A tunnel low-carbon construction machinery scheduling method, device, terminal and storage medium

The self-organizing mapping-particle swarm algorithm is used to optimize the tunnel construction machinery configuration model, which solves the problem of mechanical configuration in tunnel construction that is difficult to reduce carbon emissions, and achieves the effect of reducing carbon emissions and improving mechanical configuration efficiency on the basis of ensuring the construction period.

CN117875800BActive Publication Date: 2024-10-11NO 1 ENG LIMITED OF CR20G +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410016065.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-10-11
Estimated Expiration
2044-01-05

AI Technical Summary

Technical Problem

Existing technology makes it difficult to effectively optimize mechanical configuration during tunnel construction to reduce carbon emissions while ensuring construction schedule and quality.

Method used

Self-organizing mapping-particle swarm algorithm based on multiple perturbation strategies is used to establish a comprehensive optimization model for tunnel construction machinery configuration that considers carbon emissions, optimizes construction scheduling, and reduces carbon emissions from construction equipment.

Benefits of technology

On the basis of ensuring the construction period, optimize construction scheduling, reduce carbon emissions from mechanical equipment during tunnel construction, and improve the efficiency and economy of mechanical configuration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117875800B_ABST
    Figure CN117875800B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, device, terminal and storage medium for scheduling low-carbon construction machinery in a tunnel, and relates to the technical field of scheduling tunnel construction machinery. The method comprises the following steps: S1: establishing a scheduling model for tunnel construction machinery; S2: establishing a configuration model for tunnel construction machinery considering carbon emissions; S3: determining the constraints of the configuration model for tunnel construction machinery considering carbon emissions; S4: using a self-organizing map-particle swarm algorithm to optimize and solve the configuration model for tunnel construction machinery to obtain a final optimization scheduling solution. In the self-organizing map-particle swarm algorithm, strategies are adopted to generate an initial population uniformly distributed in the solution space, adaptively adjust parameters to timely change the search neighborhood size, and generate particles using the weights of a self-organizing map neural network to enhance local search capabilities. On the basis of ensuring the construction period, the present invention can optimize construction scheduling and reduce redundant carbon emissions generated by construction machinery during tunnel construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel construction machinery scheduling, and in particular to a tunnel low-carbon construction machinery scheduling method, device, terminal and storage medium. Background Art

[0002] With the development of highway and railway construction and the requirements of ecological civilization construction in my country, it is becoming increasingly important to carry out research on ecological environment protection in the field of highway and railway construction. Therefore, it is necessary and practical to study energy conservation and emission reduction in tunnel construction. The tunnel excavation and support cycle has high requirements for the overlap and coordination of various mechanical equipment. Reasonable mechanical configuration can effectively speed up the construction progress and save construction costs on the basis of ensuring the quality of the project.

[0003] Realizing energy conservation and emission reduction in buildings is an important measure to implement the national "carbon peak and carbon neutrality" strategy, and it is also an inevitable requirement for achieving sustainable development of the national economy. The country has continuously introduced favorable policies in promoting green and low-carbon transformation, such as "carbon trading" and "carbon asset management", which will be reflected in the construction field. In the existing technology, the research on tunnel machinery configuration and construction carbon emissions mainly focuses on the research on tunnel machinery configuration for the purpose of rapid tunnel construction and the research on carbon emissions of mechanical equipment in road engineering and house construction. In the context of advocating sustainable development, how to consider the mechanized configuration of large-scale projects such as tunnels from the perspective of low-carbon economy is innovative and practical. Summary of the invention

[0004] In view of the above problems, the present invention aims to provide a method and device for optimizing the scheduling of low-carbon emission construction machinery for long and large tunnels based on a self-organizing map-particle swarm algorithm with multiple perturbation strategies. On the basis of ensuring the construction period, a comprehensive optimization model for the configuration of tunnel construction machinery taking into account carbon emissions is established; and the particle swarm algorithm is optimized with the purpose of improving the search ability of traditional particle swarms to solve multi-level complex optimization models, and the optimized particle swarm algorithm is used to find the comprehensive optimization model for the configuration of tunnel construction machinery. The present invention can optimize construction scheduling and reduce redundant carbon emissions generated by construction machinery during tunnel construction.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0006] A tunnel low-carbon construction machinery scheduling method comprises the following steps:

[0007] S1: Establish a tunnel construction machinery scheduling model;

[0008] S2: Establish a tunnel construction machinery configuration model considering carbon emissions;

[0009] S3: Determine the constraints of the tunnel construction machinery configuration model considering carbon emissions;

[0010] S4: Use the self-organizing map-particle swarm algorithm based on multiple perturbation strategies to optimize and solve the tunnel construction machinery configuration model considering carbon emissions in step S2 to obtain the final optimized scheduling plan.

[0011] Furthermore, the tunnel construction machinery described in step S1 includes a drilling and blasting system, an anchor spraying support system, an excavation and transportation system, and an energy supply and driving system.

[0012] Furthermore, the specific operation of step S2 includes the following steps:

[0013] S201: The number of all possible types of equipment to be mobilized for the construction process is recorded as d, and the number of each item of all possible machinery and equipment to be mobilized is recorded as a d-dimensional vector A = {A1, A2, A3, ..., A d}; The construction process time T and the total carbon emission E are both functions of A, denoted as T(A) and E(A) respectively;

[0014] S202: Without considering nonlinear effects, the total carbon emissions are expressed as

[0015] In the formula, A ij is the number of the i-th mechanical work on the j-th working surface, m is the total number of working surfaces; T ij (A) is the direct working time of the i-th machine on the specified working surface j of the current process, E i is the carbon dioxide equivalent value of the total unit emission of the i-th machinery, expressed as: E i =C d ×D1+C o ×D2+C e ×D3,C d , C o , C e are the carbon emission factors of diesel, gasoline and electricity respectively, and D1, D2 and D3 are the total amount of diesel, gasoline and electricity consumed in the current mechanical unit shift respectively;

[0016] S203: Dimensionless processing of T(A) and E(A) yields

[0017]

[0018]

[0019] In the formula, k1 and k2 are the carbon emission preference weight and construction period preference weight respectively, and E max 、T max They are the maximum carbon emission and the maximum construction period respectively;

[0020] S204: The optimization model for tunnel machinery configuration considering construction cost, construction period, quality control and carbon emissions is:

[0021]

[0022] Furthermore, in step S202, the life cycle basic database is combined with the IPCC to calculate the carbon emission factors of diesel, gasoline and electricity.

[0023] Furthermore, the constraint conditions of the tunnel construction machinery configuration model considering carbon emissions in step S3 are:

[0024] stk1,k2>0

[0025] k1+k2=1

[0026] 0≤A ij ≤Z ij

[0027] P e ≥P

[0028] In the formula, Z ij A is the total number of available machines of the i-th type on the j-th working surface; ij is the number of the i-th mechanical work on the j-th working surface, and Z ij and A ij Both are integers; P e The rated power or working capacity provided for the energy-supplying driving equipment, P is the power consumed by the energy-consuming machinery.

