Integrated operating device for voltage testing and grounding wire installation / removal and method
By using an integrated operation device for voltage testing and grounding wire installation and removal, and utilizing pulley positioning and electric traction control mechanisms, the grounding wire can be operated quickly, safely, and simply during the maintenance of ultra-high voltage substations. This solves the problems of cumbersome procedures and high-altitude operation risks in existing technologies, and improves maintenance efficiency and safety.
Patent Information
- Application Number
- CN202311559874.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-21
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-11-21
AI Technical Summary
In the maintenance of ultra-high voltage substations, the existing procedures for voltage testing and grounding wire installation and removal are cumbersome, require multiple people to work together, pose risks of working at heights, and are inefficient, failing to effectively guarantee maintenance safety and schedule.
Design an integrated operation device for voltage testing and grounding wire installation/removal, including a voltage testing and pulley positioning mechanism, a loading platform guiding installation/removal mechanism, and an electric traction control mechanism. The pulley positioning mechanism is used to hang the grounding wire via an insulating rod or drone, and the electric traction control mechanism is used to realize the automatic lifting and connection of the grounding wire, simplifying the operation process.
It enables single-person operation to quickly and accurately complete the voltage testing and installation/removal of grounding wires, reducing operational risks, saving personnel and vehicle costs, improving maintenance efficiency and safety, and reducing the difficulty of maintenance organization and labor intensity.
Smart Images

Figure CN117748253B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of substation maintenance technology, specifically to an integrated operating device and method for voltage testing and grounding wire installation / removal. Background Technology
[0002] At ultra-high voltage (UHV) substation maintenance sites, voltage testing and the installation / removal of grounding wires are essential safety measures to ensure the safety of personnel during maintenance. The time required for installation and removal of grounding wires, and the reliability of the connection, directly affect the maintenance schedule, energization operation, and maintenance safety. UHV and UHV grounding wires are heavy and installed at great heights, making manual installation using insulated poles impossible. Aerial work platforms and other climbing tools are required for installation and removal, resulting in high personnel, vehicle, and time costs.
[0003] Currently, the installation and removal of ultra-high voltage (UHV) grounding wires mainly involves manual installation using aerial work platforms. This involves verifying the voltage on the ground with a voltage detector, then using an aerial work platform to carry workers who, wearing insulated gloves and using insulated rods, install and remove the grounding wires. Manually installing grounding wires using an aerial work platform requires a complex and inefficient process, including personnel and vehicle access procedures, preparation for the work, voltage testing, operating the aerial work platform, and installing the grounding wire with insulated gloves and rods. Using aerial work platforms within substation equipment areas requires 4-5 personnel: a driver, operator, person performing voltage testing and grounding wire installation / removal, supervisor, and monitor. The use of aerial work platforms for grounding wire installation is limited by the working space, posing risks such as falls from height, injuries from falling objects, accidental contact with live equipment, and injuries from induced electric shock. Summary of the Invention
[0004] The purpose of this invention is to provide an integrated operation device and method for voltage testing and grounding wire installation and removal, which can replace the traditional high-altitude vehicle installation operation, save manpower, effectively ensure operational safety, and solve the problems of the prior art.
[0005] The technical solution adopted by this invention to solve its technical problem is: an integrated operating device for voltage detection and grounding wire installation / removal, comprising a voltage detection and pulley positioning mechanism, a loading platform guiding installation / removal mechanism, and an electric traction control mechanism. The voltage detection and pulley positioning mechanism can be mounted on the transmission line to be tested. The grounding wire can be installed on the loading platform guiding installation / removal mechanism. The electric traction control mechanism can control the loading platform guiding installation / removal mechanism to vertically lift and lower relative to the voltage detection and pulley positioning mechanism, and connect the grounding wire to the transmission line to be tested. The voltage detection and pulley positioning mechanism includes a pulley frame, with a fixed pulley installed at the bottom of the pulley frame. A slot is provided on one side of the pulley frame, allowing the transmission line to be tested to enter the slot. A detachable insulating rod is installed on the other side of the pulley frame, with a voltage detector at the top. The insulating rod can lift the voltage detection and pulley positioning mechanism to the position of the transmission line to be tested. The loading platform guiding installation / removal mechanism... The system includes a support base with connecting rods at both ends along its length. Each connecting rod has a lifting ring at its end, and a traction rope is connected to each lifting ring. The traction ropes are connected as a single rope, passing over a fixed pulley and connecting to an electric traction control mechanism. Y-shaped guide frames are installed at both ends along the length of the support base. A fixed tube is installed in the middle of the support base, and a grounding wire slide rail that mates with a grounding wire is installed on one side of the fixed tube. A detachable grounding wire hook is also installed at the top of the fixed tube, and the grounding wire hook is electrically connected to the grounding wire. The electric traction control mechanism includes a traveling trolley, on which a traction motor, a control panel, and a mobile power supply are installed. The mobile power supply is connected to the traction motor and the control panel via power supply lines. The control panel is connected to the traction motor via control lines. The traction rope is connected to the drum of the traction motor. A traction counterweight is also installed on the traveling trolley. The bottom of the slot is equipped with an outwardly inclined guide frame, and the top of the slot is equipped with a limit plate. A spring pressure plate is also installed inside the slot, and the spring pressure plate always tends to rotate towards the limit plate. The power transmission wire entering the slot is fixed between the spring pressure plate and the limit plate. A shock-absorbing rubber pad is installed at the opening of the Y-shaped guide frame. The bottom of the Y-shaped guide frame is hinged to the support base, and a spring buffer connects the support base and the Y-shaped guide frame. A Bluetooth attitude and angle measurement sensor is installed at the bottom of the support base, and one end of one of the connecting rods is connected to a balance control rope, one end of which is mounted on the drum of the balance control motor.The top of the fixed tube is equipped with a detachable and replaceable ground wire mounting sleeve assembly and a ground wire dismounting sleeve assembly. The ground wire mounting sleeve assembly includes a mounting sleeve with an L-shaped groove. A limiting block that mates with the L-shaped groove is located at the bottom of the ground wire hook. When the limiting block enters the horizontal groove at the bottom of the L-shaped groove, a vertical limit is formed between the mounting sleeve and the ground wire hook. When the limiting block rotates into the vertical groove of the L-shaped groove, the mounting sleeve and the ground wire hook can be separated. The ground wire dismounting sleeve assembly includes a guide flare. A clamping sleeve is located at the bottom of the guide flare. Several circumferentially arranged spring plates are located on the inner circumferential surfaces of the guide flare and the clamping sleeve. The spring plates tend to tighten the clamping sleeve. A rubber strip is located on the inner side of the spring plates, allowing the bottom of the ground wire hook to be wrapped and clamped by the rubber strip. A push-out reset mechanism is also