Industrial park inspection management method and system

Through the Internet of Things monitoring equipment, the changes in hazard sources and parameters are determined, and the industrial park inspection route is dynamically adjusted, which solves the problem of difficulty in detecting safety risks in time in the existing technology and improves the timeliness and reliability of inspections.

CN118014176BActive Publication Date: 2024-10-18浙江安通产业园运营技术有限公司
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410116261.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-10-18
Estimated Expiration
2044-01-29

AI Technical Summary

Technical Problem

Existing technology makes it difficult to dynamically adjust inspection routes in industrial parks, and cannot promptly and accurately detect safety risks caused by changes in the number and parameters of hazard sources, affecting the timeliness and reliability of inspections.

Method used

Use IoT monitoring equipment to determine the changes in hazard sources and parameters in different enterprises and parks, dynamically adjust inspection routes, determine the change cycle of inspection routes based on hazard source distribution data and parameter changes, and prioritize the number of hazard sources. and areas with large parameter changes.

Benefits of technology

It realizes the assessment of changes in hazard sources and adjusts differentiated inspection routes, improves the efficiency and reliability of inspection processing, and ensures that dangerous sources that change more drastically are handled in a timely manner.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118014176B_ABST
    Figure CN118014176B_ABST
Patent Text Reader

Abstract

The present invention provides an industrial park inspection management method and system, which belongs to the field of inspection management technology, and specifically includes: determining the change amount of hazard sources of different enterprises within the park and the change amount of park hazard sources in the park according to the change data of hazard sources between different dates, determining the change amount of park parameters of the park according to the change amount of parameters of different hazard sources, obtaining the distribution data of different hazard sources in the park, and determining the change period of the inspection route of the park in combination with the change amount of park parameters and the change amount of park hazard sources in the park, taking the change period as a constraint condition, and determining the inspection route based on the number of different types of hazard sources in different enterprises and monitoring parameters, thereby improving the efficiency of inspection processing of hazard sources in the industrial park.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of patrol inspection management technology, and in particular, relates to an industrial park patrol inspection management method and system. Background Art

[0002] The agglomeration and centralized development of industries has not only greatly reduced the production and transportation costs of enterprises, but also made it easier for the government to manage related industries. However, at the same time, due to the large number of enterprises and hazardous sources within industrial parks, how to implement inspection management of industrial parks and improve the reliability and safety of industrial park management has become a technical problem that needs to be solved urgently.

[0003] In order to solve the above technical problems, in the existing technical solution, in the invention patent CN202111055125.0 "A Park Security Method and Equipment", global path planning and local path planning are used to inspect the park according to the inspection route under the premise of ensuring the safety of the security robot, so that abnormal behaviors of the park can be discovered in time, which improves the timeliness of the park inspection. However, there are the following technical problems:

[0004] Within the industrial park, the number of different types of hazardous sources in different enterprises is not fixed. For example, the stacking of flammable items and the number of high-power electrical equipment used will change to a certain extent. At the same time, the parameters of different types of hazardous sources in different enterprises will also gradually change. Therefore, if the above factors are not taken into account and the inspection routes are adjusted dynamically, it may not be possible to ensure the timely and accurate discovery of hazardous sources that pose safety risks.

[0005] In response to the above technical problems, the present invention provides an industrial park inspection management method and system. Summary of the invention

[0006] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:

[0007] According to one aspect of the present invention, an industrial park inspection management method is provided.

[0008] An industrial park inspection management method, characterized by comprising:

[0009] S1 determines different types of hazardous sources of different enterprises within the park based on the Internet of Things monitoring equipment, and determines the change amount of hazardous sources of different enterprises within the park and the change amount of hazardous sources of the park according to the change data of hazardous sources between different dates;

[0010] S2 obtains monitoring parameters of different types of hazardous sources of different enterprises in the park through the Internet of Things monitoring equipment, and determines the parameter changes of different hazardous sources according to the change data of the monitoring parameters of different hazardous sources and the change data of different risk intervals, and determines the park parameter change of the park according to the parameter change of different hazardous sources;

[0011] S3: obtaining the distribution data of different danger sources of the park, and determining the change period of the inspection route of the park in combination with the change amount of the park parameter and the change amount of the danger source of the park;

[0012] S4 uses the change cycle as a constraint condition and determines the inspection route based on the number of different types of hazard sources in different enterprises and monitoring parameters.

