A ventilation device for tunnel multi-face construction
By introducing a cooling unit into the tunnel construction ventilation system and using water spray structures and induction structures to automatically adjust air humidity according to the tunnel temperature, the problem of difficult temperature adjustment in the tunnel is solved and construction safety and ventilation effects are improved.
Patent Information
- Application Number
- CN202311145180.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-06
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-09-06
AI Technical Summary
The existing tunnel construction ventilation system cannot automatically adjust according to the temperature inside the tunnel. Ventilation is difficult especially in high-altitude areas, resulting in rising temperatures that pose safety risks and affect the health of workers.
Design a ventilation device for tunnel multi-face construction, including a first ventilation component and a drainage component. A cooling unit is installed in the drainage component. The water spray structure and induction structure are used to automatically adjust the air humidity according to the tunnel temperature to cool down, ensuring the automatic ventilation system. adjustment function.
It effectively solves the problem of temperature rise in the tunnel, improves construction safety, reduces adverse effects on the health of workers, and realizes automatic adjustment and rapid cooling of the ventilation system.
Smart Images

Figure CN117449895B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a ventilation device for tunnel multi-face construction. Background Art
[0002] "Face" is a term used in the construction of a pit or tunnel, which refers to the working face that continuously moves forward during tunnel excavation. It is not a fixed face. The excavation face includes the face, side wall and vault face. To be precise, it is the working face that continuously moves forward facing the operating workers.
[0003] In tunnel construction, the tunnel excavation process is basically designed and constructed according to the H-shaped shape. The H-shaped tunnel mainly includes two parallel tunnel bodies, which are connected by branch tunnels. As the construction progresses, other branch tunnels can be dug on both sides of the branch tunnel to strengthen the air circulation in the two tunnel bodies. During the construction process, the tunnel needs to be ventilated. The function of ventilation is to transport enough fresh air from outside the tunnel to the inside of the tunnel, and to discharge the gun smoke and harmful gases generated by blasting and transportation in the tunnel, so as to ultimately ensure the need for fresh air for the workers and machinery in the tunnel, so that the air in the tunnel meets the standards stipulated by the state and the industry. The quality of ventilation in the construction of long and large tunnels directly affects the progress of the project and the health of the workers.
[0004] The utility model patent with authorization announcement number CN203769824U discloses an air supply system for multiple construction faces in a tunnel. In this patent, fans and air ducts are installed as needed in an air bin set up near auxiliary tunnels and tunnel intersections. The fresh air in the air bin can be continuously transported to the construction faces through the air ducts, thereby meeting the demand for fresh air when multiple faces are under construction at the same time.
[0005] It has been found through practice that the above patent cannot automatically adjust according to the temperature conditions in the tunnel in time when ventilating the tunnel, especially in high altitude conditions. Due to the high altitude geographical conditions, ventilation of the tunnel itself is more difficult than that of ordinary tunnels. When the temperature in the tunnel rises, it cannot be automatically adjusted according to the temperature conditions and cannot be cooled down quickly. The continuous rise in temperature will pose a major safety hazard and will also have a direct adverse effect on the health of the workers.
[0006] Therefore, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Summary of the invention
[0007] The object of the present invention is to provide a tunnel multi-face construction ventilation device to solve the technical problem in the prior art that the air supply system in the tunnel cannot automatically adjust the ventilation conditions in the ventilation duct according to the temperature conditions in the tunnel.
[0008] In order to achieve the above-mentioned purpose, the tunnel multi-face construction ventilation device of the present invention provides the following technical solutions:
[0009] A tunnel multi-face construction ventilation device includes a first ventilation component for introducing air from the outside of a first tunnel body and passing it through a branch tunnel to a second tunnel body; it also includes a drainage component, which is arranged in the first tunnel body and the second tunnel body. The drainage component in the second tunnel body is used to guide the air introduced into the second tunnel body from the entry position to both ends and then introduce it into the first tunnel body. The drainage component in the first tunnel body is used to discharge the air introduced into the second tunnel body out of the first tunnel body after circulating in the first tunnel body; a cooling unit is arranged in the drainage component, which is used to automatically adjust the humidity of the flowing air according to the temperature conditions in the tunnel to adjust the temperature of the tunnel.
