pile message rules to establish a message database;
[0081] S202, obtaining a target message corresponding to the target charging pile operation and maintenance data, and determining whether the number of characters in the target message meets a preset number of bytes;
[0082] S203: If it is determined that the number of characters in the target message meets the preset number of bytes, determining a target field in the target message based on a preset protocol document constraint;
[0083] S204: Check and match the target field based on the message database.
[0084] In this embodiment, by collecting the message rules of different charging pile brands on the market and the message rules of different versions of the same brand, a message database is established on the cloud server to adapt to the data collected by different charging piles. Then, the collected data is parsed, checked, matched, and screened through self-built parsing rules, so that the entire system can be widely used in different charging piles.
[0085] When parsing, this embodiment can first obtain the other party's IP and port number through the TCP / IP protocol, and then obtain the number of characters of the other party's fixed message for message matching, such as: the other party's message length is obtained to be 100 bytes. If the message length is not 100, it will not match and will not be processed. After matching, preparation for data parsing is performed, such as obtaining the template model library of the message, opening up reserved space in the memory to store preprocessed data, calling thread ready, etc. Then, the regional field is judged and stored in the database using the field rules constrained by the protocol document. If the constrained field identifier is ABC0123, the area represents the status of the electric pile, then the database is stored. If the constrained field identifier is ABC001, which is the fault alarm status of the electric pile, the database is stored, and the current thread is closed after the parsing is completed, and the memory is released to end the operation. When checking, the characters are checked through the protocol document, and if they meet the requirements, they are judged as valid data and calculated and processed. If the charging pile reports a long heartbeat connection, it is invalid data, because this information only corresponds to whether the device is online, and it does not belong to the calculation type, so there is no need to process the data, only respond to the reported heartbeat information. For example, if the charging pile reports that it is charging or the charging end instruction, then it is necessary to calculate the charging time and the end time. For example, by calculating the charging time, a 7-day peak fluctuation chart is given to the charging pile, so that the manager can more clearly know the peak power consumption of the charging pile. When pairing, the message can be paired through the protocol document constraints. If the regional character is not in the pairing area, it is regarded as invalid data.
[0086] In another embodiment, when acquiring the target charging pile operation and maintenance data, two methods, active collection and passive collection, can be used. Specifically, when using the active collection method, a smart operation and maintenance detection box hardware device can be used, set up on the network backbone node of the new energy charging station, and then the network interface is mirrored and diverted through the smart operation and maintenance detection box, and the network transmission data packet is captured and collected using the Socket communication protocol without affecting the transmission of the original data channel.
[0087] The packet capture method is:
[0088] (1) Data packet structure screening: capturing packets based on the hexadecimal data packet structure;
[0089] (2) Data packet content screening, the screening rule is to match the IP and port number of the charging pile data reporting server;
[0090] (3) Data correctness verification and judgment: Obtain the bytes in a specific area of the docking document through the message header and match them to the standard format of different pile brands to determine whether the captured data is accurate.
[0091] When passive collection is adopted, after reaching a cooperation agreement with the charging pile manufacturer, the two parties can develop and negotiate the contract for data encryption transmission. After the contract is completed, the two parties will call each other for joint debugging. The specific process is that the charging pile manufacturer actively uploads data for data reporting, decrypts and splits the reported data after obtaining it, matches the data according to the standards of the contract, logically determines which characters in which area belong to which type of data to store in the database, and which data needs to be calculated by the functions provided by the algorithm library and stored in the database. After the processing is completed, key messages are returned, such as: data reporting success, data processing success, illegal parameter data, blacklist users are prohibited from accessing, etc. In addition, after the corresponding service call is completed with the charging pile manufacturer, the basic version is iterated, and the offline charging pile is upgraded through remote or manual intervention. The upgraded charging pile has the ability to report data, or the charging pile forwards the required data through the charging pile station platform to achieve passive data acquisition. In this way, the data can be calculated more accurately and more detailed fault alarms can be predicted and notified.
[0092] Furthermore, AI processing of the collected data can display it to the site administrator more accurately and clearly, allowing the administrator to have a more thorough understanding of the site data, and open the data to third-party application companies for data docking services, providing data service customers.
[0093] In one embodiment, the step S104 includes:
[0094] Collect the fault types, troubleshooting methods and treatment methods of charging piles to establish a fault knowledge base;
[0095] Extracting fault keywords from the fault information, and performing precise retrieval or fuzzy retrieval on the fault knowledge base according to the fault keywords;
[0096] The result of the precise search is used as the fault analysis and processing strategy output of the fault information; or the result with the highest priority in the fuzzy search is selected as the fault analysis and processing strategy output of the fault information.
[0097] This embodiment constructs the fault knowledge base by collecting and establishing conventional, implicit and special charging pile fault types, troubleshooting methods and processing methods, and then can search in the fault knowledge base through fault keywords to obtain corresponding solutions. This embodiment provides two methods: precise retrieval and fuzzy retrieval. Among them, precise retrieval can provide accurate answers to fault processing methods, and fuzzy retrieval can display the answer summary in the order of fault frequency in the same type of fault phenomenon by adapting keywords, and the operator determines the fault and the processing method. At the same time, when there is no corresponding fault, a remote technical answer and a manual intervention button for assistance are provided. This embodiment enables the site operator to autonomously learn and troubleshoot charging pile faults through the establishment of a fault knowledge base. When encountering emergency or dangerous faults, it can autonomously solve and prevent the occurrence or expansion of faults in a timely manner.
[0098] In a specific embodiment, the fault knowledge base is constructed in the following manner, and its format is: fault description-judgment basis-specific fault cause analysis and processing method.