[0013] The beneficial effects of the present invention are:

[0014] 1. According to the change data of hazardous sources between different dates, the change amount of hazardous sources of different enterprises within the park and the change amount of hazardous sources in the park are determined, so as to realize the assessment of the severity of changes in hazardous sources in the park from the change data of hazardous sources, and also lay the foundation for the dynamic adjustment of the change cycle of differentiated inspection routes according to the differences in the severity of changes, thus ensuring the inspection and processing efficiency of the park with more drastic changes in hazardous sources.

[0015] 2. The change cycle of the park's inspection routes is determined based on the distribution data of different hazardous sources in the park, the changes in the park's parameters and the changes in the park's hazardous sources. This not only takes into account the changes in the parameters of different hazardous sources, but also takes into account the changes in the number of hazardous sources in the park and the distribution density of hazardous sources, thereby achieving dynamic adjustment of the change cycle of the park's inspection routes.

[0016] 3. Inspection routes are determined based on the number of different types of hazardous sources in different enterprises and monitoring parameters, so that the inspection priorities of enterprises can be differentiated according to the changes in the number and parameters of hazardous sources, ensuring the inspection priority of hazardous sources with more drastic changes and enterprises with a large number of hazardous sources, thereby improving the timeliness and reliability of the handling of hazardous sources in industrial parks.

[0017] A further technical solution is that the Internet of Things monitoring device includes a monitoring device, a smoke sensing device and a power consumption monitoring device.

[0018] A further technical solution is that the change data of the hazard sources include quantity change values ​​of different types of hazard sources.

[0019] A further technical solution is that the distribution data of the hazard sources include the distribution locations of the hazard sources and the number of hazard sources in different divided areas.

[0020] A further technical solution is that the method for determining the change period of the inspection route of the park is:

[0021] Determine the number of hazardous sources in different divided areas based on the distribution data of different hazardous sources in the park, and determine the concentration of hazardous sources in the park in combination with the number of divided areas where the number of hazardous sources is greater than a preset threshold value of the number of hazardous sources;

[0022] The change period of the inspection route of the park is determined by the concentration of the hazard sources, the change amount of the park parameters of the park and the change amount of the hazard sources in the park.

[0023] A further technical solution is that the method for determining the inspection route is:

[0024] Determine the hazard intervals corresponding to the monitoring parameters of different types of hazard sources based on the monitoring parameters of different types of hazard sources in different enterprises, and determine the number of hazard sources in different hazard intervals of different enterprises according to the hazard intervals corresponding to the monitoring parameters of different types of hazard sources;

[0025] The enterprise inspection priority values ​​of different enterprises are determined by the number of hazardous sources in different hazardous areas of different enterprises, and the inspection routes are determined based on the enterprise inspection priority values ​​of different enterprises.

[0026] In a second aspect, the present invention provides a computer system comprising: a memory and a processor connected in communication, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, it executes the above-mentioned industrial park inspection management method.

[0027] Other features and advantages will be described in the following description. The objects and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and drawings.

[0028] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.

[0030] Figure 1 It is a flow chart of an industrial park inspection management method;

[0031] Figure 2 It is a flow chart of the method for determining the change in the enterprise's hazard sources;

[0032] Figure 3 It is a flow chart of a method for determining the parameter variation of a hazard source. DETAILED DESCRIPTION

[0033] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.

[0034] Method Example

[0035] To solve the above problems, according to one aspect of the present invention, Figure 1 As shown, an industrial park inspection management method is provided, which is characterized by specifically including:

[0036] S1 determines different types of hazardous sources of different enterprises within the park based on the Internet of Things monitoring equipment, and determines the change amount of hazardous sources of different enterprises within the park and the change amount of hazardous sources of the park according to the change data of hazardous sources between different dates;

[0037] It should be noted that the Internet of Things monitoring equipment includes a monitoring device, a smoke sensing device and a power consumption monitoring device.

[0038] Specifically, the change data of the hazard sources include quantity change values ​​of different types of hazard sources.