[0029] Furthermore, the specific operation of step S4 includes the following steps:

[0030] S401: define a two-dimensional particle, in which the first dimension of the two-dimensional particle is represented by a natural number 1, 2, ..., n to represent the nth machine of the current machine type, the second dimension represents the position of the particle, and the length of the particle is the total number of machines of the same type that can be dispatched;

[0031] S402: For the i-th particle component, its vector form is (p, x ij ) T , p∈{1, 2, ..., n}, x ij ∈[0, m+1), x ij is a randomly generated real number;

[0032] S403: using a rounding-down method, generating and summarizing a scheduling plan for each type of machinery to obtain a current scheduling plan for the entire machinery;

[0033] S404: Calculate the minimum scale of the corresponding energy supply or drive machinery, and use the rounding up method to generate a current scheduling plan for the energy supply drive system;

[0034] S405: Using a self-organizing map-particle swarm algorithm based on multiple perturbation strategies, the particle positions in the particle swarm are iteratively searched and optimized to obtain a new mechanical scheduling solution and a functional drive system solution, and then obtain the final optimized scheduling solution.

[0035] Furthermore, the operation steps of the self-organizing map-particle swarm algorithm based on multiple perturbation strategies in step S405 specifically include:

[0036] S4051: Set the initial particle population P0 distributed in the feasible region and input it into the particle swarm calculation process with linear decreasing weight;

[0037] S4052: According to the complexity of the fitness function, adopt the linear decreasing inertia weight mode to iterate n0 times, and record n0 global optimal particle stepping trajectories;

[0038] S4053: Based on the SOM network, adjust and generate a new population P1 of the same size as the original population;

[0039] S4054: inputting the new population P1 into the particle swarm calculation process of the adaptive mode as its initial population;

[0040] S4055: Adopting the mode of adaptively changing the inertia weight and searching the neighborhood to perform the second round of particle swarm iterative calculation;

[0041] S4056: Repeat the loop iteration and output the output result of the last loop as the final solution.

[0042] Furthermore, the present invention also includes a low-carbon emission construction machinery scheduling optimization device for long tunnels, including at least one processor; and a memory communicatively connected to the processor; wherein the memory stores instructions executable by the processor, and the instructions are executed by the processor so that the processor can execute the scheduling optimization method as described above.

[0043] Furthermore, the present invention also includes a terminal, including the tunnel low-carbon construction machinery dispatching device as described above.

[0044] Furthermore, the present invention also includes a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to enable the computer to execute the scheduling optimization method as described above.

[0045] The beneficial effects of the present invention are:

[0046] 1. The present invention proposes a low-carbon tunnel construction machinery scheduling, which establishes a tunnel construction machinery configuration model that takes carbon emissions into consideration, determines the constraints of the tunnel construction machinery configuration model that takes carbon emissions into consideration, and uses a self-organizing map-particle swarm algorithm to optimize and solve the tunnel construction machinery configuration model to obtain the final optimization scheduling solution. This method can optimize construction scheduling and reduce redundant carbon emissions generated by construction equipment during tunnel construction while ensuring the tunnel construction period.

[0047] 2. The present invention proposes a self-organizing map-particle swarm algorithm, with the purpose of improving the search ability of traditional particle swarm to solve multi-level complex optimization models, and adopts a variety of improved strategies to optimize the particle swarm algorithm, specifically, respectively adopting strategies to generate an initial population uniformly distributed in the solution space, adaptively adjusting parameters to change the search neighborhood scale in time, and self-organizing map neural network weight generation particles to improve local search capabilities. After simulation experiments, it was verified that the algorithm can effectively avoid converging to the local extreme value in advance to reach the theoretical extreme point, with high convergence accuracy and stronger robustness. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 This is the energy flow model of the tunnel construction machinery system in the first embodiment of the present invention.

[0049] Figure 2 This is a schematic diagram of the process flow of solving the optimization process of the tunnel construction machinery configuration model considering carbon emissions in the first embodiment of the present invention.

[0050] Figure 3 This is an algorithm convergence curve of 9 function test runs in the simulation experiment of the present invention. DETAILED DESCRIPTION

[0051] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0052] Embodiment 1:

[0053] A tunnel low-carbon construction machinery scheduling method comprises the following steps:

[0054] S1: Establish a tunnel construction machinery scheduling model;

[0055] Specifically, according to the idea of ​​energy flow path tracking and based on previous tunnel construction engineering experience, the tunnel construction machinery system can be divided into four subsystems: drilling and blasting system, anchor spraying support system, excavation and transportation system, and energy supply and drive system. The energy flow relationship of the four subsystems during the construction process is shown in the attached figure. Figure 1 It should be pointed out that Figure 1The energy flow diagram does not take into account the electricity and fuel consumption caused by self-propelled mechanical equipment in other systems besides the excavation and transportation system.

[0056] S2: Establish a tunnel construction machinery configuration model considering carbon emissions;

[0057] Specifically, the number of all possible types of equipment used in the construction process is recorded as d, and the number of each item of all possible machinery and equipment is recorded as a d-dimensional vector A = {A1, A2, A3, ..., A d In the process of mechanized tunnel construction, if large-scale mechanical equipment (such as TBM) that consumes heavy oil is not used, the types of energy required are mainly electricity, diesel and gasoline. The above forms of energy consumption can be converted into carbon dioxide equivalent values ​​for direct assessment of carbon emission levels, that is, the carbon emission factor method is used to calculate carbon emissions; combined with previous engineering experience, the construction process time and total carbon emissions can be regarded as functions of A, recorded as T(A) and E(A) respectively. Further investigation of the relationship between T(A) and E(A), without considering nonlinear effects such as changes in drilling depth caused by changes in rock drill configuration, affecting the depth of the charge hole and thus affecting the single blasting footage, the total carbon emissions can be considered to have the following expression:

[0058]

[0059] In the formula, A ij is the number of the i-th mechanical work on the j-th working surface, m is the total number of working surfaces; T ij (A) is the direct working time of the i-th machine on the specified working surface j of the current process, and E i That is, the carbon dioxide equivalent value of the total unit emission of the i-th type of machinery, expressed as: E i =C d ×D1+C o ×D2+C e ×D3,C d , C o , C e D1, D2 and D3 are the carbon emission factors of diesel, gasoline and electricity respectively. D1, D2 and D3 are the total amount of diesel, gasoline and electricity consumed in the current mechanical unit shift.

[0060] It should be noted that the carbon emission factor refers to the unit carbon emissions of various energy sources from production to transportation and then to complete energy conversion. In view of the regional and temporal nature of the carbon emission factor, the present invention selects the life cycle basic database and IPCC to comprehensively calculate the carbon emission factors of the three energy sources.

[0061] By dimensionless processing of T(A) and E(A), we can obtain

[0062]

[0063] In the formula, k1 and k2 are the carbon emission preference weight and construction period preference weight respectively, and E max 、T max They are the maximum carbon emission and the maximum construction period respectively.

[0064] In summary, the tunnel machinery configuration optimization model considering construction cost, construction period, quality control and carbon emissions can be written as

[0065]

[0066] S3: Determine the constraints of the tunnel construction machinery configuration model considering carbon emissions;

[0067] When determining the constraints, the following issues need to be considered: the determination and division of main process operations and parallel operations; the differences in the types and upper and lower limits of the machine group configurations for each work surface; and the fixed-duration processes that must be arranged within the cycle due to safety regulations.

