Energy storage benefit calculation method and system for wind and energy storage combined system simulation operation

By constructing the system frequency solution function and MPC control model in the wind-storage combined system, combined with the P-f curve and droop controller, the energy storage capacity is optimized, and the energy storage system solves the problem of balancing wind power fluctuations and economy, and achieves Efficient energy storage utilization and improvement of new energy utilization rate.

CN117791657BActive Publication Date: 2024-10-01SHANDONG HUANENG POWER GENERATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311840247.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-10-01
Estimated Expiration
2043-12-28

AI Technical Summary

Technical Problem

In the existing technology, the capacity optimization configuration model of the energy storage system cannot take into account the smoothing effect of system frequency fluctuations caused by wind power fluctuations and economy, resulting in poor costs and benefits of the energy storage system.

Method used

An energy storage revenue calculation method for combined wind and storage systems is proposed. By constructing a system frequency solution function based on wind power historical data and system frequency data, and predicting the system frequency by combining the unit power adjustment coefficient and energy storage power adjustment amount, an MPC control model and P-f curve, optimize energy storage capacity and use P-f droop controller to control system frequency and calculate energy storage profit.

Benefits of technology

It improves energy storage utilization, optimizes wind farm operating conditions, reduces grid operation safety risks, provides effective energy storage configuration guidance, and improves new energy utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117791657B_ABST
    Figure CN117791657B_ABST
Patent Text Reader

Abstract

The present invention proposes a method and system for calculating energy storage benefits for simulated operation of a wind-storage combined system. The method includes: constructing a system frequency solution function under simulated operation of a wind-storage combined system; predicting the system frequency at the next moment based on the system frequency solution function in combination with the wind farm unit power regulation coefficient and the energy storage power adjustment; constructing an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation and solving the P‑f curve under the control time window; constructing a droop controller based on the P‑f curve; controlling the system frequency using the droop controller; optimizing the energy storage capacity based on the energy storage capacity operating status under droop control; and constructing an energy storage profit calculation model taking into account the assessment indicators after optimization. Based on this method, an energy storage benefit calculation system for simulated operation of a wind-storage combined system is also proposed. The present invention optimizes the planned energy storage capacity, calculates the specific benefits of energy storage in combination with the assessment standards and simulated operation status, and provides guidance for the energy storage configuration of wind farms.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of energy storage capacity optimization of new energy stations, and in particular relates to an energy storage benefit calculation method and system for simulated operation of a wind-storage combined system. Background Art

[0002] In recent years, more and more wind farms have been connected to the power grid, but due to the uncontrollability of their output, the safe and stable operation of the power system has been greatly affected. To this end, adding a certain amount of energy storage system to smooth the system frequency fluctuations has become an effective means to improve the wind power grid-connected capacity and system absorption capacity. However, the construction cost of various energy storage systems is high, which will directly affect the technical and economic feasibility of the energy storage system. Therefore, in the process of using energy storage to smooth the frequency of the wind farm grid-connected system, determining the configuration capacity of the energy storage system is a key issue. Therefore, for the capacity optimization configuration of the energy storage system, it is of great research value to propose a capacity optimization model with safety and economy.

[0003] In the prior art, the optimization configuration models for energy storage system capacity are generally divided into two categories: economic configuration model and safety configuration model. The economic configuration model usually aims to minimize the construction cost of the energy storage system and maximize the net benefit, and has good economic performance. However, the economic configuration model cannot take into account the smoothing effect of system frequency fluctuations caused by wind power fluctuations, and the smoothing ability is poor. The safety configuration model usually aims to optimize the frequency regulation and smoothing capabilities of the energy storage system, and has good safety performance. However, the safety configuration model cannot take into account the cost and benefit of the energy storage system, and has poor economic performance. Summary of the invention

[0004] In order to solve the above technical problems, the present invention proposes a storage benefit calculation method and system for wind-storage combined system simulation operation, which can effectively improve the utilization rate of energy storage, and at the same time, considering the primary frequency regulation assessment standard of wind farms, the operating conditions of wind farms can be optimized under the guidance of the present invention, the utilization rate of new energy can be improved, and the safety risk of power grid operation can be reduced.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] The energy storage benefit calculation method for the simulated operation of the wind-storage combined system includes the following steps:

[0007] Based on the historical operation data of wind power, the historical operation forecast data of wind power and the historical operation data of system frequency, a system frequency solution function is constructed under the simulation operation of the wind-storage joint system;

[0008] The system frequency solution function under the current simulation operation of the wind-storage combined system is used to predict the system frequency at the next moment by combining the wind farm unit power regulation coefficient and the energy storage power adjustment amount; an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation is constructed and the Pf curve under the control time window is solved;

[0009] Constructing a Pf droop controller based on the Pf curve; and controlling the system frequency by using the Pf droop controller;

[0010] The energy storage capacity is optimized based on the operating status of the energy storage capacity under real-time droop control; and an energy storage profit calculation model taking into account the assessment indicators is constructed after the energy storage capacity is optimized.

[0011] Furthermore, the formula for solving the system frequency function under the simulated operation of the wind-storage combined system is:

[0012]

[0013] Wherein, ζ>i; ζ is the simulation time; i is the control time; freal(ζ) is the system frequency of the wind-storage combined system under simulation at time ζ; f history (ζ) is the historical frequency data of the wind-storage combined system at time ζ; K is the unit power regulation coefficient; P control (i) is the output power of the energy storage system at time i; P history (i) is the historical operation data of wind power at time i.

[0014] Furthermore, the system frequency solution function for the current simulated operation of the wind-storage combined system is combined with the wind farm unit power regulation coefficient and the energy storage power adjustment amount to predict the system frequency at the next moment. The formula is:

[0015] f pre (k+1)=f real (k)+KΔP c (k); (2)

[0016] Among them, f pre (k+1) is the predicted frequency at time k+1; k is the rolling window; ΔP c (k) is the energy storage power adjustment at time k.

