A BIM-based emergency simulation monitoring method and system

Through the combination of BIM model and neural network model, real-life simulation and evaluation of building emergency facilities are realized, which solves the scientific problems of building resistance to natural disasters and emergency strategy customization in the existing technology, and improves the reliability of monitoring results.

CN117540462BActive Publication Date: 2024-10-22江苏瀚天智能科技股份有限公司
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN202311486682.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-09
Publication Date
2024-10-22
Estimated Expiration
2043-11-09

AI Technical Summary

Technical Problem

The existing technology lacks effective methods to assess the ability of buildings to withstand natural disasters and the rationality of emergency facilities, and the customization of emergency strategies lacks scientific guidance.

Method used

Using BIM-based emergency simulation monitoring methods and systems, BIM models are used for real-time simulation, real-time data extraction and recording, and neural network models are used to evaluate the feasibility and effectiveness of emergency facility settings and plans to achieve real-life simulation inspection of building emergency measures. .

Benefits of technology

By simulating emergency scenarios through BIM models, we can achieve accurate evaluation of emergency facility settings and plans, improve the reliability of monitoring results, and solve the scientific problems of verifying the building's ability to withstand natural disasters and customizing emergency strategies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117540462B_ABST
    Figure CN117540462B_ABST
Patent Text Reader

Abstract

The present invention discloses a BIM-based emergency simulation monitoring method and system, which obtains a first BIM model, first emergency setting information, and a first emergency simulation scene by obtaining a first emergency simulation element according to the first emergency simulation scene; obtains first emergency route information according to the first emergency simulation element and the first emergency setting information; marks the first emergency setting according to the first emergency route information; obtains first emergency simulation information according to the first emergency simulation scene and the first BIM model; obtains first monitoring information according to the first emergency simulation information; inputs the first monitoring information and the first emergency simulation scene into an emergency evaluation model to obtain a first emergency evaluation result; determines whether the first emergency evaluation result meets a first predetermined threshold; and obtains a first emergency monitoring report when the threshold is met. The method solves the technical problems that the prior art cannot verify the ability of buildings to resist natural disasters and the customization of emergency strategies lacks scientific guidance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data analysis, and in particular to a BIM-based emergency simulation monitoring method and system. Background Art

[0002] Usually, buildings, especially commercial and civil buildings, will provide people with escape routes in the architectural design in order to resist disasters and emergencies. How to verify the rationality of the design of the escape route? Some will be set according to empirical data or relevant regulations. For built buildings, it can be verified through emergency field exercises. Emergency drills are a practical activity that simulates emergency response to test the effectiveness of emergency plans, the perfection of emergency preparations, the adaptability of emergency response capabilities, and the coordination of emergency personnel. It can be divided into single exercises, comprehensive exercises, and joint exercises conducted by on-site and off-site emergency organizations. However, for buildings under construction or design, how to ensure the rationality and perfect performance of the actual design of their emergency facilities? There is a lack of effective assessment and verification methods in the existing technology. Summary of the invention

[0003] The embodiment of the present application solves the technical problems in the prior art that the ability of buildings to resist natural disasters cannot be verified and the customization of emergency strategies lacks scientific guidance by providing a BIM-based emergency simulation monitoring method and system. The BIM model is used to perform real-life simulation according to the emergency setting scenario requirements, and the entire process of emergency simulation can be intuitively grasped. Real-time data extraction is performed through the emergency simulation process in the model, and the emergency simulation data is accurately recorded. In combination with the neural network model, the feasibility and effectiveness of the building's emergency facility settings and emergency plan customization are accurately evaluated based on the monitoring data, while the real-life simulation test of the building's emergency measures is achieved, and the reliability of the monitoring results is improved.

[0004] In view of the above problems, an embodiment of the present application provides a BIM-based emergency simulation monitoring method and system.

[0005] In a first aspect, an embodiment of the present application provides a BIM-based emergency simulation monitoring method, the method comprising: obtaining a first BIM model; obtaining first emergency setting information according to the first BIM model, wherein the first emergency setting information comprises an emergency setting category, a number of emergency settings, and an emergency setting location; obtaining a first emergency simulation scene, extracting scene elements according to the first emergency simulation scene, and determining a first emergency simulation element; obtaining first emergency route information according to the first emergency simulation element and the first emergency setting information; obtaining a first marking instruction according to the first emergency route information, the first marking instruction being used to mark the first emergency setting in the first emergency route information; and The first emergency simulation scenario and the first BIM model are used to obtain first emergency simulation information, where the first emergency simulation information is used to start a first emergency simulation process according to the first emergency setting information; first monitoring information is obtained according to the first emergency simulation information, where the first monitoring information is the emergency monitoring data collected for the first emergency simulation process, wherein the first monitoring information includes a first marked traffic rate; the first monitoring information and the first emergency simulation scenario are input into an emergency evaluation model to obtain a first emergency evaluation result; it is determined whether the first emergency evaluation result meets a first predetermined threshold; when satisfied, a first emergency monitoring report is obtained according to the first emergency evaluation result, the first monitoring information and the first emergency route information.

