A cable tower deviation monitoring and control system during the construction of a cable-stayed suspension bridge

By using laser sensors and angle sensors to detect cable tower deflections during the construction process of cable-stayed suspension bridges, and combining linear elastic and nonlinear models for accurate calculation and correction, the problem of cable tower deflection monitoring and control is solved, and real-time, high-speed monitoring and control are achieved. Precision monitoring and adjustment ensure construction safety and efficiency.

CN117928389BActive Publication Date: 2024-10-25CCCC SHEC FIRST HIGHWAY ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410048273.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2024-10-25
Estimated Expiration
2044-01-12

AI Technical Summary

Technical Problem

During the construction of cable-stayed suspension bridges, factors such as construction errors, wind loads, and temperature changes cause the cable towers to shift. The existing monitoring system cannot achieve real-time, high-precision monitoring and control, affecting construction quality and safety.

Method used

A cable tower offset monitoring and control system including an offset detection module, a control module, a data transmission module, an analysis module, a display module, an alarm module and a power supply module is designed, using laser emission sensors, laser receiving sensors and angle sensors for real-time detection. The deviation is adjusted by driving the deviation correction mechanism, and linear elasticity and nonlinear models are combined for accurate calculation and deviation correction.

Benefits of technology

It achieves real-time acquisition of the cable tower offset, timely diagnosis and control, ensuring the safety and stability of the cable-stayed suspension bridge, reducing construction risks, improving construction efficiency and shortening the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117928389B_ABST
    Figure CN117928389B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of cable-stayed suspension bridge towers, and in particular, is a tower offset monitoring and control system during the construction of a cable-stayed suspension bridge, comprising an offset detection module, a control module, a data transmission module, an analysis module, a display module, an alarm module and a power module, wherein the offset detection module comprises a laser emission sensor, a laser receiving sensor and an angle sensor. The tower offset monitoring and control system during the construction of a cable-stayed suspension bridge can obtain the offset of the tower in real time through the monitoring system, timely discover and diagnose the problems of the tower, and ensure the safety of the cable-stayed suspension bridge; the monitoring system can provide high-precision data, and perform real-time control and adjustment of the position of the tower to ensure that the position of the tower meets the design requirements and ensure the stability of the cable-stayed suspension bridge; the tower offset monitoring and control system can effectively reduce the risks during the construction of the cable-stayed suspension bridge, and avoid accidents caused by problems such as the offset of the tower position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cable towers of cable-stayed suspension bridges, and in particular to a cable tower deviation monitoring and control system during the construction process of a cable-stayed suspension bridge. Background Art

[0002] The cable-stayed suspension bridge is a special type of bridge structure with a complex construction process and high precision requirements. During the construction process, due to the influence of various factors, such as construction errors, wind loads, temperature changes, etc., the cable tower may shift, affecting the construction quality and safety. At present, the existing monitoring system mainly uses manual measurement methods, which cannot achieve real-time, high-precision monitoring and control, and it is difficult to meet the requirements of modern bridge construction. Therefore, a cable tower shift monitoring and control system is needed during the construction of a cable-stayed suspension bridge. Summary of the invention

[0003] Based on the existing technical problems, the present invention proposes a cable tower deviation monitoring and control system during the construction process of a cable-stayed suspension bridge.

[0004] The present invention proposes a cable tower displacement monitoring and control system during the construction process of a cable-stayed suspension bridge, comprising a displacement detection module, a control module, a data transmission module, an analysis module, a display module, an alarm module and a power supply module. The displacement detection module comprises a laser emission sensor, a laser receiving sensor and an angle sensor.

[0005] The offset detection module realizes the action of detecting angle data by using the angle sensor in real time according to the tilt state generated when the light beam emitted by the laser emitting sensor is received by the laser receiving sensor.

[0006] The data transmission module implements the action of transmitting the data detected by the offset detection module to the control module.

[0007] The control module realizes that the data transmitted by the data transmission module is transmitted through the analysis module and the offset D 实验计算偏移量 After comparative analysis, the correction mechanism is driven to adjust the correction action according to the result of comparative analysis.

[0008] The display module realizes the display action of the data transmitted by the data transmission module and the data analyzed by the analysis module.

