A method for installing super-long curtain wall keel

Through the cooperation of auxiliary equipment and connecting support components, the deformation and collision problems during the lifting of ultra-long columns are solved, and the safe lifting of columns and the smooth installation of curtain walls are achieved.

CN117432214BActive Publication Date: 2025-08-08SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311631036.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-01
Publication Date
2025-08-08
Estimated Expiration
2043-12-01

AI Technical Summary

Technical Problem

During the lifting of super-long columns, the columns are prone to deformation and collision with the ground during the lifting from horizontal to vertical, which affects the installation of the columns and subsequent curtain wall panels.

Method used

The column is lifted from the horizontal state to the vertical state through a crane. The coordination between the connecting support components and auxiliary equipment is used to prevent the end of the column from colliding with the ground, and the traction force is applied evenly through the support to avoid bending and deformation.

Benefits of technology

Effectively prevent damage caused by collision and bending of columns during lifting, and ensure the smooth installation of columns and curtain wall panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117432214B_ABST
    Figure CN117432214B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for installing an extra-long curtain wall keel, belonging to the technical field of building construction, comprising: 1) preparing columns; 2) hoisting the columns; and 3) installing curtain wall units. The method aims to solve the problem that during the hoisting process of the extra-long columns, the extra-long and extra-thin columns may be deformed or even damaged during the process of lifting the columns from horizontal to vertical, thereby affecting the installation of the columns.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and particularly relates to a method for installing an extra-long curtain wall keel. Background Art

[0002] Curtain wall panels are a rapidly emerging building technology. They typically combine aluminum alloy frames, glass, spacers, insulation, shock-absorbing and waterproof materials, and decorative fabrics into curtain wall units with additional iron fittings in the factory. After the columns are hoisted, the unit glass curtain wall is hoisted and installed, requiring a crane for the entire process. Due to the design of the building's height, the curtain wall panels are large in size, with the steel columns being even longer. Therefore, during the hoisting of the extra-long and thin columns, the columns are prone to significant deformation during the process of being hoisted from horizontal to vertical, and their bottoms are easily damaged by collision with the ground, affecting the installation of the columns and the subsequent curtain wall panels. Summary of the Invention

[0003] In view of this, the present invention discloses a method for installing an extra-long curtain wall keel, which aims to solve the problem that during the hoisting process of an extra-long column, the bottom of the column is easily damaged by collision with the ground during the process of lifting the column from horizontal to vertical, thereby affecting the installation of the column.

[0004] In order to achieve the above object, the present invention provides the following technical solutions:

[0005] A method for installing an extra-long curtain wall keel comprises the following steps:

[0006] 1) Column Preparation: Install auxiliary equipment that can move relative to the ground; install the connecting support component on the column and place the end of the connecting support component on the auxiliary equipment so that the end of the column can deflect relative to the auxiliary equipment; install the guide rail on the ground and install the vehicle body on the guide rail; connect the crane's traction rope to the front end of the connecting support component, with the connection point located in the upper area of the column;

[0007] 2) Hoisting the column: Start the crane and lift the column from a horizontal state to a vertical device. During the entire process, the end of the column is supported by auxiliary equipment, and the auxiliary equipment moves with the end of the column to the bottom of the column to ensure that the column is in a vertical state. After the connecting support components and the auxiliary equipment are disassembled, the column is hoisted to the installation location of the building using a crane while maintaining the vertical state. After the column is installed, the connecting support components and the traction rope are removed.

[0008] 3) Install the curtain wall unit: After the columns are installed, use a crane to lift the curtain wall unit onto the columns for installation.

[0009] Furthermore, the auxiliary equipment includes a guide rail fixed on the ground, and the guide rail faces the crane, a car body is provided on the guide rail, and an adjustment groove horizontally and perpendicular to the guide rail is opened on the car body, a support is slidably connected to the adjustment groove, and a connecting seat is hinged at the top of the support; it also includes a connecting support component detachably mounted on the column, the connecting support component extends from the end of the column to the upper half of the column, and the end of the connecting support component is detachably connected to the connecting seat, and the front end of the connecting support component is connected to the traction rope of the crane.