[0010] As a further optimized technical solution: the first ventilation component includes a first fan and a ventilation duct, one end of the ventilation duct extends out of the tunnel body and the other end extends into the tunnel body, and the first fan is arranged on the ventilation duct to suck air into the tunnel.
[0011] As a further optimized technical solution: the drainage component includes multiple second fans for driving the air in the tunnel to flow in a straight line. The drainage component also includes a third fan and a guide pipe. The third fan is fixedly connected to the guide pipe. The third fan and the guide pipe are used to guide the flow direction of the air so that the air is discharged after flowing in the first tunnel body and the second tunnel body.
[0012] As a further optimized technical solution: the second fan and the third fan both have a fan body, and the cooling unit is arranged on the fan body of the second fan and / or the third fan; the cooling unit includes a water spray structure and a sensing structure, the water spray structure is connected to an external water source, and the sensing structure is used to sense the temperature in the tunnel and control the on and off of the water spray structure.
[0013] As a further optimized technical solution: the sensing structure includes a shell, a first connecting conductor and a gas storage pipe are arranged in the shell, a sliding rod is slidably arranged in the gas storage pipe, gas is arranged in the gas storage pipe, the expansion and contraction of the gas is used to drive the sliding rod to slide axially along the gas storage pipe, a second connecting conductor is fixedly connected to the sliding rod, and the sliding rod controls the connection or disconnection of the second connecting conductor with the first connecting conductor.
[0014] As a further optimized technical solution: the first connecting conductor is a sliding resistor, the contact position between the second connecting conductor and the first connecting conductor is a paddle, the paddle has a contact groove adapted to the outer surface of the first connecting conductor, and the paddle can slide along the first connecting conductor under the drive of the sliding rod.
[0015] As a further optimized technical solution: the water spray structure includes a water pump, which is fixedly connected to the fan body. The water inlet of the water pump is connected to a pumping pipe for drawing cooling water from an external water source, and the water outlet of the water pump is connected to an atomizing nozzle through a spray pipe.
[0016] As a further optimized technical solution: the guide pipe includes multiple straight branch pipes, multiple "L"-shaped branch pipes and multiple "Z"-shaped branch pipes. The straight branch pipes are arranged in the first tunnel body and / or at a position where the air flows in a straight line with the second tunnel body. The "Z"-shaped branch pipes are symmetrically arranged in a branch tunnel close to the heading face. One end of the "Z"-shaped branch pipe is arranged in the second tunnel body, and the other end is arranged in the first tunnel body for guiding the air in the second tunnel body into the first tunnel body. The "L"-shaped branch pipe is arranged in the auxiliary tunnel of the first tunnel body for discharging the air in the first tunnel body to the outside.
[0017] As a further optimized technical solution: the drainage component also includes a reinforced fan, which is arranged on the trajectory of air flow and is used to increase the air flow rate. The reinforced fan includes an outer shell, and fan blades are rotatably installed in the outer shell. The fan blades are connected to a drive motor. The induction structure is arranged on the outer shell, and the induction structure is electrically connected to the drive motor.
[0018] As a further optimized technical solution: the drainage component also includes a reinforced fan for increasing the air flow rate. The reinforced fan includes a shell, and fan blades are rotatably installed in the shell. The fan blades are connected to a drive motor. An induction adjustment unit is provided on the shell. The induction adjustment unit includes a temperature and humidity sensor and a controller, which is used to control the speed of the drive motor according to the temperature and humidity in the tunnel.