installed at the bottom of the clamping sleeve. The push-out reset mechanism includes a connecting cylinder. Both the top and bottom surfaces are equipped with ring plates, and the grounding wire is located inside the ring plates. A vertically movable push rod is installed inside the connecting cylinder. A first spring is installed between the push rod and the bottom ring plate. The first spring always tends to push the push rod into the clamping sleeve. A self-locking hole is opened at the lower part of the push rod. A locking rod that can extend into the self-locking hole is installed on one side of the connecting cylinder. The locking rod has an inclined surface at the end near the push rod. A second spring is also provided on the outer periphery of the locking rod. The second spring always tends to push the end of the locking rod into the self-locking hole. When the ground wire disassembly sleeve assembly moves upward and gradually approaches the ground wire hook, the ground wire hook moves to the clamping sleeve position and pushes the push rod downward. The push rod gradually moves downward and contacts the inclined surface, overcoming the elastic force of the second spring to move the locking rod. When the self-locking hole moves to the locking rod position, under the action of the elastic force of the second spring, the locking rod can extend into the self-locking hole to realize the vertical limit of the push rod. The grounding wire slide rail includes two semi-circular slide rail frames that can be rotated and opened. The two slide rail frames are connected by a switch hinge. A buckle is provided on the side of the slide rail frame that can be rotated and opened. A roller with a groove is also installed inside the slide rail frame.The method for using an integrated voltage testing and grounding wire installation / removal device includes the following steps: ① Tie one end of the traction rope around the fixed pulley to the insulating rod, and use the insulating rod to lift the voltage testing and pulley positioning mechanism to the designated position of the transmission line to be tested; ② After lifting to the designated position, perform the voltage testing operation, then move the pulley frame to allow the transmission line to enter the slot, and hang the voltage testing and pulley positioning mechanism on the transmission line; ③ After the voltage testing and pulley positioning mechanism is installed, remove and retrieve the insulating rod from the pulley frame, untie the traction rope tied to the insulating rod, and connect the traction rope to the drum of the traction motor; ④ Install the grounding wire into the grounding wire slide rail on the loading platform guide installation / removal mechanism, and form an electrical connection with the grounding wire hook. Then operate the control panel of the electric traction control mechanism to rotate the drum of the traction motor to retrieve the traction rope, and the loading platform guide installation / removal mechanism synchronously raises the grounding wire, gradually approaching the transmission line; ⑤ When the grounding wire rises to 0.2 meters directly below the transmission line, operate the control panel. Stop the traction motor, and the loading platform guide assembly / disassembly mechanism will stop rising; ⑥ Pull the balance control rope to tilt the loading platform guide assembly / disassembly mechanism at a certain angle, so that the grounding hook avoids the power transmission line; ⑦ Maintain the state of the loading platform guide assembly / disassembly mechanism in step ⑥, operate the control panel to start the traction motor to drive the loading platform guide assembly / disassembly mechanism to continue rising until the opening of the grounding hook rises above the power transmission line, then operate the control panel to stop the traction motor, and the loading platform guide assembly / disassembly mechanism will stop rising; ⑧ Pull the balance control rope to reset the loading platform guide assembly / disassembly mechanism to its initial state, so that the opening of the grounding hook is above the power transmission line, then operate the control panel to reverse the traction motor, using the weight of the grounding wire and the loading platform guide assembly / disassembly mechanism to hang the grounding hook on the power transmission line, completing the connection between the grounding wire and the power transmission line; ⑨ Disconnect the connection between the grounding hook and the fixing pipe, operate the control panel to reverse the traction motor, and let the grounding wire slide rail on the loading platform guide assembly / disassembly mechanism descend along the grounding wire back to the ground.
[0006] The positive effects of this invention are as follows: The integrated operation device for voltage testing and grounding wire installation and removal described in this invention includes a voltage testing and pulley positioning mechanism, a loading platform guiding installation and removal mechanism, and an electric traction control mechanism. The voltage testing and pulley positioning mechanism can be mounted on the transmission line to be tested. The grounding wire can be installed on the loading platform guiding installation and removal mechanism. The electric traction control mechanism can control the loading platform guiding installation and removal mechanism to vertically lift and lower relative to the voltage testing and pulley positioning mechanism, and connect the grounding wire to the transmission line to be tested.
[0007] This device replaces traditional manual operation using aerial work platforms. Under the premise of ensuring operational safety, only one person is needed to operate and another to supervise. It enables rapid and accurate contact with the designated location for grounding wire installation on electrical equipment for voltage testing, and allows for quick installation and removal of the grounding wire. The grounding wire maintains good contact and is not limited by its weight, installation / removal height, or working space. This device and the method for voltage testing and grounding wire installation / removal integrate voltage testing and grounding wire installation / removal. It is simple to operate, ensures good grounding wire contact, and guarantees accurate installation location. It saves personnel and vehicle costs, avoids on-site operational risks, reduces the difficulty of maintenance organization, minimizes ineffective maintenance time, alleviates the labor intensity of switching operations and on-site maintenance, and improves the efficiency and effectiveness of lean operation and maintenance of ultra-high voltage and extra-high voltage equipment. Attached Figure Description
[0008] Figure 1 This is a schematic diagram of the usage state of the present invention;
[0009] Figure 2 This is a schematic diagram of the voltage detection and pulley positioning mechanism;
[0010] Figure 3 This is a structural diagram of the loading platform guide assembly / disassembly mechanism and the electrical testing and pulley positioning mechanism;
[0011] Figure 4 This is the front view of the loading platform guide assembly / disassembly mechanism;
[0012] Figure 5 yes Figure 4 The right view;
[0013] Figure 6 This is a schematic diagram of the electric traction control mechanism;
[0014] Figure 7 This is a schematic diagram of the force analysis of the loading platform guide assembly and disassembly mechanism when it is pulled at a constant speed;
[0015] Figure 8 This is a schematic diagram of the force analysis during the installation of the grounding wire;
[0016] Figure 9 This is a schematic diagram of the stress analysis when the grounding wire is removed;
[0017] Figure 10 This is a simplified schematic diagram of traction dynamic balance control;
[0018] Figure 11 This is a schematic diagram of the equilibrium force analysis of the loading platform's guide assembly / disassembly mechanism;
[0019] Figure 12 This is a simplified diagram illustrating the steps for installing a grounding wire;
[0020] Figure 13 This is a schematic diagram of the grounding wire slide rail structure;
[0021] Figure 14 This is a structural diagram of the grounding wire mounting sleeve assembly installed on the fixed pipe;
[0022] Figure 15 This is a structural schematic diagram of the grounding wire removal sleeve assembly installed on the fixed pipe;
[0023] Figure 16 This is a half-section structural diagram of the ground wire removal sleeve assembly;
[0024] Figure 17 This is a diagram illustrating how the grounding hook pushes the top rod downwards to the locked position;
[0025] Figure 18 This is a schematic diagram of the actual electrical testing and pulley positioning mechanism;
[0026] Figure 19 and Figure 20 This is a schematic diagram of the loading platform's guide assembly / disassembly mechanism;
[0027] Figure 21 This is a schematic diagram of the electric traction control mechanism.