[0006] On the other hand, the present application also provides a BIM-based emergency simulation monitoring system, the system comprising:

[0007] A first obtaining unit, wherein the first obtaining unit is used to obtain a first BIM model;

[0008] a second obtaining unit, the second obtaining unit being configured to obtain first emergency setting information according to the first BIM model, wherein the first emergency setting information includes an emergency setting category, a number of emergency settings, and a location of the emergency settings;

[0009] A scene element determination unit, the scene element determination unit is used to obtain a first emergency simulation scene, extract scene elements according to the first emergency simulation scene, and determine the first emergency simulation elements;

[0010] a third obtaining unit, the third obtaining unit being used to obtain first emergency route information according to the first emergency simulation element and the first emergency setting information;

[0011] a fourth obtaining unit, the fourth obtaining unit being used to obtain a first marking instruction according to the first emergency route information, the first marking instruction being used to mark the first emergency setting in the first emergency route information;

[0012] A simulation unit, wherein the simulation unit is used to obtain first emergency simulation information according to the first emergency simulation scenario and the first BIM model, wherein the first emergency simulation information is used to start a first emergency simulation process according to the first emergency setting information;

[0013] A monitoring information collection unit, the monitoring information collection unit is used to obtain first monitoring information according to the first emergency simulation information, the first monitoring information is emergency monitoring data collected during the first emergency simulation process, wherein the first monitoring information includes a first marked pass rate;

[0014] A model processing execution unit, wherein the model processing execution unit is used to input the first monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a first emergency evaluation result;

[0015] A judgment unit, the judgment unit is used to judge whether the first emergency evaluation result meets a first predetermined threshold;

[0016] The judgment result is executed, and the judgment result is executed for obtaining a first emergency monitoring report according to the first emergency evaluation result, the first monitoring information, and the first emergency route information when the judgment result is met.

[0017] In a third aspect, the present invention provides a BIM-based emergency simulation monitoring system, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method described in the first aspect when executing the program.

[0018] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0019] The embodiment of the present application provides a BIM-based emergency simulation monitoring method and system, which comprises the following steps: obtaining a first BIM model; obtaining first emergency setting information according to the first BIM model, wherein the first emergency setting information includes the emergency setting category, the emergency setting quantity, and the emergency setting location; obtaining a first emergency simulation scene; extracting scene elements according to the first emergency simulation scene to determine the first emergency simulation element; obtaining first emergency route information according to the first emergency simulation element and the first emergency setting information; obtaining a first marking instruction according to the first emergency route information, wherein the first marking instruction is used to mark the first emergency setting in the first emergency route information; and extracting scene elements according to the first emergency simulation element and the first emergency setting information. The first BIM model is used to obtain first emergency simulation information, which is used to start the first emergency simulation process according to the first emergency setting information; first monitoring information is obtained according to the first emergency simulation information, and the first monitoring information is the emergency monitoring data collected for the first emergency simulation process, wherein the first monitoring information includes the first marked traffic rate; the first monitoring information and the first emergency simulation scene are input into the emergency evaluation model to obtain the first emergency evaluation result; it is determined whether the first emergency evaluation result meets the first predetermined threshold; when it meets the threshold, the first emergency monitoring report is obtained according to the first emergency evaluation result, the first monitoring information, and the first emergency route information. The BIM model is used to perform real-life simulation according to the requirements of the emergency setting scene, and the entire process of the emergency simulation can be intuitively grasped. The emergency simulation process in the model is used to extract real-time data, and the emergency simulation data is accurately recorded. The feasibility and effectiveness of the emergency facility setting and emergency plan customization of the building are accurately evaluated according to the monitoring data in combination with the neural network model, and the real-life simulation test of the building emergency measures is realized at the same time, and the reliability of the monitoring results is improved. The technical effect is solved. The technical problem that the ability of buildings to resist natural disasters cannot be verified in the prior art and the customization of emergency strategies lacks scientific guidance.

[0020] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A flow chart of a BIM-based emergency simulation monitoring method according to an embodiment of the present application;

[0022] Figure 2 This is a structural schematic diagram of a BIM-based emergency simulation monitoring system according to an embodiment of the present application;

[0023] Figure 3 It is a schematic diagram of the structure of an exemplary electronic device according to an embodiment of the present application.

[0024] Explanation of the accompanying drawings: first obtaining unit 11, second obtaining unit 12, scene element determination unit 13, third obtaining unit 14, fourth obtaining unit 15, simulation unit 16, monitoring information acquisition unit 17, model processing execution unit 18, judgment unit 19, judgment result execution unit 20, bus 300, receiver 301, processor 302, transmitter 303, memory 304, bus interface 306. DETAILED DESCRIPTION

[0025] The embodiment of the present application solves the technical problems in the prior art that the ability of buildings to resist natural disasters cannot be verified and the customization of emergency strategies lacks scientific guidance by providing a BIM-based emergency simulation monitoring method and system. The BIM model is used to perform real-life simulation according to the emergency setting scenario requirements, and the entire process of emergency simulation can be intuitively grasped. Real-time data extraction is performed through the emergency simulation process in the model, and the emergency simulation data is accurately recorded. In combination with the neural network model, the feasibility and effectiveness of the building's emergency facility settings and emergency plan customization are accurately evaluated based on the monitoring data, while the real-life simulation test of the building's emergency measures is achieved, and the reliability of the monitoring results is improved.

[0026] Below, the exemplary embodiments according to the present application will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application, and it should be understood that the present application is not limited to the exemplary embodiments described here. Embodiment 1

[0027] like Figure 1 As shown, an embodiment of the present application provides a BIM-based emergency simulation monitoring method, the method comprising:

[0028] Step S100: obtaining a first BIM model;

[0029] Specifically, BIM (Building Information Modeling) technology is a digital tool used in engineering design, construction, and management. By integrating the digital and informationized models of buildings, it is shared and transmitted throughout the entire life cycle of project planning, operation, and maintenance, enabling engineering and technical personnel to correctly understand and efficiently respond to various building information, providing a basis for collaborative work for the design team and all parties involved in the construction, including construction and operation units, and playing an important role in improving production efficiency, saving costs, and shortening construction periods. BIM has the following five characteristics: visualization, coordination, simulation, optimization, and mappability.

[0030] Step S200: obtaining first emergency setting information according to the first BIM model, wherein the first emergency setting information includes emergency setting category, emergency setting quantity, and emergency setting location;

[0031] Specifically, based on the first BIM model, a simulated real scene of the emergency passage set up in the building is obtained, which includes the emergency setting category, size, quantity, and specific setting location, all of which can be displayed through the BIM model, and features are extracted from the data to obtain the first emergency setting information.

