A multi-machine linkage LKJ integrated tester

By designing an LKJ integrated tester compatible with LKJ2000 and LKJ-15 models, automatic synchronous testing and data comparison analysis of multiple LKJ devices were realized, solving the problems of model incompatibility and low efficiency in the existing technology, and improving testing efficiency and accuracy.

CN117250426BActive Publication Date: 2026-11-17BEIJING JIAODA SIGNAL TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311287044.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-07
Publication Date
2026-11-17
Estimated Expiration
2043-10-07

AI Technical Summary

Technical Problem

The existing LKJ testers are not compatible with the LKJ2000 and LKJ-15 models, and cannot achieve synchronous testing and automatic comparative analysis of multiple devices, resulting in high procurement costs, low efficiency, high resource consumption and low accuracy.

Method used

An LKJ integrated tester was designed, which has multi-machine linkage function and is compatible with LKJ2000 and LKJ-15 equipment. It realizes automatic synchronous testing and data comparison analysis of multiple LKJ equipment through synchronous linkage configuration interface and data configuration interface.

Benefits of technology

It enables efficient and accurate testing of multiple LKJ devices, reduces procurement costs, saves time and human resources, and improves testing efficiency and the accuracy of data analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117250426B_ABST
    Figure CN117250426B_ABST
Patent Text Reader

Abstract

This invention relates to an LKJ integrated tester with multi-machine linkage function, compatible with testing LKJ2000 and LKJ15 LKJ devices. The LKJ integrated tester features a synchronous linkage configuration interface, including an Ethernet interface and a synchronous I / O interface, for synchronous linkage control of multiple LKJ integrated testers; a data configuration interface for importing test record data into the LKJ integrated tester for analysis; and an LKJ communication interface, connected to the LKJ device, serving as an interface for data interaction between the LKJ and various external communication devices simulating the LKJ. Multiple LKJ integrated testers can be synchronously linked to achieve automatic synchronous testing of multiple LKJ devices. This invention's LKJ integrated tester is compatible with testing LKJ2000 and LKJ-15 LKJ devices, exhibiting high integration and good compatibility, enabling simultaneous automatic testing of multiple LKJ devices and allowing for comparative analysis of multiple test record results.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of railway signaling, and specifically to a comprehensive testing instrument that can control multiple machines to test the functions of multiple LKJ (Locked Keyless Jumper) units through a single unit. Background Technology

[0002] The Train Control Unit (LKJ) is a core component of the train control system, used for overspeed protection, real-time monitoring of train operation status, and assisting drivers in safe driving. To ensure the LKJ functions correctly before train operation and prevent operation with defects that could lead to safety issues, specialized testing equipment is needed to comprehensively and effectively test its functions. The LKJ tester is used to simulate the various functions of peripheral equipment during train operation to test the LKJ. Currently, existing LKJ testers have the following problems:

[0003] 1. Currently, the commonly used LKJ models are LKJ2000 and the latest upgraded LKJ-15. The LKJ-15 model, based on the LKJ2000, introduces a safety computer platform and optimizes some peripheral communication interfaces, making the train operation monitoring system safer and more reliable. Existing LKJ testers only test either the LKJ2000 or LKJ-15 models and are incompatible with both. Therefore, users must purchase two different models of LKJ testers, resulting in high procurement costs and complex procedures for setting up dual testing systems.

[0004] 2. Existing LKJ testers can only test individual LKJ units one at a time, and cannot test multiple devices simultaneously. During LKJ data replacement on-site operations, it may be necessary to perform functional tests on multiple LKJ15 or LKJ2000 spare parts from different manufacturers. Given the tight schedule and heavy workload, using existing LKJ testers to test each unit individually requires a significant investment of manpower, is inefficient, and consumes substantial resources.

[0005] 3. Existing LKJ testing instruments can only analyze the operation of a single LKJ and cannot automatically compare and analyze data from multiple LKJs. When comparative testing of multiple LKJs is required, manual comparison and analysis is necessary, which is labor-intensive and prone to errors. Moreover, since it is impossible to guarantee that multiple LKJs are tested synchronously, the accuracy of the comparative test is also low. Summary of the Invention

[0006] To address the aforementioned issues, this invention proposes an LKJ integrated tester capable of multi-machine linkage, which is compatible with testing LKJ2000 and LKJ-15 LKJ devices, and supports multi-machine synchronous linkage testing and automatic comparison and analysis of multi-machine test data.

