Supercapacitor charging and discharging test method, equipment and storage medium

By building a multicast network and sending data frames of specific IDs and instructions, synchronously controlling the power supply equipment and electronic load of the supercapacitor, the problem of inaccurate internal resistance measurement values ​​caused by untimely charging and discharging switching in traditional test methods is solved, and the accuracy is achieved test results.

CN117805515BActive Publication Date: 2024-11-12HUNAN NEXT GENERATION INSTRUMENTAL T&C TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311652947.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-04
Publication Date
2024-11-12
Estimated Expiration
2043-12-04

AI Technical Summary

Technical Problem

Traditional supercapacitor testing methods cannot quickly switch charge and discharge tests, resulting in inaccurate internal resistance measurement values.

Method used

The host builds a multicast network with the power supply equipment and electronic loads of multiple charging and discharging units, sends data frames of specific IDs and instructions, and synchronously controls the power supply equipment and electronic load on and off, and quickly switches the charging and discharging test.

Benefits of technology

A quick switching charge and discharge test of supercapacitors is realized to ensure the accuracy of internal resistance measurement values.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117805515B_ABST
    Figure CN117805515B_ABST
Patent Text Reader

Abstract

The present application discloses a supercapacitor charge and discharge test method, equipment and storage medium. The supercapacitor charge and discharge test method comprises: a host communicates with power supply equipment and electronic loads of multiple charge and discharge units by multicast. When performing a charge test, the host sends a first data frame to control the power supply equipment of the charge and discharge unit that performs the charge test to turn on, and controls the electronic load to turn off synchronously, so as to perform a charge test on the corresponding supercapacitor; when performing a discharge test, the host sends a second data frame to control the power supply equipment of the charge and discharge unit that switches the discharge test to turn off, and controls the electronic load to turn on synchronously, so as to perform a discharge test on the corresponding supercapacitor. Compared with traditional supercapacitor testing technology, the charge and discharge test can be switched quickly and independently, so that the internal resistance measurement value is accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of supercapacitor testing, and in particular to a supercapacitor charging and discharging testing method, equipment and storage medium. Background Art

[0002] Supercapacitors refer to a new type of energy storage device between traditional capacitors and rechargeable batteries. They have a wide operating temperature range, extremely long service life, and are pollution-free to the environment. Therefore, they are a new type of green and environmentally friendly power source. Testing supercapacitor indicators is a very important part of judging the quality of products, especially internal resistance testing. Internal resistance testing includes many methods, including: measuring internal resistance with a single current pulse, measuring internal resistance with multiple current pulses, measuring capacity and internal resistance with a six-step method, and measuring internal resistance by charging and discharging. Among them, the internal resistance test requirements for charging and discharging tests are relatively high. It requires the device to switch instantly from the charging state to the discharging state, and the time control must be below milliseconds.

[0003] The traditional method is to combine a DC power supply and a DC electronic load into a charge and discharge test unit, use the host computer software to control the DC power supply and DC electronic load, use the DC power supply to test the supercapacitor, and use the electronic load to test the supercapacitor. Under normal circumstances, the host computer can only send instructions one by one, which will inevitably cause a time difference between the DC power supply and the DC electronic load when receiving the instructions, and the execution steps cannot be synchronized, and the fast switching of charging to discharging cannot be achieved. If the host computer uses the broadcast method of the LAN network, it can only realize the switching of all DC power supplies or DC electronic loads at the same time, and cannot control the discharge conversion timing of each charge and discharge test unit separately. The charging progress of the supercapacitor corresponding to each charge and discharge test unit may be different. If a supercapacitor is forced to discharge before it is fully charged, the internal resistance measurement value will be inaccurate. Summary of the invention

[0004] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a supercapacitor charge and discharge test method, device and storage medium, which can solve the problem that the traditional supercapacitor test technology cannot quickly switch the charge and discharge test and the internal resistance measurement value is inaccurate.

