A feedback regulation method for control loop of power generation system based on multivariable control
Through the multi-variable control method, feedback adjustment of the power generation system control loop is carried out, trend characteristics and early warning information are identified, and a control unit is constructed for adjustment, which solves the problems of instability and low performance of the power generation system control loop, and achieves higher system stability and Proactive diagnostic capabilities.
Patent Information
- Application Number
- CN202410235531.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-03-01
AI Technical Summary
Power generation system control loop regulation suffers from insufficient feedback regulation accuracy, resulting in control loop instability, poor power generation system performance, and a lack of proactive problem diagnosis and resolution mechanisms.
The power generation system control loop feedback adjustment method based on multi-variable control is adopted to obtain and analyze the operation monitoring data of the power generation system control loop through multi-variable trend identification, early warning judgment and benchmark correction, multi-level feedback identification, and control unit construction and adjustment, and identify Trend characteristics, judge early warning information, determine the benchmark correction coefficient or build a control unit for feedback adjustment.
It improves the stability of the power generation system control loop, improves the overall performance of the power generation system, and enables proactive problem diagnosis and resolution.
Smart Images

Figure CN118011938B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to fields related to automation control, and in particular to a control loop feedback adjustment method for a power generation system based on multivariable control. Background Art
[0002] In the power generation system, the control loop is a key component responsible for monitoring and adjusting various parameters in the power generation process to ensure stable and efficient operation of the system. Since the power generation system is usually complex and large-scale, the working state of the control loop has an important impact on the performance and stability of the entire system. In order to ensure the normal operation of the control loop, feedback regulation becomes an important means. Feedback regulation is mainly based on real-time monitoring data. By comparing the preset standards or target values, the parameters or equipment of the control loop are adjusted accordingly to achieve the preset goals or standards. Current technologies are mainly based on fixed control strategies or algorithms, which are usually formulated based on historical data and experience, and adjusted and optimized in actual operation. However, since the power generation system is often affected by various dynamic and uncertain factors, fixed control strategies cannot cope with all situations.
[0003] In the current relevant technologies, the control loop regulation of the power generation system has the technical problems of insufficient accuracy of feedback regulation, resulting in unstable control loop, poor performance of the power generation system and lack of active problem diagnosis and solution mechanism. Summary of the invention
[0004] The present application provides a feedback adjustment method for a power generation system control loop based on multivariable control, and adopts technical means such as multivariable trend identification, early warning judgment and benchmark correction, multi-level feedback identification, and control unit construction and adjustment to achieve the technical effect of improving the stability of the power generation system control loop, improving the overall performance of the power generation system, and realizing active problem diagnosis and resolution.
[0005] The present application provides a control loop feedback adjustment method for a power generation system based on multivariable control, comprising:
[0006] Obtaining N loop operation monitoring data sets of N power generation system control loops of the target unit within a preset monitoring period;
[0007] Performing multivariate trend identification on the N loop operation monitoring data sets to obtain N trend feature sets;
[0008] Determine whether there is any early warning prompt information in the N power generation system control loops, and if not, determine a reference correction coefficient based on the N trend feature sets, and use the reference correction coefficient as first feedback adjustment information;
[0009] If so, multi-level feedback identification is performed based on the N trend feature sets, and P feedback control target clusters and P deviation feature value clusters are generated in combination with the N loop operation monitoring data sets, wherein the P deviation feature value clusters and the P feedback control target clusters correspond one to one;
[0010] Traversing the P feedback control target clusters to construct P control units, wherein the P control units have computing power allocation weight identifiers;
[0011] Based on the P control units with computing power allocation weight identifiers, the P deviating characteristic value clusters are adjusted to obtain second feedback adjustment information;
[0012] Feedback regulation is performed on a power generation system control loop of the target unit based on the first feedback regulation information or the second feedback regulation information.
[0013] In a possible implementation, multivariate trend identification is performed on the N loop operation monitoring data sets to obtain N trend feature sets, and the following processing is performed:
[0014] Traversing the N loop operation monitoring data sets to retrieve benchmark monitoring data, and obtaining N benchmark monitoring data sets;
[0015] Taking the N benchmark monitoring data sets as center points respectively, extracting the amount of monitoring data distributed within a preset trend step, and obtaining N benchmark monitoring center density sets;
[0016] According to the preset trend step, N benchmark monitoring data sets are diffused toward the periphery to obtain N diffuse monitoring data sets.
[0017] In a possible implementation, after obtaining N diffusion monitoring data sets, the following processing is performed:
[0018] Taking the N diffusion monitoring data sets as the center points, respectively, extracting the amount of monitoring data distributed within the preset trend step, and obtaining N diffusion monitoring density sets, wherein each diffusion monitoring density set includes multiple diffusion monitoring density sets, and each diffusion monitoring data corresponds to one diffusion monitoring density set;
[0019] Based on N benchmark monitoring center density sets and N diffusion monitoring density sets, N diffusion direction sets and N diffusion point sets are determined, wherein the diffusion direction is the direction with the highest density in the diffusion process, and the diffusion point is the monitoring data with the highest density in the diffusion process;
[0020] Taking N diffusion point sets as starting points, the diffusion is performed toward N diffusion direction sets according to N diffusion trend step sets to obtain N stage diffusion point sets;
[0021] Determine whether the density difference between the N diffusion point sets and the N stage diffusion point sets meets the preset threshold. If so, stop the diffusion and use the monitoring data with the largest density in the diffusion process as the N trend feature sets;
[0022] If not, the diffusion is continued by taking the N diffusion point sets and the N stage diffusion point sets with the larger density as the starting point.