[0019] Beneficial effects: By setting up a first ventilation component to introduce air from the outside of the first tunnel body into the second tunnel body, by setting up a drainage component to drive the air in the tunnel to circulate comprehensively and then discharge it from the tunnel, by setting up a cooling unit in the drainage component, the humidity of the air can be adjusted in time when the temperature in the tunnel rises to ultimately achieve the purpose of cooling, thereby effectively solving the technical problem in the prior art that the air supply system in the tunnel cannot automatically adjust the ventilation conditions in the ventilation duct according to the temperature conditions in the tunnel, thereby ensuring the safety performance of the construction and reducing the adverse effects on the physical condition of the workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:
[0021] Figure 1This is a schematic diagram of the overall structure of a tunnel multi-face construction ventilation device according to Example 1 of the present invention;
[0022] Figure 2 This is a schematic diagram of air flow in a tunnel multi-face construction ventilation device according to Example 1 of the present invention;
[0023] Figure 3 This is a schematic diagram of the overall structure of the fan body according to Embodiment 1 of the present invention;
[0024] Figure 4 This is a schematic diagram of the overall structure of the water spray structure of Example 1 of the present invention;
[0025] Figure 5 This is a schematic diagram of the overall structure of the sensing structure of Example 1 of the present invention;
[0026] Figure 6 This is a schematic diagram of the internal structure of the gas storage pipe according to Embodiment 1 of the present invention;
[0027] Figure 7 This is a schematic diagram of the enhanced fan structure of Example 1 of the present invention;
[0028] Figure 8 This is a schematic diagram of the enhanced fan structure of Example 2 of the present invention;
[0029] In the figure: 1. first tunnel body; 101. auxiliary tunnel; 102. branch tunnel; 2. second tunnel body; 3. first fan; 4. ventilation duct; 5. second fan; 6. third fan; 56a. fan body; 7. water spraying structure; 701. water pump; 702. water suction pipe; 703. water spraying pipe; 704. atomizing nozzle; 705. fixing ring; 8. induction structure; 801. shell; 802. first connecting conductor; 803. gas storage pipe; 804. sliding rod; 805. second connecting conductor; 806. paddle; 807. fixing frame; 9. linear branch pipe; 10. "L"-shaped branch pipe; 11. "Z"-shaped branch pipe; 12. reinforced fan; 1201. shell; 1202. fan blade; 1203. driving motor; 1204. temperature and humidity sensor; 1205. controller; 1206. wire. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention belong to the scope of protection of the present invention.
[0031] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present invention. The terms "connected" and "connected" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0032] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.
[0033] Embodiment 1:
[0034] The present invention provides a ventilation device for tunnel multi-face construction. A first ventilation component is provided to introduce fresh air from the outside of a first tunnel body into a second tunnel body for circulation. A drainage component is provided to drive the air in the tunnel to be fully circulated in the tunnel and then discharged from the tunnel. In addition, a cooling unit is provided in the drainage component, so that when the temperature in the tunnel rises, the humidity of the air is adjusted in time to ultimately achieve the purpose of cooling the tunnel.
[0035] Specifically, Figure 1 , Figure 2 As shown, the tunnel of this embodiment includes two parallel tunnel bodies, namely a first tunnel body 1 and a second tunnel body 2, and construction faces are respectively provided at both ends of the first tunnel body 1 and the second tunnel body 2, wherein an auxiliary tunnel 101 is provided on the side of the first tunnel body 1 away from the second tunnel body 2, and the auxiliary tunnel 101 is opened at an angle to facilitate the connection between the first tunnel body 1 and the outside world, and the first tunnel body 1 and the second tunnel body 2 are connected through three branch tunnels 102, wherein the branch tunnel 102 located in the middle is aligned with the auxiliary tunnel 101.
[0036] The tunnel multi-face construction ventilation device includes a first ventilation component and a drainage component, and the drainage component is arranged in the first tunnel body 1 and the second tunnel body 2. The first ventilation component is used to introduce air from the outside of the auxiliary tunnel 101 of the first tunnel body 1 and pass it to the second tunnel body 2 through the branch hole 102 in the middle of the first tunnel body 1; the drainage component in the second tunnel body 2 is used to guide the air introduced into the second tunnel body 2 from the entry position to the two ends of the second tunnel body 2 and then pass it into the first tunnel body 1, and the drainage component in the first tunnel body 1 is used to circulate the air introduced into the second tunnel body 2 in the first tunnel body 1 and then discharge it from the first tunnel body 1 through the auxiliary tunnel 101; in addition, a cooling unit is arranged in the drainage component, which is used to automatically adjust the humidity of the flowing air according to the temperature in the tunnel to adjust the temperature of the tunnel.
