A feng shui pump conversion device and its control method
By using two three-way valves in conjunction with valve control, the air-water extraction switching device can be quickly switched, which solves the problem of insufficient prediction of gas injection holes in the existing technology, realizes the pre-extraction of gas in the hole, and improves safety and ease of operation.
Patent Information
- Application Number
- CN202311785355.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-12-22
AI Technical Summary
Existing ventilation and water extraction conversion devices cannot predict and switch in advance the gas situation during drilling operations, resulting in the inability to prevent abnormal situations such as gas eruptions.
By using a two-position three-way valve in conjunction with the control of the first and second valves, rapid switching between negative pressure pipelines and delivery pipelines, air supply pipelines and delivery pipelines, or water supply pipelines and delivery pipelines can be achieved. Switching between air supply and negative pressure or water supply and negative pressure can be achieved by switching the two-position three-way valve, thus enabling pre-extraction of gas from the orifice.
It enables pre-extraction of gas from orifices, preventing the recurrence of gas warning accidents. It has clear functions, is easy to operate, and has high safety performance.
Smart Images

Figure CN117759322B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal mine gas control technology, and in particular to a ventilation and water extraction conversion device and its control method. Background Technology
[0002] Drilling and drainage is the primary means of controlling gas disasters in mines. However, the gas conditions inside the borehole are variable and unpredictable. This requires that during the drilling process, abnormal situations such as gas venting should be addressed at any time to ensure that the gas inside the borehole can be drained and controlled at any time.
[0003] Currently, the ventilation and water extraction conversion devices used at various drilling sites can only enable drilling under single ventilation and water supply conditions. If the construction personnel do not have sufficient prediction of the gas situation in the hole, they cannot switch the ventilation and water extraction conversion devices in advance to pre-extract the gas in the hole. Summary of the Invention
[0004] The purpose of this invention is to provide a ventilation and water extraction conversion device and its control method to solve the problems existing in the prior art. By using a two-position three-way valve in conjunction with the control of the first valve and the second valve, the negative pressure pipeline can be connected to the delivery pipeline, or the air supply pipeline can be connected to the delivery pipeline, or the water supply pipeline can be connected to the delivery pipeline. By switching the two-position three-way valve, the switching between air supply and negative pressure or the switching between water supply and negative pressure can be quickly realized, thereby allowing the ventilation and water extraction conversion device to be switched in advance to achieve pre-extraction of gas in the orifice.
[0005] To achieve the above objectives, the present invention provides the following solution:
[0006] This invention provides a ventilation and water extraction conversion device, including a negative pressure pipeline, an air supply pipeline, a water supply pipeline, and a delivery pipeline. The air supply pipeline is equipped with a first valve, and the water supply pipeline is equipped with a second valve. The air supply pipeline and the water supply pipeline merge to form a ventilation and water pipeline. The ventilation and water pipeline is used to circulate water and / or air. The negative pressure pipeline, the delivery pipeline, and the ventilation and water pipeline are connected to three ports of a two-position three-way valve. The two-position three-way valve includes two valve positions, one of which connects the negative pressure pipeline to the delivery pipeline, and the other valve position connects the ventilation and water pipeline to the delivery pipeline.
[0007] Preferably, the air supply pipeline is equipped with a third valve, and a pressure gauge is installed on the air supply pipeline between the third valve and the first valve.
[0008] Preferably, the negative pressure pipeline is equipped with a fourth valve, and a negative pressure gauge is installed on the negative pressure pipeline between the fourth valve and the two-position three-way valve.
[0009] Preferably, the water supply pipeline is equipped with a fifth valve, and a water pressure gauge is installed on the water supply pipeline between the fifth valve and the second valve.
[0010] Preferably, the water supply pipeline between the water pressure gauge and the second valve is connected to a water supply branch pipeline, and the water supply branch pipeline is equipped with an on / off valve.
[0011] Preferably, the water supply branch pipeline includes a cooling water pipeline and a dust removal water pipeline. The cooling water pipeline leads to the drilling rig, and the dust removal water pipeline leads to the borehole. The on / off valve includes a sixth valve installed on the cooling water pipeline and a seventh valve installed on the dust removal water pipeline.
[0012] The present invention also provides a control method for using the feng shui pump conversion device as described above, comprising the following:
[0013] During the shutdown, close the third, fourth, and fifth valves;
[0014] When drilling with water supply, the fourth valve, the fifth valve, the second valve, and the two-position three-way valve are opened, and the first valve is closed. At this time, the water supply pipeline is connected to the delivery pipeline.