[0017] Furthermore, the process of constructing the MPC control model for comprehensive energy storage capacity optimization and system frequency regulation includes: based on the system capacity value under the current simulation operation, predicting the energy storage capacity value at the next moment through the energy storage output power and regulation amount and control time window duration at the current moment; the formula of the MPC control model is:

[0018] E pre (k+1)=E(k)+T(P c (k)+ΔPc (k)) (3)

[0019] Among them, E pre (k+1) is the predicted value of energy storage capacity at time k+1; E(k) is the energy storage capacity at time k; T is the duration of each control time window; P c (k) is the power output at energy storage time k.

[0020] Furthermore, after constructing the MPC control model for comprehensive energy storage capacity optimization and system frequency regulation, it also includes constructing the objective function in multiple control time domains with minimum energy storage capacity and minimum frequency error through weight coefficients;

[0021]

[0022] Where C1 is the frequency control target weight coefficient; C2 is the capacity optimization target weight coefficient; f N =50HZ is the rated frequency; f pre (k) is the predicted frequency at time k; E pre (k) is the predicted value of energy storage capacity at time k;

[0023] The constraints are:

[0024]

[0025] Among them, SOC(k+1) is the energy storage charge state at time k+1; SOC(k) is the energy storage charge state at time k; SOC min SOC is the minimum value of energy storage state of charge; max is the maximum value of the energy storage charge state; P min is the minimum value of energy storage discharge power; P max is the maximum value of energy storage discharge power.

[0026] Furthermore, the process of solving the Pf curve under the control time window includes:

[0027] Determine the energy storage reference power; take the first sequence under the MPC control sequence as the execution sequence, and use the energy storage output power after execution as the energy storage reference power in the Pf curve; the specific formula is:

[0028] P0=P c (k)+ΔP c (k)k=1(6)

[0029] Among them, P0 is the reference power of the Pf curve;

[0030] Determine the droop coefficient; take the ratio of the first sequence energy storage execution amount to the frequency modulation amount in the MPC control sequence as the droop coefficient in the Pf curve; the specific formula is:

[0031]

[0032] Among them, K droop is the droop coefficient of the Pf curve;

[0033] Determine the frequency boundary value; combine the upper and lower limits of the energy storage dead zone, the droop coefficient and the linear relationship between the maximum and minimum output power of the energy storage to solve the frequency boundary value; specifically:

[0034]

[0035] Among them, f lo is the upper limit of the frequency boundary; f up is the lower limit range of the frequency boundary; f is the upper limit of the frequency dead zone; is the lower limit of the frequency dead zone;

[0036] Integrate the reference power, droop coefficient, frequency boundary value and set frequency dead zone to determine the Pf curve;

[0037]

[0038] Further, the process of controlling the system frequency by using the Pf droop controller includes:

[0039] The droop controller monitors the system frequency in real time and takes the monitored value as input. The droop controller gives the power output of the energy storage system based on the droop coefficient at the current moment. Through the feedback signal, the system frequency is corrected in real time, and finally the system frequency tracks the rated value.

[0040] Furthermore, the process of optimizing the energy storage capacity based on the energy storage capacity operating state under real-time droop control includes:

[0041] According to the state of charge at the simulation time and the rated capacity of the planned energy storage, the simulated operating capacity of the planned energy storage at that time is solved; specifically:

[0042] E(ζ)=SOC(ζ)·E rate (10)

[0043] Where E(ζ) is the energy storage capacity at the simulation time ζ; E rate Plan rated capacity for energy storage;

[0044] The optimal configuration capacity is calculated based on the simulated operating capacity of the planned energy storage; specifically:

[0045] E op.rate =max{E rate (1),E rate (2),…,E rate (ζ)|ζ∈N} (11)

[0046] Among them, E op.rate is the optimal configuration capacity; E rate (1) is the planned energy storage capacity at the first simulation operation time; E rate (2) is the planned energy storage capacity at the second simulation operation time; E rate (ζ) is the planned energy storage capacity at the ζth simulation operation moment.

[0047] Furthermore, the process of constructing the energy storage profit calculation model taking into account the assessment indicators after optimizing the energy storage capacity is as follows:

[0048] Establish the calculation formula for the monthly operation rate and assessment power of primary frequency regulation:

[0049]

[0050] ω punish =(100%-λ in )×S Wind.N ×2×α (13)

[0051] λ in is the monthly operation rate of primary frequency regulation; t in is the monthly operation time of the wind farm frequency regulation; t all is the grid-connected time of the wind farm in that month; ω punish For the test power; S wind.N is the rated installed capacity of the wind farm; α is the primary frequency regulation assessment coefficient, and its value is 2;

[0052] Construct a frequency regulation ancillary service compensation fee calculation formula:

[0053]

[0054] Where, λ is the monthly commissioning rate of primary frequency regulation auxiliary service; R cps is the compensation fee for energy storage participating in the frequency regulation auxiliary service; Y is the compensation standard for large disturbances, which is 100 yuan / MW; τ is the number of large disturbances per month;

[0055] Combine the unit rated power cost of the energy storage system and the unit rated capacity cost of the energy storage to calculate the initial investment cost of energy storage; specifically:

[0056] R in =C P P rate +C E E rate (15)

[0057] In the formula, R in is the initial investment cost of energy storage; C p is the unit rated power cost of energy storage; CE is the unit rated capacity cost of energy storage;

[0058] Based on the principle of sharing assessment costs and ancillary service costs, a calculation formula for wind farm operating income is established; specifically:

[0059]

