An intelligent diagnosis method for drainage network transportation bottlenecks and manhole overflows
Through the drainage performance chart diagnosis method based on hydraulic principles, the problem of accurate positioning of bottlenecks and overflows in the drainage pipe network is solved, the design is optimized and operating costs are reduced, and the operating efficiency and safety of the drainage system are improved.
Patent Information
- Application Number
- CN202311863654.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-12-29
AI Technical Summary
Existing technology makes it difficult to accurately diagnose pipe sections and inspection well overflows in drainage pipe networks that are most prone to overflow bottlenecks, affecting construction optimization design and later operation and management costs.
A drainage performance diagram is established based on hydraulic principles. By determining the type of water flow conditions, collecting drainage pipe network data and combining it with the drainage performance diagram, the bottlenecks of the drainage pipe network sections and inspection well overflows are diagnosed, and unfavorable nodes are determined.
Effectively optimize design drawings, improve drainage system operation efficiency, reduce operation and management costs, and ensure safe operation of water flow.
Smart Images

Figure CN117909787B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of urban drainage system design, and in particular relates to an intelligent diagnosis method for drainage network transportation bottlenecks and inspection well overflows. Background Art
[0002] The drainage system is responsible for collecting and transporting rainwater, urban domestic sewage and industrial wastewater, and is an important infrastructure of a city. The online monitoring system of the urban drainage network can significantly improve the management level of the urban system by monitoring the flow and liquid level of the network and issuing real-time warnings when the warning line is exceeded. However, the monitoring cost is high, it is difficult to carry out large-scale monitoring, and it can only serve as a warning, and cannot improve the flow capacity of the drainage network.
[0003] The flow capacity of the drainage network is affected by the bottleneck of the drainage pipe and the overflow of the inspection well. The bottleneck of the drainage pipe refers to the water level in the pipe reaching the full pipe, causing the bottleneck of the drainage network transportation, and the overflow of the inspection well refers to the water level in the well exceeding the well depth. At the beginning of the design of the drainage system, there was a lack of sufficient judgment on the pipe sections in the system that were most prone to flow bottlenecks and overflowing inspection wells, resulting in the inability to improve the flow capacity of the system after it was built.
[0004] In the prior art, when designing drainage systems, drainage pipes are designed based on uniform flow and the Manning formula, which is somewhat different from the non-uniform flow that occurs in actual pipes, and there is a lack of evaluation of the flow capacity of the entire drainage system, which leads to the inability to accurately judge the bottlenecks of pipe sections and overflows in manholes in the drainage system, which affects the optimization design in the early stage of construction on the one hand, and the operation and maintenance costs in the later stage on the other hand. Therefore, it is urgent to develop an intelligent diagnosis method for drainage network transportation bottlenecks and manhole overflows, which can be used to evaluate the design scheme in the early stage of construction, optimize the determined unfavorable nodes, and evaluate the most unfavorable nodes based on the monitored flow and water level data in the later stage, so as to improve the operation efficiency of drainage pipes and reduce operating costs.
[0005] The Drainage Performance Graph (DPG) is a set of curves that show the relationship between upstream and downstream water levels at different flow rates based on the basic physical parameters (dimensional parameters, slope and roughness) of each drainage pipe and manhole provided by the drainage network design drawings. The DPG can be used to determine the pipe sections in the drainage system that are most prone to flow bottlenecks and overflowing manholes.
[0006] The present invention aims to propose an intelligent diagnosis method for drainage network transportation bottlenecks and manhole overflows based on drainage performance diagrams. By adopting the principles of hydraulics, a drainage performance diagram is established, and the drainage system design drawings are deeply analyzed. Under various working conditions, the bottlenecks of drainage network sections and manhole overflows are diagnosed, and unfavorable nodes are determined, providing a reference for optimizing the design drawings, thereby laying a solid foundation for reducing the subsequent operation and management costs and improving operation efficiency. Summary of the invention
[0007] The object of the present invention is to provide an intelligent diagnosis method for transportation bottlenecks and manhole overflows in a drainage pipe network, so as to solve the problems in the prior art such as the difficulty in diagnosing the pipe segments most prone to flow bottlenecks and the manholes prone to overflow in the system as mentioned in the above background art.