[0028] Figure 22 and Figure 23 This is a schematic diagram of the on-site assembly and disassembly test of the present invention;
[0029] Figure 24 This is a schematic diagram of the preferred structure for the grounding hook. Detailed Implementation
[0030] The present invention provides an integrated operating device for voltage testing and grounding wire installation / removal, such as... Figure 1 As shown, it includes a voltage detection and pulley positioning mechanism 1, a loading platform guide assembly and disassembly mechanism 2, and an electric traction control mechanism 3. The voltage detection and pulley positioning mechanism 1 can be mounted on the power transmission line 4 to be tested. A grounding wire 5 can be installed on the loading platform guide assembly and disassembly mechanism 2. The electric traction control mechanism 3 can control the loading platform guide assembly and disassembly mechanism to vertically lift and lower relative to the voltage detection and pulley positioning mechanism 1, and connect the grounding wire 5 to the power transmission line 4 to be tested.
[0031] like Figure 2 As shown, the voltage testing and pulley positioning mechanism 1 includes a pulley frame 10, with a fixed pulley 11 installed at the bottom of the pulley frame 10. The pulley frame 10 is used to hang on the power transmission line 4, and the fixed pulley 11 serves as a connection point for transmitting lifting force, thereby realizing the lifting and lowering of the loading platform guide assembly and disassembly mechanism 2. A slot 12 is provided on one side of the pulley frame 10, allowing the power transmission line 4 to be tested to enter the slot 12, thus enabling the voltage testing and pulley positioning mechanism 1 to be hung on the power transmission line 4.
[0032] A detachable insulating rod 13 is installed on the other side of the pulley frame 10. A voltage detector 14 is installed on the top of the insulating rod 13. The insulating rod 13 can lift the voltage detection and pulley positioning mechanism 1 to the position of the transmission line 4 to be tested. The voltage detector 14 can perform the corresponding voltage detection operation on the transmission line 4 to be tested. When the position of the transmission line 4 to be tested is low, the voltage detection and pulley positioning mechanism 1 can be lifted manually using the insulating rod 13. When the position of the transmission line 4 is high, a drone can be used to lift the pulley frame 10 to the designated position.
[0033] The loading platform guide assembly / disassembly mechanism 2 is a device for installing the grounding wire 5 and raising it to a position where it is electrically connected to the power transmission line 4, such as... Figures 3-5 As shown, the loading platform guide assembly and disassembly mechanism 2 includes a support base 20. Both ends of the support base 20 in the length direction are provided with connecting rods 21. Each end of the connecting rod 21 is provided with a lifting ring 22. Each lifting ring 22 is connected with a traction rope 23. The traction rope 23 is connected as one and passes around the fixed pulley 11 to connect with the electric traction control mechanism 3. After the voltage detection and pulley positioning mechanism 1 is installed in place, the electric traction control mechanism 3 can be started and the loading platform guide assembly and disassembly mechanism 2 can be vertically lifted by the traction rope 23, thereby connecting the grounding wire 5 on the ground with the power transmission wire 4.
[0034] To facilitate the position adjustment of the loading platform guide assembly and disassembly mechanism 2 relative to the power transmission line 4, Y-shaped guide frames 24 are installed at both ends of the support base 20 along its length. During the lifting process, the power transmission line 4 can be pre-entered into the Y-shaped guide frame 24 to achieve the initial limit of the loading platform guide assembly and disassembly mechanism 2.
[0035] A fixing tube 25 is installed in the middle of the support base 20. A grounding wire slide rail 26, which mates with the grounding wire 5, is provided on one side of the fixing tube 25. A detachable grounding hook 27 is also installed on the top of the fixing tube 25. After the grounding wire 5 is installed into the grounding wire slide rail 26, the grounding hook 27 is electrically connected to the grounding wire 5. When the loading platform guide assembly / disassembly mechanism 2 is raised to the designated position of the transmission line 4, the grounding hook 27 can be hooked onto the transmission line 4, realizing the electrical connection between the transmission line 4 and the grounding wire 5. Then, the grounding hook 27 can be separated from the fixing tube 25 to complete the disassembly of the loading platform guide assembly / disassembly mechanism 2. To achieve effective hooking of the grounding hook 27 onto the transmission line 4, a preferred method is... Figure 24 The hook structure in it.
[0036] The electric traction control mechanism 3 is the power supply device for realizing the vertical lifting and lowering of the loading platform guide assembly / disassembly mechanism 2, such as... Figure 6As shown, the electric traction control mechanism 3 includes a traveling trolley 30, on which a traction motor 31, a control panel 32, and a mobile power supply 33 are mounted. The mobile power supply 33 is connected to both the traction motor 31 and the control panel 32 via power lines. The control panel 32 is connected to the traction motor 31 via control lines. The traction rope 23 is connected to the drum of the traction motor 31. The traveling trolley 30 facilitates the movement of the electric traction control mechanism 3 to a designated location within the substation. The traction motor 31 provides vertical lifting power. The control panel 32 has start / stop buttons to control the operation of the traction motor 31. The mobile power supply 33 provides the necessary electrical energy to the device. To prevent the electric traction control mechanism 3 from tipping over due to excessive gravity during the lifting of the loading platform guide assembly / disassembly mechanism 2 and the grounding wire 5, a traction counterweight 34 is also installed on the traveling trolley 30.
[0037] Furthermore, in order to make the voltage detection and pulley positioning mechanism 1 more stably mounted on the power transmission line 4, the bottom of the slot 12 is equipped with an outwardly inclined guide frame 15, the top of the slot 12 is equipped with a limiting plate 16, and a spring pressure plate 17 is also installed in the slot 12. The spring pressure plate 17 always has a tendency to rotate and move closer to the limiting plate 16, so that the power transmission line 4 can be fixed between the spring pressure plate 17 and the limiting plate 16 when it enters the slot 12.
[0038] As the pulley frame 10 moves closer to the transmission line 4, the guide frame 15 makes it easier for the transmission line 4 to enter the slot 12. Then, the pulley frame 10 is pulled down. Under the guidance of the spring pressure plate 17, the transmission line 4 squeezes the spring pressure plate 17 to deform it and then enters between the limiting plate 16 and the spring pressure plate 17. After losing the downward pulling force, the spring pressure plate 17 presses the transmission line 4 onto the limiting plate 16. Through the friction between them, the pulley frame 10 is prevented from moving in the length direction of the transmission line 4, thereby improving the stability of the voltage detection and pulley positioning mechanism 1 on the transmission line 4.
[0039] Furthermore, in order to buffer the contact vibration between the power transmission line 4 and the loading platform guide assembly / disassembly mechanism 2, a shock-absorbing rubber pad 28 is installed at the opening of the Y-shaped guide 24. In addition, the bottom of the Y-shaped guide 24 is hinged to the support base 20, and a spring buffer 29 is connected between the support base 20 and the Y-shaped guide 24. The shock-absorbing rubber pad 28 and the spring buffer 29 work together to achieve elastic buffering of the entire device.
[0040] Furthermore, to save manpower, the device's position is automatically adjusted through real-time monitoring, replacing traditional manual pulling and adjustment. A Bluetooth attitude and angle measurement sensor 211 is installed at the bottom of the support base 20. One end of a connecting rod 21 is connected to a balance control rope 212, one end of which is mounted on the drum of the balance control motor 213. The Bluetooth attitude and angle measurement sensor 211 can detect the tilting angle position of the loading platform guide assembly / disassembly mechanism 2 during the lifting process in real time, and then control the balance control motor 213 to rotate, thereby adjusting the state of the loading platform guide assembly / disassembly mechanism 2 by winding and unwinding the balance control rope 212.