[0060] In the formula, R income.w The operating income of the wind farm without energy storage support; grid.w The amount of electricity that is online in a wind farm without energy storage support; punish.w To assess the power consumption of wind farms without energy storage support; C price is the on-grid electricity price of wind farm; ∑R′ back.w is the total assessment fee for the station grid-connected system without energy storage support; ∑F is the total amount of electricity connected to the grid by the station grid-connected system; ∑R′ cps.w The total auxiliary service fee for the grid-connected system of the wind farm without energy storage support;

[0061] Constructing a wind farm operating income model with energy storage participating in auxiliary services; specifically:

[0062]

[0063] In the formula, R income.c The operating income of the wind farm under the support of energy storage; grid.c The amount of electricity that is connected to the grid by the wind farm supported by energy storage; punish.c To assess the power consumption of wind farms under the support of energy storage; ∑R′ back.c is the total assessment fee for the wind farm station grid-connected system under the support of energy storage; ∑R′ cps.c The total auxiliary service fee for the wind farm station grid-connected system supported by energy storage;

[0064] By comparing the operating income of the wind farm after configuring energy storage with the operating income of the wind farm without energy storage, the energy storage income is calculated, specifically:

[0065] R=R income.c -R income.w (18)

[0066] Where R is the specific benefit of the energy storage system.

[0067] The present invention also proposes an energy storage benefit calculation system for wind-storage combined system simulation operation, comprising: a first building module, a second building module, a support module and an optimization calculation module;

[0068] The first construction module is used to construct a system frequency solution function under the simulated operation of the wind-storage joint system based on the historical operation data of wind power, the historical operation forecast data of wind power and the historical operation data of system frequency;

[0069] The second construction module is used to solve the system frequency function under the current simulation operation of the wind-storage combined system, and predict the system frequency at the next moment by combining the unit power regulation coefficient of the wind farm and the energy storage power adjustment amount; construct an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation and solve the Pf curve under the control time window;

[0070] The support module is used to construct a Pf droop controller based on the Pf curve; and control system frequency by using the Pf droop controller;

[0071] The optimization calculation module is used to optimize the energy storage capacity based on the energy storage capacity operating status under real-time droop control; after optimizing the energy storage capacity, an energy storage profit calculation model taking into account the assessment indicators is constructed.

[0072] The effects provided in the content of the invention are only the effects of the embodiments, not all the effects of the invention. One of the above technical solutions has the following advantages or beneficial effects:

[0073] The present invention proposes a method and system for calculating energy storage benefits for simulated operation of a wind-storage combined system. The method includes the following steps: constructing a system frequency solution function for simulated operation of a wind-storage combined system based on historical wind power operation data, historical wind power operation forecast data, and historical system frequency operation data; predicting the system frequency at the next moment based on the system frequency solution function for the current simulated operation of the wind-storage combined system in combination with the wind farm unit power regulation coefficient and the energy storage power adjustment amount; constructing an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation and solving the Pf curve under the control time window; constructing a Pf droop controller based on the Pf curve; controlling the system frequency using the Pf droop controller; optimizing the energy storage capacity based on the energy storage capacity operating status under real-time droop control; and constructing an energy storage profit calculation model taking into account the assessment indicators after optimizing the energy storage capacity. Based on the energy storage benefit calculation method for simulated operation of a wind-storage combined system, an energy storage benefit calculation system for simulated operation of a wind-storage combined system is also proposed. The present invention optimizes the planned energy storage capacity, and calculates the specific benefits of energy storage in combination with the assessment standards and simulated operating conditions, providing effective guidance for the subsequent wind farm energy storage configuration.

[0074] The present invention can effectively improve the utilization rate of energy storage, and at the same time, taking into account the primary frequency regulation assessment standard of the wind farm, the operating conditions of the wind farm are optimized under the guidance of the present invention, the utilization rate of new energy is increased, and the safety risk of power grid operation is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] Figure 1 This is a flow chart of the energy storage benefit calculation method for the simulated operation of the wind-storage combined system proposed in Example 1 of the present invention;

[0076] Figure 2 This is a frequency fluctuation diagram of the wind-storage combined system without control proposed in Example 1 of the present invention;

[0077] Figure 3 This is a diagram showing the effect of system frequency fluctuation after the wind-storage combined system is controlled in Example 1 of the present invention;

[0078] Figure 4 The optimal capacity configuration table of energy storage proposed in Example 1 of the present invention;

[0079] Figure 5 This is a comparison table of wind farm energy storage benefits proposed in Example 1 of the present invention;

[0080] Figure 6 Schematic diagram of the energy storage revenue calculation system for simulated operation of a wind-storage combined system proposed in Example 2 of the present invention. DETAILED DESCRIPTION

[0081] In order to clearly illustrate the technical features of the present solution, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings. The disclosure below provides many different embodiments or examples for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. In addition, the present invention may repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. It should be noted that the components illustrated in the accompanying drawings are not necessarily drawn to scale. The present invention omits the description of known components and processing techniques and processes to avoid unnecessary limitations on the present invention.

[0082] Example 1

[0083] The energy storage benefit calculation method for the simulated operation of a wind-storage combined system proposed in Example 1 of the present invention constructs an energy storage optimization controller for updating the droop control coefficient in a rolling time domain based on historical data, and realizes the optimization of the energy storage plan capacity by simulated operation and the calculation of the specific benefits of energy storage in combination with relevant assessment rules.

[0084] The present invention proposes a system frequency solution function under the simulated operation of the wind-storage combined system based on the historical operation data of wind power, the output power of the energy storage system and the historical operation data of the system frequency; constructs an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation and solves the Pf curve under the control time window; establishes a Pf droop control with dynamic update of the droop control coefficient; optimizes the energy storage capacity based on the operating status of the energy storage capacity; and constructs an energy storage profit calculation model taking into account the assessment indicators.