[0008] To achieve the above object, the present invention is implemented by adopting the following technical solutions:
[0009] An intelligent diagnosis method for transportation bottlenecks and manhole overflows in a drainage pipe network includes the following steps:
[0010] S1. Determine the judgment criteria for the working condition types of the water flow regime in the drainage pipes. The working condition types include the open-channel steady gradually varied flow type working condition and the pressure flow type working condition;
[0011] S2. Collect the drainage pipe network data, and the drainage pipe network data includes building design parameters and water flow regime parameters;
[0012] S3. Based on the drainage pipe network data, determine the drainage performance diagrams of each drainage pipe, and combine the working condition types of the water flow regime in the drainage pipes to diagnose the bottlenecks of the drainage pipe network segments and the overflows of the drainage pipe network manholes.
[0013] Preferably, the judgment criteria for the working condition types of the water flow regime in the drainage pipes in S1 are specifically as follows:
[0014] The drainage pipe network is formed by connecting manholes and drainage pipes, and the water flow enters the manholes and drainage pipes in sequence from the upstream until it is discharged into the sewage treatment terminal; based on the liquid level h of the manhole in the drainage pipe network, the liquid level y u at the inlet of the drainage pipe and the liquid level y d at the outlet of the drainage pipe, it is judged that there are the following several working condition types of the water flow regime in the drainage pipe:
[0015] When y u < D, y d < D, it means that the water flow regime in the drainage pipe is the open-channel steady gradually varied flow, and this open-channel steady gradually varied flow type working condition is used for the diagnosis of bottleneck pipe segments;
[0016] When y u = D, y d = D, or h - z u ≥ D, h - z d ≥ D, it means that the water flow regime in the drainage pipe is the pressure flow, and this pressure flow type working condition is used for the diagnosis of manhole overflows.
[0017] Preferably, the building design parameters in S2 include the diameter D of the drainage pipe, the length L of the drainage pipe, the roughness n of the drainage pipe, the depth H of the manhole, and the height difference z between the bottom of the manhole and the inlet of the downstream connected drainage pipe uand the height difference z between the bottom of the inspection well and the outlet of the upstream drainage pipe d 。
[0018] Preferably, the acquisition of the water flow regime parameters in S2 is specifically as follows:
[0019] Install a liquid level sensor at the bottom of the drainage pipe outlet and the bottom of the inspection well to monitor the liquid level y d at the drainage pipe outlet and the liquid level h of the inspection well in real time, and install a flowmeter sensor at the inlet of the drainage pipe to monitor the drainage pipe flow rate Q in real time.
[0020] Preferably, the drainage performance diagram in S3 is a curve graph of the upstream and downstream water level relationship when the open channel flow expands to the pressurized flow, which is described by the open channel flow formula (1) and the pressurized flow formula (2) respectively, as follows:
[0021]
[0022]
[0023] Where: y is the water flow depth; x is the ordinate; S0 is the drainage pipe slope; S f is the friction slope; F r is the Froude number; Q is the flow rate value in the pressurized flow pipe; A is the pipe cross-sectional area; Δh is the liquid level difference between the upstream and downstream inspection wells of the drainage pipe, and the treatment terminal liquid level or the river liquid level is at the end outlet of the drainage network; D is the drainage pipe diameter; L is the drainage pipe length; n is the drainage pipe roughness.
[0024] Preferably, when it is determined that the working condition is of the open channel steady gradually varied flow type, the steps for diagnosing the bottleneck of the drainage network pipe section are as follows:
[0025] A1. If the liquid level monitoring data y d at the outlets of each drainage pipe are known, according to the open channel flow formula (1) in the drainage performance diagram, calculate the liquid level y u at the inlets of each drainage pipe under the same flow rate;
[0026] When y u < D and y d < D, it is determined that there is no bottleneck in this drainage pipe, otherwise it is a bottleneck pipe section. Compare each drainage pipe to determine the pipe section with the smallest maximum flow capacity, that is, the bottleneck pipe section;
[0027] A2. If only the liquid level y d < D at the outlet of the drainage pipe at the end of the drainage network is known, take the liquid level at the outlet of the drainage pipe at the end of the drainage network as the calculation starting point, and according to the known data set, use the open channel flow formula (1) in the drainage performance diagram to sequentially calculate the liquid level y u at the inlets of each drainage pipe. If y u<D determines that there is no bottleneck in the drainage pipe, and continues to calculate upstream; otherwise, it is a bottleneck pipe segment. At the same time, calculate the liquid level h of the inspection well, and the formula is as follows;
[0028]
[0029] Among them, z u is the elevation difference between the bottom of the inspection well and the inlet of the downstream drainage pipe; g is the acceleration due to gravity; K e is the inlet loss coefficient of the drainage pipe, taking 0.5; A u is the cross-sectional area corresponding to the liquid level y u at the inlet of the drainage pipe, A u = D 2 (cos -1 (1 - 2y u ) - 2(1 - 2y u )(y u (1 - y u )) 0.5 ) / 4;
[0030] A3. If h - z d ≤ y c , it means that the outlet of the upstream pipe is free outfall, and take y d = y c ;
[0031] If y c < h - z d < D, it means that the outlet of the upstream pipe is partially submerged and has continuous outfall, and take y d = h - z d ; Then repeat A2 to continue calculating the liquid level at the inlet of the upstream drainage pipe and the liquid level of the inspection well upstream;
[0032] A4. Determine the first flow operation result;
[0033] If there is no pipe bottleneck, increase the flow rate and repeat steps A2 - A3 until the bottleneck pipe is determined;
[0034] If multiple pipes have bottlenecks, decrease the flow rate and repeat steps A2 - A3 until only one bottleneck pipe segment remains;
[0035] A5. Adjust the terminal control water depth and repeat steps A2 - A4 to determine the bottleneck pipe segments of the drainage pipe network under different flow rates and terminal water depth controls; when multiple drainage pipes have bottlenecks, the most downstream one is the most unfavorable pipe segment.