[0039] In one possible embodiment, Figure 2 As shown, the method for determining the change amount of the risk source of the enterprise in the above step S1 is:

[0040] Determining the change value of the number of hazardous sources of the enterprise between different dates through the change data of hazardous sources between different dates, and determining the change date of the enterprise based on the change value;

[0041] Determine the daily hazard source change amount of the enterprise according to the change value of the change date of the enterprise and the date quantity ratio of the change date;

[0042] Determine the change period of the enterprise on different dates based on the change value of the number of hazardous sources between different adjacent time periods on different dates, and determine the change amount of hazardous sources within the day on different dates according to the number of change periods and the change value of the number of hazardous sources between different change periods and adjacent time periods;

[0043] The change in hazard sources of the enterprise is determined by the change in hazard sources within days of different dates and the change in hazard sources between days of the enterprise.

[0044] Furthermore, the daily hazard source change is determined based on the product of the average value of the change value of the enterprise's change date and the date proportion of the change date.

[0045] It should be noted that the change in the number of hazardous sources of the enterprise between different dates is determined based on the number of hazardous sources in different time periods on different dates and the deviations therebetween.

[0046] In another possible embodiment, the method for determining the change amount of the risk source of the enterprise in the above step S1 is:

[0047] Determine the change value of the number of hazardous sources of the enterprise between different dates through the change data of hazardous sources between different dates, and determine the change date of the enterprise based on the change value; when the date quantity ratio of the change date is greater than the preset quantity ratio, determine the change amount of the hazardous sources of the enterprise through the date quantity ratio of the change date;

[0048] When the proportion of the number of dates of the change date is not greater than the preset proportion, the change period of the enterprise on different dates is determined based on the change value of the number of hazardous sources between different adjacent time periods on different dates; when the proportion of the number of dates whose proportion of the change period is greater than the preset proportion is greater than the preset proportion, the change amount of hazardous sources of the enterprise is determined by the proportion of the number of dates whose proportion of the change period is greater than the preset proportion;

[0049] When the proportion of the number of changing time periods is greater than the proportion of the preset time periods and the proportion of the number of dates is not greater than the preset proportion, the daily change in hazard sources of the enterprise is determined according to the change value of the change date of the enterprise and the proportion of the number of dates of the change date, and the daily change in hazard sources on different dates is determined according to the number of changing time periods and the change value of the number of hazard sources between different changing time periods and adjacent time periods;

[0050] The change in hazard sources of the enterprise is determined by the change in hazard sources within days of different dates and the change in hazard sources between days of the enterprise.

[0051] In another possible embodiment, the method for determining the change amount of the risk source of the enterprise in the above step S1 is:

[0052] Determine the change value of the quantity of hazard sources of different enterprises between different dates through the change data of hazard sources between different dates, and determine the change date of the enterprise based on the change value;

[0053] Determine the daily risk source change amount of the enterprise according to the change value of the change date of the enterprise and the date proportion of the change date, and determine whether the enterprise is a risk source change enterprise based on the daily risk source change amount of the enterprise. If so, determine the risk source change amount of the enterprise through the daily risk source change amount of the enterprise; if not, proceed to the next step;

[0054] Determine the change period of the enterprise on different dates based on the change value of the number of hazardous sources between different adjacent time periods on different dates, and judge whether the number proportion of the date whose number proportion of the change period is greater than the preset period proportion is greater than the preset number proportion. If so, determine the change amount of the hazardous sources of the enterprise by the number proportion of the date whose number proportion of the change period is greater than the preset period proportion. If not, proceed to the next step.

[0055] Determine the intraday hazard source change amount on different dates based on the number of change periods and the change value of the number of hazard sources between different change periods and adjacent periods, determine whether the enterprise is a risk source change enterprise based on the proportion of dates when the intraday hazard source change amount of the enterprise is greater than the preset change amount, if so, determine the hazard source change amount of the enterprise by the proportion of dates when the intraday hazard source change amount of the enterprise is greater than the preset change amount, if not, proceed to the next step;

[0056] The change in hazard sources of the enterprise is determined by the change in hazard sources within days of different dates and the change in hazard sources between days of the enterprise.