[0007] This invention provides an LKJ integrated tester with multi-machine linkage function, which is compatible with testing LKJ2000 and LKJ15 LKJ equipment;

[0008] The LKJ integrated tester includes a human-computer interaction module, a control and communication module, and a power supply module. The control and communication module is used to simulate the various external devices of the LKJ to generate test signals for communication with the LKJ, and also to send control commands and data to other modules.

[0009] The LKJ comprehensive tester has the following features

[0010] The synchronous linkage configuration interface includes an Ethernet interface and a synchronous IO interface, which are used for synchronous linkage control of multiple LKJ integrated testers;

[0011] The data configuration interface is used to import test record data into the LKJ integrated tester for analysis.

[0012] The LKJ communication interface connects to the LKJ device and serves as the interface for various external communication devices that simulate the LKJ to exchange data with the LKJ. The exchanged information includes communication signals, switch signals, frequency signals, and analog signals.

[0013] Multiple LKJ integrated testers can be synchronously controlled to achieve automatic synchronous testing of multiple LKJ devices.

[0014] Technical advantages of the present invention:

[0015] The LKJ integrated tester of this invention is compatible with testing LKJ2000 and LKJ-15 LKJ devices, with high integration, good compatibility, and user-friendliness; it can simultaneously and automatically test multiple LKJ devices, with high test data accuracy and high testing efficiency; it can realize comparative analysis of multiple test record results, with high data analysis accuracy and significant savings in time and labor costs. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the components and interfaces of the LKJ integrated tester of the present invention.

[0017] Figure 2 This is a schematic diagram illustrating the compatibility test of the LKJ2000 and LKJ15 LKJ devices according to the present invention.

[0018] Figure 3 This is a schematic diagram of a synchronous linkage test for multiple LKJ devices.

[0019] Figure 4 This is a diagram illustrating the conversion of a standard test script.

[0020] Figure 5 This is a diagram illustrating the comparison and analysis of multiple record files. Detailed Implementation

[0021] The features and advantages of the present invention will be described in detail below with reference to specific embodiments. This content will help those skilled in the art to further understand the present invention, but it does not limit the present invention in any way. It should be noted that those skilled in the art can make several modifications and improvements without departing from the inventive concept, and these all fall within the protection scope of the present invention.

[0022] This invention provides an LKJ integrated tester that simulates communication between the LKJ and its external communication devices to test various functions. It is compatible with both LKJ2000 and LKJ15 models, providing testing functions and interfaces for both. Automatic synchronous testing of multiple LKJ devices can be achieved through the synchronized control of multiple LKJ integrated testers. It also allows for comparative analysis and output of multiple test record results.

[0023] See Figure 1 The LKJ integrated tester of the present invention has a human-computer interaction module, a control communication module and a power supply module; it also has a synchronous linkage configuration interface X5, a data configuration interface X6, an LKJ communication interface X2...X4 and a power input interface X1.

[0024] The human-computer interaction module is used for human-computer interaction and has a display screen and buttons: when manually testing the LKJ device, test commands and test parameters can be entered; when automatically testing the LKJ device through test scripts, test commands can be entered, and test steps and test status can be displayed; when comparing and analyzing test data, analysis steps and results can be displayed.

[0025] Its control and communication module, as the core module, is used to simulate the various external devices of the LKJ to generate test signals for communication with the LKJ, including speed signals, pressure signals, diesel speed / primary side signals, leveling signals, locomotive signals, TIU signals, extended switching signals, braking signals, and communication signals from BTM / TAX / STP / radar / TMIS / EMU / ATP / CIR / radio / CMD / JRU / ATO, etc. In addition, the control and communication module can send control commands and data to other modules.

[0026] Its power module converts the input 220VAC power supply to power the LKJ integrated tester and the LKJ device under test.

[0027] Its X5 synchronous linkage configuration interface includes an Ethernet interface and a synchronous IO interface, used for the synchronous linkage control of multiple LKJ integrated testers. Each Ethernet interface is connected via an Ethernet switch, and the synchronous IO interface is connected via installation cables. Automatic test scripts, automatic test commands, and timestamp information are sent through the Ethernet interface, while the synchronous IO signal enables hardware triggering synchronization of multiple testers.