[0009] The alarm module implements the action of issuing an alarm reminder based on the offset result analyzed and compared by the analysis module.

[0010] The power supply module realizes the action of providing power to the laser emission sensor, the laser receiving sensor, the angle sensor, the control module, the data transmission module, the analysis module, the display module and the alarm module.

[0011] Preferably, the driving and correcting mechanism includes a cable tower, and a climbing formwork assembly is arranged on the surface of the cable tower. The bottom of the climbing formwork assembly is fixedly mounted to the mounting surface of the laser receiving sensor, and four of the laser receiving sensors are distributed in a rectangular array. The climbing formwork assembly is lifted and driven by a climbing formwork mechanism arranged on the surface of the cable tower.

[0012] Preferably, the climbing formwork assembly includes a climbing formwork partition, which is L-shaped, and a casting formwork is arranged inside the climbing formwork partition. A telescopic cylinder is fixedly installed on the surface of the climbing formwork partition, and the telescopic end of the telescopic cylinder is hinged to the relative surface of the casting formwork.

[0013] Preferably, detection points are respectively arranged around the bottom of the tower, and the four detection points are distributed in a rectangular array, and the top of each detection point corresponds to the receiving end of the laser receiving sensor at the bottom of the climbing formwork assembly.

[0014] Preferably, the detection point is composed of a support plate, a bearing seat fixedly installed on the top of the support plate, a rotating shaft rotatably connected to the opposite surfaces of the two bearing seats through bearings, a laser emitting sensor and an angle sensor. The surface of the support plate is fixedly installed on the surface of the tower, and the emitting end of the laser emitting sensor corresponds to the receiving end of the laser receiving sensor.

[0015] Preferably, the mounting surface of the laser emission sensor is fixedly mounted on the arc surface of the rotating shaft, the detection end of the angle sensor is fixedly mounted on one end of the rotating shaft, the mounting surface of the angle sensor is fixedly mounted on the surface of the bearing seat opposite to the angle sensor, a drive motor is fixedly mounted on the other surface of the bearing seat, and the output shaft of the drive motor is fixedly mounted on one end of the rotating shaft through a coupling.

[0016] Preferably, the analysis module analysis step includes the following:

[0017] a1. First, perform an experiment to calculate the offset D 实验计算偏移量 Then, four detection points 86 are set on the four sides of the bottom of the cable tower, and each detection point 86 is respectively installed with a laser emission sensor and an angle sensor; a laser receiving sensor is installed at the connection between the climbing formwork and the tower column, and laser is emitted from the detection point at the bottom to the laser receiving sensor;

[0018] a2. After the emitted laser is received, the angle sensor at the detection point detects the angle data a at this time and the height h of the current climbing mold movement, and then calculates the offset d through the detected angle data a and height h, and analyzes and compares d with the offset D. 实验计算偏移量 ;

[0019] a3. When the results are the same, the tower body has not shifted. When the results are different, the tower body has shifted. The control module is used to start the deviation correction operation. After the pouring of this layer is completed, the climbing formwork operation is carried out. Similarly, the deviation status of the tower is continuously monitored and compared and analyzed in real time.

[0020] Preferably, the offset D 实验计算偏移量 The experimental calculations are obtained by the following methods: b1. Establishing a linear elastic model: First, the initial model of the cable tower is established using the linear elastic theory; according to the geometric shape, material properties and loading condition parameters of the cable tower, the displacement and stress distribution of the cable tower under the linear elastic model are calculated by finite element analysis;

[0021] b2. Determine nonlinear factors: Determine nonlinear factors that have a significant impact on the tower deflection through the nonlinear constitutive relationship of the material, the nonlinear behavior of the tower under large deformation conditions, and the contact state between the tower and the foundation;

[0022] b3. Introduce appropriate nonlinear models: According to the determined nonlinear factors, select nonlinear models to describe the behavior of the cable tower; use elastic-plastic material models, constitutive models, and damage models to describe the nonlinear characteristics of the cable tower material; according to the selected model, determine the corresponding nonlinear parameters and incorporate them into the calculation model;

[0023] b4. Iterative calculation: Using iterative calculation method, the nonlinear equations are solved based on nonlinear factors. In the initial state, the displacement and stress distribution of the cable tower are first solved by the linear elastic model. Then, based on the displacement and stress distribution, the corresponding nonlinear equations are calculated according to the selected nonlinear model. Finally, using iterative calculation method, the nonlinear equations are solved to obtain the updated displacement and stress distribution.

