A method for expediting the process in workflow

By obtaining the circulation time of the to-do process and the preset reminder instruction level matrix, real-time monitoring and timely warning of business processes are achieved, which solves the problem of work delay caused by long processes or multi-role participation, improves work efficiency and reduces operation and maintenance costs. cost.

CN117151614BActive Publication Date: 2024-10-11HUANENG INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310863388.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-13
Publication Date
2024-10-11
Estimated Expiration
2043-07-13

AI Technical Summary

Technical Problem

In a business process system, when a long process or multiple roles are involved, delays in user work will delay the work of other users and reduce work efficiency.

Method used

By obtaining the circulation time of the to-do process, setting different reminder processes, timely warning of work processes that are about to be overdue, and urging the overdue to-do processes, using the preset reminder instruction level matrix to establish a multi-faceted reminder system, to achieve Real-time monitoring and timely warning, and dynamically set reminder plans.

Benefits of technology

It improves process processing efficiency in workflow, reduces operation and maintenance costs, and enhances expediting efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117151614B_ABST
    Figure CN117151614B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of process urging, and in particular to a method for urging processes in a workflow. It includes: obtaining the process to be urged according to the workflow parameters; obtaining the urging node according to the parameters of the process to be urged, setting the urging instruction according to the urging node and the process to be urged; setting the monitoring time node according to the urging instruction, obtaining the feedback instruction according to the monitoring time node, and correcting the urging instruction according to the feedback instruction. By obtaining the flow time of the pending process, setting different urging processes, timely warning of the workflow that is about to be overdue, and urging the pending processes that have been overdue, the process processing efficiency in the workflow is improved, and a multi-dimensional urging system is established by presetting the urging instruction level matrix to achieve real-time monitoring and timely warning of the process in the workflow. At the same time, the urging plan is dynamically set according to the urgency of the process, reducing the operation and maintenance cost and improving the urging efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of process expediting, and in particular to a method for expediting a process in a workflow. Background Art

[0002] With the improvement of office automation level, people have put forward higher requirements for convenient office. In order to simplify the process of work handover between units and improve work efficiency, various departments in the enterprise hope to establish a unified office system and share a set of data resource libraries, so as to save work connection, optimize office processes, simplify office operations and improve work efficiency.

[0003] However, in a business process system, when the business process is long or involves many roles, it is inevitable that the work of other users will be delayed due to the delay of one user, which reduces the efficiency of work. Summary of the invention

[0004] The purpose of this application is: to solve the above-mentioned technical problems, this application provides a method for urging the process in a workflow, aiming to achieve real-time monitoring and timely warning of the workflow, and improve work efficiency.

[0005] In some embodiments of the present application, by obtaining the flow time of pending processes, different processes that need to be expedited are set, timely warnings are given to workflows that are about to be overdue, and pending processes that have already been overdue are urged, thereby improving the process processing efficiency in the workflow.

[0006] In some embodiments of the present application, a multi-dimensional urging system is established by presetting a urging instruction level matrix to achieve real-time monitoring and timely warning of processes in the workflow. At the same time, urging plans are dynamically set according to the urgency of the process, thereby reducing operation and maintenance costs and improving urging efficiency.

[0007] In some embodiments of the present application, a method for expediting a process in a workflow is provided, including:

[0008] Get the process that needs to be expedited based on workflow parameters;

[0009] Acquire the urging node according to the parameters of the process to be urging, and set the urging instruction according to the urging node and the process to be urging;

[0010] A monitoring time node is set according to the urging instruction, a feedback instruction is obtained according to the monitoring time node, and the urging instruction is modified according to the feedback instruction.

[0011] In some embodiments of the present application, the process of obtaining the process to be expedited according to the workflow parameters includes:

[0012] Get all pending processes based on workflow parameters;

[0013] Obtain the nodes to be transferred and the preset transfer time axis of the to-do process

[0014] Obtain the current transfer node and the real-time transfer time a1 of the to-do process;

[0015] Generate a preset transfer time a2 according to the current transfer node of the to-do process and the preset transfer time axis;

[0016] Set the to-do process type according to the real-time transfer time a1 and the preset transfer time a2;

[0017] Preset the first-level process to be reminded, the second-level process to be reminded, and the third-level process to be reminded;

[0018] If a1 < a2, generate a transfer time difference Δa according to a1 and a2, and set the to-do process type according to the transfer time difference Δa;

[0019] If a1 ≥ a2, set the to-do process as the third-level process to be reminded.

