A right-angle turning method for open-pit mines based on end-wall mining
Through the methods of triangular internal drainage, alternating end-chamber mining and non-balanced earth discharge, the problem of insufficient internal drainage space and increased transportation distance during the right-angle turn of the open-pit mine was solved, achieving efficient use of space and reducing costs, ensuring that Normal production in the new mining area.
Patent Information
- Application Number
- CN202311619713.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-11-29
AI Technical Summary
During the right-angle turning process of open-pit mines, the problem of insufficient internal drainage space and increased transportation distance caused by end-bar coal pressing limits the scope of application of the process solution.
The methods of triangular internal discharge, end-to-end alternating adit mining and non-equilibrium discharge are adopted to advance the dump site at a differential speed, mine horizontal adits and boundary alleys, optimize the discharge area of stripped materials, and ensure the discharge space within the mining area. The utilization and transportation roads are smooth.
This effectively avoids space waste and increased transportation costs, completes the easing of new mining areas in advance, reduces the cost of stripping projects, and rationally utilizes the space at the bottom of the pit.
Smart Images

Figure CN117432413B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an open-pit mine steering method, in particular to an open-pit mine right-angle steering method based on end-wall mining. Background Art
[0002] Mining area steering is an inevitable technical problem in the production process of large-scale multi-mining area open-pit mines. After years of research, relevant domestic scholars have proposed a right-angle steering method, that is, when the stripping work line of the old mining area of the open-pit mine reaches or is about to reach the final mining boundary of the current mining area, the end wall of the current mining area close to the new mining area is arranged as the working wall of the new mining area, and then the new mining area is continued to be mined. Right-angle steering has the advantages of fixed working line length, balanced output, and stable equipment capacity requirements, so it is adopted by many open-pit mines. However, there are also two serious defects. First, when the lowest coal line of the mining area enters the scope of the new mining area but the coal at the end wall of the old mining area is not completely mined, in order to avoid secondary stripping from the old mining area to the boundary end wall, the inner dump must temporarily suspend the dumping of soil to make way for the construction space of the old mining area, which makes it impossible for the dump to follow up with the new mining area, causing part of the volume of the mine pit to be temporarily unusable, and it is necessary to be forced to discharge the soil outside to raise the inner dump. Second, in the process of actively mining the end-wall coal in the old mining area and then releasing the internal row space, the end-wall transportation road was destroyed, which increased the stripping and transportation distance of the new mining area. The above two points caused a significant increase in the stripping and transportation costs, limiting the scope of application of this process. Based on this, this scheme proposes a right-angle turning method for open-pit mines based on end-wall mining to solve the problem of insufficient internal row space and increased transportation distance during the right-angle turning period caused by end-wall coal compression. Summary of the invention
[0003] In view of the problems existing in the above-mentioned prior art, the present invention provides an open-pit mine right-angle turning method based on end-wall mining, which can solve the problems of insufficient internal row space and increased transportation distance during right-angle turning caused by end-wall coal compression.
