- Estimated Expiration
- 2043-11-16
AI Technical Summary
In the existing technology, the fixed speed adjustment of wind turbine groups is prone to damage when the wind energy is unstable, and the wind energy utilization efficiency is reduced after the wind turbine orientation is adjusted.
By constructing a predictive twin model based on wind power generation, combining the predicted wind energy dataset and the preset adjustment cycle, the adjustment rate is determined, and the layout and orientation of the wind turbines are adjusted within the preset cycle until the simulated total power generation is maximized, so as to achieve the target layout and orientation of the wind turbine group.
It improves the efficiency and stability of wind power generation, and enables simultaneous adjustment of the wind turbine's position and orientation, maximizing the utilization of offshore wind resources.
Smart Images

Figure CN117808133B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of resource allocation technology, specifically to a method, apparatus, computer equipment, and storage medium for resource allocation in offshore wind farms. Background Technology
[0002] Offshore wind resources refer to energy resources that utilize wind power in ocean areas for power generation. Due to the large and stable winds at sea, offshore wind energy is considered a renewable energy source with great potential. Offshore wind farms are usually built on some structure above the ocean surface, such as fixed platforms or floating equipment, to house wind turbines. The resource allocation of offshore wind resources refers to the rational planning and configuration of the construction and layout of offshore wind farms based on the distribution and changes of offshore wind energy resources. The layout is optimized according to the characteristics of the sea area and the distribution of wind energy, with the aim of maximizing the utilization of offshore wind energy resources and improving power generation efficiency.
[0003] In existing technologies, the adjustment of wind turbine groups is often carried out at a fixed rate, which may cause damage to the turbines themselves when the wind energy is unstable. In addition, existing technologies often adjust the turbines to the corresponding positions before adjusting their orientation, which objectively reduces the efficiency of wind energy utilization. Summary of the Invention
[0004] In view of this, the present invention provides a method, apparatus, computer equipment and storage medium for resource allocation in offshore wind farms, in order to solve the problems in the prior art that use a fixed rate to adjust the wind turbine group, which causes damage to the wind turbines themselves when the wind energy is unstable, and that after adjusting the wind turbines to the corresponding positions, their orientation is then adjusted, which reduces the efficiency of wind energy utilization.
[0005] In a first aspect, the present invention provides a method for resource allocation in offshore wind farms, the method comprising:
[0006] Obtain the initial measured wind energy dataset, initial measured wind turbine dataset, and initial forecast wind energy dataset for the offshore wind farm to be configured. Based on these datasets, construct a predictive twin model for wind power generation. This model is used to obtain the simulated total power generation generated by different wind turbine layouts within the offshore wind farm to be configured, given the predicted wind energy dataset. Determine the adjustment rate based on the predicted wind energy dataset and a preset adjustment period. Within the preset adjustment period, adjust the layout of each wind turbine in the predictive twin model based on the predicted wind energy dataset and the adjustment rate until the simulated total power generation generated by the offshore wind farm to be configured is maximized. This yields the target layout of the wind turbine group and the target orientation of each wind turbine within the offshore wind farm to be configured.
[0007] The offshore wind farm resource allocation method provided by this invention combines a predicted wind energy dataset and a preset adjustment cycle to determine different adjustment rates. These determined adjustment rates are then used to adjust the layout of each wind turbine in a predictive twin model based on wind power generation. This helps ensure the stability of the wind turbine group during movement and enables a targeted adjustment mechanism for the turbines based on different wind resource conditions. Furthermore, based on the established predictive twin model based on wind power generation, the target layout of the wind turbine group within the offshore wind farm to be configured and the target orientation of each turbine can be obtained. This allows for simultaneous adjustment of turbine location and orientation, thereby maximizing the utilization of offshore wind resources and improving the efficiency of wind power generation.
[0008] In one optional implementation, a predictive twin model for wind power generation is constructed based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset, including:
[0009] Based on the initial measured wind energy dataset and the initial measured wind turbine dataset, a digital twin model based on wind power generation is constructed using digital twin technology; the initial forecast wind energy dataset is processed by a preset offshore wind energy prediction model to obtain the predicted wind energy dataset for the offshore wind farm to be configured; based on the predicted wind energy dataset and the digital twin model based on wind power generation, a predicted twin model based on wind power generation is constructed.
[0010] This invention constructs a digital twin model based on wind power generation by combining measured wind turbine data. Furthermore, based on this digital twin model based on wind power generation and combined with predicted wind energy data, a corresponding predictive twin model based on wind power generation can be constructed, providing support for subsequently determining the target layout of wind turbine groups and the target orientation of each wind turbine in the offshore wind farm to be configured.
[0011] In one optional implementation, based on the initial measured wind energy dataset and the initial measured wind turbine dataset, a digital twin model based on wind power generation is constructed using digital twin technology, including:
[0012] Obtain the characteristic dataset of the wind turbine generators in the offshore wind farm to be configured; process the initial measured wind energy dataset and the initial measured wind turbine dataset to obtain the target measured wind energy dataset and the target measured wind turbine dataset; construct a physical system model based on wind power generation based on the target measured wind turbine dataset and the characteristic dataset; construct a digital twin model based on wind power generation based on the target measured wind energy dataset and the physical system model based on wind power generation.
[0013] This invention constructs a digital twin model of wind power generation by combining the characteristic dataset of wind turbine generators in the offshore wind farm to be configured. This can improve the accuracy of the model and thus provide support for improving the accuracy of determining the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured.
[0014] In one optional implementation, before processing the initial forecast wind energy dataset using a preset offshore wind energy prediction model to obtain the predicted wind energy dataset for the offshore wind farm to be configured, the method further includes:
[0015] Obtain the first historical measured wind energy dataset and the historical forecast wind energy dataset of the offshore wind farm to be configured; determine the second historical measured wind energy dataset corresponding to the historical forecast wind energy dataset from the first historical measured wind energy dataset; construct a preset offshore wind energy prediction model based on the historical forecast wind energy dataset and the second historical measured wind energy dataset.