[0041] Furthermore, in order to reduce the frictional force between the grounding wire 5 and the grounding wire slide rail 26 during relative vertical movement, such as... Figure 13 As shown, the grounding wire slide rail 26 includes two rotatably opening and closing semi-circular slide rail frames 216. The two slide rail frames 216 are hinged together by a switch hinge. A buckle 217 is provided on the rotatably opening and closing side of the slide rail frame 216. A grooved roller 218 is also installed inside the slide rail frame 216. After releasing the lock of the buckle 217 and opening the slide rail frame 216, the grounding wire 5 is inserted into it. Then the slide rail frame 216 is closed and the buckle 217 is locked. The grounding wire 5 is then wrapped inside the grounding wire slide rail 26. The roller 218 inside can convert sliding friction into rolling friction, effectively reducing the friction between them.
[0042] Furthermore, to facilitate the controllable assembly and disassembly of the fixed pipe 25 and the ground wire hook 27, a detachable and replaceable ground wire mounting sleeve assembly and a ground wire disassembly sleeve assembly are installed on the top of the fixed pipe 25. The ground wire mounting sleeve assembly is used when installing the ground wire, and the ground wire disassembly sleeve assembly is used when disassembling the ground wire. Both of the above structures can be threaded onto the fixed pipe 25, corresponding to the two operations of installation and disassembly, respectively, and corresponding components can be used.
[0043] like Figure 14-16 As shown, the ground wire mounting assembly includes a mounting sleeve 40 with an L-shaped groove 41. The bottom of the ground wire hook 27 has a limiting block 42 that mates with the L-shaped groove 41. When the limiting block 42 enters the horizontal groove at the bottom of the L-shaped groove 41, a vertical limit is formed between the mounting sleeve 40 and the ground wire hook 27. When the limiting block 42 rotates into the vertical groove of the L-shaped groove 41, the mounting sleeve 40 and the ground wire hook 27 can be separated. That is, during the upward lifting process, the limiting block 42 is located in the horizontal groove of the L-shaped groove 41. After the hook is installed, rotating the mounting sleeve 40 90 degrees relative to the ground wire hook 27 allows the limiting block 42 to enter the vertical groove of the L-shaped groove 41, thus completing the subsequent disengagement operation.
[0044] The ground wire removal assembly includes a guide flare 43, a clamping sleeve 44 at the bottom of the guide flare 43, and several circumferentially arranged spring plates 45 on the inner circumferential surfaces of the guide flare 43 and the clamping sleeve 44. The spring plates 45 tend to tighten the clamping sleeve 44. A rubber strip 46 is provided on the inner side of the spring plate 45, and the bottom of the ground wire hook 27 can be wrapped and clamped by the rubber strip 46. The guide flare 43 can guide the bottom of the ground wire hook 27, making it easier for the ground wire hook 27 to enter the clamping sleeve 44. Through the friction between them, the ground wire hook 27 and the clamping sleeve 44 are integrated, so as to facilitate the removal of the ground wire hook 27.
[0045] The circumferentially arranged spring pieces 45 have a certain gap between them. This gap can be adapted to the limiting block 42, so that the rubber strip 46 is clamped on the outer periphery of the ground hook 27. This avoids the disadvantage of loose clamping caused by the protruding part of the limiting block 42. After the limiting block 42 of the ground hook 27 moves down and extends out of the clamping sleeve 44, the protrusion of the limiting block 42 can no longer be considered, thus ensuring a stable and reliable clamping of the ground hook 27.
[0046] A push-out reset mechanism is also installed at the bottom of the clamping sleeve 44. The push-out reset mechanism includes a connecting cylinder 47, and annular plates 48 are provided on both the top and bottom surfaces of the connecting cylinder 47. The grounding wire 5 is located inside the annular plates 48 to facilitate vertical lifting and lowering of the device along the grounding wire 5. A vertically lifting push rod 49 is installed inside the connecting cylinder 47. A first spring 410 is installed between the push rod 49 and the bottom annular plate 48. The first spring 410 always has a tendency to push the push rod 49 into the clamping sleeve 44.
[0047] A self-locking hole 411 is provided at the lower part of the top rod 49. A locking rod 412 that can extend into the self-locking hole 411 is installed on one side of the connecting cylinder 47. The locking rod 412 has a bevel 414 at the end near the top rod 49. A second spring 413 is also provided on the outer periphery of the locking rod 412. The second spring 413 always tends to push the end of the locking rod 412 into the self-locking hole 411. When the ground wire removal sleeve assembly moves upward and gradually approaches the ground wire hook 27, the ground wire hook 27 moves to the position of the clamping sleeve 44 and pushes the top rod 49 downward. The top rod 49 gradually moves downward and contacts the bevel 414, overcoming the elastic force of the second spring 413 to move the locking rod 412. When the self-locking hole 411 moves to the position of the locking rod 412, as Figure 17 As shown, under the elastic force of the second spring 413, the locking rod 412 can extend into the self-locking hole 411 to achieve vertical positioning of the push rod 49. The self-locking hole 411 can be a groove of an annular structure provided at the bottom of the push rod 49.
[0048] When ground wire removal is required, the guide bell mouth 43 gradually moves upward and approaches the ground wire hook 27 under the lifting action of the traction rope 23. At this time, the top rod 49 is in position. Figure 16 As shown, after the grounding hook 27 enters the clamping sleeve 44, it will push the push rod 49 downwards and move the push rod 49 out of the clamping sleeve 44. The push rod 49 eventually moves down to... Figure 17 In the indicated state, the locking rod 412 extends into the self-locking hole 411, overcoming the elastic force of the first spring 410, and vertically limits the push rod 49. The push rod 49 will not move upward to push out the ground wire hook 27. The ground wire hook 27 and the clamping sleeve 44 are integrated, allowing for subsequent disassembly operations. After removing the ground wire hook 27, the locking rod 412 can be pulled out of the self-locking hole 411, and the push rod 49 moves upward to reset, pushing out the ground wire hook 27 from the clamping sleeve 44 to facilitate the next ground wire installation and removal operation.
[0049] The grounding wire 5 can be a multi-strand soft copper wire wrapped in a transparent sheath. The grounding wire 5 is fixed at the upper part of the grounding hook 27, and the lower part of the grounding hook 27 has a rod of sufficient length to fix the grounding hook. The connection position of the grounding wire 5 at the grounding hook 27 is located above the guide horn opening 43, at a certain distance from the guide horn opening 43. Spring plates 45 are arranged at intervals inside the guide horn opening 43, and the distance between adjacent spring plates 45 can be 0.5 cm. The rubber strip 46 is located in the lower middle part of the guide horn opening 43, and the rubber strip 46 and spring plates 45 can move up and down as the grounding hook 27 is inserted and removed. Limiting rings are fixed at two positions on the upper middle and lower middle parts of the outer side of the guide horn opening 43 to prevent the horn opening from spreading outward under force during the insertion of the grounding hook 27.