[0005] The supercapacitor charging and discharging test method according to the first aspect of the present application includes:

[0006] The host configures a first ID corresponding to each other for the power supply devices of the multiple charging and discharging units, and configures a second ID corresponding to each other for the electronic loads of the multiple charging and discharging units, so as to build a multicast network;

[0007] The host sends a first data frame to the communication bus, wherein the first data frame includes a plurality of the first target IDs, a plurality of first opening instructions corresponding to the first target IDs, a plurality of second target IDs, and a plurality of first closing instructions corresponding to the second target IDs, wherein the first target ID is the first ID of the power supply device of the charging and discharging unit that needs to perform a charging test, and the first opening instruction is used to control the power supply device to be turned on, and the second target ID is the second ID of the electronic load of the charging and discharging unit that needs to perform a charging test, and the first closing instruction is used to control the electronic load to be turned off;

[0008] Each of the power supply devices and each of the electronic loads receives and parses the first data frame. If the power supply device identifies its own first ID from the first data frame, it performs a start operation according to the corresponding first start instruction. If the electronic load device identifies its own second ID from the first data frame, it performs a close operation according to the corresponding first close instruction, thereby performing a charging test on the supercapacitor.

[0009] The host sends a second data frame to the communication bus, wherein the second data frame includes at least one third target ID, at least one second shutdown instruction corresponding to the third target ID, at least one fourth target ID, and at least one second startup instruction corresponding to the fourth target ID, wherein the third target ID is the first ID of the power supply device of the charge and discharge unit to be switched for discharge test, the second shutdown instruction is used to control the power supply device to be shut down, the fourth target ID is the second ID of the electronic load of the charge and discharge unit to be switched for discharge test, and the second startup instruction is used to control the electronic load to be turned on;

[0010] Each of the power supply devices and each of the electronic loads receives and parses the second data frame. If the power supply device identifies its own first ID from the second data frame, it performs a shutdown operation according to the corresponding second shutdown instruction. If the electronic load device identifies its own second ID from the second data frame, it performs a startup operation according to the corresponding second startup instruction, thereby performing a discharge test on the supercapacitor.

[0011] The supercapacitor charge and discharge test method according to the first aspect of the present application has at least the following beneficial effects:

[0012] The host communicates with the power supply equipment and electronic load of multiple charge and discharge units by multicast. When performing a charge test, the host sends a first data frame to control the power supply equipment of the charge and discharge unit that performs the charge test to turn on, and controls the electronic load to turn off synchronously, so as to perform a charge test on the corresponding supercapacitor; when performing a discharge test, the host sends a second data frame to control the power supply equipment of the charge and discharge unit that switches the discharge test to turn off, and the electronic load to turn on synchronously, so as to perform a discharge test on the corresponding supercapacitor. Compared with the traditional supercapacitor testing technology, the supercapacitor charge and discharge test method of the embodiment of the present application can synchronously control the power supply equipment in multiple charge and discharge units to turn on and the electronic load to turn off, and can synchronously control the power supply equipment in multiple charge and discharge units to turn off and the electronic load to turn on, quickly switch the charge and discharge test, and the host can independently control the charge and discharge unit that needs to switch the discharge test in multiple charge and discharge units to switch the charge and discharge test, so that the internal resistance measurement value is accurate.

[0013] According to some embodiments of the present application, the host sends a second data frame to the communication bus, including:

[0014] If the host monitors that the voltage of the supercapacitor corresponding to the charging and discharging unit reaches a preset voltage threshold, the first ID of the power supply device in the charging and discharging unit and the second ID of the electronic load are obtained;

[0015] The host generates the second data frame using the first ID as the third target ID and the second ID as the fourth target ID;

[0016] The host sends the second data frame to the communication bus.

[0017] According to some embodiments of the present application, the first data frame also includes a first data header and a first data tail corresponding one-to-one to the first target ID, and a second data header and a second data tail corresponding one-to-one to the second target ID, the first target ID and the first open instruction are located between the first data header and the first data tail, and the second target ID and the first close instruction are located between the second data header and the second data tail.

[0018] According to some embodiments of the present application, the first data frame also includes first delay data corresponding to the first open instruction and second delay data corresponding to the first close instruction, the first delay data is located between the first data header and the first data tail, and the second delay data is located between the second data header and the second data tail.