[0057] In one possible embodiment, the method for determining the change amount of the park hazard source of the park in the above step S1 is:

[0058] Determine the enterprises with changing hazardous sources and enterprises with stable hazardous sources according to the hazardous source changes of different enterprises in the park;

[0059] Determine the comprehensive change amount of the hazardous source changing enterprises in the park by the hazardous source change amount and number of the hazardous source changing enterprises in the park, and determine the comprehensive change amount of the hazardous source stable enterprises in the park by the hazardous source change amount and number of the hazardous source stable enterprises in the park;

[0060] Based on the proportion of the number of hazardous sources in the hazardous source-changing enterprises and the proportion of the number of hazardous sources in the hazardous source-stable enterprises in the park, the weight values ​​of the comprehensive changes in the hazardous source-changing enterprises and the weight values ​​of the comprehensive changes in the hazardous source-stable enterprises in the park are determined, and the change in hazardous sources in the park of the park is determined in combination with the comprehensive changes in the hazardous source-changing enterprises and the comprehensive changes in the hazardous source-stable enterprises in the park.

[0061] In another possible embodiment, the method for determining the change amount of the park hazard source of the park in the above step S1 is:

[0062] S11 determines whether there is an enterprise with hazard source changes in the park according to the hazard source changes of different enterprises in the park. If yes, proceed to the next step. If not, determine the hazard source change of the park by summing the weights of the hazard source changes of different enterprises in the park.

[0063] S12 determines the comprehensive change amount of the hazardous source changing enterprises in the park by the hazardous source change amount and the number of the hazardous source changing enterprises in the park, and judges whether the comprehensive change amount of the hazardous source changing enterprises is within the preset change amount range. If so, proceed to the next step; if not, proceed to step S14;

[0064] S13 determines whether the proportion of the number of hazardous sources of the hazardous source changing enterprise is greater than the preset hazardous source proportion. If so, the change amount of the hazardous source of the park is determined by the comprehensive change amount of the hazardous source changing enterprise. If not, proceed to the next step.

[0065] S14 determines the comprehensive change amount of the hazardous source stable enterprises in the park through the hazardous source change amount and the number of hazardous source stable enterprises in the park;

[0066] S15 determines the weight value of the comprehensive change amount of the hazardous source changing enterprises in the park and the weight value of the comprehensive change amount of the hazardous source stable enterprises based on the proportion of the number of hazardous sources of the hazardous source changing enterprises in the park and the proportion of the number of hazardous sources of the hazardous source stable enterprises in the park, and determines the park hazardous source change amount of the park in combination with the comprehensive change amount of the hazardous source changing enterprises and the comprehensive change amount of the hazardous source stable enterprises in the park.

[0067] S2 obtains monitoring parameters of different types of hazardous sources of different enterprises in the park through the Internet of Things monitoring equipment, and determines the parameter changes of different hazardous sources according to the change data of the monitoring parameters of different hazardous sources and the change data of different risk intervals, and determines the park parameter change of the park according to the parameter change of different hazardous sources;

[0068] Furthermore, the monitoring parameters of the hazard source are determined according to the type of the hazard source, specifically, the hazard parameters of the hazard source are determined according to the type of the hazard source, and the hazard parameters are used as the monitoring parameters of the hazard source.

[0069] Specifically, the risk interval is divided according to the monitoring parameters of the hazard source, and specifically the risk interval is divided into a high-risk interval, a dangerous risk interval and a safe interval.

[0070] In one possible embodiment, Figure 3 As shown, the method for determining the parameter variation of the hazard source in the above step S2 is:

[0071] Determine the number of changes in the monitoring parameters of the hazard source within a preset time period through the change data of the monitoring parameters of the hazard source, and determine the change amount of the monitoring parameters of the hazard source in combination with the change amounts of the monitoring parameters with different change times;

[0072] Obtain the duration ratios of different danger intervals of the danger source on different dates within a preset time period, and determine the interval parameter changes between different adjacent dates within the preset time period according to the duration ratios of different danger intervals on different dates, and determine the danger source interval change of the danger source according to the interval parameter changes between different adjacent dates;

[0073] The parameter variation of the hazard source is determined based on the monitoring parameter variation of the hazard source and the hazard source interval variation.