[0099] 1. Charging pile power failure stop - Charging pile power failure stop - (1) Check whether the power supply is normal, whether there is leakage or short circuit; (2) Restart the mainboard if it freezes;
[0100] 2. Fully charged - the charging pile receives a BST termination message from the vehicle. The reason is that the required SOC target value is reached - (1) The SOC value set by the vehicle is reached: ① Modify the charging stop SOC value of the vehicle; (2) Improper handling on the vehicle side, false alarm: Get the BMS message and feedback to the vehicle side; (3) Normal end: Stop charging and put the charging gun back to its original place;
[0101] 3. Reaching the total voltage - the charging pile receives the BST termination message from the vehicle side, and the reason is that the total voltage setting value has been reached - (1) Improper handling on the vehicle side, false alarm: obtain the BMS message and feedback to the vehicle side; (2) Normal settlement, stop charging, and put the charging gun back to its original place;
[0102] 4. Reaching the single cell voltage - the charging pile receives the BST termination message from the vehicle side. The reason is that the single cell voltage setting value is reached - (1) Improper handling on the vehicle side, false alarm: obtain the BMS message and feedback to the vehicle side; (2) Normal end, stop charging, and put the charging gun back to its original place;
[0103] 5. BST insulation failure - the reason for the BST termination received by the pile side from the vehicle side is insulation failure - comparative test, replace different piles and different vehicles for testing, and use megohmmeter test: the analysis conclusions may be as follows: (1) Insulation failure on the vehicle side, error report: analyze the megohmmeter test value and BMS message on the vehicle side; (2) Insulation failure on the pile side, error report: adjust the specific insulation problem line, or replace specific components;
[0104] 6. Output connector overheating - the reason why the charging pile receives the BST termination signal from the vehicle is that the output connector is overheated - use a thermometer to check the temperature of the charging gun seat: (1) The charging gun and the vehicle gun seat are in poor contact: ① reconfirm that the charging gun and the vehicle seat are connected normally; (2) The gun seat / internal metal is deformed, damaged, or abnormally protruded: ① replace / repair the charging gun head / gun seat; (3) The gun line is unqualified: temperature rise test and feedback to the supplier;
[0105] 7. BST components and output connectors are overheated. The reason why the charging station receives the BST termination signal from the vehicle is that the output connector is overheated. Use a thermometer to check the temperature of the charging gun seat during charging: (1) The charging gun and the vehicle gun seat are in poor contact: ① Confirm again that the charging gun and the vehicle seat are connected normally; (2) The gun seat / internal metal is deformed, damaged, or abnormally protrudes: ① Replace / repair the charging gun head / gun seat; (3) The gun line is unqualified: perform a temperature rise test and feedback to the supplier;
[0106] 8. The gun has been pulled out - the CC1 voltage is detected to be incorrect during charging under the old national standard - (1) Check whether the CC1 line of the charging pile is correctly connected and there is no poor contact; (2) The charging gun and the vehicle gun seat have poor contact: ① Confirm again that the charging gun and the vehicle seat are connected normally;
[0107] 9. BST battery pack overtemperature - the pile side receives the BST termination message from the vehicle side due to the battery pack overtemperature failure - ask professionals to check the vehicle's power battery charging abnormality, whether it is damaged, and repair or replace the power battery;
[0108] 10. BST high-voltage relay failure - the pile side receives the BST termination signal from the vehicle side due to high-voltage relay failure - ask professionals to check the vehicle's high-voltage relay;
[0109] 11. BST current is too large - the pile side receives the BST termination signal from the vehicle side. The reason is that the voltage detection failure of detection point 2 - please ask professionals to check the vehicle side;
[0110] 12. Abnormal BST voltage - the pile side receives the BST termination message from the vehicle side because the voltage detection failure at detection point 2 - ask a professional to check the vehicle side;
[0111] 13. Excessive power - the pile side receives the BST termination reason from the old national standard vehicle side, which is excessive power - please ask professionals to check the vehicle side;
[0112] 14. Manual stop - stop charging on the screen, end charging in the background - (1) Manually settle normally and put the charging gun back to its original position; (2) Actively stop charging in the background: Feedback platform to find the specific reason;
[0113] 15. BRO message (0x00) reception timeout - The charging side receives the BRO (0X00) message timeout - (1) The voltage of the A+ and A- auxiliary sources is abnormal: ① Replace the A+ and A- wires and reconnect them ② Switch the auxiliary source voltage and restart charging; (2) Communication message timeout: ① Check to ensure that S+ and S- are in good contact and are not parallel to the power line ② Check to confirm that the auxiliary source is outputting normally ③ Check to confirm that the content, format and cycle of the relevant messages are correct ④ Replace the S+ and S- wires with shielded wires;
[0114] 16. BST stop unknown fault - the pile side receives the BST termination reason from the vehicle side as other reasons - (1) obtain the BMS message and feedback the vehicle side technology; (2) check the vehicle side background charging data, analyze the reason for stopping charging based on the background data, and make improvements;
[0115] 17. Abnormal voltage of K1K2 - Before starting, the voltage outside the DC+-relay detected on the pile side is greater than >10V - (1) The K5 and K6 relays on the vehicle side are always in the closed state: ① Check the K5 and K6 on the vehicle side and repair them; (2) The DCbus wiring on the pile side is wrong: check and modify the wiring; (3) The dubus sampling is not calibrated: calibrate the sampling;
[0116] 18. Timeout in receiving the battery charging status message - Timeout in receiving the BCS message at the pile end - (1) Check whether the S+S- signal line is in poor contact; (2) Check whether the S+S- communication is interfered with (S+S- should not be wired in parallel with the power line). If necessary, replace S+S- with a shielded line; (3) Obtain the message and check whether the BCS message cycle at the vehicle end meets the protocol standard;
[0117] 19. Timeout in receiving battery charging demand message - Timeout in receiving BCL message at the pile end - (1) Check if the S+S- signal line is in poor contact; (2) Check if the S+S- communication is interfered with (S+S- should not be wired in parallel with the power line). If necessary, replace S+S- with a shielded line; (3) Obtain the message and check if the BCL message cycle at the vehicle end meets the protocol standard;
[0118] 20. No current shutdown / current too small - the output current detected on the charging pile side is less than the minimum current setting value - (1) (in charging parameter settings -> termination current, delay time). If this fault occurs, first check whether the setting value is correct; (2) Open the charging pile side door to check whether the charging module is outputting normally, check whether the charging module is faulty, and repair or replace it if necessary; (3) The pile side relay does not attract, check the specific reason why the pile side does not attract; (4) The vehicle side relay does not attract, check the specific reason why the vehicle side does not attract;
[0119] 21. Battery pack temperature is too high 2-The pile side detects that the "maximum power battery temperature" in the BSM message exceeds the "maximum allowable temperature" in the BCP message-(1) Get the message and compare whether the "maximum power battery temperature" in the BSM message exceeds the "maximum allowable temperature" in the BCP message to see if it is actually overheated; (2) Check on the vehicle side whether the battery is working abnormally, whether it is a false alarm or actual overheating;