[0023] In a possible implementation, the following processing is performed:
[0024] Calculate the ratio of the absolute value of the difference between the N benchmark monitoring center density sets and the N diffusion monitoring density sets to the N benchmark monitoring center density sets to obtain N calculation result sets;
[0025] The N calculation result sets are multiplied by the preset trend step length to obtain N diffusion trend step length sets, where the diffusion trend step length is the difference of the monitoring data of a single movement during the diffusion process.
[0026] In a possible implementation, multi-level feedback identification is performed based on N trend feature sets, and P feedback control target clusters and P deviation feature value clusters are generated by combining N loop operation monitoring data sets, and the following processing is performed:
[0027] Performing multi-level feedback identification on the N trend feature sets to obtain P deviation feature value clusters;
[0028] Based on the P deviation characteristic value clusters and the N loop operation monitoring data sets, corresponding matching is performed to obtain P loop operation monitoring data clusters;
[0029] The P loop operation monitoring data clusters are matched with the devices in the N power generation system control loops of the target unit to obtain P feedback regulation target clusters, wherein the feedback regulation targets are the devices in the N power generation system control loops of the target unit.
[0030] In a possible implementation, the following processing is performed:
[0031] Traversing the N loop operation monitoring data sets to obtain N benchmark monitoring data sets;
[0032] Randomly extracting a first trend feature from the N trend feature sets without replacement to construct a first-layer recognition unit;
[0033] The first-layer identification unit is used to perform feature judgment on the N trend feature sets to obtain a first-layer identification result, wherein the first-layer identification result includes two trend feature value clusters, the first trend feature value cluster is a set of feature values greater than the first trend feature, and the second trend feature value cluster is a set of feature values less than or equal to the first trend feature.
[0034] In a possible implementation, the following processing is performed:
[0035] Again, randomly extracting a second trend feature from the N trend feature sets without replacement to construct a second-layer recognition unit;
[0036] Using the second-layer recognition unit to perform binary classification on the first-layer recognition results to obtain second-layer recognition results;
[0037] A P-th layer recognition unit is constructed again to perform binary classification on the P-1-th layer recognition result to obtain a P-th layer recognition result, wherein the P-th layer recognition result includes P trend feature value clusters;
[0038] The P trend eigenvalue clusters are mapped with the N benchmark monitoring data sets to obtain P deviation eigenvalue clusters.
[0039] The present application also provides a power generation system control loop feedback regulation system based on multivariable control, comprising:
[0040] A loop operation monitoring data set acquisition module, wherein the loop operation monitoring data set acquisition module is used to acquire N loop operation monitoring data sets of N power generation system control loops of the target unit within a preset monitoring period;
[0041] A trend feature set acquisition module, the trend feature set acquisition module is used to perform multivariate trend recognition on the N loop operation monitoring data sets to obtain N trend feature sets;
[0042] A judgment module, the judgment module is used to judge whether there is early warning prompt information in the N power generation system control loops;
[0043] a first feedback adjustment information acquisition module, the first feedback adjustment information acquisition module being used to, if not, determine a reference correction coefficient based on the N trend feature sets, and use the reference correction coefficient as first feedback adjustment information;
[0044] A multi-level feedback identification module, wherein if yes, multi-level feedback identification is performed according to N trend feature sets, and P feedback control target clusters and P deviation feature value clusters are generated in combination with N loop operation monitoring data sets, wherein the P deviation feature value clusters and the P feedback control target clusters correspond one to one;
[0045] A control unit construction module, wherein the control unit construction module is used to traverse the P feedback control target clusters to construct P control units, wherein the P control units have computing power allocation weight identifiers;
[0046] A second feedback adjustment information acquisition module, wherein the second feedback adjustment information acquisition module is used to adjust the P deviation characteristic value clusters based on the P control units with computing power allocation weight identifiers to obtain second feedback adjustment information;
[0047] A feedback regulation module, wherein the feedback regulation module is used to perform feedback regulation on a power generation system control loop of the target unit based on the first feedback regulation information or the second feedback regulation information.
[0048] The present application also provides an electronic device, comprising:
[0049] A memory for storing executable instructions;
[0050] The processor is used to implement a control loop feedback adjustment method for a power generation system based on multivariable control when executing the executable instructions stored in the memory.
[0051] The present application also provides a computer-readable storage medium, comprising:
[0052] A computer program is stored thereon, and when the program is executed by a processor, a control loop feedback adjustment method for a power generation system based on multivariable control is implemented.
[0053] The present application proposes a method for feedback regulation of a power generation system control loop based on multivariable control, and obtains the operation monitoring data of the power generation system control loop to perform multivariable trend identification. It is determined whether there is early warning information. If there is no early warning, the benchmark correction coefficient is determined as the first feedback regulation information; if there is an early warning, multi-level feedback identification is further performed, a control unit is constructed, and the deviation characteristic value is adjusted to obtain the second feedback regulation information. Finally, the power generation system control loop is feedback regulated based on the first feedback regulation information or the second feedback regulation information, so as to achieve the technical effect of improving the stability of the power generation system control loop, improving the overall performance of the power generation system, and realizing active problem diagnosis and resolution. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] In order to more clearly illustrate the technical solution of the embodiment of the present disclosure, the accompanying drawings of the embodiment of the present disclosure will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.