[0037] Specific as Figure 1 As shown, the first ventilation component includes a first fan 3 and a ventilation duct 4. In the present embodiment, an axial flow fan is recommended for the first fan 3. One end of the ventilation duct 4 extends out of the tunnel body through the auxiliary tunnel 101 and the other end passes through the branch hole 102 and extends into the second tunnel body 2. The first fan 3 is fixedly connected to the outer end of the ventilation duct 4 for sucking air into the tunnel, so that the fresh air from the outside is directly passed into the middle part of the second tunnel body 2, and then flows and diffuses from the middle part of the second tunnel body 2 to both ends through the drainage component in the second tunnel body 2.
[0038] The drainage assembly specifically includes a plurality of second fans 5. In this embodiment, it is recommended that the second fans 5 use jet fans. The jet fans are fixedly arranged in the tunnel along the direction of the tunnel length. The drainage assembly also includes a third fan 6 and a guide pipe. The guide pipe includes two straight branch pipes 9, two "L"-shaped branch pipes 10 and two "Z"-shaped branch pipes 11. The straight branch pipe 9 is arranged at the first tunnel body 1 and / or the position where the air flows in a straight line with the second tunnel body 2. In this embodiment, the two straight branch pipes 9 are respectively arranged at the positions near the two ends of the second tunnel body 2 to further guide the air at the end to avoid the air at the end from being unable to fully circulate in the tunnel due to the chaotic flow direction caused by the reduction of air pressure. The two "Z"-shaped branch pipes 11 are symmetrically arranged in the branch holes 102 at the two ends near the face. One end of the "Z"-shaped branch pipe 11 is arranged in the second tunnel body 2, and the other end is arranged in the first tunnel body 1 to guide the air in the second tunnel body 2 to the first tunnel body 1, thereby ensuring that the air in the two tunnel bodies is fully circulated. Two "L"-shaped branch pipes 10 are symmetrically arranged at the auxiliary tunnel 101 of the first tunnel body 1, and are used to discharge the air circulated and returned from both ends of the first tunnel body 1 to the outside of the tunnel. The third fan 6 is fixedly connected to the guide pipe, and is used to suck air into the guide pipe, so as to ensure the guide function of the guide pipe. From the above description, it can be seen that the third fan 6 and the guide pipe are used to guide the flow direction of the air, so that the air flows in the first tunnel body 1 and the second tunnel body 2 and then is discharged.
[0039] The second fan 5 and the third fan 6 can be of different models, but the second fan 5 and the third fan 6 have a fan body 56a regardless of the model. In order to facilitate the explanation of the working principle of the cooling unit, the common parts of the second fan 5 and the third fan 6 are combined for introduction. Figure 3 As shown, the cooling unit is arranged on the fan body 56a of the second fan 5 and / or the third fan 6, and is selected specifically according to the cooling speed. If the cooling is required to be faster, the cooling unit can be arranged on both the second fan 5 and the third fan 6, so that when cooling, the cooling units on the second fan 5 and the third fan 6 work synchronously, thereby achieving the purpose of rapid cooling. If a fast cooling method is not required on site, the cooling unit can be arranged on the second fan 5 or the third fan 6, and is selected specifically according to the actual situation. The cooling unit includes a water spraying structure 7 and a sensing structure 8, the water spraying structure 7 is connected to an external water source to supply water to the water spraying structure 7, and the sensing structure 8 is used to sense the temperature in the tunnel and control the on and off of the water spraying structure 7.
[0040] like Figure 5 , Figure 6As shown, the sensing structure 8 includes a shell 801, a cylindrical first conductor 802 is fixedly connected in the shell 801, a gas storage tube 803 is fixedly connected to one side of the conductor 802 through a fixing frame 807, a sliding rod 804 is slidably arranged in the gas storage tube 803, gas is arranged in the gas storage tube 803, the expansion and contraction of the gas is used to drive the sliding rod 804 to slide axially along the gas storage tube 803, a second connecting conductor 805 is fixedly connected to the sliding rod 804, and the sliding rod 804 controls the second connecting conductor 805 to be connected or disconnected with the first connecting conductor 802.