[0068] In actual engineering, the support operation for tunnel excavation method often needs to be carried out simultaneously with the drilling and blasting operation, which also makes the two unable to be completely separated. In order to unify the accuracy and simplicity of modeling, a new division system must be selected to deconstruct the construction process within the cycle time. The main process operation directly controls the single cycle time. Although the parallel operation does not directly participate in the control of the cycle time, its operation time still needs to be constrained. The most direct restriction strategy is that it must not exceed the duration of the parallel main process. However, in the process of optimization and iterative calculation, this situation can be allowed to occur. At this time, the parallel process with the longest relative duration can be adjusted as the nominal main process for the calculation model; therefore, the main process-parallel process division form is conducive to simplifying the process model. After the processes within the cycle time are distinguished as the main process-parallel process, the cycle time can be regarded as the transformation of the main process time accumulated in order, and on this basis, the secondary relationship between the main process working time and the parallel process working time is established. If there is only one process on the working surface and the processes carried out simultaneously are independent of each other, the following relationship exists:

[0069] T control,n =max{T ij (A,m=n)}

[0070]

[0071] Where, T control,n Represents the nth main process in the cycle.

[0072] The number of machines that can be configured for each working face and each process is also restricted by the actual situation; when the multi-step method is adopted for excavation, the working face of each step is significantly narrower due to the length and height restrictions compared with the full-section method with the gantry advancement. The rock drill operation team cannot arrange as many rock drills as possible without restriction. At this time, the drilling operation time is controlled by the step with the longest time required; in the excavation section of the invert, the existence of the trestle makes the vehicle available channel further narrow. When excavating and mucking, the ballast truck and the concrete transport pump truck will interfere with each other, and the interference effect becomes more obvious as the number of vehicles increases. The interference time can be obtained by the on-site investigation data and the establishment of a linear regression equation; moreover, when the number of energy supply drive devices is limited, it is impossible to start enough machines and the rock drill must be driven by an air compressor. However, it is difficult to ensure the sufficient number of energy supply drive machines in real time during the construction of long and large tunnels. Reasonable planning of the configuration of energy supply drive machines is a deep manifestation of the problem of mechanical configuration optimization. In summary, the constraints are:

[0073] stk1,k2>0

[0074] k1+k2=1

[0075] 0≤A ij ≤Z ij

[0076] In the formula, Z ij A is the total number of available machines of the i-th type on the j-th working surface; ij is the number of the i-th mechanical work on the j-th working surface, and Z ij and A ij Both are integers.

[0077] It should be noted that, under the premise of adopting a multi-step construction method, the number of working faces can be considered equal to the number of steps. If an invert and advance support are required, they should be regarded as independent working faces for conversion. For machines such as rock drills that do not have independent energy supply capabilities, according to the idea that there is a fixed route for energy flow between systems, it is necessary to trace back and examine the lower limit of the scale and working hours of the energy supply equipment (i.e., air compressors, etc.) upstream of the energy flow to calculate emissions. In this way, the constraints become:

[0078] stk1,k2>0

[0079] k1+k2=1

[0080] 0≤A ij ≤Z ij

[0081] P e ≥P

[0082] Where P eThe rated power or working capacity provided for the energy-supplying driving equipment, P is the power consumed by the energy-consuming machinery.

[0083] Combined with the operation form of the mechanical system during the cyclic excavation of the tunnel, the model mentioned in the above model that combines the construction period and carbon emission targets through linear weighting is discussed: Existing projects have shown that although the degree of mechanization is directly positively correlated with the carbon emission level within a certain range, and increasing the degree of mechanization will shorten the construction period, this improvement effect is not unlimited due to the constraints of other factors, and the longer the single process time, the greater the emissions caused by the idling of the machinery. Therefore, although the two targets of construction period and carbon emissions are conjugate, there is no obvious mutual constraint relationship. Therefore, the previous practice of converting the target model into a single target model by using the linear weighted method to weight each indicator is desirable.

[0084] S4: Optimizing and solving the tunnel construction machinery configuration model considering carbon emissions in step S2 to obtain a final optimization scheduling solution;

[0085] According to the above deconstruction method, the scheduling model of the present invention does not involve the sorting and time allocation problems of various machines, and there is not much connection between the processes, so it can be divided into several independent parallel machine scheduling problems that can be calculated in a unified manner, and based on this, a particle encoding and decoding technical solution suitable for the model proposed by the present invention is designed. The encoding design of the particle swarm algorithm applied to the scheduling problem mainly considers the following three issues: the feasibility of the corresponding encoding scheme mapping the solution space, the availability of the particle encoding scheme for the calculation model, and the complexity of the encoding scheme mapping the solution space. The first two are the basic conditions to ensure the feasibility of the calculation process, and the latter is the requirement to reduce the calculation cost and save the calculation time.

[0086] Referring to the Machine-PPR particle encoding method, a Workplace-PPR particle encoding method based on the work surface as the reference object is defined to adapt to the above model: a two-dimensional particle is defined as follows. The first dimension of the two-dimensional particle uses natural numbers 1, 2, ..., n to represent the nth machine under the current machine type. The second dimension represents the position of the particle. The length of the particle is the total number of schedulable machines of the same type.

[0087] For the i-th particle component, its vector form is (p, x ij ) T , p∈{1, 2, ..., n}, x ij ∈[0, m+1), x ij is a randomly generated real number, and the encoding format is shown in Table 1 below:

[0088] Table 1 Coding format

[0089]

[0090] The generation process of the scheduling scheme is the decoding process of the above encoding. The specific operation is to ij Round down, so that the rounded particle position INT[x ij ] is the working surface corresponding to the current mechanical unit i or no working surface is assigned (that is, 0). In this way, all mechanical units are assigned whether to be called or the working surface they are in, and a parallel machine scheduling plan for the current type of machinery is generated; by splitting the entire process of the work step into several parallel machine scheduling problems, the remaining mechanical scheduling plans are generated in parallel and independently and summarized to obtain an overall mechanical scheduling plan. Since the above-mentioned particle encoding and scheduling plan generation method are carried out for the working surface, the present invention refers to this particle representation as particle encoding based on working surface and PPR. It is worth noting that this encoding method pays attention to the corresponding situation of the working surface of each mechanical unit scheduled. Although this creates an unfavorable situation of large computing expenses, it is of great help to the subsequent accurate flow tracking to the mechanical unit, and when there is a significant gap in the working capacity of different unit machines, this encoding method can still maintain the availability of the computing model.

[0091] The scheduling of the energy supply and drive system uses another set of calculation methods: after the mechanical scheduling scale particles in other systems are mutated and decoded into scheduling plans, the minimum scale of the corresponding energy supply or driving machinery is directly calculated according to the required driving energy. The specific operation is to round up to get the minimum number of corresponding machines; and the cycle duration is recalculated and determined by the main process duration corresponding to each work surface that performs scheduling optimization, and then added to the duration of other main processes; in order to minimize the generation probability of particles corresponding to infeasible solutions, for operations that randomly generate particle positions within a specified domain, when the specified domain boundary is exceeded, the values ​​should be randomly selected within the domain instead of assigning upper and lower limits to the particle positions.

[0092] Based on the above calculation method for the mechanical scheduling scheme and the functional drive system scheme, a new mechanical scheduling scheme and the functional drive system scheme can be obtained by iterative search and optimization of the particle position, and then the final optimized scheduling scheme can be obtained, as shown in the attached figure. Figure 2 shown.

[0093] Embodiment 2:

[0094] On the basis of Example 1, in Example 2, step S4 uses a self-organizing map-particle swarm algorithm based on multiple perturbation strategies to optimize and solve the tunnel construction machinery configuration model considering carbon emissions in step S2 to obtain a final optimized scheduling solution.