[0055] Figure 1 A flow chart of a control loop feedback adjustment method for a power generation system based on multivariable control provided in an embodiment of the present application;
[0056] Figure 2 A schematic flow chart of a method for obtaining N trend feature sets provided in an embodiment of the present application;
[0057] Figure 3 A schematic diagram of the structure of a control loop feedback regulation system for a power generation system based on multivariable control provided in an embodiment of the present application;
[0058] Figure 4 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0059] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.
[0060] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.
[0061] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.
[0062] The present application embodiment provides a control loop feedback adjustment method for a power generation system based on multivariable control, such as Figure 1 As shown, the method includes:
[0063] Step S100, obtaining N loop operation monitoring data sets of N power generation system control loops of the target unit within a preset monitoring period. The target unit refers to the unit to be subjected to feedback adjustment of the power generation system control loop, and the operation data of the power generation system control loop of the target unit is acquired through sensor collection. The power generation system control loop is an important part of the power generation system, which is responsible for controlling and adjusting various parameters in the power generation process to ensure the stable operation of the system and the quality of the output electric energy. These operation data will be continuously and regularly collected within a preset monitoring period, and the N loop operation monitoring data sets contain various information about each power generation system control loop, such as voltage, current, power, temperature, pressure, etc.
[0064] After the operation data of the control loop of the power generation system is obtained, step S200 is executed to perform multivariate trend identification on the N loop operation monitoring data sets to obtain N trend feature sets. The multivariate trend identification is a data-based working condition identification method that can obtain potential information from the data sequence and describe and identify the process state. Specifically, first, each loop operation monitoring data set is preprocessed to ensure the quality and reliability of the data, and then the features related to the operation state of the control loop of the power generation system are extracted from each data set, including the change trend, periodic fluctuation, etc. of parameters such as voltage, current, power, temperature, and pressure, and then trend analysis is performed on each feature by drawing a trend graph, calculating a trend line, or using statistical methods to identify its change law over time or other factors. Finally, based on the results of the trend analysis, each data set is classified or labeled using machine learning, pattern recognition and other technologies to form N trend feature sets, which represent the operation state and behavior mode of each control loop.
[0065] In a possible implementation, step S200 further includes step S210, traversing the N loop operation monitoring data sets to retrieve benchmark monitoring data and obtain N benchmark monitoring data sets. Each loop operation monitoring data set represents the operation data of a control loop, and from each data set, benchmark monitoring data is retrieved, and these benchmark monitoring data are the benchmark points or reference values of each loop operation data. Based on the benchmark monitoring data set, step S220 is executed, and the amount of monitoring data distributed within the preset trend step is extracted with the N benchmark monitoring data sets as the center point, to obtain N benchmark monitoring center density sets. By extracting the amount of monitoring data distributed within the preset trend step, the density or distribution of each benchmark monitoring data set can be calculated, thereby obtaining N benchmark monitoring center density sets, each density set corresponding to a control loop. Then step S230 is executed, and the N benchmark monitoring data sets are diffused to the periphery according to the preset trend step to obtain N diffused monitoring data sets. That is, based on step S210 and step S220, according to the preset trend step length, each benchmark monitoring data set is diffused to the periphery, and relevant monitoring data is collected. Through this step, N diffusion monitoring data sets are obtained, and each data set corresponds to a control loop. The benchmark monitoring data set, the benchmark monitoring center density set, and the diffusion monitoring data set are extracted through the above steps, which provides an important basis for subsequent multivariate trend identification, helps to improve the accuracy and reliability of identification, and achieves the technical effect of enhancing feature extraction capabilities.
[0066] like Figure 2As shown, in another possible implementation, after obtaining N diffusion monitoring data sets, step S200 further includes step S240, taking the N diffusion monitoring data sets as the center point, extracting the amount of monitoring data distributed within the preset trend step length, and obtaining N diffusion monitoring density sets, wherein each diffusion monitoring density set includes multiple diffusion monitoring density sets, and each diffusion monitoring data corresponds to a diffusion monitoring density set; step S250, determining N diffusion direction sets and N diffusion point sets based on N benchmark monitoring center density sets and N diffusion monitoring density sets, wherein the diffusion direction is the direction with the highest density in the diffusion process, and the diffusion point is the monitoring data with the highest density in the diffusion process. The diffusion direction and the diffusion point represent the main diffusion trend and the maximum density of the data. Through this step, the main diffusion trend of the data in each direction is identified, and the points with the highest data density are determined, which play a key role in the diffusion process. Then, step S260 is executed, taking the N diffusion point sets as the starting point, respectively, and diffusing to the N diffusion direction sets according to the N diffusion trend step length sets, to obtain N stage diffusion point sets. That is, starting from the determined diffusion point, diffusion is performed along the diffusion direction to simulate the diffusion process of the data, and the distribution of the data points is gradually expanded according to the diffusion trend step set. Then, step S270 is executed to determine whether the density difference between the N diffusion point sets and the N stage diffusion point sets meets the preset threshold. This step ensures the termination condition of the diffusion process and avoids excessive diffusion or insufficient diffusion. If the preset threshold is met, step S280 is executed. If so, the diffusion is stopped and the monitoring data with the largest density in the diffusion process is used as the N trend feature sets. That is, when the density difference meets the preset threshold, the monitoring data with the largest density in the diffusion process is used as the trend feature set, which represents the main trend and feature of the data. If the preset threshold is not met, step S290 is executed. If not, the larger density value of the N diffusion point sets and the N stage diffusion point sets is used as the starting point to continue diffusion. That is, the diffusion process is continued until the preset threshold condition is met. By continuing to diffuse, the distribution characteristics of the data are explored more comprehensively, and more trend features are captured, ensuring full exploration of the data and comprehensive extraction of features. The diffusion process helps to explore the distribution of data in different directions and capture more comprehensive features. Through the above steps, the system can more accurately identify and extract key trend features from the original monitoring data. These features represent the main changes and distribution characteristics of the data, achieving the technical effect of improving the accuracy of trend feature extraction.
