Methods and applications of volumetric stimulation of hot dry rock reservoirs

By combining multiple batches of injection of liquid CO2 and slickwater fracturing fluid with geostress and fracture monitoring, a complex fracture network is formed, which solves the problem of low fracture complexity in the stimulation of hot dry rock reservoirs and improves heat exchange efficiency and injection-production efficiency.

CN117489315BActive Publication Date: 2026-11-17CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210880459.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-25
Publication Date
2026-11-17
Estimated Expiration
2042-07-25

AI Technical Summary

Technical Problem

Existing methods for regenerating hot dry rock reservoirs are limited by geological and construction conditions, resulting in low fracture complexity, low heat exchange efficiency, and short circuits or ineffective connections between injection and production well water lines, which affect the effective utilization of thermal energy resources.

Method used

By employing a multi-batch fracturing fluid injection method, first injecting liquid CO2 fracturing fluid and then slickwater fracturing fluid, and combining the geostress direction and fracture extension orientation, a complex fracture network is formed through thermal strain and hydraulic fracturing, which avoids waterline short-circuiting and improves reservoir stimulation effect.

Benefits of technology

It improves the injection and production efficiency of hot dry rock wells, ensures effective connectivity between injection and production wells, and increases heat exchange efficiency and production volume.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

This invention relates to the field of new energy utilization and discloses a method and application for volumetric fracturing of hot dry rock reservoirs. The method employs a multi-batch injection of fracturing fluid during the fracturing process of hot dry rock reservoirs. Each batch first injects liquid CO2 fracturing fluid followed by slickwater fracturing fluid. The liquid CO2 creates a temperature difference between the inside and outside of the formation rock, and the resulting thermal strain forms disordered microfractures or weak stress surfaces in the formation. The subsequent injection of slickwater fracturing fluid further expands these microfractures and forms ordered hydraulic fracturing main fractures. Through multiple batches of fracturing fluid injection, the number and direction of fractures around the wellbore become more complex, ultimately increasing the complexity and swept volume of the fracturing fractures in the hot dry rock reservoir. This effectively improves the injection and production efficiency of hot dry rock wells and avoids the problem of waterline short-circuiting between the injection and production wells.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of new energy utilization, specifically to a method and application for volume modification of dry hot rock reservoirs. Background Technology

[0002] Hot dry rock is a high-temperature rock mass buried at a depth of 2,000-6,000 meters. The rock type is mainly metamorphic or crystalline rock, and the temperature range is usually between 150-650℃. It belongs to high-temperature geothermal resources and has advantages such as large resource volume and zero emissions, making it a typical new energy source.

[0003] The thermal energy resources of hot dry rock are located deep underground in dense, high-strength rock masses and cannot be directly utilized. Currently, the utilization of hot dry rock resources is mainly carried out through enhanced geothermal systems. This technology typically involves drilling one injection well and one to two production wells in the target hot dry rock layer. Then, the injection and production wells undergo continuous large-scale fracturing to form a complex fracture network system in the hot dry rock reservoir. This is the process of constructing the thermal energy reservoir. Subsequently, fluid is injected from the injection well into the target underground heat exchange layer. Heat exchange occurs through the fracture system formed within the formation, and the injected fluid is heated. The high-temperature vaporized fluid is then extracted from the production well for power generation. The cooled fluid after heat exchange is then recycled back into the injection well, and this cycle is repeated to complete the utilization of hot dry rock geothermal resources.

[0004] CN111173485A discloses a method for increasing the volume of hot dry rock reservoirs. This method involves cooling water to 0-4°C using a coolant, then injecting it into the hot dry rock mass. The low-temperature water, upon contact with the hot dry rock, generates thermal stress, causing uneven heating inside and outside the rock. Under this thermal stress, micro-fractures are created within the rock. Liquid is then injected at a critical flow rate (the flow rate at which the micro-fractures just begin to expand) to further expand these micro-fractures. The problems with this method are: firstly, it is difficult to control the liquid temperature at 0-4°C on-site; secondly, it relies solely on thermal stress to increase and expand the micro-fractures, without using hydraulic fracturing to create hydraulic fractures, resulting in relatively small fracture sizes; and thirdly, this method requires determining the critical injection flow rate for micro-fracture opening, which is difficult to determine under current conditions.

