Method for installing a high-rise rocking steel column with rotatable column foot

The installation method of tall, swaying steel columns with rotatable column bases solves the problems of construction safety and quality accuracy of tall, swaying steel columns, improves stability and precision, and provides a systematic and standardized installation method.

CN117868510BActive Publication Date: 2026-04-10MCC (SHANGHAI) STEEL STRUCTURE TECHNOLOGY CORP LTD
View PDF 3 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2026-04-10

AI Technical Summary

Technical Problem

Existing technologies cannot provide a systematic and standardized method for installing tall, swaying steel columns, making it difficult to guarantee construction safety and quality accuracy.

Method used

The installation method of tall, swaying steel columns with rotatable column bases is adopted. By hoisting the steel column, adjusting its verticality, and setting column base limit braces and diagonal braces, it is ensured that the steel column will not loosen after it is in place, thus preventing rotation and swaying.

Benefits of technology

It improves construction safety and installation quality, ensures the stability and precision of the tall, swaying steel column, and is simple, safe, and reliable to operate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117868510B_ABST
    Figure CN117868510B_ABST
Patent Text Reader

Abstract

The application discloses a kind of column foot rotatable installation method of high-rise swing steel column, steps: high-rise swing steel column is lifted;Adjust the position of high-rise swing steel column so that the column bottom ear plate at the bottom of high-rise swing steel column is inserted between the two embedded parts ear plates of the position to be installed and the column foot pin shaft is installed;Make the lifting rope that is tied in hook and high-rise swing steel column be in taut state, install jack between high-rise swing steel column and installation surface, control jack to adjust the perpendicularity of high-rise swing steel column to comply with specification requirements;Again install column foot fixed support between high-rise swing steel column and installation surface and make it brace high-rise swing steel column;Remove jack and install column foot fixed support in the position of jack and make it brace high-rise swing steel column;Install X direction diagonal bracing and Y direction diagonal bracing;After hook is loosened, remove the connection of hook and high-rise swing steel column.The application provides a kind of system standardization installation method of high-rise swing steel column, construction safety is good, installation quality is good and installation precision is high, and application prospect is good.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of steel structure construction, and relates to a mounting method of a high-rise swinging steel column with rotatable column foot. BACKGROUND

[0002] In areas where the temperature difference between winter and summer reaches 70 degrees Celsius, the release of the large deformation caused by the temperature difference of the steel structure system requires further improvement. Therefore, a high-rise swinging steel column with a rotatable pin shaft column foot node is designed. By rotating back and forth around the pin shaft of the column foot, the steel column swings to absorb the expansion and contraction deformation of the steel roof.

[0003] When the high-rise swinging steel column is not connected with other structures, its own stability is very poor, and the wind level is also high in areas with large temperature differences. The existing steel column installation method is relatively conventional and cannot guarantee the construction safety and quality precision of such steel columns. To solve the problem of installing swinging steel columns, CN 115653114A discloses a method for installing a row of super-high swinging columns, which connects multiple swinging steel columns into one body by setting a scissors brace therebetween; CN 116220232A discloses an auxiliary installation device for a steel structure swinging column, which sets a receiving base plate at the bottom of the column to control the stability of the swinging column. Although the above-mentioned methods can solve some problems in the installation of swinging steel columns, they are not systematic and cannot provide a systematic specification for the installation of high-rise swinging steel columns.

[0004] Therefore, it is of great practical significance to develop a systematic and standardized installation method for high-rise swinging steel columns. SUMMARY

[0005] Since the prior art has the above-mentioned defects, the present application provides a systematic and standardized installation method for high-rise swinging steel columns, specifically a mounting method of a high-rise swinging steel column with rotatable column foot, which solves the defects that the existing installation method of swinging steel columns cannot guarantee construction safety and quality precision and lacks systematic specifications.