[0067] In another possible implementation, step S260 further includes step S261, respectively calculating the absolute value of the difference between the N benchmark monitoring center density sets and the N diffusion monitoring density sets and the ratio of the N benchmark monitoring center density sets to obtain N calculation result sets. By calculating the ratio of the absolute value of the difference and the benchmark monitoring center density set, it is used to quantify the degree of difference between the two density sets, and each calculation result set represents a difference measure of a control loop. Next, step S262 is executed to multiply the N calculation result sets with the preset trend step length to obtain N diffusion trend step length sets, wherein the diffusion trend step length is the difference of the monitoring data for a single movement during the diffusion process. Each step length set represents the moving step length that should be taken in the diffusion process of a control loop, and is used to ensure that the movement of data points during the diffusion process is orderly and consistent. These two steps provide step length guidance for the diffusion process. Through this processing, the system can more accurately understand and analyze the distribution and diffusion pattern of the data, achieving the technical effect of providing strong support for trend identification and feature extraction.
[0068] Next, step S300 is executed to determine whether there is any early warning information in the N power generation system control loops. The early warning information is an indication that there may be potential problems or an impending failure in the system. Specifically, all available early warning information is collected from the power generation system control loop, including abnormal sensor readings, control parameter out-of-limit, equipment fault codes, etc. Based on the collected information, the data is filtered, classified and sorted to screen out data related to the early warning prompts, and then the screened data is analyzed by comparing historical data, analyzing trends, checking abnormal values, etc. to determine whether there is any early warning information. Result output: Based on the results of the judgment analysis, determine whether there is early warning information.
[0069] If there is no early warning information, execute step S400. If not, determine the benchmark correction coefficient based on the N trend feature sets, and use the benchmark correction coefficient as the first feedback adjustment information. Specifically, based on the N trend feature sets, by comparing the trend characteristics of each control loop, analyzing the operating status and performance of each control loop, identifying the control loop with better performance, and determining its benchmark correction coefficient, the benchmark correction coefficient is used as a reference standard for other control loops to adjust and optimize their operating status, and finally the determined benchmark correction coefficient is used as the first feedback adjustment information to guide the operator or control system to make corresponding adjustments to the power generation system control loop to ensure that it operates in the best state.
[0070] If there is early warning information, execute step S500. If so, perform multi-level feedback identification based on N trend feature sets, and generate P feedback control target clusters and P deviation feature value clusters in combination with N loop operation monitoring data sets, wherein the P deviation feature value clusters correspond to the P feedback control target clusters one by one. The multi-level feedback identification is a systematic fault diagnosis and problem solving method, which identifies potential problems by performing multi-level analysis on the system. Specifically, based on N trend feature sets, the operating status and performance of each control loop are analyzed in combination with N loop operation monitoring data sets, and the control loops with poor performance or early warning prompts are identified by comparing the operating status, trend characteristics and performance indicators of each control loop. In the multi-level feedback identification process, the hierarchical division can be carried out according to the degree of trend deviation, the severity of the problem, the scope of influence or other standards. Finally, the N trend feature sets are divided into P layers according to the division criteria. For each layer, the root cause of the problem is identified by checking historical data, analyzing parameter changes, checking hardware and software configurations, etc. Based on the results of multi-level feedback identification, corresponding feedback control target clusters are formulated for the problematic control loops in each layer of N power generation system control loops. These target clusters are designed to solve the identified performance problems or optimize the operating status of the control loops. For each feedback control target cluster, the corresponding deviation eigenvalue clusters are calculated based on the N loop operation monitoring data sets. These deviation eigenvalue clusters reflect the degree or trend of the control loop deviating from the normal state during operation. Then, each deviation eigenvalue cluster is associated with the corresponding feedback control target cluster to establish a one-to-one correspondence.
[0071] In a possible implementation, step S500 further includes step S510, performing multi-level feedback identification on the N trend feature sets to obtain P deviation feature value clusters. Using statistical tools or machine learning algorithms, such as cluster analysis, principal component analysis, etc., the N trend feature sets are processed to identify P trend feature sets that are significantly different from the benchmark or normal mode, and P deviation feature value clusters are obtained. Next, step S520 is performed to perform corresponding matching based on the P deviation feature value clusters and the N loop operation monitoring data sets to obtain P loop operation monitoring data clusters. Using a data matching algorithm, such as nearest neighbor search or similarity matching, the P deviation feature value clusters are matched with the N loop operation monitoring data sets, and for each deviation feature value cluster, the most relevant loop operation monitoring data set is found to form P loop operation monitoring data clusters. Then step S530 is performed to match the P loop operation monitoring data clusters with the equipment in the N power generation system control loops of the target unit to obtain P feedback control target clusters, wherein the feedback control target is the equipment in the N power generation system control loops of the target unit. Specifically, the association between the control loop equipment and the loop operation monitoring data is established by a predefined or learned method, and the P loop operation monitoring data clusters are matched with the equipment in the power generation system control loop of the target unit. For each matched data cluster, the corresponding feedback control target is determined to form P feedback control target clusters. The above steps establish the corresponding relationship between the deviation characteristic value cluster and the equipment, so that the system can formulate the corresponding feedback control strategy according to the specific conditions of the equipment, avoid unnecessary adjustments or misadjustments, ensure that each device obtains the most suitable control strategy for its current state, and achieve the technical effect of ensuring the pertinence and accuracy of the control strategy.