[0041] The specific control principle is: when the temperature in the tunnel rises, the gas in the gas storage pipe 803 expands due to the heat, and the sliding rod 804 is pushed to slide upward, thereby driving the second connecting conductor 805 to connect with the first connecting conductor 802. At this time, the power supply of the water spraying structure 7 is turned on, and the water spraying structure 7 starts to work and spray water, so as to cool the tunnel; when the temperature drops, the gas in the gas storage pipe 803 contracts, and the external air pressure causes the sliding rod 804 to slide downward, thereby driving the second connecting conductor 805 to disconnect from the first conductor 802, and the water spraying structure 7 stops working, thereby achieving the purpose of automatically controlling and adjusting the temperature in the tunnel.
[0042] In order to make the sensing structure 8 further realize more precise adjustment according to the temperature in the tunnel, the first connecting conductor 802 can be selected as a sliding rheostat, and the contact position between the second connecting conductor 805 and the first connecting conductor 802 is a paddle 806, which has a contact groove adapted to the outer surface of the first connecting conductor 802 to facilitate connection with the sliding rheostat, and the paddle 806 can slide along the first connecting conductor 802 under the drive of the sliding rod 804. In this way, when the temperature is relatively high, the gas in the gas storage tube 803 expands more, so that the sliding rod 804 is pushed outward more, so that the paddle 806 slides on the sliding rheostat for a longer length, and the upper part of the sliding rheostat is the part connected in series with the circuit, so the resistance value connected in series will be smaller, making the current in the circuit stronger, so that the water spraying structure 7 has more power to work and the temperature drops faster, otherwise the temperature drops slowly, so it can achieve more precise adjustment according to the temperature in the tunnel.
[0043] like Figure 4 As shown, the water spray structure 7 includes a water pump 701, which is fixedly connected to the fan body 56a by using a fixing ring 705. The water inlet of the water pump 701 is connected to a water pumping pipe 702, and the water pumping pipe 702 is connected to an external water source for extracting cooling water from the external water source. The water outlet of the water pump 701 is connected to an atomizing nozzle 704 through a water spraying pipe 703, so that the water is atomized and then sprayed out. The atomized water is blown into the tunnel under the action of the fan, which can cool the tunnel and also has a good dust reduction effect.
[0044] In order to further adjust the air flow rate in the tunnel, the drainage component also includes a reinforced fan 12. The reinforced fan 12 can be of the same model as the second fan 5 and is arranged along the length of the tunnel, that is, it is set on the trajectory of air flow and is spaced apart from the second fan 5, which is equivalent to adding another set of fans to increase the air flow rate. However, the reinforced fan 12 does not work under normal circumstances. It will only start working in a zigzag manner after the temperature in the tunnel rises, and further cooperate with the cooling unit to cool the tunnel. Figure 7 As shown, the enhanced fan 12 includes a shell 1201 , in which a fan blade 1202 is rotatably installed. The fan blade 1202 is connected to a drive motor 1203 . An induction structure 8 is also provided on the shell 1201 , and the induction structure 8 is electrically connected to the drive motor 1203 .
[0045] The principle of the induction structure 8 controlling the enhanced fan 12 to work is as follows: when the temperature rises, the gas in the gas storage tube 803 expands due to the heat, and the sliding rod 804 is pushed to slide upward to achieve connection with the sliding rheostat, thereby connecting the power of the enhanced fan 12, and the enhanced fan 12 starts, and together with other fans in the tunnel, increases the air circulation speed in the tunnel, and the higher the temperature, the higher the speed of the enhanced fan 12. When the temperature drops, the paddle 806 slides out of the sliding rheostat, disconnects from the sliding rheostat, disconnects the power of the enhanced fan 12, and stops working.