[0015] When the "pull" function is needed, rotate the two-position three-way valve. At this time, the negative pressure pipeline is connected to the delivery pipeline.
[0016] Preferably,
[0017] During compressed air drilling, the third valve, the fourth valve, the first valve, and the two-position three-way valve are opened, and the second valve is closed. At this time, the air supply pipeline is connected to the delivery pipeline.
[0018] When the "pull" function is needed, rotate the two-position three-way valve. At this time, the negative pressure pipeline is connected to the delivery pipeline.
[0019] Preferably,
[0020] When removing dust from the orifice, open the fifth and seventh valves, close the second valve, and supply water into the dust removal water pipeline.
[0021] Preferably,
[0022] When the pump station is cooling, the fifth and sixth valves are opened and the second valve is closed, allowing water to enter the cooling water pipeline.
[0023] The present invention achieves the following technical effects compared to the prior art:
[0024] This invention merges air supply and water supply pipelines into a single air-water pipeline. The air-water pipeline, delivery pipeline, and negative pressure pipeline are then connected to the three ports of a two-position three-way valve. The air supply pipeline is equipped with a first valve to control its on / off state, and the water supply pipeline is equipped with a second valve to control its on / off state. The two-position three-way valve, in conjunction with the first and second valves, can connect the negative pressure pipeline to the delivery pipeline, or the air supply pipeline to the delivery pipeline, or the water supply pipeline to the delivery pipeline. By switching the two-position three-way valve, the switching between air supply and negative pressure, or between water supply and negative pressure, can be quickly achieved. This allows for advance switching of the air-water extraction conversion device, enabling pre-extraction of gas from the borehole. This invention has a clear function, simple operation, and high safety performance, enabling forced pre-extraction of gas from the drill pipe controlled by a single valve, fundamentally preventing the recurrence of gas warning accidents. Attached Figure Description
[0025] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0026] Figure 1 This is a schematic diagram of the overall structure of the present invention;
[0027] Among them, 1. First valve; 2. Second valve; 3. Third valve; 4. Fourth valve; 5. Fifth valve; 6. Sixth valve; 7. Seventh valve; 8. Air pressure gauge; 9. Negative pressure gauge; 10. Water pressure gauge; 11. Air supply pipeline; 12. Negative pressure pipeline; 13. Water supply pipeline; 14. Air and water pipeline; 15. Delivery pipeline; 16. Two-position three-way valve; 17. Cooling water pipeline; 18. Dust removal water pipeline. Detailed Implementation
[0028] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0029] The purpose of this invention is to provide a ventilation and water extraction conversion device and its control method to solve the problems existing in the prior art. By using a two-position three-way valve in conjunction with the control of the first valve and the second valve, the negative pressure pipeline can be connected to the delivery pipeline, or the air supply pipeline can be connected to the delivery pipeline, or the water supply pipeline can be connected to the delivery pipeline. By switching the two-position three-way valve, the switching between air supply and negative pressure or the switching between water supply and negative pressure can be quickly realized, thereby allowing the ventilation and water extraction conversion device to be switched in advance to achieve pre-extraction of gas in the orifice.
[0030] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0031] like Figure 1 As shown, this invention provides a wind-water extraction and conversion device, including a negative pressure pipeline 12, an air supply pipeline 11, a water supply pipeline 13, and a delivery pipeline 15. Each pipeline can be connected and supported by a support frame. The negative pressure pipeline 12 is connected to a negative pressure generating device, the air supply pipeline 11 is connected to a wind power generating device, and the water supply pipeline 13 is connected to a water pressure generating device. The delivery pipeline 15 is used to deliver air and water to a water source or to perform negative pressure extraction. The air supply pipeline 11 is equipped with a first valve 1, which controls the opening and closing of the air supply pipeline 11. The water supply pipeline 13 is equipped with a second valve 2, which controls the opening and closing of the water supply pipeline 13. The air supply pipe 11 and the water supply pipe 13 merge (e.g., connected via a tee) to form the air-water pipe 14. When the first valve 1 is open and the second valve 2 is closed, air flows through the air-water pipe 14; when the first valve 1 is closed and the second valve 2 is open, water flows through the air-water pipe 14; and when both the first valve 1 and the second valve 2 are open, a mixture of water and air flows through the air-water pipe 14. The negative pressure pipe 12, the delivery pipe 15, and the air-water pipe 14 are connected to the three ports of a two-position three-way valve 16. The two-position three-way valve 16 has two valve positions. By rotating the handle of the two-position three-way valve 16 or by electric control, one valve position connects the negative pressure pipe 12 to the delivery pipe 15, and the other valve position connects the air-water pipe 14 to the delivery pipe 15. When water flows through the ventilation pipe 14, the two-position three-way valve 16 can switch between water supply and negative pressure. When air flows through the ventilation pipe 14, the two-position three-way valve 16 can switch between air supply and negative pressure.