[0120] 22. Single cell voltage is too high - the charging pile detects whether the "maximum single cell power battery voltage" in the BCS message exceeds the "maximum allowable charging voltage of the single cell power battery" in the BCP message - (1) Obtain the message and compare whether the "maximum single cell power battery voltage" in the BCS message exceeds the "maximum allowable charging voltage of the single cell power battery" in the BCP message; (2) Check on the vehicle side whether the battery is working abnormally, whether it is a false alarm or actual overvoltage;
[0121] 23. Receiving identification message timeout / connection failure, please check auxiliary source settings - timeout of receiving BRM message at the charging station - National standard: (1) A+, A- auxiliary source voltage is abnormal: ① Replace A+, A- wires and reconnect ② Switch auxiliary source voltage and restart charging; (2) Communication message timeout: ① Check to ensure that S+, S- are in good contact and not parallel to the power line ② Check to confirm that the auxiliary source is outputting normally ③ Check to confirm that the content, format and cycle of the relevant message are correct ④ Replace S+, S- wires with shielded wires; European, American and Japanese standards: (1) Check the charging data at the vehicle end background, analyze the reasons for stopping charging based on the background data, and make improvements;
[0122] 24. BCP communication message timeout - The pile end receives the BCP message timeout - (1) Check whether the S+S- signal line has poor contact; (2) Check whether the S+S- communication is interfered with (S+S- should not be wired in parallel with the power line). If necessary, replace S+S- with a shielded line; (3) Obtain the message and check whether the vehicle-end BCP message cycle meets the protocol standard;
[0123] 25. Reaching SOC value 2 - Detecting that the SOC is less than the SOC setting value for the pile-end stop - (1) The SOC value for the pile-end stop is incorrectly set: ① (in Charging Parameter Settings->Termination SOC, Delay Time) check and reset the value; (2) Normal stop charging: ① Check the SOC value for stopping charging on the vehicle side, modify or stop charging; (3) Battery SOC value sampling upload error: ① Check the actual voltage (SOC) of the current power battery ② Compare the uploaded values in the background charging records of the vehicle side and the pile side;
[0124] 26. Battery reverse connection - pre-charging stage, the pile detects that the voltage outside the relay is negative (less than -20V) before closing the relay - (1) Battery voltage problem on the vehicle side; (2) DCbus wiring error on the pile side: check and modify the wiring; (3) Dubus sampling is not calibrated: calibrate the sampling;
[0125] 27. Abnormal battery voltage - During the pre-charging stage, the pile detects that the voltage outside the relay does not match the BCS voltage before closing the relay - (1) Battery voltage on the vehicle side and sampling problem; (2) DCbus wiring error on the pile side: check and modify the wiring; (3) Dubus sampling is not calibrated: calibrate the sampling;
[0126] 28. BMS pre-charge voltage mismatch - During the pre-charge stage, the pile detects that the voltage outside the relay is not within the maximum and minimum voltage range of the pile side output before closing the relay - the battery voltage on the vehicle side does not match the output on the pile side;
[0127] 29. Pre-charge timeout - During the pre-charge stage, the pile will first output and raise the voltage to 5V lower than the battery voltage before closing the relay. The boost exceeds the protocol requirements - (1) Charging module problem: insufficient boost capacity, repair or replace the charging module if necessary; (2) DCbus wiring error on the pile side: check and modify the wiring; (3) Dubus sampling is not calibrated: calibrate the sampling;
[0128] 30. BRO error - the pile side received a BRO (0x00) message after receiving a BRO (0XAA) message - the vehicle side BMS disconnected the internal relay before the pile closed the output relay;
[0129] 31. Auxiliary source abnormality - Detection of auxiliary source output voltage lower than protocol requirements - (1) Auxiliary source input voltage abnormality: ① Check whether the auxiliary source input voltage is 12V / 24V, and ensure that the input voltage does not exceed the relay withstand voltage; (2) Auxiliary source output relay is damaged: ① Replace the auxiliary source output relay; (3) Auxiliary source control line is connected incorrectly: ① Confirm the reason for the control line connection error ② Reconnect the wires and restart the charging pile;
[0130] 32. Auxiliary source overvoltage - detect that the auxiliary source output voltage is higher than the protocol requirement - (1) Auxiliary source input voltage is abnormal: ① Check whether the auxiliary source input voltage is 12V / 24V, and ensure that the input voltage does not exceed the relay withstand voltage; (2) Auxiliary source output relay is damaged: ① Replace the auxiliary source output relay; (3) Auxiliary source control line is connected incorrectly: ① Confirm the reason for the control line connection error ② Reconnect the wires and restart the charging pile;
[0131] 33. Discharge circuit abnormality - the output voltage does not drop to the required value within the specified time - (1) Discharge circuit abnormality: For models without a discharge function, check whether the discharge circuit is normal; (2) Module discharge abnormality: For models with a discharge function, check whether the module address setting is normal;
[0132] 34. Excessive power - the output power exceeds the set maximum power - (1) The maximum power setting is incorrect; (2) The module output capacity exceeds the theoretical value;
[0133] 35. Output overvoltage - the output voltage exceeds the set maximum voltage - (1) The control board is not calibrated: calibrate the control board voltage; (2) The overvoltage value is set incorrectly: measure the actual value of the output DC voltage, compare the overvoltage parameter value in the background, and the maximum voltage of the module, and increase the overvoltage parameter value if necessary;
[0134] 36. Output undervoltage - the output voltage exceeds the set minimum voltage - (1) The control board is not calibrated: calibrate the control board voltage; (2) The undervoltage value is set incorrectly: measure the actual value of the output DC voltage, compare the undervoltage parameter value in the background, and the minimum voltage of the module, and reduce the undervoltage parameter value if necessary; (3) The sampling line is wrong: modify the wiring;
[0135] 37. Output overcurrent - output current exceeds BMS required current - (1) sampling line error: modify wiring; (2) module output current jump: feedback to supplier; (3) module communication protocol is incorrect, resulting in module current error: feedback to supplier;
[0136] 38. Output short circuit-DC output short circuit fault;
[0137] 39. Abnormal output current - Abnormal output current;
[0138] 40. Distribution unit over temperature - Distribution unit over temperature;
[0139] 41. AC contactor failure - The detection and control status of the AC contactor are inconsistent - (1) Wiring error: Check the feedback and control wiring, and modify the wiring; (2) AC contactor failure: Test whether the feedback is normal and whether it is normally attracted;
[0140] 42. Smoke alarm - (1) When the pile side collects smoke through the fault port and the fault state is faulty, the fault occurs; (2) When the pile side collects smoke through the fault port and the fault state is normal, the fault is cancelled;
[0141] 43. Abnormal measurement - the error between the meter measurement and the pile-side self-measurement exceeds 0.8kw.h, or the error is 8% - (1) The meter sampling line is connected incorrectly: modify the connection; (2) The shunt and meter models are inconsistent: replace the components;
[0142] 44. Abnormal output voltage - the meter voltage sampling value is inconsistent with the module voltage - (1) Module code error: modify the code; (2) Meter sampling line or module output line error: modify the wiring; (3) Module failure: replace the module;