[0005] CN105696996A discloses a method for constructing an artificial geothermal reservoir in hot dry rock. This method employs a well layout centered on an injection well, with four wells (quadrilateral arrangement), five wells (pentagonal arrangement), or six wells (hexagonal arrangement) deployed at equal intervals around it. Based on core samples from the injection wells, the location of weak structural planes or weak layers within the strata is determined, and a geological profile is drawn. On this basis, the wells in the entire well group are subjected to segmented fracturing until all production well fractures are interconnected with the injection well fractures, forming a large reservoir exchange volume. However, this method does not consider the orientation and magnitude of horizontal geostress in the reservoir during well group deployment and fracturing. The hydraulic fracturing fractures only extend along the direction of maximum principal stress, failing to propagate along the direction of minimum principal stress. This results in fracturing fractures that are not cylindrical with the fracturing well as their center, potentially causing communication difficulties between the injection and production wells. Furthermore, this method does not consider the problem of vertical stress shielding, nor does it consider segmented / layered fracturing. In addition, this method does not consider the waterline short-circuiting problem in the direction of maximum principal stress during fracturing operations, nor does it consider the matching of injection parameters, fracture parameters and the whole well group, as well as the influence of fracture height.

[0006] CN105332681A discloses a combined thermal and chemical stimulation process for hot dry rock reservoirs. This method first uses thermal stimulation to disrupt the naturally occurring fracture network, increasing permeability. Then, chemical stimulation dissolves some minerals and blockages within the wellbore and fractures, further enhancing fracture conductivity. Repeating this process allows for the stimulation of a larger area of ​​the reservoir. However, this method does not create artificial hydraulic pressure fractures during reservoir construction. Because the hot dry rock reservoir lithology is predominantly metamorphic with few acid-soluble minerals, the resulting fractures are actually acid-etched wormholes and are relatively small in scale. Furthermore, it does not consider factors such as the orientation of horizontal geostress, vertical stress shielding, and actual mineral composition within the reservoir, nor does it account for the impact of construction parameters on the fracture volume of the hot dry rock reservoir. The resulting stimulation volume is small, making it difficult to achieve connectivity between the injection and production wells, ultimately leading to unsatisfactory heat exchange efficiency and production rate.

[0007] In summary, existing methods for modifying hot dry rock reservoirs are constrained by various factors such as geological conditions and construction conditions, as well as inherent limitations of the methods themselves, resulting in unsatisfactory volume modification effects and hindering the effective utilization of hot dry rock thermal energy resources. Summary of the Invention

[0008] This invention addresses the problem of low heat exchange efficiency and short-circuiting or ineffective connectivity of waterlines in injection and production wells caused by the low complexity of fractures during the stimulation of existing hot dry rock reservoirs. It provides a method and application for volumetric stimulation of hot dry rock reservoirs.

[0009] To achieve the above objectives, a first aspect of the present invention provides a method for volumetric stimulation of hot dry rock reservoirs, the method comprising:

[0010] (1) Using a basic model, a simulation calculation is performed to obtain the pumping procedure for injecting fracturing fluid into a dry hot rock reservoir; wherein, the fracturing fluid includes liquid CO2 fracturing fluid and slickwater fracturing fluid;

[0011] (2) According to the pumping procedure, fracturing fluid is injected into the hot dry rock reservoir in multiple batches through the injection well. Each batch first injects liquid CO2 fracturing fluid and then slickwater fracturing fluid until the injection procedure is completed and the fracturing fluid injection ends.

[0012] (3) Shut down the well, monitor and perform optional well shut-off based on the pressure drop at the wellhead;

[0013] (4) The fracturing fluid is flowed back to obtain the volume-modified dry hot rock reservoir.

[0014] A second aspect of the present invention provides the application of the aforementioned method in the extraction of thermal energy from hot dry rock.

[0015] The method provided by the present invention, through the above technical solution, has the following beneficial effects:

[0016] (1) In the process of fracturing the hot dry rock reservoir, multiple batches of fracturing fluid are injected. Each batch first injects liquid CO2 fracturing fluid and then injects slickwater fracturing fluid. During the pumping process, CO2 always exists in a liquid or low-viscosity supercritical state, forming a temperature difference inside and outside the formation rock, changing the stress structure of the rock itself, and causing the formation to form disordered micro-fractures or stress weak surfaces (caused by thermal strain). Then, the injection of slickwater fracturing fluid further expands the above-mentioned micro-fractures and forms ordered main fractures (caused by hydraulic fracturing). The fractures formed by the two methods work together to increase the complexity of reservoir stimulation fractures and the volume of the affected area, effectively improving the injection and production efficiency of the hot dry rock reservoir.