[0016] In one optional implementation, the adjustment rate is determined based on the predicted wind energy dataset and a preset adjustment period, including:
[0017] Based on the predicted wind energy dataset and the preset adjustment cycle, the predicted wind energy coefficient is determined; the predicted wind energy coefficient is compared with the preset threshold, and the adjustment rate is determined based on the comparison results.
[0018] In one optional implementation, within a preset adjustment period, the layout of each wind turbine in the wind power-based predictive twin model is adjusted based on the predicted wind energy dataset and the adjustment rate until the simulated total power generation of the offshore wind farm to be configured is maximized, thus obtaining the target layout of the wind turbine group within the offshore wind farm to be configured and the target orientation of each wind turbine, including:
[0019] Within a preset adjustment period, the positions of each wind turbine and the distances between different wind turbines in the wind power-based predictive twin model are adjusted based on the predicted wind energy dataset and the adjustment rate, resulting in multiple layouts of the wind turbine group within the offshore wind farm to be configured and multiple first simulated total power generation. Based on the multiple first simulated total power generation, a target layout of the wind turbine group within the offshore wind farm to be configured is determined among the multiple layouts, where the simulated total power generation generated by the wind turbine group within the offshore wind farm to be configured under the target layout is the largest among the multiple first simulated total power generation. Based on the target layout, the target turning rate of each wind turbine within the offshore wind farm to be configured is determined. Based on the target layout and the target turning rate of each wind turbine, the orientation of each wind turbine is adjusted in the wind power-based predictive twin model, resulting in multiple second simulated total power generation and multiple first orientations of each wind turbine. Based on the multiple second simulated total power generation, a target orientation of each wind turbine within the offshore wind farm to be configured is determined among the multiple first orientations, where the simulated total power generation generated by the offshore wind farm to be configured under the target orientation of each wind turbine is the largest among the multiple second simulated total power generation.
[0020] This invention, by using a target turning rate, can simultaneously adjust the wind turbine group within the offshore wind farm to its optimal layout and the individual wind turbines within the offshore wind farm to their optimal orientation. This enables simultaneous adjustment of both the turbine position and orientation, thereby improving the efficiency of wind power generation.
[0021] In one alternative implementation, based on the target layout, the target steering rate of each wind turbine within the offshore wind farm to be configured is determined, including:
[0022] Obtain the measured location and orientation of each wind turbine within the offshore wind farm to be configured; based on the target layout, adjust the orientation of each wind turbine in a predictive twin model based on wind power generation to obtain multiple third simulated total power generation and multiple second orientations of each wind turbine; based on the multiple third simulated total power generation, determine the third orientation of each wind turbine within the offshore wind farm to be configured from among the multiple second orientations, where the simulated total power generation generated by the offshore wind farm to be configured under each wind turbine's third orientation is the largest among the multiple third simulated total power generation; based on the measured orientation and third orientation of each wind turbine, determine the turning angle of each wind turbine; based on the target layout and measured location, determine the adjustment time for each wind turbine; based on the adjustment time and turning angle of each wind turbine, determine the target turning rate of each wind turbine.
[0023] In a second aspect, the present invention provides an offshore wind farm resource allocation device, the device comprising:
[0024] The system comprises the following modules: an acquisition module for acquiring the initial measured wind energy dataset, initial measured wind turbine dataset, and initial forecast wind energy dataset for the offshore wind farm to be configured; a construction module for constructing a predictive twin model of wind power generation based on the initial measured wind energy dataset, initial measured wind turbine dataset, and initial forecast wind energy dataset, which is used to obtain the simulated total power generation generated by different wind turbine layouts within the offshore wind farm to be configured under the conditions of the predicted wind energy dataset; a determination module for determining the adjustment rate based on the predicted wind energy dataset and a preset adjustment period; and an adjustment module for adjusting the layout of each wind turbine in the predictive twin model of wind power generation within the preset adjustment period based on the predicted wind energy dataset and the adjustment rate, until the simulated total power generation generated by the offshore wind farm to be configured is maximized, thus obtaining the target layout of the wind turbine group and the target orientation of each wind turbine within the offshore wind farm to be configured.
[0025] Thirdly, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to perform the offshore wind farm resource allocation method of the first aspect or any corresponding embodiment described above.
[0026] Fourthly, the present invention provides a computer-readable storage medium storing computer instructions for causing a computer to execute the offshore wind farm resource allocation method of the first aspect or any corresponding embodiment described above. Attached Figure Description
[0027] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0028] Figure 1 This is a flowchart illustrating the offshore wind farm resource allocation method according to an embodiment of the present invention;
[0029] Figure 2 This is a flowchart illustrating another method for allocating resources in an offshore wind farm according to an embodiment of the present invention;
[0030] Figure 3 This is a flowchart illustrating another method for allocating resources in an offshore wind farm according to an embodiment of the present invention;
[0031] Figure 4 This is a structural block diagram of an offshore wind farm resource allocation device according to an embodiment of the present invention;
[0032] Figure 5 This is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. Detailed Implementation
[0033] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0034] This invention provides a method for resource allocation in offshore wind farms. By adjusting the layout of individual wind turbines in a predictive twin model based on wind power generation at different adjustment rates, it helps ensure the stability of the wind turbine group during movement and enables a targeted adjustment mechanism for wind turbines based on different wind resource conditions. Furthermore, based on the established predictive twin model based on wind power generation, the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured can be obtained, realizing simultaneous adjustment of wind turbine position and orientation. This maximizes the utilization of offshore wind resources and improves the efficiency of wind power generation.
[0035] According to an embodiment of the present invention, an embodiment of a method for resource allocation in offshore wind farms is provided. It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions. Furthermore, although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in a different order than that shown here.
[0036] This embodiment provides a method for resource allocation in offshore wind farms. Figure 1 This is a flowchart of an offshore wind farm resource allocation method according to an embodiment of the present invention, such as... Figure 1 As shown, the process includes the following steps:
[0037] Step S101: Obtain the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset for the offshore wind farm to be configured.
[0038] Specifically, the initial measured wind energy dataset represents the wind energy data of the offshore wind farm to be configured obtained from the current measurements, which may include data such as wind speed, wind direction, wind speed frequency distribution, wind energy density, wind energy potential, and wind resource distribution.