[0019] According to some embodiments of the present application, if the power supply device identifies its own first ID from the first data frame, performing a start operation according to the corresponding first start instruction, and if the electronic load device identifies its own second ID from the first data frame, performing a shutdown operation according to the corresponding first shutdown instruction, including:

[0020] If the power supply device recognizes its own first ID from the first data frame, it performs a turn-on operation according to the corresponding first turn-on instruction and the first delay data; if the electronic load device recognizes its own second ID from the first data frame, it performs a turn-off operation according to the corresponding first turn-off instruction and the second delay data.

[0021] According to some embodiments of the present application, the second data frame also includes a third data header and a third data tail corresponding one-to-one to the third target ID, and a fourth data header and a fourth data tail corresponding one-to-one to the fourth target ID, the third target ID and the second close instruction are located between the third data header and the third data tail, and the fourth target ID and the second open instruction are located between the fourth data header and the fourth data tail.

[0022] According to some embodiments of the present application, the second data frame also includes third delayed data corresponding to the second closing instruction and fourth delayed data corresponding to the second opening instruction, the third delayed data is located between the third data header and the third data tail, and the fourth delayed data is located between the fourth data header and the fourth data tail.

[0023] According to some embodiments of the present application, if the power supply device identifies its own first ID from the second data frame, it performs a shutdown operation according to the corresponding second shutdown instruction; if the electronic load device identifies its own second ID from the second data frame, it performs a startup operation according to the corresponding second startup instruction, including: if the power supply device identifies its own first ID from the second data frame, it performs a shutdown operation according to the corresponding second shutdown instruction and the third delay data; if the electronic load device identifies its own second ID from the second data frame, it performs a startup operation according to the corresponding second startup instruction and the fourth delay data.

[0024] The supercapacitor charging and discharging testing device according to the second aspect of the present application includes:

[0025] A host, used to perform the supercapacitor charge and discharge test method as described above;

[0026] A plurality of charging and discharging units, each of which comprises a power supply device and an electronic load connected to the host via a communication bus, and each of the power supply device and the super load is connected to a super capacitor.

[0027] The supercapacitor charge and discharge test equipment according to the second aspect of the present application has at least the following beneficial effects:

[0028] The host communicates with the power supply equipment and electronic load of multiple charge and discharge units by multicast. When performing a charge test, the host sends a first data frame to control the power supply equipment of the charge and discharge unit that performs the charge test to turn on, and controls the electronic load to turn off synchronously, so as to perform a charge test on the corresponding supercapacitor; when performing a discharge test, the host sends a second data frame to control the power supply equipment of the charge and discharge unit that switches the discharge test to turn off, and the electronic load to turn on synchronously, so as to perform a discharge test on the corresponding supercapacitor. Compared with the traditional supercapacitor testing technology, the supercapacitor charge and discharge test equipment of the embodiment of the present application can synchronously control the power supply equipment in multiple charge and discharge units to turn on and the electronic load to turn off, and can synchronously control the power supply equipment in multiple charge and discharge units to turn off and the electronic load to turn on, quickly switch the charge and discharge test, and the host can independently control the charge and discharge unit that needs to switch the discharge test in multiple charge and discharge units to switch the charge and discharge test, so that the internal resistance measurement value is accurate.

[0029] According to the computer-readable storage medium of the third aspect embodiment of the present application, a program executable by a processor is stored therein, and when the program executable by the processor is executed by the processor, it is used to implement the supercapacitor charging and discharging test method as described above.

[0030] The computer-readable storage medium according to the third aspect of the present application has at least the following beneficial effects:

[0031] The host communicates with the power supply devices and electronic loads of multiple charging and discharging units by multicasting. When performing a charging test, the host sends a first data frame to control the power supply device of the charging and discharging unit that performs the charging test to turn on, and controls the electronic load to turn off synchronously, thereby performing a charging test on the corresponding supercapacitor; when performing a discharge test, the host sends a second data frame to control the power supply device of the charging and discharging unit that switches the discharge test to turn off, and controls the electronic load to turn on synchronously, thereby performing a discharge test on the corresponding supercapacitor. The host can synchronously control the power supply devices in multiple charging and discharging units to turn on and the electronic loads to turn off, and can synchronously control the power supply devices in multiple charging and discharging units to turn off and the electronic loads to turn on, quickly switch the charging and discharging tests, and the host can independently control the charging and discharging units that need to switch the discharge test among the multiple charging and discharging units to switch the charging and discharging tests, so that the internal resistance measurement value is accurate.