[0010] In this solution, after the connecting support component is installed, the end of the connecting support component is connected to the connecting seat, and the traction rope of the crane is connected and fixed to the front end of the connecting support component; at this time, the crane is used to lift the column from the horizontal device to a vertical state. During the whole process, the connection between the column, the connecting support component and the connecting seat is used to make the vehicle body move with the movement of the end of the column, and the end of the column is always supported to prevent the end of the column from colliding with the ground and being damaged; the setting of the support and the guide rail enables the connecting seat to move in any horizontal direction with the end of the column; when the column is pulled to the vertical state, the connecting support component and the connecting seat are removed, and then the column is lifted to the installation position of the building by the crane.

[0011] Furthermore, the connecting support component includes several groups of annular parts, and the annular parts include several fixing parts that fit the edges of the columns and are detachably connected to the columns. The fixing parts are V-shaped, and the annular parts also include connecting rods arranged between adjacent fixing parts. The ends of the fixing parts are provided with connecting grooves coaxial with the connecting rods, and the ends of the connecting rods are slidably connected to the corresponding connecting grooves. The fixing parts are provided with locking structures for locking the connecting rods; several support parts for supporting the columns are provided between adjacent annular parts, and the two ends of the support parts are respectively detachably connected to the corresponding connecting rods.

[0012] In this solution, fixing parts with the same number as the edges of the columns are fitted and connected to the edges of the columns, connecting rods are installed, and the connecting rods and fixing parts are fixed through a locking structure. The ring parts can be used with columns of various sizes through the cooperation of the connecting rods and the connecting grooves. After the ring parts are installed, the supporting parts are installed on the connecting rods. After the lifting is completed, they are removed in sequence. The whole process is simple and quick. During the lifting process of the columns, the columns are supported by the supporting parts, so that the traction applied by the crane is applied to the columns more evenly, avoiding the columns from bending due to unbalanced force, which affects the overall installation of the curtain wall panels.

[0013] Furthermore, a clamping block facing the column is provided on the side wall of the support member, the clamping block is slidably connected to the support member, and an elastic reset member is provided between the clamping block and the adjustment hole; an adjustment groove parallel to it is provided on the upper side wall of the clamping block, and a number of evenly distributed limiting grooves are provided on one side of the adjustment groove; the interior of the support member is hollow, and an adjustment rod parallel to it is slidably connected to the support member along its axial direction, and the adjustment rod cannot rotate, and a limiting protrusion extending into the adjustment groove is provided on the side wall of the adjustment rod, and the width of the limiting protrusion is equal to the width of the limiting groove.

[0014] In this solution, after the support member is installed, the adjusting rod is slid to drive the limiting protrusion to slide from the limiting groove into the adjusting groove, so that the clamping block can slide relative to the support member; at this time, the support member moves toward the column under the action of the elastic reset member until the clamping block abuts against the surface of the column, and then the adjusting rod is slid in the opposite direction to drive the limiting protrusion to slide from the adjusting groove into the corresponding limiting groove, limiting the movement of the clamping block, so that the clamping block maintains support for the column and prevents the column from bending and deformation during the lifting process.

[0015] Furthermore, the connecting seat includes a seat body hinged to the support, the seat body is fixed with a fixing plate, the seat body is slidably connected with a mounting plate symmetrically arranged with the fixing plate, and both the fixing plate and the mounting plate are provided with connecting holes; the middle part of the connecting rod located on both sides of the end ring part of the column is horizontally and vertically fixed with a connecting shaft facing the corresponding connecting hole, and a fastening nut is provided on the connecting shaft.

[0016] After the connecting support component is installed on the column, insert the connecting shaft on the connecting rod on one side into the connecting hole on the fixing plate and install the fastening nut; then slide the mounting plate to insert the connecting shaft on the connecting rod on the other side into the connecting hole on the mounting plate and install the fastening nut, use the fixing plate and the mounting plate to clamp and fix the end of the column to connect the end of the column to the connecting seat; so that columns of various sizes can be connected to the connecting seat.