[0028] The data configuration interface X6 is a USB interface used to import test record data dumped by the LKJ recording module into the LKJ comprehensive tester for analysis.

[0029] The LKJ communication interfaces X2...X4 connect to the LKJ device and simulate the interfaces for data interaction between the LKJ and various external communication devices. The interaction information includes communication signals, switch signals, frequency signals, and analog signals. Among them, X2 has a reserved CAN interface for collecting key parameters of the LKJ device's test actions.

[0030] Power input interface X1, for inputting a 220V AC power signal.

[0031] The LKJ2000 model LKJ under test employs a dual-machine hot standby safety architecture with two backups and two standby modes to achieve real-time monitoring of train operation status. It has interfaces for connecting to various external devices. It includes a recording module for recording status information and driver operation information during LKJ operation. The data recorded by the module can be transferred out using a data transfer device and then imported into a PC or the LKJ comprehensive tester of this invention for analysis.

[0032] The LKJ-15 train operation monitoring device introduces a safety computer platform based on the LKJ2000 LKJ. It expands the range of connectable external devices and device connection interfaces. It features a recording module, with optimized data recording format compared to the LKJ2000 recording module, making data recording more convenient and easier to analyze. Data recorded by the module can be transferred using a data transfer device and then imported into a PC or the LKJ integrated testing instrument of this invention for analysis.

[0033] The LKJ integrated tester of the present invention is compatible with testing LKJ2000 and LKJ15 LKJ devices, and can realize automatic testing of multiple LKJ2000 and LKJ15 LKJ devices through the linkage control of multiple LKJ integrated testers.

[0034] See Figure 2 The following example illustrates the testing of four LKJ devices using four LKJ integrated testers. The four LKJ devices under test are LKJ2000, LKJ15, LKJ2000, and LKJ15, but other LKJ models and testing quantities are also possible.

[0035] Four LKJ integrated testers are connected via an Ethernet switch, each with its own synchronously configured Ethernet interface. The four LKJ integrated testers are distinguished as master and slave testers; during testing, only one tester is allowed to operate as the master tester, while the others, acting as slave testers, are inoperable and only display information. Figure 2 In the test, tester 1 is the main instrument, and the others are from 1, from 2 and from 3 respectively.

[0036] When testing four LKJ devices of different models simultaneously, the master tester sends LKJ15 and LKJ2000 standard scripts to slave testers 1, 2, and 3 via a synchronous linkage configuration Ethernet interface. After the standard scripts (i.e., standard test scripts) are sent and received, the master tester and slave testers 1, 2, and 3 automatically identify the model of the LKJ device under test. If the device under test is an LKJ2000, it will automatically execute the LKJ2000 standard script; if the device under test is an LKJ15, it will automatically execute the LKJ15 standard script. After the LKJ device model is identified, the master tester sends an automatic test command, and the master tester and the three slave testers automatically execute the corresponding test scripts. After the test is completed, the test data can be transferred to the master tester for automatic comparison and analysis.

[0037] The LKJ integrated tester of this invention can automatically identify LKJ2000 and LKJ15 LKJ devices and automatically execute the corresponding test scripts. This saves time and is more efficient than existing LKJ testers that require manual identification of LKJ models. Furthermore, while existing LKJ testers can only test a single LKJ device, this invention can simultaneously test multiple LKJ2000 and LKJ15 LKJ devices, offering good compatibility, high integration, and avoiding the need to build multiple test systems, making it more user-friendly.

[0038] This invention enables automatic synchronous testing of multiple LKJ devices through the synchronous linkage control of the LKJ integrated tester.

[0039] When multiple LKJ devices of the same model need to be compared and analyzed for key parameters during testing, the testing time of the LKJ devices must be synchronized. The LKJ comprehensive tester of this invention ensures the synchronization of testing time for multiple LKJ devices under test through timestamp calibration and hardware triggering. See also... Figure 3 The following example illustrates how to test three LKJ2000 LKJ devices (the tested LKJ can also be LKJ15) using three LKJ integrated testers:

[0040] The master tester sends the LKJ2000 standard test script to slave testers 1 and 2 via the Ethernet bus. After the script is sent and received, the master tester sends a hardware trigger signal to each slave tester through the synchronous I / O interface, ensuring hardware synchronization of the master and slave testers' test time. After the test starts, during the execution of the test script, the master tester continuously sends timestamps to each slave tester via the Ethernet bus. When a slave tester receives a timestamp from the master tester, it automatically corrects its own running time, ensuring software synchronization of the master and slave testers' test time.