[0072] In another possible implementation, step S510 further includes step S511, traversing the N loop operation monitoring data sets to obtain N benchmark monitoring data sets. The benchmark monitoring data set is a benchmark for determining whether a feature is abnormal. After extracting the benchmark monitoring data set, step S512 is executed to randomly extract a first trend feature from the N trend feature sets without replacement to construct a first-layer recognition unit. The first trend feature is any one of the N trend feature sets, and the selection method is without replacement, that is, after the selection, other features can still be used for subsequent extraction. Next, step S513 is executed to perform feature judgment on the N trend feature sets using the first-layer recognition unit to obtain a first-layer recognition result, wherein the first-layer recognition result includes two trend feature value clusters, the first trend feature value cluster is a feature value set greater than the first trend feature, and the second trend feature value cluster is a feature value set less than or equal to the first trend feature. That is, the first trend feature is used to judge all trend feature sets. The basis for judgment is whether the feature value exceeds or is equal to the first trend feature, which is used to screen out abnormal or poorly performing feature values, thereby forming two trend feature value clusters, which represent two different states: a feature value set greater than the first trend feature and a feature value set less than or equal to the first trend feature. Through the above steps, the system has made sufficient data preparation for obtaining the deviation feature value cluster, achieving the technical effect of providing an important data basis for feedback regulation.
[0073] In another possible implementation, step S510 further includes step S514, randomly extracting a second trend feature from the N trend feature sets without replacement to construct a second-layer recognition unit. Similar to step S512, a trend feature is randomly selected from the remaining trend feature sets without replacement as a second-layer recognition unit, and then step S515 is executed to perform binary classification on the first-layer recognition result using the second-layer recognition unit to obtain a second-layer recognition result; step S516, constructing the P-th layer recognition unit again to perform binary classification on the P-1-th layer recognition result to obtain the P-th layer recognition result, wherein the P-th layer recognition result includes P trend feature value clusters. Similar to step S513, based on the determined second-layer recognition unit, the first-layer recognition result is further binary classified, and the feature values in the first-layer recognition result are further subdivided into two categories, and the above-mentioned recognition unit construction and classification process are repeated until the P layer is reached. At each layer, the system uses the recognition unit of the current layer to perform binary classification on the recognition result of the previous layer. Finally, step S517 is executed to map the P trend feature value clusters with the N benchmark monitoring data sets to obtain P deviation feature value clusters. For each layer of trend feature value clusters, the difference between it and the corresponding benchmark monitoring data set is calculated. These differences represent the degree of deviation of each feature value cluster relative to the benchmark. The degree of deviation of each feature value cluster is quantified through the mapping difference calculation. The above steps use a multi-level feedback recognition strategy to carefully divide and screen the feature values. Through layer-by-layer classification and screening, the system can get closer and closer to the feature values of the real anomalies or performance problems, thereby providing more accurate feedback control targets and achieving the technical effect of improving the precision and accuracy of recognition.
[0074] After obtaining P feedback control target clusters and P deviation characteristic value clusters, step S600 is executed to traverse the P feedback control target clusters to construct P control units, wherein the P control units have computing power allocation weight identifiers. The construction of the control unit is used to achieve the goal of feedback regulation. Specifically, the P feedback control target clusters are traversed, and the requirements and characteristics of each target cluster are evaluated one by one. For each feedback control target cluster, a corresponding control unit is constructed. These control units are designed based on the specific requirements and characteristics of the feedback control target cluster to ensure that the goal of feedback regulation can be effectively achieved. Furthermore, based on the degree to which the control loop deviates from the normal state during operation, a computing power allocation weight identifier is allocated to each control unit. The identifier is used to indicate the weight of the computing resources and capabilities required by the control unit to achieve its goal. The greater the deviation, the greater the computing power allocation weight.
[0075] Next, step S700 is performed to adjust the P deviated characteristic value clusters based on the P control units with computing power allocation weight identifiers to obtain the second feedback adjustment information. Specifically, the P deviated characteristic value clusters are adjusted using the P control units with computing power allocation weight identifiers, that is, according to the computing power allocation weight identifier of each control unit, the corresponding adjustment tasks and priorities are assigned to it, and then according to the adjustment strategy and priority of the control unit, the deviated characteristic value clusters are adjusted, including adjusting control parameters, optimizing equipment configuration, changing operation mode and other measures to reduce or eliminate the deviated characteristic value clusters and return them to the normal range, thereby generating the second feedback adjustment information.