[0143] 45. Address conflict - multi-gun charging control board address conflict - modify the charging control board pull code;
[0144] 46. Vehicle card mismatch - the VIN code bound to the charging card is inconsistent with the vehicle VIN code - (1) The bound VIN code and the charging card number are inconsistent: check the bound VIN code and the charging card number in the backend and modify the VIN; (2) Normal error: Replace the vehicle or charging card with a charging card number that matches the VIN code;
[0145] 47. Ground fault - ground wire not connected fault alarm - wiring error: modify the wiring;
[0146] 48. Vehicle request to pause - When receiving BSM message with SPN3090 - SPN3095 both as 00 (battery status normal) and SPN3096 as 00 (charging prohibited), the charger will suspend charging output for more than 10 minutes - ask professionals to check the vehicle side;
[0147] 49. Communication failure - (1) Integrated 4-gun model: Communication failure between the charging control board and the main board; (2) Integrated dual-gun model communication failure between the main board and the sub-board - (1) Wiring error: Modify the wiring; (2) Bus impedance mismatch: Modify the bus resistance; (3) Code pull error: Modify the code pull; (4) Main board damage: Use an oscilloscope to confirm the port voltage waveform and replace the main board;
[0148] 50. Meter failure - Meter communication timeout - (1) Communication line error: modify the wiring; (2) Meter manufacturer setting error: modify the setting;
[0149] 51. Insulation fault - positive pole - positive pole insulation fault (resistance less than 100O / V) - use megger to test, adjust the specific insulation problem circuit, or replace specific components;
[0150] 52. Insulation fault - negative pole - negative pole insulation fault (resistance less than 100O / V) - use megger to test, adjust the specific insulation problem circuit, or replace specific components
[0151] 53. Insulation module communication failure - Communication with external insulation module timed out - (1) Setting error, actual configuration without external insulation module: modify setting; (2) Insulation module communication line wiring error: modify wiring; (3) Insulation module communication bus impedance does not match: modify bus resistance;
[0152] 54. Insulation detection undervoltage - During insulation detection, the pile side module voltage boost timed out - module failure, no output: replace the module;
[0153] 55. Emergency stop - (1) When the pile side collects the emergency stop fault port and it is in fault state, the fault occurs; (2) When the pile side collects the emergency stop fault port and it is in normal state, the fault is cancelled - (1) Wiring error: modify the wiring; (2) Setting error: modify the setting; (3) Component failure: replace the component;
[0154] 56. Lightning arrester failure - (1) When the pile side collects the lightning arrester fault port and it is in fault state, the fault occurs; (2) When the pile side collects the lightning arrester fault port and it is in normal state, the fault is cancelled - (1) Wiring error: modify the wiring; (2) Setting error: modify the setting; (3) Component failure: replace the component;
[0155] 57. Output relay failure - the output contactor detection and control status are inconsistent, and there is no current output during charging - (1) Wiring error: modify the wiring; (2) The module has no output: modify the pull-out code and replace the module;
[0156] 58. Access control abnormality - (1) When the access control fault port on the pile side is in a fault state, the fault occurs; (2) When the access control fault port on the pile side is in a normal state, the fault is canceled - (1) Wiring error: modify the wiring; (2) Setting error: modify the setting; (3) Component failure: replace the component;
[0157] 59. Module communication abnormality - Communication with the charging module has timed out, or the charging module is in fault status - (1) Module fault: Replace the module or check the wiring according to the specific module fault code; (2) Charging module communication bus impedance does not match: Modify the bus resistance; (3) Module manufacturer setting error: Modify the setting;
[0158] 60. Power distribution positive relay failure - the contactor detection and control status are inconsistent, and there is no current output during charging - (1) Wiring error: modify the wiring; (2) Component failure: replace the component;
[0159] 61. Power distribution negative relay failure - the contactor detection and control status are inconsistent, and there is no current output during charging - (1) Wiring error: modify the wiring; (2) Component failure: replace the component;
[0160] 62. Power switching failure - timeout when switching from single mode to dual-gun mode, module discharge too slowly, or software problem - (1) Abnormal discharge circuit: For models without module discharge function, check whether the discharge circuit is normal; (2) Abnormal module discharge: For models with module discharge function, check whether the module address setting is normal;
[0161] 63. Abnormal SOC - the soc in the BMSbcs message during the charging phase is less than the soc in the BMSBCP message - improper handling on the vehicle side, false alarm: obtain the BMS message, feedback to the vehicle side or modify the pile side software;
[0162] 64. Chassis overheating - judged by the temperature acquisition probe built into the pile side cabinet, and an alarm is issued if the temperature is higher than the chassis overheating setting value - (1) Chassis temperature sampling is not calibrated: calibrate sampling; (2) The temperature does reach the overheating setting value: temperature rise test, feedback to the supplier; (3) The temperature probe is used incorrectly: replace the temperature probe;
[0163] 65. Charging gun overheating - judged by the built-in temperature acquisition probe of the charging gun, and an alarm is issued if the temperature is higher than the chassis overheat setting value - (1) The chassis temperature sampling is not calibrated: calibrate the sampling; (2) The temperature does reach the overheat setting value: temperature rise test, feedback to the supplier;
[0164] 66. Circuit breaker failure - the circuit breaker detection and control status are inconsistent, and there is no current output during charging - (1) Wiring error: modify the wiring; (2) Setting error: modify the setting; (3) Component failure: replace the component;
[0165] 67. Vehicle not ready
[0166] 68. Distribution relay failure - the contactor detection and control status are inconsistent, and there is no current output during charging - (1) Wiring error: modify the wiring; (2) Component failure: replace the component;
[0167] 69. Insufficient balance - Account balance has been used up - Normal end: remind the user to recharge;
[0168] 70. Reaching the set degree - reaching the set degree - normal end: reminding the user to draw the gun;
[0169] 71. Reaching the set time - reaching the set time - normal end: remind the user to draw the gun;
[0170] 72. Reaching the set amount - Reaching the set amount - Normal end: remind the user to draw the gun;
[0171] 73. End of the backend - Stop on the APP / WeChat - (1) Manually settle normally and put the charging gun back to its original position; (2) Actively stop charging on the backend: Feedback platform to find out the specific reason;
[0172] 74. TCU ends TCU ends actively - TCU ends actively. For specific problems, see the tcu event record;
[0173] 75. TCU startup completion response timeout - TCU startup completion response timeout - impedance mismatch: modify the bus resistance;
[0174] 76. TCU startup completion confirmation failed - TCU startup completion confirmation failed - impedance mismatch: modify the bus resistance;
[0175] 77. TCU communication timeout - TCU communication timeout - (1) Communication line error: modify the wiring; (2) Impedance mismatch: modify the bus resistance; (3) Gun type, address setting error: modify the setting; (4) Component failure: replace the component;
[0176] 78. TCU fault - TCU terminates automatically - TCU terminates automatically. For specific problems, see TCU event log.
