Coal mine goaf backfilling system and control methods for coal mine goaf backfilling system
The coal mine goaf backfilling system, designed with coal gangue degradation units and plant root entanglement, solves the problems of coal gangue accumulation and ground subsidence, achieves efficient degradation and water resource utilization, and improves the safety and economy of the backfilling system.
Patent Information
- Application Number
- CN202310940656.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-28
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-07-28
AI Technical Summary
Coal gangue accumulation and ground subsidence in mining areas caused by coal mining have a serious impact on the environment. Existing backfilling technologies cannot take into account the overall, long-term, economic and ecological aspects.
By employing a coal gangue degradation unit, a water infiltration component, and a control terminal system, and through communication connections between a water infiltration control valve, a pore pressure sensor, and a signal transmitter and receiver controller, combined with plant root entanglement and a water storage layer design, the system achieves coal gangue degradation and efficient utilization of water resources, while reducing the risk of surface cracking.
It improves the degradation efficiency of coal gangue, enhances the safety and reliability of the backfill system, reduces the risk of environmental pollution, and improves the utilization rate of water resources and the economic value of the backfill cover layer.
Smart Images

Figure CN117211789B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of land management technology in mining areas, and more specifically, to a coal mine goaf backfilling system and a control method for the coal mine goaf backfilling system. Background Technology
[0002] Although many new energy sources are gradually emerging, coal remains my country's primary energy source, requiring the extraction and consumption of large quantities of coal annually. With societal progress and increasingly sophisticated coal mine exploration and mining technologies, more and more coal mines are being discovered and put into operation. As the scope of coal mining expands, the hazards associated with it are becoming increasingly apparent, such as coal gangue accumulation, ground subsidence in mined-out areas, and ecological problems surrounding coal mines. If these issues are not addressed promptly, they will significantly impact the environment around coal mines. Therefore, backfilling of open-pit coal mines must consider overall, long-term, economic, and ecological factors, paying particular attention to the potential impact on the surrounding ecological environment. Summary of the Invention
[0003] The purpose of this application is to provide a coal mine goaf backfilling system and a control method for the coal mine goaf backfilling system, addressing at least one of the technical problems mentioned in the background art.
[0004] To achieve the above objectives, this application adopts the following technical solution:
[0005] One aspect of this application provides a coal mine goaf backfilling system, including a seepage component, a control terminal, and a degradation unit. The degradation unit includes a coal gangue layer, a buffer layer, and a waterproof layer laid sequentially from bottom to top, as well as a pore pressure sensor and a signal transmission and reception controller. The buffer layer includes a coal gangue degradation agent. Both the pore pressure sensor and the signal transmission and reception controller are installed within the buffer layer.
[0006] The water-permeable assembly includes a first water-permeable element and a water-permeable control valve. The water-proof layer and the buffer layer are connected through the first water-permeable element. The water-permeable control valve is installed on the first water-permeable element. The signal transmitting and receiving controller is communicatively connected to the control terminal, the pore pressure sensor, and the water-permeable control valve.
[0007] Optionally, the coal mine goaf backfilling system provided in this application further includes a water storage layer and a vegetation layer. The water storage layer is laid above the degradation unit, and the vegetation layer is laid above the water storage layer. The vegetation layer is used to plant multiple plants, and the roots of each plant are intertwined in the vegetation layer.
[0008] The beneficial effects of this technical solution are: it allows the roots of each plant to intertwine, improving the erosion resistance of the shallow layer and reducing the risk of surface cracking; the water storage layer is placed below the vegetation layer, preferably composed of sand and gravel, and its main function is to purify and collect excess irrigation water and natural precipitation, improving the utilization rate of water resources, while also supporting the weight of the upper part.
[0009] Optionally, the coal mine goaf backfilling system provided in this application further includes a second water infiltration element, wherein a unidirectional geomembrane is laid between the vegetation layer and the water storage layer, the unidirectional geomembrane is used to supply water from the water storage layer into the vegetation layer, the second water infiltration element passes through the unidirectional geomembrane in the vertical direction, and the second water infiltration element connects the vegetation layer and the water storage layer.
[0010] The beneficial effect of this technical solution is that the unidirectional geomembrane transports water from the water storage layer to the vegetation layer, preventing a large amount of water loss from the vegetation layer and providing water for plant growth.
[0011] Optionally, the second infiltration element is funnel-shaped, with the larger diameter end of the second infiltration element located inside the vegetation layer and the smaller diameter end located inside the water storage layer.