[0024] b5. Accurately calculate the offset: Finally, accurately calculate the offset of the cable tower based on the calculation model and iterative calculation results; obtain the displacement of the cable tower by integrating the displacement field; obtain the mechanical quantities of the bending moment and shear force of the cable tower at different sections by integrating the stress field, and thus calculate the offset of the cable tower.

[0025] Preferably, the iterative calculation comprises the following specific steps:

[0026] c1. Assume that the nonlinear equation system is F(x)=0;

[0027] c2. Give the initial calculated value x (0) ;

[0028] c3. For the Kth iteration, first calculate x (K) The nonlinear equation function and Jacobian matrix F at (K) =F(x (K) ),

[0029]

[0030] c4, then iterate and calculate according to the Newton-Raphson formula: x (K+1) =x (K) -[J (K) ] -1 F (K) , where [J (K) ] -1 represents the inverse matrix of the Jacobian matrix;

[0031] c5. Repeat steps c3 and c4 until the convergence condition is met: F (K) <ε, where ε is a preset convergence error threshold.

[0032] Preferably, the analysis module analyzes the offset calculation formula in step a2: offset = h*tan(a);

[0033] The offset refers to the offset distance of the tower relative to the vertical direction.

[0034] The beneficial effects of the present invention are:

[0035] The present invention can obtain the offset of the cable tower in real time through the monitoring system, timely discover and diagnose the problems of the cable tower, and ensure the safety of the cable-stayed suspension bridge; the monitoring system can provide high-precision data, and control and adjust the position of the cable tower in real time to ensure that the position of the cable tower meets the design requirements and ensure the stability of the cable-stayed suspension bridge; setting up a cable tower offset monitoring and control system can effectively reduce the risks in the construction process of the cable-stayed suspension bridge and avoid accidents caused by problems such as cable tower position offset; through real-time monitoring and precise control, the construction efficiency of the cable-stayed suspension bridge can be effectively improved, the construction period can be shortened, and the cost can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a structural schematic diagram of a cable tower deviation monitoring and control system during the construction of a cable-stayed suspension bridge;

[0037] Figure 2 A three-dimensional diagram of a driving and correcting mechanism of a cable tower deviation monitoring and control system during the construction of a cable-stayed suspension bridge;

[0038] Figure 3 A three-dimensional diagram of the supporting plate structure of a cable tower deviation monitoring and control system during the construction of a cable-stayed suspension bridge;

[0039] Figure 4 The present invention is a schematic block diagram of a cable tower deflection monitoring and control system during the construction of a cable-stayed suspension bridge.

[0040] In the figure: 1. offset detection module; 11. laser emission sensor; 12. laser receiving sensor; 13. angle sensor; 2. control module; 3. data transmission module; 4. analysis module; 5. display module; 6. alarm module; 7. power module; 8. drive correction mechanism; 81. cable tower; 82. climbing formwork assembly; 83. climbing formwork partition; 84. casting formwork; 85. telescopic cylinder; 86. detection point; 87. support plate; 88. bearing seat; 89. rotating shaft; 810. driving motor. DETAILED DESCRIPTION

[0041] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0042] Reference Figure 1-Figure 4 A cable tower displacement monitoring and control system during the construction of a cable-stayed suspension bridge includes a displacement detection module 1, a control module 2, a data transmission module 3, an analysis module 4, a display module 5, an alarm module 6 and a power supply module 7. The displacement detection module 1 includes a laser emission sensor 11, a laser receiving sensor 12 and an angle sensor 13.

[0043] The deviation detection module 1 realizes the action of detecting angle data by using the angle sensor 13 in real time according to the tilt state generated when the light beam emitted by the laser emitting sensor 11 is received by the laser receiving sensor 12 .

[0044] The data transmission module 3 implements the action of transmitting the data detected by the deviation detection module 1 to the control module 2 .