[0085] Figure 1 This is a flow chart of the energy storage benefit calculation method for the simulated operation of the wind-storage combined system proposed in Example 1 of the present invention;

[0086] In step S100, a system frequency solution function under the simulated operation of the wind-storage combined system is constructed based on the historical operation data of wind power, the historical operation forecast data of wind power and the historical operation data of system frequency;

[0087] The formula for solving the system frequency function under the simulation operation of the wind-storage combined system is:

[0088]

[0089] Wherein, ζ>i; ζ is the simulation time; i is the control time; freal(ζ) is the system frequency of the wind-storage combined system under simulation at time ζ; f history (ζ) is the historical frequency data of the wind-storage combined system at time ζ; K is the unit power regulation coefficient; P control (i) is the output power of the energy storage system at time i; P history (i) is the historical operation data of wind power at time i.

[0090] In step S110, the system frequency solution function is calculated for the current simulated operation of the wind-storage combined system, and the system frequency at the next moment is predicted by combining the wind farm unit power regulation coefficient and the energy storage power adjustment amount; an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation is constructed and the Pf curve under the control time window is solved;

[0091] The frequency prediction model is established as:

[0092] f pre (k+1)=f real (k)+KΔP c (k); (2)

[0093] Among them, f pre (k+1) is the predicted frequency at time k+1; k is the rolling window; ΔP c (k) is the energy storage power adjustment at time k.

[0094] Based on the system capacity value under the current simulation operation, the energy storage capacity value at the next moment is predicted by the energy storage output power, regulation amount, and control window duration at the current moment; the formula of the MPC control model is:

[0095] E pre (k+1)=E(k)+T(P c (k)+ΔP c (k)) (3)

[0096] Among them, E pre (k+1) is the predicted value of energy storage capacity at time k+1; E(k) is the energy storage capacity at time k; T is the duration of each control time window; P c(k) is the power output at energy storage time k.

[0097] After constructing the MPC control model for comprehensive energy storage capacity optimization and system frequency regulation, it also includes constructing the objective function in multiple control time domains with minimum energy storage capacity and minimum frequency error through weight coefficients;

[0098]

[0099] Where C1 is the frequency control target weight coefficient; C2 is the capacity optimization target weight coefficient; f N =50HZ is the rated frequency; f pre (k) is the predicted frequency at time k; E pre (k) is the predicted value of energy storage capacity at time k;

[0100] The constraints are:

[0101]

[0102] Among them, SOC(k+1) is the energy storage charge state at time k+1; SOC(k) is the energy storage charge state at time k; SOC min SOC is the minimum value of energy storage state of charge; max is the maximum value of the energy storage charge state; P min is the minimum value of energy storage discharge power; P max is the maximum value of energy storage discharge power.

[0103] Solve the Pf curve under the MPC control time window; take the first sequence under the MPC control sequence as the execution sequence, and use the energy storage output power after execution as the energy storage reference power in the Pf curve.

[0104] The specific formula is:

[0105] P0=P c (k)+ΔP c (k)k=1 (6)

[0106] Among them, P0 is the reference power of the Pf curve;

[0107] Determine the droop coefficient; take the ratio of the first sequence energy storage execution amount to the frequency modulation amount in the MPC control sequence as the droop coefficient in the Pf curve; the specific formula is:

[0108]

[0109] Among them, K droop is the droop coefficient of the Pf curve;

[0110] Determine the frequency boundary value; combine the upper and lower limits of the energy storage dead zone, the droop coefficient and the linear relationship between the maximum and minimum output power of the energy storage to solve the frequency boundary value; specifically:

[0111]

[0112] Among them, f lo is the upper limit of the frequency boundary; f up is the lower limit range of the frequency boundary; f is the upper limit of the frequency dead zone; is the lower limit of the frequency dead zone;

[0113] Integrate the reference power, droop coefficient, frequency boundary value and set frequency dead zone to determine the Pf curve;

[0114]

[0115] In step S120, a Pf droop controller is constructed based on the Pf curve; the system frequency is controlled by using the Pf droop controller;

[0116] A Pf droop controller is constructed based on the Pf curve, and the relevant parameters in the Pf droop controller are updated based on the solution of the previous stage MPC control model.

[0117] In the simulated operation system, the droop controller monitors the system frequency in real time and takes the monitored value as input. The droop controller gives the power output of the energy storage system based on the droop coefficient at the current moment. Through the feedback signal, the system frequency is corrected in real time, and finally the system frequency tracks the rated value.

[0118] Figure 2 This is a frequency fluctuation diagram of the wind-storage combined system without control proposed in Example 1 of the present invention; Figure 3 This is an effect diagram of the system frequency fluctuation after the wind-storage combined system is controlled in Example 1 of the present invention; Figure 2 and Figure 3 By comparing the two figures, it can be clearly seen that the frequency fluctuation becomes smaller after adopting the wind-storage combined system control of the present application.

[0119] In step S130, the energy storage capacity is optimized based on the energy storage capacity operating state under real-time droop control.

[0120] According to the state of charge at the simulation time and the rated capacity of the planned energy storage, the simulated operating capacity of the planned energy storage at that time is solved; specifically:

[0121] E(ζ)=SOC(ζ)·E rate (10)

[0122] Where E(ζ) is the energy storage capacity at the simulation time ζ; E ratePlan rated capacity for energy storage;

[0123] The optimal configuration capacity is calculated based on the simulated operating capacity of the planned energy storage; specifically:

[0124] E op.rate =max{E rate (1),E rate (2),…,E rate (ζ)|ζ∈N} (11)

[0125] Among them, E op.rate is the optimal configuration capacity; E rate (1) is the planned energy storage capacity at the first simulation operation time; E rate (2) is the planned energy storage capacity at the second simulation operation time; E rate (ζ) is the planned energy storage capacity at the ζth simulation operation moment.

[0126] In step S140, after optimizing the energy storage capacity, an energy storage profit calculation model taking into account the assessment indicators is constructed.