[0012] The beneficial effects of this technical solution are as follows: the second infiltration element collects excess irrigation water and natural precipitation, which is then transported to the lower water storage layer and sent to the buffer layer through the first infiltration element. After dissolving the coal gangue degradation agent, the water flows into the coal gangue layer.
[0013] Optionally, the coal mine goaf backfilling system provided in this application includes multiple degradation units, each of which is arranged in a vertical direction.
[0014] The beneficial effects of this technical solution are as follows: If the single-layer coal gangue is too thick, the coal gangue degradation agent solution will take a long time to penetrate to the bottom of the coal gangue layer, reducing the degradation efficiency. Alternatively, the coal gangue that has already been degraded in the upper part may block the continued penetration of the coal gangue degradation agent, making it difficult for the lower part of the coal gangue layer to continue degrading, resulting in an unsatisfactory degradation effect. In this embodiment, the degradation unit is multiple, so there are also multiple coal gangue layers. Each coal gangue layer will not be too thick, which facilitates the separate degradation of each coal gangue layer, improves the degradation efficiency of the coal gangue layer, and makes the degradation effect of the coal gangue layer more ideal.
[0015] Optionally, the first seepage component includes a funnel-shaped collection section and a plurality of connecting pipes. The funnel-shaped collection section is disposed in the water-proof layer of the uppermost degradation unit. Each of the connecting pipes is connected to the buffer layer of each degradation unit. The seepage assembly includes a plurality of the first seepage components and a plurality of seepage control valves. Each of the connecting pipes is equipped with a seepage control valve.
[0016] The beneficial effects of this technical solution are as follows: Each buffer layer is equipped with a dedicated connecting pipe, and each connecting pipe is controlled by a corresponding seepage control valve. This facilitates the separate control of the water injection volume of each buffer layer according to the site conditions, improves the flexibility of the coal mine goaf backfilling system control, facilitates the precise control of the water injection volume of each buffer layer, makes the bottom surface less prone to collapse during the water injection process, and improves the reliability of the coal mine goaf backfilling system.
[0017] Optionally, the degradation unit further includes a plurality of coal gangue degradation monitors, each of which is installed in a corresponding coal gangue layer.
[0018] The beneficial effects of this technical solution are as follows: the coal gangue degradation monitor is placed in the coal gangue layer, and the content of the products after coal gangue degradation is determined by atomic absorption spectrometry, thereby monitoring the degree of coal gangue degradation and sending the monitoring data to the control terminal. The control terminal analyzes the data, and if the degree of degradation is poor, it controls the pipeline switch controller to open the wide-mouth water collector to increase the seepage of water into the buffer layer and accelerate the dissolution of the degradation agent.
[0019] Optionally, the seepage control valve includes a drainage baffle, a connecting rod, and a motor. The seepage control valve is located at the bottom end of the connecting pipe, the motor is installed in the connecting pipe, the drainage baffle is circular, the drainage baffle is disposed inside the connecting pipe, and the diameter of the drainage baffle corresponds to the inner diameter of the connecting pipe; or, the seepage control valve is a solenoid valve.
[0020] Another aspect of this application provides a control method for a coal mine goaf backfilling system, implemented using the coal mine goaf backfilling system provided in this application, the method comprising:
[0021] During the continuous release of water into the buffer layer, it is determined in real time whether the coal gangue layer currently meets the preset balance condition. If so, a stop water release signal is generated.
[0022] Output the stop water discharge signal to stop water discharge into the buffer layer.
[0023] Optionally, during the continuous water release into the buffer layer, it is determined in real time whether the coal gangue layer currently meets the preset equilibrium condition. If so, a stop water release signal is generated, including:
[0024] During the continuous water release into the buffer layer, the current water pressure value in the buffer layer is collected in real time by the pore pressure sensor. It is then determined whether twice the water pressure value is equal to the pre-acquired overburden load value of the coal gangue layer. If so, a stop water release signal is generated.
[0025] And / or,
[0026] During the continuous release of water into the buffer layer, the settlement of the coal gangue layer is periodically measured; it is determined whether the current settlement is less than or equal to the settlement threshold, and if so, a stop water release signal is generated.