[0046] When the device is working, Figure 2As shown, the first fan 3 introduces external air into the middle of the second tunnel body 2 through the ventilation duct 4, and the air flows from the middle to both ends of the second tunnel body 2. The second fan 5 increases the speed of air circulation. When the airflow outside the second tunnel body 2 flows to a position close to the end of the tunnel, it further flows to the end of the tunnel through the action of the third fan 6 and the linear branch pipe 9 until it is blown to the face and then returns to the inside of the second tunnel body 2, and flows into the first tunnel body 1 through the branch hole 102. The airflow inside the second tunnel body 2 flows to a position close to the branch hole 102, and is blown to the inside of the second tunnel body 2 by the action of the third fan 6 and the "Z"-shaped branch pipe 9. The air is directed into the first tunnel body 1. The air entering the first tunnel body 1 from the branch tunnel 102 and the guide pipe first flows to the two ends of the first tunnel body 1, and then returns to flow along the outer side of the first tunnel body 1 after encountering the support surface. After being accelerated by the second fan 5, it flows to the vicinity of the auxiliary tunnel 101, and is guided out of the tunnel through the "L"-shaped branch pipe, completing the overall normal circulation in the tunnel. During the circulation process, if the temperature in the tunnel rises, the induction structure 8 starts working, and the water spray structure 7 and the enhanced fan 12 will be started to work, so as to cool down the tunnel in time, ensure the safety performance of the construction and reduce the adverse effects on the physical condition of the workers. After the cooling is completed, the induction structure 8 disconnects the power connection, the water spray structure 7 and the enhanced fan 12 stop working, and the tunnel resumes the normal ventilation circulation state. The whole process is automatically adjusted to ensure the construction environment safely and effectively.
[0047] Embodiment 2:
[0048] like Figure 8 As shown, the difference between this embodiment and embodiment 1 lies in the setting of the enhanced fan 12. In the embodiment itself, the drainage component also includes a reinforced fan 12 for increasing the air flow rate. The reinforced fan 12 includes a shell 1201, and a fan blade 1202 is rotatably installed in the shell 1201. The fan blade 1202 is connected to a drive motor 1203. The shell 1201 is provided with a sensing adjustment unit, and the sensing adjustment unit includes a temperature and humidity sensor 1204 and a controller 1205. The temperature and humidity sensor 1204 and the controller 1205 are electrically connected through a wire 1206, which is used to control the rotation speed of the drive motor 1203 according to the temperature and humidity in the tunnel.
[0049] Specifically, when the sensing and regulating unit is put into operation in the tunnel, the temperature and humidity sensor 1204 in the sensing and regulating unit is used to sense the temperature and humidity parameters inside the tunnel, and transmit the sensed parameters to the controller 1205 through the wire 1206. The controller 1205 judges and adjusts the working state according to the parameters, and controls the switch of the driving motor 1203 by controlling the electrical signal. The fan blades 1202 rotatably connected to the driving motor 1203 automatically adjust the ventilation volume according to the input of the control signal to achieve the preset ventilation effect. It should be noted that the above-mentioned sensing and regulating unit is a prior art. The utility model patent with patent number CN203394819U discloses an intelligent controller that automatically adjusts the fan speed according to the temperature, which can realize the above-mentioned adjustment operation.
[0050] Embodiment 3:
[0051] The difference between this embodiment and embodiment 1 is the setting of the guide pipe. In this embodiment, four straight branch pipes can be set. At this time, the tunnel has been further extended, and two are respectively set at both ends of the second tunnel body. When the tunnel is further extended, two branch holes can be opened at both ends of the first tunnel body and the second tunnel body, and the third fan and "Z"-shaped branch pipe can continue to be arranged in the two branch holes. In other embodiments, the third fan and the straight branch pipe can also be set outside the first tunnel body. At this time, one end of the straight branch pipe with the third fan facing the face.
[0052] It should be understood that the above description is merely exemplary and the embodiments of the present application do not limit this.
[0053] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.