[0017] (2) Based on the study of the direction of geostress and the orientation and length of fracture extension, injection and production wells are rationally deployed to avoid the waterline short-circuit problem between injection and production wells. Detailed Implementation

[0018] The endpoints and any values ​​of the ranges disclosed herein are not limited to the precise ranges or values, and these ranges or values ​​should be understood to include values ​​close to these ranges or values. For numerical ranges, the endpoint values ​​of the various ranges, the endpoint values ​​of the various ranges and individual point values, and individual point values ​​can be combined with each other to obtain one or more new numerical ranges, which should be considered as specifically disclosed herein.

[0019] The following provides a detailed description of specific embodiments of the present invention. It should be understood that the specific embodiments described herein are for illustrative and explanatory purposes only and are not intended to limit the scope of the invention.

[0020] The first aspect of this invention provides a method for volumetric stimulation of hot dry rock reservoirs, the method comprising:

[0021] (1) Using a basic model, a simulation calculation is performed to obtain the pumping procedure for injecting fracturing fluid into a dry hot rock reservoir; wherein, the fracturing fluid includes liquid CO2 fracturing fluid and slickwater fracturing fluid;

[0022] (2) According to the pumping procedure, fracturing fluid is injected into the hot dry rock reservoir in multiple batches through the injection well. Each batch first injects liquid CO2 fracturing fluid and then slickwater fracturing fluid until the injection procedure is completed and the fracturing fluid injection ends.

[0023] (3) Shut down the well, monitor and perform optional well shut-off based on the pressure drop at the wellhead;

[0024] (4) The fracturing fluid is flowed back to obtain the volume-modified dry hot rock reservoir.

[0025] The method provided by this invention is based on reservoir evaluation parameters of hot dry rock reservoirs. It utilizes numerical simulation combined with actual reservoir parameters obtained from drilling to determine the parameters for reservoir volumetric fracturing. During the fracturing process, multiple batches of fracturing fluid are injected, with each batch first injecting liquid CO2 fracturing fluid followed by slickwater fracturing fluid. A variable displacement injection mode is employed. In each injection batch, the first injected liquid CO2, with its strong diffusion capacity and ultra-low temperature, causes thermal strain due to the temperature difference between the inside and outside of the high-temperature rock formation. Under thermal stress, random-direction microfractures or stress-weak surfaces are formed in the formation. The orientation of these microfractures or stress-weak surfaces is not controlled by the maximum or minimum horizontal principal stress. The subsequent injection of high-pressure slickwater fracturing fluid at variable displacement can generate new hydraulic fracturing main fractures based on the expanded thermally strained microfractures or stress-weak surfaces. Through multiple batches of fracturing fluid injection in this manner, the number and direction of fractures around the wellbore become more complex, ultimately forming complex volumetric fractures of different scales in the hot dry rock reservoir. In addition, by combining real-time fracture monitoring technology during the batch injection of fracturing fluid, the modification and construction parameters are optimized and adjusted in real time to ensure that the hydraulic fracturing fractures form complex volumetric fractures without causing short circuits in the waterline, thereby improving the heat exchange efficiency of the injected well fluid and the production volume of the produced well.

[0026] According to the present invention, step (1) includes:

[0027] (1-1) Using data from adjacent wells, reservoir characteristics of the hot dry rock reservoir are evaluated to obtain reservoir evaluation parameters; the reservoir evaluation parameters include geostress direction, geostress magnitude, longitudinal geostress profile and fracture propagation law.

[0028] (1-2) Input the reservoir evaluation parameters and the lithological parameters, physical property parameters and temperature and pressure parameters of the adjacent well into the fracturing simulation software to establish a basic model. Use the basic model to simulate the expansion and change of fractures formed during the injection of liquid CO2 fracturing fluid and slickwater fracturing fluid into the dry hot rock reservoir under different injection parameters, obtain the fracture parameters, and obtain the indicator chart from the change relationship between the injection parameters and the fracture parameters.

[0029] (1-3) Deploy injection wells and production wells according to the reservoir evaluation parameters and fracture parameters, and complete the drilling;

[0030] (1-4) Based on the azimuth relationship between the injection well and the production well obtained after drilling, the well spacing, and the actual reservoir parameters obtained after drilling, the basic model is modified, and the modified model is used to calculate the modification construction parameters and form the modified indicator board.

[0031] (1-5) Formulate the pumping procedures for liquid CO2 fracturing fluid and slickwater fracturing fluid based on the modified construction parameters and the revised indicator diagram.

[0032] According to the present invention, in step (1-1), the testing methods used for reservoir characteristic evaluation include: target reservoir core experiments, outcrop simulation experiments, and well logging interpretation stress profile experiments. Specifically, the target reservoir core experiments are used to obtain parameters of geostress direction and magnitude; the outcrop simulation experiments are used to obtain parameters of fracture propagation behavior; and the well logging interpretation stress profile experiments are used to obtain parameters of longitudinal geostress profile.