[0177] 79. TCU charging controller failure - TCU active termination - TCU active termination, see TCU event record for specific problems;
[0178] 80. Parallel charging VIN mismatch - When charging two guns in parallel, the vin of the two guns is inconsistent - normal alarm: change the gun and restart;
[0179] 81. Abnormal parallel charging voltage - When charging two guns in parallel, the voltage of the two guns is inconsistent - Normal alarm: Change guns and restart
[0180] 82. BSM single cell is too high - the charging pile receives a BSM message from the vehicle side, indicating that the single power battery voltage is too high, and the charging is stopped for active protection - please ask a professional to check whether the power battery of the vehicle is abnormally charged, whether it is damaged, and repair or replace the power battery;
[0181] 83. BSM single cell is too low - the charging pile receives a BSM message from the vehicle side, indicating that the single power battery voltage is too low, and the charging is stopped for active protection - ask professionals to check whether the power battery of the vehicle is abnormally charged, whether it is damaged, and repair or replace the power battery;
[0182] 84. BSMsoc is too high - the SOC in the BSM message sent by the vehicle is too high, and the charging is stopped for active protection - please ask professionals to check whether the power battery of the vehicle is abnormally charged, whether it is damaged, and repair or replace the power battery;
[0183] 85. BSMsoc is too low - the charging pile receives a BSM message from the vehicle indicating that the SOC is too low, and the charging is stopped for active protection - please ask a professional to check if the power battery of the vehicle is abnormally charged, whether it is damaged, and repair or replace the power battery;
[0184] 86. BSM overcurrent - The charging pile receives an overcurrent message from the vehicle, and the charging is stopped for active protection - (1) The module output current jumps: feedback to the supplier; (2) Ask a professional to check the abnormal charging of the vehicle's power battery, whether it is damaged, and repair or replace the power battery;
[0185] 87. BSM overtemperature - the charging pile receives a BSM message from the vehicle indicating overtemperature, and automatically stops charging for protection - ask a professional to check if the vehicle's power battery is abnormally charged, whether it is damaged, and repair or replace the power battery;
[0186] 88. BSM insulation failure - the charging pile receives a BSM message from the vehicle indicating a battery insulation failure, and proactively stops charging for protection - comparative test, replace different charging piles and different vehicles for testing, and use a megohmmeter to test: The analysis conclusions may be as follows: (1) Insulation failure on the vehicle side, error report: analyze the megohmmeter test value and the BMS message sent by the vehicle side; (2) Insulation failure on the charging pile side, error report: adjust the specific insulation problem circuit, or replace specific components;
[0187] 89. Abnormal status of BSM output connector - The charging pile receives the output connector connection status in the BSM message sent by the vehicle, and actively stops charging. Use a thermometer to check the gun seat temperature during charging: (1) Poor contact between the charging gun and the vehicle gun seat: ① Confirm again that the charging gun and the vehicle seat are connected normally; (2) The gun seat / internal metal is deformed, damaged, or abnormally protruded: ① Replace / repair the charging gun head / gun seat; (3) The gun line is unqualified: Feedback to the supplier.
[0188] In one embodiment, the step S105 includes:
[0189] In response to a work order request from a user, generating the maintenance work order based on the fault information, and associating the maintenance work order with the station operator information and the station equipment information;
[0190] Selecting at least one candidate maintenance party matching the fault information according to the maintenance work order, and obtaining the working status of each candidate maintenance party;
[0191] If there is an idle candidate maintenance party, the idle candidate maintenance party is selected as the target maintenance party for dispatch processing;
[0192] If there is no candidate maintenance party in an idle state, the candidate maintenance party with the least number of current maintenance work orders is selected as the target maintenance party for dispatching work orders.
[0193] In this embodiment, when a user's order request is received, a corresponding maintenance work order can be generated for it, and the maintenance work order will directly and automatically associate the station operator information and station equipment information, where the station operator information includes corporate information, contact information, contract information, and charging station information; the station equipment information includes the number of charging piles, charging pile manufacturer information, charging pile type, charging pile serial number, charging pile system information, and charging pile historical fault problems. Through the above association method, a complete work order information can be established to quickly locate the multi-dimensional information of the charging station and the historical fault problems of the charging pile, improve the maintenance party's timely understanding of the station information and charging pile information, and greatly improve the efficiency of fault judgment, processing, and maintenance.
[0194] When dispatching work orders, maintenance personnel with different maintenance skills are automatically matched according to the corresponding fault description, and idle maintenance personnel are given priority for automatic dispatching, and dispatching work orders is combined with the work order type. Furthermore, for maintenance work orders with high priority, they can be dispatched expedited.
[0195] In one embodiment, the maintenance feedback includes a bad review rate and a return rate;
[0196] The step S106 includes:
[0197] Acquire rating attributes of different maintenance parties, and classify the ratings of the maintenance parties according to the rating attributes; wherein the rating attributes include skill attributes, regional attributes, and service attributes;
[0198] The rating of the corresponding maintenance party is adjusted according to the bad review rate and the return repair rate, and the maintenance work order is dispatched based on the maintenance party with the adjusted rating.
[0199] In this embodiment, the rating is performed according to the service attributes of the maintenance party. For example, maintenance parties with high service attributes are given priority in dispatching orders, and maintenance parties with low service attributes are correspondingly reduced in dispatching order. Service attributes may specifically include skill attributes, regional attributes, and service attributes. Among them, skill attributes: rating the maintenance skills of service providers, including module-specific maintenance, gun line maintenance, motherboard maintenance, and comprehensive maintenance; regional attributes: rating the service coverage, including district, county, city, and regional levels; service attributes: rating the output service and capability mirroring, and the system automatically selects the maintenance providers that have cooperated in multiple dimensions.
[0200] For example, when the rating attributes of a maintenance provider are: service delivery time <= 7 days, service price is 10%-50% lower than the market price, service warranty period >= 6 months, service attitude is calculated by the average of the comprehensive after-sales processing capabilities and maintenance professionalism of relevant peers, and the service provider's timely response speed is <= 24 hours, etc., then the rating of the maintenance provider can be improved.