[0127] Establish the calculation formula for the monthly operation rate and assessment power of primary frequency regulation:

[0128]

[0129] ω punish =(100%-λ in )×S Wind.N ×2×α (13)

[0130] λ in is the monthly operation rate of primary frequency regulation; t in is the monthly operation time of the wind farm frequency regulation; t all is the grid-connected time of the wind farm in that month; ω punish For the test power; S wind.N is the rated installed capacity of the wind farm; α is the primary frequency regulation assessment coefficient, and its value is 2;

[0131] Construct a frequency regulation ancillary service compensation fee calculation formula:

[0132]

[0133] Where, λ is the monthly commissioning rate of primary frequency regulation auxiliary service; R cps is the compensation fee for energy storage participating in the frequency regulation auxiliary service; Y is the compensation standard for large disturbances, which is 100 yuan / MW; τ is the number of large disturbances per month;

[0134] Combine the unit rated power cost of the energy storage system and the unit rated capacity cost of the energy storage to calculate the initial investment cost of energy storage; specifically:

[0135] R in =C P P rate +C E E rate (15)

[0136] In the formula, R in is the initial investment cost of energy storage; C p is the unit rated power cost of energy storage; C E is the unit rated capacity cost of energy storage;

[0137] Based on the principle of sharing assessment costs and ancillary service costs, a calculation formula for wind farm operating income is established; specifically:

[0138]

[0139] In the formula, R income.w The operating income of the wind farm without energy storage support; grid.w The amount of electricity that is online in a wind farm without energy storage support; punish.w To assess the power consumption of wind farms without energy storage support; C price is the on-grid electricity price of wind farm; ∑R′ back.w is the total assessment fee for the station grid-connected system without energy storage support; ∑F is the total amount of electricity connected to the grid by the station grid-connected system; ∑R′ cps.w The total auxiliary service fee for the grid-connected system of the wind farm without energy storage support;

[0140] Constructing a wind farm operating income model with energy storage participating in auxiliary services; specifically:

[0141]

[0142] In the formula, R income.c The operating income of the wind farm under the support of energy storage; grid.c The amount of electricity that is connected to the grid by the wind farm supported by energy storage; punish.c To assess the power consumption of wind farms under the support of energy storage; ∑R′ back.c is the total assessment fee for the wind farm station grid-connected system under the support of energy storage; ∑R′ cps.c The total auxiliary service fee for the wind farm station grid-connected system supported by energy storage; Figure 4 The optimal capacity configuration table of energy storage proposed in Example 1 of the present invention;

[0143] By comparing the operating income of the wind farm after configuring energy storage with the operating income of the wind farm without energy storage, the energy storage income is calculated, specifically:

[0144] R=R income.c -R income.w (18)

[0145] Where R is the specific benefit of the energy storage system. Figure 5 This is a comparison table of wind farm energy storage benefits proposed in Example 1 of the present invention.

[0146] The energy storage benefit calculation method for the simulated operation of the wind-storage combined system proposed in Example 1 of the present invention optimizes the planned energy storage capacity, and calculates the specific benefits of energy storage in combination with the assessment standards and simulated operation status, providing effective guidance for the subsequent wind farm energy storage configuration.

[0147] The energy storage benefit calculation method for the simulated operation of the wind-storage combined system proposed in Example 1 of the present invention can effectively improve the utilization rate of energy storage. At the same time, taking into account the primary frequency regulation assessment standard of the wind farm, the operating conditions of the wind farm are optimized under the guidance of the present invention, the utilization rate of new energy is improved, and the safety risk of power grid operation is reduced.

[0148] Example 2

[0149] Based on the energy storage benefit calculation method for wind-storage combined system simulation operation proposed in Example 1 of the present invention, Example 2 of the present invention further proposes an energy storage benefit calculation system for wind-storage combined system simulation operation. Figure 6 This is a schematic diagram of an energy storage revenue calculation system for wind-storage combined system simulation operation proposed in Example 2 of the present invention. The system includes: a first building module, a second building module, a support module and an optimization calculation module;

[0150] The first construction module is used to construct a system frequency solution function under the simulation operation of the wind-storage joint system based on the historical operation data of wind power, the historical operation forecast data of wind power and the historical operation data of system frequency;

[0151] The second construction module is used to solve the system frequency function under the current simulation operation of the wind-storage combined system, and predict the system frequency at the next moment by combining the unit power regulation coefficient of the wind farm and the energy storage power adjustment amount; construct an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation and solve the Pf curve under the control time window;

[0152] The support module is used to construct a Pf droop controller based on the Pf curve; and control the system frequency by using the Pf droop controller;

[0153] The optimization calculation module is used to optimize the energy storage capacity based on the energy storage capacity operating status under real-time droop control; after optimizing the energy storage capacity, an energy storage profit calculation model taking into account the assessment indicators is constructed.

[0154] The process of implementing the first building block is as follows: The formula for solving the system frequency function under the simulation operation of the wind-storage combined system is:

[0155]

[0156] Wherein, ζ>i; ζ is the simulation time; i is the control time; freal(ζ) is the system frequency of the wind-storage combined system under simulation at time ζ; f history (ζ) is the historical frequency data of the wind-storage combined system at time ζ; K is the unit power regulation coefficient; P control (i) is the output power of the energy storage system at time i; P history (i) is the historical operation data of wind power at time i.

[0157] The process implemented by the second building block is:

[0158] The frequency prediction model is established as:

[0159] f pre (k+1)=f real (k)+KΔP c (k); (2)

[0160] Among them, f pre (k+1) is the predicted frequency at time k+1; k is the rolling window; ΔP c (k) is the energy storage power adjustment at time k.

[0161] Based on the system capacity value under the current simulation operation, the energy storage capacity value at the next moment is predicted by the energy storage output power, regulation amount, and control window duration at the current moment; the formula of the MPC control model is:

[0162] E pre (k+1)=E(k)+T(P c (k)+ΔP c (k)) (3)

[0163] Among them, E pre (k+1) is the predicted value of energy storage capacity at time k+1; E(k) is the energy storage capacity at time k; T is the duration of each control time window; P c (k) is the power output at energy storage time k.