[0032] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The present application is further described below with reference to the accompanying drawings and embodiments, wherein:

[0034] Figure 1 This is a flow chart of the supercapacitor charging and discharging test method of the present application;

[0035] Figure 2 This is a flowchart of sending a second data frame of the present application;

[0036] Figure 3 This is a functional block diagram of the supercapacitor charging and discharging testing equipment of this application.

[0037] Figure Number:

[0038] Host 100,

[0039] Communication bus 200,

[0040] Power supply equipment 300,

[0041] Electronic load 400,

[0042] Supercapacitor 500. DETAILED DESCRIPTION

[0043] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0044] In the description of the present application, it should be understood that the descriptions involving orientation, such as the orientation or positional relationship indicated as up, down, etc., are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0045] In the description of this application, "a plurality" means more than two. If there is a description of "first" or "second", it is only for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0046] In the description of this application, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in this application based on the specific content of the technical solution.

[0047] Refer to the following Figures 1 to 3 The present invention describes a supercapacitor charging and discharging test method, device and storage medium according to an embodiment of the present application.

[0048] According to the supercapacitor charging and discharging test method of the embodiment of the present application, as Figure 1 As shown, including but not limited to step S100, step S200, step S300, step S400 and step S500.

[0049] Step S100: The host 100 configures a one-to-one corresponding first ID for the power supply devices 300 of the multiple charging and discharging units, and configures a one-to-one corresponding second ID for the electronic loads 400 of the multiple charging and discharging units, to build a multicast network;

[0050] Step S200: the host 100 sends a first data frame to the communication bus 200, the first data frame including a plurality of first target IDs, a plurality of first start instructions corresponding to the first target IDs, a plurality of second target IDs, and a plurality of first close instructions corresponding to the second target IDs, the first target ID is a first ID of a power supply device 300 of a charge-discharge unit to be tested for charging, the first start instruction is used to control the power supply device 300 to be turned on, the second target ID is a second ID of an electronic load 400 of a charge-discharge unit to be tested for charging, and the first close instruction is used to control the electronic load 400 to be turned off;

[0051] Step S300: Each power supply device 300 and each electronic load 400 receives and parses the first data frame. If the power supply device 300 recognizes its own first ID from the first data frame, it performs a start operation according to the corresponding first start instruction. If the electronic load 400 recognizes its own second ID from the first data frame, it performs a close operation according to the corresponding first close instruction, thereby performing a charging test on the supercapacitor 500.

[0052] Step S400: the host 100 sends a second data frame to the communication bus 200, the second data frame including at least one third target ID, at least one second shutdown instruction corresponding to the third target ID, at least one fourth target ID and at least one second startup instruction corresponding to the fourth target ID, the third target ID is the first ID of the power supply device 300 of the charge and discharge unit to be switched for discharge test, the second shutdown instruction is used to control the power supply device 300 to be shut down, the fourth target ID is the second ID of the electronic load 400 of the charge and discharge unit to be switched for discharge test, and the second startup instruction is used to control the electronic load 400 to be turned on;

[0053] Step S500: Each power supply device 300 and each electronic load 400 receives and parses the second data frame. If the power supply device 300 identifies its own first ID from the second data frame, it performs a shutdown operation according to the corresponding second shutdown instruction. If the electronic load 400 device identifies its own second ID from the second data frame, it performs a startup operation according to the corresponding second startup instruction, thereby performing a discharge test on the supercapacitor 500.