[0032] Step S300: obtaining a first emergency simulation scenario, extracting scenario elements according to the first emergency simulation scenario, and determining first emergency simulation elements;

[0033] Specifically, the first emergency simulation scenario is the scenario setting of the current emergency simulation, such as fire, flood, typhoon, earthquake, etc. The first emergency simulation element is the description content of the emergency scenario corresponding to the first emergency simulation scenario, such as severity, disaster level, the number of people participating in the emergency simulation, the identity setting information of the participants, the location setting information, etc., to set the specific values ​​in the first emergency simulation scenario and improve the elements in the emergency scenario.

[0034] Step S500: obtaining first emergency route information according to the first emergency simulation element and the first emergency setting information;

[0035] Further, the first emergency route information is obtained according to the first emergency simulation element and the first emergency setting information. Step S500 of the embodiment of the present application includes:

[0036] Step S510: obtaining the total number of participants in emergency activities according to the first emergency simulation element;

[0037] Step S520: Obtain emergency environment attributes according to the first emergency simulation element;

[0038] Step S530: Obtaining a first emergency environment level according to the emergency environment attribute;

[0039] Step S540: Obtaining the first emergency effective time according to the emergency environment level;

[0040] Step S550: obtaining location information of participating individuals according to the first emergency simulation elements and the total number of participants in the emergency activity;

[0041] Step S560: Obtain the emergency setting category, emergency setting quantity, and emergency setting location according to the first emergency setting information;

[0042] Step S570: Obtain emergency classification information according to the total number of participants in the emergency activities, the category of the emergency settings, and the number of emergency settings;

[0043] Step S580: Obtain emergency strategy information according to the participating individual location information and the emergency setting location;

[0044] Step S590: Obtain the first emergency route information according to the emergency classification information, the emergency strategy information, and the first emergency effective time, wherein the first emergency route information includes one or more emergency route information.

[0045] Specifically, the design and planning of the emergency route is carried out according to the first emergency simulation element and the first emergency setting information. According to the total number of participants in the emergency activities in the first emergency simulation element, the emergency environment attributes, i.e., disasters, emergency event settings, and the level of emergency handling events, the first emergency effective time is determined according to the attributes and levels of the emergency combined with the structure in the building BIM model. According to the total number of emergency parameters and the positions of the corresponding personnel and the positions of the emergency passages in the building, it is determined how to distribute the flow of people. The emergency strategy is arranged according to the distance between the personnel's location and the emergency passage settings. The arrangement of the emergency route information must meet the principle of taking into account the total number of emergency setting parameters and ensuring the safety of personnel to the greatest extent. It is coordinated and arranged according to the specific location of the personnel and the actual emergency passage settings (emergency setting locations). Emergency allocation is carried out from a global perspective. The number of routes in the first emergency route information, the number of participants, and the emergency setting information are determined. For example, if the population density of the building is small and the passage settings are relatively simple, there may be one first emergency route. If the building participating in the emergency is densely populated and the number of passage settings is large, there may be multiple first emergency routes.

[0046] Step S600: obtaining a first marking instruction according to the first emergency route information, wherein the first marking instruction is used to mark a first emergency setting in the first emergency route information;

[0047] Specifically, the emergency passage exit is marked, and the mark is used for data identification with the system. During monitoring, data statistics are collected for the emergency exit corresponding to the marked position.

[0048] Step S700: obtaining first emergency simulation information according to the first emergency simulation scenario and the first BIM model, where the first emergency simulation information is used to start a first emergency simulation process according to the first emergency setting information;

[0049] Specifically, the relevant information of the emergency simulation scenario and the first BIM model are input, and the emergency simulation instruction is started. By simulating the emergency scenario in the first BIM model, the design position of the emergency passage exit of the building and the corresponding customized emergency escape plan are monitored and evaluated.

[0050] Step S800: obtaining first monitoring information according to the first emergency simulation information, wherein the first monitoring information is emergency monitoring data collected during the first emergency simulation process, wherein the first monitoring information includes a first marked traffic rate;

[0051] Specifically, based on the data collection during the emergency process in the BIM model, monitoring data of the emergency simulation exercise process is constructed. The monitoring data includes image information of the emergency process, emergency results, emergency simulation time, etc., and monitoring data of relevant emergency indicators in the entire simulation process, including the monitoring results of the traffic data in the marked emergency settings (emergency passages, exits). The traffic rate is marked as the first mark. The traffic rate is a statistical calculation of the traffic speed and number of people passing through the emergency settings.

[0052] Step S900: inputting the first monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a first emergency evaluation result;

[0053] Furthermore, the first monitoring information and the first emergency simulation scenario are input into an emergency evaluation model to obtain a first emergency evaluation result. Step S900 of the embodiment of the present application includes:

[0054] According to the first emergency simulation scenario, obtaining first scenario emergency assessment information;

[0055] The first monitoring information and the first scenario emergency assessment information are input into an emergency evaluation model to obtain the first emergency evaluation result, and the first emergency evaluation result is used to evaluate the emergency effect.

[0056] Specifically, the current emergency simulation results are evaluated based on the matching calculation of the currently acquired monitoring data and the standard data of the corresponding emergency scenario. The rationality of the emergency settings of the current building and the feasibility of the emergency planning scheme are evaluated through the evaluation results. If the first emergency evaluation result is high, it indicates that the rationality of the emergency settings of the current building and the feasibility of the emergency planning scheme are high, otherwise the rationality and feasibility are low. In order to improve the accuracy of the emergency evaluation results, the embodiment of the present application adds a neural network model, and uses the computational advantages of the neural network model to improve the accuracy of the emergency evaluation results of the emergency simulation process. The emergency evaluation model is a neural network model in machine learning. Simply put, it is a mathematical model. Through the training of a large amount of training data, the first input information and the second input information are input into the neural network model, and the first emergency evaluation result is output. Furthermore, the training process is essentially a supervised learning process. Each group of supervised data includes the first input information, the second input information and the identification information for identifying the first emergency evaluation result. The first input information and the second input information are input into the neural network model. According to the identification information for identifying the first emergency evaluation result, the neural network model continuously corrects and adjusts itself until the output result obtained is consistent with the identification information, then the supervised learning of this group of data is terminated and the supervised learning of the next group of data is carried out. When the output information of the neural network model reaches a predetermined accuracy rate / reaches a convergence state, the supervised learning process ends. Through supervised learning of the neural network model, the neural network model can process the input information more accurately, thereby obtaining a more accurate and suitable first emergency evaluation result, and then the rationality of the emergency setting and the feasibility of the emergency planning scheme can be evaluated, thereby achieving the technical effect of accurately evaluating the building's emergency handling capabilities and the effectiveness of the emergency plan by matching the recorded data of the real-life simulated emergency process with industry standards.

