A steel-concrete composite rigid frame arch bridge encased in precast UHPC slabs

Through the combination of prefabricated UHPC panels and hollow steel tube truss arch rib segments, the problems of heavy concrete outsourcing, low construction efficiency and material waste of traditional steel tube concrete arch bridges are solved, achieving more efficient construction and better durability.

CN117845718BActive Publication Date: 2024-10-25CHONGQING JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410120374.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-10-25
Estimated Expiration
2044-01-29

AI Technical Summary

Technical Problem

Traditional concrete-filled steel tube rigid skeleton arch bridges have problems such as heavy weight, low construction efficiency, difficulty in quality assurance and material waste during the outer concrete pouring process. In particular, the precision requirements for the formwork are high and micro-cracks may affect the durability.

Method used

Prefabricated UHPC panels are used as the outer concrete, which are prefabricated in the factory and connected with cast-in-place joints at the construction site to reduce the amount of concrete pouring on site. Prefabricated UHPC webs, top plates and bottom plates are used, combined with hollow steel tube truss arch rib segments and bolts for fixation. Reduce self-weight and shrinkage creep, and reduce the use of formwork.

Benefits of technology

It significantly reduces the self-weight of the outer concrete, improves construction efficiency and quality, reduces material waste, extends the durability of the structure, and reduces later maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117845718B_ABST
    Figure CN117845718B_ABST
Patent Text Reader

Abstract

The invention discloses a steel tube concrete rigid skeleton outsourcing prefabricated UHPC plate arch bridge, belonging to the technical field of steel tube concrete rigid skeleton arch bridge. It comprises a steel tube concrete rigid skeleton arch rib segment, the steel tube concrete rigid skeleton arch rib segment is located at the four corners inside the steel tube concrete rigid skeleton outsourcing prefabricated UHPC plate arch rib segment, the steel tube concrete rigid skeleton outsourcing prefabricated UHPC plate arch rib segment comprises two web structures, the top and bottom of the two web structures are respectively connected to the top plate structure and the bottom plate structure through cast-in-place UHPC longitudinal joints and cast-in-place UHPC transverse joints. The invention prefabricates the rigid skeleton outsourcing concrete into UHPC plates and then transports them to the site for assembly, adopts UHPC as outsourcing concrete to reduce the deadweight of the structure, so that it has the potential to develop to a larger span; at the same time, the assembly construction method is adopted to improve the construction efficiency, ensure the quality of outsourcing UHPC, reduce the shrinkage creep of outsourcing concrete, save investment costs, and has good technical, environmental protection and economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel tube concrete rigid skeleton arch bridges, and in particular to a steel tube concrete rigid skeleton arch bridge wrapped with prefabricated UHPC plates. Background Art

[0002] my country's basic transportation infrastructure network is constantly developing towards the western mountainous areas. Arch bridges are a very suitable bridge type in the mountainous terrain of the western region. Based on this background, rigid skeleton arch bridges have been widely used in my country due to their high strength, high rigidity, strong spanning capacity and good durability. Steel tube concrete rigid skeleton arch bridge uses steel tube concrete as a rigid skeleton, hangs formwork on it, and casts the arch ring concrete symmetrically and evenly in rings, segments and layers, and finally closes the bridge to form an arch bridge. As a new type of steel-framed concrete structure, this type of arch bridge not only takes advantage of steel tube concrete, but also has the advantages of high strength, high rigidity, good dynamic performance, strong fire resistance and strong earthquake resistance of steel-framed concrete. However, there are several main shortcomings in the pouring of external concrete for this type of structure: (1) External concrete is cast-in-place ordinary concrete, and its overall structural deadweight is relatively large, which limits the further increase of the span of the arch bridge; (2) External concrete is labor-intensive and the construction period is long; (3) The formwork accuracy of external concrete is high, and it is difficult to construct with slipforms, resulting in low construction efficiency; (4) Large volumes of external concrete are cast-in-place at the construction site, and its pouring quality is difficult to ensure; (5) Ordinary concrete has a large shrinkage creep. Large volumes of external concrete may form microcracks in the external concrete due to shrinkage creep, thus affecting the durability of the structure; (6) A large number of disposable wooden formworks are required when pouring external concrete, which is not environmentally friendly. Summary of the invention

[0003] The purpose of the present invention is to provide a steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch bridge, which solves the problems of large deadweight and shrinkage creep of outsourcing concrete of traditional steel tube concrete rigid frame arch bridge, low construction efficiency, difficult quality assurance and cast-in-place outsourcing concrete requiring a large number of disposable formworks, which easily leads to material waste.