[0017] Furthermore, the locking structure includes a fastening bolt threadedly connected to the side wall of the fixing member, and a plurality of threaded holes corresponding to the fastening bolts are provided on the side walls on both sides of the connecting rod.

[0018] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to make the purpose, technical solutions and beneficial effects of the present invention more clear, the present invention provides the following drawings for illustration:

[0020] Figure 1 Schematic diagram of the structure of an embodiment of the present invention;

[0021] Figure 2 for Figure 1 A magnified schematic diagram of point A in the middle;

[0022] Figure 3 is a longitudinal cross-sectional view of a support member according to an embodiment of the present invention;

[0023] Figure 4 for Figure 3 A magnified schematic diagram of point B in the middle;

[0024] Figure 5 2 is a longitudinal cross-sectional view of a fixing member according to an embodiment of the present invention.

[0025] The markings in the accompanying drawings are as follows: guide rail 1, vehicle body 2, support 3, traction rope 4, fixing part 5, connecting rod 6, support part 7, tightening block 8, adjusting rod 9, limiting protrusion 10, limiting groove 11, seat body 12, fixing plate 13, mounting plate 14, connecting shaft 15, fastening nut 16, fastening bolt 17, threaded hole 18, column 19. DETAILED DESCRIPTION

[0026] like Figures 1 to 5 As shown:

[0027] A method for installing an extra-long curtain wall keel comprises the following steps:

[0028] 1) Preparation of column 19: Install auxiliary equipment that can move relative to the ground; install the connecting support component on the column 19 and place the end of the connecting support component on the auxiliary equipment so that the end of the column 19 can deflect relative to the auxiliary equipment; install the guide rail 1 on the ground and install the vehicle body 2 on the guide rail 1; connect the crane's traction rope 4 to the front end of the connecting support component, with the connection point located in the upper area of the column 19;

[0029] 2) Hoisting the column 19: Start the crane and hoist the column 19 from a horizontal state to a vertical device; during the entire process, the end of the column 19 is supported by an auxiliary device, and the auxiliary device moves with the end of the column 19 to just below the column 19 to ensure that the column 19 is in a vertical state. After the connecting support component and the auxiliary device are disassembled, the column 19 is kept in a vertical state and hoisted to the installation location of the building using a crane; after the column 19 is installed, the connecting support component and the traction rope 4 are removed;

[0030] 3) Installing the curtain wall unit: After the columns 19 are installed, a crane is used to lift the curtain wall unit onto the columns 19 for installation.

[0031] In this embodiment, the auxiliary equipment includes a guide rail 1 fixed on the ground, and the guide rail 1 faces the crane. A car body 2 is provided on the guide rail 1, and an adjustment groove horizontally and perpendicular to the guide rail 1 is provided on the car body 2. A support 3 is slidably connected to the adjustment groove, and a connecting seat is hinged at the top of the support 3; it also includes a connecting support component that is detachably mounted on the column 19, and the connecting support component extends from the end of the column 19 to the upper half of the column 19, and the end of the connecting support component is detachably connected to the connecting seat, and the front end of the connecting support component is connected to the traction rope 4 of the crane.

[0032] In this solution, after the connecting support component is installed, the end of the connecting support component is connected to the connecting seat, and the traction rope 4 of the crane is connected and fixed to the front end of the connecting support component; at this time, the crane is used to lift the column 19, and the column 19 is pulled from the horizontal device to a vertical state. During the whole process, the connection between the column 19, the connecting support component and the connecting seat is used to make the car body 2 move with the movement of the end of the column 19, and the end of the column 19 is always supported to prevent the end of the column 19 from colliding with the ground and being damaged; and the setting of the support 3 and the guide rail 1 enables the connecting seat to move in any horizontal direction with the end of the column 19; when the column 19 is pulled to the vertical state, the connecting support component and the connecting seat are removed, and then the column 19 is lifted to the installation position of the building by the crane.