[0020] In some embodiments of the present application, when setting the to-do process type according to the transfer time difference Δa, it includes:

[0021] Preset a first transfer time difference A1 and a second transfer time difference A2, and A1 < A2;

[0022] If A1 > Δa, set the to-do process as the second-level process to be reminded;

[0023] If A1 < Δa < A2, set the to-do process as the first-level process to be reminded;

[0024] If A2 < Δa, do not set the reminder level of the to-do process.

[0025] In some embodiments of the present application, when obtaining the reminder node according to the reminder process parameter, it includes:

[0026] Obtain the task transfer branch of the process to be reminded, and obtain the reminder node according to the task transfer branch;

[0027] Generate a reminder instruction according to the reminder process level, and set the number of reminder instructions according to the number m of reminder nodes.

[0028] In some embodiments of the present application, when generating a reminder instruction according to the reminder process level, it includes:

[0029] Preset a reminder instruction level matrix B, and set B(B1, B2, B3), where B1 is the preset first-level reminder instruction, B2 is the preset second-level reminder instruction, and B3 is the preset third-level reminder instruction;

[0030] If the process to be expedited is a first-level process to be expedited, a first-level expediting instruction B1 is generated;

[0031] If the process to be expedited is a secondary process to be expedited, a secondary expediting instruction B2 is generated;

[0032] If the process requiring urging is a level three urging process, a level three urging instruction B3 is generated.

[0033] In some embodiments of the present application, the step of setting the monitoring time node according to the urging instruction includes:

[0034] The preset monitoring time interval matrix T is set as T(T1, T2, T3), where T1 is the preset first monitoring time interval, T2 is the preset second monitoring time interval, T3 is the preset third monitoring time interval, and T1 <T2<T3;

[0035] Obtaining a urging instruction b for a process to be urging, setting a real-time monitoring time interval t according to the urging instruction b, and setting a monitoring time node according to the real-time monitoring time interval t;

[0036] If the reminder instruction b is a first-level reminder instruction B1, set the real-time monitoring time interval t to the preset third monitoring time interval T3, ie t = T3;

[0037] If the reminder instruction b is a secondary reminder instruction B2, set the real-time monitoring time interval t to the preset second monitoring time interval T2, ie t = T2;

[0038] If the urging instruction b is a third-level urging instruction B3, the real-time monitoring time interval t is set to the preset first monitoring time interval T1, that is, t=T1.

[0039] In some embodiments of the present application, when the monitoring time node is set according to the urging instruction, it also includes:

[0040] Get the number of nodes m in the process to be urged, and set the time interval correction coefficient n to correct the real-time monitoring time interval t according to the number of nodes m;

[0041] The preset number of nodes for urging the processing is a matrix M, set M(m1,m2,m3), where m1 is the preset number of nodes for urging the processing first, m2 is the preset number of nodes for urging the processing second, m3 is the preset number of nodes for urging the processing third, and m1 <m2<m3;

[0042] The preset time interval correction coefficient matrix N is set to N(n1,n2,n3), where n1 is the preset first time interval correction coefficient, n2 is the preset second time interval correction coefficient, n3 is the preset third time interval correction coefficient, and n1 <n2<n3<1;

[0043] If the number of urged nodes is m=m1, set the time interval correction coefficient n=n1, and the real-time monitoring time interval after correction is t=n1*Ti, (i=1,2,3);

[0044] If the number of urged nodes is m=m2, set the time interval correction coefficient n=n2, and the real-time monitoring time interval after correction is t=n2*Ti, (i=1,2,3);

[0045] If the number of urged nodes is m=m3, set the time interval correction coefficient n=n3. After correction, the real-time monitoring time interval is t=n3*Ti, (i=1,2,3).