[0057] Step S1000: determining whether the first emergency evaluation result meets a first predetermined threshold;

[0058] Step S1100: When the conditions are met, a first emergency monitoring report is obtained according to the first emergency evaluation result, the first monitoring information, and the first emergency route information.

[0059] Specifically, it is determined whether the first emergency evaluation result meets the pre-set threshold requirements. The threshold setting is specifically set according to the current construction requirements of the building. For buildings located in special areas or with special purposes, a higher threshold can be set, while for buildings with low requirements, a lower threshold can be set. The specific setting is made according to the emergency handling requirements of the building itself. The general setting value must meet the requirements of industry standards or relevant regulations. When the first predetermined threshold is met, it indicates that the current emergency setting information and the formulation of the emergency plan meet the requirements of the building emergency handling. According to the current emergency setting information and monitoring information, emergency route information (emergency plan), the emergency monitoring report for the current emergency scene is generated and the building emergency simulation results are evaluated. This solves the technical problem that the ability of buildings to resist natural disasters cannot be verified in the prior art, and the customization of emergency strategies lacks scientific guidance. The BIM model can be used to perform real-life simulation according to the requirements of emergency scenario settings, and the entire process of emergency simulation can be intuitively grasped. Real-time data can be extracted through the emergency simulation process in the model, and the emergency simulation data can be accurately recorded. In combination with the neural network model, the feasibility and effectiveness of the building's emergency facility settings and emergency plan customization can be accurately evaluated based on the monitoring data. At the same time, real-life simulation inspection of building emergency measures can be achieved, thereby improving the reliability of monitoring results.

[0060] Furthermore, after determining whether the first emergency evaluation result meets a first predetermined threshold, the embodiment of the present application includes:

[0061] Step S1010: when the first emergency evaluation result does not meet the first predetermined threshold, obtaining first structural information according to the first BIM model;

[0062] Step S1020: obtaining second emergency line information according to the first emergency simulation element and the first structure information;

[0063] Step S1030: obtaining second emergency setting information according to the second emergency line information;

[0064] Step S1040: obtaining a second BIM model according to the second emergency setting information and the first BIM model;

[0065] Step S1050: obtaining second emergency simulation information according to the first emergency simulation scenario and the second BIM model, where the second emergency simulation information is used to start a second emergency simulation process according to the second emergency setting information;

[0066] Step S1060: obtaining second monitoring information according to the second emergency simulation information;

[0067] Step S1070: inputting the second monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a second emergency evaluation result;

[0068] Step S1080: determining whether the second emergency evaluation result meets a first predetermined threshold;

[0069] Step S1090: When the conditions are met, a second emergency monitoring report is obtained according to the second emergency evaluation result, the second monitoring information, and the second emergency route information.

[0070] Specifically, in the case where the first emergency evaluation result does not meet the predetermined threshold, it is necessary to make corresponding adjustments to the emergency settings of the building, that is, the settings of emergency facilities, to meet the emergency requirements. First, the main structure of the building is obtained through the BIM model, and the second emergency route information is set according to the building structure and emergency scenario factors, that is, the emergency plan is re-formulated. The corresponding emergency facility setting plan is determined according to the emergency plan, and the second BIM model is regenerated according to the adjusted emergency facility setting plan. The real-life simulation is performed again according to the new emergency route plan and the second BIM model to obtain the second monitoring information. The second monitoring information obtained by monitoring is input into the emergency evaluation model, and an emergency evaluation is performed to obtain the second emergency evaluation result. For the evaluation results that meet the threshold requirements, the corresponding emergency evaluation results, monitoring information, and emergency route information are used to generate an emergency monitoring report, so as to realize the re-setting of the building emergency facilities according to the emergency evaluation results, and the BIM model is updated through the new emergency facility setting plan. The new BIM model is used to monitor and assess the emergency facility setting plan and the emergency route. The feasibility and effectiveness of the building's emergency facility setting and emergency plan customization are accurately evaluated according to the monitoring data in combination with the neural network model, so as to improve the technical effect of the reliability of the monitoring results. This further solves the technical problems in the prior art that the ability of buildings to resist natural disasters cannot be verified and the customization of emergency strategies lacks scientific guidance.

[0071] Furthermore, the embodiment of the present application also includes:

[0072] Step S1210: Obtaining emergency traffic efficiency according to the first emergency effective time;

[0073] Step S1220: determining whether the first marked traffic rate satisfies the emergency traffic efficiency;

[0074] Step S1230: if not satisfied, obtaining first reminder information, where the first reminder information is used to remind in the first monitoring information;

[0075] Step S1240: obtaining a first alternative route according to the first reminder information;

[0076] Step S1250: determining whether the first alternative new road is included in the first emergency route information;

[0077] Step S1260: If not included, obtaining third emergency line information according to the first alternative line and the first emergency line information;

[0078] Step S1270: obtaining third emergency simulation start information according to the third emergency line information and the first BIM model;

[0079] Step S1280: obtaining third monitoring information according to the third emergency simulation start information;

[0080] Step S1290: Obtain a third emergency monitoring report based on the third monitoring information.