[0006] In order to achieve the above-mentioned purpose, the present application provides the following technical solutions:

[0007] A mounting method of a high-rise swinging steel column with rotatable column foot, comprising the following steps:

[0008] (1) Hoist the high-rise swinging steel column;

[0009] (2) Adjust the position of the high-rise swinging steel column so that the column bottom ear plate at the bottom of the high-rise swinging steel column is inserted between the two embedded ear plates of the installation position and the column foot pin shaft is installed to fix the column bottom ear plate and the two embedded ear plates;

[0010] (3) keep the hook to make the rope which is tied on the hook and the high and towering steel column in a taut state, install a jack between the high and towering steel column and the installation surface, control the jack to adjust the perpendicularity of the high and towering steel column to meet the specification requirements;

[0011] (4) install a column foot fixing support between the high and towering steel column and the installation surface again and make the column foot fixing support support the high and towering steel column tightly;

[0012] (5) remove the jack, and install a column foot fixing support at the position of the jack and make the column foot fixing support support the high and towering steel column tightly;

[0013] (6) install an X-directional diagonal brace, one end of the X-directional diagonal brace is connected with an X-directional diagonal brace embedded part embedded in the installation surface, and the other end is connected with the high and towering steel column;

[0014] (7) install a Y-directional diagonal brace, one end of the Y-directional diagonal brace is connected with a Y-directional diagonal brace embedded part embedded in the installation surface, and the other end is connected with the high and towering steel column, and the Y-directional diagonal brace is perpendicular to the plane in which the high and towering steel column and the X-directional diagonal brace are located;

[0015] (8) remove the connection between the hook and the high and towering steel column after the hook is loosened, that is, the installation of the column foot rotatable high and towering steel column is completed.

[0016] The installation method of the column foot rotatable high and towering steel column of the application, after the high and towering steel column is in place, the jack is used to adjust the perpendicularity of the steel column to meet the precision requirements without loosening the hook of the crane, then the column foot limiting support is set to prevent the high and towering steel column from rotating around the column foot pin shaft, and finally the diagonal braces are set in two directions of the column side to prevent the high and towering steel column from shaking due to strong wind, which solves the problem that the construction safety and quality requirements of the high and towering steel column are difficult to guarantee, and the application provides a systematic and standardized installation method of the high and towering steel column, which not only greatly improves the construction safety, but also improves the installation quality and precision, and has good application prospect.

[0017] As a preferred technical solution:

[0018] The installation method of the column foot rotatable high and towering steel column, step (1) is specifically that the two ends of the steel wire rope are fixed on the two side column top lifting lugs of the high and towering steel column through the clasp ring, the hook hooks the middle part of the steel wire rope, and the high and towering steel column is lifted.

[0019] The installation method of the column foot rotatable high and towering steel column, the position of the high and towering steel column is adjusted by the hook.

[0020] The installation method of the column foot rotatable high and towering steel column, the two jacks are diagonally installed on the installation surface.

[0021] The column foot rotatable high-rise swing steel column installation method as described above, the column foot fixing support installed in step (4) is two in total, and the two column foot fixing supports are installed on two opposite corners of the installation surface without installing the jacks;

[0022] The wedge plate is punched between the column foot fixing support and the installation surface to tightly support the high-rise swing steel column.

[0023] The column foot rotatable high-rise swing steel column installation method as described above, the wedge plate is punched between the column foot fixing support installed in step (5) and the installation surface to tightly support the high-rise swing steel column.

[0024] The column foot rotatable high-rise swing steel column installation method as described above, the X-direction inclined support is welded with the X-direction inclined support embedded part and the high-rise swing steel column respectively.

[0025] The Y-direction inclined support is welded with the Y-direction inclined support embedded part and the high-rise swing steel column respectively.

[0026] The column foot rotatable high-rise swing steel column installation method as described above, step (8) is specifically that after the lifting hook is loosened, the steel wire rope and the clasp are removed.

[0027] The above technical solution is only one possible technical solution of the present application, and the protection scope of the present application is not limited to this, and the person skilled in the art can reasonably adjust the specific design according to the actual needs.