[0039] Among them, wind speed and wind direction represent the speed and direction of the wind; wind speed frequency distribution represents the frequency of wind occurrence within different wind speed ranges; wind energy density represents the average energy of wind per unit area or volume; wind energy potential represents the estimated value of wind energy in a given area or specific location; and wind resource distribution represents the spatial distribution of wind energy in a specific region or wind farm.
[0040] Furthermore, the initial measured wind turbine dataset represents the wind turbine data of the offshore wind farm to be configured obtained from the current measurements, which may include data such as rated power, rated wind speed, cut-in and cut-out wind speeds, power curves, and wind direction performance.
[0041] Among them, rated power represents the power that the wind turbine can continuously and stably output under standard operating conditions; rated wind speed represents the minimum wind speed threshold at which the wind turbine starts generating electricity; cut-in and cut-out wind speeds represent the minimum wind speed threshold at which the wind turbine starts rotating and the maximum wind speed threshold at which the wind turbine stops generating electricity; power curve represents the output power of the wind turbine under different wind speeds; and wind direction performance represents the power generation performance and efficiency of the wind turbine under different wind direction conditions.
[0042] Furthermore, the initial forecast wind energy dataset represents the forecast wind energy data at sea at different time periods, which can be obtained from meteorological forecast data from weather stations.
[0043] Step S102: Based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset, construct a predictive twin model based on wind power generation.
[0044] Among them, the predictive twin model based on wind power generation can be used to obtain the simulated total power generation generated by different wind turbine layouts in the offshore wind farm to be configured under the condition of predictive wind energy dataset.
[0045] Specifically, by obtaining the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset, a corresponding predictive twin model based on wind power generation can be constructed.
[0046] Step S103: Determine the adjustment rate based on the predicted wind energy dataset and the preset adjustment cycle.
[0047] Specifically, this can be achieved by adjusting the wind turbine group at a fixed rate, but this method may damage the turbines themselves when the wind energy is unstable.
[0048] Therefore, in this embodiment, the corresponding adjustment rate is determined by predicting the wind energy dataset and the preset adjustment cycle. Then, by using different adjustment rates, support can be provided for the adjustment of subsequent wind turbine groups.
[0049] Step S104: Within a preset adjustment period, the layout of each wind turbine in the wind power generation prediction twin model is adjusted based on the predicted wind energy dataset and the adjustment rate until the simulated total power generation of the offshore wind farm to be configured is maximized, thus obtaining the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured.
[0050] Specifically, within a preset adjustment period, the layout of each wind turbine is adjusted by combining the predicted wind energy dataset and the adjustment rate. This ensures the stability of the wind turbine group during movement and enables a targeted adjustment mechanism for the turbines based on different wind resource conditions. Furthermore, the adjustment process is carried out within a constructed predictive twin model based on wind power generation, allowing for simultaneous adjustment of both turbine location and orientation. This maximizes the utilization of offshore wind resources and improves the efficiency of wind power generation.
[0051] The offshore wind farm resource allocation method provided in this embodiment determines different adjustment rates by combining predicted wind energy datasets and preset adjustment cycles. These determined adjustment rates are then used to adjust the layout of each wind turbine in a predictive twin model based on wind power generation. This helps ensure the stability of the wind turbine group during movement and enables a targeted adjustment mechanism for the turbines based on different wind resource conditions. Furthermore, based on the established predictive twin model based on wind power generation, the target layout of the wind turbine group within the offshore wind farm to be configured and the target orientation of each turbine can be obtained. This allows for simultaneous adjustment of turbine location and orientation, thereby maximizing the utilization of offshore wind resources and improving the efficiency of wind power generation.
[0052] This embodiment provides a method for resource allocation in offshore wind farms. Figure 2 This is a flowchart of an offshore wind farm resource allocation method according to an embodiment of the present invention, such as... Figure 2 As shown, the process includes the following steps:
[0053] Step S201: Obtain the initial measured wind energy dataset, initial measured wind turbine dataset, and initial forecasted wind energy dataset for the offshore wind farm to be configured. For details, please refer to [link to relevant documentation]. Figure 1 Step S101 of the illustrated embodiment will not be described again here.
[0054] Step S202: Based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset, construct a predictive twin model based on wind power generation.
[0055] Specifically, step S202 includes:
[0056] Step S2021: Based on the initial measured wind energy dataset and the initial measured wind turbine dataset, construct a digital twin model based on wind power generation using digital twin technology.
[0057] Digital twin technology refers to a technology that fully utilizes data such as physical models, sensor updates, and operational history to integrate a simulation process involving multiple disciplines, physical quantities, scales, and probabilities, and completes mapping in virtual space to reflect the entire life cycle of the corresponding physical equipment.
[0058] Specifically, by combining the initial measured wind energy dataset and the initial measured wind turbine data using digital twin technology, a digital twin model based on wind power generation can be constructed that reflects the simulation layout of the wind turbine group of the offshore wind farm to be configured and its entire life cycle.
[0059] Step S2022: Obtain the first historical measured wind energy dataset and the historical forecast wind energy dataset of the offshore wind farm to be configured.
[0060] Specifically, the first historical measured wind energy dataset represents the wind energy data of the offshore wind farm to be configured within a historical period; the historical forecast wind energy dataset represents the forecast wind energy data of the offshore wind farm to be configured in different historical periods, which can be obtained from the historical weather forecast data of the meteorological station.
[0061] Step S2023: Determine the historical second measured wind energy dataset corresponding to the historical forecast wind energy dataset from the historical first measured wind energy dataset.
[0062] Specifically, based on the historical forecast wind energy dataset, the corresponding actual wind energy data, namely the historical second measured wind energy dataset, is determined from the first historical measured wind energy dataset.
[0063] Step S2024: Based on the historical forecast wind energy dataset and the second historical measured wind energy dataset, construct a preset offshore wind energy prediction model.
[0064] Specifically, by using the historical forecast wind energy dataset as the input value of the model and the second historical measured wind energy dataset as the output value of the model, and by combining the correspondence between the historical forecast wind energy dataset and the second historical measured wind energy dataset for model training, a preset offshore wind energy prediction model for predicting wind energy data can be constructed.