[0164] After constructing the MPC control model for comprehensive energy storage capacity optimization and system frequency regulation, it also includes constructing the objective function in multiple control time domains with minimum energy storage capacity and minimum frequency error through weight coefficients;

[0165]

[0166] Where C1 is the frequency control target weight coefficient; C2 is the capacity optimization target weight coefficient; f N =50HZ is the rated frequency; f pre (k) is the predicted frequency at time k; E pre (k) is the predicted value of energy storage capacity at time k;

[0167] The constraints are:

[0168]

[0169] Among them, SOC(k+1) is the energy storage charge state at time k+1; SOC(k) is the energy storage charge state at time k; SOC min SOC is the minimum value of energy storage state of charge; max is the maximum value of the energy storage charge state; P min is the minimum value of energy storage discharge power; P max is the maximum value of energy storage discharge power.

[0170] Solve the Pf curve under the MPC control time window; take the first sequence under the MPC control sequence as the execution sequence, and use the energy storage output power after execution as the energy storage reference power in the Pf curve.

[0171] The specific formula is:

[0172] P0=P c (k)+ΔP c (k)k=1 (6)

[0173] Among them, P0 is the reference power of the Pf curve;

[0174] Determine the droop coefficient; take the ratio of the first sequence energy storage execution amount to the frequency modulation amount in the MPC control sequence as the droop coefficient in the Pf curve; the specific formula is:

[0175]

[0176] Among them, K droop is the droop coefficient of the Pf curve;

[0177] Determine the frequency boundary value; combine the upper and lower limits of the energy storage dead zone, the droop coefficient and the linear relationship between the maximum and minimum output power of the energy storage to solve the frequency boundary value; specifically:

[0178]

[0179] Among them, f lo is the upper limit of the frequency boundary; f up is the lower limit range of the frequency boundary; f is the upper limit of the frequency dead zone; is the lower limit of the frequency dead zone;

[0180] Integrate the reference power, droop coefficient, frequency boundary value and set frequency dead zone to determine the Pf curve;

[0181]

[0182] The process of supporting module implementation is:

[0183] A Pf droop controller is constructed based on the Pf curve, and the relevant parameters in the Pf droop controller are updated based on the solution of the previous stage MPC control model.

[0184] In the simulated operation system, the droop controller monitors the system frequency in real time and takes the monitored value as input. The droop controller gives the power output of the energy storage system based on the droop coefficient at the current moment. Through the feedback signal, the system frequency is corrected in real time, and finally the system frequency tracks the rated value.

[0185] The process of optimizing the calculation module is as follows:

[0186] According to the state of charge at the simulation time and the rated capacity of the planned energy storage, the simulated operating capacity of the planned energy storage at that time is solved; specifically:

[0187] E(ζ)=SOC(ζ)·E rate (10)

[0188] Where E(ζ) is the energy storage capacity at the simulation time ζ; E rate Plan rated capacity for energy storage;

[0189] The optimal configuration capacity is calculated based on the simulated operating capacity of the planned energy storage; specifically:

[0190] E op.rate =max{E rate (1),E rate (2),…,E rate (ζ)|ζ∈N} (11)

[0191] Among them, E op.rate is the optimal configuration capacity; E rate (1) is the planned energy storage capacity at the first simulation operation time; E rate (2) is the planned energy storage capacity at the second simulation operation time; E rate (ζ) is the planned energy storage capacity at the ζth simulation operation moment.

[0192] Establish the calculation formula for the monthly operation rate and assessment power of primary frequency regulation:

[0193]

[0194] ω punish =(100%-λ in )×S Wind.N ×2×α (13)

[0195] λ in is the monthly operation rate of primary frequency regulation; t inis the monthly operation time of the wind farm frequency regulation; t all is the grid-connected time of the wind farm in that month; ω punish For the test power; S wind.N is the rated installed capacity of the wind farm; α is the primary frequency regulation assessment coefficient, and its value is 2;

[0196] Construct a frequency regulation ancillary service compensation fee calculation formula:

[0197]

[0198] Where, λ is the monthly commissioning rate of primary frequency regulation auxiliary service; R cps is the compensation fee for energy storage participating in the frequency regulation auxiliary service; Y is the compensation standard for large disturbances, which is 100 yuan / MW; τ is the number of large disturbances per month;

[0199] Combine the unit rated power cost of the energy storage system and the unit rated capacity cost of the energy storage to calculate the initial investment cost of energy storage; specifically:

[0200] R in =C P P rate +C E E rate (15)

[0201] In the formula, R in is the initial investment cost of energy storage; C p is the unit rated power cost of energy storage; C E is the unit rated capacity cost of energy storage;

[0202] Based on the principle of sharing assessment costs and ancillary service costs, a calculation formula for wind farm operating income is established; specifically:

[0203]

[0204] In the formula, R income.w The operating income of the wind farm without energy storage support; grid.w The amount of electricity that is online in a wind farm without energy storage support; punish.w To assess the power consumption of wind farms without energy storage support; C price is the on-grid electricity price of wind farm; ∑R′ back.w is the total assessment fee for the station grid-connected system without energy storage support; ∑F is the total amount of electricity connected to the grid by the station grid-connected system; ∑R′ cps.w The total auxiliary service fee for the grid-connected system of the wind farm without energy storage support;

[0205] Constructing a wind farm operating income model with energy storage participating in auxiliary services; specifically:

[0206]

[0207] In the formula, R income.c The operating income of the wind farm under the support of energy storage; grid.c The amount of electricity that is connected to the grid by the wind farm supported by energy storage; punish.c To assess the power consumption of wind farms under the support of energy storage; ∑R′ back.c is the total assessment fee for the wind farm station grid-connected system under the support of energy storage; ∑R′ cps.c The total auxiliary service fee for the wind farm station grid-connected system supported by energy storage;

[0208] By comparing the operating income of the wind farm after configuring energy storage with the operating income of the wind farm without energy storage, the energy storage income is calculated, specifically:

[0209] R=R income.c -R income.w (18)

[0210] Where R is the specific benefit of the energy storage system.