[0076] Finally, step S800 is executed to perform feedback adjustment on the power generation system control loop of the target unit based on the first feedback adjustment information or the second feedback adjustment information. The feedback adjustment of the control loop is intended to optimize the operating state and performance of the control loop. Specifically, the first feedback adjustment information or the second feedback adjustment information is selected according to the specific situation. According to the selected feedback adjustment information, the actual feedback adjustment operation is performed on the power generation system control loop of the target unit, including adjusting the parameters of the control loop, optimizing the operating mode or taking other corrective measures to achieve the best operating state and performance of the system. After the feedback adjustment is implemented, the operating state and performance of the power generation system control loop are continuously monitored. By comparing the changes before and after the adjustment and evaluating the effect of the feedback adjustment, the effectiveness of the adjustment strategy and the performance improvement of the control loop are verified. According to the results of monitoring and evaluation, the feedback adjustment strategy is dynamically adjusted and optimized, including changing the control parameters, adjusting the equipment configuration, improving the operating mode and other measures to ensure that the control loop is always in the best operating state. The embodiments of the present application adopt technical means such as multivariable trend identification, early warning judgment and benchmark correction, multi-level feedback identification, and control unit construction and adjustment to achieve the technical effect of improving the stability of the control loop of the power generation system, improving the overall performance of the power generation system, and realizing active problem diagnosis and resolution.
[0077] In the above, refer to Figure 1 and Figure 2 A method for adjusting a control loop feedback of a power generation system based on multivariable control according to an embodiment of the present invention is described in detail. Figure 3 A control loop feedback regulation system of a power generation system based on multivariable control according to an embodiment of the present invention is described.
[0078] A feedback regulation system for a control loop of a power generation system based on multivariable control according to an embodiment of the present invention is used to solve the technical problems of insufficient accuracy of feedback regulation in the existing control loop regulation of a power generation system, which leads to instability of the control loop, poor performance of the power generation system, and lack of active problem diagnosis and solution mechanism, so as to improve the stability of the control loop of the power generation system, improve the overall performance of the power generation system, and achieve the technical effect of active problem diagnosis and solution. A feedback regulation system for a control loop of a power generation system based on multivariable control includes: a loop operation monitoring data set acquisition module 10, a trend feature set acquisition module 20, a judgment module 30, a first feedback regulation information acquisition module 40, a multi-level feedback identification module 50, a control unit construction module 60, a second feedback regulation information acquisition module 70, and a feedback regulation module 80.
[0079] The loop operation monitoring data set acquisition module 10 is used to acquire N loop operation monitoring data sets of N power generation system control loops of the target unit within a preset monitoring period;
[0080] The trend feature set acquisition module 20 is used to perform multivariate trend recognition on the N loop operation monitoring data sets to obtain N trend feature sets;
[0081] The judgment module 30 is used to judge whether there is any early warning prompt information in the N power generation system control loops;
[0082] The first feedback adjustment information acquisition module 40 is used to determine a reference correction coefficient based on the N trend feature sets if no, and use the reference correction coefficient as the first feedback adjustment information;
[0083] The multi-level feedback identification module 50 is used to perform multi-level feedback identification according to N trend feature sets, and generate P feedback control target clusters and P deviation feature value clusters in combination with N loop operation monitoring data sets, wherein the P deviation feature value clusters and the P feedback control target clusters correspond one to one;
[0084] The control unit construction module 60 is used to traverse the P feedback control target clusters to construct P control units, wherein the P control units have computing power allocation weight identifiers;
[0085] The second feedback adjustment information acquisition module 70 is used to adjust the P deviation characteristic value clusters based on the P control units with computing power allocation weight identifiers to obtain second feedback adjustment information;
[0086] The feedback regulation module 80 is used to perform feedback regulation on the power generation system control loop of the target unit based on the first feedback regulation information or the second feedback regulation information.
[0087] The specific configuration of the trend feature set acquisition module 20 will be described in detail below. As described above, multivariate trend identification is performed on the N loop operation monitoring data sets to obtain N trend feature sets. The trend feature set acquisition module 20 may further include: a benchmark monitoring data retrieval unit is used to traverse the N loop operation monitoring data sets to retrieve benchmark monitoring data to obtain N benchmark monitoring data sets; a monitoring data volume extraction unit is used to extract the monitoring data volume distributed within a preset trend step length with the N benchmark monitoring data sets as the center point, to obtain N benchmark monitoring center density sets; a peripheral diffusion unit is used to diffuse from the N benchmark monitoring data sets to the periphery according to the preset trend step length to obtain N diffused monitoring data sets.
[0088] After obtaining the N diffusion monitoring data sets, the trend feature set acquisition module 20 may further include: a diffusion monitoring density set acquisition unit is used to extract the amount of monitoring data distributed within a preset trend step length with the N diffusion monitoring data sets as the center point, and obtain N diffusion monitoring density sets, wherein each diffusion monitoring density set includes multiple diffusion monitoring density sets, and each diffusion monitoring data corresponds to a diffusion monitoring density set; a diffusion direction and diffusion point determination unit is used to determine N diffusion direction sets and N diffusion point sets based on the N benchmark monitoring center density sets and the N diffusion monitoring density sets, wherein the diffusion direction is the direction with the largest density in the diffusion process, and the diffusion point is the monitoring data with the largest density in the diffusion process; the diffusion unit is used to diffuse to N diffusion direction sets according to N diffusion trend step sets with N diffusion point sets as the starting point, so as to obtain N stage diffusion point sets; the judgment unit is used to judge whether the density difference between the N diffusion point sets and the N stage diffusion point sets meets the preset threshold; the stop diffusion unit is used to stop diffusion if yes, and take the monitoring data with the largest density in the diffusion process as the N trend feature sets; the continue diffusion unit is used to continue diffusion if no, taking the larger density value between the N diffusion point sets and the N stage diffusion point sets as the starting point.