[0065] Step S2025: The initial forecast wind energy dataset is processed by a preset offshore wind energy prediction model to obtain the predicted wind energy dataset of the offshore wind farm to be configured.
[0066] Specifically, by inputting the initial forecast wind energy dataset into a pre-trained offshore wind energy prediction model, wind energy data corresponding to the initial forecast wind energy dataset can be predicted, i.e., the predicted wind energy dataset.
[0067] Step S2026: Based on the predicted wind energy dataset and the digital twin model based on wind power generation, construct a predicted twin model based on wind power generation.
[0068] Specifically, by inputting the predicted wind energy dataset into the constructed digital twin model, a predicted twin model based on wind power generation can be obtained.
[0069] In some optional implementations, step S2021 above includes:
[0070] Step a1: Obtain the characteristic dataset of the wind turbine generators in the offshore wind farm to be configured.
[0071] Step a2: Process the initial measured wind energy dataset and the initial measured wind turbine dataset to obtain the target measured wind energy dataset and the target measured wind turbine dataset.
[0072] Step a3: Based on the target measured wind turbine dataset and characteristic dataset, construct a physical system model based on wind power generation.
[0073] Step a4: Based on the target measured wind energy dataset and the physical system model based on wind power generation, construct a digital twin model based on wind power generation.
[0074] Specifically, outlier processing, missing value processing, and normalization processing are performed on the initial measured wind energy dataset and the initial measured wind turbine dataset to obtain the corresponding usable target measured wind energy dataset and target measured wind turbine dataset.
[0075] Outlier handling is used to clean up abnormal data, and methods such as absolute median outlier handling can be used; missing value handling is used to fill in missing data, and methods such as statistical imputation can be used; normalization is used to standardize the data format, and methods such as Z-Score normalization can be used.
[0076] Furthermore, by utilizing the processed target measured wind turbine dataset and combining it with the obtained characteristic dataset of wind turbine generator sets, a corresponding physical system model based on wind power generation, including the structure of the wind turbine and the generator set, can be constructed.
[0077] Furthermore, the processed target measured wind energy dataset is correlated with the constructed physical system model based on wind power generation, and the target measured wind energy dataset is aligned or calibrated with the model of the physical system model based on wind power generation, and a corresponding digital twin model based on wind power generation is constructed.
[0078] Among them, the digital twin model based on wind power generation is used to simulate the input conditions of wind energy, simulate the power output and other performance indicators of wind turbines, compare and verify with the actual operation data of wind power generation systems, and adjust and optimize the model according to the verification results. The subsequently collected wind turbine data and wind energy data are connected to the digital twin model to update the model's input parameters in real time.
[0079] Step S203: Determine the adjustment rate based on the predicted wind energy dataset and the preset adjustment cycle. For details, please refer to [link to relevant documentation]. Figure 1 Step S103 of the illustrated embodiment will not be described again here.
[0080] Step S204: Within a preset adjustment period, the layout of each wind turbine in the predictive twin model based on wind power generation is adjusted according to the predicted wind energy dataset and the adjustment rate until the simulated total power generation of the offshore wind farm to be configured is maximized, thus obtaining the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured. For details, please refer to... Figure 1 Step S104 of the illustrated embodiment will not be described again here.
[0081] The offshore wind farm resource allocation method provided in this embodiment constructs a digital twin model based on wind power generation by combining the characteristic dataset of wind turbine generators in the offshore wind farm to be configured. This can improve the accuracy of the model. Furthermore, based on the digital twin model based on wind power generation and combined with predicted wind energy data, a corresponding predictive twin model based on wind power generation can be constructed. Through this predictive twin model based on wind power generation, the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured can be obtained. This enables simultaneous adjustment of the wind turbine position and orientation, thereby maximizing the utilization of offshore wind resources and improving the efficiency of wind power generation.
[0082] This embodiment provides a method for resource allocation in offshore wind farms. Figure 3 This is a flowchart of an offshore wind farm resource allocation method according to an embodiment of the present invention, such as... Figure 3 As shown, the process includes the following steps:
[0083] Step S301: Obtain the initial measured wind energy dataset, initial measured wind turbine dataset, and initial forecasted wind energy dataset for the offshore wind farm to be configured. For details, please refer to [link to relevant documentation]. Figure 1 Step S101 of the illustrated embodiment will not be described again here.
[0084] Step S302: Based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecasted wind energy dataset, construct a predictive twin model for wind power generation. For details, please refer to [link to details]. Figure 2 Step S202 of the illustrated embodiment will not be described again here.
[0085] Step S303: Determine the adjustment rate based on the predicted wind energy dataset and the preset adjustment cycle.
[0086] Specifically, step S303 includes:
[0087] Step S3031: Determine the predicted wind energy coefficient based on the predicted wind energy dataset and the preset adjustment cycle.
[0088] First, obtain the number of wind direction changes in the predicted wind energy dataset within a preset adjustment period and label them as F. x .
[0089] Among them, the number of wind direction changes indicates the number of times the wind direction changes within a preset adjustment period.
[0090] Secondly, the corresponding predicted wind speed can be obtained from the predicted wind energy data and labeled as F. s .
[0091] Then, the obtained predicted wind speed F s Number of wind direction changes F x Set wind energy weights separately: For the predicted wind speed F s The wind energy weight is set to Q. s The number of wind direction changes F x The wind energy weight is set to Q. x .
[0092] Finally, the predicted wind energy coefficient R is calculated according to the following relationship (1):
[0093] R = F x Q x +F s Q s (1)
[0094] Step S3032: Compare the predicted wind energy coefficient with the preset threshold, and determine the adjustment rate based on the comparison results.
[0095] Specifically, the predicted wind energy coefficient R is compared with a preset threshold R0. When R≤R0, the predicted wind energy coefficient R is marked as stable wind energy; when R>R0, the predicted wind energy coefficient R is marked as unstable wind energy.
[0096] Furthermore, when the predicted wind energy coefficient R is labeled as stable wind energy, the adjustment rate is determined to be a high adjustment rate; when the predicted wind energy coefficient R is labeled as unstable wind energy, the adjustment rate is determined to be a low adjustment rate.