[0054] In this embodiment, the host 100 communicates with the power supply devices 300 and the electronic loads 400 of multiple charging and discharging units by multicasting. When performing a charging test, the host 100 sends a first data frame to control the power supply device 300 of the charging and discharging unit that performs the charging test to turn on, and controls the electronic load 400 to turn off synchronously, thereby performing a charging test on the corresponding supercapacitor 500; when performing a discharge test, the host 100 sends a second data frame to control the power supply device 300 of the charging and discharging unit that switches the discharge test to turn off, and controls the electronic load 400 to turn on synchronously, thereby performing a discharge test on the corresponding supercapacitor 500. Compared with the traditional supercapacitor 500 testing technology, the supercapacitor charging and discharging testing method of the embodiment of the present application is that the host 100 can synchronously control the power supply equipment 300 in multiple charging and discharging units to turn on and the electronic load 400 to turn off, and can synchronously control the power supply equipment 300 in multiple charging and discharging units to turn off and the electronic load 400 to turn on, quickly switch the charging and discharging test, and the host 100 can independently control the charging and discharging units in multiple charging and discharging units that need to switch the discharge test to perform charging and discharging test switching, so that the internal resistance measurement value is accurate.

[0055] In one embodiment of the present application, the "host 100 sends a second data frame to the communication bus 200" in step S400 is further described. Figure 2 As shown, step S400 includes but is not limited to step S410, step S420 and step S430.

[0056] Step S410: If the host 100 detects that the voltage of the supercapacitor 500 corresponding to the charge-discharge unit reaches a preset voltage threshold, the first ID of the power supply device 300 and the second ID of the electronic load 400 in the charge-discharge unit are obtained;

[0057] Step S420: the host 100 generates a second data frame using the first ID as the third target ID and the second ID as the fourth target ID;

[0058] Step S430 : the host 100 sends a second data frame to the communication bus 200 .

[0059] In this embodiment, by monitoring the voltages of the supercapacitors 500 corresponding to the multiple charging and discharging units that perform the charging test, if one or more supercapacitors 500 reach the preset voltage threshold, it is confirmed that the charging test is completed, and the corresponding charging and discharging unit needs to switch to perform the discharge test. A second data frame is generated according to the first ID of the power supply device 300 of the corresponding charging and discharging unit and the second ID of the electronic load 400, and the second data frame is sent to the communication bus 200, thereby controlling the corresponding charging and discharging unit to switch to perform the discharge test, so that the internal resistance measurement value of the supercapacitor 500 is accurate.

[0060] In one embodiment of the present application, the first data frame also includes a first data header and a first data tail corresponding one-to-one to the first target ID, and a second data header and a second data tail corresponding one-to-one to the second target ID, the first target ID and the first open instruction are located between the first data header and the first data tail, and the second target ID and the first close instruction are located between the second data header and the second data tail.

[0061] In this embodiment, since there are multiple first target IDs and corresponding first turn-on instructions, as well as multiple second target IDs and corresponding first turn-off instructions in the first data frame, each group of first target IDs and first turn-on instructions and each group of second target IDs and first turn-off instructions are separated by the first data header, the first data tail, the second data header and the second data tail, so that the power supply device 300 and the electronic load 400 can parse the first data frame and find the first turn-on instruction or the first turn-off instruction corresponding to themselves.

[0062] According to one embodiment of the present application, the first data frame also includes first delay data corresponding to the first open instruction and second delay data corresponding to the first close instruction, the first delay data is located between the first data header and the first data tail, and the second delay data is located between the second data header and the second data tail.

[0063] In this embodiment, the corresponding first delay data and second delay data are added to the first data frame, so that the power supply device 300 starts timing after parsing the first data frame to find its own first ID, and executes the corresponding first start instruction after completing the first delay according to the first delay data; the electronic load 400 starts timing after parsing the first data frame to find its own second ID, and executes the corresponding first close instruction after completing the second delay according to the second delay data.

[0064] It can be understood that the format of the first data frame is: first data header + first delayed data + first target ID + first opening instruction + first data tail... second data header + second delayed data + second target ID + first closing instruction + second data tail...

[0065] In one embodiment of the present application, the step S300 of "if the power supply device 300 identifies its own first ID from the first data frame, it performs a turn-on operation according to the corresponding first turn-on instruction; if the electronic load 400 device identifies its own second ID from the first data frame, it performs a turn-off operation according to the corresponding first turn-off instruction" is further explained, and the step S300 includes but is not limited to the step S310.