[0004] To achieve the above object, the present invention provides the following technical solutions: a right-angle turning method for open-pit mines based on end-wall tunnel mining, comprising three steps of triangular inner row, end-wall alternating horizontal tunnel mining, and non-balanced soil discharge;
[0005] Triangle inner drainage: When the bottom step of the spoil dump in the old mining area of the open-pit mine is advanced to 20-30m away from the extension line of the inner boundary of the new mining area, all the spoil dump steps begin to be advanced at differential speeds. The advancement speed of the spoil dump steps gradually increases from zero from the side close to the inner boundary of the old mining area to the side close to the outer boundary of the old mining area, and the distance between the bottom spoil dump step and the bottom coal seam step of the old mining area is kept as the minimum construction width. Thus, the spoil dump gradually forms a triangular spoil dump. During the triangle inner drainage process, the early stage of the new mining area wall relief process is synchronously implemented on the side of the old mining area close to the new mining area;
[0006] Alternating horizontal tunnel mining at the end and side: On the coal mining steps at the bottom of the old mining area near the outer boundary of the old mining area and the new mining area, horizontal tunnels are excavated towards the bottom boundary of the old mining area until the bottom boundary of the old mining area. The horizontal tunnel near the outer boundary of the old mining area is the air intake tunnel, and the horizontal tunnel near the new mining area is the air outlet tunnel; a boundary tunnel connecting the air intake tunnel and the air outlet tunnel is excavated inside the end wall coal along the bottom boundary of the old mining area, and a negative pressure device is arranged at the entrance of the air outlet tunnel. After the excavation of the boundary tunnel is completed, on the coal mining step, along the direction from the air inlet tunnel to the air outlet tunnel, the coal mining adit is sequentially excavated at intervals to mine the end wall coal. After the first coal mining adit close to the air inlet tunnel is mined, it will be used as a new air inlet tunnel, and the old air inlet tunnel will be filled with materials stripped from the open-pit mine, thereby preventing the collapse of the coal mining adit and ensuring the smooth flow of the end wall transportation road on the old mining area; and so on, until the last coal mining adit;
[0007] Unbalanced dumping: When the end-wall alternating adit mining steps begin, the new mining area slow wall later process also starts synchronously. At this time, the stripping materials produced in the new mining area slow wall later process are concentrated and dumped to the area near the midpoint of the dumping step of the triangular dumping yard. This area is the first unbalanced dumping area. It should be ensured that the distance between the lowest dumping step and the coal mining adit and the lowest step of the new mining area slow wall later process is the minimum construction width;
[0008] After the second coal mining adit in the end-wall alternating adit mining step is completed, the stripping materials of the late process of the new mining area are discharged to the area near the first two coal mining adit openings, and this area is the second non-balanced soil discharge area; with two coal mining adit mining as one cycle, the stripping materials generated in the late process of the new mining area are switched back and forth between the first non-balanced soil discharge area and the second non-balanced soil discharge area for discharge;
[0009] After the lowest coal mining step of the later process of the new mining area's wall buffer begins to advance and the distance from the intersection of the new mining area's inner boundary and the old mining area's inner boundary exceeds the minimum construction width, a third non-balanced soil discharge area is added to the area next to the intersection of the new mining area's inner boundary and the old mining area's inner boundary. At this time, the two coal mining adits are still used as a cycle, and the stripping materials produced in the later process of the new mining area's wall buffer are selected and discarded in one of the first non-balanced soil discharge area, the second non-balanced soil discharge area, and the third non-balanced soil discharge area until the last coal mining adit is completed, all the end wall pressure coal is mined, and the later process of the new mining area's wall buffer is also completed, the new mining area starts normal production, and the inner dumping yard turns to the middle dumping of the new mining area.
[0010] Furthermore, the stripping materials produced in the early process of wall softening in the new mining area are discarded according to the triangular inner discharge steps. When the top stripping step of the old mining area is pushed to the bottom boundary of the old mining area, the stripping and coal mining in the old mining area are stopped. At this time, it should be ensured that the goals of the early process of wall softening implemented in the new mining area are also completed synchronously, and a triangular spoil dump is formed synchronously.
[0011] Furthermore, the goal of the pre-softening process is to peel off 1 / 2 of the total amount of material required to complete the entire softening process.
[0012] Furthermore, the interval between the sequentially excavated coal mining adits is 0.3-0.5 times of the diameter of the coal mining adits, and the interval parts serve as coal pillars.
[0013] Furthermore, in the non-balanced soil discharge step, when the last coal mining adit is completed, the later process of easing the wall in the new mining area is also completed at the same time.
[0014] Furthermore, the basis for selecting one of the first unbalanced soil discharge area, the second unbalanced soil discharge area and the third unbalanced soil discharge area for discharge of the stripping materials produced in the later process of the new mining area is the principle of the shortest internal discharge distance.