[0097] Step S304: Within a preset adjustment period, the layout of each wind turbine in the wind power generation prediction twin model is adjusted based on the predicted wind energy dataset and the adjustment rate until the simulated total power generation of the offshore wind farm to be configured is maximized, thus obtaining the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured.
[0098] Specifically, step S304 includes:
[0099] Step S3041: Within a preset adjustment period, the positions of each wind turbine and the distances between different wind turbines in the wind power generation prediction twin model are adjusted based on the predicted wind energy dataset and the adjustment rate to obtain multiple layouts of the wind turbine group in the offshore wind farm to be configured and multiple first simulated total power generation.
[0100] Specifically, in the predictive twin model based on wind power generation, the location of each wind turbine in the offshore wind farm to be configured and the distance between different wind turbines are adjusted according to the predicted wind energy dataset and the adjustment rate. The simulated power generation of each wind turbine after each adjustment can be obtained. Then, the simulated total power generation of the wind turbine group in the offshore wind farm to be configured can be obtained based on the simulated power generation of each wind turbine.
[0101] Furthermore, by making multiple adjustments within a preset adjustment period, multiple layouts of the wind turbine groups in the offshore wind farm to be configured and multiple first simulated total power generation can be obtained.
[0102] Step S3042: Based on multiple first simulated total power generation, determine the target layout of the wind turbine group in the offshore wind farm to be configured among multiple layouts.
[0103] Specifically, a line graph is constructed based on the obtained first simulated total power generation, and the maximum simulated total power generation can be obtained based on the constructed line graph.
[0104] Furthermore, the positions of each wind turbine are recorded when the maximum simulated total power generation is achieved. The recorded positions of each wind turbine are marked as the optimal layout of the wind turbine group, that is, the simulated total power generation generated by the wind turbine group in the offshore wind farm to be configured under the target layout is the largest among multiple first simulated total power generation.
[0105] Step S3043: Based on the target layout, determine the target turning rate of each wind turbine in the offshore wind farm to be configured.
[0106] Specifically, based on the optimal layout of the wind turbine group, the target turning rate of each wind turbine in the offshore wind farm to be configured can be further determined.
[0107] Step S3044: Based on the target layout and the target turning rate of each wind turbine, the orientation of each wind turbine is adjusted in the predictive twin model based on wind power generation to obtain multiple second simulated total power generation and multiple first orientations of each wind turbine.
[0108] Specifically, based on the optimal layout of the wind turbine group, the orientation of each wind turbine is adjusted in the predictive twin model based on wind power generation using the determined target turning rate of each wind turbine. The simulated power generation of each wind turbine in different orientations can be obtained, and then the simulated total power generation of the wind turbine group in the offshore wind farm to be configured can be obtained based on the simulated power generation of each wind turbine.
[0109] Furthermore, by making multiple adjustments within a preset adjustment period, multiple second simulated total power generation of the wind turbine group in the offshore wind farm to be configured and multiple first orientations of each wind turbine can be obtained after adjustment.
[0110] Step S3045: Based on multiple second simulated total power generation, determine the target orientation of each wind turbine in the offshore wind farm to be configured from multiple first orientations.
[0111] Specifically, based on the obtained multiple second simulated total power generation, the maximum second simulated total power generation can be obtained, and the operating point of the maximum second simulated total power generation is marked as the maximum power point. The orientation of the wind turbine at the maximum power point is obtained and marked as the optimal orientation, i.e., the target orientation.
[0112] In some optional implementations, step S3043 above includes:
[0113] Step b1: Obtain the measured location and orientation of each wind turbine in the offshore wind farm to be configured.
[0114] Step b2: Based on the target layout, adjust the orientation of each wind turbine in the predictive twin model based on wind power generation to obtain multiple third simulated total power generation and multiple second orientations of each wind turbine.
[0115] Step b3: Based on multiple third simulated total power generation, determine the third orientation of each wind turbine in the offshore wind farm to be configured among multiple second orientations.
[0116] Step b4: Determine the turning angle of each fan based on the measured orientation and third orientation of each fan.
[0117] Step b5: Based on the target layout and measured location, determine the adjustment time for each fan.
[0118] Step b6: Determine the target turning rate of each fan based on the adjustment time and turning angle of each fan.
[0119] First, based on the optimal layout of the wind turbine group, the orientation of each wind turbine is randomly adjusted in the predictive twin model based on wind power generation. This allows us to obtain the simulated power generation of each wind turbine in different orientations. Then, based on the simulated power generation of each wind turbine, we can obtain the simulated total power generation of the wind turbine group in the offshore wind farm to be configured.
[0120] Furthermore, by making multiple adjustments within a preset adjustment period, multiple third-simulated total power generation of the wind turbine group in the offshore wind farm to be configured and multiple second orientations of each wind turbine can be obtained after adjustment.
[0121] Secondly, based on the obtained multiple third simulated total power generation, the maximum third simulated total power generation can be obtained, and the operating point of the maximum third simulated total power generation is marked as the maximum power point. The orientation of the wind turbine at the maximum power point is obtained and marked as the optimal orientation under the current random adjustment.
[0122] Furthermore, based on the measured orientation of each wind turbine and the optimal orientation under the current random adjustment conditions, the minimum rotation angle required for each wind turbine to adjust to the optimal orientation can be obtained, i.e., the turning angle, and denoted as Z. j .
[0123] Then, based on the measured location of each wind turbine and its position in the target layout, the adjustment distance for each wind turbine to be adjusted to the target layout can be obtained.
[0124] Furthermore, the adjustment time can be obtained based on the adjustment distance and its corresponding adjustment rate, and denoted as T. s .
[0125] Finally, based on the adjustment time and turning angle of each wind turbine, the target turning rate Z of each wind turbine can be obtained. s The following relationship (2) is shown:
[0126]
[0127] The offshore wind farm resource allocation method provided in this embodiment determines different adjustment rates by combining predicted wind energy datasets and preset adjustment cycles. The determined adjustment rates are then used to adjust the layout of each wind turbine in a predictive twin model based on wind power generation. This helps ensure the stability of the wind turbine group during movement and enables a targeted adjustment mechanism for the turbines based on different wind resource conditions. Furthermore, by using the target turning rate, the individual wind turbines within the offshore wind farm can be adjusted to their optimal orientation simultaneously while adjusting the wind turbine group to its optimal layout. This allows for simultaneous adjustment of both turbine position and orientation, improving the efficiency of wind power generation.