[0041] During testing, the master tester and each slave tester can not only drive the LKJ device under test to perform corresponding test actions through test commands in the automatic test script, but also adopt a closed-loop feedback mode to collect key test parameters fed back by the LKJ device under test in real time via the CAN bus after its actions. These parameters include speed control mode parameters, pipe pressure information, braking information, current signal and forward signal display information, branch line and lateral line information, etc. Each slave tester sends the key test parameters collected by the CAN bus to the master tester via the Ethernet bus. The master tester can then generate a real-time comparison curve (or create a data comparison table) by comparing the key test parameters obtained by the slave testers via the Ethernet bus with the key parameters collected by its own CAN bus and the corresponding parameters in the standard script. Through the real-time comparison curve or comparison table of key test parameters, it is possible to quickly and intuitively observe whether the LKJ device under test is functioning normally. This advantage is particularly prominent in the real-time comparison analysis of speed control mode curves.

[0042] The speed control mode curve mainly reflects the train's operating speed and speed limit parameters. When multiple LKJ devices are tested synchronously, the LKJ integrated tester of this invention automatically calculates the starting position, current starting point position, nth segment starting point position, nth segment distance length, nth segment common braking speed reference, nth segment fixed speed limit reference, and nth segment traction break speed reference, etc., based on the test command and mode setting specifications. The speed control mode curve can be automatically fitted using these parameters. During synchronous linkage testing, each slave tester sends these key control mode parameters to the master tester via Ethernet bus. The master tester fits its own speed control mode curve and the speed control mode curve obtained from each slave tester using its own acquired key control mode parameters, and compares them with the speed control mode curve of the standard script to form a comparison curve graph (or comparison data table). This determines whether these key parameter values ​​meet expectations, and parameters that do not meet expectations are specially marked for test personnel reference. By comparing the key parameters of the speed control mode curve in real time, it is possible to intuitively reflect whether there are any unexpected deviations in the speed and speed limit data of the measured speed channel at a certain moment, and to promptly detect potential problems of the measured LKJ equipment.

[0043] Furthermore, the automatic synchronous testing function of the LKJ comprehensive tester can effectively test whether the key actions of the LKJ equipment are triggered normally and whether the key parameters returned after triggering are correct. Taking the braking function test of the LKJ equipment as an example:

[0044] See Figure 3 When the master and slave testers test the braking function of the LKJ equipment by running the automatic test script, the three LKJ2000 devices simultaneously receive the braking command and execute the braking action. At the same time, the braking signal and pipe pressure information are fed back to the master and slave testers via the CAN bus. Slave 1 and Slave 2 testers send the feedback braking information and pipe pressure information to the master tester via the Ethernet bus. The master tester automatically compares the braking signal and pipe pressure information of the three LKJ2000 devices with the standard test script to determine whether the three LKJ2000 devices have acted and whether the braking information and pipe pressure information are normal. When an error or a large deviation occurs, the tester will alarm to remind the tester.

[0045] In the synchronous linkage test of multiple LKJ devices, it is also possible to realize real-time comparative analysis of key parameters such as the information displayed by the current and forward signal lights, and the information of the branch and lateral lines. This has important reference value in quickly and intuitively judging whether the function of the tested equipment is normal.

[0046] By simultaneously testing multiple LKJ devices with multiple testing instruments, faulty LKJ devices can be quickly located. This method effectively tests whether key actions of the LKJ devices are triggered correctly and whether the returned key parameters are correct, resulting in high testing efficiency and data accuracy. In contrast, existing LKJ testing instruments can only test a single LKJ device and cannot simultaneously compare test data from multiple LKJ devices.

[0047] The LKJ integrated tester of the present invention can realize the function of comparing and analyzing multiple test scripts and outputting analysis results.