[0004] To achieve the above-mentioned purpose, the present invention provides a steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch bridge, comprising a steel tube concrete rigid frame arch rib segment, wherein the steel tube concrete rigid frame arch rib segment is located at the four inner corners of the steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segment, and the steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segment comprises two web structures, and the top and bottom of the two web structures are respectively connected to the top plate structure and the bottom plate structure through a cast-in-place UHPC longitudinal joint and a cast-in-place UHPC transverse joint.

[0005] Preferably, the steel tube concrete rigid skeleton arch rib segment comprises a hollow steel tube truss arch rib segment, core concrete is poured inside the hollow steel tube truss arch rib segment, and the hollow steel tube truss arch rib segment is fixedly connected to the cast-in-place UHPC longitudinal joint by a plurality of bolts.

[0006] Preferably, the web structure comprises a prefabricated UHPC web, and the prefabricated UHPC web is provided with prefabricated UHPC web steel meshes which are evenly and equidistantly arranged.

[0007] Preferably, the roof structure comprises a prefabricated UHPC roof, and the prefabricated UHPC roof is provided with prefabricated UHPC roof steel meshes that are evenly and equidistantly arranged.

[0008] Preferably, the base plate structure comprises a prefabricated UHPC base plate, and the prefabricated UHPC base plate is provided with prefabricated UHPC base plate steel meshes which are evenly and equidistantly arranged.

[0009] Preferably, the cast-in-place UHPC longitudinal joints are provided with cast-in-place UHPC longitudinal joint steel bars which are evenly and equidistantly arranged.

[0010] Therefore, the present invention adopts a steel tube concrete rigid skeleton outsourcing prefabricated UHPC plate arch bridge of the above structure, which has the following beneficial effects:

[0011] (1) The present invention uses prefabricated UHPC panels as the outer concrete of the steel tube concrete rigid skeleton arch bridge. UHPC has ultra-high mechanical properties and its deadweight can be greatly reduced under the same bearing capacity, which has the potential to break through to a larger span.

[0012] (2) The outsourced concrete of the present invention is prefabricated into UHPC panels in a prefabrication plant and then transported to a factory for assembly. The panels are connected into a whole by cast-in-place joints, which can reduce the number of concrete pouring beams at the construction site by more than 70%. In addition, only a small amount of steel bar formwork operations are required on site, which saves a lot of labor and has high construction efficiency and good economic benefits.

[0013] (3) The present invention prefabricates the outer concrete into UHPC panels, which can ensure their quality and reduce shrinkage creep and alleviate micro cracks caused by shrinkage creep.

[0014] (4) The present invention avoids the need to cast large areas of external concrete at the construction site, thereby avoiding the large-scale one-time use of wooden formwork and causing material waste, thereby having good environmental and economic benefits.

[0015] (5) UHPC has extremely high durability. Using it as outer concrete can make the structure more durable and significantly reduce subsequent maintenance costs. It can also be used in corrosive environments such as the ocean.

[0016] (6) UHPC has ultra-high mechanical properties, and its outer concrete can better match the internal steel tube concrete, so that the outer UHPC and the internal steel tube concrete can reach their limits almost at the same time.

[0017] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the cross-sectional structure of a steel tube concrete rigid skeleton outwrapped with prefabricated UHPC slab arch bridge of the present invention;

[0019] Figure 2 This is a schematic diagram of the arch rib segment structure of a steel tube concrete rigid skeleton of an arch bridge with prefabricated UHPC plates wrapped therein according to the present invention;

[0020] Figure 3 This is a schematic diagram of the elevation structure of a steel tube concrete rigid skeleton outwrapped with prefabricated UHPC plate arch bridge of the present invention;

[0021] Reference numerals

[0022] 1-steel tube concrete rigid skeleton arch rib segment; 2-precast UHPC web; 3-cast-in-place UHPC longitudinal joint; 4-precast UHPC top plate; 5-precast UHPC bottom plate; 6-precast UHPC web steel mesh; 7-precast UHPC bottom plate steel mesh; 8-precast UHPC top plate steel mesh; 9-bolts; 10-hollow steel tube truss arch rib segment; 11-core concrete; 12-cast-in-place UHPC longitudinal joint steel bars; 13-cast-in-place UHPC transverse joint; 14-steel tube concrete rigid skeleton wrapped with precast UHPC plate arch rib segment. DETAILED DESCRIPTION

[0023] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.