[0201] In addition, this embodiment establishes a service quality monitoring system through the bad review rate and the return repair rate to dynamically adjust the rating classification of the maintenance party. For example, with respect to the bad review rate, if the bad review rate is higher than 5%, an early warning will be issued; if the bad review rate is higher than 10%, a penalty will be imposed; if the bad review rate is higher than 15%, the order will be controlled; if the bad review rate is higher than 20%, the cooperation will be terminated. With respect to the return repair rate, if the return repair rate is higher than 3%, an early warning will be issued; if the return repair rate is higher than 8%, a penalty will be imposed; if the return repair rate is higher than 10%, the order will be controlled; if the return repair rate is higher than 15%, the cooperation will be terminated. Of course, the bad review rate and the return repair rate can also be combined for early warning, penalty, order control, and termination of cooperation, or other evaluation methods can be used to monitor service quality.
[0202] Figure 3 A schematic block diagram of a charging pile intelligent operation and maintenance management system 300 provided in an embodiment of the present invention, the system 300 includes:
[0203] The model building unit 301 is used to obtain the historical operation and maintenance data of the charging pile and the rated information and / or preset information of the charging pile, and to build a charging pile fault warning model based on the historical operation and maintenance data of the charging pile, the rated information and / or preset information of the charging pile;
[0204] The parsing processing unit 302 is used to obtain the target charging pile operation and maintenance data for the target charging pile, and parse the target charging pile operation and maintenance data according to preset parsing rules to obtain parsed data;
[0205] A fault detection unit 303, used for inputting the analysis data into the charging pile fault warning model to perform fault detection on the target charging pile;
[0206] The strategy output unit 304 is used to obtain fault information when a fault is detected in the target charging pile, and output a fault analysis and processing strategy according to the fault information;
[0207] A work order generating unit 305 is used to generate a maintenance work order according to the fault information if the fault analysis and processing strategy fails to eliminate the fault, and dispatch the maintenance work order to a corresponding maintenance party;
[0208] The service feedback unit 306 is used to obtain the maintenance feedback corresponding to the maintenance work order, to perform service evaluation on the maintenance party according to the maintenance feedback, and to adjust the dispatching process of the maintenance work order based on the service evaluation.
[0209] In one embodiment, the historical operation and maintenance data includes historical output data, historical operation data, historical temperature data, historical charging status data, and historical health status data;
[0210] The model building unit 301 includes:
[0211] A first sub-construction unit is used to construct a first sub-fault warning model according to the deviation value between the historical output data and the rated information of the charging pile; wherein the historical output data includes historical output current data, historical output voltage data and historical output power data;
[0212] A second sub-construction unit is used to construct a second sub-fault warning model according to the historical operation data and the corresponding historical output data; wherein the historical operation data includes the operation time of the charging pile;
[0213] A third sub-construction unit is used to construct a third sub-fault warning model according to the historical temperature data and preset information; wherein the preset information includes temperature threshold information;
[0214] A fourth sub-construction unit, configured to construct a fourth sub-fault warning model according to the historical charging state data and preset information; wherein the preset information includes charging state threshold information;
[0215] The fifth sub-construction unit is used to construct a fifth sub-fault warning model according to the historical health status data; wherein the historical health status data includes historical online data, historical usage data and historical fault data.
[0216] In one embodiment, if Figure 4 As shown, the parsing processing unit 302 includes:
[0217] A database establishment unit 401 is used to pre-acquire a variety of different charging pile message rules to establish a message database;
[0218] The character number judgment unit 402 is used to obtain the target message corresponding to the target charging pile operation and maintenance data, and judge whether the number of characters in the target message meets the preset number of bytes;
[0219] A field determination unit 403, configured to determine a target field in the target message based on a preset protocol document constraint if it is determined that the number of characters in the target message meets a preset number of bytes;
[0220] The checking and matching unit 404 is used to check and match the target field based on the message database.
[0221] In one embodiment, the policy output unit 304 includes:
[0222] A knowledge base building unit is used to collect the fault types, troubleshooting methods and treatment methods of the charging piles, so as to build a fault knowledge base;
[0223] A keyword retrieval unit, used to extract fault keywords from the fault information, and perform precise retrieval or fuzzy retrieval on the fault knowledge base according to the fault keywords;
[0224] The result output unit is used to output the result of the precise search as the fault analysis and processing strategy of the fault information; or select the result with the highest priority in the fuzzy search as the fault analysis and processing strategy of the fault information.
[0225] In one embodiment, the work order generating unit 305 includes:
[0226] A work order associating unit, configured to generate the maintenance work order based on the fault information in response to a work order placing request from a user, and associate the maintenance work order with the station operator information and the station equipment information;
[0227] a state acquisition unit, configured to select at least one candidate maintenance party matching the fault information according to the maintenance work order, and acquire a working state of each of the candidate maintenance parties;
[0228] A first dispatching unit, configured to select an idle candidate maintenance party as a target maintenance party for dispatching if there is an idle candidate maintenance party;
[0229] The second dispatching unit is used to select the candidate maintenance party with the least number of current maintenance work orders as the target maintenance party for dispatching if there is no candidate maintenance party in an idle state.
[0230] In one embodiment, the maintenance feedback includes a bad review rate and a return rate;
[0231] The service feedback unit 306 includes:
[0232] An attribute rating unit, used to obtain rating attributes of different maintenance parties, and to rate and classify each maintenance party according to the rating attributes; wherein the rating attributes include skill attributes, regional attributes, and service attributes;
[0233] The rating adjustment unit is used to adjust the rating of the corresponding maintenance party according to the bad rating rate and the return repair rate, and to dispatch the maintenance work order based on the maintenance party with the adjusted rating.
[0234] In one embodiment, the fifth sub-building unit comprises:
[0235] The online rate analysis unit is used to perform online rate analysis on the charging pile according to the following formula:
[0236] Real-time online rate = 1-(offline charging pile line / total number of charging piles)
[0237] Online rate on day N = (online rate on the first day + online rate on the second day + ... + online rate on the Nth day) / N
[0238] The usage rate analysis unit is used to analyze the usage rate of the charging pile according to the following formula:
[0239] Real-time utilization rate = charging pile / total number of charging piles*100%
[0240] N-day usage rate = (first-day usage rate + second-day usage rate + ... + N-th-day usage rate) / N Failure rate analysis unit, used to perform failure rate analysis on the charging pile according to the following formula:
[0241] Real-time failure rate = (number of faulty charging piles / total number of charging piles) * 100%
[0242] Failure rate on day N = (failure rate on the first day + failure rate on the second day + ... + failure rate on the Nth day) / N
[0243] A combination construction unit is used to combine the online rate analysis, the usage rate analysis and the failure rate analysis to construct the fifth sub-fault warning model.