[0027] The technical solution provided in this application can achieve the following beneficial effects:
[0028] The coal mine goaf backfilling system and control method provided in this application, when in use, dissolve the coal gangue degrading agent in the buffer layer by releasing water into it. The coal gangue degrading agent gradually enters the coal gangue layer and degrades the coal gangue, transforming it into lumps of soil. This alleviates the environmental pollution caused by coal gangue accumulation. Simultaneously, since the signal transmitting and receiving controller is communicatively connected to the control terminal, the pore pressure sensor, and the seepage control valve, the opening and closing of the seepage control valve can be controlled based on the water pressure value in the buffer layer. This makes it less likely for the bottom surface to collapse during the process of releasing water into the buffer layer, thus making the application of the coal mine goaf backfilling system safer.
[0029] The additional technical features and advantages of this application will become more apparent from the following description or from practical application. Attached Figure Description
[0030] To more clearly illustrate the technical solutions of the specific embodiments of this application, the accompanying drawings used in the description of the specific embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0031] Figure 1 This is a partial structural schematic diagram of one embodiment of the coal mine goaf backfilling system provided in this application, wherein the ellipsis represents at least one degradation unit not shown;
[0032] Figure 2 A partial structural schematic diagram of one embodiment of the coal mine goaf backfilling system provided in this application;
[0033] Figure 3 A partial structural schematic diagram of one embodiment of the coal mine goaf backfilling system provided in this application;
[0034] Figure 4 A partial structural schematic diagram of one embodiment of the coal mine goaf backfilling system provided in this application;
[0035] Figure 5 A partial structural schematic diagram of one embodiment of the seepage control valve provided in this application;
[0036] Figure 6 A flowchart illustrating one implementation of the coal mine goaf backfilling system control method provided in this application embodiment;
[0037] Figure 7 This is a flowchart illustrating another implementation of the coal mine goaf backfilling system control method provided in the embodiments of this application.
[0038] Figure label:
[0039] 1-Plants; 2-Vegetation layer;
[0040] 3-Water storage layer; 4-Water-proof layer;
[0041] 5-Buffer layer; 6-Coal gangue layer;
[0042] 7-Control terminal; 8-One-way geomembrane;
[0043] 9-Second seepage element; 10-Pore pressure sensor;
[0044] 11-Line; 12-Leakage control valve;
[0045] 13-Funnel-shaped collecting section; 14-Communicating tube;
[0046] 15-First seepage component; 16-Coal gangue degradation monitor;
[0047] 17-Drainage baffle; 18-Connecting rod;
[0048] 19-Motor; 20-Signal transmitter / receiver controller. Detailed Implementation
[0049] The technical solutions of this application will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0050] In the description of this application, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0051] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection between two components. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances.
[0052] like Figures 1 to 5 As shown, one aspect of this application provides a coal mine goaf backfilling system, including a seepage component, a control terminal 7, and a degradation unit. The degradation unit includes a coal gangue layer 6, a buffer layer 5, and a water-proof layer 4 laid sequentially from bottom to top, as well as a pore pressure sensor 10 and a signal transmission and reception controller 20. The buffer layer 5 includes a coal gangue degradation agent. The pore pressure sensor 10 and the signal transmission and reception controller 20 are both installed within the buffer layer 5.
[0053] The seepage assembly includes a first seepage element 15 and a seepage control valve 12. The water-proof layer 4 and the buffer layer 5 are connected through the first seepage element 15. The seepage control valve 12 is installed on the first seepage element 15. The signal transmission and reception controller 20 is communicatively connected to the control terminal 7, the pore pressure sensor 10, and the seepage control valve 12. The signal transmission and reception controller 20 and the seepage control valve 12 are connected via line 11.
[0054] The coal mine backfilling system provided in this application embodiment can be powered by solar energy or by underground thermal energy. The coal gangue degrading agent is mainly composed of anaerobic microorganisms, and the seepage water mainly utilizes the coal mine drainage water. After the seepage water dissolves the coal gangue degrading agent, it decomposes the coal gangue and transforms it into boulders and soil.
[0055] The coal mine goaf backfilling system provided in this application, when in use, dissolves the coal gangue degrading agent in the buffer layer 5 by releasing water into the buffer layer 5. The coal gangue degrading agent gradually enters the coal gangue layer 6 and degrades the coal gangue, turning it into lumps of soil. This alleviates the environmental pollution caused by coal gangue accumulation. At the same time, since the signal transmitting and receiving controller 20 is communicatively connected to the control terminal 7, the pore pressure sensor 10, and the seepage control valve 12, the opening and closing of the seepage control valve 12 can be controlled according to the water pressure value in the buffer layer 5. This makes it less likely for the bottom surface to collapse during the process of releasing water into the buffer layer 5, making the application of the coal mine goaf backfilling system safer.