[0024] Unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0025] Example

[0026] like Figure 1-3 As shown, the present invention provides a steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch bridge, including a steel tube concrete rigid frame arch rib segment 1, the steel tube concrete rigid frame arch rib segment 1 is located at the four inner corners of the steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segment 14, the steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segment 14 includes two web structures, the top and bottom of the two web structures are respectively connected to the top plate structure and the bottom plate structure through a cast-in-place UHPC longitudinal joint 3 and a cast-in-place UHPC transverse joint 13.

[0027] The steel tube concrete rigid skeleton arch rib segment 1 comprises a hollow steel tube truss arch rib segment 10 , in which core concrete 11 is poured, and the hollow steel tube truss arch rib segment 10 is fixedly connected to the cast-in-place UHPC longitudinal joint 3 through a plurality of bolts 9 .

[0028] The web structure comprises a prefabricated UHPC web 2 , on which prefabricated UHPC web reinforcement meshes 6 are evenly and equidistantly arranged.

[0029] The top plate structure comprises a prefabricated UHPC top plate 4 , on which prefabricated UHPC top plate steel meshes 8 are evenly and equidistantly arranged.

[0030] The bottom plate structure comprises a prefabricated UHPC bottom plate 5 , on which prefabricated UHPC bottom plate steel meshes 7 are evenly and equidistantly arranged.

[0031] The cast-in-place UHPC longitudinal joints 3 are provided with cast-in-place UHPC longitudinal joint steel bars 12 which are evenly and equidistantly arranged.

[0032] Here’s how it works:

[0033] S1: The required prefabricated UHPC top plate 4, prefabricated UHPC bottom plate 5 and prefabricated UHPC web plate 2 are prefabricated in a concrete prefabrication factory, and the hollow steel tube truss arch rib segment 10 is prefabricated in a steel structure prefabrication factory, and the bolts 9 required to connect the various components are welded in the factory.

[0034] S2: The steel tube concrete rigid skeleton arch rib segment 1 with studs 9 is erected at the construction site.

[0035] S3: The prefabricated UHPC top plate 4, the prefabricated UHPC bottom plate 5 and the prefabricated UHPC web plate 2 are transported to the construction site for assembly, and connected into a whole by pre-welded studs 9 and cast-in-situ UHPC longitudinal seams 3.

[0036] S4: After completing the above steps, the arch ribs are longitudinally connected to form multiple steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segments 14, and the multiple steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segments 14 are connected to form steel tube concrete rigid frame arch ribs through cast-in-place UHPC transverse joints 13.

[0037] The welding work of the studs 9 is all completed in the prefabrication factory, avoiding the danger of high-altitude welding at the construction site.

[0038] The strength grades of the ordinary concrete filled in the hollow steel tube truss arch rib segment 10 and the UHPC panels prefabricated in the factory are selected according to the requirements of the actual engineering structure.

[0039] The segment lengths of the prefabricated UHPC top plate 4, the prefabricated UHPC bottom plate 5 and the prefabricated UHPC web plate 2 can be determined according to the hoisting capacity of the construction site and in combination with the deadweight of the prefabricated UHPC plate.

[0040] The steel bars in the prefabricated UHPC top plate 4, the prefabricated UHPC bottom plate 5 and the prefabricated UHPC web plate 2, the prefabricated UHPC top plate steel mesh 8, the prefabricated UHPC top plate steel mesh 7 and the prefabricated UHPC web plate steel mesh 6 are all reserved with a certain length exceeding the prefabricated plate, extending into the UHPC longitudinal joint 3 and the UHPC transverse joint 13 to ensure their anchoring effect.