[0095] The construction of the self-organizing map-particle swarm algorithm based on multiple perturbation strategies includes the following:

[0096] 1. Optimize particle swarm algorithm

[0097] The construction plan for long and large tunnels is complex. The excavation site often involves dozens or even hundreds of machines working simultaneously with each other in time and space. This means that the configuration and scheduling model for the tunnel construction machinery group is a complex, high-dimensional, hierarchical, multi-functional expression. The search for the optimal solution to the overall carbon emissions and configuration parameters requires considerable overhead. Therefore, an algorithm with sufficient search capabilities must be designed based on the model optimization calculation requirements.

[0098] Particle swarm optimization (PSO) is an optimization algorithm based on continuous space. It has an inherent advantage in retaining excellent fitness value solutions. In the particle iteration process, the particles corresponding to the high fitness value solutions are used as references. While fully retaining excellent particles, the remaining particles are also allowed to move preferentially, so that all particles can be accelerated to participate in the convergence process as much as possible. However, it also has many disadvantages, such as the final search performance is subject to the size and distribution of the initial population, the local search ability of the whole process is insufficient, and it is easy to fall into local extreme values. For the problems of the particle swarm algorithm itself, it can be optimized through the following three schemes: 1. Change or refine the topological structure of the particles, such as the particle swarm algorithm with a master-slave structure; 2. Introduce a new particle stepping mechanism, the most direct means is to adjust various parameters such as the stepping speed update process; 3. Coupling with other algorithms; On the basis of replacing the original randomly generated initial population distribution, the present invention adopts a combination of several methods and designs a set of combined iteration schemes of multiple modes and strategies in the whole process to optimize the particle swarm algorithm.

[0099] The optimization of intelligent algorithms is often done by combining machine learning technology. There are also many practices of improving optimization algorithms through neural networks, support vector machines and other technologies in order to obtain the optimal solution for a single objective or get as close to the Pareto frontier of multiple objectives as possible. There are few research and discussion papers on how to track the step trajectory of the historical optimal particle and use this as a starting point to improve the particle swarm algorithm. The present invention starts from the perspective of tracking the historical optimal particle trajectory and analyzing the topological structure of its solution vector space, uses multiple means to intervene and interfere in the particle stepping process, improves the global particle stepping iteration mechanism, and proposes a self-organizing mapping-hybrid particle swarm (Hybrid Self-Organization Mapping Net-Particle Swarm Optimization With Improvement Strategies) algorithm that adopts multiple improvement strategies. First, a certain scale of preliminary calculations are performed using the search and stepping strategy of a variable inertia parameter particle swarm, and the trajectory of the historical optimal fitness value particle is tracked. The corresponding solution space is projected onto the node using a self-organizing mapping network to form a flattened distribution that retains the original topological structure, and the particle perturbation is performed based on the weight that converges to the local extreme value too early, and then it is put into the original iteration process and the search mode is adjusted to an adaptive mode. The parameters or the number of cycles of each strategy are adjusted according to the complexity of the fitness function; if a single particle redistribution adjustment is difficult to meet the fitness function complexity requirement, a cyclic iteration step of generating an intermediate particle swarm based on a uniform design table for perturbation is added; and an automatic exit mechanism is used to avoid redundant iterations.

[0100] 2. Self-organizing network

[0101] 2.1 Adaptive Change Strategy

[0102] The commonly used particle swarm improvement strategies at the parameter level are to use dynamically changing inertia weights and to introduce shrinkage factors into the learning factors for adjustment. The inertia weight represents the ability of the particle to inherit its previous stepping speed. Compared with only one fixed inertia weight in the whole particle stepping process, the changing inertia weight is more conducive to adapting to the requirements of different stages in the algorithm. The adaptive inertia weight strategy is one of the most adaptable variable weight strategies. It uses the fitness and number of iterations of each particle as variable weight parameters. By directly measuring the distance between the particle and the optimal solution, it determines the search mode orientation that the current particle needs to take. Taking the minimum fitness function as an example, its inertia weight is:

[0103]

[0104] in, is the average fitness of all particles at the dth iteration, and That is, it is the minimum and maximum value of all particles at the dth iteration.

[0105] According to the size of the neighboring particle group range referenced by the particle weight step, two search modes, global mode and neighborhood mode, are usually adopted. The global mode is a mode that uses all particles in the current space as a reference for step adjustment. This is also the search strategy adopted by the basic particle swarm algorithm. Although the communication between particles is large and rapid in the global search mode, it also indirectly causes the unfavorable situation that the early seed particles are single and easy to fall into the local optimum. When the particle swarm algorithm is actually applied, an adaptive neighborhood mode can be introduced, that is, only particles in a limited neighboring area are taken as step reference objects, and the particle swarm is divided into several small groups for search to weaken the disadvantage of being easy to fall into the local optimum.

[0106] The present invention adopts a scheme that the search mode changes with the iteration process. The neighborhood mode is adopted in the early stage and the global mode is adopted in the later stage. The advantages of both are fully reflected. In the neighborhood mode, the search range (i.e., the number of single-particle searches) and other parameters are more continuously adaptively changed. The specific rules are as follows: The minimum fitness of all particles when the number of iterations is k (k>1) is The minimum fitness of all particles after the last iteration is Compare and The relative size of Record flag = 1, otherwise record flag = 0; if flag = 0, then accumulate once, the stagnation counter counts (starts counting from 0 in the global process), and changes the scale Q of floating particles in the field:

[0107] Q=min{Q+minNeighborhoodSize,SwarmSize}

[0108] Where minNeighborhoodSize is the minimum number of particles in the neighborhood, that is, the fixed particle size; SwarmSize is the total number of particles.

[0109] If flag = 1, then only the minimum number of particles in the domain is taken for Q, and c is updated, where:

[0110] c = max{c-1,0};

[0111] The size of c needs to be judged on this basis. If c<2, change w to 2w; if c>5, change w to w / 2; if the calculated result exceeds the upper limit of the inertia weight or is lower than the lower limit, it needs to be adjusted to the boundary.

[0112] When the fitness begins to stagnate, the search of the particle swarm will change from a small-range neighborhood mode to a large-range neighborhood mode, and then to a global mode as needed. Once the fitness increases, the search range will be immediately narrowed to avoid local optimality. When the order of magnitude of the update stagnation is less than the predetermined value and the number of stagnations is large enough, the inertia coefficient begins to decrease continuously to facilitate local search.

[0113] 2.2 Self-Organizing Map Network

[0114] The self-organizing map network (SOM) is an unsupervised learning competitive neural network proposed by Finnish neural network scientist Kohonen in 1981. It is different from the forward plus feedback transmission network structure represented by the BP neural network. Instead, it uses competitive learning as a guiding strategy. It selects nodes with good performance by calculating the Euclidean distance between each node and the input data, and adjusts the weights of the nodes. It also steps the weights of the neighboring nodes within a certain distance to achieve node activation. The SOM network is mainly used in tasks such as classification and clustering. In engineering applications, it is mainly reflected in statistical analysis, image processing, and fault diagnosis. However, in the number of iterations, Under the premise that the number reaches a certain value, it can be found that the sub-item values ​​of the input sample are fitted in the form of weight components connecting the input layer and the competition layer. The fitting deviation will decrease with the increase of the number of iterations, and the activated nodes mapped to the competition layer still maintain the topological structure of the original high-dimensional data sample. This provides a very intuitive observation tool for observing the stepping trajectory of the particle group when calculating the high-dimensional model and whether it has fallen into the local optimum. At the same time, the correlation between the sub-vectors of the solution vector particles can also be intuitively observed through the weight distribution of the mapping nodes, which provides a realistic possibility for using the self-organizing map network weights to generate or iteratively update the solution vector particles.