[0015] Compared with the prior art, the present invention can not only ensure the normal local soil discharge of the spoil yard, avoid the waste of space leading to stripping and external discharge and thus increase production costs, but also complete a part of the stripping work of the new mining area's cushion wall in advance and discharge the stripping material into the internal spoil yard, reducing the pressure of the later stripping work and avoiding the problem of insufficient internal discharge space due to the huge stripping volume in the later concentrated cushion wall process; the stripping project required in the old mining area's cushion wall process is cancelled, avoiding damage to the stripping step transportation road, reducing the cost of the stripping project and avoiding the increase in transportation costs caused by the detour of the stripping material in the early stage of the cushion wall process; the discharge of the stripping material in the early stage of the cushion wall process can avoid the increase in external discharge costs and at the same time does not affect the recovery of the end wall compressed coal in the old mining area, thereby ensuring that the pit bottom space is used reasonably and does not cause waste of pit bottom resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a top view of the present invention when the triangles are arranged inwardly;
[0017] Figure 2 This is a top view of the triangular inner row of the present invention when it is completed;
[0018] Figure 3 It is a top view of the end-wall alternating horizontal tunnel mining of the present invention;
[0019] Figure 4 for Figure 3 Middle AA partial enlarged image;
[0020] Figure 5This is a top view of the non-balanced soil discharge in the early stage of the present invention;
[0021] Figure 6 This is a top view of the non-balanced soil discharge in the later stage of the present invention;
[0022] Figure 7 It is a top view of the present invention in a completed state;
[0023] In the figure: 1- old mining area; 2- spoil dump; 3- inner boundary of old mining area; 4- new mining area; 5- inner boundary of new mining area; 6- outer boundary of old mining area; 7- mining area of old mining area; 8- triangular spoil dump; 9- end wall of old mining area; 10- bottom boundary of old mining area; 11- air inlet tunnel; 12- air outlet tunnel; 13- boundary tunnel; 14- coal mining adit; 15- open pit bottom; 16- coal pillar; 17- end wall transportation road; 18- first unbalanced spoil dumping area; 19- second unbalanced spoil dumping area; 20- third unbalanced spoil dumping area. DETAILED DESCRIPTION
[0024] The present invention will be further described below in conjunction with the accompanying drawings.
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] The present invention provides a technical solution, comprising three main steps: triangular inner row, end-wall alternating horizontal tunnel mining, and non-balanced soil discharge.
[0027] Triangle inner row: Figure 1 and Figure 2 As shown, when the bottom step of the spoil dump 2 in the old mining area 1 of the open-pit mine is advanced to 20-30m away from the extension line of the inner boundary 5 of the new mining area, differential advancement is adopted at each position on all the spoil steps of the spoil dump 2, and the advancement speed of the spoil steps gradually increases from zero from the side close to the inner boundary 3 of the old mining area to the side close to the outer boundary 6 of the old mining area, that is, the advancement speed of the spoil steps on the side of the inner boundary 3 of the old mining area is 0, and the advancement speed of the spoil steps on the side of the outer boundary 6 of the old mining area is the largest, and the distance between the bottom spoil step of the spoil dump 2 and the bottom coal seam step of the old mining area 7 is maintained at the minimum construction width, thereby the spoil dump 2 gradually forms a triangular spoil dump 8 inclined from the outer boundary 6 of the old mining area to the inner boundary 3 of the old mining area, and in the process of triangular inner drainage, the preliminary process of slowing down the wall of the new mining area 4 is synchronously implemented on the end wall 9 of the old mining area close to the side of the new mining area 4.
[0028] The stripping materials produced in the preliminary process of the slow wall in the new mining area 4 are discarded according to the triangular inner row steps. When the uppermost stripping step of the old mining area 7 advances to the bottom boundary 10 of the old mining area, the old mining area 7 stops stripping and coal mining. At this time, it should be ensured that the goals of the preliminary process of the slow wall implemented in the new mining area 4 are also completed synchronously. The goal of the preliminary process of the slow wall in the new mining area 4 is to complete 1 / 2 of the total amount of stripping materials required for the entire slow wall process. The calculation standard for the total amount of stripping of the slow wall in the new mining area 4 is: the sum of the stripping materials when all steps from the start of the slow wall process to the end wall form a stripping working face and the uppermost coal seam step also meets the conditions for coal mining; at this point, the triangular spoil dump 8 is formed synchronously, and the triangular inner row steps end here.
[0029] The triangular inner drainage ensures the normal local drainage of the spoil dump 2, avoiding the waste of space that leads to stripping and external drainage, thereby increasing production costs; secondly, it completes part of the stripping work of the new mining area 4 buffer wall in advance and discharges the stripped materials into the inner spoil dump, reducing the pressure of the later stripping work and avoiding the problem of insufficient inner drainage space due to the huge stripping volume in the later concentrated buffer wall process; thirdly, the undischarged space will provide the open-pit mine bottom 15 working space and soil discharge space for the later process of the new mining area 4 buffer wall.