[0074] In another possible embodiment, the method for determining the parameter variation of the hazard source in the above step S2 is:

[0075] S21 determines the number of changes of the monitoring parameters of the hazard source within a preset time period through the change data of the monitoring parameters of the hazard source, and judges whether the number of changes of the monitoring parameters of the hazard source within the preset time period is greater than the preset number of changes. If so, proceed to step S23, if not, proceed to the next step;

[0076] S22 obtains the duration ratio of different danger intervals of the danger source on different dates within a preset time period, and determines the interval parameter change amount between different adjacent dates within the preset time period according to the duration ratio of different danger intervals on different dates, and judges whether there is a date with an interval parameter change amount greater than the preset parameter change amount. If so, proceeds to the next step; if not, determines the parameter change amount of the danger source by the number of changes in the monitoring parameters of the danger source within the preset time period;

[0077] S23 determines the change amount of the monitoring parameters of the hazardous source based on the number of changes of the monitoring parameters of the hazardous source within the preset time period and the change amounts of the monitoring parameters at different change times, obtains the duration ratios of different hazardous intervals on different dates of the hazardous source within the preset time period, and determines the change amount of the interval parameters between different adjacent dates within the preset time period according to the duration ratios of different hazardous intervals on different dates, and determines the interval change amount of the hazardous source of the hazardous source through the change amount of the interval parameters between different adjacent dates;

[0078] S24 determines the parameter variation of the hazard source based on the monitoring parameter variation of the hazard source and the hazard source interval variation.

[0079] Specifically, the method for determining the variation of the park parameters of the park is as follows:

[0080] Determine the enterprise parameter changes of different enterprises according to the parameter changes of the hazard sources of different enterprises and the number of hazard sources;

[0081] The park parameter change amount of the park is determined based on the enterprise parameter change amounts of different enterprises and the number of enterprises in the park.

[0082] In another possible embodiment, the method for determining the park parameter variation of the park in the above step S2 is:

[0083] S31 determines the variable hazardous sources among the hazardous sources according to the parameter changes of the hazardous sources of different enterprises, and judges whether the number of the variable hazardous sources is greater than the limited value of the number of hazardous sources. If so, the park parameter change of the park is determined by the number of the variable hazardous sources. If not, proceed to the next step.

[0084] S32 determines the enterprise parameter changes of different enterprises based on the parameter changes of the hazardous sources of different enterprises and the number of hazardous sources, and judges whether the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold is greater than the preset number of enterprises. If so, the park parameter change of the park is determined by the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold;

[0085] S33 determines the comprehensive parameter change of the risk source by the number of the changed risk sources and the parameter change, the average value of the parameter change of the risk source and the number of risk sources, and determines the enterprise comprehensive change of the enterprise based on the number of enterprises whose enterprise parameter change is greater than the enterprise change threshold, the number of enterprises and the enterprise parameter change of different enterprises;

[0086] S34 determines the park parameter change of the park based on the comprehensive parameter change of the hazard source and the enterprise comprehensive change of the enterprise.

[0087] In another possible embodiment, the method for determining the park parameter variation of the park in the above step S2 is:

[0088] Determine the variable hazardous sources among the hazardous sources according to the parameter changes of the hazardous sources of different enterprises. When the number of the variable hazardous sources is greater than the limit value of the number of hazardous sources, determine the comprehensive parameter changes of the hazardous sources by the number of the variable hazardous sources and the parameter changes, the average value of the parameter changes of the hazardous sources and the number of hazardous sources. Determine the park parameter changes of the park by the comprehensive parameter changes of the hazardous sources.

[0089] When the number of the changing hazardous sources is not greater than the hazardous source quantity limit value, the enterprise parameter changes of different enterprises are determined based on the parameter changes of the hazardous sources of different enterprises and the number of hazardous sources; when there is no enterprise whose enterprise parameter change is greater than the enterprise change threshold, the park parameter change of the park is determined by the comprehensive parameter change of the hazardous sources;

[0090] When there are enterprises whose enterprise parameter changes are greater than the enterprise change threshold, and when the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold is greater than the preset number of enterprises, the park parameter change of the park is determined by the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold;

[0091] When the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold is not greater than the preset number of enterprises, determining the enterprise comprehensive change of the enterprise based on the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold, the number of enterprises, and the enterprise parameter changes of different enterprises;

[0092] The park parameter change of the park is determined based on the comprehensive parameter change of the hazard source and the enterprise comprehensive change of the enterprise.

[0093] S3: obtaining the distribution data of different danger sources of the park, and determining the change cycle of the inspection route of the park in combination with the change amount of the park parameter and the change amount of the danger source of the park;

[0094] Furthermore, the distribution data of the hazard sources include the distribution locations of the hazard sources and the number of hazard sources in different divided areas.