[0089] Among them, the diffusion unit can further include: a calculation subunit used to calculate the ratio of the absolute value of the difference between N benchmark monitoring center density sets and N diffusion monitoring density sets to the N benchmark monitoring center density sets, and obtain N calculation result sets; a multiplication subunit is used to multiply the N calculation result sets with a preset trend step length to obtain N diffusion trend step length sets, wherein the diffusion trend step length is the difference in monitoring data for a single movement during the diffusion process.
[0090] The specific configuration of the multi-level feedback identification module 50 will be described in detail below. As described above, multi-level feedback identification is performed based on N trend feature sets, and P feedback control target clusters and P deviation feature value clusters are generated in combination with N loop operation monitoring data sets. The multi-level feedback identification module 50 may further include: a deviation feature value cluster acquisition unit is used to perform multi-level feedback identification on the N trend feature sets to obtain P deviation feature value clusters; a corresponding matching unit is used to perform corresponding matching based on the P deviation feature value clusters and the N loop operation monitoring data sets to obtain P loop operation monitoring data clusters; a device matching unit is used to match the P loop operation monitoring data clusters with the devices in the N power generation system control loops of the target unit to obtain P feedback control target clusters, wherein the feedback control target is the device in the N power generation system control loops of the target unit.
[0091] Among them, the deviation characteristic value cluster acquisition unit can further include: a traversal subunit is used to traverse the N loop operation monitoring data sets to obtain N benchmark monitoring data sets; a first-layer identification construction subunit is used to randomly extract the first trend feature from the N trend feature sets without replacement to construct a first-layer identification unit; a feature judgment subunit is used to use the first-layer identification unit to perform feature judgment on the N trend feature sets to obtain a first-layer identification result, wherein the first-layer identification result includes two trend characteristic value clusters, the first trend characteristic value cluster is a set of characteristic values greater than the first trend feature, and the second trend characteristic value cluster is a set of characteristic values less than or equal to the first trend feature.
[0092] Among them, the deviation characteristic value cluster acquisition unit can further include: a second-layer recognition construction subunit is used to randomly extract a second trend feature from the N trend feature sets without replacement to construct a second-layer recognition unit; a binary classification subunit is used to use the second-layer recognition unit to perform binary classification on the first-layer recognition results to obtain the second-layer recognition results, and again construct the P-th layer recognition unit to perform binary classification on the P-1-th layer recognition results to obtain the P-th layer recognition results, wherein the P-th layer recognition results include P trend characteristic value clusters; a mapping difference calculation subunit is used to perform mapping difference calculation on the P trend characteristic value clusters and the N benchmark monitoring data sets, respectively, to obtain P deviation characteristic value clusters.
[0093] A power generation system control loop feedback regulation system based on multivariable control provided in an embodiment of the present invention can execute a power generation system control loop feedback regulation method based on multivariable control provided in any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.
[0094] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.
[0095] Based on the foregoing embodiments, the embodiments of the present application further provide an electronic device and a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of the electronic device, it can implement the method described in any of the foregoing embodiments.
[0096] Figure 4 1 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, showing a block diagram of an exemplary electronic device suitable for implementing an implementation of the present invention. Figure 4 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention. The electronic device is in the form of a general computing device, and its components may include but are not limited to an input device 401, a processor 402, a memory 403, and an output device 404. Among them, the processor 402 may be one or more; the memory 403 may include a computer-readable medium and at least one program product, and the program product has a set (at least one) of program modules, which are configured to perform the functions of each embodiment of the present application.
[0097] The memory 403 shown in the embodiment of the present invention may adopt any combination of one or more computer-readable media; the computer-readable storage medium may be, but is not limited to, an infrared, semiconductor system, device or component, or any combination of the above, for storing software programs, computer executable programs and modules, such as the program instructions / modules corresponding to a control loop feedback regulation method for a power generation system based on multivariable control in the embodiment of the present invention. The processor 402 executes various functional applications and data processing of the computer device by running the software programs, instructions and modules stored in the memory 403, that is, implements the above-mentioned control loop feedback regulation method for a power generation system based on multivariable control.
[0098] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. A control loop feedback adjustment method for a power generation system based on multivariable control, characterized in that: The method comprises: Obtaining N loop operation monitoring data sets of N power generation system control loops of the target unit within a preset monitoring period; Performing multivariate trend identification on the N loop operation monitoring data sets to obtain N trend feature sets; Determine whether there is any early warning prompt information in the N power generation system control loops, and if not, determine a reference correction coefficient based on the N trend feature sets, and use the reference correction coefficient as first feedback adjustment information; If so, multi-level feedback identification is performed based on the N trend feature sets, and P feedback control target clusters and P deviation feature value clusters are generated in combination with the N loop operation monitoring data sets, wherein the P deviation feature value clusters and the P feedback control target clusters correspond one to one; Traversing the P feedback control target clusters to construct P control units, wherein the P control units have computing power allocation weight identifiers; Based on the P control units with computing power allocation weight identifiers, the P deviating characteristic value clusters are adjusted to obtain second feedback adjustment information; Performing feedback regulation on a power generation system control loop of the target unit based on the first feedback regulation information or the second feedback regulation information; Among them, multi-level feedback identification is performed according to N trend feature sets, and P feedback control target clusters and P deviation feature value clusters are generated in combination with N loop operation monitoring data sets. The method also includes: Performing multi-level feedback identification on the N trend feature sets to obtain P deviation feature value clusters; Based on the P deviation characteristic value clusters and the N loop operation monitoring data sets, corresponding matching is performed to obtain P loop operation monitoring data clusters; Matching the P loop operation monitoring data clusters with the devices in the N power generation system control loops of the target unit to obtain P feedback regulation target clusters, wherein the feedback regulation targets are the devices in the N power generation system control loops of the target unit; Wherein, the method further comprises: Traversing the N loop operation monitoring data sets to obtain N benchmark monitoring data sets; Randomly extracting a first trend feature from the N trend feature sets without replacement to construct a first-layer recognition unit; Using the first-layer identification unit to perform feature judgment on the N trend feature sets to obtain a first-layer identification result, wherein the first-layer identification result includes two trend feature value clusters, the first trend feature value cluster is a feature value set greater than the first trend feature, and the second trend feature value cluster is a feature value set less than or equal to the first trend feature; Wherein, the method further comprises: Again, randomly extracting a second trend feature from the N trend feature sets without replacement to construct a second-layer recognition unit; Using the second-layer recognition unit to perform binary classification on the first-layer recognition results to obtain second-layer recognition results; A P-th layer recognition unit is constructed again to perform binary classification on the P-1-th layer recognition result to obtain a P-th layer recognition result, wherein the P-th layer recognition result includes P trend feature value clusters; The P trend eigenvalue clusters are mapped with the N benchmark monitoring data sets to obtain P deviation eigenvalue clusters.