[0048] During LKJ data conversion operations, it may be necessary to test multiple LKJ15 or LKJ2000 spare parts. Existing LKJ testers can only test a single LKJ device, and test records can only be viewed manually via PC software, which is very inefficient. The LKJ integrated tester of this invention can simultaneously perform coordinated testing on multiple LKJ devices of different models. Test records can be simultaneously imported into the main LKJ integrated tester for comparative analysis, outputting analysis results. This is highly efficient and avoids errors caused by manual data comparison.

[0049] The LKJ integrated tester of this invention achieves automatic testing of LKJ equipment by automatically running test scripts. The test scripts are standard test scripts generated by the main integrated tester from the record files produced after the LKJ2000 or LKJ15 LKJ equipment has controlled the entire route on an actual operating line. See also... Figure 4 LKJ2000 and LKJ15 are the LKJ devices that actually control the vehicle. The LKJ2000 record file and LKJ15 record file are the record files generated after the LKJ2000 and LKJ15 control the vehicle for the entire road section, respectively. The LKJ2000 record file and LKJ15 record file are converted into LKJ2000 standard script and LKJ15 standard script by the main tester.

[0050] The main tester and each slave tester automatically execute the test instructions of the LKJ2000 and LKJ15 standard scripts, complete the testing of each LKJ device, generate log files, and import the generated log files into the main tester for comparison and analysis with the standard log files to generate a report. See also Figure 5 The master tester sends the LKJ2000 and LKJ15 standard scripts to each slave tester via the Ethernet bus. The master and slave testers complete the tests on the corresponding LKJ2000 or LKJ15 LKJ devices according to the test instructions in the standard scripts, generating corresponding log files. The log files generated by the LKJ device under test are imported into the master tester and compared with the standard log files; that is, the LKJ2000 log files are compared with the LKJ2000 standard log files, and the LKJ15 log files are compared with the LKJ15 standard log files, generating a comparison analysis report.

[0051] The standard test script (i.e., the standard script) originates from the log files generated after the LKJ2000 and LKJ15 models have controlled the entire road section. The generated test commands simulate the actual vehicle control environment of the LKJ equipment, resulting in more reliable test results. Using the various test commands in the test script to simulate the actual vehicle control environment is more convenient and efficient than having all spare LKJ equipment actually control the vehicle for testing.

[0052] When a new line is constructed, LKJ2000 and LKJ15 LKJ equipment typically require trial operation. After the trial operation, a standard log file is generated. This standard log file is then used to generate a standard test script via an LKJ integrated tester. Running this standard script tests the LKJ equipment (spare parts) for that section of the line. However, when an existing line is being upgraded, trial operation of LKJ2000 and LKJ15 LKJ equipment is generally not required, and no standard log file is generated after the trial operation. When testing the LKJ equipment (spare parts) for that section, the corresponding parameters are modified based on the test script generated from the original standard log file, according to the upgrade details. This modified test script is then used to test the LKJ equipment (spare parts) for that section. This method of simulating actual line conditions simply by changing the log file and modifying the test script makes LKJ equipment testing more convenient, safer, and more reliable.

[0053] Technical advantages of the present invention:

[0054] The LKJ integrated tester of this invention is compatible with testing LKJ2000 and LKJ-15 LKJ devices. It features high integration, good compatibility, and avoids the time-consuming and labor-intensive process of building multiple test systems, making it user-friendly. Multiple testers can be used to simultaneously test multiple LKJ devices, resulting in high test data accuracy and efficiency. The automatic analysis tool of the LKJ integrated tester enables automatic comparison and analysis of multiple record files, avoiding errors caused by manual analysis and saving significant analysis time. Using test scripts to test LKJ devices is more convenient, reliable, and flexible.

[0055] The terms and expressions used herein are for descriptive purposes only. This invention is not limited to these terms and expressions, and the use of these terms and expressions does not mean the exclusion of any illustrative and descriptive equivalent features. Various modifications, transformations and substitutions that may exist should also be included within the scope of the claims, and the claims should be regarded as covering these equivalents.

[0056] It should also be noted that the LKJ integrated tester of the present invention only explicitly lists a few peripheral communication functions that can be simulated, but is not limited to the listed peripheral simulation communication functions. It can be extended on this basis, and such designs are all within the protection scope of this patent. Therefore, any changes or modifications to the above examples within the essential spirit of the present invention will fall within the scope of the claims of this application.