[0050] Furthermore, in addition to the detachable structure of the aforementioned mechanical structure, an electromagnetic on / off connection and fixation can also be adopted. The top of the fixing tube 25 is equipped with an electromagnet sleeve 214, and the bottom of the ground wire hook 27 is provided with a connecting iron pipe 215 that cooperates with the electromagnet sleeve 214. When the electromagnet sleeve 214 is energized, it is attracted to the connecting iron pipe 215 and fixedly connected to the ground wire hook 27. When the electromagnet sleeve 214 is de-energized, it is disengaged from the ground wire hook 27. The ground wire hook 27 and the grounding wire 5 are electrically connected through the connecting iron pipe 215, thereby facilitating the installation and removal of the grounding wire 5.
[0051] The method of using the integrated operation device for testing and installing / removing grounding wires includes the following steps: ① Tie one end of the traction rope 23 around the fixed pulley 11 to the insulating rod 13, and use the insulating rod 13 to lift the testing and pulley positioning mechanism 1 to the designated position of the transmission line 4 to be tested.
[0052] ② After lifting to the designated position, perform the voltage testing operation, then move the pulley frame 10 to allow the power transmission line 4 to enter the slot 12, and hang the voltage testing and pulley positioning mechanism 1 on the power transmission line 4;
[0053] ③ After the voltage testing and pulley positioning mechanism 1 is installed, remove and recycle the insulating rod 13 from the pulley frame 10, untie the traction rope 23 tied to the insulating rod 13, and connect the traction rope 23 to the drum of the traction motor 31.
[0054] ④ Install the grounding wire 5 into the grounding wire slide rail 26 on the loading platform guide assembly and disassembly mechanism 2, and form an electrical connection with the grounding wire hook 27. Then operate the control panel 32 of the electric traction control mechanism 3 to make the drum of the traction motor 31 rotate to collect the traction rope 23. The loading platform guide assembly and disassembly mechanism 2 synchronously carries the grounding wire 5 up and gradually approaches the power transmission line 4.
[0055] ⑤ When the grounding wire 5 rises to 0.2 meters directly below the transmission line 4, operate the control panel 32 to stop the traction motor 31 and the loading platform guide assembly / disassembly mechanism 2 to stop rising;
[0056] ⑥ Pulling the balance control rope 212 causes the loading platform guide loading and unloading mechanism 2 to tilt at a certain angle, so that the ground wire hook 27 avoids the power transmission line 4;
[0057] ⑦ Maintain the state of the loading platform guide assembly and disassembly mechanism 2 in step ⑥, operate the control panel 32 to start the traction motor 31 and drive the loading platform guide assembly and disassembly mechanism 2 to continue to rise until the opening of the ground wire hook 27 rises above the position of the power transmission line 4, operate the control panel 32 to stop the traction motor 31, and the loading platform guide assembly and disassembly mechanism 2 stops rising.
[0058] ⑧ Pull the balance control rope 212 to reset the loading platform guide assembly and disassembly mechanism 2 to the initial state, so that the opening of the ground wire hook 27 is above the power transmission line 4. Then operate the control panel 32 to reverse the traction motor 31, and use the weight of the ground wire 5 and the loading platform guide assembly and disassembly mechanism 2 to hang the ground wire hook 27 on the power transmission line 4, thus completing the connection between the ground wire 5 and the power transmission line 4.
[0059] ⑨ Disconnect the connection between the grounding hook 27 and the fixing pipe 25, operate the control panel 32 to reverse the traction motor 31, and let the grounding wire slide rail 26 on the loading platform guide loading and unloading mechanism 2 descend along the grounding wire 5 back to the ground.
[0060] This project adopts the principle of "insulated high-altitude operation," utilizing an insulating rod 13 or a drone to install voltage detectors and special lightweight fixed pulleys. Voltage is detected on the conductor, and a dedicated fixed pulley 11 is installed. A traction motor 31 controls the raising and lowering of the grounding wire loading platform by pulling an insulating rope. The grounding wire loading platform can perform high-altitude turning, accurately locating the voltage detection position for rapid installation and removal of grounding wires. Operators can also remotely control the grounding wire loading platform. This device integrates voltage detection and grounding wire installation / removal, offering simple operation, good grounding wire contact, and accurate installation. It saves personnel and vehicle costs, avoids on-site operational risks, reduces maintenance organization difficulty, minimizes ineffective maintenance time, and alleviates the labor intensity of switching operations and on-site maintenance. It also has advantages such as being unrestricted by the weight of the grounding wire, installation / removal height, and operating space.
[0061] The voltage detection and pulley positioning mechanism 1 can be divided into an insulating rod 13 or a drone with a voltage detector 14 and a hook to fix a special lightweight fixed pulley. It mainly enables voltage detection at designated locations on electrical equipment, and uses the hook of the insulating rod 13 to fix the special lightweight fixed pulley to the designated location where a grounding wire needs to be attached. The loading platform guiding and dismantling mechanism 2 can maintain the balance of the grounding wire 5 during lifting and lowering, accurately locate the installation point of the grounding wire, and perform high-altitude grounding wire installation and removal operations based on the force applied. The electric traction control mechanism 3 can be divided into a traction motor system and an operation control system. It can remotely control the grounding wire to maintain a constant speed during lifting and lowering, and can also perform "jogging" and "emergency stop" operations during grounding wire installation and removal.
[0062] A groove can be designed on the top of the pulley frame 10 to self-lock with the hook of the insulating rod 13, and can be self-unlocked and disengaged when subjected to a force in a specific direction. The fixed pulley 11 adopts a custom design, with its length and weight as short as possible, so as to meet the requirement of ensuring the vertical lifting and lowering of the grounding wire even when subjected to traction on one side. The fixed pulley 11 should be properly matched with the loading platform guide installation and removal mechanism 2, so that there will be no mutual obstruction or collision during the installation and removal of the grounding wire; the special lightweight fixed pulley has a reasonable width design, and a spring pressure plate 17 is set in the pulley frame 10, which can increase the friction between the wire and the fixed pulley, and prevent lateral sliding due to traction force. When the fixed pulley is subjected to a force in a specific direction, the wire can slide out of the fixed pulley.
[0063] The fixed pulley is secured using the insulating rod 13 or a drone hook, and then moved to the location of the power transmission line 4 where the grounding wire needs to be attached. The drone used in this project can be a DJI M300. The fixed pulley 11 can also be equipped with a "guided positioning device" to accurately fix it to the equipment's power line. The traction rope 23 passes around the fixed pulley 11, with one end fixed to the insulating rod 13 at the location where the grounding wire needs to be attached. The traction rope 23, which passes around the fixed pulley 11, is pulled down using the insulating rod 13 or the drone and fixed to the grounding wire loading platform. Removing the fixed pulley 11 is the reverse process.