[0033] In this invention, the target reservoir core experiment, outcrop large object simulation experiment, and well logging interpretation stress profile experiment are conventional reservoir evaluation testing methods in the field. The testing process can use steps and parameters known to those skilled in the art, and this invention does not have any particular limitations on them.

[0034] In this invention, the meanings of geostress direction, geostress magnitude, longitudinal geostress profile, and crack propagation law can be understood according to the definitions known to those skilled in the art.

[0035] According to the present invention, in step (1-2), the fracturing simulation software can be a commercial software conventional in the art for formation fracturing simulation, which can be selected from FracProPT software, StimPlan software, Gohfer software or Meyer software, preferably StimPlan software.

[0036] According to the present invention, in step (1-2), the basic model can be established by the linear elastic three-dimensional model module in the fracturing simulation software.

[0037] According to the present invention, in steps (1-2), considering that there may be differences between the software used to establish the basic model, the specific reservoir evaluation parameters of the dry hot rock reservoir required for modeling, as well as the lithological parameters, physical property parameters and temperature and pressure parameters of the adjacent wells, may also be slightly different. The software can be selected according to the actual software used, as long as it can simulate the expansion and change law of the fractures formed during the injection of liquid CO2 fracturing fluid and slickwater fracturing fluid into the dry hot rock reservoir under different injection parameter conditions and obtain the fracture parameters.

[0038] According to the present invention, in steps (1-2), the meanings of the lithological parameters, physical property parameters and temperature and pressure parameters can be understood according to the definitions known to those skilled in the art.

[0039] According to the present invention, in step (1-2), the injection parameters include: fracturing fluid discharge rate, fracturing fluid viscosity, fracturing fluid injection scale and fracturing fluid injection method.

[0040] According to the present invention, in step (1-2), the crack parameters include: crack length, crack width and crack height.

[0041] According to the present invention, in step (1-2), the indicator chart refers to the variation law diagram of injection parameters and crack parameters obtained from the injection parameters and crack parameters.

[0042] According to the present invention, in steps (1-3), the orientation relationship and well spacing of the injection well and the production well satisfy the following:

[0043] The line connecting the injection well and the production well is aligned with the direction of the maximum principal stress in the geostress direction.

[0044] The distance between the injection well and the production well is 2-3 times the maximum fracture length.

[0045] Deploying well locations in the above manner can effectively avoid the waterline short-circuiting problem between the injection well and the production well that may occur after fracturing.

[0046] According to the present invention, in steps (1-4), the actual reservoir parameters refer to the actual geostress direction, geostress magnitude, longitudinal geostress profile, fracture propagation law, lithological parameters, physical property parameters, and temperature and pressure parameters of the downhole formation obtained by testing the actual geological conditions of the well after drilling.

[0047] According to the present invention, in steps (1-4), the modified construction parameters include: fracturing fluid injection scale, fracturing fluid variable displacement mode, and fracturing fluid batch injection mode.

[0048] According to the present invention, steps (1-4) further include: calculating the fracture height obtained under the maximum fracturing fluid discharge condition using the basic model, and determining the stimulation method based on the fracture height and the thickness of the hot dry rock reservoir. Specifically, different injection parameters (i.e., different fracturing fluid discharge, fracturing fluid viscosity, fracturing fluid injection scale, and fracturing fluid injection method) are input into the basic model for calculation to obtain the fracture length, fracture width, and fracture height of the fractures formed during the injection of liquid CO2 fracturing fluid and slickwater fracturing fluid into the hot dry rock reservoir under different injection parameters. This yields an injection parameter-fracture parameter variation diagram (i.e., the indicator chart), thus obtaining the fracture height obtained under the maximum injection parameter condition, and determining the stimulation method based on the fracture height and the thickness of the hot dry rock reservoir. The maximum value of the injection parameter should be less than 80% of the construction operation capacity and the maximum pressure resistance level of the equipment.

[0049] According to the present invention, the modification method includes overall modification or layered modification. If it is difficult to achieve longitudinal activation of the entire thermal reservoir under the maximum injection parameters obtained from simulation (i.e., the fracture height obtained under this condition is less than the reservoir thickness), then a layered modification method is adopted, in which an open-hole packer or a drillable composite bridge plug is installed for layered modification.

[0050] According to the present invention, in steps (1-5), the limiting parameters in the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of batches of fracturing fluid injection, and predicted value of fracturing fluid injection pressure.