[0056] Optionally, the coal mine goaf backfilling system provided in this application embodiment further includes a water storage layer 3 and a vegetation layer 2. The water storage layer 3 is laid above the degradation unit, and the vegetation layer 2 is laid above the water storage layer 3. The vegetation layer 2 is used to plant multiple plants 1, and the roots of each plant 1 are intertwined within the vegetation layer 2. In this application embodiment, the plant 1 is preferably an economic crop such as sea buckthorn. Economic crops can be used to make food, beverages, and other products, thereby increasing the economic value of the backfill cover layer and reducing the economic cost of backfilling. Selecting plants 1 for coppicing and intermittent planting continuously improves and optimizes the fertility of the cover layer. In this application embodiment, the roots of each plant 1 are intertwined, improving the erosion resistance of the shallow layer and reducing the risk of surface cracking. Preferably, the root orientation of the plant 1 is artificially intervened. Preferably, the plant can be a sun-loving tree species, sea buckthorn, with a spacing of 1.5 meters × 2 meters, which can achieve the purpose of intertwining the roots and improving the erosion resistance of the shallow layer without affecting the natural canopy width of the sea buckthorn. Sea buckthorn trees are dioecious, so a female-to-male ratio of 8:1 is recommended for planting. The size of the planting pit is determined by the size of the seedling, generally using a pit with a diameter of 35cm and a depth of 35cm. The water storage layer 3 is placed below the vegetation layer 2, preferably composed of sand and gravel. Its main function is to purify and collect excess irrigation water and natural rainfall, improving water resource utilization, while also supporting the weight of the upper structure.
[0057] Optionally, the coal mine goaf backfilling system provided in this application embodiment further includes a second permeable element 9. A unidirectional geomembrane 8 is laid between the vegetation layer 2 and the water storage layer 3. The unidirectional geomembrane 8 is used to supply water from the water storage layer 3 into the vegetation layer 2. The second permeable element 9 passes through the unidirectional geomembrane 8 in the vertical direction and connects the vegetation layer 2 and the water storage layer 3. The unidirectional geomembrane 8 transmits water from the direction of the water storage layer 3 to the direction of the vegetation layer 2, preventing a large amount of water loss from the vegetation layer 2 and providing water for the growth of the plants 1. In this application embodiment, both the first permeable element 15 and the second permeable element 9 are preferably made of stainless steel.
[0058] Optionally, the second infiltration element 9 is funnel-shaped, with the larger diameter end of the second infiltration element 9 located within the vegetation layer 2, and the smaller diameter end located within the water storage layer 3. The second infiltration element 9 collects excess irrigation water and natural precipitation, which is then transported to the lower water storage layer 3 and, through the first infiltration element 15, to the buffer layer 5, where it dissolves the coal gangue degradation agent before flowing into the coal gangue layer 6. The second infiltration element 9 can also be a pipe with a constant diameter.
[0059] Optionally, the coal mine goaf backfilling system provided in this application embodiment includes multiple degradation units, each of which is arranged vertically. In this application embodiment, the multiple units are preferably at least two. If the single-layer coal gangue layer 6 is too thick, the coal gangue degradation agent solution will take a long time to penetrate to the bottom of the coal gangue layer 6, reducing the degradation efficiency. Alternatively, the already degraded coal gangue at the top may obstruct the continued penetration of the coal gangue degradation agent, making it difficult for the lower part of the coal gangue layer 6 to continue degradation, resulting in an unsatisfactory degradation effect of the coal gangue layer 6. In this application embodiment, multiple degradation units are used, resulting in multiple coal gangue layers 6. Each coal gangue layer 6 will not be too thick, which facilitates the separate degradation of each coal gangue layer 6, improving the degradation efficiency of the coal gangue layer 6 and making the degradation effect of the coal gangue layer 6 more ideal.
[0060] Optionally, the first seepage component 15 includes a funnel-shaped collection section 13 and multiple connecting pipes 14. The funnel-shaped collection section 13 is disposed in the water-proof layer 4 of the uppermost degradation unit. Each connecting pipe 14 is connected to the buffer layer 5 of each degradation unit. The seepage assembly includes multiple first seepage components 15 and multiple seepage control valves 12, with a seepage control valve 12 installed on each connecting pipe 14. In this way, each buffer layer 5 is equipped with a dedicated connecting pipe 14, and each connecting pipe 14 is controlled to open and close by a corresponding seepage control valve 12. This facilitates the individual control of the water injection volume of each buffer layer 5 according to the site conditions, improves the flexibility of the coal mine goaf backfilling system control, facilitates precise control of the water injection volume of each buffer layer 5, makes the bottom surface less prone to collapse during water injection, and improves the reliability of the coal mine goaf backfilling system.