[0046] In some embodiments of the present application, when obtaining a feedback instruction according to the monitoring time node, it includes:

[0047] Obtaining the task processing status of all expedited nodes according to the monitoring time node;

[0048] Generate feedback instructions based on the number m of nodes to be urged in the process and the task processing status;

[0049] If m=1;

[0050] When the task processing status is completed, generating a first-level feedback instruction;

[0051] When the task processing status is incomplete, generating a secondary feedback instruction;

[0052] If m≠1, set the unfinished node threshold;

[0053] Get the number of nodes M1 whose task processing status is unfinished;

[0054] If M1 is less than the unfinished node threshold, a secondary feedback instruction is generated;

[0055] If M1 is greater than the unfinished node threshold, a third-level feedback instruction is generated.

[0056] In some embodiments of the present application, when the urging instruction is modified according to the feedback instruction, it includes:

[0057] Obtain feedback instructions for the current monitoring node of the process that needs to be expedited;

[0058] If it is a secondary feedback instruction, obtain the previous urging instruction of the process to be expedited, and set the current urging instruction based on the previous urging instruction;

[0059] When the previous urging instruction is a first-level urging instruction, set the current urging instruction to a second-level urging instruction;

[0060] When the previous urging instruction is a level 2 urging instruction, set the current urging instruction to a level 3 urging instruction;

[0061] When the last urging instruction is a level three urging instruction, the current urging instruction is set as a level three urging instruction, the last monitoring time interval t1 is obtained, and the real-time monitoring time interval t=e1*t1 is set, where e1 is a compensation coefficient, e1<1.

[0062] In some embodiments of the present application, when the urging instruction is modified according to the feedback instruction, the process further includes:

[0063] Obtain feedback instructions for the current monitoring node of the process that needs to be expedited;

[0064] If it is a third-level feedback instruction, obtain the previous urging instruction of the process to be expedited, and set the current urging instruction based on the previous urging instruction;

[0065] When the previous urging instruction is a first-level urging instruction, set the current urging instruction to a third-level urging instruction;

[0066] When the last urging instruction is a second-level urging instruction, set the current urging instruction to a third-level urging instruction, obtain the last monitoring time interval t1, and set the real-time monitoring time interval t=e1*t1, where e1 is the compensation coefficient, e1<1;

[0067] When the last urging instruction is a level 3 urging instruction, set the current urging instruction as a level 3 urging instruction, obtain the last monitoring time interval t1, and set the real-time monitoring time interval t=e2*t1, where e2 is the compensation coefficient, e2 <e1<1。

[0068] Compared with the prior art, the method for urging the processing of a process in a workflow in the embodiment of the present application has the following beneficial effects:

[0069] By obtaining the turnover time of pending processes, setting different processes that need to be expedited, timely warnings can be issued for workflows that are about to be overdue, and expediting pending processes that have already been overdue can be issued, thereby improving the process processing efficiency in the workflow.

[0070] By presetting a matrix of urging instruction levels and establishing a diversified urging system, real-time monitoring and timely warning of processes in the workflow can be achieved. At the same time, urging plans can be dynamically set according to the urgency of the process to reduce operation and maintenance costs and improve urging efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 It is a flowchart of a method for urging the processing of a process in a workflow in a preferred embodiment of the present application. DETAILED DESCRIPTION

[0072] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0073] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0074] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0075] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0076] like Figure 1 As shown, a method for urging the processing of a process in a workflow according to a preferred embodiment of the present application includes:

[0077] S101: Obtain the process to be expedited according to the workflow parameters;

[0078] S102: Obtaining a urging node according to the parameters of the process to be urging, and setting an urging instruction according to the urging node and the process to be urging;

[0079] S103: Setting a monitoring time node according to the urging instruction, obtaining a feedback instruction according to the monitoring time node, and modifying the urging instruction according to the feedback instruction.