[0030] Alternative side-to-side horizontal tunnel mining: Figure 3 and Figure 4 As shown, after the inner arrangement of the triangle is completed, the operation of the stope 7 in the old mining area is stopped; on the coal mining steps at the bottom of the stope 7 in the old mining area, close to the outer boundary 6 of the old mining area and the new mining area 4, horizontal tunnels are respectively excavated in the direction of the bottom boundary 10 of the old mining area until the bottom boundary 10 of the old mining area, the horizontal tunnel close to the outer boundary 6 of the old mining area is the air inlet tunnel 11, and the horizontal tunnel close to the new mining area 4 is the air outlet tunnel 12. The main functions of the air inlet tunnel 11 and the air outlet tunnel 12 are to provide internal space for subsequent mining and transportation, and to be used as the input of fresh air and the output of turbid air during the mining process; a boundary tunnel 13 connecting the air inlet tunnel 11 and the air outlet tunnel 12 is excavated inside the end wall coal along the bottom boundary 10 of the old mining area, and a negative pressure exhaust fan is arranged at the entrance of the air outlet tunnel 12; the boundary After the excavation of the main tunnel 13 is completed, on the coal mining step, horizontal tunnels are sequentially excavated at intervals along the direction from the air inlet tunnel 11 to the air outlet tunnel 12 as coal mining tunnels 14 to mine the end wall coal. The excavated coal is transported to the bottom of the open-pit mine 15 and then to the surface. The interval between the sequentially excavated coal mining tunnels 14 is 0.3-0.5 times the diameter of the coal mining tunnel 14, and the interval part is used as a coal pillar 16; after the first coal mining tunnel 14 close to the air inlet tunnel 11 is mined, the mining equipment is withdrawn, and the coal mining tunnel 14 is used as a new air inlet tunnel 11, and the old air inlet tunnel 11 is filled with open-pit mine stripping materials, thereby preventing the coal mining tunnel 14 from collapsing and ensuring the smooth flow of the end wall transportation road 17 on the old mining area 7; and so on, until the last coal mining tunnel 14.
[0031] The alternating side-slope mining eliminates the stripping work required during the side-slope process in the old mining area 1, avoids damage to the stripping step transportation road, reduces the stripping project cost, and avoids the increase in transportation costs caused by the detour of stripping materials in the early process of the new mining area 4 soft wall; the side-slope coal mining method is technically mature, with simple construction technology and easy implementation; side-slope mining and new mining area 4 soft wall work can be carried out simultaneously without affecting each other, thus speeding up the turning process.
[0032] Unbalanced soil discharge: Unbalanced soil discharge refers to the process of discharging the late stripping materials of the new mining area 4 slow slope after the triangular inner drainage is completed and the end slope alternating horizontal tunnel mining construction begins. Figure 3 , Figure 5-Figure 7 As shown, at the same time as the end wall alternating horizontal shaft mining steps begin, the new mining area 4 slow wall later process also starts synchronously. At this time, the stripping materials produced in the new mining area 4 slow wall later process are concentrated and discharged to the area near the midpoint of the dumping steps of the triangular dump 8. This area is the first non-balanced dumping area 18. It should be ensured that the lowest dumping step is at a minimum construction width from the coal mining horizontal shaft 14 and the lowest step of the new mining area 4 slow wall later process. In this way, the open-pit mine bottom 15 space near the coal mining horizontal shaft 14 and the open-pit mine bottom 15 space near the new mining area 4 slow wall later process are reserved, thereby ensuring the normal progress of each process.
[0033] After the second coal mining adit 14 is mined in the step of alternating adit mining at the end wall, the stripping materials of the late process of the new mining area 4 are discharged to the area near the mouths of the first two coal mining adit 14. This area is the second non-balanced soil discharge area 19, and other areas are not discharged temporarily. Taking the mining of two coal mining adit 14 as a cycle, the stripping materials generated in the late process of the new mining area 4 are switched back and forth between the first non-balanced soil discharge area 18 and the second non-balanced soil discharge area 19 for discharge. With the continuous mining of the coal mining adit 14 and the continuous progress of the late process of the new mining area 4, the first non-balanced soil discharge area 18 and the second non-balanced soil discharge area 19 gradually extend toward the new mining area 4.