[0033] In this embodiment, the connecting support component includes several groups of annular parts, and the annular parts include several fixing parts 5 that are attached to the edges of the columns 19 and are detachably connected to the columns 19. The fixing parts 5 are V-shaped, and the annular parts also include connecting rods 6 arranged between adjacent fixing parts 5. The ends of the fixing parts 5 are provided with connecting grooves coaxial with the connecting rods 6, and the ends of the connecting rods 6 are slidably connected to the corresponding connecting grooves. The fixing parts 5 are provided with locking structures for locking the connecting rods 6; several support parts 7 for supporting the columns 19 are provided between adjacent annular parts, and the two ends of the support parts 7 are detachably connected to the side walls of the corresponding connecting rods 6 by bolts.

[0034] In this solution, the fixing parts 5 with the same number of edges as the column 19 are fitted and connected to the edges of the column 19, the connecting rod 6 is installed, and the connecting rod 6 and the fixing part 5 are fixed by a locking structure. The ring part can use columns 19 of various sizes through the cooperation of the connecting rod 6 and the connecting groove; after the ring part is installed, the support part 7 is installed on the connecting rod 6; after the hoisting is completed, it is removed in turn, and the whole process is simple and fast; and during the hoisting process of the column 19, the column 19 is supported by the support part 7, so that the traction applied by the crane is applied more evenly to the column 19, thereby avoiding the column 19 from bending due to unbalanced force, affecting the overall installation of the curtain wall panel.

[0035] In this embodiment, a clamping block 8 is provided on the side wall of the support member 7 facing the column 19, the clamping block 8 is slidably connected to the support member 7, and an elastic reset member is provided between the clamping block 8 and the adjustment hole; an adjustment groove parallel to the support member 7 is provided on the upper side wall of the clamping block 8, and a plurality of evenly distributed limiting grooves 11 are provided on one side of the adjustment groove; the interior of the support member 7 is hollow, and an adjustment rod 9 parallel to the support member 7 is slidably connected to the support member 7 along its axial direction, and the adjustment rod 9 cannot rotate, and a limiting protrusion 10 extending into the adjustment groove is provided on the side wall of the adjustment rod 9, and the width of the limiting protrusion 10 is equal to the width of the limiting groove 11.

[0036] In this solution, after the support member 7 is installed, the adjusting rod 9 is slid, thereby driving the limiting protrusion 10 to slide from the limiting groove 11 into the adjusting groove, so that the tightening block 8 can slide relative to the support member 7; at this time, the support member 7 moves toward the column 19 under the action of the elastic reset member until the tightening block 8 and the surface of the column 19 are abutted, and then the adjusting rod 9 is slid in the opposite direction, driving the limiting protrusion 10 to slide from the adjusting groove into the corresponding limiting groove 11, limiting the movement of the tightening block 8, so that the tightening block 8 maintains support for the column 19, and prevents the column 19 from bending and deforming during the lifting process.

[0037] In this embodiment, the connecting seat includes a seat body 12 hinged to the support 3, and the seat body 12 is welded with a fixing plate 13, and the seat body 12 is slidably connected to a mounting plate 14 symmetrically arranged with the fixing plate 13, and both the fixing plate 13 and the mounting plate 14 are provided with connecting holes; the middle part of the connecting rod 6 on both sides of the end ring part of the column 19 is horizontally and vertically fixed with a connecting shaft 15 facing the corresponding connecting hole, and a fastening nut 16 is provided on the connecting shaft 15.

[0038] After the connecting support component is installed on the column 19, insert the connecting shaft 15 on the connecting rod 6 on one side into the connecting hole on the fixing plate 13, and install the fastening nut 16; then slide the mounting plate 14 to insert the connecting shaft 15 on the connecting rod 6 on the other side into the connecting hole on the mounting plate 14, and install the fastening nut 16, use the fixing plate 13 and the mounting plate 14 to clamp and fix the end of the column 19, so that the end of the column 19 is connected to the connecting seat; so that columns 19 of various sizes can be connected to the connecting seat.

[0039] In this embodiment, the locking structure includes a fastening bolt 17 threadedly connected to the side wall of the fixing member 5, and a plurality of threaded holes 18 corresponding to the fastening bolts 17 are provided on the side walls of both sides of the connecting rod 6; the fastening bolts 17 are used to restrict the connecting rod 6, and the operation process is simple and quick.