[0080] Specifically, when obtaining the process that needs to be expedited according to the workflow parameters, it includes:

[0081] Get all pending processes based on workflow parameters;

[0082] Get the required flow nodes and preset flow timeline of the pending process

[0083] Get the current flow node and real-time flow time a1 of the pending process;

[0084] Generate a preset transfer time a2 according to the current transfer node and preset transfer timeline of the to-do process;

[0085] Set the type of to-do process according to the real-time transfer time a1 and the preset transfer time a2;

[0086] Preset the first-level process to be reminded, the second-level process to be reminded, and the third-level process to be reminded;

[0087] If a1 < a2, generate a transfer time difference Δa according to a1 and a2, and set the type of to-do process according to the transfer time difference Δa;

[0088] If a1 ≥ a2, set the to-do process as a third-level process to be reminded.

[0089] Specifically, when setting the type of to-do process according to the transfer time difference Δa, it includes:

[0090] Preset a first transfer time difference A1 and a second transfer time difference A2, and A1 < A2;

[0091] If A1 > Δa, set the to-do process as a second-level process to be reminded;

[0092] If A1 < Δa < A2, set the to-do process as a first-level process to be reminded;

[0093] If A2 < Δa, do not set the reminder level of the to-do process.

[0094] Specifically, according to its importance, the third-level process to be reminded is superior to the second-level process to be reminded, which is superior to the first-level process to be reminded;

[0095] Specifically, the third-level process to be reminded is a process that has expired, and the first-level process to be reminded and the second-level process to be reminded are unexpired processes.

[0096] It can be understood that in the above embodiments, by obtaining the transfer time of the to-do process, setting different processes to be reminded, warning the upcoming overdue workflow in a timely manner, and reminding the overdue to-do process, the process handling efficiency in the workflow is improved.

[0097] In the preferred embodiment of the present application, when obtaining the reminder node according to the reminder process parameter, it includes:

[0098] Obtain the task transfer branch of the process to be reminded, and obtain the reminder node according to the task transfer branch;

[0099] Generate a reminder instruction according to the reminder process level, and set the number of reminder instructions according to the number m of reminder nodes.

[0100] Specifically, when generating a reminder instruction according to the reminder process level, it includes:

[0101] The preset expediting instruction level matrix B is set to B(B1, B2, B3), where B1 is the preset first-level expediting instruction, B2 is the preset second-level expediting instruction, and B3 is the preset third-level expediting instruction;

[0102] If the process to be expedited is a first-level process to be expedited, a first-level expediting instruction B1 is generated;

[0103] If the process to be expedited is a secondary process to be expedited, a secondary expediting instruction B2 is generated;

[0104] If the process requiring urging is a level three urging process, a level three urging instruction B3 is generated.

[0105] Specifically, the first-level urging instruction means that the current task to be urged is within the processing period and there is sufficient processing time, and a reminder can be made through a system short message. The second-level urging instruction means that the current task to be urged is within the processing period but the remaining processing time is short and needs to be processed immediately. A reminder is made through a system short message and email. The third-level urging instruction means that the current task to be urged is overdue and has affected the work of the next flow node. It needs to be processed immediately, and a reminder is made through a system short message, email and SMS.

[0106] Specifically, system short messages, emails and text messages are sent to the mobile terminals of the processing personnel.

[0107] It can be understood that in the above embodiment, by presetting the urging instruction level matrix, a multi-dimensional urging system is established to achieve real-time monitoring and timely warning of the processes in the workflow. At the same time, the urging plan is dynamically set according to the urgency of the process, thereby reducing operation and maintenance costs and improving urging efficiency.

[0108] In a preferred embodiment of the present application, when setting a monitoring time node according to an urging instruction, it includes:

[0109] The preset monitoring time interval matrix T is set as T(T1, T2, T3), where T1 is the preset first monitoring time interval, T2 is the preset second monitoring time interval, T3 is the preset third monitoring time interval, and T1 <T2<T3;

[0110] Obtain the urging instruction b of the process to be expedited, set the real-time monitoring time interval t according to the urging instruction b, and set the monitoring time node according to the real-time monitoring time interval t;

[0111] If the reminder instruction b is a first-level reminder instruction B1, set the real-time monitoring time interval t to the preset third monitoring time interval T3, ie t = T3;

[0112] If the reminder instruction b is a secondary reminder instruction B2, set the real-time monitoring time interval t to the preset second monitoring time interval T2, ie t = T2;

[0113] If the urging instruction b is a third-level urging instruction B3, the real-time monitoring time interval t is set to the preset first monitoring time interval T1, that is, t=T1.