[0032] This invention merges the air supply pipeline 11 and the water supply pipeline 13 into a combined air-water pipeline 14. The air-water pipeline 14, the delivery pipeline 15, and the negative pressure pipeline 12 are then connected to the three ports of a two-position three-way valve 16. Simultaneously, the air supply pipeline 11 is equipped with a first valve 1 to control its on / off state, and the water supply pipeline 13 is equipped with a second valve 2 to control its on / off state. The two-position three-way valve 16, in conjunction with the control of the first valve 1 and the second valve 2, can connect the negative pressure pipeline 12 to the delivery pipeline 15, or the air supply pipeline 11 to the delivery pipeline 15, or the water supply pipeline 13 to the delivery pipeline 15. By switching the two-position three-way valve 16, the switching between air supply and negative pressure, or between water supply and negative pressure, can be quickly achieved, thus allowing for advance switching of the air-water extraction conversion device to achieve pre-extraction of gas from the borehole. This invention has a clear function, simple operation, and high safety performance, enabling forced pre-extraction of gas from the drill pipe using a single valve control, fundamentally preventing the recurrence of gas warning accidents.
[0033] The air supply pipeline 11 may be equipped with a third valve 3. An air pressure gauge 8 is installed on the air supply pipeline 11 between the third valve 3 and the first valve 1. The third valve 3 can control whether air is supplied to the air-water pumping conversion device, and the air pressure gauge 8 can be used to observe the air supply pressure in real time.
[0034] The negative pressure pipeline 12 may be equipped with a fourth valve 4. A negative pressure gauge 9 is installed on the negative pressure pipeline 12 between the fourth valve 4 and the two-position three-way valve 16. The fourth valve 4 can control whether to supply negative pressure to the air-water pumping conversion device. The negative pressure gauge 9 can be used to observe the negative pressure in real time.
[0035] The water supply pipeline 13 may be equipped with a fifth valve 5. A water pressure gauge 10 is installed on the water supply pipeline 13 between the fifth valve 5 and the second valve 2. The fifth valve 5 can control whether water is supplied to the air-water pumping conversion device, and the water pressure gauge 10 can be used to observe the water supply pressure in real time.
[0036] The water supply pipeline 13 between the water pressure gauge 10 and the second valve 2 is connected to a water supply branch pipeline. An on / off valve is installed on the water supply branch pipeline, which can control whether the water supply branch pipeline is opened or closed.
[0037] Furthermore, the water supply branch pipelines may include a cooling water pipeline 17 and a dust removal water pipeline 18. The cooling water pipeline 17 leads to the drilling rig for cooling. The dust removal water pipeline 18 leads to the borehole for dust removal. The on / off valves include a sixth valve 6 installed on the cooling water pipeline 17 and a seventh valve 7 installed on the dust removal water pipeline 18, which control the on / off state of the cooling water pipeline 17 and the dust removal water pipeline 18, respectively.
[0038] The first valve 1, the second valve 2, the third valve 3, the fourth valve 4, the fifth valve 5, the sixth valve 6, and the seventh valve 7 can be ordinary ball valves or other on / off valves, and can be manually or remotely controlled.
[0039] Combination Figure 1 As shown, the present invention also provides a control method for using the feng shui pump conversion device as described above, including the following:
[0040] During the shutdown, valves 3, 4, and 5 are closed, and air supply line 11, negative pressure line 12, and water supply line 13 are all disconnected.
[0041] When drilling with water supply, open the fourth valve 4, the fifth valve 5, the second valve 2 and the two-position three-way valve 16, and close the first valve 1. At this time, the valve position of the two-position three-way valve 16 connects the water supply pipeline 13 and the delivery pipeline 15.
[0042] When the "pull" function is needed, rotate the two-position three-way valve 16 to change its position. At this time, the negative pressure pipeline 12 is connected to the delivery pipeline 15.