[0045] The control module 2 realizes that the data transmitted by the data transmission module 3 is transmitted through the analysis module 4 and the offset D 实验计算偏移量 After comparative analysis, the driving correction mechanism 8 is controlled to adjust the correction action according to the results of the comparative analysis; the driving correction mechanism 8 includes a cable tower 81, and a climbing formwork assembly 82 is arranged on the surface of the cable tower 81. The bottom of the climbing formwork assembly 82 is fixedly installed on the mounting surface of the laser receiving sensor 12, and the four laser receiving sensors 12 are distributed in a rectangular array. The climbing formwork assembly 82 is lifted and driven by the climbing formwork mechanism arranged on the surface of the cable tower 81.

[0046] The benefits and effects of improving the driving deviation correction mechanism 8 by arranging a climbing formwork mechanism on the surface of the cable tower 81 include accuracy, flexibility, automation and safety. This design can effectively correct the deviation problem of the cable tower 81 and improve the operational stability and safety of the project.

[0047] The climbing formwork assembly 82 includes a climbing formwork partition 83, which is L-shaped. A casting formwork 84 is arranged inside the climbing formwork partition 83. A telescopic cylinder 85 is fixedly installed on the surface of the climbing formwork partition 83, and the telescopic end of the telescopic cylinder 85 is hinged to the relative surface of the casting formwork 84.

[0048] When deviation correction is required, the contact surface of the casting template 84 is adjusted by telescopic movement of the telescopic cylinder 85, thereby achieving the deviation correction effect.

[0049] Detection points 86 are arranged around the bottom of the tower 81 , and the four detection points 86 are distributed in a rectangular array, and the top of each detection point 86 corresponds to the receiving end of the laser receiving sensor 12 at the bottom of the climbing formwork assembly 82 .

[0050] By setting a detection point 86 at the bottom of the cable tower 81 and combining it with the laser receiving sensor 12 at the bottom of the climbing formwork assembly 82, it is possible to accurately detect the position and offset of the cable tower 81. This can ensure the accuracy and stability of the deviation correction operation and improve the operating efficiency and safety of the cable tower 81.

[0051] The detection point 86 is composed of a support plate 87, a bearing seat 88 fixedly installed on the top of the support plate 87, a rotating shaft 89 rotatably connected to the opposite surfaces of the two bearing seats 88 through bearings, a laser emitting sensor 11 and an angle sensor 13. The surface of the support plate 87 is fixedly installed on the surface of the tower 81, and the emitting end of the laser emitting sensor 11 corresponds to the receiving end of the laser receiving sensor 12.

[0052] By combining the laser emitting sensor 11 and the laser receiving sensor 12, it is possible to accurately detect the position of the cable tower 81. When a deviation occurs, a deviation correction operation can be performed through an automatic control system to avoid the risks and impacts caused by the deviation.

[0053] The mounting surface of the laser emission sensor 11 is fixedly mounted on the arc surface of the rotating shaft 89, the detection end of the angle sensor 13 is fixedly mounted on one end of the rotating shaft 89, the mounting surface of the angle sensor 13 is fixedly mounted on the surface of the bearing seat 88 relative to the angle sensor 13, and the surface of the other bearing seat 88 is fixedly mounted with a drive motor 810, and the output shaft of the drive motor 810 is fixedly mounted on one end of the rotating shaft 89 through a coupling.

[0054] During the climbing formwork lifting, the receiving position of the laser receiving sensor 12 changes due to the change in the inclination of the variable cross-section, and then the driving motor 810 is used to drive the rotating shaft 89 to rotate, thereby controlling the angle adjustment of the laser emitting sensor 11, thereby achieving the effect of opposite-shooting reception.

[0055] The display module 5 realizes the display action of the data transmitted by the data transmission module 3 and the data analyzed by the analysis module 4 .