[0081] Specifically, in addition to improving the emergency effect by adjusting the emergency facilities of the building, for buildings that cannot be remodeled in an emergency, the emergency effect can be improved by re-customizing the emergency route plan, and by utilizing the existing emergency facilities, that is, the emergency setting information. During the simulation process, the first emergency route information is used to measure whether the planning of the emergency facilities is reasonable by monitoring and counting the traffic rate of the marked emergency facilities. When the traffic rate exceeds the set standard, a reminder message is issued to prompt that the marked emergency facilities need to be adjusted due to the low traffic rate, otherwise it will affect the evaluation result of the entire emergency plan. According to the reminder information and the corresponding emergency setting, the first alternative route related to it is obtained. Usually, an emergency setting adjacent to the emergency setting with a larger traffic rate is found to divert the emergency setting to improve its traffic rate. The first emergency route information is adjusted according to the first alternative route to obtain a new emergency route plan as the third emergency route information. The emergency simulation is started again according to the new emergency route plan, and the new emergency route plan is monitored to evaluate the emergency effect of the plan. Finally, the corresponding third emergency monitoring report is generated according to the new third emergency route information and monitoring data. The new emergency route plan can be adjusted according to the traffic rate of the marked emergency facilities monitored during the simulation process, and the emergency route plan can be optimized on the basis of the existing emergency settings to improve the effect of emergency handling. The feasibility and effectiveness of the emergency facility settings and emergency plan customization of the building can be accurately evaluated based on the monitoring data, and the reliability of the monitoring results can be improved. This further solves the technical problems in the existing technology that the ability of buildings to resist natural disasters cannot be verified, and the customization of emergency strategies lacks scientific guidance.

[0082] Furthermore, the embodiment of the present application also includes:

[0083] Step S1310: obtaining a second emergency simulation scenario, wherein the emergency level of the second emergency simulation scenario meets a third predetermined condition;

[0084] Step S1320: obtaining simulated damage intensity information according to the second emergency simulation scenario;

[0085] Step S1330: obtaining third emergency simulation data according to the second emergency simulation scenario and the simulated damage intensity information;

[0086] Step S1340: constructing a third emergency simulation space according to the third emergency simulation data and the first BIM model;

[0087] Step S1350: obtaining a third simulation result according to the third emergency simulation space;

[0088] Step S1360: Obtaining building block tolerance information according to the third simulation result and the first BIM model;

[0089] Step S1370: Obtain a building emergency analysis report based on the building block tolerance information.

[0090] Furthermore, the building emergency analysis report is obtained according to the building block tolerance information. Step S1370 of the embodiment of the present application includes:

[0091] Step S1371: Obtain an emergency adjustment plan according to the building block tolerance information;

[0092] Step S1372: Obtain an emergency treatment plan according to the building block tolerance information;

[0093] Step S1373: Generate the building emergency analysis report according to the building block tolerance information, emergency adjustment plan, and emergency handling plan.

[0094] Specifically, the simulation and visualization characteristics of the BIM model can be used to set the building's disaster resistance mode. According to the set second emergency simulation scenario, the second emergency simulation scenario is set for natural disasters such as earthquakes. The third predetermined condition can set the earthquake level to above level 5 as needed. The emergency simulation scenario and the corresponding level are input, and the destructive intensity information is simulated. The corresponding emergency simulation data and the corresponding BIM model are loaded to construct the third emergency simulation space. The third emergency simulation space is a simulation space used to simulate the corresponding scenario and destructive intensity, simulate and restore the building state under the natural disaster, and record the tolerance information of each block in the simulation environment, which is the tolerance information of the building block. Different areas have different tolerance information of the building block. Through the simulation in the third emergency simulation space, the building in the BIM model is subjected to corresponding force impact, the morphological characteristics and force conditions of the building are simulated under the impact, and the data is monitored and recorded. The tolerance information of the building block is used to evaluate the building's tolerance to the emergency scenario. According to the tolerance information of each block and the comprehensive evaluation of the building tolerance information, the building emergency analysis report under the emergency scenario is generated. At the same time, according to the different block tolerance information, adjustment and treatment plans are recommended, including generating corresponding adjustment or / and treatment plans for the tolerance information of the block combined with the structural characteristics of the area, and the data of the recommended connection tolerance capacity are recorded together in the building emergency analysis report, providing users with a full range of emergency evaluation services. It achieves the goal of simulating the impact force of natural disasters, monitoring the tolerance capacity of each building block through the BIM model during the simulation process, and evaluating the precise emergency treatment effect through real-life simulation, which further solves the technical problems that the ability of buildings to resist natural disasters cannot be verified in the existing technology, and the customization of emergency strategies lacks scientific guidance.

[0095] Furthermore, after obtaining the building emergency analysis report according to the building block tolerance information, the embodiment of the present application further includes:

[0096] Step S1410: Obtaining a first building risk resistance level according to the building emergency analysis report;

[0097] Step S1420: determining whether the first building risk resistance level meets a fourth predetermined condition;

[0098] Step S1430: when not satisfied, obtaining building design parameters according to the first BIM model;

[0099] Step S1440: Obtain parameter adjustment information according to the building block tolerance information and the building design parameters;

[0100] Step S1450: obtaining a first matching degree according to the parameter adjustment information and the first BIM model;

[0101] Step S1460: When the first matching degree satisfies a fifth predetermined condition, the first BIM model is adjusted according to the parameter adjustment information to obtain a third BIM model.