[0114] Specifically, when setting monitoring time nodes according to urging instructions, it also includes:

[0115] Obtain the number of nodes m in the process that needs to be urged, and set the time interval correction coefficient n to correct the real-time monitoring time interval t according to the number of nodes m;

[0116] The preset number of nodes for urging the processing is a matrix M, set M(m1,m2,m3), where m1 is the preset number of nodes for urging the processing first, m2 is the preset number of nodes for urging the processing second, m3 is the preset number of nodes for urging the processing third, and m1 <m2<m3;

[0117] The preset time interval correction coefficient matrix N is set to N(n1,n2,n3), where n1 is the preset first time interval correction coefficient, n2 is the preset second time interval correction coefficient, n3 is the preset third time interval correction coefficient, and n1 <n2<n3<1;

[0118] If the number of urged nodes is m=m1, set the time interval correction coefficient n=n1, and the real-time monitoring time interval after correction is t=n1*Ti, (i=1,2,3);

[0119] If the number of urged nodes is m=m2, set the time interval correction coefficient n=n2, and the real-time monitoring time interval after correction is t=n2*Ti, (i=1,2,3);

[0120] If the number of urged nodes is m=m3, set the time interval correction coefficient n=n3. After correction, the real-time monitoring time interval is t=n3*Ti, (i=1,2,3).

[0121] It can be understood that in the above embodiment, by setting the monitoring time interval matrix and the time interval correction coefficient matrix, different feedback cycles are established according to different urging instructions, and the urging process is cyclically monitored and urged until the process is completed, so as to avoid the overall work efficiency being reduced due to the delay of a single node in the process.

[0122] In a preferred embodiment of the present application, when obtaining a feedback instruction according to a monitoring time node, it includes:

[0123] Obtain the task processing status of all expedited nodes according to the monitoring time node;

[0124] Generate feedback instructions based on the number m of nodes to be urged in the process and the task processing status;

[0125] If m=1;

[0126] When the task processing status is completed, a first-level feedback instruction is generated;

[0127] When the task processing status is unfinished, a secondary feedback instruction is generated;

[0128] If m≠1, set the unfinished node threshold;

[0129] Get the number of nodes M1 whose task processing status is unfinished;

[0130] If M1 is less than the unfinished node threshold, a secondary feedback instruction is generated;

[0131] If M1 is greater than the unfinished node threshold, a third-level feedback instruction is generated.

[0132] Specifically, when a reminder task requires multiple nodes to process, if one or several nodes complete the processing, the remaining unprocessed nodes will automatically enter the overdue state and be reminded to process, thereby improving the processing efficiency of the process and avoiding the reduction of the overall work efficiency of the process due to the non-processing of a single node.

[0133] Specifically, the first-level feedback instruction is an end instruction, which means that the task in the process that needs to be urged has been completed at the current urging node and can enter the next node.

[0134] Specifically, when revising the expediting instruction based on the feedback instruction, it includes:

[0135] Obtain feedback instructions for the current monitoring node of the process that needs to be expedited;

[0136] If it is a secondary feedback instruction, obtain the previous urging instruction of the process to be expedited, and set the current urging instruction based on the previous urging instruction;

[0137] When the previous urging instruction is a first-level urging instruction, set the current urging instruction to a second-level urging instruction;

[0138] When the previous urging instruction is a level 2 urging instruction, set the current urging instruction to a level 3 urging instruction;

[0139] When the last urging instruction is a level three urging instruction, the current urging instruction is set as a level three urging instruction, the last monitoring time interval t1 is obtained, and the real-time monitoring time interval t=e1*t1 is set, where e1 is a compensation coefficient, e1<1.