[0056] Offset D 实验计算偏移量 The experimental calculation is obtained by the following method: b1. Establishing a linear elastic model: First, the initial model of the cable tower 81 is established using the linear elastic theory; according to the geometric shape, material properties and loading condition parameters of the cable tower 81, the displacement and stress distribution of the cable tower 81 under the linear elastic model are calculated by finite element analysis;

[0057] b2. Determine nonlinear factors: Determine nonlinear factors that have a significant impact on the deflection of the cable tower 81 by using the nonlinear constitutive relationship of the material, the nonlinear behavior of the cable tower 81 under large deformation conditions, and the contact state between the cable tower 81 and the foundation;

[0058] b3. Introducing an appropriate nonlinear model: Based on the determined nonlinear factors, a nonlinear model is selected to describe the behavior of the cable tower 81; an elastic-plastic material model, a constitutive model, and a damage model are used to describe the nonlinear characteristics of the cable tower 81 material; based on the selected model, corresponding nonlinear parameters are determined and incorporated into the calculation model;

[0059] b4. Iterative calculation: using an iterative calculation method, the nonlinear equation group is solved based on the nonlinear factors; in the initial state, the displacement and stress distribution of the cable tower 81 are first solved by the linear elastic model; then, based on the displacement and stress distribution, the corresponding nonlinear equation group is calculated according to the selected nonlinear model; finally, using the iterative calculation method, the nonlinear equation group is solved to obtain the updated displacement and stress distribution;

[0060] b5. Accurately calculate the offset: Finally, the offset of the cable tower 81 is accurately calculated based on the calculation model and iterative calculation results; the displacement of the cable tower 81 is obtained by integrating the displacement field; the mechanical quantities of the bending moment and shear force of the cable tower 81 at different sections are obtained by integrating the stress field, thereby calculating the offset of the cable tower 81.

[0061] Iterative calculation, the specific steps are as follows:

[0062] c1. Assume that the nonlinear equation system is F(x)=0;

[0063] c2. Give the initial calculated value x (0) ;

[0064] c3. For the Kth iteration, first calculate x (K) The nonlinear equation function and Jacobian matrix F at (K) =F(x (K) ),

[0065]

[0066] c4, then iterate and calculate according to the Newton-Raphson formula: x (K+1) =x (K) -[J (K) ] -1 F (K) , where [J (K) ] -1 represents the inverse matrix of the Jacobian matrix;

[0067] c5. Repeat steps c3 and c4 until the convergence condition is met: F (K) <ε, where ε is a preset convergence error threshold.

[0068] By using the online elastic theory and adding nonlinear factors to accurately calculate the offset of cable tower 81, the accuracy and reliability of the calculation results can be improved, the safety and stability of the tower body can be ensured, and the ability to predict future offset conditions can be achieved. This method can help engineers and managers better evaluate and deal with tower offset problems, and improve the efficiency and safety of construction and operation.

[0069] The alarm module 6 implements the action of alarming the offset result after analysis and comparison by the analysis module 4; the analysis steps of the analysis module 4 include the following:

[0070] a1. First, perform an experiment to calculate the offset D 实验计算偏移量 Then, four detection points 86 are set on the four sides of the bottom of the cable tower 81, and each detection point 86 is respectively installed with a laser emitting sensor 11 and an angle sensor 13; a laser receiving sensor 12 is installed at the connection between the climbing formwork and the tower column, and a laser is emitted from the detection point 86 at the bottom to the laser receiving sensor 12;

[0071] a2. After the emitted laser is received, the angle data a and the height h of the current climbing mold movement are detected by the angle sensor 13 of the detection point 86, and then the offset d is calculated by the detected angle data a and height h, and the offset d is analyzed and compared with the offset D. 实验计算偏移量 ;

[0072] a3. When the results are the same, the tower body of the cable tower 81 has not shifted; when the results are different, the tower body of the cable tower 81 has shifted, and the control module 2 is used to start the deviation correction operation;

[0073] After the pouring of this layer is completed, the climbing formwork operation is carried out, and the offset status of the tower 81 is monitored and compared and analyzed in real time.

[0074] The analysis module 4 analyzes the offset calculation formula in step a2: offset = h*tan(a);

[0075] The offset refers to the offset distance of the cable tower 81 relative to the vertical direction.

[0076] The steps of the analysis module 4 include experimental calculation of the offset, setting monitoring points and sensors, detecting angle data and height, calculating the comparison between the distance and the offset, and starting the deviation correction operation. Through these steps, the deviation of the cable tower 81 can be accurately analyzed, and corresponding measures can be taken to correct it to ensure the stability and safety of the cable tower 81.