[0095] Specifically, the method for determining the change period of the inspection route of the park is as follows:

[0096] Determine the number of hazardous sources in different divided areas based on the distribution data of different hazardous sources in the park, and determine the concentration of hazardous sources in the park in combination with the number of divided areas where the number of hazardous sources is greater than a preset threshold value of the number of hazardous sources;

[0097] The change period of the inspection route of the park is determined by the concentration of the hazard sources, the change amount of the park parameters of the park and the change amount of the hazard sources in the park.

[0098] S4 uses the change cycle as a constraint condition and determines the inspection route based on the number of different types of hazard sources in different enterprises and monitoring parameters.

[0099] Specifically, the method for determining the inspection route is as follows:

[0100] Determine the hazard intervals corresponding to the monitoring parameters of different types of hazard sources based on the monitoring parameters of different types of hazard sources in different enterprises, and determine the number of hazard sources in different hazard intervals of different enterprises according to the hazard intervals corresponding to the monitoring parameters of different types of hazard sources;

[0101] The enterprise inspection priority values ​​of different enterprises are determined by the number of hazardous sources in different hazardous areas of different enterprises, and the inspection routes are determined based on the enterprise inspection priority values ​​of different enterprises.

[0102] Example 2

[0103] In a second aspect, the present invention provides a computer system comprising: a memory and a processor connected in communication, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, it executes the above-mentioned industrial park inspection management method.

[0104] Through the above embodiments, the present invention achieves the following beneficial effects:

[0105] 1. According to the change data of hazardous sources between different dates, the change amount of hazardous sources of different enterprises within the park and the change amount of hazardous sources in the park are determined, so as to realize the assessment of the severity of changes in hazardous sources in the park from the change data of hazardous sources, and also lay the foundation for the dynamic adjustment of the change cycle of differentiated inspection routes according to the differences in the severity of changes, thus ensuring the inspection and processing efficiency of the park with more drastic changes in hazardous sources.

[0106] 2. The change cycle of the park's inspection routes is determined based on the distribution data of different hazardous sources in the park, the changes in the park's parameters and the changes in the park's hazardous sources. This not only takes into account the changes in the parameters of different hazardous sources, but also takes into account the changes in the number of hazardous sources in the park and the distribution density of hazardous sources, thereby achieving dynamic adjustment of the change cycle of the park's inspection routes.

[0107] 3. Inspection routes are determined based on the number of different types of hazardous sources in different enterprises and monitoring parameters, so that the inspection priorities of enterprises can be differentiated according to the changes in the number and parameters of hazardous sources, ensuring the inspection priority of hazardous sources with more drastic changes and enterprises with a large number of hazardous sources, thereby improving the timeliness and reliability of the handling of hazardous sources in industrial parks.

[0108] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0109] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0110] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.