[0140] Obtain feedback instructions for the current monitoring node of the process that needs to be expedited;

[0141] If it is a third-level feedback instruction, obtain the previous urging instruction of the process to be expedited, and set the current urging instruction based on the previous urging instruction;

[0142] When the previous urging instruction is a first-level urging instruction, set the current urging instruction to a third-level urging instruction;

[0143] When the last urging instruction is a second-level urging instruction, set the current urging instruction to a third-level urging instruction, obtain the last monitoring time interval t1, and set the real-time monitoring time interval t=e1*t1, where m1 is the compensation coefficient, e1<1;

[0144] When the last urging instruction is a level 3 urging instruction, set the current urging instruction as a level 3 urging instruction, obtain the last monitoring time interval t1, and set the real-time monitoring time interval t=e2*t1, where e2 is the compensation coefficient, e2 <e1<1。

[0145] It can be understood that in the above embodiment, the urging instructions are dynamically adjusted according to the feedback instructions obtained according to the monitoring time node, and the urging cycle is adjusted through the compensation coefficient to improve the urging efficiency and ensure the overall work efficiency in the workflow.

[0146] According to the first concept of this application, by obtaining the flow time of pending processes, setting different processes that need to be urged, timely warning of workflows that are about to be overdue, and urging pending processes that have been overdue, the process processing efficiency in the workflow is improved.

[0147] According to the second concept of the present application, a multi-dimensional urging system is established by presetting a urging instruction level matrix to achieve real-time monitoring and timely warning of the processes in the workflow. At the same time, the urging plan is dynamically set according to the urgency of the process, thereby reducing operation and maintenance costs and improving urging efficiency.

[0148] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A method for reminding of processes in a workflow, characterized in that, it includes: Obtaining the processes to be reminded according to the workflow parameters; Obtaining the reminder nodes according to the parameters of the processes to be reminded, and setting reminder instructions according to the reminder nodes and the processes to be reminded; Setting the monitoring time nodes according to the reminder instructions, obtaining feedback instructions according to the monitoring time nodes, and correcting the reminder instructions according to the feedback instructions; When obtaining the processes to be reminded according to the workflow parameters, it includes: Obtaining all the to-be-done processes according to the workflow parameters; Obtaining the nodes to be transferred and the preset transfer time axis of the to-be-done processes Obtaining the current transfer node and the real-time transfer time a1 of the to-be-done process; Generating a preset transfer time a2 according to the current transfer node and the preset transfer time axis of the to-be-done process; Setting the type of the to-be-done process according to the real-time transfer time a1 and the preset transfer time a2; Presetting the first-level processes to be reminded, the second-level processes to be reminded, and the third-level processes to be reminded; If a1 < a2, generating a transfer time difference Δa according to a1 and a2, and setting the type of the to-be-done process according to the transfer time difference Δa; If a1 ≥ a2, setting the to-be-done process as the third-level process to be reminded; When setting the type of the to-be-done process according to the transfer time difference Δa, it includes: Presetting a first transfer time difference A1 and a second transfer time difference A2, and A1 < A2; If A1 > Δa, setting the to-be-done process as the second-level process to be reminded; If A1 < Δa < A2, setting the to-be-done process as the first-level process to be reminded; If A2 < Δa, not setting the reminder level of the to-be-done process; When obtaining the reminder nodes according to the parameters of the processes to be reminded, it includes: Obtaining the task transfer branches of the processes to be reminded, and obtaining the reminder nodes according to the task transfer branches; Generating reminder instructions according to the level of the processes to be reminded, and setting the number of reminder instructions according to the number m of the reminder nodes; When generating reminder instructions according to the level of the processes to be reminded, it includes: Presetting a reminder instruction level matrix B, setting B(B1, B2, B3), where B1 is the preset first-level reminder instruction, B2 is the preset second-level reminder instruction, and B3 is the preset third-level reminder instruction; If the process to be reminded is the first-level process to be reminded, generating the first-level reminder instruction B1; If the process to be reminded is the second-level process to be reminded, generating the second-level reminder instruction B2; If the process to be reminded is the third-level process to be reminded, generating the third-level reminder instruction B3; When setting the monitoring time nodes according to the reminder instructions, it includes: Presetting a monitoring time interval matrix T, setting T(T1, T2, T3), where T1 is the preset first monitoring time interval, T2 is the preset second monitoring time interval, T3 is the preset third monitoring time interval, and T1 < T2 < T3; Obtaining the reminder instruction b of the process to be reminded, setting the real-time monitoring time interval t according to the reminder instruction b, and setting the monitoring time nodes according to the real-time monitoring time interval t; If the reminder instruction b is the first-level reminder instruction B1, setting the real-time monitoring time interval t as the preset third monitoring time interval T3, that is, t = T3; If the reminder instruction b is a secondary reminder instruction B2, set the real-time monitoring time interval t to the preset second monitoring time interval T2, ie t = T2; If the urging instruction b is a third-level urging instruction B3, the real-time monitoring time interval t is set to the preset first monitoring time interval T1, that is, t=T1; When the monitoring time node is set according to the urging instruction, it also includes: Get the number of nodes m in the process to be urged, and set the time interval correction coefficient n to correct the real-time monitoring time interval t according to the number of nodes m; The preset number of nodes for urging the processing is a matrix M, set M(m1,m2,m3), where m1 is the preset number of nodes for urging the processing first, m2 is the preset number of nodes for urging the processing second, m3 is the preset number of nodes for urging the processing third, and m1 <m2<m3; The preset time interval correction coefficient matrix N is set to N(n1,n2,n3), where n1 is the preset first time interval correction coefficient, n2 is the preset second time interval correction coefficient, n3 is the preset third time interval correction coefficient, and n1 <n2<n3<1; If the number of urged nodes is m=m1, set the time interval correction coefficient n=n1, and the real-time monitoring time interval after correction is t=n1*Ti, (i=1,2,3); If the number of urged nodes is m=m2, set the time interval correction coefficient n=n2, and the real-time monitoring time interval after correction is t=n2*Ti, (i=1,2,3); If the number of urged nodes is m=m3, set the time interval correction coefficient n=n3, and the real-time monitoring time interval after correction is t=n3*Ti, (i=1,2,3); When obtaining the feedback instruction according to the monitoring time node, it includes: Obtaining the task processing status of all expedited nodes according to the monitoring time node; Generate feedback instructions based on the number m of nodes to be urged in the process and the task processing status; If m=1; When the task processing status is completed, generating a first-level feedback instruction; When the task processing status is incomplete, generating a secondary feedback instruction; If m≠1, set the unfinished node threshold; Get the number of nodes M1 whose task processing status is unfinished; If M1 is less than the unfinished node threshold, a secondary feedback instruction is generated; If M1 is greater than the unfinished node threshold, a third-level feedback instruction is generated.