[0128] This embodiment also provides an offshore wind farm resource allocation device, which is used to implement the above embodiments and preferred embodiments; details already described will not be repeated. As used below, the term "module" can refer to a combination of software and / or hardware that performs a predetermined function. Although the device described in the following embodiments is preferably implemented in software, hardware implementation, or a combination of software and hardware, is also possible and contemplated.
[0129] This embodiment provides a resource allocation device for offshore wind farms, such as... Figure 4 As shown, the device includes:
[0130] The acquisition module 401 is used to acquire the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset of the offshore wind farm to be configured.
[0131] Module 402 is used to construct a predictive twin model of wind power generation based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset. The predictive twin model of wind power generation is used to obtain the simulated total power generation generated by different wind turbine layouts in the offshore wind farm to be configured under the condition of the forecast wind energy dataset.
[0132] The determination module 403 is used to determine the adjustment rate based on the predicted wind energy dataset and the preset adjustment cycle.
[0133] The adjustment module 404 is used to adjust the layout of each wind turbine in the wind power generation prediction twin model based on the predicted wind energy dataset and the adjustment rate within a preset adjustment period, until the simulated total power generation of the offshore wind farm to be configured is maximized, and then obtain the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured.
[0134] In some alternative implementations, building module 402 includes:
[0135] The first construction submodule is used to build a digital twin model of wind power generation based on the initial measured wind energy dataset and the initial measured wind turbine dataset using digital twin technology.
[0136] The processing submodule is used to process the initial forecast wind energy dataset through a preset offshore wind energy prediction model to obtain the predicted wind energy dataset of the offshore wind farm to be configured.
[0137] The second construction submodule is used to build a predictive twin model based on wind power generation, based on the predicted wind energy dataset and the digital twin model based on wind power generation.
[0138] In some alternative implementations, the first construction submodule includes:
[0139] The first acquisition unit is used to acquire the characteristic dataset of wind turbine generators in the offshore wind farm to be configured.
[0140] The processing unit is used to process the initial measured wind energy dataset and the initial measured wind turbine dataset respectively to obtain the target measured wind energy dataset and the target measured wind turbine dataset.
[0141] The first building unit is used to construct a physical system model based on wind power generation, based on the target measured wind turbine dataset and characteristic dataset.
[0142] The second building unit is used to construct a digital twin model of wind power generation based on the target measured wind energy dataset and the physical system model of wind power generation.
[0143] In some alternative implementations, building module 402 further includes:
[0144] The acquisition submodule is used to acquire the historical first measured wind energy dataset and the historical forecast wind energy dataset of the offshore wind farm to be configured.
[0145] The first determination submodule is used to determine the historical second measured wind energy dataset corresponding to the historical forecast wind energy dataset in the historical first measured wind energy dataset.
[0146] The third construction submodule is used to build a preset offshore wind energy prediction model based on historical forecast wind energy datasets and historical second measured wind energy datasets.
[0147] In some alternative implementations, the determining module 403 includes:
[0148] The second determination submodule is used to determine the predicted wind energy coefficient based on the predicted wind energy dataset and the preset adjustment cycle.
[0149] The comparison and determination submodule is used to compare the predicted wind energy coefficient with the preset threshold and determine the adjustment rate based on the comparison results.
[0150] In some alternative implementations, the adjustment module 404 includes:
[0151] The first adjustment submodule is used to adjust the position of each wind turbine and the distance between different wind turbines in the wind power generation prediction twin model based on the predicted wind energy dataset and the adjustment rate within a preset adjustment period, so as to obtain multiple layouts of wind turbine groups in the offshore wind farm to be configured and multiple first simulated total power generation.
[0152] The third determination submodule is used to determine the target layout of the wind turbine group in the offshore wind farm to be configured among multiple layouts based on multiple first simulated total power generation. The simulated total power generation generated by the wind turbine group in the offshore wind farm to be configured under the target layout is the largest among multiple first simulated total power generation.
[0153] The fourth determination submodule is used to determine the target turning rate of each wind turbine in the offshore wind farm to be configured based on the target layout.
[0154] The second adjustment submodule is used to adjust the orientation of each wind turbine in the predictive twin model based on wind power generation, based on the target layout and the target turning rate of each wind turbine, to obtain multiple second simulated total power generation and multiple first orientations of each wind turbine.
[0155] The fifth determination submodule is used to determine the target orientation of each wind turbine in the offshore wind farm to be configured based on multiple second simulated total power generation and multiple first orientations. The simulated total power generation generated by the offshore wind farm to be configured under the target orientation of each wind turbine is the largest among multiple second simulated total power generation.
[0156] In some alternative implementations, the fourth determining submodule includes:
[0157] The second acquisition unit is used to acquire the measured location and measured orientation of each wind turbine in the offshore wind farm to be configured.
[0158] The adjustment unit is used to adjust the orientation of each wind turbine in a predictive twin model based on wind power generation, based on the target layout, to obtain multiple third simulated total power generation and multiple second orientations of each wind turbine.
[0159] The first determining unit is used to determine the third orientation of each wind turbine in the offshore wind farm to be configured based on multiple third simulated total power generation among multiple second orientations, wherein the simulated total power generation generated by the offshore wind farm to be configured under the third orientation of each wind turbine is the largest among multiple third simulated total power generation.
[0160] The second determining unit is used to determine the turning angle of each wind turbine based on the measured orientation and the third orientation of each wind turbine.
[0161] The third determining unit is used to determine the adjustment time of each wind turbine based on the target layout and measured location.
[0162] The fourth determining unit is used to determine the target turning rate of each wind turbine based on the adjustment time and turning angle of each wind turbine.
[0163] Further functional descriptions of the above modules and units are the same as those in the corresponding embodiments described above, and will not be repeated here.