[0102] Specifically, the risk resistance level of the building is judged according to the results of the simulation monitoring. If the risk resistance level is high, no modification is made. If the risk resistance level is low and cannot meet the user's setting requirements, the embodiment of the present application extracts the current design parameters of the building according to the first BIM model. The tolerance information of the building blocks in the simulation monitoring process is used to adjust the corresponding parameters for the building blocks with poor tolerance. At the same time, the comprehensive parameters are adjusted according to the correlation between the blocks and the tolerance information of the region. The data can be determined by matching the industry data of the big data, or the training model can be used to train the relevant model to set the parameters to improve the accuracy of the parameter adjustment information. The matching degree is verified with the current first BIM model according to the recommended adjustment parameter information to see whether it meets the matching requirements of the current building model data. If the matching degree does not meet the requirements, the adjustment parameter information may be abnormal and mismatched. The higher the matching degree, the more suitable it is for the current building structure. The parameter adjustment information that meets the requirements is adjusted to the first BIM model, and a new third BIM model is updated. The technical effect of evaluating the building structure parameters through the emergency simulation process and combining the monitoring data and the experience value in the industry to improve the disaster resistance of the building is achieved. Embodiment 2

[0103] Based on the same inventive concept as the BIM-based emergency simulation monitoring method in the aforementioned embodiment, the present invention also provides a BIM-based emergency simulation monitoring system, such as Figure 2 As shown, the system comprises:

[0104] A first obtaining unit 11, wherein the first obtaining unit 11 is used to obtain a first BIM model;

[0105] A second obtaining unit 12, wherein the second obtaining unit 12 is used to obtain first emergency setting information according to the first BIM model, wherein the first emergency setting information includes an emergency setting category, a number of emergency settings, and an emergency setting location;

[0106] A scene element determination unit 13, the scene element determination unit 13 is used to obtain a first emergency simulation scene, extract scene elements according to the first emergency simulation scene, and determine the first emergency simulation elements;

[0107] a third obtaining unit 14, the third obtaining unit 14 being configured to obtain first emergency route information according to the first emergency simulation element and the first emergency setting information;

[0108] A fourth obtaining unit 15, the fourth obtaining unit 15 is used to obtain a first marking instruction according to the first emergency route information, the first marking instruction is used to mark the first emergency setting in the first emergency route information;

[0109] A simulation unit 16, wherein the simulation unit 16 is used to obtain first emergency simulation information according to the first emergency simulation scenario and the first BIM model, wherein the first emergency simulation information is used to start a first emergency simulation process according to the first emergency setting information;

[0110] A monitoring information acquisition unit 17, wherein the monitoring information acquisition unit 17 is used to obtain first monitoring information according to the first emergency simulation information, wherein the first monitoring information is emergency monitoring data collected during the first emergency simulation process, wherein the first monitoring information includes a first marked traffic rate;

[0111] A model processing execution unit 18, wherein the model processing execution unit 18 is used to input the first monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a first emergency evaluation result;

[0112] A judging unit 19, the judging unit 19 is used to judge whether the first emergency evaluation result meets a first predetermined threshold;

[0113] The judgment result execution unit 20 is used to obtain a first emergency monitoring report according to the first emergency evaluation result, the first monitoring information, and the first emergency route information when the first emergency evaluation result does not meet the first predetermined threshold, and obtain first structural information according to the first BIM model;

[0114] Obtaining second emergency line information according to the first emergency simulation element and the first structure information;

[0115] obtaining second emergency setting information according to the second emergency line information;

[0116] Obtaining a second BIM model according to the second emergency setting information and the first BIM model;

[0117] According to the first emergency simulation scenario and the second BIM model, second emergency simulation information is obtained, where the second emergency simulation information is used to start a second emergency simulation process according to the second emergency setting information;

[0118] obtaining second monitoring information according to the second emergency simulation information;

[0119] Inputting the second monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a second emergency evaluation result;

[0120] Determining whether the second emergency evaluation result meets a first predetermined threshold;

[0121] When the conditions are met, a second emergency monitoring report is obtained according to the second emergency evaluation result, the second monitoring information, and the second emergency route information.

[0122] Furthermore, the model processing execution unit 18 is also used to perform the following steps:

[0123] According to the first emergency simulation scenario, obtaining first scenario emergency assessment information;

[0124] The first monitoring information and the first scenario emergency assessment information are input into an emergency evaluation model to obtain the first emergency evaluation result, and the first emergency evaluation result is used to evaluate the emergency effect.

[0125] Furthermore, the third obtaining unit 14 is further configured to perform the following steps:

[0126] According to the first emergency simulation element, the total amount of participants in the emergency activity is obtained;

[0127] According to the first emergency simulation element, obtaining emergency environment attributes;

[0128] Obtaining a first emergency environment level according to the emergency environment attribute;

[0129] According to the emergency environment level, obtain the first emergency effective time;

[0130] According to the first emergency simulation element and the total number of participants in the emergency activity, obtaining location information of participating individuals;

[0131] According to the first emergency setting information, obtain the emergency setting category, emergency setting quantity, and emergency setting location;

[0132] Obtain emergency classification information according to the total number of participants in the emergency activities, the category of the emergency settings, and the number of emergency settings;

[0133] Obtaining emergency strategy information according to the participating individual location information and the emergency setting location;

[0134] The first emergency route information is obtained according to the emergency classification information, the emergency strategy information, and the first emergency effective time, wherein the first emergency route information includes one or more emergency route information.

[0135] Furthermore, the system also includes:

[0136] an emergency traffic efficiency obtaining unit, the emergency traffic efficiency obtaining unit being used to obtain the emergency traffic efficiency according to the first emergency effective time;

[0137] a communication rate determination unit, the communication rate determination unit being used to determine whether the first marked passage rate satisfies the emergency passage efficiency;

[0138] A reminder unit, the reminder unit is used to obtain first reminder information if the requirement is not met, the first reminder information is used to remind in the first monitoring information;

[0139] an alternative line obtaining unit, the alternative line obtaining unit being configured to obtain a first alternative line according to the first reminder information;

[0140] a judgment execution unit, the judgment execution unit being used to judge whether the first alternative new road is included in the first emergency route information;

[0141] an emergency line information obtaining unit, the emergency line information obtaining unit being used to obtain third emergency line information according to the first alternative line and the first emergency line information if the third emergency line information is not included;

[0142] A starting unit, the starting unit being used to obtain third emergency simulation starting information according to the third emergency line information and the first BIM model;

[0143] A start monitoring unit, wherein the start monitoring unit is used to obtain third monitoring information according to the third emergency simulation start information;

[0144] A monitoring report obtaining unit, wherein the monitoring report obtaining unit is used to obtain a third emergency monitoring report according to the third monitoring information.