[0051] According to the present invention, a specific fracturing fluid injection method is adopted in step (2). First, low-temperature liquid CO2 is directly used as the injection medium. During the pumping process, CO2 exists in a liquid or low-viscosity supercritical state, forming a temperature difference between the inside and outside of the formation rock, changing the stress structure of the rock itself, and causing the rock to form disordered micro-fractures or weak stress surfaces. Then, the above-mentioned micro-fractures are expanded by injecting slickwater and an ordered hydraulic fracturing main fracture is formed. By injecting fracturing fluid in multiple batches (first injecting liquid CO2 fracturing fluid and then injecting slickwater fracturing fluid, which is defined as one batch), the disordered micro-fractures formed by thermal strain and the ordered main fractures created by hydraulic fracturing on this basis are organically combined, thereby increasing the complexity of reservoir stimulation fractures and the swept volume.

[0052] In this invention, there are no particular limitations on the slickwater fracturing fluid, and conventional selections in the art can be used. Those skilled in the art can select a suitable slickwater fracturing fluid formulation according to the geological conditions of the reservoir and the needs of the construction process.

[0053] According to the present invention, in step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored by real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure, and the next batch of fracturing fluid is injected according to the optimized pumping procedure.

[0054] According to the present invention, in step (2), fracturing fluid is injected into the formation according to the pumping procedure, and the longitudinal and lateral propagation of the fractures and the complexity of the fractures are monitored in real time. If the real-time monitoring results are consistent with the pre-simulated predictions in steps (1-2), pumping continues; if the real-time monitoring results are inconsistent with the pre-simulated predictions, the modification construction parameters are adjusted in a timely manner so that the fracture parameters develop in a direction favorable to modification.

[0055] According to the present invention, in step (2), the pumping procedure is optimized and adjusted based on the fracture monitoring results and actual data inversion results after each batch of fracturing fluid is injected. Subsequent construction follows the optimized and adjusted pumping procedure to inject the next batch of fracturing fluid, ensuring that there is no risk of waterline short circuit in the fracturing fracture throughout the process, and that the entire longitudinal thermal reservoir can be utilized until the pumping procedure is completed.

[0056] According to the present invention, in step (2), the pump needs to be stopped after each batch of fracturing fluid injection is completed. The duration of the pump stoppage can be determined by the actual situation at the fracturing construction site. When the wellhead pressure drops to 0 MPa or the wellhead pressure drops to a certain value and no longer continues to drop during the pump stoppage period, the injection of the next batch of fracturing fluid is started.

[0057] In this invention, there is no particular limitation on the real-time monitoring technology, and conventional methods in the field can be adopted, such as using inclinometers or microseismic monitoring technology.

[0058] According to the present invention, in step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends and the process proceeds to step (4); if the wellhead pressure is maintained at more than 50% of the pump shut-off pressure at the time of well shut-in, well shut-in is performed. During well shut-in, the high-energy fluid in the reservoir continues to expand the microfractures by relying on the remaining energy after fracturing. After well shut-in is completed, the process proceeds to step (4).

[0059] According to the present invention, in step (4), the process of releasing and draining liquid is initiated, the release is controlled by the nozzle, and the liquid discharge data is monitored at any time. When the liquid discharge volume reaches more than 10% of the total injection volume and the viscosity of the returned liquid is less than 5 mPa·s, the release is stopped and the volume modification construction is completed.

[0060] A second aspect of the present invention provides the application of the aforementioned method in the extraction of thermal energy from hot dry rock.

[0061] The present invention will be described in detail below through embodiments.

[0062] Example

[0063] (1-1) Using data from adjacent wells, reservoir characteristics of the hot dry rock reservoir were evaluated through core experiments, outcrop simulation experiments, and well logging interpretation stress profile experiments. The reservoir evaluation parameters obtained include: target layer thickness approximately 258.9-312.6 m; geostress direction 90-110°; minimum principal stress gradient 0.0195-0.0214 MPa / m; maximum horizontal principal stress gradient 0.0226-0.0238 MPa / m. The longitudinal stress profile shows that the longitudinal stress gradient of the reservoir is 0.0249-0.0252 MPa / m; the horizontal biaxial stress difference is 5.6-10.4 MPa; the Young's modulus is 30.2-35.6 GPa; the Poisson's ratio is 0.0215-0.0263; the tensile strength is 9.6-10.8 MPa; and the fracture propagation pattern under the maximum injection parameters is as follows: the extension direction is about 98° north of east, and the maximum extension length of the fracture is 300-350 m.