[0164] In this embodiment, the offshore wind farm resource allocation device is presented in the form of a functional unit. Here, a unit refers to an ASIC (Application Specific Integrated Circuit), a processor and memory that execute one or more software or fixed programs, and / or other devices that can provide the above functions.
[0165] This invention also provides a computer device having the above-described features. Figure 4 The offshore wind farm resource allocation device shown.
[0166] Please see Figure 5 , Figure 5 This is a schematic diagram of the structure of a computer device provided in an optional embodiment of the present invention, such as... Figure 5 As shown, the computer device includes one or more processors 10, memory 20, and interfaces for connecting the components, including high-speed interfaces and low-speed interfaces. The components communicate with each other via different buses and can be mounted on a common motherboard or otherwise installed as needed. The processors can process instructions executed within the computer device, including instructions stored in or on memory to display graphical information of a GUI on external input / output devices (such as display devices coupled to the interfaces). In some alternative implementations, multiple processors and / or multiple buses can be used with multiple memories and multiple memory modules, if desired. Similarly, multiple computer devices can be connected, each providing some of the necessary operations (e.g., as a server array, a group of blade servers, or a multiprocessor system). Figure 5 Take a processor 10 as an example.
[0167] Processor 10 may be a central processing unit, a network processor, or a combination thereof. Processor 10 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit (ASIC), a programmable logic device (PLD), or a combination thereof. The programmable logic device may be a complex programmable logic device (CAMP), a field-programmable gate array (FPGA), a general-purpose array logic (GDA), or any combination thereof.
[0168] The memory 20 stores instructions executable by at least one processor 10 to cause at least one processor 10 to perform the method shown in the above embodiments.
[0169] The memory 20 may include a program storage area and a data storage area. The program storage area may store the operating system and applications required for at least one function; the data storage area may store data created based on the use of the computer device. Furthermore, the memory 20 may include high-speed random access memory and may also include non-transitory memory, such as at least one disk storage device, flash memory device, or other non-transitory solid-state storage device. In some alternative embodiments, the memory 20 may optionally include memory remotely located relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of such networks include, but are not limited to, the Internet, intranets, local area networks, mobile communication networks, and combinations thereof.
[0170] The memory 20 may include volatile memory, such as random access memory; the memory may also include non-volatile memory, such as flash memory, hard disk or solid-state drive; the memory 20 may also include a combination of the above types of memory.
[0171] The computer device also includes a communication interface 30 for communicating with other devices or communication networks.
[0172] This invention also provides a computer-readable storage medium. The methods described above according to embodiments of the invention can be implemented in hardware or firmware, or implemented as computer code that can be recorded on a storage medium, or implemented as computer code downloaded via a network and originally stored on a remote storage medium or a non-transitory machine-readable storage medium and then stored on a local storage medium. Thus, the methods described herein can be processed by software stored on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. The storage medium can be a magnetic disk, optical disk, read-only memory, random access memory, flash memory, hard disk, or solid-state drive, etc.; further, the storage medium can also include combinations of the above types of memory. It is understood that computers, processors, microprocessor controllers, or programmable hardware include storage components capable of storing or receiving software or computer code, which, when accessed and executed by the computer, processor, or hardware, implements the methods shown in the above embodiments.
[0173] Although embodiments of the invention have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations all fall within the scope defined by the appended claims.
Claims
1. A method of offshore wind farm resource configuration, characterized in that, The method includes: Obtain the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset for the offshore wind farm to be configured; Based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset, a predictive twin model based on wind power generation is constructed. The predictive twin model based on wind power generation is used to obtain the simulated total power generation generated by different wind turbine layouts in the offshore wind farm to be configured under the condition of the predicted wind energy dataset. The adjustment rate is determined based on the predicted wind energy dataset and the preset adjustment cycle; Within the preset adjustment period, the layout of each wind turbine in the wind power-based predictive twin model is adjusted based on the predicted wind energy dataset and the adjustment rate until the simulated total power generation of the offshore wind farm to be configured is maximized, thus obtaining the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured. The determination of the adjustment rate based on the predicted wind energy dataset and the preset adjustment period includes: Based on the predicted wind energy dataset and the preset adjustment period, the predicted wind energy coefficient is determined; the predicted wind energy coefficient is compared with the preset threshold, and the adjustment rate is determined based on the comparison result. Within the preset adjustment period, the layout of each wind turbine in the wind power-based predictive twin model is adjusted based on the predicted wind energy dataset and the adjustment rate until the simulated total power generation generated by the offshore wind farm to be configured is maximized. This process yields the target layout of the wind turbine group within the offshore wind farm to be configured and the target orientation of each wind turbine, including: Within the preset adjustment period, the positions of each wind turbine and the distances between different wind turbines in the wind power-based predictive twin model are adjusted based on the predicted wind energy dataset and the adjustment rate, resulting in multiple layouts and multiple first simulated total power generation for the wind turbine group within the offshore wind farm to be configured. Based on the multiple first simulated total power generation, a target layout for the wind turbine group within the offshore wind farm to be configured is determined from the multiple layouts, wherein the simulated total power generation generated by the wind turbine group within the offshore wind farm to be configured under the target layout is the largest among the multiple first simulated total power generation. The target layout determines the target turning rate of each wind turbine in the offshore wind farm to be configured; based on the target layout and the target turning rate of each wind turbine, the orientation of each wind turbine is adjusted in the predictive twin model based on wind power generation to obtain multiple second simulated total power generation and multiple first orientations of each wind turbine; based on the multiple second simulated total power generation, the target orientation of each wind turbine in the offshore wind farm to be configured is determined among the multiple first orientations, and the simulated total power generation generated by the offshore wind farm to be configured under the target orientation of each wind turbine is the largest among the multiple second simulated total power generation; Based on the target layout, the target turning rate of each wind turbine in the offshore wind farm to be configured is determined, including: Obtain the measured location and measured orientation of each wind turbine in the offshore wind farm to be configured; Based on the target layout, the orientation of each wind turbine is adjusted in the wind power-based predictive twin model to obtain multiple third simulated total power generation and multiple second orientations of each wind turbine. Based on the plurality of third simulated total power generation, the third orientation of each wind turbine in the offshore wind farm to be configured is determined among the plurality of second orientations, and the simulated total power generation generated by the offshore wind farm to be configured under the third orientation of each wind turbine is the largest among the plurality of third simulated total power generation. Based on the measured orientation and the third orientation of each wind turbine, the turning angle of each wind turbine is determined; Based on the target layout and the measured location, the adjustment time for each fan is determined; Based on the adjustment time and the turning angle of each wind turbine, the target turning rate of each wind turbine is determined.