[0061] Optionally, the degradation unit further includes multiple coal gangue degradation monitors 16, each installed in a corresponding coal gangue layer 6. The coal gangue degradation monitors 16, placed in the coal gangue layer 6, use atomic absorption spectrometry to determine the content of degradation products, thereby monitoring the degree of coal gangue degradation. The monitoring data is then sent to the control terminal 7, which analyzes the data. If the degradation degree is poor, the control terminal opens the wide-mouth water collector to increase water seepage into the buffer layer 5, accelerating the dissolution of the degradation agent.
[0062] Optionally, the seepage control valve 12 includes a drainage baffle 17, a connecting rod 18, and a motor 19. The seepage control valve 12 is located at the bottom end of the connecting pipe 14, the motor 19 is installed in the connecting pipe 14, the drainage baffle 17 is circular, the drainage baffle 17 is disposed inside the connecting pipe 14, and the diameter of the drainage baffle 17 corresponds to the inner diameter of the connecting pipe 14; or, the seepage control valve 12 is a solenoid valve.
[0063] Based on the above embodiments of the coal mine goaf backfilling system, this application also provides an embodiment of a coal mine goaf backfilling system control method executed by the control terminal in the foregoing embodiments, such as... Figure 6 As shown, the control method for the coal mine goaf backfilling system specifically includes the following:
[0064] Step 100: During the continuous release of water into the buffer layer, it is determined in real time whether the coal gangue layer currently meets the preset balance condition. If yes, proceed to step 200; otherwise, repeat step 100.
[0065] Step 200: Generate a stop water discharge signal;
[0066] Step 300: Output the stop water discharge signal to stop water discharge into the buffer layer.
[0067] In step 300, outputting the stop water discharge signal means that the control terminal sends the stop water discharge signal to the signal transmission and reception controller, so that the signal transmission and reception controller controls the seepage control valve to shut off according to the stop water discharge signal, thereby stopping the discharge of water to the buffer layer.
[0068] Correspondingly, before step 100, the process may also include: the control terminal sending a start-to-release signal to the signal transmitter-receiver controller, so that the signal transmitter-receiver controller controls the seepage control valve to open according to the start-to-release signal, thereby starting to release water into the buffer layer.
[0069] To further improve the effectiveness and timeliness of water discharge cessation detection, in the embodiments of the coal mine goaf backfilling system control method provided in this application, such as Figure 7 As shown, steps 100 and 200 in the control method for the coal mine goaf backfilling system specifically include the following:
[0070] Step 110: During the continuous water release into the buffer layer, receive the current water pressure value in the buffer layer collected in real time by the pore pressure sensor; Step 120: Determine whether twice the water pressure value is equal to the pre-acquired overburden load value. If so, proceed to step 200: Generate a stop water release signal.
[0071] And / or,
[0072] Step 130: During the continuous release of water into the buffer layer, periodically measure the settlement of the coal gangue layer; Step 140: Determine whether the current settlement is less than or equal to the settlement threshold. If so, proceed to step 200: Generate a stop water release signal.
[0073] That is to say, steps 110 to 120, as well as steps 130 and 140, can be related by either satisfying both simultaneously or choosing one to satisfy.
[0074] It is understood that in step 110, the determination of the current overburden load value of the coal gangue layer based on the water pressure value can be specifically calculated using the following formula (1):
[0075] G = W + F (1)
[0076] Where G represents the current overburden load value of the coal gangue layer, which can be pre-measured or user-defined; W represents the water pressure; and F represents the effective stress. It can be understood that when water is first released into the buffer layer, the initial state of the coal gangue layer is F = G. During the water release process, W gradually increases, and F gradually decreases.
[0077] Correspondingly, in step 120, determining whether the water pressure value of twice the value is equal to the pre-acquired overburden load value specifically means determining whether W = 1 / 2G is true; if so, the water discharge is stopped.
[0078] In addition, in step 130, the user can upload the settlement amount △S of the coal gangue layer measured periodically in the mining area. Correspondingly, in step 140, determining whether the current settlement amount is less than or equal to the settlement threshold specifically means determining whether △S≤0.01m / d is true. If so, water release is stopped.
[0079] In other words, when at least one of W = 1 / 2G and ΔS ≤ 0.01m / d is true, a stop water discharge signal is generated and output.