[0043] During compressed air drilling, open the third valve 3, the fourth valve 4, the first valve 1 and the two-position three-way valve 16, and close the second valve 2. At this time, the valve position of the two-position three-way valve 16 connects the air supply pipeline 11 and the delivery pipeline 15.
[0044] When the "pull" function is needed, rotate the two-position three-way valve 16 to change its position. At this time, the negative pressure pipeline 12 is connected to the delivery pipeline 15.
[0045] In summary, during water supply drilling or compressed air drilling, the "pumping" function can be immediately achieved by operating the two-position three-way valve 16 and shutting off the air (water) supply. The pressure inside the borehole is relieved to the extraction box through the two-position three-way valve 16, restoring the pressure inside the drill rod to the normal range. This allows the water tap to be easily disassembled and prevents misoperation.
[0046] When removing dust from the orifice, open the fifth valve 5 and the seventh valve 7, and close the second valve 2. At this time, the dust removal water pipeline 18 is connected, and water is supplied into the dust removal water pipeline 18.
[0047] When the pump station is cooling, open the fifth valve 5 and the sixth valve 6, and close the second valve 2. At this time, the cooling water pipeline 17 is connected, and water is supplied into the cooling water pipeline 17.
[0048] Specific examples have been used to illustrate the principles and implementation methods of this invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this invention. Furthermore, those skilled in the art will recognize that, based on the ideas of this invention, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of this invention.
Claims
1. A feng shui pump conversion device, characterized in that: The system includes a negative pressure pipeline, an air supply pipeline, a water supply pipeline, and a delivery pipeline. The air supply pipeline is equipped with a first valve, and the water supply pipeline is equipped with a second valve. The air supply pipeline and the water supply pipeline merge to form a ventilation and water pipeline, which is used to circulate water and / or air. The negative pressure pipeline, the delivery pipeline, and the ventilation and water pipeline are connected to three ports of a two-position three-way valve. The two-position three-way valve includes two valve positions, one of which connects the negative pressure pipeline to the delivery pipeline, and the other of which connects the ventilation and water pipeline to the delivery pipeline. The air supply pipeline is equipped with a third valve, the negative pressure pipeline is equipped with a fourth valve, and the water supply pipeline is equipped with a fifth valve. The control method for the air-water pumping conversion device includes the following: During the shutdown, close the third, fourth, and fifth valves; When drilling with water supply, the fourth valve, the fifth valve, the second valve, and the two-position three-way valve are opened, and the first valve is closed. At this time, the water supply pipeline is connected to the delivery pipeline. When the "pull" function is needed, rotate the two-position three-way valve. At this time, the negative pressure pipeline is connected to the delivery pipeline. During compressed air drilling, the third valve, the fourth valve, the first valve, and the two-position three-way valve are opened, and the second valve is closed. At this time, the air supply pipeline is connected to the delivery pipeline. When the "pull" function is needed, rotate the two-position three-way valve. At this time, the negative pressure pipeline is connected to the delivery pipeline.
2. The wind and water pump conversion device according to claim 1, characterized in that: A pressure gauge is installed on the air supply pipeline between the third valve and the first valve.
3. The wind and water pump conversion device according to claim 1, characterized in that: A negative pressure gauge is installed on the negative pressure pipeline between the fourth valve and the two-position three-way valve.
4. The wind and water pumping conversion device according to claim 1, characterized in that: A water pressure gauge is installed on the water supply pipeline between the fifth valve and the second valve.
5. The wind and water pump conversion device according to claim 4, characterized in that: The water supply pipeline between the water pressure gauge and the second valve is connected to a water supply branch pipeline, and an on / off valve is installed on the water supply branch pipeline.
6. The feng shui pumping conversion device according to claim 5, characterized in that: The water supply branch pipeline includes a cooling water pipeline and a dust removal water pipeline. The cooling water pipeline leads to the drilling rig, and the dust removal water pipeline leads to the borehole. The on / off valves include a sixth valve installed on the cooling water pipeline and a seventh valve installed on the dust removal water pipeline.
7. The feng shui pumping conversion device according to claim 1, characterized in that: When removing dust from the orifice, open the fifth and seventh valves, close the second valve, and supply water into the dust removal water pipeline.
8. The feng shui pumping conversion device according to claim 1, characterized in that: When the pump station is cooling, the fifth and sixth valves are opened and the second valve is closed, allowing water to enter the cooling water pipeline.
Citation Information
Patent Citations
Gas water heater
CN103591692A
Mining wind and water three-joint quick conversion valve
CN202745762U