[0028] The above-mentioned application has the following advantages or beneficial effects:

[0029] The present application provides a column foot rotatable high-rise swing steel column installation method aiming at the poor stability of the high-rise swing steel column, under the condition that the crane is not loosened, the verticality of the steel column is first adjusted through the jack, then the column foot limiting support is set to prevent the rotation and swing of the high-rise swing steel column around the column foot pin shaft, and finally the inclined support is set in two directions of the column side to prevent the wind-induced sway of the high-rise swing steel column, thereby solving the problem that the construction safety and quality requirements of the high-rise swing steel column are difficult to guarantee, the method of the present application supplements and perfects the installation content of the special design node of the steel column, provides a systematic and standardized installation method of the high-rise swing steel column, greatly improves the construction safety, and improves the installation quality and installation precision, in addition, the method of the present application is simple in operation, high in construction efficiency, safe and reliable in construction process, and has good application prospect. BRIEF DESCRIPTION OF DRAWINGS

[0030] The present application and its features, shapes and advantages will become more apparent through reading the following detailed description of non-limiting embodiments with reference to the accompanying drawings. The same reference signs indicate the same parts throughout the drawings. The drawings are not drawn to scale, and the emphasis is on showing the main idea of the present application.

[0031] Figure 1 This is a schematic diagram of the first step of the installation method of the tall, swaying steel column with rotatable column base according to the present invention, wherein the right figure is a schematic diagram of the left figure from the perspective of 1-1;

[0032] Figure 2 This is a schematic diagram of the second step of the installation method of the towering swaying steel column with rotatable column base of the present invention, wherein the right figure is a schematic diagram of the view 1-1 in the left figure;

[0033] Figure 3 for Figure 2 A schematic diagram of node A in the middle, where the right figure is the left one. Figure 2-2 A diagram illustrating the perspective;

[0034] Figure 4 This is a schematic diagram of the third step of the installation method of the tall, swaying steel column with rotatable column base of the present invention, wherein the right figure is a schematic diagram of the view from 1-1 in the left figure;

[0035] Figure 5 for Figure 4 A schematic diagram of node B in the middle, where the right image represents the left. Figure 2-2 A diagram illustrating the perspective;

[0036] Figure 6 This is a schematic diagram of the fourth step of the installation method of the tall, swaying steel column with rotatable column base of the present invention, wherein the right figure is a schematic diagram of the view from 1-1 in the left figure;

[0037] Figure 7 for Figure 6 A schematic diagram of node C in the middle, where the right image represents the left. Figure 2-2 A diagram illustrating the perspective;

[0038] Figure 8 This is a schematic diagram of the fifth step of the installation method of the tall, swaying steel column with rotatable column base of the present invention, wherein the right figure is a schematic diagram of the view from 1-1 in the left figure;

[0039] Figure 9 for Figure 8 A schematic diagram of node D in the middle, where the right figure is the left one. Figure 2-2 A diagram illustrating the perspective;

[0040] Figure 10 This is a schematic diagram of the sixth step of the installation method of the tall, swaying steel column with rotatable column base of the present invention, wherein the right figure is a schematic diagram of the view from 1-1 in the left figure;

[0041] Figure 11 This is a schematic diagram of the seventh step of the installation method of the towering swaying steel column with rotatable column base of the present invention, wherein the right figure is a schematic diagram of the view from 1-1 in the left figure;

[0042] Figure 12It is eighth step state schematic diagram of the installation method of the column foot rotatable high-rise swing steel column of the application, wherein the right drawing is the 1-1 perspective schematic diagram in the left drawing;

[0043] Wherein, 1 is the high-rise swing steel column, 1.1 is the column bottom lug plate, 1.2 is the column top lifting lug, 2 is the lifting hook, 2.1 is the steel wire rope, 2.2 is the clasp, 3 is the embedded part lug plate, 3.1 is the column foot pin shaft, 4 is the jack, 5 is the column foot fixing support, 5.1 is the wedge plate, 6 is the X-directional diagonal bracing, 6.1 is the X-directional diagonal bracing embedded part, 7 is the Y-directional diagonal bracing, and 7.1 is the Y-directional diagonal bracing embedded part. DETAILED DESCRIPTION

[0044] The structure in the application will be further explained in combination with the drawings and specific examples, but not as the limitation of the application.