[0115] There are two types of competition layer node dimensions that can be directly observed: two-dimensional and three-dimensional. Considering the convenience of observation and implementation adjustment, an overall flat two-dimensional node competition layer is selected. By capturing the distribution trend of the particle swarm that is constantly evolving during the step-by-step iteration process, and mapping it to the low-dimensional plane represented by the node according to the topological relationship between the particles in the original dimension, it is possible to evaluate whether the connection between the particles is close, and then it can be known whether there are more abnormal concentrations of group particles in a certain area (corresponding to a single node or including nearby nodes centered on a single node). For the corresponding nodes that have fallen into the local optimum, an adaptive strategy is adopted based on the node weights after a sufficient number of iterations to redistribute them in the feasible domain as much as possible, and the re-adjusted particle swarm is put into subsequent calculations. For the high-dimensional model calculation problem with high complexity, multiple topological adjustments can be made in the subsequent iteration process; the similarities and differences in the node areas excited by the sub-items corresponding to each weight can roughly identify the size of the correlation between the sub-items, which is also instructive for the selection of variables and the timely adjustment of the fitness function form, and is also a by-product of coupling operations. In summary, the self-organizing map network acts as a monitor for whether it is trapped in the local optimum and a generator for allocating particles with new distribution forms in the early iteration process.

[0116] 2.3 Automatic Exit Mechanism

[0117] When the particle has reached the optimal fitness position in the feasible domain, it is unwise to continue the iteration operation from the perspective of saving computational costs. Therefore, it is necessary to introduce the tolerance of the change as the threshold for whether to terminate the predetermined number of iterations in advance. Generally, in the calculation process, 10 is usually taken. -6 As the termination threshold, that is, within the set number of iterations, the ratio of the change rate of the current step output fitness value to the previous step output fitness value to the previous step fitness value is continuously less than 10 -6 When , the iteration cycle is terminated in advance. However, when there are steps in the fitness function, the fluctuation range of the fitness function is unstable, or a high-precision solution is required, the threshold is too large, which may cause the particle swarm to exit the step iteration in advance before converging to the target accuracy. Therefore, a smaller threshold can be set to avoid this unfavorable situation.

[0118] 2.4 Uniform design table to generate population

[0119] Orthogonal design was originally widely used in various multi-factor and multi-level experimental designs. Because of its high efficiency and clear division, it can significantly reduce the number of experiments and fully reflect the differences in experimental results. Therefore, it is promoted and applied to the uniform generation of the initial population of swarm intelligence algorithms such as genetic algorithms. In the process of initial population generation, the goal is to disperse the particles of the initial population to be operated in the feasible domain as evenly as possible, and the numerical values ​​of each item are as orthogonal as possible without considering their internal connections. Compared with adopting a completely random strategy in a limited population space, it is more conducive to getting rid of the situation of falling into the local optimal situation and shows better performance in global search.

[0120] However, the orthogonal design also has the problem that the number of experiments increases significantly with the increase of the number of levels and factors. When solving high-dimensional problem operations and not being able to set too many initial population particles, how to screen the population determined by the orthogonal table to continue to maintain the original uniform dispersion and high orthogonality of the orthogonal design becomes a practical problem. In order to solve the problem of maintaining the uniform dispersion characteristics of the experimental design under multi-level problems, there are currently two main methods for generating uniform design tables: the good grid point method and the integer congruent power method. The present invention adopts the former, and its specific operation rules are as follows:

[0121] ①. Determine the number of trials n, which is the number of particles in the initial population in the initial population generation problem. Find all integers h that are coprime with n in the integer domain [1, n], and group all h into a set h = (h1, h2, ..., h m );

[0122] ②. Determine the recursive values ​​of each column and each row of the uniform design table through congruence calculation. The specific formula is as follows:

[0123] u ij =ih i [mod n]

[0124]

[0125] ③. It should be noted that according to the inference of the Euler function E(n) in the field of number theory, the maximum number of factors is a certain value under a certain number of trials or initial population particles, which means that a limited number of particles cannot be completely evenly distributed in an unrestricted high-dimensional solution space. However, compared with the orthogonal design, it has achieved a more efficient distribution form. The maximum number of factors allowed under a certain number of trials or initial population particles can be further determined by the Euler function E(n), that is, they can be evenly distributed in the highest dimension of the corresponding solution vector space. The specific formula is as follows:

[0126]

[0127] Here, p is a prime number in a region classified according to whether n is a prime number or a prime power.

[0128] ④. The quasi-horizontal method is used to flexibly set the number of levels under each factor according to the difference in the size of the feasible domain of each sub-item of the solution vector, and finally a mixed level uniform design table is generated. The sub-items with small feasible domains will be reproduced at a higher frequency during the initial generation of particles and particle stepping, which is also in line with the natural calculation process. Moreover, when generating orthogonal tables, the same number of levels will be used to configure the division and correction to obtain a mixed orthogonal uniform design table.

[0129] 3. Improved self-organizing network-particle swarm algorithm

[0130] Self-organizing map network is used as the monitoring and regulation mechanism of the intermediate process of particle swarm stepping iteration. In combination with improved strategies such as particle population adjustment strategy based on uniform design, adaptive change adjustment of search range and parameters, and setting early exit mechanism, a self-organizing network-particle swarm algorithm is proposed.

[0131] Compared with other algorithms based on random mutation strategies such as genetic algorithms, the biggest advantage of the particle swarm algorithm is that it organically combines the orderliness of group behavior with the controllability of the random process of individual behavior. If the particle sequence of the previous iterative operation is completely randomly scattered, although the purpose of effectively disturbing the particle motion path to avoid falling into local convergence is achieved, the current particle set search results are completely wiped out. Putting this completely randomly discretized particle set into the next round of particle swarm calculation process is equivalent to re-searching for the optimal solution from the initial level; with the help of the self-organizing map network mentioned above, the current global optimal particle sequence, that is, the global optimal particle trace, is input into it for a considerable number of iterations and then pattern recognition and pattern clustering are performed, then the classification of each particle in the set sequence and the global distribution law can be fully characterized at the competition layer. According to the self-organizing map network The working characteristics of the network, if the input data similarity is high and similar data occupies a considerable part of the data set, it will cause the weight of a single or several adjacent neuron nodes to be abnormal and then show excitement significantly higher than other nodes. At this time, the data samples absorbed by the excited nodes are the weights mapped by the vectors of the convergent particles. The mapped weights corresponding to the excited nodes are adjusted according to the uniform design table and redistributed in the feasible domain to avoid excessive concentration of topological distances between samples over a large area. The adjusted weight samples are used as particle sets to be put into the calculation process dominated by the adaptive strategy. It should be noted here that a certain number of particles are needed to maintain the computing power and accuracy of the second particle swarm step iteration, which also requires that the number of iterations of the first particle swarm calculation needs to set a lower limit on the scale. The adjustment process based on the self-organizing map network is now specifically described:

[0132] In obtaining the sequence sample of the global optimal particle {p1, p2, ..., p n}, the number of output layer neuron nodes is set according to the length m of the particle and the sample size. In order to allocate independent space to each particle as much as possible, the number of samples n can be directly taken as the number of nodes, and the number of iterations is min{100,10m}. After the iteration operation is completed and the weights are updated, the number of mapped particles Samplehit falling into each node is read. If there is a node i that satisfies Samplehit i >0.1*n, it is determined that the particles mapped by the mapping weights contained in the corresponding neural node have converged and aggregated, and the mapping weight set corresponding to the node is retrieved from all the mapping weights. Relying on the uniform design table with the number of factors taking the value of m and the uniform number of experiments taking the value of at least n, the mapping weights in the node are evenly dispersed into the feasible domain space, and the mapping weights corresponding to the remaining nodes remain unchanged. The corrected and adjusted mapping weights are the initial particles put into the next round of particle swarm calculation process.