[0036] Preferably, when it is determined as the working condition of pressure flow type, the steps for diagnosing the overflow of the inspection well in the drainage pipe network are as follows:
[0037] B1. If the liquid level monitoring data h of each inspection well is known, compare h with H. If h < H, it is determined that the inspection well is not overflowing; otherwise, the inspection well is overflowing. Compare all inspection wells to determine the inspection well where overflow first occurs.
[0038] B2. If only the liquid level at the outlet of the drainage pipe at the end of the drainage pipe network is known, i.e., y d1 = D, taking the liquid level at the outlet of the drainage pipe at the end of the drainage pipe network as the calculation starting point, according to the known data set, using the pressure flow formula (2) in the drainage performance diagram, sequentially calculate the liquid level h of the inspection well.
[0039] B3. If h ≥ H, it indicates that the inspection well is overflowing; otherwise, the inspection well is not overflowing. Then repeat B2 to continue calculating the liquid level of the previous node inspection well upstream.
[0040] B4. Determine the first flow operation result.
[0041] If no inspection well overflows, increase the flow rate and repeat steps B2 - B3 until it is determined that an inspection well overflows.
[0042] If multiple inspection wells overflow, decrease the flow rate and repeat steps B2 - B3 until it is determined which inspection well overflows first.
[0043] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0044] By adopting the hydraulic principle and establishing a drainage performance diagram, the present invention can effectively diagnose the bottlenecks of drainage pipe network segments and the overflows of inspection wells under various working conditions, and determine the unfavorable nodes. On the one hand, it can optimize the design drawings of the drainage project under construction; on the other hand, it can give early warnings to the existing drainage system, which is helpful for the safe operation of the drainage system water flow. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a schematic structural diagram of the drainage pipe network in a method for intelligent diagnosis of drainage pipe network transportation bottlenecks and inspection well overflows in the present invention (a is the open channel flow structure, b is the pressure flow structure);
[0046] Figure 2 It is a schematic diagram of the calculation model in a method for intelligent diagnosis of drainage pipe network transportation bottlenecks and inspection well overflows in the present invention;
[0047] Figure 3 It is a schematic diagram of the operation of the drainage pipe network in a method for intelligent diagnosis of drainage pipe network transportation bottlenecks and inspection well overflows in the present invention;
[0048] Figure 4 It is a schematic diagram of the performance of the drainage pipe network in a method for intelligent diagnosis of drainage pipe network transportation bottlenecks and inspection well overflows in the present invention.
[0049] In the figure: 1, inspection well; 2, drainage pipe; 3, terminal outlet of drainage pipe network; 4, outlet of drainage pipe; 5, inlet of drainage pipe; 6, water surface curve for diagnosing bottleneck of drainage pipe; 7, water surface curve for diagnosing overflow of inspection well; 8, liquid level sensor; 9, flowmeter sensor. Detailed implementation mode
[0050] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0051] Embodiment 1:
[0052] A method for intelligent diagnosis of transportation bottlenecks and inspection well overflows in a drainage pipe network based on a drainage performance map includes the following steps:
[0053] Step 1: Determine the judgment criteria for the working condition types of the water flow regime in the drainage pipe.