[0145] Furthermore, the system further comprises: an emergency simulation monitoring and analysis unit, wherein the emergency simulation monitoring and analysis unit is configured to perform the following steps:

[0146] Obtaining a second emergency simulation scenario, wherein the emergency level of the second emergency simulation scenario meets a third predetermined condition;

[0147] According to the second emergency simulation scenario, obtaining simulated damage intensity information;

[0148] Obtaining third emergency simulation data according to the second emergency simulation scenario and the simulated damage intensity information;

[0149] Constructing a third emergency simulation space according to the third emergency simulation data and the first BIM model;

[0150] According to the third emergency simulation space, obtaining a third simulation result;

[0151] Obtaining building block tolerance information according to the third simulation result and the first BIM model;

[0152] A building emergency analysis report is obtained based on the building block tolerance information.

[0153] Furthermore, the emergency simulation monitoring and analysis unit is also used to perform the following steps:

[0154] Obtaining an emergency adjustment plan according to the tolerance information of the building block;

[0155] Obtaining an emergency treatment plan according to the tolerance information of the building block;

[0156] The building emergency analysis report is generated according to the building block tolerance information, emergency adjustment plan, and emergency handling plan.

[0157] Furthermore, the system further includes: a third BIM model obtaining unit, wherein the third BIM model obtaining unit is configured to perform the following steps:

[0158] Obtaining a first building risk resistance level according to the building emergency analysis report;

[0159] determining whether the first building risk resistance level satisfies a fourth predetermined condition;

[0160] When the condition is not satisfied, obtaining building design parameters according to the first BIM model;

[0161] Obtaining parameter adjustment information according to the building block tolerance information and the building design parameters;

[0162] Obtaining a first matching degree according to the parameter adjustment information and the first BIM model;

[0163] When the first matching degree satisfies a fifth predetermined condition, the first BIM model is adjusted according to the parameter adjustment information to obtain a third BIM model.

[0164] The foregoing Figure 1 The various variations and specific examples of a BIM-based emergency simulation monitoring method in Example 1 are also applicable to a BIM-based emergency simulation monitoring system in this embodiment. Through the above detailed description of a BIM-based emergency simulation monitoring method, technical personnel in this field can clearly know the implementation method of a BIM-based emergency simulation monitoring system in this embodiment, so for the sake of brevity of the specification, it will not be described in detail here.

[0165] Exemplary Electronic Devices

[0166] Reference below Figure 3 To describe the electronic device of the embodiment of the present application.

[0167] Figure 3 The figure shows a schematic structural diagram of an electronic device according to an embodiment of the present application.

[0168] Based on the inventive concept of a BIM-based emergency simulation monitoring method in the aforementioned embodiment, the present invention also provides a BIM-based emergency simulation monitoring system, on which a computer program is stored, and when the program is executed by a processor, the steps of any method of the BIM-based emergency simulation monitoring method described above are implemented.

[0169] Among them, Figure 3 In the embodiment of the present invention, a bus architecture (represented by bus 300) is shown, and bus 300 may include any number of interconnected buses and bridges, and bus 300 links various circuits including one or more processors represented by processor 302 and memory represented by memory 304. Bus 300 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are not further described herein. Bus interface 306 provides an interface between bus 300 and receiver 301 and transmitter 303. Receiver 301 and transmitter 303 may be the same element, namely a transceiver, which provides a unit for communicating with various other systems over a transmission medium.

[0170] The processor 302 is responsible for managing the bus 300 and general processing, while the memory 304 may be used to store data used by the processor 302 when performing operations.

[0171] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0172] The embodiment of the present application provides a BIM-based emergency simulation monitoring method and system, which comprises the following steps: obtaining a first BIM model; obtaining first emergency setting information according to the first BIM model, wherein the first emergency setting information includes emergency setting category, emergency setting quantity, and emergency setting location; obtaining a first emergency simulation scenario; obtaining a first emergency simulation element according to the first emergency simulation scenario; obtaining first emergency route information according to the first emergency simulation element and the first emergency setting information; obtaining a first marking instruction according to the first emergency route information, wherein the first marking instruction is used to mark the first emergency setting in the first emergency route information; obtaining first emergency simulation information according to the first emergency simulation scenario and the first BIM model, wherein the first emergency simulation information is used to start a first emergency simulation process according to the first emergency setting information; obtaining first monitoring information according to the first emergency simulation information, wherein the first monitoring information is emergency monitoring data collected for the first emergency simulation process, wherein the first monitoring information includes a first marked traffic rate; inputting the first monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a first emergency evaluation result; judging whether the first emergency evaluation result meets a first predetermined threshold; and when satisfied, obtaining a first emergency monitoring report according to the first emergency evaluation result, the first monitoring information, and the first emergency route information. The BIM model can be used to simulate the scene according to the emergency setting scenario requirements, and the entire process of emergency simulation can be intuitively grasped. Real-time data extraction is performed through the emergency simulation process in the model, and the emergency simulation data is accurately recorded. In combination with the neural network model, the feasibility and effectiveness of the building's emergency facility settings and emergency plan customization are accurately evaluated based on the monitoring data. At the same time, the real-scene simulation test of the building's emergency measures is realized, and the reliability of the monitoring results is improved. The technical effect is achieved. This solves the technical problem that the ability of buildings to resist natural disasters cannot be verified in the existing technology, and the customization of emergency strategies lacks scientific guidance.

[0173] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0174] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A system that specifies the functions of a box or boxes.