[0066] Step S310: If the power supply device 300 recognizes its own first ID from the first data frame, it performs a turn-on operation according to the corresponding first turn-on instruction and the first delay data; if the electronic load 400 device recognizes its own second ID from the first data frame, it performs a turn-off operation according to the corresponding first turn-off instruction and the second delay data.

[0067] In this embodiment, the power supply device 300 starts timing after parsing the first data frame to find its own first ID, and executes the corresponding first turn-on instruction after completing the first delay according to the first delay data; the electronic load 400 starts timing after parsing the first data frame to find its own second ID, and executes the corresponding first turn-off instruction after completing the second delay according to the second delay data.

[0068] In one embodiment of the present application, the second data frame also includes a third data header and a third data tail corresponding one-to-one to the third target ID, and a fourth data header and a fourth data tail corresponding one-to-one to the fourth target ID, the third target ID and the second close instruction are located between the third data header and the third data tail, and the fourth target ID and the second open instruction are located between the fourth data header and the fourth data tail.

[0069] In this embodiment, since there are multiple third target IDs and corresponding second shutdown instructions, as well as multiple fourth target IDs and corresponding second start instructions in the second data frame, each group of third target IDs and second shutdown instructions and each group of fourth target IDs and second start instructions are separated by the first data header, the first data tail, the second data header and the second data tail, so that the power supply device 300 and the electronic load 400 can parse the second data frame and find their corresponding second shutdown instructions or second start instructions.

[0070] In one embodiment of the present application, the second data frame also includes third delayed data corresponding to the second closing instruction and fourth delayed data corresponding to the second opening instruction, the third delayed data is located between the third data header and the third data tail, and the fourth delayed data is located between the fourth data header and the fourth data tail.

[0071] In this embodiment, the corresponding third delay data and fourth delay data are added to the second data frame, so that the power supply device 300 starts timing after parsing the second data frame to find its own first ID, and executes the corresponding second closing instruction after completing the third delay according to the third delay data; the electronic load 400 starts timing after parsing the second data frame to find its own second ID, and executes the corresponding second opening instruction after completing the fourth delay according to the fourth delay data.

[0072] It can be understood that the format of the second data frame is: third data header + third delayed data + third target ID + second closing instruction + third data tail..... fourth data header + fourth delayed data + fourth target ID + second opening instruction + fourth data tail.....

[0073] In one embodiment of the present application, the step S500 of "if the power supply device 300 identifies its own first ID from the second data frame, it performs a shutdown operation according to the corresponding second shutdown instruction; if the electronic load 400 device identifies its own second ID from the second data frame, it performs a startup operation according to the corresponding second startup instruction" includes: if the power supply device 300 identifies its own first ID from the second data frame, it performs a shutdown operation according to the corresponding second shutdown instruction and the third delay data; if the electronic load 400 device identifies its own second ID from the second data frame, it performs a startup operation according to the corresponding second startup instruction and the fourth delay data.

[0074] In this embodiment, the power supply device 300 starts timing after parsing the second data frame to find its own first ID, and executes the corresponding second closing instruction after completing the third delay according to the third delay data; the electronic load 400 starts timing after parsing the second data frame to find its own second ID, and executes the corresponding second opening instruction after completing the fourth delay according to the fourth delay data.

[0075] In addition, the present application also discloses a supercapacitor charging and discharging test device, comprising:

[0076] The host 100 is used to execute the supercapacitor charging and discharging test method as described above;

[0077] A plurality of charging and discharging units, each of which includes a power supply device 300 and an electronic load 400 connected to the host 100 via a communication bus 200 , and both the power supply device 300 and the super load are connected to a super capacitor 500 .