[0045] Example 1

[0046] An installation method of a column foot rotatable high-rise swing steel column, comprising the following steps:

[0047] (1) The clasp 2.2 and the steel wire rope 2.1 are installed on the column top lifting lug 1.2, and the steel wire rope 2.1 is hung on the lifting hook 2, and the high-rise swing steel column 1 is lifted, at this time as shown in Figure 1 ;

[0048] (2) The lifting hook 2 drives the high-rise swing steel column 1, so that the column bottom lug plate 1.1 is inserted between the two embedded part lug plates 3, and the column foot pin shaft 3.1 is installed and fixed, at this time as shown in Figures 2-3 .

[0049] (3) The lifting hook 2, the steel wire rope 2.1 and the clasp 2.2 are kept tight, two jacks 4 are installed at the opposite corners of the installation surface (the jacks 4 are installed between the high-rise swing steel column 1 and the installation surface), and the jacks 4 are controlled to adjust the perpendicularity of the high-rise swing steel column 1 to meet the specification requirements, at this time as shown in Figures 4-5 .

[0050] (4) Two column foot fixing supports 5 are installed at the remaining opposite corners of the installation surface, and the wedge plates 5.1 are driven into the installation surface between the column foot fixing supports 5 and the installation surface to tighten, at this time as shown in Figures 6-7 .

[0051] (5) The jacks 4 are removed, and two column foot fixing supports 5 and wedge plates 5.1 are installed at the original opposite corner positions of the jacks 4, and the high-rise swing steel column 1 is prevented from rotating around the column foot pin shaft 3.1 through the four column foot fixing supports 5, at this time as shown in Figures 8-9 .

[0052] (6) The X-directional diagonal bracing 6 is installed, one end is welded on the X-directional diagonal bracing embedded part 6.1 pre-embedded in the installation surface, and the other end is welded to the column of the high-rise swing steel column 1, at this time as shown in Figure 10 .

[0053] (7) Install the Y-direction inclined brace 7, one end of which is welded on the Y-direction inclined brace embedded part 7.1 embedded in the installation surface, and the other end of which is welded to the column of the high-rise swinging steel column 1, so as to complete the wind sway prevention measure of the high-rise swinging steel column 1, at this time as shown in FIG. 7. Figure 11

[0054] (8) The hook 2 is lowered and loosened, the steel wire rope 2.1 and the clasp 2.2 are removed, and the installation of the high-rise swinging steel column 1 is completed, and the subsequent components are connected with the high-rise swinging steel column 1 to form a structural system, at this time as shown in FIG. 8. Figure 12

[0055] It has been verified that the installation method of the high-rise swinging steel column with rotatable column foot of the application can, after the high-rise swinging steel column is positioned, use the jack to adjust the perpendicularity of the steel column to meet the accuracy requirement under the condition that the crane is not loosened, then set the column foot limiting support to prevent the high-rise swinging steel column from rotating around the column foot pin shaft, and finally set the inclined braces in two directions of the column to prevent the swinging of the high-rise swinging steel column caused by strong wind, so as to solve the problem that the construction safety and quality requirement of the high-rise swinging steel column are difficult to guarantee. The application provides a systematic and standardized installation method of the high-rise swinging steel column, which not only greatly improves the construction safety, but also improves the installation quality and installation accuracy, and has good application prospect.

[0056] Those skilled in the art should understand that those skilled in the art can realize the variant examples in combination with the prior art and the above-mentioned embodiments, which are not described here in detail. Such variant examples do not affect the essential content of the application, and are not described here in detail.