[0080] To better illustrate the coal mine goaf backfilling system and its control method provided in this application, this application also provides an application example of the coal mine goaf backfilling system and its control method, as detailed below:
[0081] Currently, coal mine backfilling in China mainly involves several approaches, including using soil remediation agents to repair mining pits, preparing new backfill materials, and using new backfilling vibration devices to compact goaf areas. However, these methods place high demands on labor, machinery, and materials, and their impact on the surrounding ecological environment cannot be assessed. In recent years, the industry's requirements for coal mine backfilling have become increasingly stringent, while the cost of investment has gradually decreased. Traditional backfilling technologies cannot meet the current industry needs. Therefore, there is an urgent need for a new type of coal mine backfilling technology and its construction method that is safe, effective, economical, and environmentally friendly.
[0082] Existing technologies mostly employ water-sand backfilling or tailings cemented backfilling processes for backfilling. While these methods have addressed the issue of surface subsidence to some extent, they still suffer from problems such as high energy consumption, high density, and low compressive strength. Some technologies also utilize new backfill materials, improving the backfill material by adjusting the dosage of its components and additives. Although this has improved construction efficiency to some extent, it is impossible to assess whether the backfill additives and other materials have any negative impact on the surrounding ecological environment.
[0083] Based on this, this application example proposes a novel water-storage-vegetation composite structure and its construction method for open-pit coal mine backfill, taking into account issues such as open-pit coal mine backfill and its surrounding ecological problems. It utilizes artificial intervention to select the root system of plants to improve the erosion resistance of the shallow layer and reduce the risk of surface cracking. The multi-layered structure plays a composite role and ultimately serves the problem of coal mine backfill construction.
[0084] Existing technologies employ water-sand backfilling or tailings cemented backfilling processes for backfilling coal mine goaf areas. These technologies also utilize novel backfill materials, improving the backfill material by adjusting the dosage of its components and additives. Furthermore, existing technologies utilize novel backfill vibration devices for vibratory compaction of the goaf area. However, existing technologies using water-sand backfilling or tailings cemented backfilling suffer from high energy consumption, high density, and low compressive strength. The additives in existing backfill materials may negatively impact the surrounding ecological environment. Finally, the use of novel backfill vibration devices for vibratory compaction of the goaf area presents challenges such as high cost, low efficiency, and high risk.
[0085] This application example improves water resource utilization and solves the problem of limited resource utilization in existing technologies by providing a structure that combines a water storage layer and a water-proof layer in the backfill cover layer of open-pit mining.
[0086] This application example addresses the ecological and environmental problems of backfilling in existing technologies by artificially intervening in the root system of selected plants, allowing the roots to intertwine within a certain range, thereby improving the erosion resistance of the shallow layer and reducing the risk of surface cracking. It also addresses the issue of coal gangue accumulation difficulties in existing technologies by adding a degradation agent to the backfill buffer layer to gradually degrade coal gangue into clods. Furthermore, it solves the problem of high backfill costs in existing technologies by using carefully selected plants for coppicing and intermittent planting to continuously improve and optimize the fertility of the cover layer, and by increasing the economic value of the backfill cover layer with economic crops such as sea buckthorn.
[0087] Select plants with small leaves and roots that are easy to control artificially and have low water requirements, such as sea buckthorn. Plant them in the soil cover layer. The main function is to continuously improve the soil cover layer fertility through intermittent planting. Later, the economic value will be increased by making food and beverages from economic crops.
[0088] The vegetation layer (plant growth layer) is mainly composed of plant roots. After artificial intervention, the plant roots expand laterally and intertwine within a certain range. Its main function is to improve the erosion resistance of the shallow layer and reduce the risk of surface cracking.
[0089] The water storage layer, located below the vegetation layer, is composed of sand and gravel. Its main function is to purify and collect excess irrigation water and natural precipitation, while also supporting the weight of the upper part.
[0090] The impermeable layer, placed below the water storage layer, is made of dense rock or clay. Its main function is to allow water to seep into the buffer layer in a directional and quantitative manner, preventing a large amount of water from seeping downwards and causing loss.
[0091] The buffer layer, placed below the waterproof layer, is made of soil with high buffering capacity and is laid in a thick layer. Its main function is to coordinate the bottom coal gangue and prevent the upper part from becoming unstable due to deformation. At the same time, a large amount of degradation agent (mainly anaerobic microorganisms) is added to the buffer layer. After the seepage water (mainly coal mine drainage water) dissolves the degradation agent, it decomposes the coal gangue and turns it into boulders.