[0133] The structure and global process of the self-organizing map network-particle swarm algorithm are now explained:

[0134] Combined with previous algorithm cases and test function experiments, the algorithm global key parameter setting criteria are further formulated; among them, the complexity of the fitness function model is an important basis for determining the number and scale of adjustments in the whole process: it is generally believed that the higher the function complexity (dimension D>20), the easier it is for the optimization process to fall into the local optimum, so the required self-organizing map adjustment strength is also stronger, the number of iterations in the first stage of linear decreasing weight particle swarm calculation must meet certain scale requirements, and the exit threshold (maximum 10) should not be set too high in the particle swarm calculation stage using the adaptive mode. -9 ) to ensure the calculation accuracy, because according to experimental observations, the global optimal solution converges slowly and uniformly in the later stage; if the function complexity is low (dimension D <= 20), a smaller number of iterations of the linear decreasing weight particle swarm calculation stage can be set, but its lower limit must also meet max{100,10m}, and the early exit threshold level of the adaptive adjustment stage cannot be too high (maximum 10 -6 ); The initial particle swarm size under different modes should also be reasonably set according to the complexity of the calculation. Conventionally, the particle size should be between 20 and 60. In order to maintain the consistency of the particle swarm calculation process, it is stipulated that the particle size of the two particle swarm calculation iterations should be the same. The particle size has a weighing effect on the calculation efficiency and the calculation time expenditure as well as the complexity of the algorithm structure of the present invention. For the target model with a higher dimension, the lower limit of the particle size should be 50 and the upper limit should be 100.

[0135] In summary, the specific operation process of the self-organizing map network-particle swarm algorithm in the present invention includes the following steps:

[0136] Step 1. Set the initial particle population P0 distributed in the feasible domain and input it into the particle swarm calculation process with linear decreasing weight;

[0137] Step 2. According to the complexity of the fitness function, adopt the linear decreasing inertia weight mode to iterate n0 times, and record the n0 global optimal particle stepping trajectories;

[0138] Step 3. Import the first n0 step trajectories or part of the n0 step trajectories into the SOM network, and determine whether trajectory concentration occurs based on the topological relationship of the connection layer nodes;

[0139] Step 4. Find the particle clusters in the occurrence trajectory set according to the node size, and adjust and generate a new population P1 of the same size as the original population based on the corresponding node mapping weight set;

[0140] Step 5. Input the new population P1 into the particle swarm calculation process of the adaptive mode as its initial population;

[0141] Step 6. Adopt the mode of adaptively changing the inertia weight and searching the neighborhood to perform the second round of particle swarm iterative operation;

[0142] Step 7. Set the maximum number of iterations n1 in the adaptive mode. If the change rate is still not less than the threshold at the n0+n1th step of the whole process, the iteration is forced to exit. Starting from the r+1th step of the adaptive iteration process and the n0+n1th step of the whole process, calculate the change rate from the n0+1th step of the whole process to the current number of iterations. If the change rate is less than the threshold, exit the iteration.

[0143] Step8. Output the output result of the last cycle as the final solution.

[0144] Simulation experiment 1:

[0145] The simulation experiment 1 verifies the effectiveness of the self-organizing map network-particle swarm algorithm in the second embodiment.

[0146] For the purpose of analyzing and comparing the effectiveness of the algorithms, the classic PSO, LDIW (Linear Decreasing Inertia Weight) PSO and SOM-PSO were selected for comparative testing. Nine functions were selected as test functions for the above three algorithms and their performance was compared. The selected test functions are:

[0147] Rosenbrock,Michalewicz,Sphere,Rastrigin,Griewank,Schwefel,Styblinski-Tang,Ackley,Shekel.

[0148] The test results are shown in Table 2 below.

[0149] Table 2 9 function running test results

[0150]

[0151] The algorithm convergence curve characteristics of the 9 function running tests are shown in the attached figure. Figure 3 As shown, the traditional particle swarm (yellow), linear decreasing inertia weight particle swarm (blue) and self-organizing map particle swarm (red) are compared for convergence analysis. During the test, the tracking scale was set to 200 times. On the low-dimensional (D=4) Shekel function, LDIWPSO (linear decreasing inertia weight particle swarm) and SOM-PSO converged to the theoretical extreme value at the same time, which means that they had converged to the theoretical extreme value before the tracking mechanism of SOM-PSO was started. This shows that in searching for the optimal value of low-dimensional multi-peak functions, SOM-PSO has little advantage over the particle swarm algorithm that adopts a simple improved strategy. For the high-dimensional (D=30) single-peak function Sphere function, SOM-PSO has proved with significant convergence accuracy (7.7981e-07) and the number of iterations before convergence (355) that it can more effectively avoid premature convergence to the local extreme value to reach the theoretical extreme point compared with the first two algorithms. In addition, for high-dimensional (D=30) multi-peak functions such as Rastrigin, Griewank and Styblinski-Tang, SOM-PSO's ability to avoid premature convergence and convergence accuracy are also significantly stronger than the first two algorithms.

[0152] For Shekel (D = 4), Ackley (D = 12), Sphere (D = 30), Griewank (D = 30), and Styblinski-Tang (D = 30), only a single tracking redistribution operation is required to obtain a significantly ideal fitness value solution compared to traditional PSO or LDIWPSO; Rosenbrock (D = 30) needs to set a considerable tolerance in the adaptive mode to ensure that it can continue to converge to the ideal value, and the number of iterations is significantly increased, but compared with the traditional particle swarm, it can easily jump out of the local optimum; SOM-PSO performs better than the first two on Michalewicz (D = 10) and Schwefel (D = 10), but its ideality is not as good as the above 6 test functions, so it is necessary to add Step 9 again. The final results are -9.4269 (iteration 349 times) and 236.8768 (iteration 381 times), respectively. Compared with the single tracking redistribution strategy, its search results are closer to their respective theoretical extreme points.

[0153] In summary, in the above nine test functions, the SOM-PSO algorithm proposed in the present invention has achieved relatively excellent performance results, but it is still necessary to analyze the contribution of each disturbance mechanism to the improvement of algorithm performance on this basis.

[0154] For the theoretical extreme value search calculation of the Rosenbrock function (D=30), its computational overhead is significantly greater than that of other fitness functions of the same dimension. When the upper limit of the total number of iterations is reached (6000 times), its search result has converged to 0.39153, and when it is iterated to the 1000th time, it has converged to 20.8761. In the process of iterations from 1000 to 6000, it always maintains an extremely slow and uniform speed of convergence. In order to save computational expenses and balance the accuracy requirements, the test results only take the 1000th iteration result as the final output. After analysis, it can be seen that the exit mechanism in the post-tracking operation mode adopts a higher tolerance (e-12) which causes this situation. This convergence process has experienced several convergence stops with slight changes. If a higher tolerance is adopted, it is very likely to jump out of the iteration after experiencing a step. Although the possibility of the function converging to the theoretical extreme point is ensured, the slow convergence speed still needs to be improved.