[0175] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to work in a specific manner, so that the instructions stored in the computer-readable memory produce a product including an instruction system, which is implemented in the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0176] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps of the functions specified in a box or multiple boxes. Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they know the basic creative concept. Therefore, the attached claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0177] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A BIM-based emergency simulation monitoring method, in, The method comprises: Obtain the first BIM model; Obtaining first emergency setting information according to the first BIM model, wherein the first emergency setting information includes emergency setting category, emergency setting quantity, and emergency setting location; Obtaining a first emergency simulation scenario, extracting scenario elements according to the first emergency simulation scenario, and determining a first emergency simulation element, wherein the first emergency simulation scenario is a scenario setting of a current emergency simulation, including: fire, flood, typhoon, earthquake, and the first emergency simulation element is an emergency scenario description content corresponding to the first emergency simulation scenario; Obtaining first emergency route information according to the first emergency simulation element and the first emergency setting information; Obtaining a first marking instruction according to the first emergency route information, wherein the first marking instruction is used to mark a first emergency setting in the first emergency route information; Obtaining first emergency simulation information according to the first emergency simulation scenario and the first BIM model, where the first emergency simulation information is used to start a first emergency simulation process according to the first emergency setting information; Obtaining first monitoring information according to the first emergency simulation information, wherein the first monitoring information is emergency monitoring data collected during the first emergency simulation process, wherein the first monitoring information includes a first marked traffic rate, and the first marked traffic rate is a monitoring result of traffic data in an emergency setting; Inputting the first monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a first emergency evaluation result, wherein the emergency evaluation model is a neural network model in machine learning; Determining whether the first emergency evaluation result meets a first predetermined threshold; When the conditions are met, obtaining a first emergency monitoring report according to the first emergency evaluation result, the first monitoring information, and the first emergency route information; Inputting the first monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a first emergency evaluation result includes: According to the first emergency simulation scenario, obtaining first scenario emergency assessment information; The first monitoring information and the first scenario emergency assessment information are input into an emergency evaluation model to obtain the first emergency evaluation result, and the first emergency evaluation result is used to evaluate the emergency effect.

2. The method according to claim 1, in, After determining whether the first emergency evaluation result meets the first predetermined threshold, the method includes: When the first emergency evaluation result does not meet the first predetermined threshold, obtaining first structural information according to the first BIM model; Obtaining second emergency line information according to the first emergency simulation element and the first structure information; obtaining second emergency setting information according to the second emergency line information; Obtaining a second BIM model according to the second emergency setting information and the first BIM model; According to the first emergency simulation scenario and the second BIM model, second emergency simulation information is obtained, where the second emergency simulation information is used to start a second emergency simulation process according to the second emergency setting information; obtaining second monitoring information according to the second emergency simulation information; Inputting the second monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a second emergency evaluation result; Determining whether the second emergency evaluation result meets a first predetermined threshold; When the conditions are met, a second emergency monitoring report is obtained according to the second emergency evaluation result, the second monitoring information, and the second emergency route information.

3. The method according to claim 1, in, The method further comprises: Obtaining a second emergency simulation scenario, wherein the emergency level of the second emergency simulation scenario meets a third predetermined condition; According to the second emergency simulation scenario, obtaining simulated damage intensity information; Obtaining third emergency simulation data according to the second emergency simulation scenario and the simulated damage intensity information; Constructing a third emergency simulation space according to the third emergency simulation data and the first BIM model; According to the third emergency simulation space, obtaining a third simulation result; Obtaining building block tolerance information according to the third simulation result and the first BIM model; A building emergency analysis report is obtained based on the building block tolerance information.

4. The method according to claim 3, in, The step of obtaining a building emergency analysis report according to the building block tolerance information includes: Obtaining an emergency adjustment plan according to the tolerance information of the building block; Obtaining an emergency treatment plan according to the tolerance information of the building block; The building emergency analysis report is generated according to the building block tolerance information, emergency adjustment plan, and emergency handling plan.

5. A BIM-based emergency simulation monitoring system, in, The system is used to execute the method according to any one of claims 1 to 4, and the system comprises: A first obtaining unit, wherein the first obtaining unit is used to obtain a first BIM model; a second obtaining unit, the second obtaining unit being configured to obtain first emergency setting information according to the first BIM model, wherein the first emergency setting information includes an emergency setting category, a number of emergency settings, and a location of the emergency settings; A scene element determination unit, the scene element determination unit is used to obtain a first emergency simulation scene, extract scene elements according to the first emergency simulation scene, and determine the first emergency simulation elements; a third obtaining unit, the third obtaining unit being used to obtain first emergency route information according to the first emergency simulation element and the first emergency setting information; a fourth obtaining unit, the fourth obtaining unit being used to obtain a first marking instruction according to the first emergency route information, the first marking instruction being used to mark the first emergency setting in the first emergency route information; A simulation unit, wherein the simulation unit is used to obtain first emergency simulation information according to the first emergency simulation scenario and the first BIM model, wherein the first emergency simulation information is used to start a first emergency simulation process according to the first emergency setting information; A monitoring information collection unit, the monitoring information collection unit is used to obtain first monitoring information according to the first emergency simulation information, the first monitoring information is emergency monitoring data collected during the first emergency simulation process, wherein the first monitoring information includes a first marked pass rate; A model processing execution unit, wherein the model processing execution unit is used to input the first monitoring information and the first emergency simulation scenario into an emergency evaluation model to obtain a first emergency evaluation result; A judgment unit, the judgment unit is used to judge whether the first emergency evaluation result meets a first predetermined threshold; A judgment result execution unit, wherein the judgment result execution unit is used to obtain a first emergency monitoring report according to the first emergency evaluation result, the first monitoring information, and the first emergency route information when the conditions are met.

6. A BIM-based emergency simulation monitoring system, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, in, When the processor executes the program, the steps of the method according to any one of claims 1 to 4 are implemented.

Citation Information

Patent Citations

  • Emergency aid decision making system based on GIS and BIM

    CN110008618A

  • Emergency plan effectiveness evaluation method considering integrity and operability

    CN111639845A

  • Marine nuclear emergency drilling simulation system and drilling method

    CN113362671A

  • Bridge fire emergency rescue method based on BIM, terminal and storage medium

    CN114139243A

  • Wartime air defense system based on urban information model

    CN114282747A