Claims
1. A tunnel multi-face construction ventilation device, characterized in that: The invention comprises a first ventilation component, which is used to introduce air from the outside of the first tunnel body (1) and pass it through a branch hole (102) to the second tunnel body (2); and a drainage component, which is arranged in the first tunnel body (1) and the second tunnel body (2); the drainage component in the second tunnel body (2) is used to guide the air introduced into the second tunnel body (2) from the introduction position to both ends and then introduce it into the first tunnel body (1); the drainage component in the first tunnel body (1) is used to circulate the air introduced into the second tunnel body (2) in the first tunnel body (1) and then discharge it out of the first tunnel body (1); the drainage component is provided with a cooling unit, which is used to automatically adjust the humidity of the flowing air according to the temperature in the tunnel, so as to adjust the temperature of the tunnel; The drainage assembly comprises a plurality of second fans (5) for driving the air in the tunnel to flow in a straight line, and the drainage assembly further comprises a third fan (6) and a drainage pipe, wherein the third fan (6) is fixedly connected to the drainage pipe, and the third fan (6) and the drainage pipe are used to guide the flow direction of the air so that the air flows in the first tunnel body (1) and the second tunnel body (2) and then is discharged; The second fan (5) and the third fan (6) both have a fan body (56a), and the cooling unit is arranged on the fan body (56a) of the second fan (5) and / or the third fan (6); the cooling unit comprises a water spraying structure (7) and a sensing structure (8), the water spraying structure (7) is connected to an external water source, and the sensing structure (8) is used to sense the temperature in the tunnel and control the on and off of the water spraying structure (7); The sensing structure (8) comprises a shell (801), wherein a first connecting conductor (802) and a gas storage tube (803) are arranged in the shell (801), wherein a sliding rod (804) is slidably arranged in the gas storage tube (803), wherein gas is arranged in the gas storage tube (803), wherein expansion and contraction of the gas is used to drive the sliding rod (804) to slide axially along the gas storage tube (803), wherein a second connecting conductor (805) is fixedly connected to the sliding rod (804), and wherein the sliding rod (804) controls the second connecting conductor (805) to be connected or disconnected with the first connecting conductor (802); The first connecting conductor (802) is a sliding rheostat, the contact position between the second connecting conductor (805) and the first connecting conductor (802) is a paddle (806), the paddle (806) has a contact groove adapted to the outer surface of the first connecting conductor (802), and the paddle (806) can slide along the first connecting conductor (802) when driven by a sliding rod (804).
2. The tunnel multi-face construction ventilation device according to claim 1 is characterized in that: The first ventilation assembly comprises a first fan (3) and a ventilation duct (4); one end of the ventilation duct (4) extends out of the tunnel body and the other end extends into the tunnel body; the first fan (3) is arranged on the ventilation duct (4) for sucking air into the tunnel.
3. The tunnel multi-face construction ventilation device according to claim 1 is characterized in that: The water spray structure (7) comprises a water pump (701), the water pump (701) being fixedly connected to the fan body (56a), the water inlet of the water pump (701) being connected to a water pumping pipe (702) for extracting cooling water from an external water source, and the water outlet of the water pump (701) being connected to an atomizing nozzle (704) via a water spraying pipe (703).
4. The tunnel multi-face construction ventilation device according to claim 1 is characterized in that: The guide pipe comprises a plurality of straight branch pipes (9), a plurality of "L"-shaped branch pipes (10) and a plurality of "Z"-shaped branch pipes (11); the straight branch pipes (9) are arranged at positions where air flows in a straight line with the first tunnel body (1) and / or the second tunnel body (2); the "Z"-shaped branch pipes (11) are symmetrically arranged in a branch hole (102) close to the face; one end of the "Z"-shaped branch pipe (11) is arranged in the second tunnel body (2) and the other end is arranged in the first tunnel body (1) for guiding the air in the second tunnel body (2) into the first tunnel body (1); the "L"-shaped branch pipe (10) is arranged at an auxiliary tunnel (101) of the first tunnel body (1) for discharging the air in the first tunnel body (1) to the outside.
5. The tunnel multi-face construction ventilation device according to any one of claims 1 to 3, characterized in that: The air guide assembly further comprises an enhanced fan (12), which is arranged on the trajectory of air flow and is used to increase the air flow rate. The enhanced fan (12) comprises a housing (1201), a fan blade (1202) is rotatably mounted in the housing (1201), the fan blade (1202) is connected to a drive motor (1203), and the housing (1201) is provided with the induction structure (8), which is electrically connected to the drive motor (1203).
6. The tunnel multi-face construction ventilation device according to any one of claims 1 to 4, characterized in that: The drainage assembly further comprises a booster fan (12) for increasing the air flow rate, the booster fan (12) comprising a housing (1201), a fan blade (1202) being rotatably mounted in the housing (1201), the fan blade (1202) being connected to a drive motor (1203), and a sensing adjustment unit being arranged on the housing (1201), the sensing adjustment unit comprising a temperature and humidity sensor (1204) and a controller (1205), and being used to control the rotation speed of the drive motor (1203) according to the temperature and humidity in the tunnel.