[0211] The energy storage benefit calculation system for the simulated operation of the wind-storage combined system proposed in Example 2 of the present invention optimizes the planned energy storage capacity, and calculates the specific benefits of energy storage in combination with the assessment standards and simulated operation status, providing effective guidance for the subsequent wind farm energy storage configuration.

[0212] The energy storage benefit calculation system for the simulated operation of the wind-storage combined system proposed in Example 2 of the present invention can effectively improve the utilization rate of energy storage. At the same time, taking into account the primary frequency regulation assessment standards of the wind farm, the operating conditions of the wind farm are optimized under the guidance of the present invention, the utilization rate of new energy is improved, and the safety risks of power grid operation are reduced.

[0213] The description of the relevant parts of the energy storage benefit calculation system for the simulated operation of the wind-storage combined system provided in Example 2 of the present application can be found in the detailed description of the corresponding parts of the energy storage benefit calculation system for the simulated operation of the wind-storage combined system provided in Example 1 of the present application, and will not be repeated here.

[0214] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the term "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process, method, article or equipment that includes a series of elements are inherent to the elements. In the absence of more restrictions, the elements limited by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or equipment that includes the elements. In addition, the above-mentioned technical solution provided in the embodiment of the present application is consistent with the corresponding technical solution in the prior art in principle, and the part is not described in detail, so as not to repeat too much.

[0215] Although the above describes the specific implementation of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. For those skilled in the art, other different forms of modifications or deformations can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here. On the basis of the technical solution of the present invention, various modifications or deformations that can be made by those skilled in the art without creative work are still within the scope of protection of the present invention.

Claims

1. Energy storage benefit calculation method for wind and energy storage combined system simulation operation, It is characterized in that The following steps are involved: Based on the historical operation data of wind power, the historical operation forecast data of wind power and the historical operation data of system frequency, a system frequency solution function is constructed under the simulation operation of the wind-storage joint system; The system frequency solution function under the current simulation operation of the wind-storage combined system is used to predict the system frequency at the next moment by combining the wind farm unit power regulation coefficient and the energy storage power adjustment amount; an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation is constructed and the Pf curve under the control time window is solved; The process of constructing the MPC control model for comprehensive energy storage capacity optimization and system frequency regulation includes: based on the system capacity value under the current simulation operation, predicting the energy storage capacity value at the next moment through the energy storage output power and regulation amount and control time window duration at the current moment; the formula of the MPC control model is: E pre (k+1)=E(k)+T(P c (k)+ΔP c (k))(3) Where E pre (k+1) is the predicted value of energy storage capacity at time k+1; E(k) is the energy storage capacity at time k; T is the duration of each control time window; P c (k) is the power output at the energy storage moment k; ΔP c (k) is the energy storage power adjustment at time k; After constructing the MPC control model for comprehensive energy storage capacity optimization and system frequency regulation, it also includes constructing the objective function in multiple control time domains with minimum energy storage capacity and minimum frequency error through weight coefficients; Among them, C 1 is the frequency control target weight coefficient; C 2 is the capacity optimization target weight coefficient; f N =50HZ is the rated frequency; f pre (k) is the predicted frequency at time k; E pre (k) is the predicted value of energy storage capacity at time k; The constraints are: Among them, SOC(k+1) is the energy storage charge state at time k+1; SOC(k) is the energy storage charge state at time k; SOC min SOC is the minimum value of energy storage state of charge; max is the maximum value of the energy storage charge state; P min is the minimum value of energy storage discharge power; P max is the maximum value of energy storage discharge power; E rate Plan rated capacity for energy storage; Constructing a Pf droop controller based on the Pf curve; and controlling the system frequency by using the Pf droop controller; The energy storage capacity is optimized based on the operating status of the energy storage capacity under real-time droop control; and an energy storage profit calculation model taking into account the assessment indicators is constructed after the energy storage capacity is optimized.

2. The energy storage benefit calculation method for wind-storage combined system simulation operation according to claim 1, It is characterized in that The formula for solving the system frequency function under the simulated operation of the wind-storage combined system is: Wherein, ζ>i; ζ is the simulation time; i is the control time; freal(ζ) is the system frequency of the wind-storage combined system under simulation at time ζ; f history (ζ) is the historical frequency data of the wind-storage combined system at time ζ; K is the unit power regulation coefficient; P control (i) is the output power of the energy storage system at time i; P history (i) is the historical operation data of wind power at time i.

3. The energy storage benefit calculation method for wind-storage combined system simulation operation according to claim 2, It is characterized in that The formula for solving the system frequency solution function under the current simulation operation of the wind-storage combined system and predicting the system frequency at the next moment by combining the wind farm unit power regulation coefficient and the energy storage power adjustment amount is: f pre (k+1)=f real (k)+KΔP c (k); (2) Among them, f pre (k+1) is the predicted frequency at time k+1; k is the rolling window; ΔP c (k) is the energy storage power adjustment at time k.