[0054] The drainage pipe network is formed by connecting inspection wells 1 and drainage pipes 2. Water flow enters the inspection well 1 and the drainage pipe 2 in sequence from upstream until it is discharged into the sewage treatment terminal or the river;
[0055] Based on the liquid level h of the inspection well in the drainage pipe network and the liquid level y u at the inlet of the drainage pipe and the liquid level y d at the outlet of the drainage pipe, the water flow regime of the drainage pipe 2 has the following several working condition types:
[0056] When y u < D, y d < D, it means that the pipe flow is an open-channel steady gradually varied flow, which is working condition 1. This working condition is used for the diagnosis of bottleneck pipe sections.
[0057] When y u = D, y d = D, or h - z u ≥ D, h - z d ≥ D, it means that the pipe flow is a pressurized flow, which is working condition 2. This working condition is used for the diagnosis of inspection well overflows.
[0058] As Figure 1 shown, Figure 1 Figure a in it is a schematic diagram of the open-channel flow structure, Figure 1 and figure b in it is a schematic diagram of the pressurized flow structure.
[0059] Step 2: Collect drainage pipe network data.
[0060] Refer to Figure 1The liquid level sensor 8 is installed at the bottom of the drainage pipe outlet 4 and the bottom of the inspection well 1, and the flow meter sensor 9 is installed at the drainage pipe inlet 5, which are used to monitor the flow of the drainage network 1 and the terminal outlet liquid level in real time.
[0061] See also Figure 2-3 ,right Figure 3 The drainage network model is used for data collection. The parameters of drainage pipe 2 in the drainage network and the parameters of inspection well 1 in the drainage network are shown in Tables 1 and 2 below.
[0062] Table 1 Parameters of drainage pipe 2 in the drainage network (unit: m)
[0063] Serial number Component number D L S n <![CDATA[y d1 ]]> 1 <![CDATA[P A-B ]]> 0.18 30 0.002 0.015 - 2 <![CDATA[P B-C ]]> 0.2 35 0.002 0.015 - 3 <![CDATA[P C-D ]]> 0.25 30 0.002 0.015 0.145
[0064] Table 2 Parameters of inspection well 1 in drainage network (unit: m)
[0065] Serial number Component number H <![CDATA[z u ]]> <![CDATA[z d ]]> 1 J A 1.2 0.5 0.55 2 JB 1.0 0.4 0.45 3 JC 0.8 0.3 0.35
[0066] Step 3: Based on the working condition type of the water flow pattern of the drainage pipe 2 and the drainage performance diagram, diagnose the bottleneck of the drainage pipe network section and the overflow of the drainage pipe network inspection well.
[0067] The drainage performance graph (DPG) is a set of curves that shows the relationship between upstream and downstream water levels at different flow rates based on the basic physical parameters (dimensional parameters, slope and roughness) of each drainage pipe 2 and inspection well 1 provided by the drainage network design drawings, and is extended from open channel flow to pressurized flow, such as Figure 4 The DPG curve is described by the open channel steady-gradient flow differential equation and the pressure pipe flow formula, as shown below.
[0068]
[0069]
[0070] Where: y is the water depth; x is the ordinate; S0 is the pipe slope; S f is the friction slope; F r is the Froude number; Q is the flow value in the pressurized flow pipeline; A is the cross-sectional area of the pipeline; Δh is the difference in liquid levels between the upstream and downstream inspection wells of the drainage pipeline, and the terminal outlet 3 of the drainage network is the treatment terminal liquid level or the river channel liquid level; D is the pipeline diameter; L is the pipeline length; n is the pipeline roughness.
[0071] Combining the above Table 1 and Table 2, Figure 3 The drainage network model is used to diagnose the bottleneck section. The specific calculation steps are as follows:
[0072] Based on the known basic physical parameters of each drainage pipe 2 and inspection well 1, determine the drainage performance diagram of each pipe, and obtain the diagnostic water surface curve 6 of the drainage pipeline bottleneck in the drainage pipe network.
[0073] The liquid level y at the terminal outlet 3 of the known drainage pipe network d1 = 0.145m. According to Figure 4 the upstream and downstream water level relationship of each pipe determined by the open channel flow formula (1) in u1 at a flow rate of 25 L / s, the liquid level y at the inlet of the terminal pipe of the drainage pipe network is obtained
[0074] Then y u1 < D, y d1 < D, it is determined as working condition 1, and the bottleneck diagnosis of the drainage pipe network section is as follows:
[0075] A2. Taking the liquid level at the outlet 4 of the terminal drainage pipe as the calculation starting point, according to Figure 4 the open channel flow formula (1) in u successively obtain the liquid level y at the inlet 5 of each drainage pipe, and at the same time, calculate the liquid level h of the inspection well 1, as shown in Table 3;
[0076] A3. When y c < h - z d < D, the outlet part of the upstream pipe is submerged and flows continuously. Take y d = 0.176m. Then repeat A2 to continue calculating the liquid level at the inlet 5 of the previous section of the drainage pipe and the liquid level of the inspection well 1 upstream, as shown in Table 3.