2. The method for expediting a process in a workflow as claimed in claim 1, It is characterized in that When the urging instruction is modified according to the feedback instruction, it includes: Obtain feedback instructions for the current monitoring node of the process that needs to be expedited; If it is a secondary feedback instruction, obtain the previous urging instruction of the process to be expedited, and set the current urging instruction based on the previous urging instruction; When the previous urging instruction is a first-level urging instruction, set the current urging instruction to a second-level urging instruction; When the previous urging instruction is a level 2 urging instruction, set the current urging instruction to a level 3 urging instruction; When the last urging instruction is a level three urging instruction, the current urging instruction is set as a level three urging instruction, the last monitoring time interval t1 is obtained, and the real-time monitoring time interval t=e1*t1 is set, where e1 is a compensation coefficient, e1<1.

3. The method for expediting a process in a workflow as claimed in claim 2, It is characterized in that When the urging instruction is modified according to the feedback instruction, the method further includes: Obtain feedback instructions for the current monitoring node of the process that needs to be expedited; If it is a third-level feedback instruction, obtain the previous urging instruction of the process to be expedited, and set the current urging instruction based on the previous urging instruction; When the previous urging instruction is a first-level urging instruction, set the current urging instruction to a third-level urging instruction; When the last urging instruction is a second-level urging instruction, set the current urging instruction to a third-level urging instruction, obtain the last monitoring time interval t1, and set the real-time monitoring time interval t=e1*t1, where e1 is the compensation coefficient, e1<1; When the last urging instruction is a level 3 urging instruction, set the current urging instruction as a level 3 urging instruction, obtain the last monitoring time interval t1, and set the real-time monitoring time interval t=e2*t1, where e2 is the compensation coefficient, e2 <e1<1。