[0092] Coal gangue, placed below the buffer layer, is the main solid waste generated by open-pit mining; (the water-proof layer, buffer layer, and coal gangue are arranged in an alternating layered and overlapping manner).
[0093] The control terminal, located above the ground, is used to collect information transmitted by the drainage volume monitor, process the information in real time, send information to the signal transmitting and receiving controller, and control the pipeline switch controller to control the wide-mouth water collector and drainage pipeline.
[0094] One-way geomembranes transport water from the water storage layer to the vegetation layer, preventing excessive water loss from the vegetation layer. Their main function is to provide water for plant growth.
[0095] The water collector is made of stainless steel and is funnel-shaped. Its main function is to collect excess irrigation water and natural rainfall.
[0096] The wide-mouth water collector is made of large-mouth stainless steel funnel-shaped water collector. Its main function is to let water seep into the buffer layer in a directional and quantitative manner, so as not to seep out a lot of water and to help dissolve the degradation agent in the buffer layer.
[0097] The pipeline switch controller is connected to the signal transmitter and receiver controller via a connecting line. It controls the direction, time, and flow rate of water seeping from the wide-mouth water collector into the buffer layer by rotating the drainage baffle. When the degradation level is low and an increase in seepage is needed, the signal transmitter and receiver controller receives a command from the terminal to open the seepage switch of the wide-mouth water collector, and the drainage baffle rotates to open the pipeline. When the seepage flow is too large, resulting in a large loss of water, the signal transmitter and receiver controller receives a command from the terminal to close the seepage switch of the wide-mouth water collector, and the drainage baffle rotates to close the pipeline.
[0098] The drainage volume monitor is placed in the buffer layer to monitor the amount of water seeping into the buffer layer from the wide-mouth water collector in real time. If the drainage volume is too high, it transmits a signal to the signal transmitter and receiver controller, which then sends it to the terminal. The terminal issues an instruction to control the pipe switch controller to open and close the wide-mouth water collector pipe.
[0099] The signal transmitting and receiving controller is located in the buffer layer. It receives data sent by the drainage volume monitor and sends it to the control terminal. It also receives feedback instructions sent by the control terminal and transmits the instructions to the pipeline switch controller through the connection line, thereby controlling the wide-mouth water collector to seep water into the buffer layer.
[0100] The connecting line is placed in the buffer layer and connects the signal transmitting and receiving controller and the pipeline switch controller. After receiving the control terminal command to switch or adjust the seepage flow, the pipeline switch controller is controlled to adjust the rotation angle of its drainage baffle, thereby controlling the seepage flow of the wide-mouth water collector.
[0101] The drainage pipes start from the first waterproof layer and are inserted into each buffer layer. Their main function is to distribute and dissolve the degradation agent in each buffer layer in a layered manner, so as to achieve the gradual degradation of coal gangue.
[0102] The coal gangue degradation monitor is placed in the coal gangue layer and uses atomic absorption spectrometry to determine the content of products after coal gangue degradation, thereby monitoring the degree of coal gangue degradation. The monitoring data is sent to the control terminal, which analyzes the data. If the degree of degradation is poor, the control pipe switch controller opens the wide-mouth water collector to increase water seepage into the buffer layer and accelerate the dissolution of the degradation agent.
[0103] The specific implementation method is as follows:
[0104] 1. Instrument and equipment inspection: Before installation, all instruments shall be technically tested to ensure that they are in normal working order and that the entire system is used stably for a long time. Check whether each system is working properly and whether the wiring connections are normal.
[0105] 2. Plant selection: Before planting, plants should be carefully selected, choosing those whose root systems are easily affected by human interference and have high economic value.
[0106] 3. Selection of degradation agent: The degradation agent added to the buffer layer is selected from those mainly composed of anaerobic microorganisms to ensure environmental friendliness.
[0107] 4. Layer layout: Each layer shall be laid out according to the attached drawings of the invention, and attention shall be paid to the differences in thickness between each layer.
[0108] 5. Pipeline and switch inspection: Check whether each pipeline is unobstructed and whether the switches are working properly to ensure normal seepage of stored water.
[0109] 6. Final Inspection: Conduct a second inspection of the construction area to retest whether the instruments and equipment used in the initial inspection were accurate and whether the entire system can operate normally, in order to achieve a rigorous and efficient outcome.