[0077] A4. Drainage pipes P A-B and P B-C have bottlenecks. P B-C is located downstream, so it is taken as the most unfavorable pipe section at a flow rate of 25 L / s and a terminal control water depth of 0.145m.
[0078] Table 3 Liquid levels of the inlets and outlets of drainage pipes and inspection wells in the drainage pipe network (unit: m)
[0079]
[0080]
[0081] Based on the drainage pipe network data in S2, diagnose the inspection well overflow of the Figure 3 drainage pipe network model. The specific calculation steps are as follows:
[0082] Based on the known basic physical parameters of each drainage pipe 2 and inspection well 1, determine the drainage performance diagram of each pipe, and obtain the diagnostic water surface curve 7 of the inspection well overflow in the drainage pipe network.
[0083] The liquid level at the 3rd outlet of the drainage network terminal is y d1 =D = 0.25m, liquid level y at the terminal pipeline entrance u1 =D=0.25m, as shown in Table 4.
[0084] Then y u1 =D,y d1 =D, it is determined to be working condition 2, and the overflow diagnosis of drainage network inspection well 1 is as follows:
[0085] B2, take the liquid level at the outlet 4 of the terminal drainage pipe as the starting point for calculation, and use the known data set (Q, D, L, n) to calculate the Figure 4 According to the pressurized flow formula (2), when the flow rate is 25L / s, the liquid level h of each inspection well is obtained in turn, as shown in Table 4;
[0086] B3, inspection well JC does not overflow, then repeat B2 to continue to calculate the liquid level of the inspection well of the previous node upstream as shown in Table 4;
[0087] B4. No overflow occurred in inspection wells JC and JB, but overflow occurred in inspection well JA. Then inspection well JA is the most unfavorable node.
[0088] Table 4 Liquid levels at the inlets and outlets of drainage pipes and inspection wells in the drainage network (unit: m)
[0089]
[0090]
[0091] The above description is only used to help understand the method of the present invention and its core essence, but the protection scope of the present invention is not limited thereto. For those skilled in the art in the art, equivalent replacement or change according to the technical solution and inventive concept of the present invention within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A smart diagnostic method for drainage network transportation bottlenecks and manhole overflows, characterized in that: The steps include: S1. Determine the criteria for determining the working condition type of the water flow pattern of the drainage pipe, the working condition type includes the open channel constant gradual flow type condition and the pressurized flow type condition; The criteria for determining the working condition type of the water flow pattern in the drainage pipe are as follows: The drainage network is composed of inspection wells and drainage pipes connected to each other. Water flows from upstream into the inspection wells and drainage pipes in sequence until it is discharged into the sewage treatment terminal. h , Liquid level at the inlet of the drainage pipe y u and the liquid level at the outlet of the drainage pipe y d Judging from the flow patterns in drainage pipes, there are several types of working conditions: when y u < D , y d < D , indicating that the flow pattern of the drainage pipe is an open channel constant gradual flow, which is used for the diagnosis of bottleneck pipe sections; when y u = D , y d = D, or h - z u ≥ D , h - z d ≥ D , indicating that the flow pattern of the drainage pipe is pressurized flow, which is used for the diagnosis of overflow in the inspection well; S2. Collect drainage network data, where the drainage network data includes building design parameters and water flow pattern parameters; Building design parameters include drainage pipe diameter D、 Drain pipe length L、 Drainage pipe roughness n , Check the depth of the well H、 The height difference between the bottom of the inspection well and the inlet of the downstream drainage pipe z u And the height difference between the bottom of the inspection well and the outlet of the upstream drainage pipe z d ; S3. Determine the drainage performance diagram of each drainage pipe based on the drainage pipe network data, and diagnose the bottleneck of the drainage pipe network section and the overflow of the drainage pipe network inspection well in combination with the working condition type of the water flow pattern of the drainage pipe; The drainage performance diagram is a curve diagram of the upstream and downstream water levels when the open channel flow is extended to the pressurized flow. It is described by the open channel flow formula (1) and the pressurized flow formula (2) respectively, as shown below: (1) (2) in: y is the depth of the water flow; x is the vertical coordinate; S 0 is the slope of the drainage pipe; S f is the friction slope; F r is the Froude number; Q is the flow value in the pressurized