[0244] Since the embodiments of the system part correspond to the embodiments of the method part, please refer to the description of the embodiments of the method part for the embodiments of the system part, which will not be repeated here.
[0245] The embodiment of the present invention further provides a computer-readable storage medium on which a computer program is stored, and when the computer program is executed, the steps provided in the above embodiment can be implemented. The storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0246] The embodiment of the present invention also provides a computer device, which may include a memory and a processor, wherein a computer program is stored in the memory, and when the processor calls the computer program in the memory, the steps provided in the above embodiment may be implemented. Of course, the computer device may also include various network interfaces, power supplies and other components.
[0247] The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the various embodiments can be referred to each other. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of this application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of this application.
[0248] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprises", "comprising" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprising a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
Claims
1. A charging pile intelligent operation and maintenance management method, characterized in that: include: Acquire historical operation and maintenance data of the charging pile and rated information and / or preset information of the charging pile, and construct a charging pile fault warning model based on the historical operation and maintenance data of the charging pile, rated information of the charging pile and / or preset information; the historical operation and maintenance data includes historical output data, historical operation data, historical temperature data, historical charging status data and historical health status data; For a target charging pile, obtaining operation and maintenance data of the target charging pile, and parsing and processing the operation and maintenance data of the target charging pile according to a preset parsing rule to obtain parsed data; Inputting the analyzed data into the charging pile fault warning model to perform fault detection on the target charging pile; When a fault is detected in the target charging pile, the fault information is obtained, and a fault analysis and processing strategy is output according to the fault information; If the fault analysis and processing strategy fails to eliminate the fault, a maintenance work order is generated according to the fault information, and the maintenance work order is dispatched to the corresponding maintenance party; Obtaining maintenance feedback corresponding to the maintenance work order, so as to evaluate the service of the maintenance party according to the maintenance feedback, and adjusting the dispatching process of the maintenance work order based on the service evaluation; The acquiring of the charging pile historical operation and maintenance data and the charging pile rated information and / or preset information, and building a charging pile fault warning model based on the charging pile historical operation and maintenance data, the charging pile rated information and / or preset information, includes: Constructing a first sub-fault warning model according to the deviation value between the historical output data and the rated information of the charging pile; wherein the historical output data includes historical output current data, historical output voltage data and historical output power data; Constructing a second sub-fault warning model according to the historical operation data and the corresponding historical output data; wherein the historical operation data includes the operation time of the charging pile; Constructing a third sub-fault warning model according to the historical temperature data and preset information; wherein the preset information includes temperature threshold information; Constructing a fourth sub-fault warning model according to the historical charging state data and preset information; wherein the preset information includes charging state threshold information; Constructing a fifth sub-fault warning model according to the historical health status data; wherein the historical health status data includes historical online data, historical usage data and historical fault data; When a fault is detected in the target charging pile, the fault information is obtained, and a fault analysis and processing strategy is output according to the fault information, including: Collect the fault types, troubleshooting methods and treatment methods of charging piles to establish a fault knowledge base; Extracting fault keywords from the fault information, and performing precise retrieval or fuzzy retrieval on the fault knowledge base according to the fault keywords; Output the result of the precise search as the fault analysis and processing strategy of the fault information; or select the result with the highest priority in the fuzzy search as the fault analysis and processing strategy of the fault information; When building the first sub - fault warning model, through parameters such as the rated maximum output current, current, and power of the charging pile; the BMS required current and voltage reported in real - time; the actual output current, voltage, and power, etc., calculate the deviation value between the required output and the actual output, and the deviation value between the actual output and the rated maximum output, and build the first sub - fault warning model: When a single - gun charging pile or a double - gun charging pile - with both guns charging simultaneously, the warning algorithm rules are as follows: Intercept the charging current serial number grouped data; the intercepted data range is: greater than the preset value a pieces or the charging duration is greater than the preset value b minutes; Reverse the BMS required current and the actual output current to obtain a single piece of data of the maximum BMS required current; Maximum actual output current / maximum BMS required current < 90% of BMS required current = 1 - time module warning; If the cumulative number of module warnings within N days > 5, issue a warning; When a double - gun charging pile - with a single gun charging, the warning algorithm rules are as follows: Intercept the charging current serial number grouped data; the intercepted data range is: greater than the preset value a pieces or the charging duration is greater than the preset value b minutes; Reverse the BMS required current and the actual output current to obtain a single piece of data of the maximum BMS required current; Maximum actual output current / (maximum BMS required current < single - gun maximum output current? maximum BMS required current : total output power of the double - gun charging pile) < 90% of BMS required current = 1 - time module warning; If the cumulative number of module warnings within N days > 5, issue a warning; The construction of the fifth sub - fault warning model according to the historical health status data includes: Perform an online rate analysis on the charging pile according to the following formula: Real - time online rate = 1 - (number of offline charging pile lines / total number of charging piles) N - day online rate = (first - day online rate + second - day online rate +... + N - th - day online rate) / N Perform a utilization rate analysis on the charging pile according to the following formula: Real - time utilization rate = (number of charging charging piles / total number of charging piles) * 100% N - day utilization rate = (first - day utilization rate + second - day utilization rate +... + N - th - day utilization rate) / N Perform a failure rate analysis on the charging pile according to the following formula: Real - time failure rate = (number of faulty charging piles / total number of charging piles) * 100% N - day failure rate = (first - day failure rate + second - day failure rate +... + N - th - day failure rate) / N Combine the online rate analysis, utilization rate analysis, and failure rate analysis to build the fifth sub - fault warning model.
2. The charging pile intelligent operation and maintenance management method according to claim 1 is characterized in that: For the target charging pile, obtain the operation and maintenance data of the target charging pile, and perform parsing and processing on the operation and maintenance data of the target charging pile through preset parsing rules to obtain parsed data, including: Pre - obtain various different charging pile message rules, and establish a message database based on this; Obtain the target message corresponding to the operation and maintenance data of the target charging pile, and determine whether the character count of the target message meets the preset byte count; If it is determined that the character count of the target message meets the preset byte count, determine the target fields in the target message based on the constraints of the preset protocol document; Perform a check and match on the target fields based on the message database.