[0078] In this embodiment, the host 100 communicates with the power supply devices 300 and the electronic loads 400 of multiple charging and discharging units by multicasting. When performing a charging test, the host 100 sends a first data frame to control the power supply device 300 of the charging and discharging unit that performs the charging test to turn on, and controls the electronic load 400 to turn off synchronously, thereby performing a charging test on the corresponding supercapacitor 500; when performing a discharge test, the host 100 sends a second data frame to control the power supply device 300 of the charging and discharging unit that switches the discharge test to turn off, and controls the electronic load 400 to turn on synchronously, thereby performing a discharge test on the corresponding supercapacitor 500. Compared with the traditional supercapacitor 500 testing technology, the supercapacitor charge and discharge testing equipment of the embodiment of the present application can synchronously control the power supply equipment 300 in multiple charge and discharge units to turn on and the electronic load 400 to turn off, and can synchronously control the power supply equipment 300 in multiple charge and discharge units to turn off and the electronic load 400 to turn on, quickly switch the charge and discharge test, and the host 100 can independently control the charge and discharge units in multiple charge and discharge units that need to switch the discharge test to perform charge and discharge test switching, so that the internal resistance measurement value is accurate.

[0079] In addition, the present application also discloses a computer-readable storage medium, which stores a program executable by a processor. When the program executable by the processor is executed by the processor, it is used to implement the supercapacitor charging and discharging test method as described above.

[0080] In this embodiment, the host 100 communicates with the power supply devices 300 and the electronic loads 400 of multiple charging and discharging units by multicasting. When performing a charging test, the host 100 sends a first data frame to control the power supply device 300 of the charging and discharging unit that performs the charging test to turn on, and controls the electronic load 400 to turn off synchronously, thereby performing a charging test on the corresponding supercapacitor 500; when performing a discharge test, the host 100 sends a second data frame to control the power supply device 300 of the charging and discharging unit that switches the discharge test to turn off, and the electronic load 400 to turn on synchronously, thereby performing a discharge test on the corresponding supercapacitor 500. The host 100 can synchronously control the power supply devices 300 in multiple charging and discharging units to turn on and the electronic load 400 to turn off, and can synchronously control the power supply devices 300 in multiple charging and discharging units to turn off and the electronic load 400 to turn on, quickly switch the charging and discharging test, and the host 100 can independently control the charging and discharging units that need to switch the discharge test among the multiple charging and discharging units to switch the charging and discharging test, so that the internal resistance measurement value is accurate.

[0081] It will be appreciated by those skilled in the art that all or some of the steps and systems in the disclosed method above may be implemented as software, firmware, hardware and appropriate combinations thereof. Some physical components or all physical components may be implemented as software executed by a processor, such as a central processing unit, a digital signal processor or a microprocessor, or may be implemented as hardware, or may be implemented as an integrated circuit, such as an application specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or a non-transitory medium) and a communication medium (or a temporary medium). As known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, information structures, program modules or other information). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technologies, CD-ROM, digital versatile disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, disk storage or other magnetic storage devices, or any other medium that may be used to store desired information and may be accessed by a computer. Furthermore, it is well known to those skilled in the art that communication media generally embodies computer readable instructions, information structures, program modules, or other information in a modulated information signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

[0082] The embodiments of the present application are described in detail above in conjunction with the accompanying drawings, but the present application is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present application.

Claims

1. A supercapacitor charging and discharging test method, characterized in that: include: The host configures a first ID corresponding to each other for the power supply devices of the multiple charging and discharging units, and configures a second ID corresponding to each other for the electronic loads of the multiple charging and discharging units, so as to build a multicast network; The host sends a first data frame to the communication bus, wherein the first data frame includes a plurality of first target IDs, a plurality of first start instructions corresponding to the first target IDs, a plurality of second target IDs, and a plurality of first close instructions corresponding to the second target IDs, wherein the first target ID is the first ID of the power supply device of the charge-discharge unit that needs to perform a charging test, and the first start instruction is used to control the power supply device to be turned on, and the second target ID is the second ID of the electronic load of the charge-discharge unit that needs to perform a charging test, and the first close instruction is used to control the electronic load to be turned off; Each of the power supply devices and each of the electronic loads receives and parses the first data frame. If the power supply device identifies its own first ID from the first data frame, it performs a start operation according to the corresponding first start instruction. If the electronic load device identifies its own second ID from the first data frame, it performs a close operation according to the corresponding first close instruction, thereby performing a charging test on the supercapacitor. The host sends a second data frame to the communication bus, wherein the second data frame includes at least one third target ID, at least one second shutdown instruction corresponding to the third target ID, at least one fourth target ID, and at least one second startup instruction corresponding to the fourth target ID, wherein the third target ID is the first ID of the power supply device of the charge and discharge unit to be switched for discharge test, the second shutdown instruction is used to control the power supply device to be shut down, the fourth target ID is the second ID of the electronic load of the charge and discharge unit to be switched for discharge test, and the second startup instruction is used to control the electronic load to be turned on; Each of the power supply devices and each of the electronic loads receives and parses the second data frame. If the power supply device identifies its own first ID from the second data frame, it performs a shutdown operation according to the corresponding second shutdown instruction. If the electronic load device identifies its own second ID from the second data frame, it performs a startup operation according to the corresponding second startup instruction, thereby performing a discharge test on the supercapacitor.