[0155] A tracking redistribution disturbance can also accelerate the convergence process. Taking the Griewank (D=30) function convergence curve as an example, it is not difficult to find that after a tracking redistribution disturbance, the SOM-PSO convergence curve drops by an order of magnitude compared to the LDIWPSO curve. If a higher order of magnitude tolerance is set, the iteration will stop quickly and output a convergence value that meets the accuracy requirements.

[0156] It is mentioned above that two particle redistribution operations were performed on Michalewicz (D=10) and Schwefel (D=10). Further observation of the iterative convergence curve shows that, for both Michalewicz (D=10) and Schwefel (D=10), the second redistribution caused the fitness value to rebound, and then fell back to the level before redistribution or reached a more ideal fitness value; for the Schwefel (D=10) function, the second redistribution perturbation operation had an obvious effect on jumping out of the previous local extreme value, while for Michalewicz (D=10), after the second redistribution perturbation, its fitness value still maintained the level before the perturbation, indicating that the secondary perturbation mechanism did not have an obvious effect on the Michalewicz function, but the first redistribution perturbation made a significant contribution to both jumping out of the local extreme value.

[0157] In summary, it is not difficult to find that under the joint coordination of multiple mechanisms, the algorithm proposed in the present invention has stronger robustness, and different mechanisms and strategies have different contributions to various performance improvements under different fitness functions. At the same time, it is not difficult to find the limitations or defects of some mechanisms, which also provides ideas for improving the strategy details of the adjustment algorithm.

[0158] Simulation experiment 2:

[0159] Simulation experiment 2 simulates and verifies the low-carbon emission construction machinery scheduling optimization method for long tunnels formed by the scheduling optimization method in embodiment 1 of the present invention combined with the self-organizing map network-particle swarm algorithm in embodiment 2.

[0160] The F4 fault section of Wushaoling Tunnel is located in the southern part of Wushaoling. Its main fault zone is 200 meters long, and the two sides of the main zone are fault influence zones, with a total length of 450 meters. The influence zone is mainly composed of broken rock, the rock mass is broken, and the stability is poor. During the excavation process, the face is prone to collapse, but there is no obvious groundwater. The main fault zone is mainly composed of fault mud gravel and breccia, VI-V grade surrounding rock, poor stability, and is prone to collapse during excavation. There is a strong high ground stress squeezing effect, and there is no obvious groundwater. After the long step method was used in the No. 5 inclined shaft for construction, which led to a series of engineering problems such as abnormal convergence deformation and support damage, the main tunnel was constructed using a horseshoe section combined with an inverted arch. The three-step method is used for construction. The present invention optimizes the configuration of the machine group in this section of the cyclic construction process, in order to obtain a configuration scheme that achieves a balance among construction period, economy, quality, and carbon emissions.

[0161] According to the excavation and support process flow, the main processes that control the single cycle time are extracted and can be further divided into advance support, drilling and blasting operations, excavation and loading operations, and support operations.

[0162] After completing the advance support drilling and jacking operation of the upper section, the drilling and charging operations of the upper, middle and lower sections are carried out simultaneously, followed by smooth blasting and risk and smoke exhaust operations. The machines and tools directly needed are rock drills and air compressors.

[0163] The first mucking out and transportation operation in a single cycle is carried out simultaneously on the upper and lower sections. After the mucking out and removal work on the upper and lower sections is completed, the second mucking out and transportation operation on the lower section is carried out. The machines and tools required in this stage are excavators (excavators and loaders), dump trucks, concrete sprayers, concrete pumps / trucks, and automatic metering mixing stations.

[0164] The upper section spraying operation is at the end of the cycle. The machines and tools required at this time are concrete spraying machine and concrete delivery pump (truck).

[0165] Among them, the upper section advance support parallel to the lower section of the concrete spraying operation, need to use sprayer, conveying pump and concrete truck; the slag excavation and transportation operation is divided into two times and carried out successively, and parallel to the installation of steel frame and the construction of anchor rods and steel mesh, need to mobilize drilling rock drill and grouting pump; the upper section of the concrete spraying operation is parallel to the lower section of the steel frame and anchor rod installation operation, also need to mobilize drilling rock drill and grouting pump, in addition, the ventilation work after smooth blasting also needs to call axial flow fan to support.

[0166] After deconstructing all the work steps in the cycle and confirming the corresponding machinery and equipment required, the mechanical equipment and costs that can be used on site (based on the progress of the project) are counted based on interviews with engineering personnel involved in the project or upstream suppliers involved in equipment service support and reviewing relevant literature, and the corresponding carbon emission factors are calculated. The results are shown in Tables 3 and 4 below.

[0167] Table 3 Mechanical equipment used on site and costs

[0168]

[0169] Table 4 Energy consumption of different machines and equipment

[0170]

[0171] The target preference weights are determined for different sections and different construction methods. After the required data for the index calculation based on the previous excavation distance and the conclusions obtained from the consulting expert experience, the weights of each layer are determined according to the target preference weight index system mentioned above. Based on the on-site measurement data, previous engineering data and experience, and entropy weight method calculation, the unified target preference weight results used in this scheme are given, as shown in Table 5 below.

[0172] Table 5 Target preference weight results

[0173]

[0174] The self-organizing map-particle swarm algorithm is used to solve the cluster configuration optimization model. The parameters of the whole process are selected and determined according to the complexity of the model, and the variable results are forced to be rounded. The solution results are shown in Table 6 below.

[0175] Table 6 Results of solving cluster configuration optimization model using self-organizing map-particle swarm algorithm

[0176]

[0177] The present invention takes the basic particle swarm algorithm as the starting point, further explores the essential properties and working principles of the self-organizing map network, and deepens the coupling mechanism with the target improvement algorithm.

[0178] In view of the fact that the step search mechanism of the particle swarm algorithm is mainly designed for the search of continuous values, the fitness function and the calculation model adopted in the present invention fully consider the smoothness and continuity to ensure that the discrete solution value obtained by the rounding operation still has the properties of the optimal solution.

[0179] According to the above configuration, it can be found that when it is brought into the calculation model, while maintaining the original single cycle time, its total carbon emissions are reduced by 18.34%, and the total unit cost is reduced by 8.67%, which fully realizes the Pareto optimization of the mechanical configuration relative to the original engineering case. The calculation model fully refines the working face and accurately configures the drilling and blasting equipment on the working face. On this basis, it is optimized in conjunction with the configuration relationship of other systems. This also reflects the superiority of model design based on the principles of system engineering.

[0180] Embodiment three:

[0181] Embodiment 3 provides a low-carbon emission construction machinery scheduling optimization device for long tunnels, which specifically includes at least one processor; and a memory communicatively connected to the processor; wherein the memory stores instructions executable by the processor, and the instructions are executed by the processor so that the processor can execute the scheduling optimization method described in Embodiment 2.

[0182] Embodiment 4:

[0183] Embodiment 4 provides a terminal, including the tunnel low-carbon construction machinery dispatching device as described in Embodiment 3.