2. The method of claim 1, wherein, Based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecasted wind energy dataset, a predictive twin model for wind power generation is constructed, including: Based on the initial measured wind energy dataset and the initial measured wind turbine dataset, a digital twin model based on wind power generation is constructed using digital twin technology; The initial forecast wind energy dataset is processed by a preset offshore wind energy prediction model to obtain the predicted wind energy dataset of the offshore wind farm to be configured. Based on the predicted wind energy dataset and the digital twin model based on wind power generation, the predicted twin model based on wind power generation is constructed.
3. The method of claim 2, wherein, Based on the initial measured wind energy dataset and the initial measured wind turbine dataset, a digital twin model of wind power generation is constructed using digital twin technology, including: Obtain the characteristic dataset of the wind turbine generators in the offshore wind farm to be configured; The initial measured wind energy dataset and the initial measured wind turbine dataset are processed respectively to obtain the target measured wind energy dataset and the target measured wind turbine dataset; Based on the target measured wind turbine dataset and the characteristic dataset, a physical system model based on wind power generation is constructed; Based on the target measured wind energy dataset and the physical system model based on wind power generation, a digital twin model based on wind power generation is constructed.
4. The method according to claim 2, characterized in that, Before processing the initial forecast wind energy dataset through a preset offshore wind energy prediction model to obtain the predicted wind energy dataset for the offshore wind farm to be configured, the method further includes: Obtain the historical first measured wind energy dataset and historical forecast wind energy dataset of the offshore wind farm to be configured; Determine the second historical measured wind energy dataset corresponding to the historical forecast wind energy dataset from the first historical measured wind energy dataset. Based on the historical forecast wind energy dataset and the historical second measured wind energy dataset, the preset offshore wind energy prediction model is constructed.
5. A resource allocation device for offshore wind farms, characterized in that, The device includes: The acquisition module is used to acquire the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset of the offshore wind farm to be configured. The construction module is used to construct a predictive twin model based on wind power generation based on the initial measured wind energy dataset, the initial measured wind turbine dataset, and the initial forecast wind energy dataset. The predictive twin model based on wind power generation is used to obtain the simulated total power generation generated by different wind turbine layouts in the offshore wind farm to be configured under the condition of the predicted wind energy dataset. The determination module is used to determine the adjustment rate based on the predicted wind energy dataset and the preset adjustment cycle; An adjustment module is used to adjust the layout of each wind turbine in the wind power-based predictive twin model within the preset adjustment period, based on the predicted wind energy dataset and the adjustment rate, until the simulated total power generation generated by the offshore wind farm to be configured is maximized, thus obtaining the target layout of the wind turbine group and the target orientation of each wind turbine in the offshore wind farm to be configured. The determining module includes: The second determining submodule is used to determine the predicted wind energy coefficient based on the predicted wind energy dataset and the preset adjustment period; the comparison and determining submodule is used to compare the predicted wind energy coefficient with the preset threshold and determine the adjustment rate based on the comparison result. The adjustment module includes: The first adjustment submodule is used to adjust the positions of each wind turbine and the distances between different wind turbines in the wind power generation-based predictive twin model within the preset adjustment period, based on the predicted wind energy dataset and the adjustment rate, to obtain multiple layouts and multiple first simulated total power generation of the wind turbine group in the offshore wind farm to be configured; the third determination submodule is used to determine the target layout of the wind turbine group in the offshore wind farm to be configured from the multiple layouts based on the multiple first simulated total power generation, wherein the simulated total power generation generated by the wind turbine group in the offshore wind farm to be configured under the target layout is the largest among the multiple first simulated total power generation; the fourth determination submodule is used. The system comprises: a first submodule for determining the target turning rate of each wind turbine in the offshore wind farm to be configured based on the target layout; a second adjustment submodule for adjusting the orientation of each wind turbine in the predictive twin model based on wind power generation based on the target layout and the target turning rate of each wind turbine, thereby obtaining multiple second simulated total power generation and multiple first orientations of each wind turbine; and a fifth determination submodule for determining the target orientation of each wind turbine in the offshore wind farm to be configured based on the multiple second simulated total power generation and among the multiple first orientations, wherein the simulated total power generation generated by the offshore wind farm to be configured under the target orientation of each wind turbine is the largest among the multiple second simulated total power generation. The fourth determining submodule includes: The second acquisition unit is used to acquire the measured position and measured orientation of each wind turbine in the offshore wind farm to be configured; the adjustment unit is used to adjust the orientation of each wind turbine in the predictive twin model based on wind power generation based on the target layout, to obtain multiple third simulated total power generation and multiple second orientations of each wind turbine; the first determination unit is used to determine the third orientation of each wind turbine in the offshore wind farm to be configured based on the multiple third simulated total power generation, among the multiple second orientations, wherein the simulated total power generation generated by the offshore wind farm to be configured under the third orientation of each wind turbine is the largest among the multiple third simulated total power generation; the second determination unit is used to determine the turning angle of each wind turbine based on the measured orientation and the third orientation; the third determination unit is used to determine the adjustment time of each wind turbine based on the target layout and the measured position; the fourth determination unit is used to determine the target turning rate of each wind turbine based on the adjustment time and the turning angle.
6. A computer device, characterized in that, include: The system includes a memory and a processor, which are interconnected. The memory stores computer instructions, and the processor executes the computer instructions to perform the offshore wind farm resource allocation method according to any one of claims 1 to 4.
7. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores computer instructions for causing the computer to execute the offshore wind farm resource allocation method according to any one of claims 1 to 4.
Citation Information
Patent Citations
Wind power generation prediction method and system based on digital twin energizing, and computer equipment
CN120409206A
Offshore wind farm resource configuration method and apparatus, computer device, and storage medium
WO2025102708A1