2. A method for feedback regulation of a control loop of a power generation system based on multivariable control according to claim 1, characterized in that: Performing multivariate trend identification on the N loop operation monitoring data sets to obtain N trend feature sets, the method further comprising: Traversing the N loop operation monitoring data sets to retrieve benchmark monitoring data, and obtaining N benchmark monitoring data sets; Taking the N benchmark monitoring data sets as center points respectively, extracting the amount of monitoring data distributed within a preset trend step, and obtaining N benchmark monitoring center density sets; According to the preset trend step, N benchmark monitoring data sets are diffused toward the periphery to obtain N diffuse monitoring data sets; After obtaining N diffusion monitoring data sets, the method further includes: Taking the N diffusion monitoring data sets as the center points, respectively, extracting the amount of monitoring data distributed within the preset trend step, and obtaining N diffusion monitoring density sets, wherein each diffusion monitoring density set includes multiple diffusion monitoring density sets, and each diffusion monitoring data corresponds to one diffusion monitoring density set; Based on N benchmark monitoring center density sets and N diffusion monitoring density sets, N diffusion direction sets and N diffusion point sets are determined, wherein the diffusion direction is the direction with the highest density in the diffusion process, and the diffusion point is the monitoring data with the highest density in the diffusion process; Taking N diffusion point sets as starting points, the diffusion is performed toward N diffusion direction sets according to N diffusion trend step sets to obtain N stage diffusion point sets; Determine whether the density difference between the N diffusion point sets and the N stage diffusion point sets meets the preset threshold. If so, stop the diffusion and use the monitoring data with the largest density in the diffusion process as the N trend feature sets; If not, the N diffusion point sets and the N stage diffusion point sets with the larger density are used as the starting point to continue diffusion; Wherein, the method further comprises: Calculate the ratio of the absolute value of the difference between the N benchmark monitoring center density sets and the N diffusion monitoring density sets to the N benchmark monitoring center density sets to obtain N calculation result sets; The N calculation result sets are multiplied by the preset trend step length to obtain N diffusion trend step length sets, where the diffusion trend step length is the difference of the monitoring data of a single movement during the diffusion process.
3. A control loop feedback regulation system for a power generation system based on multivariable control, characterized in that: The system is used to implement a control loop feedback regulation method for a power generation system based on multivariable control as described in any one of claims 1 to 2, and the system comprises: A loop operation monitoring data set acquisition module, wherein the loop operation monitoring data set acquisition module is used to acquire N loop operation monitoring data sets of N power generation system control loops of the target unit within a preset monitoring period; A trend feature set acquisition module, the trend feature set acquisition module is used to perform multivariate trend recognition on the N loop operation monitoring data sets to obtain N trend feature sets; A judgment module, the judgment module is used to judge whether there is early warning prompt information in the N power generation system control loops; a first feedback adjustment information acquisition module, the first feedback adjustment information acquisition module being used to, if not, determine a reference correction coefficient based on the N trend feature sets, and use the reference correction coefficient as first feedback adjustment information; A multi-level feedback identification module, wherein if yes, multi-level feedback identification is performed according to N trend feature sets, and P feedback control target clusters and P deviation feature value clusters are generated in combination with N loop operation monitoring data sets, wherein the P deviation feature value clusters and the P feedback control target clusters correspond one to one; A control unit construction module, wherein the control unit construction module is used to traverse the P feedback control target clusters to construct P control units, wherein the P control units have computing power allocation weight identifiers; A second feedback adjustment information acquisition module, wherein the second feedback adjustment information acquisition module is used to adjust the P deviation characteristic value clusters based on the P control units with computing power allocation weight identifiers to obtain second feedback adjustment information; A feedback regulation module, wherein the feedback regulation module is used to perform feedback regulation on a power generation system control loop of the target unit based on the first feedback regulation information or the second feedback regulation information.
4. An electronic device, characterized in that: The electronic device comprises: A memory for storing executable instructions; A processor is used to implement a control loop feedback adjustment method for a power generation system based on multivariable control as described in any one of claims 1 to 2 when executing executable instructions stored in the memory.
5. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, a control loop feedback adjustment method for a power generation system based on multivariable control as described in any one of claims 1 to 2 is implemented.