[0064] The loading platform guide assembly / disassembly mechanism 2 is the core structure for the installation and removal of the grounding wire. The support base 20 and connecting rod 21 form an "I"-shaped loading platform to secure the traction rope 23. This mechanism provides balance control during the lifting and lowering of the grounding wire 5. A Bluetooth attitude angle measurement sensor 211 is installed at the bottom of the loading platform to measure the horizontal offset angle during lifting and lowering for real-time balance control. The open Y-shaped guide frame 24 has a 90-degree outward "V" shape with a maximum opening of 50 cm and is covered with an insulating sleeve. It can automatically adjust its direction within a certain angle range relative to the conductor, ensuring the grounding wire base support remains horizontal with the maintenance equipment conductor. At this time, the grounding hook 27 on the loading platform can be perpendicularly aligned with the maintenance equipment conductor, enabling high-altitude installation and removal of the grounding wire. The shock-absorbing rubber pad 28 and spring buffer 29 act as buffering and shock-absorbing devices, providing cushioning and shock absorption during the "collision" contact between the grounding wire loading platform and the maintenance equipment conductor. The buffer and shock absorption device can also adjust the distance between the special lightweight fixed pulley and the grounding wire loading platform to accommodate grounding wire hooks of different models and voltage levels. It has a certain "fault tolerance" function to prevent damage to the maintenance equipment wires and grounding wire loading platform due to collision and squeezing.
[0065] The electric traction control mechanism 3 primarily provides traction power for four operations: lifting, lowering, installing, and removing the grounding wire 5. It mainly consists of a traction motor system, an operation control system, and a traction device counterweight. The traction motor system enables uniform lifting, jogging, and emergency braking of the grounding wire loading platform and its fixed grounding wire. The operation control system allows for remote control operation via a wireless remote control device, overcoming the complex electromagnetic environment within the substation and ensuring the accuracy and timeliness of remote operation. It is equipped with "Up," "Down," "Stop," and "Emergency Stop" buttons, allowing for operation from a distance and facilitating real-time monitoring of the entire grounding wire installation and removal process. Emergency braking measures can be taken in case of sudden abnormalities, eliminating the risk of falling objects from heights causing injury. The traction device counterweight enhances the stability of the electric traction control device, ensuring its safety and stability during the electric traction of the grounding wire and preventing the device from tipping over or shifting under stress.
[0066] In order to achieve uniform lifting and lowering of the grounding wire 5, the traction motor 31 is required to change its traction output in real time as the weight of the grounding wire 5 is lifted, such as... Figure 7 As shown, the traction output of the motor (Fq) is related to the weight of the grounding wire (Gd), the weight of the grounding wire loading platform (Gz), the weight of the insulating rope (Gs), and the frictional force (f) between the conductor and the grounding hook. Only by ensuring sufficient traction force can the grounding wire maintain a constant speed (v) during the lifting and lowering process. During traction, the direction of the traction force (Fq) has an angle (θ) with the vertical direction, thereby avoiding the risk of personnel and equipment being directly below the traction object during operation.
[0067] When the grounding wire moves to point X, the mechanical analysis model is as follows:
[0068] F q ·cos(θ)=G s +G z +G d (1)
[0069] G s =g s (H-vt) (2)
[0070] G d =g d ·vt (3)
[0071] From equation 1-3, in order to achieve uniform motion of the grounding wire traction, the output force of the traction motor should be:
[0072]
[0073] where H is the height of the equipment conductor, gs is the weight of the insulating rope per unit length, and gd is the weight of the grounding wire per unit length. In summary, the traction output (Fq) of the electric motor is a quantity that varies with time (t) during the process of pulling the grounding wire up and down at a constant speed, which continuously increases as the grounding wire rises and continuously decreases as the grounding wire descends.
[0074] The force analysis during the process of installing the grounding wire is as Figure 8 shown. When the opening direction of the grounding wire hook is vertically aligned with the equipment conductor, vertical upward friction force f is generated by the contact and friction between the hook and the conductor. At this time, the friction force of the grounding wire hook will counteract the self-weight of the grounding wire.
[0075] At this time, the mechanical analysis model is as follows:
[0076] F q ·cos(θ)=G z +G d -f (5)
[0077] G d =g d ·H (6)
[0078]
[0079] When f<Gz+Gd, that is, Fq>0, the installation of the grounding wire can be realized only by the self-weight of the grounding wire and the loading platform at this time; when f≥Gz+Gd, that is, Fq≤0, the installation of the grounding wire cannot be realized only by the self-weight of the grounding wire and the loading platform at this time, and a downward traction force needs to be provided to complete the installation of the grounding wire.
[0080] When removing the grounding wire, the equipment conductor also needs to overcome the friction force between the two when it is disengaged from the grounding wire hook, and the grounding wire hook will generate a vertically downward friction force f, as Figure 9 shown. At this time, the mechanical analysis model is as follows:
[0081] F q ·cos(θ)=G z +G d +f (8)
[0082] G d =g d ·H (9)
[0083]
[0084] Comparing the three working states of constant-speed lifting, grounding wire hooking, and grounding wire removal, the traction force Fq output of the motor is the largest during the grounding wire removal process, and the rated traction force of the device motor needs to be greater than Fq.
[0085] At this time, when using this device to install and remove the grounding wire, it should be ensured that the traction force of the device motor and the weight of the equipment and grounding wire do not exceed the limit of the tension that the transformer lead can withstand (Fmax), and a reasonable margin (η) should be reserved to ensure that the transformer will not be deformed or damaged due to the tension.
[0086] The mechanical analysis model for the tensile force that the leads of power equipment can withstand is as follows:
[0087] F max ·η≥(G z +G d +f)+F q ·cos(θ)=2F q ·cos(θ) (11)
[0088]
[0089] Before installing grounding wires, Formula 12 should be used to calculate the conductor bearing capacity of the power equipment to ensure the safety of personnel and equipment during operation.
[0090] During the installation of the grounding wire, as the lifting height of the grounding wire increases, the weight of the grounding wire also increases. The position where the grounding wire is installed on the loading platform is at the geometric center of the equipment, offset to one side of the diagonal. For example... Figure 10 As shown, when the grounding wire is at a low height during the lifting process, the grounding wire loading platform can maintain balance. However, as the lifting height increases, the weight of the grounding wire becomes heavier, causing the loading platform to tilt along one diagonal side (position A). A traction force needs to be applied on the other diagonal side (position B) to maintain balance. Using the equipment's laser rangefinder, the installation height of the grounding wire and the lifting height of the grounding wire loading platform can be measured, thereby calculating the real-time distance between the equipment conductor and the grounding wire during the lifting process. Figure 11 As shown,
[0091] Traction control motor speed analysis:
[0092] When the grounding wire is lifted at a constant speed v, the traction control motor speed (Vq) of the traction loading platform is analyzed as follows:
[0093]
[0094]
[0095] Where H is the hanging height of the grounding wire, N is the distance between the balance control motor and the traction control motor, and t is the lifting time of the grounding wire.
[0096] Analysis of motor speed under balance control:
[0097] When the grounding wire is lifted at a constant speed v, the speed (Vp) of the balance control motor controlling the loading platform is analyzed as follows:
[0098]
[0099]
[0100] Where N is the distance between the balance control motor and the traction control motor, n is the diagonal length of the loading platform, and t is the lifting time.
[0101] When the grounding wire descends at a constant speed v, the analysis of the control motor speed (Vp) for balancing the loading platform is as follows:
[0102]
[0103]
[0104] Where T is the total time required for the grounding wire to rise or fall at a constant speed v, and t is the descent time.