[0034] After the lowest coal mining step of the late process of the new mining area 4 begins to advance and the distance between the intersection of the new mining area inner boundary 5 and the old mining area inner boundary 3 exceeds the minimum construction width, in order to rationally utilize the space, a third unbalanced soil discharge area 20 is added to the area near the inner side of the intersection of the new mining area inner boundary 5 and the old mining area inner boundary 3. At this time, the two coal mining horizontal shafts 14 are still used as a cycle, and the stripping materials produced in the late process of the new mining area 4 are no longer just switched back and forth between the first unbalanced soil discharge area 18 and the second unbalanced soil discharge area 19 for discharge, but are selected and discharged from the first unbalanced soil discharge area 18, the second unbalanced soil discharge area 19 and the third unbalanced soil discharge area 20 according to the principle of the shortest comprehensive internal discharge distance, until the last coal mining horizontal shaft 14 is mined. Preferably, when the mining of the last coal mining level 14 is completed, only the goaf area with the minimum construction scope near the coal mining level 14 in the old mining area 1 has not been drained, while other areas have been drained, and after the last part of the stripping materials of the late buffer wall process in the new mining area 4 is discharged in the goaf area with the minimum construction scope near the coal mining level 14, the late buffer wall process in the new mining area 4 is also completed accordingly; at this time, all the end wall pressure coal has been mined, and the late buffer wall process in the new mining area 4 has also been completed, the new mining area 4 starts normal production, and the inner dumping yard turns to the new mining area 4 for draining.
[0035] The unbalanced soil discharge is carried out at different positions on the triangular soil discharge yard 8 according to the construction arrangement of each process, which can not only avoid the increased cost of discharging the stripping materials during the wall softening process, but also does not affect the recovery of the end wall compressed coal of the old mining area 1. On the whole, the triangular soil discharge yard 8 is advanced in an asynchronous manner. When the turning is completed, the space 15 at the bottom of the open-pit mine in the old mining area 1 is also reasonably discharged, which will not cause waste of bottom pit resources.
[0036] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0037] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any slight modification, equivalent substitution and improvement made to the above embodiment based on the technical essence of the present invention should be included in the protection scope of the technical solution of the present invention.
Claims
1. A right-angle turning method for open-pit mines based on end-wall mining, characterized in that: It includes three steps: triangular inner row, end-side alternating horizontal tunnel mining, and non-balanced soil discharge; Triangular internal drainage: When the lowest step of the spoil dump (2) in the old mining area (1) of the open-pit mine is advanced to 20-30m from the extension line of the inner boundary (5) of the new mining area, all the spoil dump steps of the spoil dump (2) begin to be advanced at a differential speed, and the advancement speed of the spoil dump steps gradually increases from zero from the side close to the inner boundary (3) of the old mining area to the side close to the outer boundary (6) of the old mining area, and the distance between the lowest spoil dump step of the spoil dump (2) and the lowest coal seam step of the old mining area (7) is kept at the minimum construction width, thereby gradually forming a triangular spoil dump (8). During the triangular internal drainage process, the early process of slowing down the new mining area (4) is simultaneously started on the end wall (9) of the old mining area close to the new mining area (4); End-wall alternating horizontal tunnel mining: On the coal mining steps at the bottom of the old mining area (7) near the outer boundary (6) of the old mining area and the new mining area (4), horizontal horizontal tunnels are respectively excavated in the direction of the bottom boundary (10) of the old mining area until the bottom boundary (10) of the old mining area. The horizontal horizontal tunnel near the outer boundary (6) of the old mining area is the air intake tunnel (11), and the horizontal horizontal tunnel near the new mining area (4) is the air outlet tunnel (12). A boundary tunnel (13) connecting the air intake tunnel (11) and the air outlet tunnel (12) is excavated inside the end-wall coal pressing along the bottom boundary (10) of the old mining area, and a negative pressure device is arranged at the tunnel entrance of the air outlet tunnel (12). After the excavation of the boundary tunnel (13) is completed, on the coal mining step, along the direction from the air inlet tunnel (11) to the air outlet tunnel (12), the coal mining