[0110] The embodiments described above are merely general implementation methods of the present invention. The sequence can be adjusted in real time according to the experimental plan during the experiment. The present invention can improve the water storage performance of open-pit coal mine backfill layers and increase water resource utilization. Simultaneously, the artificial intervention in lateral root development (intertwined roots) provided by the present invention improves the erosion resistance of the shallow surface layer of the backfill layer, reduces the risk of surface cracking, and achieves environmental friendliness. Intermittent planting of cash crops can also improve and optimize the fertility of the backfill layer, thereby increasing its economic value.
[0111] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application.
Claims
1. A coal mine goaf backfilling system, characterized in that, The system includes a seepage component, a control terminal, and a degradation unit. The degradation unit comprises, from bottom to top, a coal gangue layer, a buffer layer, and a waterproof layer, as well as a pore pressure sensor and a signal transmission and reception controller. The buffer layer includes a coal gangue degradation agent. Both the pore pressure sensor and the signal transmission and reception controller are installed within the buffer layer. The water-permeable assembly includes a first water-permeable element and a water-permeable control valve. The water-proof layer and the buffer layer are connected through the first water-permeable element. The water-permeable control valve is installed on the first water-permeable element. The signal transmitting and receiving controller is communicatively connected to the control terminal, the pore pressure sensor, and the water-permeable control valve. The coal mine goaf backfilling system provided in this application includes multiple degradation units, and each degradation unit is arranged in a vertical direction; The first seepage component includes a funnel-shaped collection part and multiple connecting pipes. The funnel-shaped collection part is disposed in the water-proof layer of the uppermost degradation unit. Each of the connecting pipes is connected to the buffer layer of each degradation unit. The seepage assembly includes multiple first seepage components and multiple seepage control valves. Each of the connecting pipes is equipped with a seepage control valve. The degradation unit also includes multiple coal gangue degradation monitors, each of which is installed in a corresponding coal gangue layer.
2. The coal mine goaf backfilling system according to claim 1, characterized in that, It also includes a water storage layer and a vegetation layer. The water storage layer is laid above the degradation unit, and the vegetation layer is laid above the water storage layer. The vegetation layer is used to plant multiple plants, and the roots of the plants are intertwined in the vegetation layer.
3. The coal mine goaf backfilling system according to claim 2, characterized in that, It also includes a second infiltration element, wherein a unidirectional geomembrane is laid between the vegetation layer and the water storage layer. The unidirectional geomembrane is used to supply water from the water storage layer into the vegetation layer. The second infiltration element passes through the unidirectional geomembrane in the vertical direction and connects the vegetation layer and the water storage layer.
4. The coal mine goaf backfilling system according to claim 3, characterized in that, The second infiltration element is funnel-shaped, with the larger diameter end of the second infiltration element located inside the vegetation layer and the smaller diameter end located inside the water storage layer.
5. The coal mine goaf backfilling system according to claim 1, characterized in that, The seepage control valve includes a drainage baffle, a connecting rod, and a motor. The seepage control valve is located at the bottom end of the connecting pipe, the motor is installed in the connecting pipe, the drainage baffle is circular, the drainage baffle is disposed inside the connecting pipe, and the diameter of the drainage baffle corresponds to the inner diameter of the connecting pipe; or, the seepage control valve is a solenoid valve.
6. A control method for a coal mine goaf backfilling system, characterized in that, The method is implemented using the coal mine goaf backfilling system as described in any one of claims 1-5, and includes: During the continuous release of water into the buffer layer, it is determined in real time whether the coal gangue layer currently meets the preset balance condition. If so, a stop water release signal is generated. Output the stop water discharge signal to stop water discharge into the buffer layer.
7. The control method for a coal mine goaf backfilling system according to claim 6, characterized in that, During the continuous water release into the buffer layer, it is determined in real time whether the coal gangue layer currently meets the preset equilibrium condition. If so, a stop water release signal is generated, including: During the continuous water release into the buffer layer, the current water pressure value in the buffer layer is collected in real time by the pore pressure sensor. It is then determined whether twice the water pressure value is equal to the pre-acquired overburden load value of the coal gangue layer. If so, a stop water release signal is generated. And / or, During the continuous release of water into the buffer layer, the settlement of the coal gangue layer is periodically measured; it is determined whether the current settlement is less than or equal to the settlement threshold, and if so, a stop water release signal is generated.
Citation Information
Patent Citations
Zigbee communication function-based intelligent soil culture plant growth device
CN102893821A
Ecological treatment bed of chromium contaminated soil
CN103878171A
Coal mine mining pit backfill area soil remediation agent and remediation method
CN111875450A
Green roof intelligent water-saving irrigation system with water storage function
CN114698489A