2. The supercapacitor charge and discharge test method according to claim 1, characterized in that: The host sends a second data frame to the communication bus, including: If the host monitors that the voltage of the supercapacitor corresponding to the charging and discharging unit reaches a preset voltage threshold, the first ID of the power supply device in the charging and discharging unit and the second ID of the electronic load are obtained; The host generates the second data frame using the first ID as the third target ID and the second ID as the fourth target ID; The host sends the second data frame to the communication bus.

3. The supercapacitor charge and discharge test method according to claim 1, characterized in that: The first data frame also includes a first data header and a first data tail corresponding one-to-one to the first target ID, and a second data header and a second data tail corresponding one-to-one to the second target ID, the first target ID and the first open instruction are located between the first data header and the first data tail, and the second target ID and the first close instruction are located between the second data header and the second data tail.

4. The supercapacitor charge and discharge test method according to claim 3, characterized in that: The first data frame also includes first delay data corresponding to the first opening instruction and second delay data corresponding to the first closing instruction, the first delay data is located between the first data header and the first data tail, and the second delay data is located between the second data header and the second data tail.

5. The supercapacitor charge and discharge test method according to claim 4, characterized in that: If the power supply device recognizes the first ID of itself from the first data frame, the power supply device performs a power-on operation according to the corresponding first power-on instruction; if the electronic load device recognizes the second ID of itself from the first data frame, the electronic load device performs a power-off operation according to the corresponding first power-off instruction, including: If the power supply device recognizes its own first ID from the first data frame, it performs a turn-on operation according to the corresponding first turn-on instruction and the first delay data; if the electronic load device recognizes its own second ID from the first data frame, it performs a turn-off operation according to the corresponding first turn-off instruction and the second delay data.

6. The supercapacitor charge and discharge test method according to claim 1, characterized in that: The second data frame also includes a third data header and a third data tail corresponding one-to-one to the third target ID, and a fourth data header and a fourth data tail corresponding one-to-one to the fourth target ID. The third target ID and the second closing instruction are located between the third data header and the third data tail, and the fourth target ID and the second opening instruction are located between the fourth data header and the fourth data tail.

7. The supercapacitor charge and discharge test method according to claim 6, characterized in that: The second data frame also includes third delayed data corresponding to the second closing instruction and fourth delayed data corresponding to the second opening instruction, the third delayed data is located between the third data header and the third data tail, and the fourth delayed data is located between the fourth data header and the fourth data tail.

8. The supercapacitor charge and discharge test method according to claim 7, characterized in that: If the power supply device identifies its own first ID from the second data frame, the power supply device performs a shutdown operation according to the corresponding second shutdown instruction; if the electronic load device identifies its own second ID from the second data frame, the power supply device performs a shutdown operation according to the corresponding second shutdown instruction and the third delay data; if the electronic load device identifies its own second ID from the second data frame, the power supply device performs a shutdown operation according to the corresponding second shutdown instruction and the fourth delay data. 9.Supercapacitor charge and discharge test equipment, characterized in that, include: A host, used to perform the supercapacitor charge and discharge test method according to any one of claims 1 to 8; A plurality of charging and discharging units, each of which includes a power supply device and an electronic load connected to the host via a communication bus, and each of the power supply device and the super load is connected to a super capacitor.

10. A computer-readable storage medium, characterized in that A processor-executable program is stored therein, and when the processor-executable program is executed by the processor, it is used to implement the supercapacitor charging and discharging test method according to any one of claims 1 to 8.