[0064] (1-2) Input the reservoir evaluation parameters obtained in step (1-1) and the lithological parameters, physical property parameters and temperature and pressure parameters of the adjacent well into the Stim Plan software to establish a basic model. Simulate and calculate the changes in the length, width and height of the fractures formed during the injection of liquid CO2 fracturing fluid and slickwater fracturing fluid into the dry hot rock reservoir under different fracturing fluid discharge, fracturing fluid viscosity, fracturing fluid injection scale and fracturing fluid injection method, and generate the corresponding indicator chart (injection parameter - fracture parameter change law chart);

[0065] (1-3) Based on the direction of the maximum horizontal principal stress obtained in step (1-1) and the fracture variation obtained in step (1-2), determine the well spacing and deployment orientation of the injection well and the production well: based on the maximum fracture length of 300-350m in step (1-1), determine the well spacing of the injection well and the production well to be 700m, and the production well is located in the direction of 98° north of east of the injection well; and complete the drilling.

[0066] (1-4) Based on the actual drilling data, the actual reservoir parameters of the well are as follows: the target layer thickness is 286m; the direction of the maximum horizontal principal stress is 102° northeast; the minimum principal stress gradient is 0.0208MPa / m, the maximum horizontal principal stress gradient is 0.0235MPa / m, the longitudinal stress gradient is 0.0250MPa / m; the horizontal biaxial stress difference is 10MPa; the Young's modulus is 31.5GPa; the Poisson's ratio is 0.022; and the tensile strength is 10.4MPa.

[0067] The thickness of the irrigated section in this well is 286m. The maximum fracture height was calculated using the basic model to be 118.5m. Therefore, it is difficult to utilize all the fractures in one operation. Based on the longitudinal geostress profile and actual reservoir parameters, the well was fractured in three stages, i.e., layered fracturing. According to the well logging interpretation and stress profile results, the first stage of fracturing was 90m from bottom to top, the second stage was 100m, and the third stage was 96m.

[0068] Based on the established azimuth relationship between injection and production wells, well spacing, and actual reservoir parameters obtained from drilling, the initial stimulation construction parameters (i.e., initial fracturing fluid injection scale, variable fracturing fluid displacement mode, and batch fracturing fluid injection mode) are determined. The basic model is then modified, and the final stimulation construction parameters (fracturing fluid injection scale, variable fracturing fluid displacement mode, and batch fracturing fluid injection mode) are calculated using the modified model: the fracturing fluid injection displacement is 2-8 m³ / h. 3 / min, single-stage liquid CO2 injection rate is 1000m³ 3 The injection volume of slickwater fracturing fluid in a single stage is 10,000 m³. 3 The fracturing fluid was injected in 10 batches, with the pump stopped for 3 hours after each batch. The slickwater fracturing fluid was injected using a stepped flow rate increasing method of 2-4-6-8m. 3 / min (i.e., first use 2m) 3 The injection displacement was initially set at 1 / min, then increased in steps to 4m. 3 / min, 6m 3 / min and 8m 3 / min injection displacement); and the corrected indicator panel is calculated using the corrected model;

[0069] (1-5) Based on the modification construction parameters and the revised indicator diagram obtained in step (1-4), formulate a pumping procedure table (the limiting parameters of the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of batches of fracturing fluid injection, and predicted value of fracturing fluid injection pressure), and carry out the construction according to the pumping procedure.

[0070] (2) Fracturing fluid is injected into the hot dry rock reservoir through the injection well. The first stage of fracturing is carried out first, using a 2m... 3 / min displacement injection 1000m 3 Liquid CO2 was injected, and fracture propagation parameters were monitored using microseismic methods. Immediately after the liquid CO2 injection, slickwater fracturing fluid was injected at a flow rate of 2-4-6-8 m³ / h. 3 The injection rate gradually increases by 1000 m³ / min, with each injection stage having an injection volume of 1000 m³ / min. 3 -2000m 3 -3000m 3 -4000m3 The crack monitoring results showed that the crack propagation conformed to the pre-simulated pattern. The pumping procedure was continued according to the original procedure. After the injection was completed, the pump was stopped for 3 hours. The first batch of fracturing fluid injection was completed. The above operation was repeated to complete the first stage of fracturing construction.

[0071] Run the bridge plug packer to seal the first stage, and begin the second stage of fracturing. The second stage of fracturing is carried out according to the second stage of the pumping procedure table, and the operation method is the same as the first stage above. Continue in this way until all three stages of fracturing are completed for the entire well.

[0072] (3) After the fracturing fluid injection is completed, stop the pump, record the pump stop pressure, and shut in the well to monitor the diffusion of the injection pressure. After the well shut-in time is 3 hours, the wellhead pressure is higher than 50% of the pump stop pressure and the pressure drop tends to be stable. Start the well shut-in process, which lasts for 15 days.