[0041] The amount of steel fiber in the prefabricated UHPC top plate 4, the prefabricated UHPC bottom plate 5 and the prefabricated UHPC web plate 2 is selected appropriately according to different engineering requirements.

[0042] The transverse reinforcements of the precast UHPC web 2 and the precast UHPC top and bottom plates 5 of the same cross-section should be arranged alternately to avoid conflict. Similarly, the longitudinal reinforcements of the adjacent steel tube concrete rigid skeleton wrapped precast UHPC plate box-type arch rib segments 14 should also be arranged alternately to avoid conflict.

[0043] Therefore, the present invention adopts the above-mentioned steel tube concrete rigid skeleton outsourcing prefabricated UHPC board arch bridge, and prefabricates the outsourcing concrete of the traditional steel tube concrete rigid skeleton arch bridge into UHPC board, which can reduce the cast-in-place concrete by more than 70% at the construction site, and can greatly reduce the construction of formwork and steel bars, thereby improving the construction efficiency on site. At the same time, prefabrication in the factory eliminates the concrete shrinkage creep caused by the age difference of the successively cast concrete, thereby slowing down the micro cracks of the outsourcing concrete caused by shrinkage creep, and can avoid the waste of materials caused by the use of a large number of wooden formworks at one time for the cast-in-place outsourcing concrete. The traditional outsourcing ordinary concrete is improved to outsourcing UHPC, because the ultra-high mechanical properties of UHPC can reduce its volume and thus reduce its deadweight compared with the traditional outsourcing ordinary concrete while ensuring the same bearing capacity, so it has the potential to further improve the rigid skeleton arch bridge.

[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.

Claims

1. A construction method for a steel tube concrete rigid skeleton outsourcing prefabricated UHPC plate arch bridge, characterized in that : The arch bridge comprises a steel tube concrete rigid skeleton arch rib segment, the steel tube concrete rigid skeleton arch rib segment is located at the four corners of the steel tube concrete rigid skeleton outer package prefabricated UHPC plate arch rib segment, the steel tube concrete rigid skeleton outer package prefabricated UHPC plate arch rib segment comprises two web structures, the top and bottom of the two web structures are respectively connected to the top plate structure and the bottom plate structure through cast-in-place UHPC longitudinal joints and cast-in-place UHPC transverse joints; The steel tube concrete rigid skeleton arch rib segment comprises a hollow steel tube truss arch rib segment, core concrete is poured inside the hollow steel tube truss arch rib segment, and the hollow steel tube truss arch rib segment is fixedly connected to the cast-in-place UHPC longitudinal joint by a plurality of bolts; The web structure comprises a prefabricated UHPC web, and the prefabricated UHPC web is provided with prefabricated UHPC web reinforcement meshes evenly and equidistantly arranged; The top plate structure comprises a prefabricated UHPC top plate, on which prefabricated UHPC top plate steel meshes are evenly and equidistantly arranged; The base plate structure comprises a prefabricated UHPC base plate, and the prefabricated UHPC base plate is provided with prefabricated UHPC base plate steel meshes arranged evenly and equidistantly; The construction steps are as follows: S1, prefabricate the required prefabricated UHPC top plate, prefabricated UHPC bottom plate and prefabricated UHPC web plate in the concrete prefabrication factory, prefabricate the hollow steel tube truss arch rib segments in the steel structure prefabrication factory and weld the bolts required to connect the various components in the factory; S2, erecting the steel tube concrete rigid skeleton arch rib segments with studs at the construction site; S3, transporting the prefabricated UHPC top plate, prefabricated UHPC bottom plate and prefabricated UHPC web plate to the construction site for assembly, and connecting them into a whole through pre-welded studs and cast-in-situ UHPC longitudinal seams; S4, after completing the above steps, the arch ribs are longitudinally connected to form multiple steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segments, and multiple steel tube concrete rigid frame outsourcing prefabricated UHPC plate arch rib segments are connected to form steel tube concrete rigid frame arch ribs through cast-in-place UHPC transverse joints.

2. The construction method of a steel tube concrete rigid skeleton outsourcing prefabricated UHPC plate arch bridge according to claim 1 is characterized by: The cast-in-place UHPC longitudinal joints are provided with cast-in-place UHPC longitudinal joint steel bars which are evenly and equidistantly arranged.