[0105] Analysis of horizontal angle correction for loading platform:
[0106] During the rising or falling of the grounding wire, in order to ensure that the grounding wire loading platform always maintains a balanced state and avoids tilting, tipping, and rotation, it is necessary to control the speed of the balance control motor and the traction control motor according to the measurement results of the Bluetooth attitude angle measurement sensor, so as to achieve real-time dynamic adjustment and ensure that the speed of the two is reasonably matched.
[0107] When at time t, the angle between the Bluetooth attitude angle measurement sensor output grounding wire loading platform and the horizontal direction is α, the balance control motor speed is corrected in real time using the following formula.
[0108] V p (t)=V p '(t)-K p α (19)
[0109]
[0110] Among them, V p '(t) represents the real-time speed of the motor under balanced control at time t, V p (t) represents the real-time output speed of the balance control motor at time t after correction using a Bluetooth attitude angle measurement sensor. Kp is the correction coefficient for the balance control motor speed at angle α, and η is the weighting parameter for the correction amount.
[0111] Based on the above mechanical studies, a preliminary structural form and mechanical model were established. According to the total design weight, the key parameters of each part were calculated by substituting the aforementioned mechanical constraint equations. The key parameters of the electric traction control system are shown in the table below:
[0112] Table 1 Key parameters of the device
[0113]
[0114] Based on the key parameters, this project can build an electric traction control mechanism using a conical rotor motor, insulated rope, frame, winding drum, motor controller, and wireless remote control.
[0115] To facilitate convenient, quick, and accurate installation and removal of grounding wires, a program is designed to control the "one-click installation" and "one-click removal" operations. Because the grounding wire loading platform employs "diagonal traction balance control," it effectively prevents rotation during lifting. The Y-shaped guide frame allows for automatic adjustment and return to center when the platform deflects to a maximum of 40 degrees horizontally, ensuring the grounding wire hook opening is directly aligned with the equipment's conductor.
[0116] like Figure 12 As shown, the "one-click installation" of the grounding wire is performed in the following 6 steps:
[0117] 1. When the grounding wire rises to 0.2 meters directly below the equipment conductor, if... Figure 12 (1) As shown, stop the lifting traction operation;
[0118] 2. Using a Bluetooth attitude angle measurement sensor to control the balance control motor, the grounding wire loading platform is tilted by 30 degrees, ensuring the grounding wire hook avoids the equipment's wires. Figure 12 (2) is shown;
[0119] 3. Maintain a 30-degree tilt on the grounding wire loading platform and control its ascent so that the grounding wire hook opening exceeds the equipment's conductor. Figure 12 (3) is shown;
[0120] 4. Using a Bluetooth attitude angle measurement sensor to control the balance control motor, the grounding wire loading platform is restored from a 30-degree tilt to a 0-degree horizontal position, preparing for the installation of the grounding wire. Figure 12 (4) is shown;
[0121] 5. The operation of the balance control motor and traction control motor is controlled by utilizing the weight of the grounding wire itself to achieve reliable contact between the grounding wire hook and the equipment conductor. Figure 12 (5) is shown;
[0122] 6. Using Bluetooth to control a miniature DC electromagnet, the grounding wire is disconnected from the loading platform. Using the grounding wire slide rail on the loading platform, under motor control, the loading platform slides down in the direction of the grounding wire until it lands on the ground. Figure 12 As shown in (6).
[0123] The "one-click removal" operation of the grounding wire is performed by reversing the six steps described above. The loading platform is fixed to the grounding wire using the grounding wire rail and raised along the direction of the grounding wire under the traction of the motor. When the grounding wire hook contacts the loading platform, the miniature DC electromagnet engages, and the loading platform continues to rise, disengaging the grounding wire hook from the equipment conductor. The loading platform is then tilted 30 degrees to allow the grounding wire hook to descend and disengage from the equipment conductor. Once the equipment conductor is completely separated from the grounding wire, the loading platform can be lowered with the grounding wire on it, completing the removal of the grounding wire. Finally, a drone or insulated rod is used to remove the special lightweight fixed pulley to complete the entire operation. The aforementioned DC electromagnet can be an electromagnet sleeve 214 that attracts when energized, and a connecting iron pipe 215.
[0124] During the "one-click installation" and "one-click removal" operation of the grounding wire controlled by the program, there will be some error due to the use of laser long-distance ranging (8-20 meters). Therefore, during the "one-click installation and removal" of the grounding wire controlled by the program, a large margin should be adopted in the distance between the equipment wire and the grounding wire hook. If the distance is insufficient, the manual control mode can be switched to adjust it.
[0125] The application of the portable integrated grounding wire installation and removal device has reduced costs related to labor, vehicles, time, technology, and safety management. The average time to install and remove a set of grounding wires is only 20 minutes, requiring only two operators. The cost of installing and removing a set of grounding wires has decreased from 20,000 yuan to 1,500 yuan. Statistics show that this project has been applied to 40 ultra-high voltage and extra-high voltage substation operations in Shandong Province, saving a total of 740,000 yuan.
[0126] The technical solutions of this invention are not limited to the embodiments described herein. All technical contents not described in detail herein are well-known technologies.