[0073] (4) Switch the venting and drainage process, use the nozzle to control the venting and drainage, and monitor the drainage data at any time. When the drainage volume reaches more than 10% of the total injection volume and the return liquid viscosity is less than 5 mPa·s, the venting and drainage will be stopped, the construction will be completed, and the volume-modified dry hot rock reservoir will be obtained.

[0074] The preferred embodiments of the present invention have been described in detail above; however, the present invention is not limited thereto. Within the scope of the inventive concept, various simple modifications can be made to the technical solutions of the present invention, including combinations of various technical features in any other suitable manner. These simple modifications and combinations should also be considered as the content disclosed in the present invention and are all within the protection scope of the present invention.

Claims

1. A method of hot dry rock geothermal reservoir volume modification, characterized by, The method includes: (1) Using the basic model, a simulation calculation is performed to obtain the pumping procedure for injecting fracturing fluid into the dry hot rock reservoir; wherein, the fracturing fluid includes liquid CO2 fracturing fluid and slickwater fracturing fluid; (2) According to the pumping procedure, fracturing fluid is injected into the dry hot rock reservoir in multiple batches through the injection well. Each batch first injects liquid CO2 fracturing fluid and then injects slickwater fracturing fluid until the injection procedure is completed and the fracturing fluid injection ends. (3) Shut down the well, monitor and perform optional well shut-off based on the pressure drop at the wellhead; (4) Fracturing fluid is flowed back to obtain a volume-modified dry hot rock reservoir; Step (1) includes: (1-1) Using data from adjacent wells, reservoir characteristics of the hot dry rock reservoir are evaluated to obtain reservoir evaluation parameters; the reservoir evaluation parameters include geostress direction, geostress magnitude, longitudinal geostress profile and fracture propagation law; (1-2) Input the reservoir evaluation parameters and the lithological parameters, physical property parameters and temperature and pressure parameters of the adjacent well into the fracturing simulation software to establish a basic model. Use the basic model to simulate the expansion and change of fractures formed during the injection of liquid CO2 fracturing fluid and slickwater fracturing fluid into the dry hot rock reservoir under different injection parameters, obtain the fracture parameters, and obtain the indicator chart from the change relationship between the injection parameters and the fracture parameters. (1-3) Deploy injection wells and production wells according to the reservoir evaluation parameters and fracture parameters, and complete drilling; (1-4) Based on the azimuth relationship between the injection well and the production well obtained after drilling, the well spacing, and the actual reservoir parameters obtained after drilling, the basic model is modified, and the modified model is used to calculate the modification construction parameters and form the modified indicator board. (1-5) Formulate the pumping procedures for liquid CO2 fracturing fluid and slickwater fracturing fluid based on the modified construction parameters and the revised indicator diagram; In steps (1-3), the orientation relationship and well spacing between the injection well and the production well satisfy the following: The line connecting the injection well and the production well is aligned with the direction of the maximum principal stress in the geostress direction. The distance between the injection well and the production well is 2-3 times the maximum fracture length.

2. The method according to claim 1, wherein, In step (1-1), the testing methods used for reservoir characteristic evaluation include: target reservoir core experiment, outcrop large object simulation experiment and well logging interpretation stress profile experiment.

3. The method according to claim 1 or 2, wherein, In steps (1-2), the injection parameters include: fracturing fluid discharge rate, fracturing fluid viscosity, fracturing fluid injection scale, and fracturing fluid injection method.

4. The method according to claim 3, wherein, The crack parameters include: crack length, crack width, and crack height.

5. The method according to any one of claims 1-2 and 4, wherein, In steps (1-4), the modified construction parameters include: fracturing fluid injection scale, fracturing fluid variable displacement mode, and fracturing fluid batch injection mode.

6. The method according to claim 3, wherein, In steps (1-4), the modified construction parameters include: fracturing fluid injection scale, fracturing fluid variable displacement mode, and fracturing fluid batch injection mode.

7. The method according to any one of claims 1-2, 4 and 6, wherein, The steps (1-4) also include: using the basic model to calculate the fracture height under the maximum injection parameter conditions, and determining the stimulation method based on the fracture height and the thickness of the dry hot rock reservoir.

8. The method according to claim 7, wherein, The renovation methods include overall renovation or layered renovation.

9. The method according to claim 3, wherein, The steps (1-4) also include: using the basic model to calculate the fracture height under the maximum injection parameter conditions, and determining the stimulation method based on the fracture height and the thickness of the dry hot rock reservoir.