Claims

1. An industrial park inspection management method, characterized in that: Specifically include: Determine different types of hazardous sources for different enterprises within the park based on the Internet of Things monitoring equipment, and determine the change amount of hazardous sources for different enterprises within the park and the change amount of hazardous sources in the park according to the change data of hazardous sources between different dates; The monitoring parameters of different types of hazardous sources of different enterprises in the park are obtained through the Internet of Things monitoring equipment, and the parameter changes of different hazardous sources are determined according to the change data of the monitoring parameters of different hazardous sources and the change data of different risk intervals, and the park parameter change of the park is determined according to the parameter change of different hazardous sources; Obtaining distribution data of different danger sources of the park, and determining a change period of the inspection route of the park in combination with the change amount of the park parameters and the change amount of the danger sources of the park; Taking the change cycle as a constraint condition, the inspection route is determined based on the number of different types of hazardous sources in different enterprises and monitoring parameters; The method for determining the change amount of the park hazard source of the park is: Determine the enterprises with changing hazardous sources and enterprises with stable hazardous sources according to the hazardous source changes of different enterprises in the park; Determine the comprehensive change amount of the hazardous source changing enterprises in the park by the hazardous source change amount and number of the hazardous source changing enterprises in the park, and determine the comprehensive change amount of the hazardous source stable enterprises in the park by the hazardous source change amount and number of the hazardous source stable enterprises in the park; Based on the proportion of the number of hazardous sources of the hazardous source-changing enterprises and the proportion of the number of hazardous sources of the hazardous source-stable enterprises in the park, determine the weight value of the comprehensive change amount of the hazardous source-changing enterprises in the park and the weight value of the comprehensive change amount of the hazardous source-stable enterprises, and determine the park hazardous source change amount of the park in combination with the comprehensive change amount of the hazardous source-changing enterprises and the comprehensive change amount of the hazardous source-stable enterprises in the park; The method for determining the variation of the park parameters of the park is as follows: Determine the variable hazardous sources among the hazardous sources according to the parameter changes of the hazardous sources of different enterprises. When the number of the variable hazardous sources is greater than the limit value of the number of hazardous sources, determine the comprehensive parameter changes of the hazardous sources by the number of the variable hazardous sources and the parameter changes, the average value of the parameter changes of the hazardous sources and the number of hazardous sources. Determine the park parameter changes of the park by the comprehensive parameter changes of the hazardous sources. When the number of the changing hazardous sources is not greater than the hazardous source quantity limit value, the enterprise parameter changes of different enterprises are determined based on the parameter changes of the hazardous sources of different enterprises and the number of hazardous sources; when there is no enterprise whose enterprise parameter change is greater than the enterprise change threshold, the park parameter change of the park is determined by the comprehensive parameter change of the hazardous sources; When there are enterprises whose enterprise parameter changes are greater than the enterprise change threshold, and when the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold is greater than the preset number of enterprises, the park parameter change of the park is determined by the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold; When the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold is not greater than the preset number of enterprises, determining the enterprise comprehensive change of the enterprise based on the number of enterprises whose enterprise parameter changes are greater than the enterprise change threshold, the number of enterprises, and the enterprise parameter changes of different enterprises; Determine the park parameter change amount of the park based on the comprehensive parameter change amount of the hazard source and the enterprise comprehensive change amount of the enterprise; The method for determining the change period of the inspection route of the park is: Determine the number of hazardous sources in different divided areas based on the distribution data of different hazardous sources in the park, and determine the concentration of hazardous sources in the park in combination with the number of divided areas where the number of hazardous sources is greater than a preset threshold value of the number of hazardous sources; The change period of the inspection route of the park is determined by the concentration of the hazard sources, the change amount of the park parameters of the park and the change amount of the hazard sources in the park.

2. The industrial park inspection management method according to claim 1, characterized in that: The Internet of Things monitoring equipment includes a monitoring device, a smoke sensing device and a power consumption monitoring device.

3. The industrial park inspection management method according to claim 1, characterized in that: The change data of the hazard sources include quantity change values ​​of different types of hazard sources.

4. The industrial park inspection management method according to claim 1, characterized in that: The method for determining the change in the risk source of the enterprise is: Determining the change value of the number of hazardous sources of the enterprise between different dates through the change data of hazardous sources between different dates, and determining the change date of the enterprise based on the change value; Determine the daily hazard source change amount of the enterprise according to the change value of the change date of the enterprise and the date quantity ratio of the change date; Determine the change period of the enterprise on different dates based on the change value of the number of hazardous sources between different adjacent time periods on different dates, and determine the change amount of hazardous sources within the day on different dates according to the number of change periods and the change value of the number of hazardous sources between different change periods and adjacent time periods; The change in hazard sources of the enterprise is determined by the change in hazard sources within days of different dates and the change in hazard sources between days of the enterprise.

5. The industrial park inspection management method according to claim 4, characterized in that: The daily hazard source change is determined based on the product of the average value of the change value of the enterprise's change date and the date proportion of the change date.

6. The industrial park inspection management method according to claim 1, characterized in that: The monitoring parameters of the hazard source are determined according to the type of the hazard source. Specifically, the hazard parameters of the hazard source are determined according to the type of the hazard source, and the hazard parameters are used as the monitoring parameters of the hazard source.

7. The industrial park inspection management method according to claim 1, characterized in that: The risk interval is divided according to the monitoring parameters of the hazard source, and specifically the risk interval is divided into a high-risk interval, a dangerous risk interval and a safe interval.

8. A computer system comprising: A memory and a processor that are communicatively connected, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, an industrial park inspection management method as described in any one of claims 1-7 is executed.

Citation Information

Patent Citations

  • Park security and protection method and equipment

    CN113848890A

  • Petrochemical enterprise risk environmental management system

    CN106447150A

  • A danger source identification and management system

    CN109726207A

  • Chemical industry park big data analysis platform

    CN109799799A

  • Construction method of regional security risk superposition operation model and modeling system

    CN113361070A