[0077] The power module 7 realizes the action of providing power to the laser emission sensor 11 , the laser receiving sensor 12 , the angle sensor 13 , the control module 2 , the data transmission module 3 , the analysis module 4 , the display module 5 and the alarm module 6 .

[0078] Setting the power module 7 to provide power for each sensor, control module 2 and display module 5 can provide a stable and reliable power supply, improve the working efficiency and safety of the system, and facilitate operation and management. This will help ensure the normal operation of the equipment and improve the performance and reliability of the overall system.

[0079] The present invention can obtain the offset of the cable tower 81 in real time through the monitoring system, timely discover and diagnose the problems of the cable tower 81, and ensure the safety of the cable-stayed suspension bridge; the monitoring system can provide high-precision data, and control and adjust the position of the cable tower 81 in real time to ensure that the position of the cable tower 81 meets the design requirements and ensure the stability of the cable-stayed suspension bridge; setting up the cable tower 81 offset monitoring and control system can effectively reduce the risks in the construction process of the cable-stayed suspension bridge and avoid accidents caused by problems such as the offset of the cable tower 81 position; through real-time monitoring and precise control, the construction efficiency of the cable-stayed suspension bridge can be effectively improved, the construction period can be shortened, and the cost can be reduced.

[0080] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A cable tower deviation monitoring and control system during the construction of a cable-stayed suspension bridge, characterized in that: The device comprises a deviation detection module (1), a control module (2), a data transmission module (3), an analysis module (4), a display module (5), an alarm module (6) and a power supply module (7), wherein the deviation detection module (1) comprises a laser emission sensor (11), a laser receiving sensor (12) and an angle sensor (13); The offset detection module (1) realizes the action of detecting angle data using an angle sensor (13) in real time according to the tilt state generated when the light beam emitted by the laser emitting sensor (11) is received by the laser receiving sensor (12); The data transmission module (3) realizes the action of transmitting the data detected by the deviation detection module (1) to the control module (2); The control module (2) realizes that the data transmitted by the data transmission module (3) is transmitted through the analysis module (4) and the offset D 实验计算偏移量 After comparative analysis, the driving deviation correction mechanism (8) is controlled to adjust the deviation correction action according to the result of the comparative analysis; the driving deviation correction mechanism (8) comprises a cable tower (81), a climbing formwork assembly (82) is arranged on the surface of the cable tower (81), the bottom of the climbing formwork assembly (82) is fixedly mounted on the mounting surface of the laser receiving sensor (12), and four of the laser receiving sensors (12) are distributed in a rectangular array, and the climbing formwork assembly (82) is lifted and driven by the climbing formwork mechanism arranged on the surface of the cable tower (81); The climbing formwork assembly (82) comprises a climbing formwork partition (83), the climbing formwork partition (83) is in an L shape, a casting formwork (84) is arranged inside the climbing formwork partition (83), a telescopic cylinder (85) is fixedly mounted on the surface of the climbing formwork partition (83), and the telescopic end of the telescopic cylinder (85) is hinged to the opposite surface of the casting formwork (84); Detection points (86) are respectively arranged around the bottom of the cable tower (81), the four detection points (86) are distributed in a rectangular array, and the top of each detection point (86) corresponds to the receiving end of the laser receiving sensor (12) at the bottom of the climbing formwork assembly (82); The detection point (86) is composed of a support plate (87), a bearing seat (88) fixedly mounted on the top of the support plate (87), a rotating shaft (89) rotatably connected to the surfaces opposite to the two bearing seats (88) via bearings, a laser emission sensor (11) and an angle sensor (13); the surface of the support plate (87) is fixedly mounted on the surface of the cable tower (81); the emission end of the laser emission sensor (11) corresponds to the receiving end of the laser receiving sensor (12); The mounting surface of the laser emission sensor (11) is fixedly mounted on the arc surface of the rotating shaft (89), the detection end of the angle sensor (13) is fixedly mounted on one end of the rotating shaft (89), the mounting surface of the angle sensor (13) is fixedly mounted on the surface of the bearing seat (88) relative to the angle sensor (13), and a driving motor (810) is fixedly mounted on the surface of the other