Claims
1. An integrated operating device for voltage detection and grounding wire installation / removal, characterized in that: The system includes a voltage detection and pulley positioning mechanism (1), a loading platform guide assembly / disassembly mechanism (2), and an electric traction control mechanism (3). The voltage detection and pulley positioning mechanism (1) can be mounted on the transmission line to be tested (4). A grounding wire (5) can be installed on the loading platform guide assembly / disassembly mechanism (2). The electric traction control mechanism (3) can control the loading platform guide assembly / disassembly mechanism to vertically lift and lower relative to the voltage detection and pulley positioning mechanism (1) and connect the grounding wire (5) to the transmission line to be tested (4). (1) Includes a pulley frame (10), with a fixed pulley (11) installed at the bottom of the pulley frame (10). A slot (12) is provided on one side of the pulley frame (10), allowing the transmission line (4) to be tested to enter the slot (12). A detachable insulating rod (13) is installed on the other side of the pulley frame (10). A voltage detector (14) is provided on the top of the insulating rod (13). The insulating rod (13) can lift the voltage detector and pulley positioning mechanism (1) to the position of the transmission line (4) to be tested. The loading platform guide assembly and disassembly mechanism (1) 2) Includes a support base (20), with connecting rods (21) at both ends of the support base (20) along its length. Each connecting rod (21) has a lifting ring (22) at its end, and a traction rope (23) is connected to each lifting ring (22). The traction rope (23) is connected as one rope and passes around a fixed pulley (11) to connect with an electric traction control mechanism (3). Y-shaped guide frames (24) are installed at both ends of the support base (20) along its length, and a fixed tube (25) is installed at the middle position of the support base (20). A grounding wire slide rail (26) is provided on one side of the fixed tube (25) to cooperate with the grounding wire (5). A detachable grounding wire hook (27) is also installed on the top of the fixed tube (25). The grounding wire hook (27) is electrically connected to the grounding wire (5). The electric traction control mechanism (3) includes a traveling trolley (30). A traction motor (31), a control panel (32) and a mobile power supply (33) are installed on the traveling trolley (30). The mobile power supply (33) is connected to the traction motor (31) and the control panel (32) through power supply lines. The control panel (32) is connected to the traction motor (31) through control lines. The traction rope (23) is connected to the drum of the traction motor (31). A traction counterweight (34) is also installed on the traveling trolley (30). The top of the fixed tube (25) is equipped with a detachable and replaceable ground wire mounting sleeve assembly and a ground wire disassembly sleeve assembly. The ground wire mounting sleeve assembly includes a mounting sleeve (40) with an L-shaped groove (41) on it. The bottom of the ground wire hook (27) is provided with a limiting block (42) that cooperates with the L-shaped groove (41). When the limiting block (42) enters the horizontal groove at the bottom of the L-shaped groove (41), a vertical limit is formed between the mounting sleeve (40) and the ground wire hook (27). When the limiting block (42) rotates into the vertical groove of the L-shaped groove (41), the mounting sleeve (40) and the ground wire hook (27) can be separated. The ground wire disassembly sleeve assembly... The device includes a guide horn (43), a clamping sleeve (44) at the bottom of the guide horn (43), and several circumferentially arranged spring plates (45) on the inner circumferential surfaces of the guide horn (43) and the clamping sleeve (44). The spring plates (45) tend to tighten the clamping sleeve (44). A rubber strip (46) is provided on the inner side of the spring plate (45), and the bottom of the grounding hook (27) can be wrapped and clamped by the rubber strip (46). A push-out reset mechanism is also installed at the bottom of the clamping sleeve (44). The push-out reset mechanism includes a connecting cylinder (47), and a ring plate (48) is provided on both the top and bottom surfaces of the connecting cylinder (47). The grounding wire (5) is located in the ring. Inside the plate (48), a vertically movable push rod (49) is installed inside the connecting cylinder (47). A first spring (410) is installed between the push rod (49) and the bottom ring plate (48). The first spring (410) always tends to push the push rod (49) into the clamping sleeve (44). A self-locking hole (411) is provided at the lower part of the push rod (49). A locking rod (412) that can extend into the self-locking hole (411) is installed on one side of the connecting cylinder (47). The locking rod (412) has a bevel (414) at one end near the push rod (49). A second spring (413) is also provided on the outer periphery of the locking rod (412). 413) There is always a tendency to push the end of the locking rod (412) into the self-locking hole (411). When the ground wire disassembly sleeve assembly moves up and gradually approaches the ground wire hook (27), the ground wire hook (27) moves to the position of the clamping sleeve (44) and pushes the top rod (49) down. The top rod (49) gradually moves down and contacts the inclined surface (414) and overcomes the elastic force of the second spring (413) to make the locking rod (412) move. When the self-locking hole (411) moves to the position of the locking rod (412), under the action of the elastic force of the second spring (413), the locking rod (412) can extend into the self-locking hole (411) to realize the vertical limit of the top rod (49).
2. The device according to claim 1, wherein: The bottom of the slot (12) is equipped with an outwardly inclined guide frame (15), and the top of the slot (12) is equipped with a limiting plate (16). A spring pressure plate (17) is also installed in the slot (12). The spring pressure plate (17) always tends to rotate and move closer to the limiting plate (16). The power transmission wire (4) enters the slot (12) and can be fixed between the spring pressure plate (17) and the limiting plate (16).
3. The integrated operation device for voltage detection and grounding wire installation / removal according to claim 1, characterized in that: A shock-absorbing rubber pad (28) is installed at the opening of the Y-shaped guide (24). The bottom of the Y-shaped guide (24) is hinged to the support base (20). A spring buffer (29) is connected between the support base (20) and the Y-shaped guide (24).
4. The integrated operation device for voltage detection and grounding wire installation / removal according to claim 1, characterized in that: A Bluetooth attitude angle measurement sensor (211) is installed at the bottom of the support base (20), and a balance control rope (212) is connected to the end of one of the connecting rods (21). One end of the balance control rope (212) is installed on the drum of the balance control motor (213).
5. The integrated operation device for voltage detection and grounding wire installation / removal according to claim 1, characterized in that: The grounding wire slide rail (26) includes two semi-circular slide rail frames (216) that can be rotated and opened. The two slide rail frames (216) are connected by a switch hinge. A buckle (217) is provided on the side of the slide rail frame (216) that can be rotated and opened. A roller (218) with a groove is also installed inside the slide rail frame (216).
6. A method for performing voltage testing and grounding wire installation / removal using the integrated operating device for voltage testing and grounding wire installation / removal as described in any one of claims 1-5, characterized in that: It includes the following steps: ① Tie one end of the traction rope (23) around the fixed pulley (11) to the insulating rod (13), and use the insulating rod (13) to lift the voltage testing and pulley positioning mechanism (1) to the designated position of the power transmission line (4) to be tested; ② After lifting to the designated position, perform the voltage testing operation, then move the pulley frame (10) to let the power transmission line (4) enter the slot (12), and hang the voltage testing and pulley positioning mechanism (1) on the power transmission line (4); ③ After the voltage testing and pulley positioning mechanism (1) is installed, remove the insulating rod (13) from the pulley frame (10) and retrieve it. Untie the traction rope (23) tied to the insulating rod (13) and connect the traction rope (23) to the drum of the traction motor (31). ④ Install the grounding wire (5) into the grounding wire slide rail (26) on the loading platform guide assembly and disassembly mechanism (2) and form an electrical connection with the grounding wire hook (27). Then operate the control panel (32) of the electric traction control mechanism (3) to make the drum of the traction motor (31) rotate to collect the traction rope (23). The loading platform guide assembly and disassembly mechanism (2) simultaneously carries the grounding wire (5) up and gradually approaches the power transmission line (4). ⑤ When the grounding wire (5) rises to 0.2 meters directly below the power transmission line (4), operate the control panel (32) to stop the traction motor (31) and the loading platform guide assembly and disassembly mechanism (2) to stop rising; ⑥ Pull the balance control rope (212) to drive the loading platform guide loading and unloading mechanism (2) to tilt at a certain angle so that the ground wire hook (27) avoids the power transmission line (4). ⑦ Keep the loading platform guide assembly and disassembly mechanism (2) in the state of step ⑥, operate the control panel (32) to start the traction motor (31) and drive the loading platform guide assembly and disassembly mechanism (2) to continue to rise until the opening of the ground wire hook (27) rises above the position of the power transmission line (4), operate the control panel (32) to stop the traction motor (31), and the loading platform guide assembly and disassembly mechanism (2) stops rising. ⑧ Pull the balance control rope (212) to drive the loading platform guide assembly and disassembly mechanism (2) to reset to the initial state, so that the opening of the ground wire hook (27) is above the power transmission line (4). Then operate the control panel (32) to reverse the traction motor (31), and use the weight of the ground wire (5) and the loading platform guide assembly and disassembly mechanism (2) to hang the ground wire hook (27) on the power transmission line (4) to complete the connection between the ground wire (5) and the power transmission line (4). ⑨ Remove the connection between the grounding hook (27) and the fixing pipe (25), operate the control panel (32) to reverse the traction motor (31), and let the grounding rail (26) on the loading platform guide assembly (2) descend along the grounding wire (5) back to the ground.