3. The charging pile intelligent operation and maintenance management method according to claim 1 is characterized in that: If the fault analysis and processing strategy fails to eliminate the fault, a maintenance work order is generated according to the fault information, and the maintenance work order is dispatched to a corresponding maintenance party, including: In response to a work order request from a user, generating the maintenance work order based on the fault information, and associating the maintenance work order with the station operator information and the station equipment information; Selecting at least one candidate maintenance party matching the fault information according to the maintenance work order, and obtaining the working status of each candidate maintenance party; If there is an idle candidate maintenance party, the idle candidate maintenance party is selected as the target maintenance party for dispatch processing; If there is no candidate maintenance party in an idle state, the candidate maintenance party with the least number of current maintenance work orders is selected as the target maintenance party for dispatching work orders.
4. The charging pile intelligent operation and maintenance management method according to claim 1, characterized in that: The maintenance feedback includes the negative review rate and the return repair rate; The obtaining of maintenance feedback corresponding to the maintenance work order, performing a service evaluation on the maintenance party according to the maintenance feedback, and adjusting the dispatching process of the maintenance work order based on the service evaluation, includes: Acquire rating attributes of different maintenance parties, and classify the ratings of the maintenance parties according to the rating attributes; wherein the rating attributes include skill attributes, regional attributes, and service attributes; The rating of the corresponding maintenance party is adjusted according to the bad review rate and the return repair rate, and the maintenance work order is dispatched based on the maintenance party with the adjusted rating.
5. A charging pile intelligent operation and maintenance management system, characterized in that: include: A model building unit, used to obtain historical operation and maintenance data of the charging pile and rated information and / or preset information of the charging pile, and build a charging pile fault warning model based on the historical operation and maintenance data of the charging pile, the rated information of the charging pile and / or preset information; the historical operation and maintenance data includes historical output data, historical operation data, historical temperature data, historical charging status data and historical health status data; The parsing and processing unit is used to obtain the target charging pile operation and maintenance data for the target charging pile, and parse the target charging pile operation and maintenance data according to preset parsing rules to obtain parsed data; A fault detection unit, used for inputting the analysis data into the charging pile fault warning model to perform fault detection on the target charging pile; A strategy output unit, used to obtain fault information when a fault is detected in the target charging pile, and output a fault analysis and processing strategy according to the fault information; A work order generating unit, configured to generate a maintenance work order according to the fault information if the fault analysis and processing strategy fails to eliminate the fault, and dispatch the maintenance work order to a corresponding maintenance party; A service feedback unit, used to obtain maintenance feedback corresponding to the maintenance work order, to perform service evaluation on the maintenance party according to the maintenance feedback, and to adjust the dispatching process of the maintenance work order based on the service evaluation; The model building unit comprises: A first sub-construction unit is used to construct a first sub-fault warning model according to the deviation value between the historical output data and the rated information of the charging pile; wherein the historical output data includes historical output current data, historical output voltage data and historical output power data; When constructing the first sub-fault warning model, based on the rated maximum output current, current, and power of the charging pile; the real-time reported BMS required current and voltage; the actual output current, voltage, and power and other parameters, calculate the deviation value between the required output and the actual output, and the deviation value between the actual output and the rated maximum output, and construct the first sub-fault warning model: When a single-gun charging pile or a double-gun charging pile - both guns are charging simultaneously, the warning algorithm rules are as follows: Intercept the charging current serial number grouped data; the intercepted data range is: greater than the preset value a or the charging duration is greater than the preset value b minutes; Reverse the BMS required current and the actual output current, and obtain a single piece of data of the maximum BMS required current; Maximum actual output current / maximum BMS required current < 90% of BMS required current = 1 time of module warning; If the cumulative number of module warnings within N days > 5, issue a warning; When a double-gun charging pile - single gun is charging, the warning algorithm rules are as follows: Intercept the charging current serial number grouped data; the intercepted data range is: greater than the preset value a or the charging duration is greater than the preset value b minutes; Reverse the BMS required current and the actual output current, and obtain a single piece of data of the maximum BMS required current; Maximum actual output current / (maximum BMS required current < single-gun maximum output current? maximum BMS required current : total output power of the double-gun charging pile) < 90% of BMS required current = 1 time of module warning; If the cumulative number of module warnings within N days > 5, issue a warning; The second sub-construction unit is used to construct the second sub-fault warning model according to the historical operation data and the corresponding historical output data; wherein, the historical operation data includes the charging pile operation time; The third sub-construction unit is used to construct the third sub-fault warning model according to the historical temperature data and the preset information; wherein, the preset information includes temperature threshold information; The fourth sub-construction unit is used to construct the fourth sub-fault warning model according to the historical charging status data and the preset information; wherein, the preset information includes charging status threshold information; The fifth sub-construction unit is used to construct the fifth sub-fault warning model according to the historical health status data; wherein, the historical health status data includes historical online data, historical usage data, and historical fault data; The fifth sub-construction unit includes: The online rate analysis unit is used to analyze the online rate of the charging pile according to the following formula: Real-time online rate = 1 - (number of offline charging pile lines / total number of charging piles) N-day online rate = (first-day online rate + second-day online rate +... + N-day online rate) / N The usage rate analysis unit is used to analyze the usage rate of the charging pile according to the following formula: Real-time usage rate = number of charging charging piles / total number of charging piles * 100% N-day usage rate = (first-day usage rate + second-day usage rate +... + N-day usage rate) / N The failure rate analysis unit is used to analyze the failure rate of the charging pile according to the following formula: Real-time failure rate = (number of faulty charging piles / total number of charging piles) * 100% N-day failure rate = (first-day failure rate + second-day failure rate +... + N-day failure rate) / N A combination construction unit, used for combining the online rate analysis, the usage rate analysis and the failure rate analysis to construct the fifth sub-fault warning model; The strategy output unit includes: A knowledge base building unit is used to collect the fault types, troubleshooting methods and treatment methods of the charging piles, so as to build a fault knowledge base; A keyword retrieval unit, used to extract fault keywords from the fault information, and perform precise retrieval or fuzzy retrieval on the fault knowledge base according to the fault keywords; The result output unit is used to output the result of the precise search as the fault analysis and processing strategy of the fault information; or select the result with the highest priority in the fuzzy search as the fault analysis and processing strategy of the fault information.
6. A computer device, characterized in that: It includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the intelligent operation and maintenance management method of the charging pile as described in any one of claims 1 to 4.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by the processor, the charging pile intelligent operation and maintenance management method according to any one of claims 1 to 4 is implemented.