[0184] Embodiment five:

[0185] Embodiment 5 provides a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to enable the computer to execute the scheduling optimization method described in Embodiment 1.

[0186] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A tunnel low-carbon construction machinery scheduling method, characterized in that: The following steps are included: S1: Establish a tunnel construction machinery scheduling model; S2: Establish a tunnel construction machinery configuration model considering carbon emissions; S3: Determine the constraints of the tunnel construction machinery configuration model considering carbon emissions; S4: using the self-organizing map-particle swarm algorithm, the tunnel construction machinery configuration model considering carbon emissions in step S2 is optimized and solved to obtain the final optimization scheduling solution; The specific operation of step S2 includes the following steps: S201: The number of all possible types of equipment to be mobilized for the construction process is recorded as d, and the number of each item of all possible machinery and equipment to be mobilized is recorded as a d-dimensional vector A = {A1, A2, A3, ..., A d }; The construction process time T and the total carbon emission E are both functions of A, denoted as T(A) and E(A) respectively; S202: Without considering nonlinear effects, the total carbon emissions are expressed as In the formula, A ij is the number of the i-th mechanical work on the j-th working surface, m is the total number of working surfaces; T ij (A) is the direct working time of the i-th machine on the specified working surface j of the current process, E i is the carbon dioxide equivalent value of the total unit emission of the i-th machinery, expressed as: E i =C d ×D1+C o ×D2+C e ×D3,C d , C o , C e are the carbon emission factors of diesel, gasoline and electricity respectively, and D1, D2 and D3 are the total amount of diesel, gasoline and electricity consumed in the current mechanical unit shift respectively; S203: Dimensionless processing of T(A) and E(A) yields In the formula, k1 and k2 are the carbon emission preference weight and construction period preference weight respectively, E max , T max They are the maximum carbon emission and the maximum construction period respectively; S204: The optimization model for tunnel machinery configuration considering construction cost, construction period, quality control and carbon emissions is: The constraints of the tunnel construction machinery configuration model considering carbon emissions in step S3 are: stk1,k2>0 k1+k2=1 0≤A ij ≤Z ij P e ≥P In the formula, Z ij A is the total number of available machines of the i-th type on the j-th working surface; ij is the number of the i-th mechanical work on the j-th working surface, and Z ij and A ij Both are integers; P e The rated power or working capacity provided by the energy-supplying driving equipment, P is the power consumption of the energy-consuming machinery; The specific operation of step S4 includes the following steps: S401: define a two-dimensional particle, in which the first dimension of the two-dimensional particle is represented by a natural number 1, 2, ..., n to represent the nth machine of the current machine type, the second dimension represents the position of the particle, and the length of the particle is the total number of machines of the same type that can be dispatched; S402: For the i-th particle component, its vector form is (p, x ij ) T , p∈{1, 2, ..., n}, x ij ∈[0,0+1), x ij is a randomly generated real number; S403: using a rounding-down method, generating and summarizing a scheduling plan for each type of machinery to obtain a current scheduling plan for the entire machinery; S404: Calculate the minimum scale of the corresponding energy supply or drive machinery, and use the rounding up method to generate a current scheduling plan for the energy supply drive system; S405: using a self-organizing map-particle swarm algorithm based on multiple perturbation strategies, iteratively searching and optimizing the particle positions in the particle swarm, obtaining a new mechanical scheduling solution and a functional drive system solution, and then obtaining a final optimized scheduling solution; The self-organizing map-particle swarm algorithm described in step S405 specifically includes the following steps: after obtaining a sequence sample {p1, p2, ..., p n }, the number of output layer neuron nodes is set according to the length m of the particle and the sample size. In order to allocate independent space to each particle as much as possible, the number of samples n can be directly taken as the number of nodes, and the number of iterations is min{100,10m}. After the iteration operation is completed and the weights are updated, the number of mapped particles Samplehit falling into each node is read. If there is a node i that satisfies Samplehit i >0.1*n, it is determined that the particles mapped by the mapping weights contained in the corresponding neural node have converged and aggregated, and the mapping weight set corresponding to the node is retrieved from all the mapping weights. The mapping weights in the node are evenly dispersed into the feasible domain space based on the uniform design table with the number of factors taking the value of m and the uniform number of experiments taking the value of at least n. The mapping weights corresponding to the remaining nodes remain unchanged, and the corrected and adjusted mapping weights are the initial particles put into the next round of particle swarm calculation process; Step 1. Set the initial particle population P0 distributed in the feasible domain and input it into the particle swarm calculation process with linear decreasing weight; Step 2. According to the complexity of the fitness function, adopt the linear decreasing inertia weight mode to iterate n0 times, and record the n0 global optimal particle stepping trajectories; Step 3. Import the first n0 step trajectories or part of the n0 step trajectories into the SOM network, and determine whether trajectory concentration occurs based on the topological relationship of the connection layer nodes; Step 4. Find the particle clusters in the occurrence trajectory set according to the node size, and adjust and generate a new population P1 of the same size as the original population based on the corresponding node mapping weight set; Step 5. Input the new population P1 into the particle swarm calculation process of the adaptive mode as its initial population; Step 6. Adopt the mode of adaptively changing the inertia weight and searching the neighborhood to perform the second round of particle swarm iterative operation; Step 7. Set the maximum number of iterations n1 in the adaptive mode. If the change rate is still not less than the threshold at the n0+n1th step of the whole process, the iteration is forced to exit. Starting from the r+1th step of the adaptive iteration process and the n0+n1th step of the whole process, calculate the change rate from the n0+1th step of the whole process to the current number of iterations. If the change rate is less than the threshold, exit the iteration. Step8. Output the output result of the last cycle as the final solution.

2. A tunnel low-carbon construction machinery dispatching method according to claim 1, characterized in that: In step S202, the life cycle basic database is combined with the IPCC to calculate the carbon emission factors of diesel, gasoline and electricity.

3. A tunnel low-carbon construction machinery dispatching method according to claim 1, characterized in that: The operation steps of the self-organizing map-particle swarm algorithm based on multiple perturbation strategies in step S405 specifically include: S4051: Set the initial particle population P0 distributed in the feasible region and input it into the particle swarm calculation process with linear decreasing weight; S4052: According to the complexity of the fitness function, adopt the linear decreasing inertia weight mode to iterate n0 times, and record n0 global optimal particle stepping trajectories; S4053: Based on the SOM network, adjust and generate a new population P1 of the same size as the original population; S4054: inputting the new population P1 into the particle swarm calculation process of the adaptive mode as its initial population; S4055: Adopting the mode of adaptively changing the inertia weight and searching the neighborhood to perform the second round of particle swarm iterative calculation; S4056: Repeat the loop iteration and output the output result of the last loop as the final solution.

4. A tunnel low-carbon construction machinery dispatching method according to claim 1, characterized in that: The tunnel construction machinery described in step S1 includes a drilling and blasting system, an anchor spraying support system, an excavation and transportation system, and an energy supply and driving system.

5. A tunnel low-carbon construction machinery dispatching device, characterized by: comprising at least one processor; and a memory in communication with the processor; wherein, The memory stores instructions that can be executed by the processor, and the instructions are executed by the processor so that the processor can execute the scheduling method according to any one of claims 1 to 4.

6. A terminal, characterized in that: It comprises the tunnel low-carbon construction machinery dispatching device as described in claim 5.

7. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to enable the computer to execute the scheduling method according to any one of claims 1 to 4.