bearing seat (88), and the output shaft of the driving motor (810) is fixedly mounted on one end of the rotating shaft (89) via a coupling; The display module (5) realizes the display action of the data transmitted by the data transmission module (3) and the data analyzed by the analysis module (4); The alarm module (6) implements the action of the analysis module (4) analyzing and comparing the offset result and issuing an alarm reminder; The power module (7) realizes the action of providing power to the laser emission sensor (11), the laser receiving sensor (12), the angle sensor (13), the control module (2), the data transmission module (3), the analysis module (4), the display module (5) and the alarm module (6); The analysis module (4) includes the following analysis steps: a1. First, perform an experiment to calculate the offset D 实验计算偏移量 Then, four detection points (86) are set on the four sides of the bottom of the cable tower (81), and each detection point (86) is respectively installed with a laser emitting sensor (11) and an angle sensor (13); a laser receiving sensor (12) is installed at the connection between the climbing formwork and the tower column, and a laser is emitted from the detection point (86) at the bottom to the laser receiving sensor (12); The offset D 实验计算偏移量 The experimental calculation is calculated by the following method: b1. Establishing a linear elastic model: First, using the linear elastic theory to establish an initial model of the cable tower (81); according to the geometric shape, material properties and loading condition parameters of the cable tower (81), the displacement and stress distribution of the cable tower (81) under the linear elastic model are calculated by finite element analysis; b2. Determine nonlinear factors: Determine nonlinear factors that have a significant impact on the deflection of the cable tower (81); through the nonlinear constitutive relationship of the material, the nonlinear behavior of the cable tower (81) under large deformation conditions, and the contact state between the cable tower (81) and the foundation; b3. Introducing an appropriate nonlinear model: Based on the determined nonlinear factors, a nonlinear model is selected to describe the behavior of the tower (81); The nonlinear characteristics of the tower (81) material are described by using an elastic-plastic material model, a constitutive model and a damage model; the corresponding nonlinear parameters are determined according to the selected model and incorporated into the calculation model; b4. Iterative calculation: Use iterative calculation method to solve nonlinear equations based on nonlinear factors; In the initial state, the displacement and stress distribution of the cable tower (81) are first solved by a linear elastic model; then, based on the displacement and stress distribution, a corresponding nonlinear equation group is calculated according to the selected nonlinear model; finally, the nonlinear equation group is solved by an iterative calculation method to obtain an updated displacement and stress distribution; The specific steps of the iterative calculation are as follows: c1. Assume that the nonlinear equation system is F(x)=0; c2. Give the initial calculated value x (0) ; c3. For the Kth iteration, first calculate x (K) Function and Jacobian matrix of nonlinear system of equations at F (K) =F(x (K) ), c4, then iterate and calculate according to the Newton-Raphson formula: x (K+1) =x (K) -[J (K) ] -1 F (K) , where [J (K) ] -1 represents the inverse matrix of the Jacobian matrix; c5. Repeat steps c3 and c4 until the convergence condition is met: F (K) <ε, where ε is a preset convergence error threshold; b5. Accurately calculate the offset: Finally, accurately calculate the offset of the cable tower (81) according to the calculation model and the iterative calculation results; obtain the displacement of the cable tower (81) by integrating the displacement field; obtain the mechanical quantities of the bending moment and shear force of the cable tower (81) at different cross sections by integrating the stress field, thereby calculating the offset of the cable tower (81); a2. After the emitted laser is received, the angle data a and the height h of the current climbing mold movement are detected by the angle sensor (13) at the detection point (86), and then the offset d is calculated by the detected angle data a and height h, and the offset d is analyzed and compared with the offset D. 实验计算偏移量 ; The analysis module (4) analyzes the offset calculation formula in step a2: offset = h*tan(a); Wherein, the offset refers to the offset distance of the cable tower (81) relative to the vertical direction; a3. When the results are the same, the tower body of the cable tower (81) has not deviated; when the results are different, the tower body of the cable tower (81) has deviated, and the control module (2) is used to start the deviation correction operation; after the pouring of this layer is completed, the climbing formwork operation is performed, and similarly, the deviation state of the cable tower (81) is continuously monitored and compared and analyzed in real time.