[0057] The preferred embodiments of the application are described above. It should be understood that the application is not limited to the above specific embodiments, and the devices and structures not described in detail should be understood as being implemented in the ordinary way in the art; any person skilled in the art can make many possible changes and modifications to the technical solutions of the application or modify them into equivalent embodiments with equivalent changes without departing from the scope of the technical solutions of the application, which does not affect the essential content of the application. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the application without departing from the content of the technical solutions of the application, all still belong to the scope of protection of the technical solutions of the application.​​

Claims

1. A method of installing a high-rise sway steel column with rotatable column foot, characterized in that: The method comprises the following steps: (1) lifting the high-rise swinging steel column; (2) adjusting the position of the high-rise swinging steel column so that the column bottom lug plate at the bottom of the high-rise swinging steel column is inserted between the two embedded lug plates at the installation position, and a column foot pin shaft is installed to fix the column bottom lug plate and the two embedded lug plates; (3) keeping the lifting hook so that the lifting rope bound to the lifting hook and the high-rise swinging steel column is in a taut state, installing a jack between the high-rise swinging steel column and the installation surface, and controlling the jack to adjust the perpendicularity of the high-rise swinging steel column to meet the specification requirements; (4) installing a column foot fixing support between the high-rise swinging steel column and the installation surface and making the column foot fixing support support the high-rise swinging steel column; (5) removing the jack, installing a column foot fixing support at the position of the jack, and making the column foot fixing support support the high-rise swinging steel column; (6) installing an X-direction inclined support, one end of the X-direction inclined support being connected with an X-direction inclined support embedded part pre-embedded in the installation surface, and the other end being connected with the high-rise swinging steel column; (7) installing a Y-direction inclined support, one end of the Y-direction inclined support being connected with a Y-direction inclined support embedded part pre-embedded in the installation surface, and the other end being connected with the high-rise swinging steel column, the Y-direction inclined support being perpendicular to the plane in which the high-rise swinging steel column and the X-direction inclined support are located; (8) removing the connection between the lifting hook and the high-rise swinging steel column after the lifting hook is loosened, thereby completing the installation of the column foot rotatable high-rise swinging steel column.

2. The method of installing a high-rise sway steel column with rotatable column foot according to claim 1, characterized in that, In step (1), the two ends of the steel wire rope are fixed on the two column top lifting lugs of the high-rise swinging steel column through clamps, the lifting hook hooks the middle part of the steel wire rope, and the high-rise swinging steel column is lifted.

3. The method of installing a high-rise sway steel column with rotatable column foot according to claim 1, characterized in that, The position of the high-rise swinging steel column is adjusted by the lifting hook driving the high-rise swinging steel column.

4. The method of claim 1, wherein, The jack has two, and the two jacks are installed on the installation surface in a diagonal manner.

5. The method of claim 4, wherein the column foot is rotatable. In step (4), two column foot fixing supports are installed on the two diagonally opposite positions of the installation surface where the jacks are not installed. Wedges are driven between the column foot fixing supports and the installation surface to support the high-rise swinging steel column.

6. The method of installing a high-rise sway steel column with rotatable column foot according to claim 5, characterized in that, In step (5), the column foot fixing supports installed between the column foot fixing supports and the installation surface have wedges driven therebetween to support the high-rise swinging steel column.

7. The method of installing a high-rise sway steel column with rotatable column foot according to claim 1, characterized in that, The X-direction inclined support is welded with the X-direction inclined support embedded part and the high-rise swinging steel column, respectively. The Y-direction inclined support is welded with the Y-direction inclined support embedded part and the high-rise swinging steel column, respectively.

8. The method of installing a high-rise sway steel column with rotatable column foot according to claim 2, characterized in that, In step (8), the lifting hook is lowered and loosened, and then the steel wire rope and the clamps are removed.

Citation Information

Patent Citations

  • Auxiliary mounting device for steel structure swing column

    CN116220232A

  • Method and structure for lifting supporting steel column

    CN102888998A

  • Large latticed column hoisting construction method

    CN115717478A