4. The energy storage benefit calculation method for wind-storage combined system simulation operation according to claim 1, It is characterized in that The process of solving the Pf curve under the control time window includes: Determine the energy storage reference power; take the first sequence under the MPC control sequence as the execution sequence, and use the energy storage output power after execution as the energy storage reference power in the Pf curve; the specific formula is: P 0 =P c (k)+ΔP c (k) k=1 (6) Among them, P 0 is the reference power of Pf curve; Determine the droop coefficient; take the ratio of the first sequence energy storage execution amount to the frequency modulation amount in the MPC control sequence as the droop coefficient in the Pf curve; the specific formula is: Among them, K droop is the droop coefficient of the Pf curve; Determine the frequency boundary value; combine the upper and lower limits of the energy storage dead zone, the droop coefficient and the linear relationship between the maximum and minimum output power of the energy storage to solve the frequency boundary value; specifically: Among them, f lo is the upper limit of the frequency boundary; f up is the lower limit range of the frequency boundary; f is the upper limit of the frequency dead zone; is the lower limit of the frequency dead zone; Integrate the reference power, droop coefficient, frequency boundary value and set frequency dead zone to determine the Pf curve; 5. The energy storage benefit calculation method for wind-storage combined system simulation operation according to claim 4, It is characterized in that The process of controlling the system frequency using the Pf droop controller includes: The droop controller monitors the system frequency in real time and takes the monitored value as input. The droop controller gives the power output of the energy storage system based on the droop coefficient at the current moment. Through the feedback signal, the system frequency is corrected in real time, and finally the system frequency tracks the rated value.

6. The energy storage benefit calculation method for wind-storage combined system simulation operation according to claim 5, It is characterized in that The process of optimizing the energy storage capacity based on the energy storage capacity operating state under real-time droop control includes: According to the state of charge at the simulation time and the rated capacity of the planned energy storage, the simulated operating capacity of the planned energy storage at that time is solved; specifically: E(ζ)=SOC(ζ)·E rate (10) Where E(ζ) is the energy storage capacity at the simulation time ζ; E rate Plan rated capacity for energy storage; The optimal configuration capacity is calculated based on the simulated operating capacity of the planned energy storage; specifically: AND op.rate =max{E rate (1),And rate (2),…,AND rate (ζ)|ζ∈N}(11) Among them, E op.rate is the optimal configuration capacity; E rate (1) is the planned energy storage capacity at the first simulation operation time; E rate (2) is the planned energy storage capacity at the second simulation operation time; E rate (ζ) is the planned energy storage capacity at the ζth simulation operation moment.

7. The energy storage benefit calculation method for wind-storage combined system simulation operation according to claim 6, It is characterized in that The process of constructing the energy storage profit calculation model taking into account the assessment indicators after optimizing the energy storage capacity is as follows: Establish the calculation formula for the monthly operation rate and assessment power of primary frequency regulation: oh punish =(100%-l in )×S Wind.N ×2×a (13) λ in is the monthly operation rate of primary frequency regulation; t in is the monthly operation time of the wind farm frequency regulation; t all is the grid-connected time of the wind farm in that month; ω punish S is the test power; wind.N is the rated installed capacity of the wind farm; α is the primary frequency regulation assessment coefficient, and its value is 2; Construct a frequency regulation ancillary service compensation fee calculation formula: Where, λ is the monthly commissioning rate of primary frequency regulation auxiliary service; R cps is the compensation fee for energy storage participating in frequency regulation auxiliary service; Y is the compensation standard for large disturbances, which is 100 yuan / MW; τ is the number of large disturbances per month; Combine the unit rated power cost of the energy storage system and the unit rated capacity cost of the energy storage to calculate the initial investment cost of energy storage; specifically: R in =C P P rate +C E E rate (15) In the formula, R in is the initial investment cost of energy storage; C p is the unit rated power cost of energy storage; C E is the unit rated capacity cost of energy storage; Based on the principle of sharing assessment costs and ancillary service costs, a calculation formula for wind farm operating income is established; specifically: In the formula, R income.w The operating income of the wind farm without energy storage support; grid.w The amount of electricity that is online in a wind farm without energy storage support; punish.w To assess the power consumption of wind farms without energy storage support; C price is the on-grid electricity price of wind farm; ∑R′ back.w is the total assessment fee for the station grid-connected system without energy storage support; ∑F is the total amount of electricity connected to the grid by the station grid-connected system; ∑R′ cps.w The total auxiliary service fee for the grid-connected system of the wind farm without energy storage support; Constructing a wind farm operating income model with energy storage participating in auxiliary services; specifically: In the formula, R income.c The operating income of the wind farm under the support of energy storage; grid.c The amount of electricity that is connected to the grid by the wind farm supported by energy storage; punish.c To assess the power consumption of wind farms under the support of energy storage; ∑R′ back.c is the total assessment fee for the wind farm station grid-connected system under the support of energy storage; ∑R′ cps.c The total auxiliary service fee for the wind farm station grid-connected system supported by energy storage; By comparing the operating income of the wind farm after configuring energy storage with the operating income of the wind farm without energy storage, the energy storage income is calculated, specifically: R=R income.c -R income.w (18) Where R is the specific benefit of the energy storage system.

8. A system for calculating energy storage benefits for simulated operation of a wind-storage combined system, for executing the method for calculating energy storage benefits for simulated operation of a wind-storage combined system according to any one of claims 1 to 7, It is characterized in that include: A first building module, a second building module, a support module and an optimization calculation module; The first construction module is used to construct a system frequency solution function under the simulated operation of the wind-storage joint system based on the historical operation data of wind power, the historical operation forecast data of wind power and the historical operation data of system frequency; The second construction module is used to solve the system frequency function under the current simulation operation of the wind-storage combined system, and predict the system frequency at the next moment by combining the unit power regulation coefficient of the wind farm and the energy storage power adjustment amount; construct an MPC control model for comprehensive energy storage capacity optimization and system frequency regulation and solve the Pf curve under the control time window; The support module is used to construct a Pf droop controller based on the Pf curve; and control system frequency by using the Pf droop controller; The optimization calculation module is used to optimize the energy storage capacity based on the energy storage capacity operating status under real-time droop control; after optimizing the energy storage capacity, an energy storage profit calculation model taking into account the assessment indicators is constructed.