10. The method according to claim 5, wherein, The steps (1-4) also include: using the basic model to calculate the fracture height under the maximum injection parameter conditions, and determining the stimulation method based on the fracture height and the thickness of the dry hot rock reservoir.

11. The method according to claim 9, wherein, The renovation methods include overall renovation or layered renovation.

12. The method according to claim 10, wherein, The renovation methods include overall renovation or layered renovation.

13. The method according to any one of claims 1-2, 4, 6 and 8-12, wherein, The fracturing simulation software is selected from FracProPT, StimPlan, Gohfer, or Meyer software.

14. The method according to claim 13, wherein, The fracturing simulation software is Stim Plan software.

15. The method according to claim 3, wherein, The fracturing simulation software is selected from FracProPT, StimPlan, Gohfer, or Meyer software.

16. The method according to claim 5, wherein, The fracturing simulation software is selected from FracProPT, StimPlan, Gohfer, or Meyer software.

17. The method according to claim 7, wherein, The fracturing simulation software is selected from FracProPT, StimPlan, Gohfer, or Meyer software.

18. The method according to any one of claims 15-17, wherein, The fracturing simulation software is Stim Plan software.

19. The method according to any one of claims 1-2, 4, 6, 8-12, and 14-17, wherein, In steps (1-5), the limiting parameters in the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of fracturing fluid injection batches, and predicted fracturing fluid injection pressure.

20. The method according to claim 3, wherein, In steps (1-5), the limiting parameters in the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of fracturing fluid injection batches, and predicted fracturing fluid injection pressure.

21. The method according to claim 5, wherein, In steps (1-5), the limiting parameters in the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of fracturing fluid injection batches, and predicted fracturing fluid injection pressure.

22. The method according to claim 7, wherein, In steps (1-5), the limiting parameters in the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of fracturing fluid injection batches, and predicted fracturing fluid injection pressure.

23. The method according to claim 13, wherein, In steps (1-5), the limiting parameters in the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of fracturing fluid injection batches, and predicted fracturing fluid injection pressure.

24. The method according to claim 18, wherein, In steps (1-5), the limiting parameters in the pumping procedure include: fracturing fluid injection displacement, fracturing fluid injection volume, fracturing fluid injection time, fracturing fluid injection sequence, number of fracturing fluid injection batches, and predicted fracturing fluid injection pressure.

25. The method according to any one of claims 1-2, 4, 6, 8-12, 14-17, and 20-24, wherein, In step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored using real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure. The next batch of fracturing fluid is then injected according to the optimized pumping procedure.

26. The method according to claim 3, wherein, In step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored using real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure. The next batch of fracturing fluid is then injected according to the optimized pumping procedure.

27. The method according to claim 5, wherein, In step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored using real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure. The next batch of fracturing fluid is then injected according to the optimized pumping procedure.

28. The method according to claim 7, wherein, In step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored using real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure. The next batch of fracturing fluid is then injected according to the optimized pumping procedure.

29. The method according to claim 13, wherein, In step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored using real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure. The next batch of fracturing fluid is then injected according to the optimized pumping procedure.

30. The method according to claim 18, wherein, In step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored using real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure. The next batch of fracturing fluid is then injected according to the optimized pumping procedure.

31. The method according to claim 19, wherein, In step (2), during the injection of each batch of fracturing fluid, the morphology of the fracture formed by fracturing is monitored using real-time monitoring technology, and the modification construction parameters are adjusted according to the monitoring results to optimize the pumping procedure. The next batch of fracturing fluid is then injected according to the optimized pumping procedure.

32. The method according to any one of claims 1-2, 4, 6, 8-12, 14-17, 20-24, and 26-31, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

33. The method according to claim 3, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

34. The method according to claim 5, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

35. The method according to claim 7, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

36. The method according to claim 13, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

37. The method according to claim 18, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

38. The method according to claim 19, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

39. The method according to claim 25, wherein, In step (3), during the monitoring of wellhead pressure drop, if the wellhead pressure drops to 0 MPa, the monitoring ends; if the wellhead pressure remains above 50% of the pump stop pressure at the time of well shut-in, the well is shut in.

40. The application of the method according to any one of claims 1-39 in the exploitation of hot dry rock.

Citation Information

Patent Citations

  • Thermal stimulation and chemical stimulation combined process of hot-dry-rock thermal reservoir

    CN105332681A

  • Method for increasing hot dry rock thermal reservoir transformation volume

    CN111173485A

  • Shale gas well CO2 and slickwater mixing fracturing technology

    CN103924955A

  • Building method for artificial dry-hot-rock geothermal reservoir

    CN105696996A