Claims

1. A multi-machine linkage LKJ integrated tester, compatible with testing LKJ2000 and LKJ15 LKJ devices; the LKJ integrated tester includes a human-machine interaction module, a control and communication module, and a power supply module, wherein the control and communication module is used to simulate various external devices of the LKJ to generate test signals for communication with the LKJ, and also to send control commands and data to other modules; the LKJ integrated tester has a synchronous linkage configuration interface, including an Ethernet interface and a synchronous IO interface, for synchronous linkage control of multiple LKJ integrated testers; a data configuration interface for importing test record data into the LKJ integrated tester for analysis; and an LKJ communication interface, connected to the LKJ device, for simulating data interaction between various external communication devices of the LKJ and the LKJ, the interaction information including communication signals, switch signals, frequency signals, and analog signals; multiple LKJ integrated testers can be synchronously linked to achieve automatic synchronous testing of multiple LKJ devices; Multiple LKJ integrated testers are connected to their respective synchronous linkage configuration interfaces (Ethernet interfaces) via Ethernet switches. These LKJ integrated testers are distinguished as master testers and slave testers. During testing, only one tester is allowed to operate as the master tester; the others are slave testers and cannot operate, only displaying information. When multiple LKJ devices of different models are tested simultaneously, the master tester sends LKJ15 and LKJ2000 standard scripts to each slave tester simultaneously via the synchronous linkage configuration interface (Ethernet interface). After the standard scripts are sent and received, the master and slave testers automatically identify the model of the LKJ device under test and automatically execute the corresponding standard script. After the test is completed, the test record data is transferred to the master tester for comparative analysis.

2. The LKJ comprehensive tester as described in claim 1, characterized in that, The record file generated by the LKJ device after controlling the vehicle on the actual operating line can be converted into the standard script by the main tester as a standard record file; the corresponding test record data is the record file transferred by the record module of each LKJ device under test.

3. The LKJ comprehensive tester as described in claim 2, characterized in that, The main tester and each slave tester automatically execute the test instructions of the standard script to complete the test of each LKJ device and generate a record file. The generated record files are imported into the main tester and compared with the standard record file to form a report.

4. The LKJ comprehensive tester as described in claim 3, characterized in that, When testing the LKJ equipment on an old line during renovation, the corresponding parameters are modified based on the test script generated from the original line standard record file, according to the content of the line renovation. This modified script is then used to test the LKJ equipment on the line.

5. The LKJ comprehensive tester as described in claim 1, characterized in that, The LKJ integrated tester ensures the synchronization of test times for multiple LKJ devices under test through timestamp calibration and hardware triggering. The master tester sends a standard script to the slave testers via the Ethernet bus. After the script is sent and received, the master tester sends a hardware trigger signal to each slave tester through the synchronization IO interface, ensuring the synchronization of test times between the master and slave testers from a hardware perspective. After the test starts, during the execution of the standard script, the master tester continuously sends timestamps to each slave tester via the Ethernet bus. When a slave tester receives a timestamp sent by the master tester, it automatically corrects its own running time, ensuring the synchronization of test times between the master and slave testers from a software perspective.

6. The LKJ comprehensive tester as described in claim 5, characterized in that, During the test, the master tester and each slave tester not only drive each LKJ device under test to perform corresponding test actions through test commands in the standard script, but also adopt a closed-loop feedback mode to collect key test parameters fed back by the LKJ device under test after its actions in real time via the CAN bus.

7. The LKJ comprehensive tester as described in claim 6, characterized in that, Each slave tester sends the key test parameters acquired from the CAN bus to the master tester via the Ethernet bus. The master tester then compares the key test parameters acquired from the slave testers and its own key parameters acquired from the CAN bus with the corresponding parameters in the standard script to form a real-time comparison curve.

8. The LKJ comprehensive tester as described in claim 7, characterized in that, The automatic synchronous testing function of the LKJ integrated tester can test whether the key actions of each LKJ device under test are triggered normally, and whether the key parameters returned after triggering are correct.

Citation Information

Patent Citations

  • LKJ test system capable of automatically generating test scripts

    CN112162916A