adit (14) is sequentially excavated at intervals to mine the end wall coal. After the first coal mining adit (14) close to the air inlet tunnel (11) is mined, the coal mining adit (14) is used as a new air inlet tunnel (11), and the old air inlet tunnel (11) is filled with open-pit mine stripping materials, thereby preventing the coal mining adit (14) from collapsing and ensuring the smooth flow of the end wall transportation road (17) on the old mining area stope (7); and so on, until the last coal mining adit (14); Unbalanced soil discharge: When the end-wall alternating adit mining step starts, the new mining area (4) slow wall later process also starts synchronously. At this time, the stripping materials produced in the new mining area (4) slow wall later process are concentrated and discharged to the area near the midpoint of the soil discharge step of the triangular soil discharge area (8). This area is the first unbalanced soil discharge area (18). It should be ensured that the distance between the lowest soil discharge step and the coal mining adit (14) and the lowest step of the slow wall later process of the new mining area (4) is the minimum construction width; After the second coal mining adit (14) in the end-wall alternating adit mining step is mined, the stripping material of the late step of the new mining area (4) is discharged to the area near the openings of the first two coal mining adit (14), and this area is the second non-balanced soil discharge area (19); Taking the mining of two coal mining adits (14) as one cycle, the stripping materials generated in the late process of the new mining area (4) are switched back and forth between the first non-balanced soil discharge area (18) and the second non-balanced soil discharge area (19) for discharge; When the bottom coal mining step of the late process of the new mining area (4) begins to advance and the distance between the intersection of the inner boundary (5) of the new mining area and the inner boundary (3) of the old mining area exceeds the minimum construction width, a third non-balanced soil discharge area (20) is added to the area next to the intersection of the inner boundary (5) of the new mining area and the inner boundary (3) of the old mining area. At this time, the two coal mining horizontal shafts (14) are still used as one cycle. The stripping materials produced in the late process of the new mining area (4) are selected and discarded in one of the first non-balanced soil discharge area (18), the second non-balanced soil discharge area (19) and the third non-balanced soil discharge area (20) until the last coal mining horizontal shaft (14) is mined, the end wall pressure coal is completely mined, and the late process of the new mining area (4) is also completed. The new mining area (4) starts normal production, and the inner soil discharge yard turns to the middle soil discharge of the new mining area (4).
2. The open-pit mine right-angle turning method based on end-wall mining according to claim 1 is characterized in that: The stripping materials produced in the preliminary process of the new mining area (4) are discarded according to the steps of the inner triangle. When the uppermost stripping step of the old mining area (7) is advanced to the bottom boundary (10) of the old mining area, the stripping and coal mining of the old mining area (7) are stopped. At this time, it should be ensured that the preliminary process of the new mining area (4) is also completed synchronously, and the triangular spoil dump (8) is formed synchronously.
3. The right-angle turning method for open-pit mines based on end-wall mining according to claim 2 is characterized in that: The goal of the preliminary process of softening is to peel off 1 / 2 of the total amount of material required to complete the entire softening process.
4. The right-angle turning method for open-pit mines based on end-wall mining according to claim 1 is characterized in that: The interval between the sequentially spaced coal mining tunnels (14) is 0.3-0.5 times the diameter of the coal mining tunnel (14), and the spaced portions serve as coal pillars (16).
5. The open-pit mine right-angle turning method based on end-wall mining according to claim 1 is characterized in that: In the non-balanced soil discharge step, when the mining of the last coal mining adit (14) is completed, the later process of easing the wall of the new mining area (4) is also completed at the same time.
6. The right-angle turning method for open-pit mines based on end-wall mining according to claim 1 is characterized in that: The basis for selecting one of the first non-balanced soil discharge area (18), the second non-balanced soil discharge area (19) and the third non-balanced soil discharge area (20) for discharge of the stripping material generated in the late process of the new mining area (4) is the principle of shortest internal discharge distance.
Citation Information
Patent Citations
Run-through inner dumping method between mining areas for opencast coal mine during period of diversion
CN103670419A
Sectioned and alternation type mining area turning method of open pit coal mine dragline work line
CN107687342A