[0040] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention and are not limiting. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A method for installing an extra-long curtain wall keel, characterized in that: The steps include: 1) Preparation of columns: Install auxiliary equipment, which can move relative to the ground; install the connecting support component on the column, and place the end of the connecting support component on the auxiliary equipment so that the end of the column can deflect relative to the auxiliary equipment; install the guide rail on the ground, and install the vehicle body on the guide rail; connect the traction rope of the crane to the front end of the connecting support component, and the connection point is located in the upper area of the column; the auxiliary equipment includes a guide rail fixed on the ground, and the guide rail faces the crane, and a vehicle body is provided on the guide rail, and an adjustment groove is provided on the vehicle body that is horizontally and perpendicular to the guide rail, and a support is slidably connected to the adjustment groove, and the top of the support is hinged with a connecting seat; it also includes a connecting support component that is detachably mounted on the column, and the connecting support part The part extends from the end of the column to the upper half area of the column, and the end of the connecting support part is detachably connected to the connecting seat, and the front end of the connecting support part is connected to the traction rope of the crane; the connecting support part includes a plurality of groups of annular parts, and the annular parts include a plurality of fixing parts that fit the edge of the column and are detachably connected to the column, and the fixing parts are V-shaped, and the annular parts also include connecting rods arranged between adjacent fixing parts, and the ends of the fixing parts are provided with connecting grooves coaxial with the connecting rods, and the ends of the connecting rods are slidably connected to the corresponding connecting grooves, and the fixing parts are provided with a locking structure for locking the connecting rods; a plurality of support parts for supporting the columns are provided between adjacent annular parts, and the two ends of the support parts are respectively detachably connected to the corresponding connecting rods; 2) Hoisting the column: Start the crane and lift the column from a horizontal state to a vertical device. During the entire process, the end of the column is supported by auxiliary equipment, and the auxiliary equipment moves with the end of the column to the bottom of the column to ensure that the column is in a vertical state. After the connecting support components and the auxiliary equipment are disassembled, the column is hoisted to the installation location of the building using a crane while maintaining the vertical state. After the column is installed, the connecting support components and the traction rope are removed. 3) Install the curtain wall unit: After the columns are installed, use a crane to lift the curtain wall unit onto the columns for installation.

2. The method for installing an extra-long curtain wall keel according to claim 1, wherein: A clamping block facing the column is provided on the side wall of the support member, the clamping block is slidably connected to the support member, and an elastic reset member is provided between the clamping block and the adjustment hole; an adjustment groove parallel to the support is provided on the upper side wall of the clamping block, and a plurality of evenly distributed limiting grooves are provided on one side of the adjustment groove; the interior of the support member is hollow, and an adjustment rod parallel to the support member is slidably connected to the support member along its axial direction, and the adjustment rod cannot rotate, and a limiting protrusion extending into the adjustment groove is provided on the side wall of the adjustment rod, and the width of the limiting protrusion is equal to the width of the limiting groove.

3. The method for installing an extra-long curtain wall keel according to claim 2, wherein: The connecting seat includes a seat body hinged to the support, a fixing plate is fixed to the seat body, a mounting plate symmetrically arranged with the fixing plate is slidably connected to the seat body, and connecting holes are provided on both the fixing plate and the mounting plate; a connecting shaft facing the corresponding connecting hole is fixed horizontally and vertically in the middle of the connecting rod on both sides of the ring part at the end of the column, and a fastening nut is provided on the connecting shaft.

4. The method for installing an extra-long curtain wall keel according to claim 3, wherein: The locking structure includes a fastening bolt threadedly connected to the side wall of the fixing member, and a plurality of threaded holes corresponding to the fastening bolts are provided on the side walls on both sides of the connecting rod.

Citation Information

Patent Citations

  • Construction method of ultra-large plate glass curtain wall in narrow space

    CN115680173A

  • A turning device for prefabricating hoist and mount of stand unit

    CN205443944U