flow pipeline; A is the cross-sectional area of the pipe; Δh It is the difference between the liquid levels in the upstream and downstream inspection wells of the drainage pipeline; D is the diameter of the drainage pipe; L is the length of the drainage pipe; n Roughness of drainage pipe; When it is determined to be an open channel constant gradual flow type condition, the steps for diagnosing the bottleneck of the drainage pipe network section are as follows: A1. If the liquid level monitoring data at the outlet of each drainage pipe is known y d , according to the open channel flow formula (1) in the drainage performance diagram, calculate the liquid level at the inlet of each drainage pipe at the same flow rate y u ; when y u < D , y d < D, It is judged that the drainage pipe has no bottleneck, otherwise it is a bottleneck pipe section. Compare the drainage pipes to determine the pipe section with the smallest maximum flow capacity, that is, the bottleneck pipe section; A2. If there is only the drainage pipe outlet level at the drainage network terminal y d < D It is known that the outlet liquid level of the drainage pipe at the end of the drainage network is used as the calculation starting point. According to the known data set, the open channel flow formula (1) in the drainage performance diagram is used to calculate the liquid level at the inlet of each drainage pipe in turn. y u ,like y u < D If the drainage pipe has no bottleneck, the calculation will continue upstream, otherwise it is a bottleneck pipe section; at the same time, calculate the liquid level of the inspection well. h , the formula is as follows; in, z u is the height difference between the bottom of the inspection well and the inlet of the downstream drainage pipe; g is the acceleration of gravity; K e is the loss coefficient of the drainage pipe inlet, which is taken as 0.5; A u is the liquid level at the inlet of the drainage pipe y u The corresponding cross-sectional area, A u = D 2 (cos -1 (1-2 y u )-2(1-2 y u )( y u (1- y u )) 0.5 ) / 4; A3. If h - z d ≤ y c , indicating free outflow at the upstream pipe outlet, take y d = y c ; like y c < h - z d < D , indicating that the upstream pipe outlet is partially submerged and the flow is continuous. y d = h - z d ; Then repeat A2 to continue upstream to calculate the liquid level at the entrance of the previous drainage pipe and the liquid level of the inspection well; A4. Determine the first flow operation results; If no pipeline bottleneck occurs, increase the flow rate and repeat steps A2-A3 until the bottleneck pipeline is identified; If multiple pipelines have bottlenecks, reduce the flow rate and repeat steps A2-A3 until only one bottleneck pipe section remains; A5. Adjust the terminal control water depth and repeat steps A2-A4 to determine the bottleneck section of the drainage network under different flow rates and terminal water depths. When bottlenecks occur in multiple drainage pipes, the most downstream section is the most unfavorable section. When it is determined to be a pressurized flow type condition, the steps for diagnosing overflow in the drainage network inspection well are as follows: B1. If the liquid level monitoring data of each inspection well is known h ,Compare h and H ;like h < H , then it is determined that the inspection well is not overflowing; otherwise, the inspection well is overflowing, and all inspection wells are compared to determine the inspection well that overflows first; B2. If only the outlet liquid level of the drainage pipe at the end of the drainage network is known, that is, y d1 = D , taking the outlet liquid level of the drainage pipe at the end of the drainage network as the calculation starting point, according to the known data set, using the pressurized flow formula (2) in the drainage performance diagram, the liquid level of the inspection well is calculated in sequence h ; B3. If h ≥ H , indicating that the inspection well is overflowing; otherwise, the inspection well is not overflowing; then repeat B2 to continue to calculate the liquid level of the inspection well of the previous node upstream; B4. Determine the first flow operation results; If the inspection well does not overflow, increase the flow rate and repeat steps B2-B3 until the inspection well is confirmed to overflow; If overflow occurs in multiple inspection wells, reduce the flow rate and repeat steps B2-B3 until the inspection well where overflow occurs first is determined.
2. According to claim 1, a drainage network transportation bottleneck and inspection well overflow intelligent diagnosis method is characterized in that: The collection of water flow parameters in S2 is as follows: The liquid level sensor is installed at the bottom of the drainage pipe outlet and the bottom of the inspection well to monitor the liquid level at the drainage pipe outlet in real time. y d and manhole level h , install the flow meter sensor at the inlet of the drainage pipe to monitor the flow of the drainage pipe in real time Q .